KEGIATAN :

SUB KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN :

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
1 2 3 4 5 8

IV.B PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.I. PEKERJAAN PEMADAM KEBAKARAN

1. INSTALASI APAR
a. LANTAI 1
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00
b. LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00

B.II. PEKERJAAN VENTILASI UDARA


Exhaust Fan Toilet
1. LANTAI 1
- Exhaust kap 200 Cfm ( ceiling Mounted ) unit 2,00
Pipa PVC Class D
- dia. 100 m 18,80
- Grille 200 x 200 (Alumunium) bh 10,00
2 LANTAI 2
- Exhaust kap 200 Cfm ( ceiling Mounted ) unit 2,00
Pipa PVC Class D
- dia. 100 m 18,80
- Grille 200 x 200 (Alumunium) bh 10,00

B.III. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I. PEKERJAAN INSTALASI PLUMBING


1. INSTALASI AIR BERSIH
PERALATAN UTAMA
Pengadaan dan pemasangan unit
- Lift Pump bh 1,00
2. Booster Pump / Distribution Pump set 2,00
3. Tangki Air Atas ( Type Cylinder ) unit 4,00
4. Ground Water Tank unit 4,00
5. ACCESSORIES POMPA AIR BERSIH
Gate Valve
- dia. 50 bh 2,00
Check Valve ( CV )
- dia. 50 bh 2,00
Strainer ( STR )
- dia. 50 bh 2,00
Flexible Joint ( FJ )
- dia. 50 bh 4,00
Foot Valve
- dia. 50 bh 2,00
- Pressure Gauge bh 2,00
- GIP med dia. 100 ( pipa header ) set 1,00
- Instalasi pemipaan area pompa lot 1,00
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1,00
8. INSTALASI
INSTALASI PEMIPAAN
PEMIPAAN
a. SITE PLAN
Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 6,00
Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 40 m 64,60
b. Penyambungan pipa PDAM, pipa gip dia. 65 termasuk perijinan. lot 1,00

II. INSTALASI AIR KOTOR & AIR BEKAS


1. Septic Tank ( Konvensional ) unit 2,00
2. Resapan unit 2,00

III. PENYAMBUNGAN DAYA PLN


1. Pekerjaan Pasang Baru Daya Listrik PLN 13,2 KVA (13200 VA) Lot 1,00
- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

IV. PEKERJAAN INSTALASI KABEL FEEDER


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1 m' 10,00
- NYY 4 x 4 mm2 ke LP-2 m' 10,00
- Proteksi Kabel dengan Pipa Gip Dia 100 m' 20,00
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya
- Testing & Commissioning lot 1,00