#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN PK-PKK
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
I SISTEM PLAMBING -
TOTAL -
PPN 10 % -
TOTAL -
DIBULATKAN -
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m - 84,100.00 -
- Pipa PVC tipe AW dia 1" m - 27,540.00 -
- Pipa PVC tipe AW dia 3/4" m - 23,360.00 -
- Fitting PVC Tee 90 Ø 1" x 1" bh - 13,300.00 -
- Fitting PVC Tee 90 Ø 1" x ¾" bh - 13,000.00 -
- Fitting PVC Tee 90 Ø ¾" x ¾" bh - 11,600.00 -
- Fitting PVC Elbow 90 Ø 1" bh - 11,900.00 -
- Fitting PVC Elbow 90 Ø ¾" bh - 10,800.00 -
- Fitting PVC Reduser Ø 2"x 1" bh - 19,100.00 -
- Fitting PVC Reduser Ø 1"x ¾" bh - 13,000.00 -
- Gate valve diameter 50 mm Brass bh - 319,500.00 -
- Bak Gate Valve Ukuran 30x30x35 cm unit - 485,360.00 -
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh - 2,069,700.00 -
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Air Fan
Exhaust Axial Wall Pan bh - 464,000.00 -
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 40 W, 220 v/50 Hz
Volume Air 840 m3/h, Sound Power 30 dB
2 AC
AC Splite Wall Mounted
11450 Btu/h bh - 8,941,500.00 -
9000 Btu/h bh - 6,770,000.00 -
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
I SISTEM PLAMBING -
TOTAL -
PPN 10 % -
TOTAL -
DIBULATKAN -
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m - 84,100.00 -
- Pipa PVC tipe AW dia 1" m - 27,540.00 -
- Pipa PVC tipe AW dia 3/4" m - 23,360.00 -
- Fitting PVC Tee 90 Ø 1" x 1" bh - 13,300.00 -
- Fitting PVC Tee 90 Ø 1" x ¾" bh - 13,000.00 -
- Fitting PVC Elbow 90 Ø 1" bh - 11,900.00 -
- Fitting PVC Elbow 90 Ø ¾" bh - 10,800.00 -
- Fitting PVC Reduser Ø 2"x 1" bh - 19,100.00 -
- Fitting PVC Reduser Ø 1"x ¾" bh - 13,000.00 -
- Gate valve diameter 50 mm Brass bh - 319,500.00 -
- Bak Gate Valve Ukuran 30x30x35 cm unit - 485,360.00 -
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh - 2,069,700.00 -
Type : Dry Chemical , kap 3 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
2 AC
AC Splite Wall Mounted
5000 Btu/h bh - 6,625,971.00 -
7000 Btu/h bh - 6,625,971.00 -
9000 Btu/h bh - 6,625,971.00 -
11450 Btu/h bh - 8,775,954.00 -
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 50,843,515.00
PPN 10 % 5,084,351.50
TOTAL 55,927,866.50
DIBULATKAN 55,928,000.00
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih Toilet
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 22.50 25,280.00 568,800.00
- Pipa PVC tipe AW dia 3/4" m 24.50 21,440.00 525,280.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 8.00 11,900.00 95,200.00
- Fitting PVC Tee 90 Ø ¾" x ¾" bh 2.00 10,700.00 21,400.00
- Fitting PVC Elbow 90 Ø 1" bh 6.00 11,000.00 66,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 11.00 10,000.00 110,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 1.00 11,900.00 11,900.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 3.00 2,048,900.00 6,146,700.00
Type : Dry Chemical , Kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Air Fan
Exhaust Axial Wall Fan bh 2.00 426,000.00 852,000.00
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 40 W, 220 v/50 Hz
Volume Air 840 m3/h, Sound power 30 dB
Air Fan
Exhaust Axial Wall Fan bh 2.00 3,022,500.00 6,045,000.00
Type : Wall Mounted Fan
Speed 1400 Rpm, Power motor 75 W, 220 v/50 Hz
Volume Air 2260 m3/h, Sound power 36 dB
2 AC
AC Splite Wall Mounted
17750 Btu/h bh 1.00 12,440,200.00 12,440,200.00
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 52,855,195.00
PPN 10 % 5,285,519.50
TOTAL 58,140,714.50
DIBULATKAN 58,141,000.00
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih Toilet
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 8.50 25,280.00 214,880.00
- Pipa PVC tipe AW dia 3/4" m 7.50 21,440.00 160,800.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 12,200.00 12,200.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 1.00 11,900.00 11,900.00
- Fitting PVC Elbow 90 Ø 1" bh 3.00 11,000.00 33,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 3.00 10,000.00 30,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
1 Wastafel lengkap ( Type LW 220 J ) ex Toto - setara unit 1.00 1,805,670.00 1,805,670.00
2 Urinoir Type U 57M ex Toto - setara unit 1.00 2,738,000.00 2,738,000.00
3 Kloset jongkok Type CE 6 ex Toto - setara bh 1.00 737,530.00 737,530.00
4 Floor drain stainless Type TX 1BV1 ex Toto - setara bh 1.00 397,730.00 397,730.00
5 Clean out dia. 100 mm Type HN 58 ex San - Ei - setara bh 1.00 222,490.00 222,490.00
6 Shower Spray Type THX 20 NBW ex Toto - setara unit 1.00 210,270.00 210,270.00
7 Kran dia 3/4" atau 1/2" stainless Type T23 B13 ex Toto - setara bh 1.00 235,820.00 235,820.00
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 3.00 2,048,900.00 6,146,700.00
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
2 AC
AC Splite Wall Mounted
5000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
9000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
21800 Btu/h bh 1.00 17,732,800.00 17,732,800.00
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Air Fan
Exhaust Fan Ceiling bh - - -
Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 v/50 Hz
Volume Air 420 m3/h, Sound power 36 dB
2 AC
AC Splite Wall Mounted
11450 Btu/h bh - - -
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL #REF!
PPN 10 % #REF!
TOTAL #REF!
DIBULATKAN #REF!
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 21.00 25,280.00 530,880.00
- Pipa PVC tipe AW dia 3/4" m 18.50 21,440.00 396,640.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 2.00 12,200.00 24,400.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 4.00 11,900.00 47,600.00
- Fitting PVC Elbow 90 Ø 1" bh 6.00 11,000.00 66,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 8.00 10,000.00 80,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 3.00 11,900.00 35,700.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 2.00 2,048,900.00 4,097,800.00
Type : Dry Chemical , Kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
2 AC
AC Splite Wall Mounted
5000 Btu/h bh 1.00 6,215,000.00 6,215,000.00
7000 Btu/h bh 2.00 6,215,000.00 12,430,000.00
11450 Btu/h bh 1.00 8,208,500.00 8,208,500.00
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 37,295,520.00
PPN 10 % 3,729,552.00
TOTAL 41,025,072.00
DIBULATKAN 41,025,000.00
Terbilang :
-
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih
- Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
- Pipa PVC tipe AW dia 1" m 18.00 25,280.00 455,040.00
- Pipa PVC tipe AW dia 3/4" m 14.00 21,440.00 300,160.00
- Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 12,200.00 12,200.00
- Fitting PVC Tee 90 Ø 1" x ¾" bh 9.00 11,900.00 107,100.00
- Fitting PVC Tee 90 Ø ¾" x ¾" bh 1.00 10,700.00 10,700.00
- Fitting PVC Elbow 90 Ø 1" bh 5.00 11,000.00 55,000.00
- Fitting PVC Elbow 90 Ø ¾" bh 13.00 10,000.00 130,000.00
- Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
- Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
- Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
- Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00
II PEKERJAAN SANITASI
termasuk accessories dan pemasangan
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Hydrant
Alat Pemadam Api Ringan (APAR) bh 2.00 2,048,900.00 4,097,800.00
Type : Dry Chemical , kap 6 Kg ( CO2 ), Dimensi Box 60x30x25 cm
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
1 Air Fan
Exhaust Fan Ceiling bh 5.00 298,800.00 1,494,000.00
Type : Ceiling Mounted Fan
Speed 1250 Rpm, Power motor 30 W, 220 v/50 Hz
Volume Air 420 m3/h, Sound power 36 dB
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 9,186,675.00
PPN 10 % 918,667.50
TOTAL 10,105,342.50
DIBULATKAN 10,105,000.00
Terbilang :
# Sepuluh Juta Seratus Enam Belas Ribu Rupiah #
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
I SISTEM PLAMBING
1 Air Bersih
-Pipa Galvanis dia 2" m 2.00 77,210.00 154,420.00
-Pipa PVC tipe AW dia 1" m 6.50 25,280.00 164,320.00
-Pipa PVC tipe AW dia 3/4" m 3.00 21,440.00 64,320.00
-Fitting PVC Tee 90 Ø 1" x 1" bh 1.00 22,200.00 22,200.00
-Fitting PVC Elbow 90 Ø 1" bh 3.00 11,000.00 33,000.00
-Fitting PVC Elbow 90 Ø ¾" bh 2.00 10,000.00 20,000.00
-Fitting PVC Reduser Ø 2"x 1" bh 1.00 17,500.00 17,500.00
-Fitting PVC Reduser Ø 1"x ¾" bh 2.00 11,900.00 23,800.00
-Gate valve diameter 50 mm Brass bh 1.00 293,300.00 293,300.00
-Bak Gate Valve Ukuran 30x30x35 cm unit 1.00 445,570.00 445,570.00
Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 187,662,744.10
PPN 10 % 18,766,274.41
TOTAL 206,429,018.51
DIBULATKAN 206,429,000.00
Terbilang :
# Dua Ratus Enam Juta Empat Ratus Dua Puluh Sembilan Ribu Rupiah #
RENCANA ANGGARAN BIAYA ( RAB )
#REF!
KEGIATAN : PROGRAM PEMELIHARAAN, REHABILITASI, PENINGKATAN DAN PEMBANGUNAN TRANSPORTASI UDARA
PEKERJAAN : BANGUNAN MENARA AIR
Harga Jumlah
No Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
Pipa GIP 2½" Tangga dan Anak Tangga kg 15.40 86,510.00 1,332,254.00
Base Plate 15 mm Pada Pijakan Tangga kg 6.02 30,340.00 182,643.38
Angkur f 12 mm L = 400 mm ( Pijakan Tangga ) bh 8.00 25,000.00 200,000.00
7 Pompa Hisab Kapasitas : 70 Liter/Menit, Head 30, 1500 Rpm Unit 1.00 8,515,350.00 8,515,350.00
Power 300 Watt / 220 V / 1 Phase / 50 Hz
Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018
I PEKERJAAN PERSIAPAN
1 Bongkar konblock existing 4152.2 m2 0.6976
2 Papan nama proyek 1 Unit 0.0151
3 Pengukuran dan positioning 1 Ls 0.0903
4 Gudang material dan direksi keet 25 m2 0.7376
5 Penerangan dan keselamtan kerja 1.00 Ls 0.1505
6 Pembersihan lokasi 500.00 m2 0.1680
7 Mobilisasi dan demobilisasi 1.00 Ls 0.1505
II PEKERJAAN PAVEMENT
A PEKERJAAN TANAH
1 Pekerjaan gali tanah 4,008.40 m3 7.6659
2 Pekerjaan timbun tanah kembali 1,556.34 m3 0.9920
3 Pekerjaan perbaikan & pemadatan tanah CBR 5% 6,239.60 m2 1.8072
4 Perapihan +Buang sisa kerja + Bongkaran 1.00 Ls 0.0301
B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 8.0741
2 Laying course pasir t=5cm 312.86 m3 2.3313
3 Konblock K500 Internusa 16.8 5,268.40 m2 27.6903
4 Kanstin 20x20x40 1,660.00 m' 5.9935
5 Separator 40x50x100 1,642.00 m1 27.1904
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.0903
C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 0.4756
2 Pembongkaran dan pemasangan gorong2 5.00 Unit 0.2258
3 Railing sandaran 10.00 m' 0.4516
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls 0.1505
Page 30 of 37
ACTION PLAN (RENCANA KERJA
Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018
Page 31 of 37
ACTION PLAN (RENCANA KERJA
Minggu Ke :
1 2 3 4 5 6 7 8 9
Bobot Hari Ke :
No Uraian Pekerjaan Volume Satuan KET.
(%)
(27 April-
(26-29) (30 Mar-05 (06-12 (13-19 (20-26 (04 Mei-10 (11 Mei-17 (18 Mei-24
03 Mei)
Maret 2018 April) 2018 April) 2018 April) 2018 April) 2018 Mei) 2018 Mei) 2018 Mei) 2018
2018
Page 32 of 37
JADUAL WAKTU PELAKSANAAN (KURVA "S" & BARCHAT)
UNIVERSITAS INDONESIA
80
B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 Rp 285,720 Rp 268,171,077.60 8.0741 2.0185 2.0185 2.0185 2.0185
2 Laying course pasir t=5cm 312.86 m3 Rp 247,500 Rp 77,432,850.00 2.3313 1.1657 1.1657
3 Konblock K500 Internusa 16.8 5,268.40 m2 Rp 174,570 Rp 919,704,588.00 27.6903 9.2301 9.2301 9.2301
4 Kanstin 20x20x40 1,660.00 m' Rp 119,920 Rp 199,067,200.00 5.9935 1.4984 1.4984 1.4984 1.4984
5 Separator 40x50x100 1,642.00 m1 Rp 550,000 Rp 903,100,000.00 27.1904 3.3988 6.7976 8.4970 8.4970
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 3,000,000 Rp 3,000,000.00 0.0903 0.0226 0.0226 0.0226 0.0226
70
C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 Rp 9,620 Rp 15,796,040.00 0.4756 0.4756
2 Pembongkaran dan pemasangan gorong2 5.00 Unit Rp 1,500,000 Rp 7,500,000.00 0.2258 0.0753 0.0753 0.0753
3 Railing sandaran 10.00 m' Rp 1,500,000 Rp 15,000,000.00 0.4516 0.4516
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 5,000,000 Rp 5,000,000.00 0.1505 0.0376 0.0376 0.0376 0.0376
0
JUMLAH Rp 3,321,392,822 100.00
RENCANA KEMAJUAN PEKERJAAN PERMINGGU 0.6798 0.9391 1.3314 5.4529 17.0900 18.7651 23.3005 21.4460 10.9953
KOMULATIF RENCANA KEMAJUAN PEKERJAAN PERMINGGU - 0.6798 1.6189 2.9502 8.4031 25.4931 44.2582 67.5587 89.0047 100.0000
REALISASI KEMAJUAN PEKERJAAN PERMINGGU
KOMULATIF REALISASI KEMAJUAN PEKERJAAN PERMINGGU
DEVIASI
UNIVERSITAS INDONESIA
Jakarta, 8 Desember2017
PT. Timbang Cipta Laksana
Marihot Gultom
Direktur
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK
UNIVERSITAS INDONESIA
B PEKERJAAN PAVEMENT
1 Subase Split 2/3 t=15cm 938.58 m3 Rp 285,720 Rp 268,171,077.60
2 Laying course pasir t=5cm 312.86 m3 Rp 247,500 Rp 77,432,850.00
3 Konblock K500 Internusa 16.8 5,268.40 m2 Rp 174,570 Rp 919,704,588.00
4 Kanstin 20x20x40 1,660.00 m1 Rp 119,920 Rp 199,067,200.00
5 Separator 40x50x100 1,642.00 m1 Rp 550,000 Rp 903,100,000.00
6 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 3,000,000 Rp 3,000,000.00
C PEKERJAAN DARINASE
1 Perapihan elevasi tanah samping 1,642.00 m2 Rp 9,620 Rp 15,796,040.00
2 Pembongkaran dan pemasangan gorong2 5.00 Unit Rp 1,500,000 Rp 7,500,000.00
3 Railing sandaran 10.00 m1 Rp 1,500,000 Rp 15,000,000.00
4 Perapihan + Buang sisa kerja + bongkaran 1.00 Ls Rp 5,000,000 Rp 5,000,000.00
UNIVERSITAS INDONESIA
Jakarta, 8 Desember2017
PT. Timbang Cipta Laksana
Marihot Gultom
Direktur
PEMBANGUNAN BIKER OUTER RING ROAD
(BORR) UTARA KAMPUS UI DEPOK
UNIVERSITAS INDONESIA
II PEKERJAAN PAVEMENT
A PEKERJAAN TANAH Rp 348,586,238
Rp 3,321,392,821.60