DOKUMEN PENYESUAIAN RENCANA K3LL (BRIDGING

DOCUMENT)
PT PERTAMINA EP & PT PERTAMINA DRILLING SERVICES
INDONESIA
Tanggal :12 Agustus 2019 Revisi :

PT PDSI PT PERTAMINA EP

PIMPINAN PERUSAHAAN GM. Asset 5


Muhammad Irwan Andri Haribowo

POJECT MANAGER Drilling Supervisor


Slamet Nurhadi BUNYU : Herman S & Edwin
Firmansyah Arifin SEMBAKUNG : Syaiful Anam
SANGATTA : Marjuki
SANGA-SANGA : Syaiful
HSE OFFICER
Anam
Rig#01.2 TANJUNG : Marjuki
Afdal, Yoga, Bagus
Rig#04.3
Hendra, Andriyaldi,
Gifianando HSE PT. PERTAMINA EP
Rig#09.2 BUNYU : Willem K.
Rig Supt Rig Supt
Oki Alfan, I Kadek Angga TARAKAN : Fugi N
Rig#01.2 Rig#01.2
Rig#10.2 TANJUNG : Budiman W
Aktrilianjas Ulfa El Mahmudi
Suriansyah, Rifki, SANGATTA: Supriyadi
Rig#04.3 Rig#04.3
Hendri SANGASANGA : Dani H. C.
Rudi Sanjaya Andi
Rig#11.2
Rig#09.2 Rig#09.2 * Sesuaikan dengan
Alfidi, Usman, Benny
M. Toha Ryan Tony lokasi pekerjaan
Rig#16.2
Rig#10.2 Rig#10.2
Tufan, Donny, Basuki
Suhardiman Ryan Tony
Rig#18.2
Rig#11.2 Rig#11.2
Herdian, Anggoro,
Agusmanjaya Benny Indarayana
Dedi
Rig#16.2 Rig#16.2
Rig#21.2
Setiawan Zulfitra
Reza, Syahrial, Ehsan
Rig#18.2 Rig#18.2
Rig#22.2
Aria Amanda Sareh
Nurul, Lotar, Abdul
Rig#21.2 Rig#21.2
Dodik Prasetyo M. Toha
Rig#22.2 Rig#22.2
Andik Pandi

Struktur organisasi proyek PT PDSI terlampir pada lampiran 3.

Setiap fungsi dalam struktur organisasi memiliki tugas dan tanggung jawab terkait
aspek HSSE sebagai berikut :

Page 19 of 49