RENCANA ANGGARAN BIAYA ( RAB )

#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN PK-PKK

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING -

II SISTEM ALAT SANITASI -

III SISTEM PEMADAM KEBAKARAN -

IV SISTEM TATA UDARA -

TOTAL -
PPN 10 % -
TOTAL -
DIBULATKAN -

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN PK-PKK

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m - 84,100.00 -
- Pipa PVC tipe AW dia 1" m - 27,540.00 -
- Pipa PVC tipe AW dia 3/4" m - 23,360.00 -
- Fitting PVC Tee 90 Ø 1" x 1" bh - 13,300.00 -
- Fitting PVC Tee 90 Ø 1" x ¾" bh - 13,000.00 -
- Fitting PVC Tee 90 Ø ¾" x ¾" bh - 11,600.00 -
- Fitting PVC Elbow 90 Ø 1" bh - 11,900.00 -
- Fitting PVC Elbow 90 Ø ¾" bh - 10,800.00 -
- Fitting PVC Reduser Ø 2"x 1" bh - 19,100.00 -
- Fitting PVC Reduser Ø 1"x ¾" bh - 13,000.00 -
- Gate valve diameter 50 mm Brass bh - 319,500.00 -
- Bak Gate Valve Ukuran 30x30x35 cm unit - 485,360.00 -

2 Air Bekas & Kotor


- Pipa PVC tipe AW dia 4" m - 107,480.00 -
- Pipa PVC tipe AW dia 3" m - 76,820.00 -
- Pipa PVC tipe AW dia 2" m - 44,950.00 -
- Fitting PVC Tee Way 90 Ø 4"x 4" bh - 62,900.00 -
- Fitting PVC Tee Way 45 Ø 4"x 4" bh - 60,600.00 -
- Fitting PVC Tee Way 45 Ø 4"x 2" bh - 48,000.00 -
- Fitting PVC Tee Way 90 Ø 3"x 3" bh - 41,400.00 -
- Fitting PVC Tee Way 90 Ø 3"x 2" bh - 34,200.00 -
- Fitting PVC Elbow 90 Ø 4" bh - 78,600.00 -
- Fitting PVC Elbow 45 Ø 4" bh - 39,900.00 -
- Fitting PVC Elbow 90 Ø 3" bh - 48,900.00 -
- Fitting PVC Elbow 90 Ø 2" bh - 20,300.00 -
- Fitting PVC Dop Ø 4" bh - 41,400.00 -
- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit - 492,440.00 -
- Tanki septik kapasitas tiap 3 m³ unit - 5,245,920.00 -
- Sumur Resapan Ø 0,8 m (digali 1 m) unit - 349,590.00 -
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing -

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Bak Cuci Piring Stainless Steel bh - 498,580.00 -


2 Kran leher angsa stainless Type T 30 ARQ 13N ex Toto - setara bh - 533,490.00 -
3 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit - 1,966,920.00 -
4 Urinoir Type U 57M ex Toto - setara unit - 2,982,500.00 -
5 Penyekat urinoir Type A 100 ex Toto - setara bh - 1,508,030.00 -
6 Closet duduk Type CW 660 NJ ex Toto - setara bh - 3,306,640.00 -
7 Kloset jongkok Type CE 6 ex Toto - setara bh - 803,380.00 -
8 Shower Dinding Type TX 465 SM ex Toto - setara bh - 906,100.00 -
9 Shower Spray Type THX 20 NBW ex Toto - setara unit - 211,280.00 -
10 Floor drain stainless Type TX 1BV1 ex Toto - setara bh - 433,240.00 -
11 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh - 242,360.00 -
12 Clean out dia. 80 mm Type HN 58 ex San - Ei - setara bh - 156,640.00 -
13 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh - 263,740.00 -

Sub Total Alat Sanitasi -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN PK-PKK

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh - 2,069,700.00 -
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadam Kebakaran -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN PK-PKK

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan
Exhaust Axial Wall Pan bh - 464,000.00 -
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 40 W, 220 v/50 Hz
Volume Air 840 m3/h, Sound Power 30 dB

2 AC
AC Splite Wall Mounted
11450 Btu/h bh - 8,941,500.00 -
9000 Btu/h bh - 6,770,000.00 -

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot - - -

Sub Total Tata Udara -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN TOWER

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING -

II SISTEM ALAT SANITASI -

III SISTEM PEMADAM KEBAKARAN -

IV SISTEM TATA UDARA -

TOTAL -
PPN 10 % -
TOTAL -
DIBULATKAN -

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN TOWER

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m - 84,100.00 -
- Pipa PVC tipe AW dia 1" m - 27,540.00 -
- Pipa PVC tipe AW dia 3/4" m - 23,360.00 -
- Fitting PVC Tee 90 Ø 1" x 1" bh - 13,300.00 -
- Fitting PVC Tee 90 Ø 1" x ¾" bh - 13,000.00 -
- Fitting PVC Elbow 90 Ø 1" bh - 11,900.00 -
- Fitting PVC Elbow 90 Ø ¾" bh - 10,800.00 -
- Fitting PVC Reduser Ø 2"x 1" bh - 19,100.00 -
- Fitting PVC Reduser Ø 1"x ¾" bh - 13,000.00 -
- Gate valve diameter 50 mm Brass bh - 319,500.00 -
- Bak Gate Valve Ukuran 30x30x35 cm unit - 485,360.00 -

2 Air Bekas & Kotor


- Pipa PVC tipe AW dia 4" m - 107,480.00 -
- Pipa PVC tipe AW dia 3" m - 76,820.00 -
- Pipa PVC tipe AW dia 2" m - 44,950.00 -
- Fitting PVC Tee Way 90 Ø 4"x 4" bh - 62,900.00 -
- Fitting PVC Tee Way 90 Ø 3"x 3" bh - 41,400.00 -
- Fitting PVC Tee Way 90 Ø 3"x 2" bh - 34,200.00 -
- Fitting PVC Elbow 90 Ø 4" bh - 78,600.00 -
- Fitting PVC Elbow 45 Ø 4" bh - 39,900.00 -
- Fitting PVC Elbow 90 Ø 3" bh - 48,900.00 -
- Fitting PVC Elbow 45 Ø 3" bh - 31,300.00 -
- Fitting PVC Elbow 90 Ø 2" bh - 20,300.00 -
- Fitting PVC Reducer Ø 3" - 2" bh - 36,100.00 -
- Fitting PVC Dop Ø 3" bh - 28,600.00 -
- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit - 492,440.00 -
- Tanki septik kapasitas tiap 3 m³ unit - 5,245,920.00 -
- Sumur Resapan Ø 0,8 m (digali 1 m) unit - 349,590.00 -
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing -

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Bak Mandi Fiberglass volume 0,3 m3 bh - 940,140.00 -


2 Closet duduk Type CW 660 NJ ex Toto - setara bh - 3,306,640.00 -
3 Shower Spray Type THX 20 NBW ex Toto - setara unit - 211,280.00 -
4 Floor drain stainless Type TX 1BV1 ex Toto - setara bh - 433,240.00 -
5 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh - 242,360.00 -

Sub Total Alat Sanitasi -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN TOWER

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh - 2,069,700.00 -
Type : Dry Chemical , kap 3 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadam Kebakaran -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
###
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN TOWER

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Exhaust Fan Ceiling bh - 262,890.00 -


Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 V/50 Hz
Volume Air 420 m3/h, Sound power 36 dB

2 AC
AC Splite Wall Mounted
5000 Btu/h bh - 6,625,971.00 -
7000 Btu/h bh - 6,625,971.00 -
9000 Btu/h bh - 6,625,971.00 -
11450 Btu/h bh - 8,775,954.00 -

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot - - -

Sub Total Tata Udara -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MAINTENANCE / WORKSHOP

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING 11,004,185.00

II SISTEM ALAT SANITASI 13,733,420.00

III SISTEM PEMADAM KEBAKARAN 6,146,700.00

IV SISTEM TATA UDARA 19,959,210.00

TOTAL 50,843,515.00
PPN 10 % 5,084,351.50
TOTAL 55,927,866.50
DIBULATKAN 55,928,000.00

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MAINTENANCE / WORKSHOP

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih Toilet
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 22.50 25,280.00 568,800.00
- Pipa PVC tipe AW dia 3/4" m 24.50 21,440.00 525,280.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 8.00 11,900.00 95,200.00
- Fitting PVC Tee 90 Ø ¾" x ¾" bh 2.00 10,700.00 21,400.00
- Fitting PVC Elbow 90 Ø 1" bh 6.00 11,000.00 66,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 11.00 10,000.00 110,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 1.00 11,900.00 11,900.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00

2 Air Bekas & Kotor Toilet


- Pipa PVC tipe AW dia 4" m 4.50 98,670.00 444,015.00
- Pipa PVC tipe AW dia 3" m 23.00 70,520.00 1,621,960.00
- Pipa PVC tipe AW dia 2" m 11.00 41,270.00 453,970.00
- Fitting PVC Tee Way 90 Ø 4"x 2" bh 1.00 49,900.00 49,900.00
- Fitting PVC Tee Way 45 Ø 4"x 2" bh 1.00 46,500.00 46,500.00
- Fitting PVC Tee Way 90 Ø 3"x 2" bh 4.00 31,400.00 125,600.00
- Fitting PVC Elbow 90 Ø 4" bh 1.00 72,200.00 72,200.00
- Fitting PVC Elbow 90 Ø 3" bh 4.00 44,900.00 179,600.00
- Fitting PVC Elbow 90 Ø 2" bh 6.00 18,700.00 112,200.00

- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit 1.00 452,070.00 452,070.00


- Tanki septik kapasitas tiap 3 m³ unit 1.00 4,815,870.00 4,815,870.00
- Sumur Resapan Ø 0,8 m (digali 1 m) unit 1.00 320,930.00 320,930.00
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing 11,004,185.00

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Bak Cuci Piring Stainless Steel bh 1.00 457,710.00 457,710.00


2 Kran leher angsa stainless Type T 30 ARQ 13N ex Toto - setara bh 1.00 489,750.00 489,750.00
3 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit 2.00 1,805,670.00 3,611,340.00
4 Urinoir Type U 57M ex Toto - setara bh 1.00 2,738,000.00 2,738,000.00
5 Closet duduk Type CW 660 NJ ex Toto - setara unit 1.00 3,035,570.00 3,035,570.00
6 Shower Dinding Type TX 465 SM ex Toto - setara bh 1.00 831,820.00 831,820.00
7 Shower Spray Type THX 20 NBW ex Toto - setara unit 1.00 210,270.00 210,270.00
8 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 3.00 397,730.00 1,193,190.00
9 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 1.00 222,490.00 222,490.00
10 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh 4.00 235,820.00 943,280.00

Sub Total Alat Sanitasi 13,733,420.00

Rekapitulasi Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MAINTENANCE / WORKSHOP

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 3.00 2,048,900.00 6,146,700.00
Type : Dry Chemical , Kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadam Kebakaran 6,146,700.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MAINTENANCE / WORKSHOP

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan
Exhaust Axial Wall Fan bh 2.00 426,000.00 852,000.00
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 40 W, 220 v/50 Hz
Volume Air 840 m3/h, Sound power 30 dB

Air Fan
Exhaust Axial Wall Fan bh 2.00 3,022,500.00 6,045,000.00
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 75 W, 220 v/50 Hz
Volume Air 2260 m3/h, Sound power 36 dB

2 AC
AC Splite Wall Mounted
17750 Btu/h bh 1.00 12,440,200.00 12,440,200.00

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot 1.00 622,010.00 622,010.00

Sub Total Tata Udara Bangunan GSE Maintenance 19,959,210.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN GENSET

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING 8,391,245.00

II SISTEM ALAT SANITASI 6,347,510.00

III SISTEM PEMADAM KEBAKARAN 6,146,700.00

IV SISTEM TATA UDARA 31,969,740.00

TOTAL 52,855,195.00
PPN 10 % 5,285,519.50
TOTAL 58,140,714.50
DIBULATKAN 58,141,000.00

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN GENSET

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih Toilet
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 8.50 25,280.00 214,880.00
- Pipa PVC tipe AW dia 3/4" m 7.50 21,440.00 160,800.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 12,200.00 12,200.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 1.00 11,900.00 11,900.00
- Fitting PVC Elbow 90 Ø 1" bh 3.00 11,000.00 33,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 3.00 10,000.00 30,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00

2 Air Bekas & Kotor Toilet


- Pipa PVC tipe AW dia 4" m 5.50 98,670.00 542,685.00
- Pipa PVC tipe AW dia 3" m 4.00 70,520.00 282,080.00
- Pipa PVC tipe AW dia 2" m 2.00 41,270.00 82,540.00
- Fitting PVC Tee Way 90 Ø 4"x 4" bh 2.00 57,800.00 115,600.00
- Fitting PVC Tee Way 90 Ø 3"x 2" bh 2.00 31,400.00 62,800.00
- Fitting PVC Elbow 90 Ø 4" bh 3.00 72,200.00 216,600.00
- Fitting PVC Elbow 45 Ø 4" bh 1.00 38,300.00 38,300.00
- Fitting PVC Elbow 90 Ø 2" bh 2.00 18,700.00 37,400.00
- Fitting PVC Dop Ø 3" bh 1.00 27,000.00 27,000.00
- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit 1.00 452,070.00 452,070.00
- Tanki septik kapasitas tiap 3 m³ unit 1.00 4,815,870.00 4,815,870.00
- Sumur Resapan Ø 0,8 m (digali 1 m) unit 1.00 320,930.00 320,930.00
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing 8,391,245.00

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit 1.00 1,805,670.00 1,805,670.00
2 Urinoir Type U 57M ex Toto - setara unit 1.00 2,738,000.00 2,738,000.00
3 Kloset jongkok Type CE 6 ex Toto - setara bh 1.00 737,530.00 737,530.00
4 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 1.00 397,730.00 397,730.00
5 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 1.00 222,490.00 222,490.00
6 Shower Spray Type THX 20 NBW ex Toto - setara unit 1.00 210,270.00 210,270.00
7 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh 1.00 235,820.00 235,820.00

Sub Total Alat Sanitasi 6,347,510.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN GENSET

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 3.00 2,048,900.00 6,146,700.00
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadam Kebakaran 6,146,700.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN GENSET

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan Toilet


Exhaust Fan Ceiling bh 1.00 298,800.00 298,800.00
Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 v/50 Hz
Volume Air 420 m3/h, Sound power 36 dB

2 AC
AC Splite Wall Mounted
5000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
9000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
21800 Btu/h bh 1.00 17,732,800.00 17,732,800.00

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot 1.00 1,508,140.00 1,508,140.00

Sub Total Tata Udara 31,969,740.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN RUMAH POMPA

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

V SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan
Exhaust Fan Ceiling bh - - -
Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 v/50 Hz
Volume Air 420 m3/h, Sound power 36 dB

2 AC
AC Splite Wall Mounted
11450 Btu/h bh - - -

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot - - -

Sub Total Tata Udara -

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTOR KEAMANAN

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING 11,579,640.00

II SISTEM SANITASI #REF!

III SISTEM PEMADAM KEBAKARAN 4,097,800.00

IV SISTEM TATA UDARA 29,474,175.00

TOTAL #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTOR KEAMANAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 21.00 25,280.00 530,880.00
- Pipa PVC tipe AW dia 3/4" m 18.50 21,440.00 396,640.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 2.00 12,200.00 24,400.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 4.00 11,900.00 47,600.00
- Fitting PVC Elbow 90 Ø 1" bh 6.00 11,000.00 66,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 8.00 10,000.00 80,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 3.00 11,900.00 35,700.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00

2 Air Bekas & Kotor


- Pipa PVC tipe AW dia 4" m 8.50 98,670.00 838,695.00
- Pipa PVC tipe AW dia 3" m 22.00 70,520.00 1,551,440.00
- Pipa PVC tipe AW dia 2" m 17.50 41,270.00 722,225.00
- Fitting PVC Tee Way 45 Ø 4"x 4" bh 1.00 55,600.00 55,600.00
- Fitting PVC Tee Way 90 Ø 4"x 2" bh 1.00 49,900.00 49,900.00
- Fitting PVC Tee Way 90 Ø 3"x 2" bh 5.00 31,400.00 157,000.00
- Fitting PVC Tee Way 90 Ø 2"x 2" bh 1.00 27,900.00 27,900.00
- Fitting PVC Tee Way 45 Ø 2"x 2" bh 1.00 28,300.00 28,300.00
- Fitting PVC Elbow 90 Ø 4" bh 2.00 72,200.00 144,400.00
- Fitting PVC Elbow 90 Ø 3" bh 1.00 44,900.00 44,900.00
- Fitting PVC Elbow 90 Ø 2" bh 6.00 18,700.00 112,200.00
- Fitting PVC Elbow 45 Ø 4" bh 1.00 38,300.00 38,300.00
- Fitting PVC Elbow 45 Ø 2" bh 4.00 23,700.00 94,800.00
- Fitting PVC Reducer Ø 3" - 2" bh 1.00 33,100.00 33,100.00
- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit 1.00 452,070.00 452,070.00
- Tanki septik kapasitas tiap 3 m³ unit 1.00 4,815,870.00 4,815,870.00
- Sumur Resapan Ø 0,8 m (digali 1 m) unit 1.00 320,930.00 320,930.00
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plumbing 11,579,640.00

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Bak mandi fibreglass volume 0,3 m³ unit 1.00 863,070.00 863,070.00


2 Kloset jongkok Type CE 6 ex Toto - setara bh 1.00 737,530.00 737,530.00
3 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit 1.00 1,805,670.00 1,805,670.00
4 Bak Cuci Piring Stainless Steel bh 1.00 457,710.00 457,710.00
5 Kran leher angsa stainless Type T 30 ARQ 13N ex Toto - setara bh 1.00 489,750.00 489,750.00
6 Urinoir Type U 57M ex Toto - setara bh 2.00 2,738,000.00 5,476,000.00
7 Penyekat urinoir Type A 100 ex Toto - setara bh 2.00 1,384,400.00 2,768,800.00
8 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 6.00 397,730.00 2,386,380.00
9 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 2.00 222,490.00 444,980.00
10 Clean out dia. 80 mm Type HN 58 ex San - Ei - setara bh 1.00 #REF! #REF!
11 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh 2.00 235,820.00 471,640.00

Sub Total Alat Sanitasi #REF!

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTOR KEAMANAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 2.00 2,048,900.00 4,097,800.00
Type : Dry Chemical , Kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadam Kebakaran 4,097,800.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTOR KEAMANAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan Toilet


Exhaust Axial Wall Fan bh 3.00 426,000.00 1,278,000.00
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 40 W, 220 v/50 Hz
Volume Air 840 m3/h, Sound power 30 dB

2 AC
AC Splite Wall Mounted
5000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
7000 Btu/h bh 2.00 6,215,000.00 12,430,000.00
11450 Btu/h bh 1.00 8,208,500.00 8,208,500.00

Pengadaan material instalasi :


Pipa refrigerator berisolasi dengan ukuran yang sesuai klem lot 1.00 1,342,675.00 1,342,675.00

Sub Total Tata Udara 29,474,175.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTIN KARYAWAN

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I SISTEM PLAMBING 11,703,140.00

II SISTEM ALAT SANITASI 20,000,580.00

III SISTEM PEMADAM KEBAKARAN 4,097,800.00

IV SISTEM TATA UDARA 1,494,000.00

TOTAL 37,295,520.00
PPN 10 % 3,729,552.00
TOTAL 41,025,072.00
DIBULATKAN 41,025,000.00

Terbilang :
-

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTIN KARYAWAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 18.00 25,280.00 455,040.00
- Pipa PVC tipe AW dia 3/4" m 14.00 21,440.00 300,160.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 12,200.00 12,200.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 9.00 11,900.00 107,100.00
- Fitting PVC Tee 90 Ø ¾" x ¾" bh 1.00 10,700.00 10,700.00
- Fitting PVC Elbow 90 Ø 1" bh 5.00 11,000.00 55,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 13.00 10,000.00 130,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00

2 Air Bekas & Kotor


- Pipa PVC tipe AW dia 4" m 9.00 98,670.00 888,030.00
- Pipa PVC tipe AW dia 3" m 21.00 70,520.00 1,480,920.00
- Pipa PVC tipe AW dia 2" m 19.00 41,270.00 784,130.00
- Fitting PVC Tee Way 90 Ø 4"x 4" bh 2.00 57,800.00 115,600.00
- Fitting PVC Tee Way 90 Ø 3"x 2" bh 6.00 31,400.00 188,400.00
- Fitting PVC Tee Way 90 Ø 2"x 2" bh 5.00 27,900.00 139,500.00
- Fitting PVC Elbow 90 Ø 4" bh 3.00 72,200.00 216,600.00
- Fitting PVC Elbow 90 Ø 3" bh 1.00 44,900.00 44,900.00
- Fitting PVC Elbow 90 Ø 2" bh 12.00 18,700.00 224,400.00
- Fitting PVC Dop Ø 3" bh 1.00 27,000.00 27,000.00
- Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit 1.00 452,070.00 452,070.00
- Tanki septik kapasitas tiap 3 m³ unit 1.00 4,815,870.00 4,815,870.00
- Sumur Resapan Ø 0,8 m (digali 1 m) unit 1.00 320,930.00 320,930.00
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing 11,703,140.00

II PEKERJAAN SANITASI
termasuk accessories dan pemasangan

1 Bak Cuci Piring Stainless Steel bh 3.00 457,710.00 1,373,130.00


2 Kran leher angsa stainless Type T 30 ARQ 13N ex Toto - setara bh 3.00 489,750.00 1,469,250.00
3 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit 5.00 1,805,670.00 9,028,350.00
4 Closet duduk Type CW 660 NJ ex Toto - setara bh 2.00 3,035,570.00 6,071,140.00
5 Shower Spray Type THX 20 NBW ex Toto - setara unit 2.00 210,270.00 420,540.00
6 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 3.00 397,730.00 1,193,190.00
7 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 2.00 222,490.00 444,980.00

Sub Total Alat Sanitasi 20,000,580.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTIN KARYAWAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

III SISTEM PEMADAM KEBAKARAN

1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 2.00 2,048,900.00 4,097,800.00
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm

Sub Total Pemadan Kebakaran 4,097,800.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN KANTIN KARYAWAN

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

IV SISTEM VENTILATING AIR CONDITIONING ( VAC )


Semua pekerjaan termasuk pengadaan dan pemasangan AC biaya
penyetelan dan pengetesan serta comisioning dan transport

1 Air Fan
Exhaust Fan Ceiling bh 5.00 298,800.00 1,494,000.00
Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 v/50 Hz
Volume Air 420 m3/h, Sound power 36 dB

Sub Total Tata Udara 1,494,000.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN RUMAH DINAS TYPE 36

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I PEKERJAAN SISTEM PLAMBING 4,431,995.00

II PEKERJAAN SANITASI 4,754,680.00

TOTAL 9,186,675.00
PPN 10 % 918,667.50
TOTAL 10,105,342.50
DIBULATKAN 10,105,000.00

Terbilang :
# Sepuluh Juta Seratus Enam Belas Ribu Rupiah #

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PENYUSUNAN RANCANGAN TEKNIK TERINCI SISI DARAT BANDAR UDARA BETOAMBARI BAU-BAU
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN RUMAH DINAS TYPE 36

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I SISTEM PLAMBING

1 Air Bersih
-Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
-Pipa PVC tipe AW dia 1" m 6.50 25,280.00 164,320.00
-Pipa PVC tipe AW dia 3/4" m 3.00 21,440.00 64,320.00
-Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 22,200.00 22,200.00
-Fitting PVC Elbow 90 Ø 1" bh 3.00 11,000.00 33,000.00
-Fitting PVC Elbow 90 Ø ¾" bh 2.00 10,000.00 20,000.00
-Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
-Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
-Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
-Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00

2 Air Bekas & Kotor


-Pipa PVC tipe AW dia 4" m 4.00 98,670.00 394,680.00
-Pipa PVC tipe AW dia 3" m 3.00 70,520.00 211,560.00
-Pipa PVC tipe AW dia 2" m 0.50 41,270.00 20,635.00
-Fitting PVC Tee Way 90 Ø 4"x 4" bh 1.00 57,800.00 57,800.00
-Fitting PVC Tee Way 90 Ø 3"x 2" bh 1.00 31,400.00 31,400.00
-Fitting PVC Elbow 90 Ø 4" bh 1.00 72,200.00 72,200.00
-Fitting PVC Dop Ø 3" bh 1.00 27,000.00 27,000.00
-Bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm unit 1.00 452,070.00 452,070.00
-Tanki septik kapasitas tiap 1 m³ unit 1.00 1,605,290.00 1,605,290.00
-Sumur Resapan Ø 0,8 m (digali 1 m) unit 1.00 320,930.00 320,930.00
dalam 1 m (digali 1,9 m) kap. 0,5 m³

Sub Total Plambing 4,431,995.00

II PEKERJAAN SANITASI TYPE 36


termasuk accessories dan pemasangan

1 Bak mandi fibreglass volume 0,3 m³ unit 1.00 863,070.00 863,070.00


2 Closet duduk Type CW 660 NJ ex Toto - setara bh 1.00 3,035,570.00 3,035,570.00
3 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 1.00 397,730.00 397,730.00
4 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 1.00 222,490.00 222,490.00
5 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh 1.00 235,820.00 235,820.00

Sub Total Alat Sanitasi 4,754,680.00

Mekanikal Engineer Estimate


RENCANA ANGGARAN BIAYA ( RAB )
#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MENARA AIR

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

I PEKERJAAN MENARA AIR 187,662,744.10

TOTAL 187,662,744.10
PPN 10 % 18,766,274.41
TOTAL 206,429,018.51
DIBULATKAN 206,429,000.00

Terbilang :
# Dua Ratus Enam Juta Empat Ratus Dua Puluh Sembilan Ribu Rupiah #
RENCANA ANGGARAN BIAYA ( RAB )
#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MENARA AIR

Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)

I PEKERJAAN MENARA AIR

1 Pondasi Menara Air


Beton K225 Menara Air m3 2.68 1,031,060.00 2,762,333.47
Beton K225 Pompa Air m3 0.10 1,031,060.00 98,981.76

2 Rangka Menara Air


Besi Siku L 100 x 100 x 10 kg 2,000.06 30,340.00 60,681,680.84
Plate 6 mm untuk Alas Tangki kg 382.00 30,340.00 11,590,006.38
Base Plate 15 mm Pada kolom kg 18.81 30,340.00 570,760.55
Angkur f 12 mm L = 400 mm ( Kolom Beton ) bh 16.00 25,000.00 400,000.00

Pipa GIP 2½" Tangga dan Anak Tangga kg 15.40 86,510.00 1,332,254.00
Base Plate 15 mm Pada Pijakan Tangga kg 6.02 30,340.00 182,643.38
Angkur f 12 mm L = 400 mm ( Pijakan Tangga ) bh 8.00 25,000.00 200,000.00

Cat Rangka Menara Air m2 98.48 100,440.00 9,891,110.23


Hanger Pipa 5 x 3 mm bh 2.00 15,000.00 30,000.00

3 Pipa pada Menara Air :


Pipa Outlet PVC 1¼" m 10.20 33,560.00 342,312.00
Pipa Intlet PVC 1" m 14.35 27,540.00 395,199.00
Pipa Drain PVC ½" m 6.75 18,950.00 127,912.50

4 Accessories Pipa Outlet :


Fitting Elbow PVC 90 1¼" bh 2.00 14,100.00 28,200.00

5 Accessories Pipa Drain :


Fitting Elbow PVC 90 ½" bh 2.00 10,400.00 20,800.00

6 Accessories Pipa Intlet :


Float Valve 1" bh 1.00 445,600.00 445,600.00
Fitting Elbow PVC 90 1" bh 4.00 11,900.00 47,600.00
Buterfly Valve 1" bh 1.00 - -
Sumur Bor unit 1.00 90,000,000.00 90,000,000.00

7 Pompa Hisab Kapasitas : 70 Liter/Menit, Head 30, 1500 Rpm Unit 1.00 8,515,350.00 8,515,350.00
Power 300 Watt / 220 V / 1 Phase / 50 Hz

Sub Total Menara Air 187,662,744.10


ACTION PLAN (RENCANA KERJA

langkah kerja dan percepatan

Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018

I PEKERJAAN PERSIAPAN
1 Bongkar konblock existing 4152.2 m2 0.6976
2 Papan nama proyek 1 Unit 0.0151
3 Pengukuran dan positioning 1 Ls 0.0903
4 Gudang material dan direksi keet 25 m2 0.7376
5 Penerangan dan keselamtan kerja 1.00 Ls 0.1505
6 Pembersihan lokasi 500.00 m2 0.1680
7 Mobilisasi dan demobilisasi 1.00 Ls 0.1505

II PEKERJAAN PAVEMENT
A PEKERJAAN TANAH
1 Pekerjaan gali tanah 4,008.40 m3 7.6659
2 Pekerjaan timbun tanah kembali 1,556.34 m3 0.9920
3 Pekerjaan perbaikan & pemadatan tanah CBR 5% 6,239.60 m2 1.8072
4 Perapihan +Buang sisa kerja + Bongkaran 1.00 Ls 0.0301

B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 8.0741
2 Laying course pasir t=5cm 312.86 m3 2.3313
3 Konblock K500 Internusa 16.8 5,268.40 m2 27.6903
4 Kanstin 20x20x40 1,660.00 m' 5.9935
5 Separator 40x50x100 1,642.00 m1 27.1904
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.0903

C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 0.4756
2 Pembongkaran dan pemasangan gorong2 5.00 Unit 0.2258
3 Railing sandaran 10.00 m' 0.4516
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.1505

III PEKERJAAN LAINNYA


A PEMBANGUNAN POS SECURITY (2 UNIT)
1 Pekerjaan galian pondasi 10.08 m3 0.0193
2 Pekerjaan pondasi batu kali 1:3 6.48 m3 0.1731
3 Pek. Urugan pasir t=5cm 0.90 m3 0.0067
4 Pekerjaan slof 15/20 0.72 m3 0.1240
5 Pek. Kolom praktis dan balok praktis 1.13 m3 0.1267
6 Pek. Dinding hebel 44.60 m2 0.1997
7 Pek. Plester dan acian 98.87 m2 0.2690
8 Pek pengecatan dan vinilex 98.87 m2 0.0758
9 Pek. Baja ringan 39.58 m2 0.3218

Page 30 of 37
ACTION PLAN (RENCANA KERJA

langkah kerja dan percepatan

Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018

10 Pek atap genteng 39.58 m2 0.2205


11 Pek. Plafon gypsum 18.00 m2 0.0556
12 Pek. Pintu aluminium 2.00 Unit 0.2108
13 Pek. Jendela aluminium (1x1.25m) 4.00 Unit 0.2258
14 Pek. Jendela aluminium (1x0.3m) 2.00 Unit 0.0271
15 Pek. Jedela aluminium siku 2.00 Unit 0.1505
16 Pek lantai keramik 18.00 m2 0.0877
17 Pek. Meja finisihing keramik 0.60 m3 0.0994
18 Pek. Motif bata 9.66 m2 0.0471
19 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.0452

B BOX CULVERT TYPE .1 (Panjang 6m)


1 Galian tanah 9.60 m3 0.0184
2 Sirtu t.25cm 6.00 m3 0.0531
3 Pasir urug t.10cm 2.40 m3 0.0179
4 LC tebal 5cm 1.20 m3 0.0353
5 Beton bertulang (K350) 19.28 m3 2.2842
6 Railing sandaran 14.00 m1 0.6323
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.0301

C BOX CULVERT TYPE .2 (Panjang 4m)


1 Galian tanah 6.40 m3 0.0122
2 Sirtu t.25cm 4.00 m3 0.0354
3 Pasir urug t.10cm 1.60 m3 0.0119
4 LC Tebal 5cm 0.80 m3 0.0235
5 Beton bertulang (K350) 13.17 m3 1.5603
6 Railing sandaran 10.00 m1 0.4516
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.0301

D KELENGKAPAN JALAN DAN PENUNJANG


1 Pengadaan dan pemasangan portal pipa besi 2.00 Unit 0.2409
2 Perbaikan gerbang lama (Pintu Kutek) 1.00 Unit 0.2409
Pembuatan gerbang baru 3.55 m t=2.75 wiremes
3 1.00 Unit 0.1323
kuning
4 LPJU 30 WATT LED solar panel 42.00 Unit 6.3226
5 Speed bumb karet 100x34x5 10.00 m 0.2032

Tembusan : Jakarta, 27 Maret 2018


- Konsultan Pengawas LEMTEK UI Dibuat Oleh :
- DPPF UI Kontraktor Pelaksana
PT. TIMBANG CIPTA LAKSANA

Page 31 of 37
ACTION PLAN (RENCANA KERJA

langkah kerja dan percepatan

Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018

DALAN MARTUA SITOHANG, ST


Project Manager

Page 32 of 37
JADUAL WAKTU PELAKSANAAN (KURVA "S" & BARCHAT)

PEMBANGUNAN BIKER OUTER RING ROAD


(BORR) UTARA KAMPUS UI DEPOK

UNIVERSITAS INDONESIA

TAHUN ANGGARAN 2017

Jangka Waktu Pelaksanaan = 60 (Enam Puluh) Hari Kalender


Minggu Ke :
1 2 3 4 5 6 7 8 9
No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah Bobot (%) KET.
Hari Ke :
(29 Jan - 04 Feb) (05 - 11) Feb (12 - 18) Feb (19 - 25) Feb (26 Feb - 04 Mar) (05 - 11) Mar (12 - 18) Mar (19 - 25) Mar (26 - 29) Mar
2018 2018 2018 2018 2018 2018 2018 2018 2018

I PEKERJAAN PERSIAPAN Rp 66,747,526.00


100
1 Bongkar konblock existing 4152.2 m2 Rp 5,580 Rp 23,169,276.00 0.6976 0.2325 0.2325 0.2325
2 Papan nama proyek 1 Unit Rp 500,000 Rp 500,000.00 0.0151 0.0151
3 Pengukuran dan positioning 1 Ls Rp 3,000,000 Rp 3,000,000.00 0.0903 0.0113 0.0113 0.0113 0.0113 0.0113 0.0113 0.0113 0.0113
4 Gudang material dan direksi keet 25 m2 Rp 979,930 Rp 24,498,250.00 0.7376 0.3688 0.3688
5 Penerangan dan keselamtan kerja 1.00 Ls Rp 5,000,000 Rp 5,000,000.00 0.1505 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167
6 Pembersihan lokasi 500.00 m2 Rp 11,160 Rp 5,580,000.00 0.1680 0.0187 0.0187 0.0187 0.0187 0.0187 0.0187 0.0187 0.0187 0.0187
7 Mobilisasi dan demobilisasi 1.00 Ls Rp 5,000,000 Rp 5,000,000.00 0.1505 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167 0.0167
90
II PEKERJAAN PAVEMENT Rp 2,762,357,993.40
A PEKERJAAN TANAH
1 Pekerjaan gali tanah 4,008.40 m3 Rp 63,520 Rp 254,613,568.00 7.6659 0.4791 1.9165 2.3956 2.8747
2 Pekerjaan timbun tanah kembali 1,556.34 m3 Rp 21,170 Rp 32,947,717.80 0.9920 0.3307 0.4960 0.1653
3 Pekerjaan perbaikan & pemadatan tanah CBR 5% 6,239.60 m2 Rp 9,620 Rp 60,024,952.00 1.8072 0.6024 0.6024 0.6024
4 Perapihan +Buang sisa kerja + Bongkaran 1.00 Ls Rp 1,000,000 Rp 1,000,000.00 0.0301 0.0060 0.0060 0.0060 0.0060 0.0060

80
B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 Rp 285,720 Rp 268,171,077.60 8.0741 2.0185 2.0185 2.0185 2.0185
2 Laying course pasir t=5cm 312.86 m3 Rp 247,500 Rp 77,432,850.00 2.3313 1.1657 1.1657
3 Konblock K500 Internusa 16.8 5,268.40 m2 Rp 174,570 Rp 919,704,588.00 27.6903 9.2301 9.2301 9.2301
4 Kanstin 20x20x40 1,660.00 m' Rp 119,920 Rp 199,067,200.00 5.9935 1.4984 1.4984 1.4984 1.4984
5 Separator 40x50x100 1,642.00 m1 Rp 550,000 Rp 903,100,000.00 27.1904 3.3988 6.7976 8.4970 8.4970
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 3,000,000 Rp 3,000,000.00 0.0903 0.0226 0.0226 0.0226 0.0226
70
C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 Rp 9,620 Rp 15,796,040.00 0.4756 0.4756
2 Pembongkaran dan pemasangan gorong2 5.00 Unit Rp 1,500,000 Rp 7,500,000.00 0.2258 0.0753 0.0753 0.0753
3 Railing sandaran 10.00 m' Rp 1,500,000 Rp 15,000,000.00 0.4516 0.4516
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 5,000,000 Rp 5,000,000.00 0.1505 0.0376 0.0376 0.0376 0.0376

III PEKERJAAN LAINNYA Rp 492,287,302.20


A PEMBANGUNAN POS SECURITY (2 UNIT) 60
1 Pekerjaan galian pondasi 10.08 m3 Rp 63,520 Rp 640,281.60 0.0193 0.0193
2 Pekerjaan pondasi batu kali 1:3 6.48 m3 Rp 887,280 Rp 5,749,574.40 0.1731 0.1731
3 Pek. Urugan pasir t=5cm 0.90 m3 Rp 247,500 Rp 222,750.00 0.0067 0.0067
4 Pekerjaan slof 15/20 0.72 m3 Rp 5,722,330 Rp 4,120,077.60 0.1240 0.1240
5 Pek. Kolom praktis dan balok praktis 1.13 m3 Rp 3,723,070 Rp 4,207,069.10 0.1267 0.1267
6 Pek. Dinding hebel 44.60 m2 Rp 148,730 Rp 6,633,358.00 0.1997 0.1997
7 Pek. Plester dan acian 98.87 m2 Rp 90,380 Rp 8,935,870.60 0.2690 0.2690
50
8 Pek pengecatan dan vinilex 98.87 m2 Rp 25,450 Rp 2,516,241.50 0.0758 0.0758
9 Pek. Baja ringan 39.58 m2 Rp 270,000 Rp 10,686,600.00 0.3218 0.3218
10 Pek atap genteng 39.58 m2 Rp 185,000 Rp 7,322,300.00 0.2205 0.2205
11 Pek. Plafon gypsum 18.00 m2 Rp 102,580 Rp 1,846,440.00 0.0556 0.0556
12 Pek. Pintu aluminium 2.00 Unit Rp 3,500,000 Rp 7,000,000.00 0.2108 0.2108
13 Pek. Jendela aluminium (1x1.25m) 4.00 Unit Rp 1,875,000 Rp 7,500,000.00 0.2258 0.2258
14 Pek. Jendela aluminium (1x0.3m) 2.00 Unit Rp 450,000 Rp 900,000.00 0.0271 0.0271
15 Pek. Jedela aluminium siku 2.00 Unit Rp 2,500,000 Rp 5,000,000.00 0.1505 0.1505 40
16 Pek lantai keramik 18.00 m2 Rp 161,790 Rp 2,912,220.00 0.0877 0.0877
17 Pek. Meja finisihing keramik 0.60 m3 Rp 5,500,000 Rp 3,300,000.00 0.0994 0.0994
18 Pek. Motif bata 9.66 m2 Rp 161,790 Rp 1,562,891.40 0.0471 0.0471
19 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,500,000 Rp 1,500,000.00 0.0452 0.0452

B BOX CULVERT TYPE .1 (Panjang 6m)


1 Galian tanah 9.60 m3 Rp 63,520 Rp 609,792.00 0.0184 0.0184
30
2 Sirtu t.25cm 6.00 m3 Rp 294,110 Rp 1,764,660.00 0.0531 0.0531
3 Pasir urug t.10cm 2.40 m3 Rp 247,500 Rp 594,000.00 0.0179 0.0179
4 LC tebal 5cm 1.20 m3 Rp 976,140 Rp 1,171,368.00 0.0353 0.0353
5 Beton bertulang (K350) 19.28 m3 Rp 3,934,940 Rp 75,865,643.20 2.2842 2.2842
6 Railing sandaran 14.00 m1 Rp 1,500,000 Rp 21,000,000.00 0.6323 0.6323
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,000,000 Rp 1,000,000.00 0.0301 0.0301

C BOX CULVERT TYPE .2 (Panjang 4m) 20


1 Galian tanah 6.40 m3 Rp 63,520 Rp 406,528.00 0.0122 0.0122
2 Sirtu t.25cm 4.00 m3 Rp 294,110 Rp 1,176,440.00 0.0354 0.0354
3 Pasir urug t.10cm 1.60 m3 Rp 247,500 Rp 396,000.00 0.0119 0.0119
4 LC Tebal 5cm 0.80 m3 Rp 976,140 Rp 780,912.00 0.0235 0.0235
5 Beton bertulang (K350) 13.17 m3 Rp 3,934,940 Rp 51,823,159.80 1.5603 1.5603
6 Railing sandaran 10.00 m1 Rp 1,500,000 Rp 15,000,000.00 0.4516 0.4516
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,000,000 Rp 1,000,000.00 0.0301 0.0301
10
D KELENGKAPAN JALAN DAN PENUNJANG
1 Pengadaan dan pemasangan portal pipa besi 2.00 Unit Rp 4,000,000 Rp 8,000,000.00 0.2409 0.1204 0.1204
2 Perbaikan gerbang lama (Pintu Kutek) 1.00 Unit Rp 8,000,000 Rp 8,000,000.00 0.2409 0.1204 0.1204
3 Pembuatan gerbang baru 3.55 m t=2.75 wiremes kuning 1.00 Unit Rp 4,393,125 Rp 4,393,125.00 0.1323 0.0661 0.0661
4 LPJU 30 WATT LED solar panel 42.00 Unit Rp 5,000,000 Rp 210,000,000.00 6.3226 1.5807 1.5807 1.5807 1.5807
5 Speed bumb karet 100x34x5 10.00 m Rp 675,000 Rp 6,750,000.00 0.2032 0.2032

0
JUMLAH Rp 3,321,392,822 100.00
RENCANA KEMAJUAN PEKERJAAN PERMINGGU 0.6798 0.9391 1.3314 5.4529 17.0900 18.7651 23.3005 21.4460 10.9953
KOMULATIF RENCANA KEMAJUAN PEKERJAAN PERMINGGU - 0.6798 1.6189 2.9502 8.4031 25.4931 44.2582 67.5587 89.0047 100.0000
REALISASI KEMAJUAN PEKERJAAN PERMINGGU
KOMULATIF REALISASI KEMAJUAN PEKERJAAN PERMINGGU
DEVIASI

Jakarta, 29 Januari 2018


Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :
Pengawas D1 Konsultan Pengawas Kontraktor Pelaksana
DIREKTORAT PENGELOLAN DAN PEMELIHARAAN LEMBAGA TEKNIK UI PT. TIMBANG CIPTA LAKSANA
FASILITAS UI

SARIFUDIN Ir. DJAINI DALAN MARTUA SITOHANG, ST


NIP. 196704181990031003 Team Leader Project Manager
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK

UNIVERSITAS INDONESIA

TAHUN ANGGARAN 2017


JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER

No Uraian Pekerjaan Harga Satuan Jumlah

I PEKERJAAN PERSIAPAN Rp 66,747,526.00 Rp 66,747,526.00

II PEKERJAAN PAVEMENT Rp 2,762,357,993.40


A PEKERJAAN TANAH Rp 348,586,238

B PEKERJAAN PAVEMENT Rp 2,370,475,716

C PEKERJAAN DARINASE Rp 43,296,040

III PEKERJAAN LAINNYA Rp 492,287,302.20


A PEMBANGUNAN POS SECURITY (2 UNIT) Rp 82,555,674

B BOX CULVERT TYPE .1 (Panjang 6m) Rp 102,005,463

C BOX CULVERT TYPE .2 (Panjang 4m) Rp 70,583,040

D KELENGKAPAN JALAN DAN PENUNJANG Rp 237,143,125

Sub Total Rp 3,321,392,822


PPN 10% Rp 332,139,282
TOTAL Rp 3,653,532,104

Jakarta, 8 Desember2017
PT. Timbang Cipta Laksana

Marihot Gultom
Direktur
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK

UNIVERSITAS INDONESIA

TAHUN ANGGARAN 2017


JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER

No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah

I PEKERJAAN PERSIAPAN Rp 66,747,526.00


1 Bongkar konblock existing 4152.2 m2 Rp 5,580 Rp 23,169,276.00
2 Papan nama proyek 1 Unit Rp 500,000 Rp 500,000.00
3 Pengukuran dan positioning 1 Ls Rp 3,000,000 Rp 3,000,000.00
4 Gudang material dan direksi keet 25 m2 Rp 979,930 Rp 24,498,250.00
5 Penerangan dan keselamtan kerja 1.00 Ls Rp 5,000,000 Rp 5,000,000.00
6 Pembersihan lokasi 500.00 m2 Rp 11,160 Rp 5,580,000.00
7 Mobilisasi dan demobilisasi 1.00 Ls Rp 5,000,000 Rp 5,000,000.00

II PEKERJAAN PAVEMENT Rp 2,762,357,993.40


A PEKERJAAN TANAH
1 Pekerjaan gali tanah 4,008.40 m3 Rp 63,520 Rp 254,613,568.00
2 Pekerjaan timbun tanah kembali 1,556.34 m3 Rp 21,170 Rp 32,947,717.80
3 Pekerjaan perbaikan & pemadatan tanah CBR 5% 6,239.60 m2 Rp 9,620 Rp 60,024,952.00
4 Perapihan +Buang sisa kerja + Bongkaran 1.00 m1 Rp 1,000,000 Rp 1,000,000.00

B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 Rp 285,720 Rp 268,171,077.60
2 Laying course pasir t=5cm 312.86 m3 Rp 247,500 Rp 77,432,850.00
3 Konblock K500 Internusa 16.8 5,268.40 m2 Rp 174,570 Rp 919,704,588.00
4 Kanstin 20x20x40 1,660.00 m1 Rp 119,920 Rp 199,067,200.00
5 Separator 40x50x100 1,642.00 m1 Rp 550,000 Rp 903,100,000.00
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 3,000,000 Rp 3,000,000.00

C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 Rp 9,620 Rp 15,796,040.00
2 Pembongkaran dan pemasangan gorong2 5.00 Unit Rp 1,500,000 Rp 7,500,000.00
3 Railing sandaran 10.00 m1 Rp 1,500,000 Rp 15,000,000.00
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 5,000,000 Rp 5,000,000.00

III PEKERJAAN LAINNYA Rp 492,287,302.20


A PEMBANGUNAN POS SECURITY (2 UNIT)
1 Pekerjaan galian pondasi 10.08 m3 Rp 63,520 Rp 640,281.60
2 Pekerjaan pondasi batu kali 1:3 6.48 m3 Rp 887,280 Rp 5,749,574.40
3 Pek. Urugan pasir t=5cm 0.90 m3 Rp 247,500 Rp 222,750.00
4 Pekerjaan slof 15/20 0.72 m3 Rp 5,722,330 Rp 4,120,077.60
5 Pek. Kolom praktis dan balok praktis 1.13 m3 Rp 3,723,070 Rp 4,207,069.10
6 Pek. Dinding hebel 44.60 m2 Rp 148,730 Rp 6,633,358.00
7 Pek. Plester dan acian 98.87 m2 Rp 90,380 Rp 8,935,870.60
8 Pek pengecatan dan vinilex 98.87 m2 Rp 25,450 Rp 2,516,241.50
9 Pek. Baja ringan 39.58 m2 Rp 270,000 Rp 10,686,600.00
10 Pek atap genteng 39.58 m2 Rp 185,000 Rp 7,322,300.00
11 Pek. Plafon gypsum 18.00 m2 Rp 102,580 Rp 1,846,440.00
12 Pek. Pintu aluminium 2.00 Unit Rp 3,500,000 Rp 7,000,000.00
13 Pek. Jendela aluminium (1x1.25m) 4.00 Unit Rp 1,875,000 Rp 7,500,000.00
14 Pek. Jendela aluminium (1x0.3m) 2.00 Unit Rp 450,000 Rp 900,000.00
15 Pek. Jedela aluminium siku 2.00 Unit Rp 2,500,000 Rp 5,000,000.00
16 Pek lantai keramik 18.00 m2 Rp 161,790 Rp 2,912,220.00
17 Pek. Meja finisihing keramik 0.60 m3 Rp 5,500,000 Rp 3,300,000.00
18 Pek. Motif bata 9.66 m2 Rp 161,790 Rp 1,562,891.40
19 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,500,000 Rp 1,500,000.00

B BOX CULVERT TYPE .1 (Panjang 6m)


1 Galian tanah 9.60 m3 Rp 63,520 Rp 609,792.00
2 Sirtu t.25cm 6.00 m3 Rp 294,110 Rp 1,764,660.00
3 Pasir urug t.10cm 2.40 m3 Rp 247,500 Rp 594,000.00
4 LC tebal 5cm 1.20 m3 Rp 976,140 Rp 1,171,368.00
5 Beton bertulang (K350) 19.28 m3 Rp 3,934,940 Rp 75,865,643.20
6 Railing sandaran 14.00 m1 Rp 1,500,000 Rp 21,000,000.00
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,000,000 Rp 1,000,000.00

C BOX CULVERT TYPE .2 (Panjang 4m)


1 Galian tanah 6.40 m3 Rp 63,520 Rp 406,528.00
2 Sirtu t.25cm 4.00 m3 Rp 294,110 Rp 1,176,440.00
3 Pasir urug t.10cm 1.60 m3 Rp 247,500 Rp 396,000.00
4 LC Tebal 5cm 0.80 m3 Rp 976,140 Rp 780,912.00
5 Beton bertulang (K350) 13.17 m3 Rp 3,934,940 Rp 51,823,159.80
6 Railing sandaran 10.00 m1 Rp 1,500,000 Rp 15,000,000.00
7 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 1,000,000 Rp 1,000,000.00
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK

UNIVERSITAS INDONESIA

TAHUN ANGGARAN 2017


JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER

No Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah


D KELENGKAPAN JALAN DAN PENUNJANG
1 Pengadaan dan pemasangan portal pipa besi 2.00 Unit Rp 4,000,000 Rp 8,000,000.00
2 Perbaikan gerbang lama (Pintu Kutek) 1.00 Unit Rp 8,000,000 Rp 8,000,000.00
3 Pembuatan gerbang baru 3.55m t=2.75wiremes kuning 1.00 Unit Rp 4,393,125 Rp 4,393,125.00
4 LPJU 30 WATT LED solar panel 42.00 Unit Rp 5,000,000 Rp 210,000,000.00
5 Speed bumb karet 100x34x5 10.00 m Rp 675,000 Rp 6,750,000.00

Sub Total Rp 3,321,392,822


PPN 10% Rp 332,139,282
TOTAL Rp 3,653,532,104

Jakarta, 8 Desember2017
PT. Timbang Cipta Laksana

Marihot Gultom
Direktur
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK

UNIVERSITAS INDONESIA

TAHUN ANGGARAN 2017


JANGKA WAKTU PELAKSANAAN 60 HARI KALENDER
No Uraian Pekerjaan Harga Satuan

I PEKERJAAN PERSIAPAN Rp 66,747,526.00

II PEKERJAAN PAVEMENT
A PEKERJAAN TANAH Rp 348,586,238

B PEKERJAAN PAVEMENT Rp 2,370,475,716

C PEKERJAAN DARINASE Rp 43,296,040

III PEKERJAAN LAINNYA


A PEMBANGUNAN POS SECURITY (2 UNIT) Rp 82,555,674

B BOX CULVERT TYPE .1 (Panjang 6m) Rp 102,005,463

C BOX CULVERT TYPE .2 (Panjang 4m) Rp 70,583,040

D KELENGKAPAN JALAN DAN PENUNJANG Rp 237,143,125

Rp 3,321,392,821.60