Anda di halaman 1dari 52

BILL OF QUANTITY

DAFTAR No. 4 - PEKERJAAN MEKANIKAL & ELEKTRIKAL

PENJUMLAHAN TOTAL

4.1 - PEKERJAAN PLUMBING Rp. 11,462,895,521


4.2 - PEKERJAAN PEMADAM KEBAKARAN Rp. 4,504,064,210
4.3 - PEKERJAAN TATA UDARA Rp. 2,460,293,271
4.4 - PEKERJAAN ELEKTRIKAL Rp. 17,011,835,405
4.5 - PEKERJAAN FIRE ALARM Rp. 2,403,672,085
4.6 - PEKERJAAN TATA SUARA Rp. 440,165,235
4.7 - PEKERJAAN MATV Rp. 629,516,957
4.8 - PEKERJAAN CCTV Rp. 2,493,013,499
4.9 - PEKERJAAN TRIPPLE PLY ONU Rp. 4,564,020,998
4.10 - PEKERJAAN ACCESS CARD Rp. 467,217,930
4.11 - PEKERJAAN GENERATOR SET (GENSET) Rp. 1,987,440,718
4.12 - PEKERJAAN ELEVATOR Rp. 7,020,000,000
4.13 - PEKERJAAN STP Rp. 1,588,488,000
4.14 - PEKERJAAN GONDOLA Rp. 952,160,000
PENJUMLAHAN TOTAL 57,984,783,830

Page 1 of 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


Catatan Harga

I Bill of Quantity (BQ) yang diberikan Quantity Surveyor (QS) yang berisikan Item
Pekerjaan maupun Volume hanya sebagai acuan Pemborong dalam mengajukan
penawaran harga, adapun Pemborong wajib memeriksa kembali item pekerjaan
maupun volume sesuai dengan gambar maupun spesifikasi yang telah diterima,
Pemborong dapat menambahkan Item Pekerjaan maupun volume yang dianggap
Pemborong belum tercantum dalam BQ dan menepatkannya pada lampiran yang
yang telah disediakan.

II Semua resiko baik mengenai salah hitung terhadap harga maupun volume
pekerjaan yang diajukan dan biaya - biaya lain yang tak terduga adalah tetap
menjadi tanggung jawab Pemborong sepenuhnya.

III Dalam memberikan harga pekerjaan ini Pemborong harus sudah


mempertimbangkan untuk memasukan semua biaya pengeluaran pekerjaan
dan tidak ada tuntutan dikemudian hari terhadap Pemberi Tugas bila Daftar
Uraian Pekerjaan / BQ ini dipandang tidak lengkap oleh Pemborong dan
semua hal - hal yang tidak tercantum disini dianggap sudah dimasukan dalam
penawaran pekerjaan yang ditawarkan.

IV Pemborong sudah harus memperhitungkan / mempertimbangkan


semua kemungkinan - kemungkinan yang terjadi dilapangan dalam
pelaksanaan berhubung adanya Pemborong - Pemborong lain untuk
pelaksanan proyek tersebut.

V Harga satuan pipa mulai diameter 50 mm ke bawah sudah mencakup fittingnya,


adapun pipa mulai diameter 65 mm keatas fitting dihitung terpisah, adapun
harga satuan pipa untuk semua diameter sudah termasuk penggantung, support,
socket, flange dan alat bantu lainnya, adapun untuk instalasi pipa pekerjaan
luar harus sudah termasuk isolasi dan bahan pelindung yang diperlukan.

VI Harga satuan yang ditawarkan pemborong harus sudah memperhitungkan


"waste" dari bahan yang digunakan.

VII Pekerjaan Plumbing dan Instalasinya meliputi Pengadaan dan


Pemasangan kecuali disebutkan lain dalam Bill Of Quantity (BQ).

VIII Catatan harga di atas berlaku untuk seluruh Pekerjaan Plumbing dan
Seluruh pekerjaan di bawah ini harus sesuai dengan gambar dan psesifikasi
yang diajukan oleh Pemborong yang telah disetujui oleh Pemberi Tugas.

IX Pipa yang sudah terpasang secara perbagian atau secara keseluruhan


harus ditest sesuai yang dianjurkan didalam spesifikasi dan dibuatkan
berita acara yang disetujui oleh pengawas lapangan atau pihak yang
terkait, ini merupakan dasar progrss material yang sudah terpasang.

X Penawaran harga Peralatan Pompa termasuk dudukan atau pondasi apabila


diperlukan.
XI Testing dan commissioning untuk semusa instalasi sistemnya

Ruang Pompa

A Pompa Transfer Air Bersih (PAB - 1 & 2) Unit 2.00 125,000,000 250,000,000
Type: In Suction Centrifugal
Kapasitas: 550 Ltr/min
Head: 110 M
Operation: 1 Duty - 1 Standby
Daya: 24 Kw / 380V / 3 Ph / 50 Hz
Pompa c/w Panel & Cable control.

B Pemipaan dan Valve Pompa Transfer


Instalasi Pipa Air Bersih dari Galvanized Medium
- Pipa diameter 100 mm m 11.39 480,500 5,472,895
- Fitting diameter 100 mm Bh 4.00 226,000 904,000
- Gate Valve diameter 100 mm Bh 3.00 5,165,135 15,495,405
- Check Valve diameter 100 mm Bh 2.00 6,595,463 13,190,926
- Strainer diameter 100 mm Bh 2.00 5,150,723 10,301,446
- Flexible Connection diameter 100 mm Bh 4.00 1,108,718 4,434,872
- Screen / Saringan Bh 2.00 750,000 1,500,000
- Pipa header diameter 150 mm, panjang 1 meter termasuk support, flange dan Bh 1.00 2,500,000 2,500,000
perlengkapan lainnya sesuai spesifikasi dan gambar
C Sand Filter (SF - 01) Unit 1.00 85,000,000 85,000,000
Type: Manual Back Wash
Kapasitas: 500 Ltr/min

Page 1 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


D Carbon Filter (CF - 01) Unit 1.00 105,000,000 105,000,000
Type: Manual Back Wash
Kapasitas: 500 Ltr/min

E Instalasi Pipa Air Bersih dari Galvanized Medium


(dari Sand/Carbon Filter ke Ground Reservoir Air Bersih)
- Pipa diameter 100 mm m 3.35 480,500 1,609,675
- Fitting diameter 100 mm Bh 2.00 226,000 452,000
- Gate Valve diameter 100 mm Bh 2.00 5,165,135 10,330,270
- Floating Valve diameter 100 mm Bh 1.00 11,267,660 11,267,660
F Pompa Filter Air Hujan (PAH) Unit 2.00 75,000,000 150,000,000
Type: Centrifugal
Kapasitas: 400 Ltr/min
Head: 25 M
Operation: Single Alternate
Daya: 4,5 Kw / 380V / 3 Ph / 50 Hz
Pompa c/w Panel & Cable control.

G Pemipaan dan Valve Pompa Filter Air Hujan


Instalasi Pipa Air Bersih dari Galvanized Medium
- Pipa diameter 100 mm m 4.69 480,500 2,253,545
- Fitting diameter 100 mm Bh 4.00 226,000 904,000
- Gate Valve diameter 100 mm Bh 2.00 5,165,135 10,330,270
- Check Valve diameter 100 mm Bh 2.00 6,595,463 13,190,926
- Strainer diameter 100 mm Bh 2.00 5,150,723 10,301,446
- Flexible Connection diameter 100 mm Bh 4.00 1,108,718 4,434,872
- Screen / Saringan Bh 2.00 750,000 1,500,000
- Pipa header diameter 150 mm, panjang 1 meter termasuk support, flange dan Bh 1.00 2,500,000 2,500,000
perlengkapan lainnya sesuai spesifikasi dan gambar
Sub Total - 1 712,874,208
Ruang Pompa
A Pompa Kuras Ground Reservoir Unit 1.00 20,000,000 20,000,000
Type: Portable Submersible
Kapasitas: 100 Ltr/min
Head: 10 M
Operation: Stand By
Daya: 0,75 Kw / 380 V / 3 Ph / 50 Hz
Terdiri dari 2 unit pompa c/w Panel / Cable control, support, Guide rail serta matrial bantu.

B Pemipaan dan Valve Pompa Kuras Ground Reservoir


Instalasi Pipa Air Bekas dari PVC klas AW
- Pipa diameter 65 mm m 6.70 87,300 584,910
- Fitting diameter 65 mm Bh 4.00 68,750 275,000
- Gate Valve diameter 65 mm Bh 2.00 3,424,048 6,848,096
- Check Valve diameter 65 mm Bh 1.00 3,756,555 3,756,555
C Water Level Control (WLC) termasuk kabel kontrol & probe stick (Ground Reservoir) Bh 2.00 5,535,111 11,070,222
D Pompa Transfer Air Sekunder (PAS) Unit 2.00 100,000,000 200,000,000
Type: In Suction Centrifugal
Kapasitas: 350 Ltr/min
Head: 125 M
Operation: Single Alternate
Daya: 15,75 Kw / 380V / 3 Ph / 50 Hz
Pompa c/w Panel & Cable control.

E Pemipaan dan Valve Pompa Transfer Air Sekunder (PAS)


Instalasi Pipa Air Bersih dari Galvanized Medium
- Pipa diameter 100 mm m 1.34 480,500 643,870
- Pipa diameter 80 mm m 8.71 336,188 2,928,197
- Fitting diameter 80 mm Bh 2.00 148,071 296,142
- Gate Valve diameter 80 mm Bh 3.00 3,812,361 11,437,083
- Check Valve diameter 80 mm Bh 2.00 3,607,426 7,214,852
- Strainer diameter 100 mm Bh 2.00 5,150,723 10,301,446
- Flexible Connection diameter 100 mm Bh 2.00 1,108,718 2,217,436
- Flexible Connection diameter 80 mm Bh 2.00 1,497,869 2,995,738
- Screen / Saringan Bh 2.00 750,000 1,500,000
- Pipa header diameter 200 mm, panjang 1 meter termasuk support, flange dan Bh 1.00 3,800,000 3,800,000
perlengkapan lainnya sesuai spesifikasi dan gambar
F Instalasi Pipa Air Recycling dari STP ke Ground Reservoir Air Sekunder bahan PVC klas AW
- Pipa diameter 50 mm m 53.60 63,233 3,389,289
- Floating Valve diameter 50 mm Bh 1.00 1,254,495 1,254,495
F Biaya Testing Commissioning Pekerjaan Plumbing Ls 1.00 10,000,000 10,000,000

Sub Total - 2 300,513,331


Lantai Dasar
Area Toilet Koridor

Page 2 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.69 52,269 245,142
- Pipa diameter 15 mm m 4.02 23,937 96,227
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 15 mm Bh 1.00 277,823 277,823
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 4.02 145,979 586,836
- Pipa diameter 50 mm m 1.34 63,233 84,732
- Fitting diameter 100 mm Bh 7.00 132,406 926,842
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 6.70 63,233 423,661
- Floor Clean Out (FCO) diameter 50 mm Bh 1.00 88,694 88,694
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 2.01 50,899 102,307
- Pipa diameter 40 mm m 0.67 38,924 26,079
- Pipa diameter 32 mm m 9.38 40,564 380,490
Area Toilet Kios (Typical untuk 6 unit)
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 44.22 34,038 1,505,160
- Pipa diameter 15 mm m 24.12 23,937 577,360
- Gate valve diameter 20 mm Bh 6.00 277,823 1,666,938
- Water Meter diameter 20 mm Bh 6.00 1,067,079 6,402,474
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 52.26 23,937 1,250,948
- Gate valve diameter 15 mm Bh 6.00 277,823 1,666,938
- Water Meter diameter 15 mm Bh 6.00 1,067,079 6,402,474
H Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 16.08 145,979 2,347,342
- Fitting diameter 100 mm Bh 24.00 132,406 3,177,744
- Floor Clean Out (FCO) diameter 100 mm Bh 6.00 316,589 1,899,534
I Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 8.04 63,233 508,393
J Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 16.08 40,564 652,269

Sub Total - 3 32,462,058


Lantai Dasar
Publik Area
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 100 mm m 38.86 383,934 14,919,675
- Pipa diameter 65 mm m 14.07 188,289 2,649,226
- Pipa diameter 50 mm m 3.35 136,964 458,829
- Pipa diameter 40 mm m 4.02 108,064 434,417
- Pipa diameter 32 mm m 8.04 74,673 600,371
- Fitting diameter 100 mm Bh 4.00 405,314 1,621,256
- Fitting diameter 65 mm Bh 5.00 155,482 777,410
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 80 mm m 38.86 257,949 10,023,898
- Pipa diameter 50 mm m 14.74 136,964 2,018,849
- Pipa diameter 40 mm m 3.35 108,064 362,014
- Pipa diameter 32 mm m 4.02 74,673 300,185
- Pipa diameter 25 mm m 8.71 52,269 455,263
- Pipa diameter 15 mm m 79.06 23,937 1,892,459
- Fitting diameter 80 mm Bh 3.00 275,650 826,950
- Gate valve diameter 15 mm Bh 5.00 277,823 1,389,115
- Kran Taman Type : Sillcock with hose coupling diameter 15 mm Bh 5.00 190,197 950,985
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 250 mm m 19.43 605,631 11,767,410
- Pipa diameter 100 mm m 14.74 145,979 2,151,730
- Fitting diameter 250 mm Bh 9.00 299,490 2,695,410
- Fitting diameter 100 mm Bh 4.00 132,406 529,624
- Floor Clean Out (FCO) diameter 100 mm Bh 3.00 316,589 949,767
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 250 mm m 19.43 605,631 11,767,410
- Pipa diameter 80 mm m 6.70 97,537 653,498
- Pipa diameter 65 mm m 8.04 87,300 701,892
- Pipa diameter 50 mm m 16.75 63,233 1,059,153
- Fitting diameter 250 mm Bh 9.00 299,490 2,695,410
- Fitting diameter 80 mm Bh 4.00 73,178 292,712
- Fitting diameter 65 mm Bh 3.00 68,750 206,250
- Floor Clean Out (FCO) diameter 80 mm Bh 2.00 157,193 314,386
- Floor Clean Out (FCO) diameter 50 mm Bh 2.00 88,694 177,388

Page 3 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 150 mm m 13.40 271,280 3,635,152
- Fitting diameter 150 mm Bh 8.00 299,490 2,395,920
- Floor Clean Out (FCO) diameter 100 mm Bh 3.00 316,589 949,767
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 18.76 40,564 760,981
- Vent Cup diameter 50 mm Bh 1.00 75,000 75,000
G Instalasi Pipa Air Hujan bahan PVC klas AW
- Pipa diameter 200 mm m 77.05 425,572 32,790,323
- Fitting diameter 200 mm Bh 9.00 723,903 6,515,127
H Instalasi Pipa Air Hujan bahan Galvanized Sch. 40
- Pipa diameter 200 mm m 21.44 1,625,456 34,849,777
- Fitting diameter 200 mm Bh 4.00 1,265,436 5,061,744

Sub Total - 4 162,676,735


Lantai - 2
Area Ruang Wudhu
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 5.36 52,269 280,162
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
B Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 2.01 63,233 127,098

Area Toilet Koridor


C Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.69 52,269 245,142
- Pipa diameter 15 mm m 4.02 23,937 96,227
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
D Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 15 mm Bh 1.00 277,823 277,823
E Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 4.02 145,979 586,836
- Pipa diameter 50 mm m 1.34 63,233 84,732
- Fitting diameter 100 mm Bh 7.00 132,406 926,842
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
F Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 6.70 63,233 423,661
- Floor Clean Out (FCO) diameter 50 mm Bh 1.00 88,694 88,694
G Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 2.01 50,899 102,307
- Pipa diameter 40 mm m 0.67 38,924 26,079
- Pipa diameter 32 mm m 9.38 40,564 380,490

Area Koridor
H Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.02 52,269 210,121
- Gate valve diameter 25 mm Bh 12.00 420,208 5,042,496
I Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 25 mm m 4.02 52,269 210,121
- Gate valve diameter 25 mm Bh 12.00 420,208 5,042,496
J Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 200 mm m 54.94 425,572 23,380,926
- Fitting diameter 200 mm Bh 54.00 723,903 39,090,762
- Floor Clean Out (FCO) diameter 100 mm Bh 15.00 316,589 4,748,835
K Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 200 mm m 42.88 425,572 18,248,527
- Fitting diameter 200 mm Bh 30.00 723,903 21,717,090
- Floor Clean Out (FCO) diameter 100 mm Bh 3.00 316,589 949,767

Sub Total - 5 123,985,358


Lantai - 2
Area Koridor
A Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 100 mm m 46.23 145,979 6,748,609
- Pipa diameter 80 mm m 16.08 97,537 1,568,395
- Fitting diameter 100 mm Bh 30.00 132,406 3,972,180
- Fitting diameter 80 mm Bh 36.00 73,178 2,634,408
- Floor Clean Out (FCO) diameter 100 mm Bh 3.00 316,589 949,767
- Floor Clean Out (FCO) diameter 50 mm Bh 12.00 88,694 1,064,328
B Instalasi Pipa Air Hujan bahan PVC klas AW
- Pipa diameter 200 mm m 6.03 425,572 2,566,199
- Pipa diameter 150 mm m 14.74 271,280 3,998,667
- Pipa diameter 100 mm m 7.37 145,979 1,075,865

Page 4 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


- Fitting diameter 200 mm Bh 8.00 723,903 5,791,224
- Fitting diameter 150 mm Bh 5.00 299,490 1,497,450
- Fitting diameter 100 mm Bh 9.00 132,406 1,191,654
C Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 8.04 40,564 326,135
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
D Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 16.08 34,038 547,331
- Pipa diameter 15 mm m 160.80 23,937 3,849,070
- Water Meter diameter 20 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 20 mm Bh 24.00 277,823 6,667,752
E Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 64.32 23,937 1,539,628
- Water Meter diameter 15 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 15 mm Bh 24.00 277,823 6,667,752
F Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 48.24 145,979 7,042,027
- Fitting diameter 100 mm Bh 72.00 132,406 9,533,232
- Floor Clean Out (FCO) diameter 100 mm Bh 24.00 316,589 7,598,136
G Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 16.08 63,233 1,016,787
H Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 48.24 63,233 3,050,360
- Floor Clean Out (FCO) diameter 50 mm Bh 24.00 88,694 2,128,656
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 24.00 750,000 18,000,000
I Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 160.80 40,564 6,522,691

Sub Total - 6 158,768,094


Lantai - 3
Area Toilet Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.69 52,269 245,142
- Pipa diameter 15 mm m 4.02 23,937 96,227
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 15 mm Bh 1.00 277,823 277,823
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 4.02 145,979 586,836
- Pipa diameter 50 mm m 1.34 63,233 84,732
- Fitting diameter 100 mm Bh 7.00 132,406 926,842
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 6.70 63,233 423,661
- Floor Clean Out (FCO) diameter 50 mm Bh 1.00 88,694 88,694
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 2.01 50,899 102,307
- Pipa diameter 40 mm m 0.67 38,924 26,079
- Pipa diameter 32 mm m 9.38 40,564 380,490

Area Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 100 mm m 118.59 383,934 45,530,733
- Pipa diameter 40 mm m 2.68 108,064 289,612
- Pipa diameter 25 mm m 8.71 52,269 455,263
- Fitting diameter 100 mm Bh 39.00 405,314 15,807,246
- Gate valve diameter 40 mm Bh 1.00 592,845 592,845
- Gate valve diameter 25 mm Bh 15.00 420,208 6,303,120
- Pressure Reducing Valve (PRV) set diameter 100 mm Set 1.00 90,000,000 90,000,000
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 80 mm m 118.59 257,949 30,590,172
- Pipa diameter 25 mm m 4.02 52,269 210,121
- Pipa diameter 20 mm m 9.38 34,038 319,276
- Fitting diameter 80 mm Bh 39.00 275,650 10,750,350
- Gate valve diameter 20 mm Bh 16.00 277,823 4,445,168
- Pressure Reducing Valve (PRV) set diameter 80 mm Set 1.00 80,000,000 80,000,000
H Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 200 mm m 17.42 425,572 7,413,464
- Pipa diameter 150 mm m 25.46 271,280 6,906,789
- Fitting diameter 200 mm Bh 14.00 723,903 10,134,642
- Fitting diameter 150 mm Bh 23.00 299,490 6,888,270
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178

Sub Total - 7 321,674,733

Page 5 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


Lantai - 3
Area Koridor
A Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 200 mm m 17.42 425,572 7,413,464
- Pipa diameter 150 mm m 25.46 271,280 6,906,789
- Fitting diameter 200 mm Bh 14.00 723,903 10,134,642
- Fitting diameter 150 mm Bh 23.00 299,490 6,888,270
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
B Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 100 mm m 42.88 145,979 6,259,580
- Fitting diameter 100 mm Bh 37.00 132,406 4,899,022
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
C Instalasi Pipa Air Hujan bahan PVC klas AW
- Pipa diameter 200 mm m 6.70 425,572 2,851,332
- Pipa diameter 150 mm m 12.06 271,280 3,271,637
- Pipa diameter 100 mm m 12.06 145,979 1,760,507
- Fitting diameter 200 mm Bh 10.00 723,903 7,239,030
- Fitting diameter 150 mm Bh 6.00 299,490 1,796,940
- Fitting diameter 100 mm Bh 12.00 132,406 1,588,872

Denah Unit Type - 1 (Typical untuk 24 unit kamar)


D Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 16.08 34,038 547,331
- Pipa diameter 15 mm m 160.80 23,937 3,849,070
- Water Meter diameter 20 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 20 mm Bh 24.00 277,823 6,667,752
E Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 64.32 23,937 1,539,628
- Water Meter diameter 15 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 15 mm Bh 24.00 277,823 6,667,752
F Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 48.24 145,979 7,042,027
- Fitting diameter 100 mm Bh 72.00 132,406 9,533,232
- Floor Clean Out (FCO) diameter 100 mm Bh 24.00 316,589 7,598,136
G Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 16.08 63,233 1,016,787
H Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 48.24 63,233 3,050,360
- Floor Clean Out (FCO) diameter 50 mm Bh 24.00 88,694 2,128,656
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 24.00 750,000 18,000,000
I Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 160.80 40,564 6,522,691

Sub Total - 8 187,659,654


Lantai - 3
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 15.41 52,269 805,465
- Pipa diameter 15 mm m 80.40 23,937 1,924,535
- Water Meter diameter 25 mm Bh 15.00 1,244,650 18,669,750
- Gate valve diameter 25 mm Bh 15.00 420,208 6,303,120
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 30.15 23,937 721,701
- Water Meter diameter 15 mm Bh 15.00 1,067,079 16,006,185
- Gate valve diameter 15 mm Bh 15.00 277,823 4,167,345
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 20.10 145,979 2,934,178
- Fitting diameter 100 mm Bh 45.00 132,406 5,958,270
- Floor Clean Out (FCO) diameter 100 mm Bh 15.00 316,589 4,748,835
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 10.05 63,233 635,492
E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 30.15 63,233 1,906,475
- Floor Clean Out (FCO) diameter 50 mm Bh 15.00 88,694 1,330,410
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 15.00 750,000 11,250,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 90.45 40,564 3,669,014

Sub Total - 9 81,030,774


Lantai - 4, 6, 7, 10, 12, 13, 16, 18, 19, 22 (Typical untuk 10 Lantai)
Area Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 40.20 52,269 2,101,214
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 25 mm m 40.20 52,269 2,101,214

Page 6 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 200 mm m 80.40 425,572 34,215,989
- Fitting diameter 200 mm Bh 360.00 723,903 260,605,080
- Floor Clean Out (FCO) diameter 100 mm Bh 120.00 316,589 37,990,680
D Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 100 mm m 80.40 145,979 11,736,712
- Fitting diameter 100 mm Bh 360.00 132,406 47,666,160
- Floor Clean Out (FCO) diameter 100 mm Bh 120.00 316,589 37,990,680
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 40.20 50,899 2,046,140
Area Toilet Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 46.90 52,269 2,451,416
- Pipa diameter 15 mm m 40.20 23,937 962,267
- Gate valve diameter 25 mm Bh 10.00 420,208 4,202,080
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 46.90 23,937 1,122,645
- Gate valve diameter 15 mm Bh 10.00 277,823 2,778,230
H Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 40.20 145,979 5,868,356
- Pipa diameter 50 mm m 13.40 63,233 847,322
- Fitting diameter 100 mm Bh 70.00 132,406 9,268,420
- Floor Clean Out (FCO) diameter 100 mm Bh 20.00 316,589 6,331,780
I Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 67.00 63,233 4,236,611
- Floor Clean Out (FCO) diameter 50 mm Bh 10.00 88,694 886,940
J Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 20.10 50,899 1,023,070
- Pipa diameter 40 mm m 6.70 38,924 260,791
- Pipa diameter 32 mm m 93.80 40,564 3,804,903

Sub Total - 10 480,498,700


Lantai - 4, 6, 7, 10, 12, 13, 16, 18, 19, 22 (Typical untuk 10 Lantai)
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 160.80 34,038 5,473,310
- Pipa diameter 15 mm m 1,608.00 23,937 38,490,696
- Water Meter diameter 20 mm Bh 240.00 1,067,079 256,098,960
- Gate valve diameter 20 mm Bh 240.00 277,823 66,677,520
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 643.20 23,937 15,396,278
- Water Meter diameter 15 mm Bh 240.00 1,067,079 256,098,960
- Gate valve diameter 15 mm Bh 240.00 277,823 66,677,520
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 482.40 145,979 70,420,270
- Fitting diameter 100 mm Bh 720.00 132,406 95,332,320
- Floor Clean Out (FCO) diameter 100 mm Bh 240.00 316,589 75,981,360
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 160.80 63,233 10,167,866
E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 482.40 63,233 30,503,599
- Floor Clean Out (FCO) diameter 50 mm Bh 160.80 88,694 14,261,995
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 240.00 750,000 180,000,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 1,608.00 40,564 65,226,912
Denah Unit Type - 2
G Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 150.75 52,269 7,879,552
- Pipa diameter 15 mm m 804.00 23,937 19,245,348
- Water Meter diameter 25 mm Bh 150.00 1,244,650 186,697,500
- Gate valve diameter 25 mm Bh 150.00 420,208 63,031,200
H Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 301.50 23,937 7,217,006
- Water Meter diameter 15 mm Bh 150.00 1,067,079 160,061,850
- Gate valve diameter 15 mm Bh 150.00 277,823 41,673,450
I Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 201.00 145,979 29,341,779
- Fitting diameter 100 mm Bh 450.00 132,406 59,582,700
- Floor Clean Out (FCO) diameter 100 mm Bh 150.00 316,589 47,488,350
J Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 100.50 63,233 6,354,917
K Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 301.50 63,233 19,064,750
- Floor Clean Out (FCO) diameter 50 mm Bh 150.00 88,694 13,304,100
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 150.00 750,000 112,500,000

Page 7 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


L Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 904.50 40,564 36,690,138

Sub Total - 11 2,056,940,205


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
Area Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 26.13 52,269 1,365,789
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 25 mm m 26.13 52,269 1,365,789
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 200 mm m 51.59 425,572 21,955,259
- Fitting diameter 200 mm Bh 231.00 723,903 167,221,593
- Floor Clean Out (FCO) diameter 100 mm Bh 77.00 316,589 24,377,353
D Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 100 mm m 51.59 145,979 7,531,057
- Fitting diameter 100 mm Bh 231.00 132,406 30,585,786
- Floor Clean Out (FCO) diameter 100 mm Bh 77.00 316,589 24,377,353
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 26.13 50,899 1,329,991
Area Toilet Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 32.83 52,269 1,715,991
- Pipa diameter 15 mm m 28.14 23,937 673,587
- Gate valve diameter 25 mm Bh 7.00 420,208 2,941,456
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 32.83 23,937 785,852
- Gate valve diameter 15 mm Bh 7.00 277,823 1,944,761
H Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 28.14 145,979 4,107,849
- Pipa diameter 50 mm m 9.38 63,233 593,126
- Fitting diameter 100 mm Bh 49.00 132,406 6,487,894
- Floor Clean Out (FCO) diameter 100 mm Bh 14.00 316,589 4,432,246
I Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 46.90 63,233 2,965,628
- Floor Clean Out (FCO) diameter 50 mm Bh 7.00 88,694 620,858
J Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 14.07 50,899 716,149
- Pipa diameter 40 mm m 4.69 38,924 182,554
- Pipa diameter 32 mm m 65.66 40,564 2,663,432

Sub Total - 12 310,941,352


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
Denah Unit Type - 1 (Typical untuk 22 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 103.18 34,038 3,512,041
- Pipa diameter 15 mm m 1,031.80 23,937 24,698,197
- Water Meter diameter 20 mm Bh 154.00 1,067,079 164,330,166
- Gate valve diameter 20 mm Bh 154.00 277,823 42,784,742
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 412.72 23,937 9,879,279
- Water Meter diameter 15 mm Bh 154.00 1,067,079 164,330,166
- Gate valve diameter 15 mm Bh 154.00 277,823 42,784,742
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 309.54 145,979 45,186,340
- Fitting diameter 100 mm Bh 462.00 132,406 61,171,572
- Floor Clean Out (FCO) diameter 100 mm Bh 154.00 316,589 48,754,706
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 103.18 63,233 6,524,381
E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 309.54 63,233 19,573,143
- Floor Clean Out (FCO) diameter 50 mm Bh 154.00 88,694 13,658,876
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 154.00 750,000 115,500,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 1,031.80 40,564 41,853,935

Denah Unit Type - 2 (Typical untuk 15 unit kamar)


G Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 105.86 52,269 5,533,196
- Pipa diameter 15 mm m 562.80 23,937 13,471,744
- Water Meter diameter 25 mm Bh 105.00 1,244,650 130,688,250
- Gate valve diameter 25 mm Bh 105.00 420,208 44,121,840
H Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 211.05 23,937 5,051,904
- Water Meter diameter 15 mm Bh 105.00 1,067,079 112,043,295

Page 8 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


- Gate valve diameter 15 mm Bh 105.00 277,823 29,171,415
I Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 140.70 145,979 20,539,245
- Fitting diameter 100 mm Bh 315.00 132,406 41,707,890
- Floor Clean Out (FCO) diameter 100 mm Bh 105.00 316,589 33,241,845
J Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 70.35 63,233 4,448,442
K Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 211.05 63,233 13,345,325
- Floor Clean Out (FCO) diameter 50 mm Bh 105.00 88,694 9,312,870
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 105.00 750,000 78,750,000
L Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 633.15 40,564 25,683,097

Sub Total - 13 1,371,652,642


Lantai - 9 & 15 (Typical untuk 2 Lantai)
Area Toilet Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 9.38 52,269 490,283
- Pipa diameter 15 mm m 8.04 23,937 192,453
- Gate valve diameter 25 mm Bh 2.00 420,208 840,416
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 9.38 23,937 224,529
- Gate valve diameter 15 mm Bh 2.00 277,823 555,646
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 8.04 145,979 1,173,671
- Pipa diameter 50 mm m 2.68 63,233 169,464
- Fitting diameter 100 mm Bh 14.00 132,406 1,853,684
- Floor Clean Out (FCO) diameter 100 mm Bh 4.00 316,589 1,266,356
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 13.40 63,233 847,322
- Floor Clean Out (FCO) diameter 50 mm Bh 2.00 88,694 177,388
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 4.02 50,899 204,614
- Pipa diameter 40 mm m 1.34 38,924 52,158
- Pipa diameter 32 mm m 18.76 40,564 760,981

Area Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 150 mm m 231.82 829,251 192,236,967
- Pipa diameter 25 mm m 26.13 52,269 1,365,789
- Fitting diameter 150 mm m 65.66 536,263 35,211,029
- Pressure Reducing Valve (PRV) set diameter 150 mm Set 2.00 137,500,000 275,000,000
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 125 mm m 231.82 615,500 142,685,210
- Pipa diameter 20 mm m 26.13 34,038 889,413
- Fitting diameter 125 mm m 65.66 477,500 31,352,650
- Pressure Reducing Valve (PRV) set diameter 125 mm Set 2.00 115,500,000 231,000,000

Sub Total - 14 918,550,024


Lantai - 9 & 15 (Typical untuk 2 Lantai)
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 32.16 34,038 1,094,662
- Pipa diameter 15 mm m 321.60 23,937 7,698,139
- Water Meter diameter 20 mm Bh 48.00 1,067,079 51,219,792
- Gate valve diameter 20 mm Bh 48.00 277,823 13,335,504
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 128.64 23,937 3,079,256
- Water Meter diameter 15 mm Bh 48.00 1,067,079 51,219,792
- Gate valve diameter 15 mm Bh 48.00 277,823 13,335,504
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 96.48 145,979 14,084,054
- Fitting diameter 100 mm Bh 144.00 132,406 19,066,464
- Floor Clean Out (FCO) diameter 100 mm Bh 48.00 316,589 15,196,272
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 32.16 63,233 2,033,573
E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 96.48 63,233 6,100,720
- Floor Clean Out (FCO) diameter 50 mm Bh 48.00 88,694 4,257,312
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 48.00 750,000 36,000,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 321.60 40,564 13,045,382

Denah Unit Type - 2 (Typical untuk 15 unit kamar)

Page 9 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


G Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 30.15 52,269 1,575,910
- Pipa diameter 15 mm m 160.80 23,937 3,849,070
- Water Meter diameter 25 mm Bh 30.00 1,244,650 37,339,500
- Gate valve diameter 25 mm Bh 30.00 420,208 12,606,240
H Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 60.30 23,937 1,443,401
- Water Meter diameter 15 mm Bh 30.00 1,067,079 32,012,370
- Gate valve diameter 15 mm Bh 30.00 277,823 8,334,690
I Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 40.20 145,979 5,868,356
- Fitting diameter 100 mm Bh 90.00 132,406 11,916,540
- Floor Clean Out (FCO) diameter 100 mm Bh 30.00 316,589 9,497,670
J Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 20.10 63,233 1,270,983
K Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 60.30 63,233 3,812,950
- Floor Clean Out (FCO) diameter 50 mm Bh 30.00 88,694 2,660,820
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 30.00 750,000 22,500,000
L Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 180.90 40,564 7,338,028

Sub Total - 15 412,792,954


Lantai - 21
Area Toilet Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.69 52,269 245,142
- Pipa diameter 15 mm m 4.02 23,937 96,227
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 15 mm Bh 1.00 277,823 277,823
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 4.02 145,979 586,836
- Pipa diameter 50 mm m 1.34 63,233 84,732
- Fitting diameter 100 mm Bh 7.00 132,406 926,842
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 6.70 63,233 423,661
- Floor Clean Out (FCO) diameter 50 mm Bh 1.00 88,694 88,694
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 2.01 50,899 102,307
- Pipa diameter 40 mm m 0.67 38,924 26,079
- Pipa diameter 32 mm m 9.38 40,564 380,490

Area Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 150 mm m 115.91 829,251 96,118,483
- Pipa diameter 25 mm m 13.40 52,269 700,405
- Fitting diameter 150 mm m 32.83 536,263 17,605,514
- Gate Valve diameter 150 mm Set 1.00 12,090,705 12,090,705
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 125 mm m 115.91 615,500 71,342,605
- Pipa diameter 20 mm m 13.40 34,038 456,109
- Fitting diameter 125 mm m 32.83 477,500 15,676,325
- Gate Valve diameter 125 mm Set 1.00 9,138,443 9,138,443

Sub Total - 16 227,533,073


Lantai - 21
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 16.08 34,038 547,331
- Pipa diameter 15 mm m 160.80 23,937 3,849,070
- Water Meter diameter 20 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 20 mm Bh 24.00 277,823 6,667,752
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 64.32 23,937 1,539,628
- Water Meter diameter 15 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 15 mm Bh 24.00 277,823 6,667,752
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 48.24 145,979 7,042,027
- Fitting diameter 100 mm Bh 72.00 132,406 9,533,232
- Floor Clean Out (FCO) diameter 100 mm Bh 24.00 316,589 7,598,136
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 16.08 63,233 1,016,787

Page 10 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 48.24 63,233 3,050,360
- Floor Clean Out (FCO) diameter 50 mm Bh 24.00 88,694 2,128,656
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 24.00 750,000 18,000,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 160.80 40,564 6,522,691
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
G Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 15.41 52,269 805,465
- Pipa diameter 15 mm m 80.40 23,937 1,924,535
- Water Meter diameter 25 mm Bh 15.00 1,244,650 18,669,750
- Gate valve diameter 25 mm Bh 15.00 420,208 6,303,120
H Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 30.15 23,937 721,701
- Water Meter diameter 15 mm Bh 15.00 1,067,079 16,006,185
- Gate valve diameter 15 mm Bh 15.00 277,823 4,167,345
I Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 20.10 145,979 2,934,178
- Fitting diameter 100 mm Bh 45.00 132,406 5,958,270
- Floor Clean Out (FCO) diameter 100 mm Bh 15.00 316,589 4,748,835
J Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 10.05 63,233 635,492
K Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 30.15 63,233 1,906,475
- Floor Clean Out (FCO) diameter 50 mm Bh 15.00 88,694 1,330,410
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 15.00 750,000 11,250,000
L Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 90.45 40,564 3,669,014

Sub Total - 17 206,413,987


Lantai - 24
Area Toilet Koridor
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 4.69 52,269 245,142
- Pipa diameter 15 mm m 4.02 23,937 96,227
- Gate valve diameter 25 mm Bh 1.00 420,208 420,208
B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 4.69 23,937 112,265
- Gate valve diameter 15 mm Bh 1.00 277,823 277,823
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 4.02 145,979 586,836
- Pipa diameter 50 mm m 1.34 63,233 84,732
- Fitting diameter 100 mm Bh 7.00 132,406 926,842
- Floor Clean Out (FCO) diameter 100 mm Bh 2.00 316,589 633,178
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 6.70 63,233 423,661
- Floor Clean Out (FCO) diameter 50 mm Bh 1.00 88,694 88,694
E Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 50 mm m 2.01 50,899 102,307
- Pipa diameter 40 mm m 0.67 38,924 26,079
- Pipa diameter 32 mm m 9.38 40,564 380,490

Area Koridor
F Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 150 mm m 115.91 829,251 96,118,483
- Pipa diameter 25 mm m 13.40 52,269 700,405
- Fitting diameter 150 mm m 32.83 536,263 17,605,514
- Gate Valve diameter 150 mm Set 1.00 12,090,705 12,090,705
G Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 125 mm m 115.91 615,500 71,342,605
- Pipa diameter 20 mm m 13.40 34,038 456,109
- Fitting diameter 125 mm m 32.83 477,500 15,676,325
- Gate Valve diameter 125 mm Set 1.00 9,138,443 9,138,443
H Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 100 mm m 77.72 145,979 11,345,488
- Fitting diameter 100 mm Bh 59.00 132,406 7,811,954

Sub Total - 18 246,690,515


Lantai - 24
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 20 mm m 16.08 34,038 547,331
- Pipa diameter 15 mm m 160.80 23,937 3,849,070
- Water Meter diameter 20 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 20 mm Bh 24.00 277,823 6,667,752

Page 11 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


B Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 64.32 23,937 1,539,628
- Water Meter diameter 15 mm Bh 24.00 1,067,079 25,609,896
- Gate valve diameter 15 mm Bh 24.00 277,823 6,667,752
C Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 48.24 145,979 7,042,027
- Fitting diameter 100 mm Bh 72.00 132,406 9,533,232
- Floor Clean Out (FCO) diameter 100 mm Bh 24.00 316,589 7,598,136
D Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 16.08 63,233 1,016,787
E Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 48.24 63,233 3,050,360
- Floor Clean Out (FCO) diameter 50 mm Bh 24.00 88,694 2,128,656
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 24.00 750,000 18,000,000
F Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 160.80 40,564 6,522,691
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
G Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 25 mm m 15.41 52,269 805,465
- Pipa diameter 15 mm m 80.40 23,937 1,924,535
- Water Meter diameter 25 mm Bh 15.00 1,244,650 18,669,750
- Gate valve diameter 25 mm Bh 15.00 420,208 6,303,120
H Instalasi Pipa Air Sekunder dari bahan PPR PN.10
- Pipa diameter 15 mm m 30.15 23,937 721,701
- Water Meter diameter 15 mm Bh 15.00 1,067,079 16,006,185
- Gate valve diameter 15 mm Bh 15.00 277,823 4,167,345
I Instalasi Pipa Air Kotor bahan PVC klas AW (Closet)
- Pipa diameter 100 mm m 20.10 145,979 2,934,178
- Fitting diameter 100 mm Bh 45.00 132,406 5,958,270
- Floor Clean Out (FCO) diameter 100 mm Bh 15.00 316,589 4,748,835
J Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 50 mm m 10.05 63,233 635,492
K Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 50 mm m 30.15 63,233 1,906,475
- Floor Clean Out (FCO) diameter 50 mm Bh 15.00 88,694 1,330,410
- Portable Grease Trap Kap. 30 Liter (Bahan Stainless Stell) Unit 15.00 750,000 11,250,000
L Instalasi Pipa Vent bahan PVC klas D
- Pipa diameter 32 mm m 90.45 40,564 3,669,014

Sub Total - 19 206,413,987


Lantai Atap
A Package Booster Pump (PBP) Set 1.00 185,000,000 185,000,000
Type: Centrifugal
Kapasitas: 3 x 350 Ltr/min
Head: 14 M
Power: 36 Kw / 380 V / 3 Ph / 50 Hz
Operasi: Paralel Alt. 2 Duty - 1 Standby
Terdiri dari 3 unit pompa & Tanki termasuk Panel / Cable control, support, valve,
pemipaan & pipa Header, dudukan serta material bantu sesuai gambar & spesifikasi
B Roof Tank Air Bersih Unit 1.00 248,000,000 248,000,000
Type: Panel / FRP
Kapasitas: 80 M3
Termasuk support, dudukan / bantalan tanki, vent, Tangga dari pipa Galvanized
serta material bantu sesuai gambar & spesifikasi
C Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 200 mm m 1.34 982,594 1,316,676
- Pipa diameter 150 mm m 6.70 829,251 5,555,982
- Pipa diameter 100 mm m 18.76 383,934 7,202,602
- Pipa diameter 125 mm m 8.71 615,500 5,361,005
- Fitting diameter 200 mm Bh 2.00 923,923 1,847,846
- Fitting diameter 150 mm Bh 15.00 536,263 8,043,945
- Fitting diameter 100 mm Bh 17.00 405,314 6,890,338
- Fitting diameter 125 mm Bh 5.00 477,500 2,387,500
- Gate valve diameter 150 mm Bh 3.00 12,090,705 36,272,115
- Gate valve diameter 125 mm Bh 5.00 9,138,443 45,692,215
- Gate valve diameter 100 mm Bh 1.00 5,165,135 5,165,135
- Check valve diameter 125 mm Bh 1.00 10,294,598 10,294,598
- Strainer diameter 125 mm Bh 3.00 7,829,828 23,489,484
- Flexible Joint diameter 125 mm Bh 3.00 1,651,568 4,954,704
- Butterfly valve diameter 200 mm Bh 2.00 3,774,705 7,549,410
- Floating valve diameter 100 mm Bh 2.00 11,267,660 22,535,320
- Automatic Air Vent diameter 25 mm Bh 1.00 4,000,000 4,000,000
- Pipa header diameter 300 mm, panjang 3 meter termasuk support, fitting, sambungan, Bh 1.00 10,780,000 10,780,000
flange dan perlengkapan lainnya sesuai spesifikasi dan gambar
D Instalasi pipa Kuras / Over Flow dari bahan PVC klas AW

Page 12 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


- Pipa diameter 100 mm m 12.73 145,979 1,858,313
- Pipa diameter 50 mm m 3.35 63,233 211,831
- Fitting diameter 100 mm Bh 5.00 132,406 662,030
- Butterfly valve diameter 100 mm Bh 2.00 1,747,598 3,495,196
E Water Level Control (WLC) termasuk kabel kontrol & probe stick Unit 1.00 5,535,111 5,535,111

Sub Total - 20 654,101,355


Lantai Atap
A Roof Tank Air Sekunder Unit 1.00 170,500,000 170,500,000
Type : Panel / FRP
Kapasitas : 55 M3
Termasuk support, dudukan / bantalan tanki, vent, Tangga dari pipa Galvanized
serta material bantu sesuai gambar & spesifikasi
B Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 200 mm m 1.34 982,594 1,316,676
- Pipa diameter 150 mm m 8.71 829,251 7,222,776
- Pipa diameter 100 mm m 17.42 383,934 6,688,130
- Pipa diameter 80 mm m 16.08 257,949 4,147,820
- Fitting diameter 200 mm Bh 2.00 923,923 1,847,846
- Fitting diameter 150 mm Bh 7.00 536,263 3,753,841
- Fitting diameter 100 mm Bh 14.00 405,314 5,674,396
- Fitting diameter 80 mm Bh 10.00 275,650 2,756,500
- Gate valve diameter 150 mm Bh 1.00 12,090,705 12,090,705
- Gate valve diameter 100 mm Bh 2.00 5,165,135 10,330,270
- Butterfly valve diameter 200 mm Bh 2.00 3,774,705 7,549,410
- Floating valve diameter 80 mm Bh 2.00 8,057,217 16,114,434
- Automatic Air Vent diameter 25 mm Bh 1.00 4,000,000 4,000,000
- Pipa header diameter 250 mm, panjang 1,5 meter termasuk support, fitting, sambungan, Bh 1.00 7,402,500 7,402,500
flange dan perlengkapan lainnya sesuai spesifikasi dan gambar
C Instalasi pipa Kuras / Over Flow dari bahan PVC klas AW
- Pipa diameter 100 mm m 10.72 145,979 1,564,895
- Pipa diameter 50 mm m 3.35 63,233 211,831
- Fitting diameter 100 mm Bh 5.00 132,406 662,030
- Butterfly valve diameter 100 mm Bh 2.00 1,747,598 3,495,196
D Instalasi Pipa air hujan dari bahan PVC klas AW
- Pipa diameter 80 mm m 4.02 97,537 392,099
- Fitting diameter 80 mm Bh 6.00 73,178 439,068
- Roof Drain (RD) diameter 80 mm Bh 20.00 322,000 6,440,000
E Water Level Control (WLC) termasuk kabel kontrol & probe stick Unit 1.00 5,535,111 5,535,111

Sub Total - 21 280,135,534


Pipa Tegak / Riser
A Instalasi Pipa Air Bersih dari PPR PN.20
- Pipa diameter 150 mm m 54.27 2,192,438 118,983,610
- Pipa diameter 100 mm m 92.46 760,719 70,336,079
- Fitting diameter 150 mm Bh 3.00 536,263 1,608,789
- Fitting diameter 100 mm Bh 1.00 405,314 405,314
- Gate valve diameter 150 mm Bh 3.00 12,090,705 36,272,115
B Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 65 mm m 168.84 188,289 31,790,715
- Pipa diameter 50 mm m 168.84 136,964 23,125,002
- Pipa diameter 40 mm m 225.12 108,064 24,327,368
- Pipa diameter 32 mm m 225.12 74,673 16,810,386
- Pipa diameter 25 mm m 168.84 52,269 8,825,098
- Fitting diameter 65 mm Bh 81.00 155,482 12,594,042
C Instalasi Pipa Air Sekunder dari bahan PPR PN.20
- Pipa diameter 150 mm m 30.15 2,192,438 66,102,006
- Pipa diameter 125 mm m 18.09 1,205,394 21,805,577
- Pipa diameter 80 mm m 49.58 515,488 25,557,895
- Fitting diameter 150 mm Bh 1.00 536,263 536,263
- Fitting diameter 125 mm Bh 1.00 477,500 477,500
- Gate valve diameter 125 mm Bh 1.00 9,138,443 9,138,443
- Gate valve diameter 80 mm Bh 1.00 4,570,665 4,570,665
D Instalasi Pipa Air Bersih dari PPR PN.10
- Pipa diameter 50 mm m 144.72 136,964 19,821,430
- Pipa diameter 40 mm m 337.68 108,064 36,491,052
- Pipa diameter 32 mm m 152.76 74,673 11,407,047
- Pipa diameter 25 mm m 249.24 52,269 13,027,526
- Pipa diameter 20 mm m 96.48 34,038 3,283,986
E Instalasi Pipa Air Kotor bahan PVC klas AW
- Pipa diameter 250 mm m 8.71 605,631 5,275,046
- Pipa diameter 200 mm m 42.21 425,572 17,963,394
- Pipa diameter 150 mm m 1,055.25 271,280 286,268,220
- Pipa diameter 100 mm m 211.72 145,979 30,906,674
- Fitting diameter 250 mm Bh 5.00 299,490 1,497,450

Page 13 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.1 : PEKERJAAN PLUMBING

No. Uraian Pekerjaan Sat Vol Harga Total


- Fitting diameter 200 mm Bh 4.00 723,903 2,895,612
- Fitting diameter 150 mm Bh 525.00 299,490 157,232,250
- Fitting diameter 100 mm Bh 104.00 132,406 13,770,224
- Vent Cup diameter 100 mm Bh 1.00 175,000 175,000
F Instalasi Pipa Air Bekas bahan PVC klas AW
- Pipa diameter 250 mm 8.71 605,631 5,275,046
- Pipa diameter 150 mm 1,055.25 271,280 286,268,220
- Pipa diameter 80 mm 34.84 97,537 3,398,189
- Pipa diameter 65 mm 14.07 87,300 1,228,311
- Fitting diameter 250 mm 2.01 299,490 601,975
- Fitting diameter 150 mm 351.75 299,490 105,345,608
- Fitting diameter 80 mm 12.06 73,178 882,527
- Fitting diameter 65 mm 4.02 68,750 276,375

Sub Total - 22 1,476,558,027


Pipa Tegak / Riser
A Instalasi Pipa Vent bahan PVC klas AW
- Pipa diameter 100 mm m 539.35 145,979 78,733,774
- Pipa diameter 80 mm m 633.15 97,537 61,755,552
- Pipa diameter 50 mm m 48.91 63,233 3,092,726
- Fitting diameter 100 mm Bh 268.00 132,406 35,484,808
- Fitting diameter 80 mm Bh 315.00 73,178 23,051,070
B Instalasi Pipa Air Bekas Kitchen bahan PVC klas AW
- Pipa diameter 150 mm m 8.71 271,280 2,362,849
- Pipa diameter 100 mm m 1,139.67 145,979 166,367,887
- Fitting diameter 150 mm Bh 4.00 299,490 1,197,960
- Fitting diameter 100 mm Bh 567.00 132,406 75,074,202
C Instalasi Pipa air hujan dari bahan PVC klas AW
- Pipa diameter 200 mm m 9.38 425,572 3,991,865
- Pipa diameter 80 mm m 801.99 97,537 78,223,699
- Fitting diameter 200 mm Bh 2.00 723,903 1,447,806
- Fitting diameter 80 mm Bh 17.00 73,178 1,244,026

Sub Total - 23 532,028,223


SUB TOTAL
Sub Total - 1 712,874,208
Sub Total - 2 300,513,331
Sub Total - 3 32,462,058
Sub Total - 4 162,676,735
Sub Total - 5 123,985,358
Sub Total - 6 158,768,094
Sub Total - 7 321,674,733
Sub Total - 8 187,659,654
Sub Total - 9 81,030,774
Sub Total - 10 480,498,700
Sub Total - 11 2,056,940,205
Sub Total - 12 310,941,352
Sub Total - 13 1,371,652,642
Sub Total - 14 918,550,024
Sub Total - 15 412,792,954
Sub Total - 16 227,533,073
Sub Total - 17 206,413,987
Sub Total - 18 246,690,515
Sub Total - 19 206,413,987
Sub Total - 20 654,101,355
Sub Total - 21 280,135,534
Sub Total - 22 1,476,558,027
Sub Total - 23 532,028,223

Ke Penjumlahan Total 11,462,895,521

Page 14 of 14
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : PEKERJAAN PEMADAM KEBAKARAN

No. Uraian Pekerjaan Sat Vol Harga Total

Catatan Harga

I Bill of Quantity (BQ) yang diberikan Quantity Surveyor (QS) yang berisikan Item
Pekerjaan maupun Volume hanya sebagai acuan Pemborong dalam mengajukan
penawaran harga, adapun Pemborong wajib memeriksa kembali item pekerjaan maupun
volume sesuai dengan gambar maupun spesifikasi yang telah diterima, Pemborong dapat
menambahkan Item Pekerjaan maupun volume yang dianggap Pemborong belum
tercantum dalam BQ dan menepatkannya pada lampiran yang yang telah disediakan.

II Semua resiko baik mengenai salah hitung terhadap harga maupun volume pekerjaan yang
diajukan dan biaya - biaya lain yang tak terduga adalah tetap menjadi tanggung jawab
Pemborong sepenuhnya.

III Dalam memberikan harga pekerjaan ini Pemborong harus sudah mempertimbangkan
untuk memasukan semua biaya pengeluaran pekerjaan dan tidak ada tuntutan dikemudian
hari terhadap Pemberi Tugas bila Daftar Uraian Pekerjaan / BQ ini dipandang tidak
lengkap oleh Pemborong dan semua hal - hal yang tidak tercantum disini dianggap sudah
dimasukan dalam penawaran pekerjaan yang ditawarkan.

IV Pemborong sudah harus memperhitungkan / mempertimbangkan semua kemungkinan -


kemungkinan yang terjadi dilapangan dalam pelaksanaan berhubung adanya Pemborong -
Pemborong lain untuk pelaksanan proyek tersebut.

V Harga satuan pipa mulai diameter 50 mm ke bawah sudah mencakup fittingnya, adapun
pipa mulai diameter 65 mm keatas fitting dihitung terpisah, adapun harga satuan pipa
untuk semua diameter sudah termasuk penggantung, support, socket, flange dan alat
bantu lainnya, adapun untuk instalasi pipa pekerjaan luar harus sudah termasuk isolasi dan
bahan pelindung yang diperlukan.

VI Harga satuan yang ditawarkan pemborong harus sudah memperhitungkan "waste" dari
bahan yang digunakan.

VII Pekerjaan Pemadam Kebakaran dan Instalasinya meliputi Pengadaan dan Pemasangan
kecuali disebutkan lain dalam Bill Of Quantity (BQ).

VIII Catatan harga di atas berlaku untuk seluruh Pekerjaan Pemadam Kebakaran dan Seluruh
pekerjaan di bawah ini harus sesuai dengan gambar & psesifikasi yang diajukan oleh
Pemborong yang telah disetujui oleh Pemberi Tugas.

IX Pipa yang sudah terpasang secara perbagian atau secara keseluruhan harus ditest sesuai
yang dianjurkan didalam spesifikasi dan dibuatkan berita acara yang disetujui oleh
pengawas lapangan atau pihak yang terkait, ini merupakan dasar progrss material yang
sudah terpasang.
X Penawaran harga Peralatan Pompa termasuk dudukan apabila diperlukan.
XI Testing dan commissioning untuk semusa instalasi sistemnya

Ruang Pompa
A Jockey Pump (JP - 1) standar NFPA 20 Unit 1.00 50,000,000 50,000,000
Type: Vertical Turbin
Kapasitas: …. USGPM ; 160 m ; 2900 RPM
Power: ….. Kw / 380 V / 3 Ph / 50 Hz
Termasuk Panel & Kabel Kontrol, dudukan pompa & spring Mounting
B Electric Fire Pump (EFP - 1) standar NFPA 20 Unit 1.00 275,000,000 275,000,000
Type: Vertical Turbin
Kapasitas: …. USGPM ; 160 m ; 2900 RPM
Power: ….. Kw / 380 V / 3 Ph / 50 Hz
Termasuk Panel & Kabel Kontrol, dudukan pompa & spring Mounting
C Diesel Fire Pump (DFP - 1) standar NFPA 20 Unit 1.00 525,000,000 525,000,000
Type: Vertical Turbin
Kapasitas: …. USGPM ; 160 m ; 2900 RPM
Termasuk dudukan pompa & spring Mounting
D Tanki Bahan Bakar solar untuk pompa pemadam Unit 1.00 2,500,000 2,500,000
Bahan: Mild Steel (Square Tank)
Kapasitas: 200 Liter
Termasuk support / dudukan (menara baja tinggi 1,5 meter) serta material bantu.
E Fire & Jockey Pump Set Controllers Unit 1.00 5,000,000 5,000,000
F Instalasi Pipa Hydrant / Sprinkler Black Steel Sch. 40
- Pipa diameter 200 mm m 0.67 734,146 491,878
- Pipa diameter 150 mm m 23.45 626,000 14,679,700
- Pipa diameter 100 mm m 4.02 335,000 1,346,700
- Pipa diameter 65 mm m 2.68 231,244 619,734
- Fitting diameter 150 mm Bh 3.00 512,802 1,538,406
- Fitting diameter 100 mm Bh 2.00 237,132 474,264
- Fitting diameter 65 mm Bh 2.00 159,146 318,292
- Pipa header diameter 250 mm, panjang 5,5 meter termasuk support, flange dan Bh 1.00 5,500,000 5,500,000
perlengkapan lainnya
G Pengadaan, Pemasangan dan Pengetesan Valve dan perlengkapannya

Page 1 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : PEKERJAAN PEMADAM KEBAKARAN

No. Uraian Pekerjaan Sat Vol Harga Total


- Gate Valve diameter 200 mm + Stang Panjang Bh 1.00 16,721,139 16,721,139
- Gate Valve diameter 150 mm Bh 4.00 14,076,311 56,305,244
- Gate Valve diameter 100 mm Bh 2.00 11,243,678 22,487,356
- Gate Valve diameter 65 mm Bh 2.00 6,268,515 12,537,030
- Check Valve diameter 150 mm Bh 2.00 10,134,813 20,269,626
- Check Valve diameter 65 mm Bh 1.00 7,767,705 7,767,705
- Strainer diameter 150 mm Bh 2.00 8,144,718 16,289,436
- Strainer diameter 65 mm Bh 1.00 3,055,965 3,055,965
- Flexible Connection diameter 150 mm Bh 4.00 2,587,550 10,350,200
- Flexible Connection diameter 65 mm Bh 2.00 83,259 166,518
- Safety Valve diameter 100 mm Bh 1.00 21,063,019 21,063,019
- Pressure Gauge + Valve Bh 2.00 822,154 1,644,308
- Screen / Saringan Bh 3.00 750,000 2,250,000
H Instalasi Pipa Black Steel Medium (dari Jalur PDAM)
- Pipa diameter 80 mm m 6.70 235,745 1,579,492
- Fitting diameter 80 mm Bh 3.00 165,519 496,557
- Floating Valve diameter 80 mm Bh 1.00 8,074,597 8,074,597
- Gate Valve diameter 100 mm Bh 1.00 6,504,713 6,504,713
I Biaya Testing Commissioning Pekerjaan Pemadam Kebakaran Ls 1.00 10,000,000 10,000,000
J Biaya Perizinan Dinas Pemadam Kebakaran Ls 1.00 350,000,000 350,000,000

Sub Total - 1 1,450,031,878


Pekerjaan Luar
A Instalasi Pipa Hydrant, Galvanized Steel Sch. 40
- Pipa diameter 100 mm m 50.92 456,431 23,241,467
- Fitting diameter 100 mm Bh 10.00 300,414 3,004,140
- Check Valve diameter 100 mm Bh 2.00 6,595,463 13,190,926
- Two Way Siamese Conection termasuk pondasi & perlengkapannya Unit 2.00 5,376,483 10,752,966
- Bak Kontrol Valve uk. 800 x 500 x 500 mm dari concrete termasuk tutup plat steel Bh 2.00 500 1,000
B Instalasi Pipa dari PDAM konek ke Pillar Hydrant, Galvanized Steel Sch. 40
- Pipa diameter 100 mm m 20.10 456,431 9,174,263
- Fitting diameter 100 mm Bh 5.00 300,414 1,502,070
- Gate Valve diameter 100 mm Bh 2.00 6,504,713 13,009,426
- Meter Air diameter 100 mm Bh 1.00 By PDAM
- Pilar Hydrant termasuk pondasi dan perlengkapannya Unit 2.00 4,264,419 8,528,838
- Bak Kontrol Valve uk. 500 x 500 x 500 mm dari concrete termasuk tutup plat steel Bh 2.00 500 1,000
Lantai Dasar
C Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 150 mm m 64.99 626,000 40,683,740
- Pipa diameter 65 mm m 10.72 231,244 2,478,936
- Pipa diameter 40 mm m 30.15 135,863 4,096,269
- Fitting diameter 150 mm Bh 8.00 512,802 4,102,416
- Fitting diameter 65 mm Bh 6.00 159,146 954,876
- Landing Valve diameter 65 mm Bh 2.00 3,489,099 6,978,198
D Instalasi Pipa Sprinkler, Black Steel Medium
- Pipa diameter 100 mm m 5.36 332,543 1,782,430
- Pipa diameter 80 mm m 17.42 235,745 4,106,678
- Pipa diameter 65 mm m 20.10 187,033 3,759,363
- Pipa diameter 50 mm m 18.76 170,665 3,201,675
- Pipa diameter 40 mm m 11.39 126,014 1,435,299
- Pipa diameter 32 mm m 59.63 108,151 6,449,044
- Pipa diameter 25 mm m 250.58 83,363 20,889,101
- Fitting diameter 100 mm Bh 5.00 237,132 1,185,660
- Fitting diameter 80 mm Bh 20.00 165,519 3,310,380
- Fitting diameter 65 mm Bh 17.00 159,146 2,705,482
- Branch Control Valve (BCV) set diameter 100 mm Set 2.00 9,097,247 18,194,494
- Sprinkler Head Tipe Pendant Bh 146.00 50,984 7,443,664
E Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 25 mm m 50.25 83,363 4,188,991
- Gate valve diameter 25 mm (Test Drain Valve) Bh 2.00 4,123,542 8,247,084
F Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 2.00 5,765,649 11,531,298
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya.
Sub Total - 2 240,131,175
Lantai - 2
A Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 65 mm m 9.38 231,244 2,169,069
- Pipa diameter 40 mm m 32.16 135,863 4,369,354
- Fitting diameter 65 mm Bh 6.00 159,146 954,876
- Landing Valve diameter 65 mm Bh 2.00 3,489,099 6,978,198
B Instalasi Pipa Sprinkler, Black Steel Medium
- Pipa diameter 100 mm m 5.36 332,543 1,782,430
- Pipa diameter 80 mm m 14.74 235,745 3,474,881
- Pipa diameter 65 mm m 23.45 187,033 4,385,924
- Pipa diameter 50 mm m 14.07 170,665 2,401,257
- Pipa diameter 40 mm m 22.11 126,014 2,786,170
- Pipa diameter 32 mm m 22.78 108,151 2,463,680
- Pipa diameter 25 mm m 250.58 83,363 20,889,101
- Fitting diameter 100 mm Bh 6.00 237,132 1,422,792

Page 2 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : PEKERJAAN PEMADAM KEBAKARAN

No. Uraian Pekerjaan Sat Vol Harga Total


- Fitting diameter 80 mm Bh 12.00 165,519 1,986,228
- Fitting diameter 65 mm Bh 23.00 159,146 3,660,358
- Branch Control Valve (BCV) set diameter 100 mm Set 2.00 9,097,247 18,194,494
- Sprinkler Head Tipe Pendant Bh 141.00 50,984 7,188,744
C Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 25 mm m 48.24 83,363 4,021,431
- Gate valve diameter 25 mm (Test Drain Valve) Bh 2.00 4,123,542 8,247,084
D Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 2.00 5,765,649 11,531,298
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya.
Lantai - 3
E Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 65 mm m 9.38 231,244 2,169,069
- Pipa diameter 40 mm m 44.22 135,863 6,007,862
- Fitting diameter 65 mm Bh 6.00 159,146 954,876
- Landing Valve diameter 65 mm Bh 2.00 3,489,099 6,978,198
F Instalasi Pipa Sprinkler, Black Steel Medium
- Pipa diameter 100 mm m 4.02 332,543 1,336,823
- Pipa diameter 80 mm m 10.05 235,745 2,369,237
- Pipa diameter 65 mm m 25.46 187,033 4,761,860
- Pipa diameter 50 mm m 18.09 170,665 3,087,330
- Pipa diameter 40 mm m 5.36 126,014 675,435
- Pipa diameter 32 mm m 24.79 108,151 2,681,063
- Pipa diameter 25 mm m 203.01 83,363 16,923,523
- Fitting diameter 100 mm Bh 6.00 237,132 1,422,792
- Fitting diameter 80 mm Bh 10.00 165,519 1,655,190
- Fitting diameter 65 mm Bh 27.00 159,146 4,296,942
- Branch Control Valve (BCV) set diameter 100 mm Set 2.00 9,097,247 18,194,494
- Sprinkler Head Tipe Pendant Bh 120.00 50,984 6,118,080
G Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 25 mm m 63.65 83,363 5,306,055
- Gate valve diameter 25 mm (Test Drain Valve) Bh 2.00 4,123,542 8,247,084
H Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 2.00 5,765,649 11,531,298
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya. Sub Total - 3 213,624,579

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
A Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 65 mm m 131.32 231,244 30,366,962
- Pipa diameter 40 mm m 619.08 135,863 84,110,066
- Fitting diameter 65 mm Bh 84.00 159,146 13,368,264
- Landing Valve diameter 65 mm Bh 28.00 3,489,099 97,694,772
B Instalasi Pipa Sprinkler, Black Steel Medium
- Pipa diameter 100 mm m 56.28 332,543 18,715,520
- Pipa diameter 80 mm m 140.70 235,745 33,169,322
- Pipa diameter 65 mm m 356.44 187,033 66,666,043
- Pipa diameter 50 mm m 253.26 170,665 43,222,618
- Pipa diameter 40 mm m 75.04 126,014 9,456,091
- Pipa diameter 32 mm m 347.06 108,151 37,534,886
- Pipa diameter 25 mm m 2,842.14 83,363 236,929,317
- Fitting diameter 100 mm Bh 84.00 237,132 19,919,088
- Fitting diameter 80 mm Bh 140.00 165,519 23,172,660
- Fitting diameter 65 mm Bh 378.00 159,146 60,157,188
- Branch Control Valve (BCV) set diameter 100 mm Set 28.00 9,097,247 254,722,916
- Sprinkler Head Tipe Pendant Bh 1,680.00 50,984 85,653,120
C Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 25 mm m 891.10 83,363 74,284,769
- Gate valve diameter 25 mm (Test Drain Valve) Bh 28.00 4,123,542 115,459,176
D Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 28.00 5,765,649 161,438,172
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya.
Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
E Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 65 mm m 65.66 231,244 15,183,481
- Pipa diameter 40 mm m 309.54 135,863 42,055,033
- Fitting diameter 65 mm Bh 42.00 159,146 6,684,132
- Landing Valve diameter 65 mm Bh 14.00 3,489,099 48,847,386
F Instalasi Pipa Sprinkler, Black Steel Medium
- Pipa diameter 100 mm m 28.14 332,543 9,357,760
- Pipa diameter 80 mm m 70.35 235,745 16,584,661
- Pipa diameter 65 mm m 178.22 187,033 33,333,021
- Pipa diameter 50 mm m 126.63 170,665 21,611,309
- Pipa diameter 40 mm m 37.52 126,014 4,728,045
- Pipa diameter 32 mm m 173.53 108,151 18,767,443
- Pipa diameter 25 mm m 1,421.07 83,363 118,464,658
- Fitting diameter 100 mm Bh 42.00 237,132 9,959,544
- Fitting diameter 80 mm Bh 70.00 165,519 11,586,330

Page 3 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : PEKERJAAN PEMADAM KEBAKARAN

No. Uraian Pekerjaan Sat Vol Harga Total


- Fitting diameter 65 mm Bh 189.00 159,146 30,078,594
- Branch Control Valve (BCV) set diameter 100 mm Set 14.00 9,097,247 127,361,458
- Sprinkler Head Tipe Pendant Bh 840.00 50,984 42,826,560
G Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 25 mm m 445.55 83,363 37,142,385
- Gate valve diameter 25 mm (Test Drain Valve) Bh 14.00 4,123,542 57,729,588
H Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 14.00 5,765,649 80,719,086
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya. Sub Total - 4 2,199,061,423

Lantai Atap
A Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 65 mm m 9.38 231,244 2,169,069
- Pipa diameter 40 mm m 2.68 135,863 364,113
- Fitting diameter 65 mm Bh 6.00 159,146 954,876
- Landing Valve diameter 65 mm Bh 2.00 3,489,099 6,978,198
B Indoor Hydrant Box (IHB) c/w Variable spray type Nozzle dia. 40 mm, Hose rack, Unit 2.00 5,765,649 11,531,298
Hydrant valve, Orifice, line hose panjang 30 meter dia. 40 mm, Fire Extinguisher 3 Kg (1 unit)
dan perlengkapan bantu lainnya.
Pipa Riser / Tegak
C Instalasi Pipa Hydrant, Black Steel Sch. 40
- Pipa diameter 150 mm m 134.00 626,000 83,884,000
- Fitting diameter 150 mm Bh 150.00 512,802 76,920,300
- Pressure Reducing Valve (PRV) Set diameter 150 mm Set 2.00 95,422,318 190,844,636
- Automatic Air Vent diameter 25 mm Bh 2.00 4,557,781 9,115,562
- Pressure Gauge Bh 2.00 822,154 1,644,308
D Instalasi Pipa Drain, Black Steel Medium
- Pipa diameter 50 mm m 98.49 170,665 16,808,796

Sub Total - 5 401,215,155

Ke Penjumlahan Total 4,504,064,210

Page 4 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : TATA UDARA

No. Uraian Pekerjaan Sat Vol Harga Total


Catatan Harga

I Harga satuan Ducting sudah termasuk isolasi, support / penggantung dan peralatan
bantu lainya yang diperlukan.

II Harga satuan unit peralatan AC Split Wall sudah harus termasuk instalasi pipa
refrigerant / drain, support / Bracket dan dudukan termasuk perapihan bekas bobokan.

III Harga satuan unit peralatan FAN sudah harus termasuk support dan dudukan.
(termasuk perapihan bekas bobokan)

IV Harga satuan pemasangan Grille pada area tangga kebakaran sudah harus termasuk
perapihannya. (Pelubangan oleh kontraktor Sipil dan Kontraktor ME hanya Marking)

V Semua pekerjaan Tata Udara meliputi Pengadaan & Pemasangan kecuali disebutkan lain.
VI Testing dan commissioning untuk semusa instalasi sistemnya

Lantai Dasar
Area Pemulasaraan
Unit AC (OU/IU) - DS.1.1 & DS.1.2 Unit 2 5,640,074 11,280,148
Type: Wall Mounted
Kapasitas: 12.625 BTU/H
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 8.04 267,663 2,152,011
- Instalasi kabel NYM 3 x 2,5 mm2 m 8.04 20,741 166,758
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 8.71 21,063 183,459
Area Balai Kesehatan
C Unit AC (OU/IU) - DS.2.1 & DS.2.2 Unit 2 5,640,074 11,280,148
Type: Wall Mounted
Kapasitas: 12.625 BTU/H
D Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 15.41 267,663 4,124,687
- Instalasi kabel NYM 3 x 2,5 mm2 m 15.41 20,741 319,619
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 10.72 21,063 225,795
Area Keamanan
E Unit AC (OU/IU) - DS.3 Unit 1 5,640,074 5,640,074
Type: Wall Mounted
Kapasitas: 12.000 BTU/H
F Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 8.04 267,663 2,152,011
- Instalasi kabel NYM 3 x 2,5 mm2 m 8.04 20,741 166,758
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 10.72 21,063 225,795
Area Kios
G Unit AC (OU/IU) - DS.4.1 & DS.4.2 Unit 2 8,024,500 By Tenant
Type: Wall Mounted
Kapasitas: 16.344 BTU/H
H Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 10.05 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 10.05 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 7.37 21,063 By Tenant
I Ceiling Fan (EF - DS) / area Toilet Unit 6 950,000 5,700,000
Type: Ceiling Fan
Kapasitas: 100 CFM
J Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 30.15 145,979 4,401,267
- Fitting diameter 100 mm Bh 5 132,406 662,030

Sub Total - 1 48,680,558


Lantai Dasar
Area Kios
A Unit AC (OU/IU) - DS.5 Unit 1 5,640,074 By Tenant
Type: Wall Mounted
Kapasitas: 12.000 BTU/H
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 3.35 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 3.35 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 4.02 21,063 By Tenant
C Ceiling Fan (area Toilet) Unit 1 950,000 950,000
Type: Ceiling Fan
Kapasitas: 100 CFM
D Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 4.69 145,979 684,642
- Fitting diameter 100 mm Bh 1 132,406 132,406
Area Tangga Darurat

E Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 0.804 270,000 217,080
- BJLS 50 m2 2.412 240,000 578,880

Page 1 of 5
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : TATA UDARA

No. Uraian Pekerjaan Sat Vol Harga Total


F Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 2 420,000 840,000
- Exhaust Air Grille (EAG) 8" x 8" Bh 2 224,000 448,000
- Volume Damper (VD) 8" x 6" Bh 2 168,000 336,000
Lantai - 2
Area TK
G Unit AC (OU/IU) - TK.1.1 s/d TK.1.4 Unit 4 29,000,000 116,000,000
Type: Ceiling Cassette
Kapasitas: 3 PK
H Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 3/8" + 5/8" m 26.8 125,107 3,352,868
- Instalasi kabel NYM 3 x 2,5 mm2 m 26.8 20,741 555,859
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 20.1 21,063 423,366
Area Mushola
I Unit AC (OU/IU) - M.1.1 & M.1.2 Unit 2 5,640,074 11,280,148
Type: Wall Mounted
Kapasitas: 12.812 BTU/H
J Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 9.38 267,663 2,510,679
- Instalasi kabel NYM 3 x 2,5 mm2 m 9.38 20,741 194,551
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 8.04 21,063 169,347

Sub Total - 2 138,673,824


Lantai - 2
Area Mushola
A Unit AC (OU/IU) - M.1.3 Unit 1 6,726,500 6,726,500
Type: Wall Mounted
Kapasitas: 14.750 BTU/H
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 3.35 267,663 896,671
- Instalasi kabel NYM 3 x 2,5 mm2 m 3.35 20,741 69,482
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 3.35 21,063 70,561
Area Balai Warga
C Unit AC (OU/IU) - BW.1 & BW.2 Unit 2 31,108,000 62,216,000
Type: Ceiling Cassette
Kapasitas: 5 PK
D Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 3/8" + 3/4" m 9.38 142,556 1,337,175
- Instalasi kabel NYM 3 x 2,5 mm2 m 9.38 20,741 194,551
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 9.38 21,063 197,571
Area Toilet Koridor
E Ceiling Fan (area Toilet) Unit 1 950,000 950,000
Type: Ceiling Fan
Kapasitas: 75 CFM
F Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 1.34 145,979 195,612
- Fitting diameter 100 mm Bh 2 132,406 264,812
Area Tangga Darurat

G Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 0.804 270,000 217,080
- BJLS 50 m2 2.412 240,000 578,880
H Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 1.34 420,000 562,800
- Exhaust Air Grille (EAG) 8" x 8" Bh 1.34 224,000 300,160
- Volume Damper (VD) 8" x 6" Bh 1.34 168,000 225,120

Sub Total - 3 75,002,975


Lantai - 2
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Unit AC (OU/IU) - Model.3 Unit 24 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 1 PK
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 112.56 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 112.56 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 64.32 21,063 By Tenant
C Ceiling Fan (area Toilet) Unit 24 950,000 22,800,000
Type: Ceiling Fan
Kapasitas: 75 CFM
D Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 96.48 145,979 14,084,054
- Fitting diameter 100 mm Bh 48 132,406 6,355,488
E Lovre Air Grille (LAG) 200 x 150 mm Bh 24 196,000 4,704,000
Lantai - 3
Area Toilet Koridor
E Ceiling Fan (area Toilet) Unit 1 950,000 950,000
Type: Ceiling Fan
Kapasitas: 75 CFM

Page 2 of 5
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : TATA UDARA

No. Uraian Pekerjaan Sat Vol Harga Total


F Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 1.34 145,979 195,612
- Fitting diameter 100 mm Bh 1 132,406 132,406
Area Tangga Darurat

G Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 0.804 270,000 217,080
- BJLS 50 m2 2.412 240,000 578,880
H Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 2 420,000 840,000
- Exhaust Air Grille (EAG) 8" x 8" Bh 2 224,000 448,000
- Volume Damper (VD) 8" x 6" Bh 2 168,000 336,000

Sub Total - 4 51,641,520


Lantai - 3
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
A Unit AC (OU/IU) - Model.3 Unit 24 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 1 PK
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 112.56 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 112.56 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 64.32 21,063 By Tenant
C Ceiling Fan (area Toilet) Unit 24 950,000 22,800,000
Type: Ceiling Fan
Kapasitas: 75 CFM
D Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 96.48 145,979 14,084,054
- Fitting diameter 100 mm Bh 48 132,406 6,355,488
E Lovre Air Grille (LAG) 200 x 150 mm Bh 24 196,000 4,704,000
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
F Unit AC (OU/IU) - Model.1 Unit 15 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 0,5 BTU/H
G Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 30.15 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 30.15 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 40.2 21,063 By Tenant
H Unit AC (OU/IU) - Model.2 Unit 30 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 0,75 PK
I Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 100.5 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 100.5 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 50.25 21,063 By Tenant
J Ceiling Fan (area Toilet) Unit 15 950,000 14,250,000
Type: Ceiling Fan
Kapasitas: 75 CFM
K Ceiling Fan (area Kitchen Hood) Unit 15 950,000 By Tenant
Type: Ceiling Fan
Kapasitas: 200 CFM
L Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 100.5 145,979 14,670,890
- Fitting diameter 100 mm Bh 60 132,406 7,944,360
M Lovre Air Grille (LAG) 200 x 150 mm Bh 30 196,000 5,880,000

Sub Total - 5 90,688,791

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
Area Toilet Koridor
A Ceiling Fan (area Toilet) Unit 14 950,000 13,300,000
Type: Ceiling Fan
Kapasitas: 75 CFM
B Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 18.76 145,979 2,738,566
- Fitting diameter 100 mm Bh 14 132,406 1,853,684
Area Tangga Darurat

C Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 11.256 270,000 3,039,120
- BJLS 50 m2 34.17 240,000 8,200,800
D Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 28 420,000 11,760,000
- Exhaust Air Grille (EAG) 8" x 8" Bh 28 224,000 6,272,000
- Volume Damper (VD) 8" x 6" Bh 28 168,000 4,704,000
Denah Unit Type - 1 (Typical untuk 24 unit kamar)
E Unit AC (OU/IU) - Model.3 Unit 336 4,200,000 By Tenant
Type: Wall Mounted

Page 3 of 5
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : TATA UDARA

No. Uraian Pekerjaan Sat Vol Harga Total


Kapasitas: 1 PK
F Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 1575.84 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 1575.84 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 900.48 21,063 By Tenant
G Ceiling Fan (area Toilet) Unit 336 950,000 319,200,000
Type: Ceiling Fan
Kapasitas: 75 CFM
H Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 1350.72 145,979 197,176,755
- Fitting diameter 100 mm Bh 672 132,406 88,976,832
I Lovre Air Grille (LAG) 200 x 150 mm Bh 336 196,000 65,856,000

Sub Total - 6 723,077,757

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
A Unit AC (OU/IU) - Model.1 Unit 210 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 0,5 PK
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 422.1 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 422.1 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 562.8 21,063 By Tenant
C Unit AC (OU/IU) - Model.2 Unit 420 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 0,75 PK
D Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 1407 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 1407 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 703.5 21,063 By Tenant
E Ceiling Fan (area Toilet) Unit 210 950,000 199,500,000
Type: Ceiling Fan
Kapasitas: 75 CFM
F Ceiling Fan (area Kitchen Hood) Unit 210 950,000 By Tenant
Type: Ceiling Fan
Kapasitas: 200 CFM
G Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 1407 145,979 205,392,453
- Fitting diameter 100 mm Bh 840 132,406 111,221,040
H Lovre Air Grille (LAG) 200 x 150 mm Bh 420 196,000 82,320,000
Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
Area Toilet Koridor
I Ceiling Fan (area Toilet) Unit 7 950,000 6,650,000
Type: Ceiling Fan
Kapasitas: 75 CFM
J Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 9.38 145,979 1,369,283
- Fitting diameter 100 mm Bh 7 132,406 926,842
Area Tangga Darurat

K Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 5.628 270,000 1,519,560
- BJLS 50 m2 17.085 240,000 4,100,400
L Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 14 420,000 5,880,000
- Exhaust Air Grille (EAG) 8" x 8" Bh 14 224,000 3,136,000
- Volume Damper (VD) 8" x 6" Bh 14 168,000 2,352,000

Sub Total - 7 624,367,578


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
Denah Unit Type - 1 (Typical untuk 22 unit kamar)
A Unit AC (OU/IU) - Model.3 Unit 154 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 1 PK
B Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 722.26 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 722.26 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 412.72 21,063 By Tenant
C Ceiling Fan (area Toilet) Unit 154 950,000 146,300,000
Type: Ceiling Fan
Kapasitas: 75 CFM
D Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 619.08 145,979 90,372,679
- Fitting diameter 100 mm Bh 308 132,406 40,781,048
E Lovre Air Grille (LAG) 200 x 150 mm Bh 154 196,000 30,184,000
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
F Unit AC (OU/IU) - Model.1 Unit 105 4,200,000 By Tenant
Type: Wall Mounted

Page 4 of 5
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : TATA UDARA

No. Uraian Pekerjaan Sat Vol Harga Total


Kapasitas: 0,5 PK
G Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 211.05 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 211.05 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 281.4 21,063 By Tenant
H Unit AC (OU/IU) - Model.2 Unit 210 4,200,000 By Tenant
Type: Wall Mounted
Kapasitas: 0,75 PK
I Pengadaan, pemasangan dan pengetesan instalasi pipa dan kabel :
- Instalasi pipa refrigerant dia. 1/4" + 3/8" m 703.5 267,663 By Tenant
- Instalasi kabel NYM 3 x 2,5 mm2 m 703.5 20,741 By Tenant
- Instalasi pipa drain dia. 20 mm (PVC AW + isolasi) m 351.75 21,063 By Tenant
J Ceiling Fan (area Toilet) Unit 105 950,000 99,750,000
Type: Ceiling Fan
Kapasitas: 75 CFM
K Ceiling Fan (area Kitchen Hood) Unit 105 950,000 By Tenant
Type: Ceiling Fan
Kapasitas: 200 CFM
L Pengadaan, pemasangan dan pengetesan instalasi pipa drain PVC D
- Pipa diameter 100 mm m 703.5 145,979 102,696,227
- Fitting diameter 100 mm Bh 420 132,406 55,610,520
M Lovre Air Grille (LAG) 200 x 150 mm Bh 210 196,000 41,160,000

Sub Total - 8 606,854,474


Lantai Atap
A Pressurized Fan (SPF - 1) & (SPF - 2) Unit 2 38,612,292 77,224,584
Type: Axial
Kapasitas: 21.600 CFM
Static Press.: 1,1 in.wg
Power: 8,5 Kw / 380 V / 3 Ph / 50 Hz
Dilengkapi dengan Control Variable Speed Drive

B Pengadaan, pemasangan dan pengetesan instalasi ducting Exhaust / Fresh tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 100 m2 19.698 360,100 7,093,250
Area Tangga Darurat

C Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 60 m2 5.628 270,000 1,519,560
- BJLS 50 m2 17.085 240,000 4,100,400
D Pengadaan & Pemasangan Diffuser, Grille dan Perlengkapannya
- Fresh Air Grille (FAG) 16" x 14" Bh 14 420,000 5,880,000
- Exhaust Air Grille (EAG) 8" x 8" Bh 14 224,000 3,136,000
- Volume Damper (VD) 8" x 6" Bh 14 168,000 2,352,000
Area Shaff
Pengadaan, pemasangan dan pengetesan instalasi ducting Fresh / Exhaust tanpa isolasi, termasuk bracket,
gantungan, support, dan perlengkapan bantu lainnya sesuai gambar dan spesifikasi.
- BJLS 100 m2 180.9 360,100 ExcluFe
- BJLS 80 m2 125.826 310,187 ExcluFe
- BJLS 60 m2 28.14 270,000 ExcluFe
- BJLS 50 m2 2.68 240,000 ExcluFe

Sub Total - 9 101,305,794

Ke Penjumlahan Total 2,460,293,271

Page 5 of 5
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Catatan harga berikut berlaku untuk semua pekerjaan yang berkaitan dengan pengadaan
dan pemasangan Sistem Elektrikal yang secara menyeluruh mengacu pada Spesifikasi
dan Gambar yang diterbitkan untuk tender, kecuali bila disebutkan lain.

II Pemborong wajib menghitung volume (jumlah satuan) pekerjaan yang telah dituangkan
dalam Bill of Item (BQ) oleh Quantity Surveyor. Jika menurut perhitungan Pemborong
terdapat item pekerjaan yang belum tercantum atau tidak sesuai dengan Gambar referensi
yang bersangkutan, maka Pemborong dapat melakukan koreksi dengan menambahkan dan
atau mengurangi item pekerjaan pada lampiran yang khusus dibuat untuk itu.

III Semua resiko baik mengenai salah hitung terhadap harga maupun jumlah satuan dan
item yang diajukan dan biaya - biaya lain yang tak terduga adalah tetap menjadi
tanggung jawab Pemborong.

IV Dalam memberikan harga pada semua item pekerjaan ini Pemborong harus sudah
mempertimbangkan untuk memasukan semua biaya pengeluaran pekerjaan dan tidak ada
tuntutan dikemudian hari terhadap Pemberi Tugas bila Daftar Uraian Pekerjaan / BQ ini
dipandang tidak lengkap oleh Pemborong dan semua hal - hal yang tidak tercantum di
BQ ini dianggap sudah dimasukan dalam harga penawaran pekerjaan yang diajukan
/ditawarkan

V Pemborong sudah harus memperhitungkan / mempertimbangkan semua kemungkinan -


kemungkinan yang terjadi di lapangan dalam pelaksanaan berhubung adanya
Pemborong untuk pekerjaan yang lain pada pelaksanan proyek tersebut.

VI Seluruh pekerjaan yang tertuang dalam BQ ini merupakan pekerjaan pengadaan dan
pemasangan, kecuali bila disebutkan lain.

VII Harga satuan yang ditawarkan harus sudah memperhitungkan "waste" dari material
yang digunakan.

VIII Harga satuan kabel instalasi final pertitik sudah termasuk pipa konduit, klemp, T dus,
inbouw dus, dan bobokan / chipping.

IX Harga satuan kabel Toefoor / Feeder atau pipa konduit yang dipasang di dalam tanah
sudah termasuk biaya galian, penimbunan dan perapihan kembali sepanjang jalur galian
dengan ukuran kedalaman dan lebar yang sudah ditentukan di dalam Gambar dan
Spesifikasi.

X Harga satuan panel daya sudah harus termasuk rumah panel yang terbuat dari plat besi
yang diproses anti karat, cat bakar, kunci, engsel, cover, support pondasi, sistem
pentanahan dan material / bahan pendukung lainnya.

XI Harga satuan kabel tray dan kabel ladder sudah harus termasuk semua aksesoris,
support, fitting penyambungan, penggantung, material / bahan pendukung lainnya.

XII Harga satuan armatur lampu harus sudah termasuk "marking" dan dudukan armatur,
berikut fitting, stater, ballast, trafo dan semua aksesoris serta komponen lain yang
diperlukan.

Lantai Dasar
A Pengadaan, Pemasangan dan Pengetesan Panel
- Panel MVMDP Unit 1 650,000,000 650,000,000
- Transformator 1600 KVA (Oil Type) 20 / 0.4 KV - 3 Ph - 50 Hz, Dyn 5 Unit 1 192,000,000 192,000,000
- Transformator 630 KVA (Oil Type) 20 / 0.4 KV - 3 Ph - 50 Hz, Dyn 5 Unit 1 238,967,986 238,967,986
- Panel LVMDP - 1 Unit 1 152,460,000 152,460,000
- Panel LVMDP - 2 Unit 1 247,632,000 247,632,000
- Panel LVMDP + Capacitor Bank 240 KVAR Unit 1 138,600,000 138,600,000
- Panel SDP - EE Unit 1 82,236,000 82,236,000
- Panel PP / LP - CR (Control Room) Unit 1 4,620,000 4,620,000
- Panel PP / LP - FCC Unit 1 11,088,000 11,088,000
- Panel PP - HYD Unit 1 13,860,000 13,860,000
- Panel PP - AB Unit 1 13,860,000 13,860,000
- Panel PP / LP - DS Unit 1 8,316,000 8,316,000
- Panel LP / PL Unit 1 6,468,000 6,468,000
- UPS 1 KW 30 Menit (PP/LP - FCC) (Provisional) Unit 1 50,000,000 50,000,000
- Box KWH Meter (untuk P - KO) Unit 1 15,000,000 15,000,000
B Instalasi Kabel Power dari :
- Gardu PLN ke Panel MVMDP N2XSY 3 x 1 x 120 mm2 (Provisional) m 67 1,014,706 67,985,302
- Panel MVMDP ke Trafo 1600 KVA N2XSY 3 x 1 x 120 mm2 + NYMHY 4 x 2,5 mm2 m 6.7 1,039,706 6,966,030
- Panel MVMDP ke Trafo 630 KVA N2XSY 3 x 1 x 120 mm2 + NYMHY 4 x 2,5 mm2 m 8.04 1,039,706 8,359,236

Page 1 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


- Trafo 1600 KVA ke Panel LVMDP - 1 NYY 4 x (5 x 1 x 300 mm2) + NYMHY 4 x 2,5 mm m 11.39 12,028,933 137,009,547
- Trafo 630 KVA ke Panel LVMDP - 2 NYY 4 x (2 x 1 x 300 mm2) + NYMHY 4 x 2,5 mm m 8.71 4,828,755 42,058,456
- Panel LVMDP - 2 ke Panel LVMDP + Cap.Bank Busbar CU 500 A m 3.35 3,000,000 10,050,000
- Panel LVMDP - 2 ke PKG NYY 4 x (2 x 1 x 300 mm2) + NYMHY 4 x 2,5 mm m 13.4 4,828,755 64,705,317
- Panel LVMDP - 2 ke SDP - EE NYY 4 x 1 x 300 mm2 + BCC 150 mm2 (Provision m 10.05 2,428,780 24,409,239
- Panel LVMDP - 2 ke PP - AB NYY 4 x 120 mm2 + BCC 50 mm2 (Provisional) m 20.1 1,071,455 21,536,246
- Panel SDP - EE ke PKG FRC 4 x (2 x 1 x 150 mm2) + NYMHY 4 x 2,5 mm m 13.4 3,188,455 42,725,297
- Panel SDP - EE ke PP - HYD FRC 4 x 185 mm2 + BCC 1 x 70 mm2 m 16.75 1,920,430 32,167,203
- Panel SDP - EE ke PP/LP - FCC FRC 4 x 6 mm2 m 53.6 304,196 16,304,906
- Panel SDP - EE ke PP/LP - CR FRC 4 x 120 mm2 m 10.72 4,193,519 44,954,524
- Panel PP/LP - L2 ke PP/LP - DS NYY 4 x 4 mm2 m 6.7 40,910 274,097
- Panel PP/LP - DS ke LP/PL NYY 3 x 4 mm2 m 3.35 27,273 91,365
- Panel PP - AB ke PP - STP NYY 3 x 4 mm2 (Provisional) m 43.55 27,273 1,187,739
- Panel PP - AB ke PC - Transfer (2 unit) NYY 4 x 35 mm2 + BCC 25 mm2 (Provisional) m 20.1 350,101 7,037,030
C Kabel Ladder / Tray : (Elektrikal)
- Kabel Ladder uk. 1000 x 100 mm m 36.85 513,326 18,916,063
- Kabel Ladder uk. 500 x 100 mm m 12.06 375,914 4,533,523
- Kabel Ladder uk. 300 x 100 mm m 14.07 311,058 4,376,586
- Kabel Ladder uk. 200 x 100 mm m 12.06 294,030 3,546,002
- Kabel Ladder uk. 1000 x 100 mm (dalam shaff) m 2.814 513,326 1,444,499
D Kabel Ladder / Tray : (Elektronik)
- Kabel Ladder uk. 600 x 100 mm m 36.18 390,962 14,145,005
- Kabel Ladder uk. 150 x 100 mm m 26.8 276,254 7,403,607
- Kabel Ladder uk. 600 x 100 mm (dalam shaff) m 2.814 390,962 1,100,167
E Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 113 190,000 21,470,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 16 1,500,000 24,000,000
- Baret LED 18 W Bh 6 325,000 1,950,000
- Stop Kontak Bh 7 39,920 279,440
- Saklar Ganda Bh 7 46,394 324,758
- Saklar Tunggal Bh 11 31,044 341,484
- Saklar Hotel Bh 3 75,000 225,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 135 198,325 26,773,875
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 7 239,689 1,677,823

Sub Total - 1 2,485,437,351


Lantai - 1
A KIOS (P - KO.1 s/d P - KO.6) (Provisional)
- Box MCB Unit 1 514,800 514,800
- KWH Meter Token Unit 1 330,000 330,000
- Panel PP/LP - DS ke KWH Meter Kios NYM 3 x 4 mm2 + Conduit dia. 20 mm m 168.84 32,839 5,544,537
Lantai - 2
B Pengadaan, Pemasangan dan Pengetesan Panel
- Panel SDP - L.2 Unit 1 17,278,800 17,278,800
- Panel PP / LP - L.2 Unit 1 9,240,000 9,240,000
- Box KWH Meter PLN (untuk Public area & hunian) Unit 1 16,632,000 16,632,000
- UPS 1 KW 30 Menit (PP/LP - L.2) (Provisional) Unit 1 50,000,000 50,000,000
- Box KWH Meter (untuk P - K) Unit 1 5,000,000 5,000,000
- Box KWH Meter (untuk P - WR) Unit 1 5,000,000 5,000,000
C Instalasi Kabel Power dari :
- SDP - L.3 ke SDP - L.2 NYY 4 x 50 mm2 + BCC 35 mm2 m 7.37 490,921 3,618,088
- LVMDP - 2 ke Panel PP/LP - L2 NYY 4 x 10 mm2 + BCC 6 mm2 m 45.56 102,860 4,686,302
- SDP - L.2 ke KWH Meter P - K NYM 3 x 4 mm2 (24 unit) m 225.12 38,623 8,694,810
- SDP - L.2 ke KWH Meter PP / LP - BW NYM 3 x 4 mm2 m 9.38 38,623 362,284
- SDP - L.2 ke KWH Meter PP / LP - TKK NYM 3 x 4 mm2 m 9.38 38,623 362,284
- SDP - L.2 ke KWH Meter P - WR NYM 3 x 4 mm2 (9 unit) m 84.42 38,623 3,260,554
D Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K2.1 s/d P - K2.24) m 482.4 38,623 18,631,735
E Kabel Ladder / Tray : (Elektrikal)
- Kabel Ladder uk. 400 x 100 mm m 6.7 330,154 2,212,032
- Kabel Ladder uk. 300 x 100 mm m 18.09 311,058 5,627,039
- Kabel Ladder uk. 200 x 100 mm m 32.83 294,030 9,653,005
- Kabel Ladder uk. 1000 x 100 mm (dalam shaff) m 2.68 513,326 1,375,714
F Kabel Ladder / Tray : (Elektronik)
- Kabel Ladder uk. 300 x 100 mm m 4.69 311,058 1,458,862
- Kabel Ladder uk. 150 x 100 mm m 62.31 276,254 17,213,387
- Kabel Ladder uk. 600 x 100 mm (dalam shaff) m 2.68 390,962 1,047,778
KORIDOR APARTEMEN & PUBLIC AREA
G Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 11 190,000 2,090,000
- Ressed Down Light LED 15 W / 4000 Lux ; dia. 15 cm Bh 58 450,000 26,100,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 11 1,500,000 16,500,000
- Baret LED 18 W Bh 5 325,000 1,625,000
- Baret LED 18 W + Battery Emergency (area tangga) Bh 4 1,425,000 5,700,000
- Exit TL 10 W + Battery Emergency Bh 1 2,227,351 2,227,351

Page 2 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


- Stop Kontak Bh 5 39,920 199,600
- Saklar Ganda Bh 1 46,394 46,394
- Saklar Tunggal Bh 8 31,044 248,352
- Saklar Hotel Bh 5 75,000 375,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 90 198,325 17,849,250
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 5 239,689 1,198,445
H Warung (P - WR.1 s/d P - WR.12) (Provisional)
- Box MCB Unit 12 514,800 6,177,600
- NYM 3 x 4 mm2 dari KWH Meter ke Box MCB (12 unit) m 249.24 38,623 9,626,397

Sub Total - 2 277,707,397


Lantai - 2
A Balai Warga
- Panel PP / LP - BW Unit 1 738,000 738,000
- NYM 3 x 4 mm2 dari KWH Meter ke PP / LP - BW m 10.72 38,623 414,039
- Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 12 190,000 2,280,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 2 1,500,000 3,000,000
- Stop Kontak Bh 2 39,920 79,840
- Saklar Ganda Bh 1 46,394 46,394
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 14 198,325 2,776,550
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 2 239,689 479,378
B Taman Kanak - Kanak
- Panel PP / LP - TKK Unit 1 738,000 738,000
- NYM 3 x 4 mm2 dari KWH Meter ke PP / LP - BW m 30.82 38,623 1,190,361
- Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 16 190,000 3,040,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 1 1,500,000 1,500,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 17 198,325 3,371,525
C Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Box MCB Unit 24 1,180,800 28,339,200
- Down Light 10,5 Watt Bh 120 215,000 25,800,000
- Stop Kontak Bh 96 39,920 3,832,320
- Stop Kontak AC Bh 24 39,920 958,080
- Saklar Ganda Bh 24 46,394 1,113,456
- Saklar Tunggal Bh 72 31,044 2,235,168
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 120 198,325 23,799,000
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 120 239,689 28,762,680
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 16.08 11,605 186,608

Sub Total - 3 134,680,599

Lantai - 3
A Pengadaan, Pemasangan dan Pengetesan Panel
- Panel SDP - L.3 Unit 1 37,884,000 37,884,000
- Panel PP / LP - L.3 Unit 1 5,544,000 5,544,000
- Box KWH Meter PLN (untuk hunian) Unit 1 10,000,000 10,000,000

B Instalasi Kabel Power dari :


- LVMDP - 1 ke Panel SDP - L.3 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 47.57 1,596,329 75,937,371
- Panel PP / LP - L.2 ke PP / LP - L.3 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- SDP - L.3 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 365.82 32,839 12,013,163
C Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K3.1 s/d P - K3.39) m 791.27 32,839 25,984,516
D Kabel Ladder / Tray : (Elektrikal)
- Kabel Ladder uk. 600 x 100 mm m 8.71 390,962 3,405,279
- Kabel Ladder uk. 300 x 100 mm m 36.18 311,058 11,254,078
- Kabel Ladder uk. 200 x 100 mm m 18.09 294,030 5,319,003
- Kabel Ladder uk. 1000 x 100 mm (dalam shaff) m 2.01 513,326 1,031,785
E Kabel Ladder / Tray : (Elektronik)
- Kabel Ladder uk. 300 x 100 mm m 4.69 311,058 1,458,862
- Kabel Ladder uk. 150 x 100 mm m 58.29 276,254 16,102,846
- Kabel Ladder uk. 600 x 100 mm (dalam shaff) m 2.01 390,962 785,834
KORIDOR APARTEMEN & PUBLIC AREA
F Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 4 190,000 760,000
- Ressed Down Light LED 15 W / 4000 Lux ; dia. 15 cm Bh 41 450,000 18,450,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 11 1,500,000 16,500,000
- Baret LED 18 W + Battery Emergency (area tangga) Bh 4 1,425,000 5,700,000
- Exit TL 10 W + Battery Emergency Bh 2 2,227,351 4,454,702
- Stop Kontak Bh 3 39,920 119,760
- Saklar Tunggal Bh 5 31,044 155,220
- Saklar Hotel Bh 4 75,000 300,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 62 198,325 12,296,150
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 3 239,689 719,067

Page 3 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


G Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Box MCB Unit 24 1,180,800 28,339,200
- Down Light 10,5 Watt Bh 120 215,000 25,800,000
- Stop Kontak Bh 96 39,920 3,832,320
- Stop Kontak AC Bh 24 39,920 958,080
- Saklar Ganda Bh 24 46,394 1,113,456
- Saklar Tunggal Bh 72 31,044 2,235,168
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 120 198,325 23,799,000
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 120 239,689 28,762,680
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 16.08 11,605 186,608

Sub Total - 4 381,366,603


Lantai - 3
A Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Box MCB Unit 15 1,180,800 17,712,000
- Down Light 10,5 Watt Bh 105 215,000 22,575,000
- Stop Kontak Bh 90 39,920 3,592,800
- Stop Kontak AC Bh 45 39,920 1,796,400
- Saklar Ganda Bh 15 46,394 695,910
- Saklar Tunggal Bh 90 31,044 2,793,960
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 105 198,325 20,824,125
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 135 239,689 32,358,015
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 20.1 11,605 233,261
Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
B Pengadaan, Pemasangan dan Pengetesan Panel
- Panel SDP - L.4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 Unit 14 28,459,200 398,428,800
- Panel PP / LP - L.4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 Unit 14 4,620,000 64,680,000
- Box KWH Meter PLN (untuk hunian) Unit 14 10,000,000 140,000,000
C Instalasi Kabel Power dari LVMDP - 1 ke :
- Panel SDP - L.6 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 53.6 1,596,329 85,563,234
- Panel SDP - L.9 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 59.63 1,596,329 95,189,098
- Panel SDP - L.12 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 65.66 1,596,329 104,814,962
- Panel SDP - L.15 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 71.69 1,596,329 114,440,826
- Panel SDP - L.18 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 77.72 1,596,329 124,066,690
- Panel SDP - L.21 NYY 4 x 1 x 185 mm2 + BCC 70 mm2 m 83.75 1,596,329 133,692,554
D Instalasi Kabel Power dari :
- Panel SDP - L.3 ke SDP - L.4 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.6 ke SDP - L.7 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.9 ke SDP - L.10 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.12 ke SDP - L.13 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.15 ke SDP - L.16 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.18 ke SDP - L.19 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.21 ke SDP - L.22 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.23 ke SDP - L.24 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
E Instalasi Kabel Power dari :
- Panel PP / LP - L.5 ke PP / LP - L.4 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.5 ke PP / LP - L.6 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.8 ke PP / LP - L.7 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.8 ke PP / LP - L.9 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.11 ke PP / LP - L.10 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.11 ke PP / LP - L.12 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.14 ke PP / LP - L.13 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.14 ke PP / LP - L.15 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.17 ke PP / LP - L.16 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.17 ke PP / LP - L.18 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.20 ke PP / LP - L.19 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.20 ke PP / LP - L.21 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.23 ke PP / LP - L.22 NYY 3 x 4 mm2 m 6.03 27,273 164,456
- Panel PP / LP - L.23 ke PP / LP - L.24 NYY 3 x 4 mm2 m 6.03 27,273 164,456

Sub Total - 5 1,407,754,003

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
A Instalasi Kabel Power dari :
- SDP - L.4 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.6 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.7 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.9 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.10 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.12 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.13 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.15 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.16 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.18 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282

Page 4 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


- SDP - L.19 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.21 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.22 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
- SDP - L.24 ke KWH Meter P - K NYM 3 x 4 mm2 (39 unit) m 5121.48 32,839 168,184,282
B Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K4.1 s/d P - K4.39) m 791.27 32,839 25,984,516
C Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K6.1 s/d P - K6.39) m 791.27 32,839 25,984,516
D Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K7.1 s/d P - K7.39) m 791.27 32,839 25,984,516
E Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K9.1 s/d P - K9.39) m 791.27 32,839 25,984,516
F Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K10.1 s/d P - K10.39) m 791.27 32,839 25,984,516
G Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K12.1 s/d P - K12.39) m 791.27 32,839 25,984,516
H Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K13.1 s/d P - K13.39) m 791.27 32,839 25,984,516
I Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K15.1 s/d P - K15.39) m 791.27 32,839 25,984,516
J Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K16.1 s/d P - K16.39) m 791.27 32,839 25,984,516
K Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K18.1 s/d P - K18.39) m 791.27 32,839 25,984,516
L Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K19.1 s/d P - K19.39) m 791.27 32,839 25,984,516
M Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K21.1 s/d P - K21.39) m 791.27 32,839 25,984,516
N Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K22.1 s/d P - K22.39) m 791.27 32,839 25,984,516
O Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K24.1 s/d P - K24.39) m 791.27 32,839 25,984,516
P Kabel Ladder / Tray : (Elektrikal)
- Kabel Ladder uk. 600 x 100 mm m 121.94 390,962 47,673,906
- Kabel Ladder uk. 300 x 100 mm m 506.52 311,058 157,557,098
- Kabel Ladder uk. 200 x 100 mm m 253.26 294,030 74,466,038
- Kabel Ladder uk. 1000 x 100 mm (dalam shaff) m 28.14 513,326 14,444,994
Q Kabel Ladder / Tray : (Elektronik)
- Kabel Ladder uk. 300 x 100 mm m 65.66 311,058 20,424,068
- Kabel Ladder uk. 150 x 100 mm m 816.06 276,254 225,439,839
- Kabel Ladder uk. 600 x 100 mm (dalam shaff) m 28.14 390,962 11,001,671
KORIDOR APARTEMEN & PUBLIC AREA
R Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 56 190,000 10,640,000
- Ressed Down Light LED 15 W / 4000 Lux ; dia. 15 cm Bh 574 450,000 258,300,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 154 1,500,000 231,000,000
- Baret LED 18 W + Battery Emergency (area tangga) Bh 56 1,425,000 79,800,000
- Exit TL 10 W + Battery Emergency Bh 28 2,227,351 62,365,828
- Stop Kontak Bh 56 39,920 2,235,520
- Saklar Tunggal Bh 70 31,044 2,173,080
- Saklar Hotel Bh 56 75,000 4,200,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 868 198,325 172,146,100
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 56 239,689 13,422,584

Sub Total - 6 4,105,653,888

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
A Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Box MCB Unit 336 1,180,800 396,748,800
- Down Light 10,5 Watt Bh 1680 215,000 361,200,000
- Stop Kontak Bh 1344 39,920 53,652,480
- Stop Kontak AC Bh 336 39,920 13,413,120
- Saklar Ganda Bh 336 46,394 15,588,384
- Saklar Tunggal Bh 1008 31,044 31,292,352
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 1680 198,325 333,186,000
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 1680 239,689 402,677,520
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 225.12 11,605 2,612,518
B Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Box MCB Unit 210 1,180,800 247,968,000
- Down Light 10,5 Watt Bh 1680 215,000 361,200,000
- Stop Kontak Bh 1260 39,920 50,299,200
- Stop Kontak AC Bh 630 39,920 25,149,600
- Saklar Ganda Bh 210 46,394 9,742,740
- Saklar Tunggal Bh 1260 31,044 39,115,440
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 1680 198,325 333,186,000
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 1890 239,689 453,012,210
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 281.4 11,605 3,265,647
Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
C Pengadaan, Pemasangan dan Pengetesan Panel
- Panel SDP - L.5, 8, 11, 14, 17, 20, 23 Unit 7 28,182,000 197,274,000
- Panel PP / LP - L.5, 8, 11, 14, 17, 20, 23 Unit 7 10,164,000 71,148,000
- Box KWH Meter PLN (untuk hunian) Unit 7 10,000,000 70,000,000
D Instalasi Kabel Power dari :
- Panel SDP - L.6 ke SDP - L.5 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.9 ke SDP - L.8 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.12 ke SDP - L.11 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.15 ke SDP - L.14 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.18 ke SDP - L.17 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248

Page 5 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


- Panel SDP - L.21 ke SDP - L.20 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
- Panel SDP - L.23 ke SDP - L.24 NYY 4 x 95 mm2 + BCC 50 mm2 m 6.03 870,522 5,249,248
E Instalasi Kabel Power dari LVMDP - 2 ke :
- Panel PP / LP - L.5 NYY 4 x 10 mm2 + BCC 4 mm2 m 51.59 99,158 5,115,561
- Panel PP / LP - L.8 NYY 4 x 10 mm2 + BCC 4 mm2 m 57.62 99,158 5,713,484
- Panel PP / LP - L.11 NYY 4 x 10 mm2 + BCC 4 mm2 m 63.65 99,158 6,311,407
- Panel PP / LP - L.14 NYY 4 x 10 mm2 + BCC 4 mm2 m 69.68 99,158 6,909,329
- Panel PP / LP - L.17 NYY 4 x 10 mm2 + BCC 4 mm2 m 75.71 99,158 7,507,252
- Panel PP / LP - L.20 NYY 4 x 10 mm2 + BCC 4 mm2 m 81.74 99,158 8,105,175
- Panel PP / LP - L.23 NYY 4 x 10 mm2 + BCC 4 mm2 m 87.77 99,158 8,703,098

Sub Total - 7 3,556,842,050


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
A Instalasi Kabel Power dari :
- SDP - L.5 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.8 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.11 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.14 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.17 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.20 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
- SDP - L.23 ke KWH Meter P - K NYM 3 x 4 mm2 (37 unit) m 2429.42 38,623 93,831,489
B Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K5.1 s/d P - K5.37) m 777.2 38,623 30,017,796
C Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K8.1 s/d P - K8.37) m 777.2 38,623 30,017,796
D Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K11.1 s/d P - K11.37) m 777.2 38,623 30,017,796
E Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K14.1 s/d P - K14.37) m 777.2 38,623 30,017,796
F Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K17.1 s/d P - K17.37) m 777.2 38,623 30,017,796
G Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K20.1 s/d P - K20.37) m 777.2 38,623 30,017,796
H Kabel NYM 3 x 4 mm2 dari Bx KWH Meter PLN ke Box MCB (P - K23.1 s/d P - K23.37) m 777.2 38,623 30,017,796
I Kabel Ladder / Tray : (Elektrikal)
- Kabel Ladder uk. 600 x 100 mm m 60.97 390,962 23,836,953
- Kabel Ladder uk. 300 x 100 mm m 253.26 311,058 78,778,549
- Kabel Ladder uk. 200 x 100 mm m 126.63 294,030 37,233,019
- Kabel Ladder uk. 1000 x 100 mm (dalam shaff) m 14.07 513,326 7,222,497
J Kabel Ladder / Tray : (Elektronik)
- Kabel Ladder uk. 300 x 100 mm m 32.83 311,058 10,212,034
- Kabel Ladder uk. 150 x 100 mm m 408.03 276,254 112,719,920
- Kabel Ladder uk. 600 x 100 mm (dalam shaff) m 14.07 390,962 5,500,835
KORIDOR APARTEMEN & PUBLIC AREA
K Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 28 190,000 5,320,000
- Ressed Down Light LED 15 W / 4000 Lux ; dia. 15 cm Bh 350 450,000 157,500,000
- Ressed Down Light LED 15 W + Battery Emergency / 4000 Lux ; dia. 15 cm Bh 84 1,500,000 126,000,000
- Baret LED 18 W + Battery Emergency (area tangga) Bh 28 1,425,000 39,900,000
- Exit TL 10 W + Battery Emergency Bh 14 2,227,351 31,182,914
- Stop Kontak Bh 28 39,920 1,117,760
- Saklar Tunggal Bh 70 31,044 2,173,080
- Saklar Hotel Bh 56 75,000 4,200,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 504 198,325 99,955,800
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 28 239,689 6,711,292
L Denah Unit Type - 1 (Typical untuk 22 unit kamar)
- Box MCB Unit 154 1,180,800 181,843,200
- Down Light 10,5 Watt Bh 770 215,000 165,550,000
- Stop Kontak Bh 616 39,920 24,590,720
- Stop Kontak AC Bh 154 39,920 6,147,680
- Saklar Ganda Bh 154 46,394 7,144,676
- Saklar Tunggal Bh 462 31,044 14,342,328
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 770 198,325 152,710,250
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 770 239,689 184,560,530
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 103.18 11,605 1,197,404

Sub Total - 8 2,354,596,431


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
A Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Box MCB Unit 105 1,180,800 123,984,000
- Down Light 10,5 Watt Bh 840 215,000 180,600,000
- Stop Kontak Bh 630 39,920 25,149,600
- Stop Kontak AC Bh 315 39,920 12,574,800
- Saklar Ganda Bh 105 46,394 4,871,370
- Saklar Tunggal Bh 630 31,044 19,557,720
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 840 198,325 166,593,000
- NYA 3 x 1 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Stop Kontak Ttk 945 239,689 226,506,105
- NYA 2 x 1 x 1,5 mm2 + PVC HI Conduit Φ 20 mm untuk Ceiling fan m 140.7 11,605 1,632,824
Lantai Atap
B Pengadaan, Pemasangan dan Pengetesan Panel

Page 6 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


- Panel SDP Atap Unit 1 24,024,000 24,024,000
- Panel PP - BP Unit 1 6,930,000 6,930,000
- Panel PP - Lift.1 Unit 1 18,202,800 18,202,800
- Panel PP - Lift.2 Unit 1 18,202,800 18,202,800
- Panel PP - GD.1 Unit 1 6,930,000 6,930,000
- Panel PP - GD.2 Unit 1 6,930,000 6,930,000
- Panel PP - SL.1 Unit 1 16,170,000 16,170,000
- Panel PP - SL.2 Unit 1 16,170,000 16,170,000
- Panel PP - PF.1 Unit 1 4,620,000 4,620,000
- Panel PP - PF.2 Unit 1 4,620,000 4,620,000
C Instalasi Kabel Power dari :
- LVMDP - 2 ke SDP Atap NYY 4 x 150 mm2 + BCC 50 mm2 m 93.8 1,296,878 121,647,156
- SDP - EE ke PP - SL.1 FRC 4 x 120 mm2 m 124.62 4,193,519 522,596,338
- PP - SL.1 ke PP - PF.1 FRC 4 x 10 mm2 m 10.05 1,815,970 18,250,499
- PP - SL.1 ke PP - SL.2 FRC 4 x 50 mm2 m 56.28 6,755,654 380,208,207
- PP - SL.2 ke PP - PF.2 FRC 4 x 10 mm2 m 10.05 1,815,970 18,250,499
- PP - BP ke PCP - Booster FRC 4 x 6 mm2 m 14.74 304,196 4,483,849
- PP - Lift.1 ke PC - Lift (Lift.1 & 2) NYY 4 x 25 mm2 (Passanger Lift) m 13.4 219,857 2,946,084
- PP - Lift.2 ke PC - Lift (Lift.3 & 4) NYY 4 x 25 mm2 (Passanger Lift) m 13.4 219,857 2,946,084
- PP - GD.1 ke PC - Gondola FRC 4 x 6 mm2 m 3.35 304,196 1,019,057
- PP - GD.2 ke PC - Gondola FRC 4 x 6 mm2 m 3.35 304,196 1,019,057
- PP - SL.1 ke PC - Lift FRC 4 x 16 mm2 (Lift Service) m 6.7 2,637,176 17,669,079
- PP - SL.2 ke PC - Lift FRC 4 x 16 mm2 (Lift Service) m 6.7 2,637,176 17,669,079
- PP - PF.1 ke PC - FAN FRC 4 x 6 mm2 m 6.7 304,196 2,038,113
- PP - PF.2 ke PC - FAN FRC 4 x 6 mm2 m 6.7 304,196 2,038,113
D Instalasi Kabel Power dari Panel SDP Atap ke :
- Panel PP - BP NYY 4 x 4 mm2 m 6.7 40,910 274,097
- Panel PP - Lift.1 NYY 4 x 50 mm2 m 4.69 397,969 1,866,475
- Panel PP - Lift.2 NYY 4 x 50 mm2 m 7.37 397,969 2,933,032
- Panel PP - GD.1 NYY 4 x 10 mm2 m 51.59 91,366 4,713,572
- Panel PP - GD.2 NYY 4 x 10 mm2 m 38.86 91,366 3,550,483
E Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- TL LED 1 x 16 W Bh 5 190,000 950,000
- Ressed Down Light LED 15 W / 4000 Lux ; dia. 15 cm Bh 2 450,000 900,000
- Baret LED 18 W + Battery Emergency (area tangga) Bh 4 1,425,000 5,700,000
- Saklar Ganda Bh 1 46,394 46,394
- Saklar Tunggal Bh 4 31,044 124,176
- Saklar Hotel Bh 3 75,000 225,000
- NYM 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu Ttk 11 198,325 2,181,575

Sub Total - 9 2,020,515,034


Pekerjaan Luar
A Pengadaan, Pemasangan dan Pengetesan Panel
- Panel LP - PL Unit 1 6,468,000 6,468,000
B Instalasi Kabel Power dari :
- Panel PP/LP - DS ke LP/PL NYY 3 x 4 mm2 m 18.76 27,273 511,641
C Pengadaan, Pemasangan dan Pengetesan Lampu, Stop kontak, Saklar berikut Instalasinya
- Lampu Taman LED BULP E27 25 W + Tiang tinggi 1,5 meter Bh 39 2,500,000 97,500,000
- NYFGBY 4 x 10 mm untuk Lampu (9 buah) m 67.67 170,393 11,530,494
- NYFGBY 4 x 10 mm untuk Lampu (8 buah) m 83.75 170,393 14,270,414
- NYFGBY 4 x 10 mm untuk Lampu (11 buah) m 93.8 170,393 15,982,863
- NYFGBY 4 x 10 mm untuk Lampu (11 buah) m 95.81 170,393 16,325,353
- NYY 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu (9 buah) m 12.06 26,021 313,813
- NYY 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu (8 buah) m 10.72 26,021 278,945
- NYY 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu (11 buah) m 14.74 26,021 383,550
- NYY 3 x 2,5 mm2 + PVC HI Conduit Φ 20 mm untuk Lampu (11 buah) m 14.74 26,021 383,550
Pekerjaan system Grounding (Provisional)
D Pengadaan dan pemasangan Bak Kontrol sistem grounding Netral Trafo Ttk 1 10,000,000 10,000,000
c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1" panjang 12 m
dengan maximum pentanahan R < 5 ohm termasuk perlengkapan bantu lainnya. (GBC - 06)
E Kabel BC 120 mm + Conduit PVC dari Trafo ke Bak Kontrol m 67 231,546 15,513,582
F Pengadaan dan pemasangan Bak Kontrol sistem grounding LVMDP & P - Cap Ttk 2 10,000,000 20,000,000
c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1" panjang 12 m
dengan maximum pentanahan R < 5 ohm termasuk perlengkapan bantu lainnya. (GBC - 03)
G Kabel BC 120 mm + Conduit PVC dari LVMDP ke Bak Kontrol m 67 231,546 15,513,582
H Pengadaan dan pemasangan Bak Kontrol sistem grounding MVMDP Ttk 1 10,000,000 10,000,000
c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1" panjang 12 m
dengan maximum pentanahan R < 5 ohm termasuk perlengkapan bantu lainnya. (GBC - 02)
I Kabel BC 120 mm + Conduit PVC dari MVMDP ke Bak Kontrol m 67 231,546 15,513,582
J Pengadaan dan pemasangan Bak Kontrol sistem grounding Panel Panel Ttk 1 10,000,000 10,000,000
c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1" panjang 12 m
dengan maximum pentanahan R < 5 ohm termasuk perlengkapan bantu lainnya. (GBC - 01)
K Kabel BC 120 mm + Conduit PVC dari Panel Panel ke Bak Kontrol m 67 231,546 15,513,582
L Pengadaan dan pemasangan Bak Kontrol sistem grounding Elektronik Ttk 1 10,000,000 10,000,000

Page 7 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.2 : ELEKTRIKAL

No. Uraian Pekerjaan Sat Vol Harga Total


c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1" panjang 12 m
dengan maximum pentanahan R < 5 ohm termasuk perlengkapan bantu lainnya. (GBC - 04)
M Kabel BC 10 mm + Conduit PVC dari Elektronik ke Bak Kontrol m 67 19,091 1,279,097

Sub Total - 10 287,282,049


Pekerjaan system Penangkal Petir
A Terminal Splitzen tinggi 50 cm (diameter 15 mm) Ttk 18 408,142 7,346,556
B Test Link (Counter Lightning) Bh 6 2,584,400 15,506,400
C Pengadaan dan pemasangan Bak Kontrol sistem grounding Penangkal Petir Ttk 6 10,000,000 60,000,000
c/w Bak kontrol uk. 400 x 400 x 400 mm dan Electroda Cooper
dengan maximum 2 ohm termasuk perlengkapan bantu lainnya.
D Copper Tape 20 x 30 mm m 1015.72 510,196 518,216,281
E Fire Stop area shaff elektrikal Ttk 23 5,000,000 115,000,000
F Biaya Testing Commisioning Pekerjaan Elektrikal Ls 1 10,000,000 10,000,000
G System KWH Meter Token Prabayar 1 Phase + Segel Monitoring
- Hardwear, Komputer Server, Komputer Client, Printer dot metric, UPS & Ls 1 100,000,000 100,000,000
Switch Hub

- Vending System Softwear, 1 Server dan 1 Client Ls 1 175,000,000 175,000,000

Sub Total - 11 1.256.310.092

Ke Penjumlahan Total 17,011,835,405

Page 8 of 8
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.5 : PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga Fire Alarm sudah termasuk pembuatan lubang diplafon, perapihan dan bahan
pendukung lainnya.

V Pekerjaan Fire Alarm dan instalasinya meliputi pengadaan dan pemasangan kecuali
disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A Ruang FCC
- FACP kap. ….. Address …. Lop c/w Baterry Sealed lead acid rechargeable 1 jam, Unit 1 270,000,000 270,000,000
Rectifier, Surge arrester dan peralatan bantu lainnya termasuk instalasi kabel grounding.
(Type Full Addressable)
- Voice Evacuation Unit 1 15,000,000 15,000,000
- Announcitor Unit 1 15,506,559 15,506,559
- Personal Computer Unit 1 17,500,000 17,500,000
- Printer Report Data Unit 1 2,500,000 2,500,000
- UPS 1 KW 4 Jam (Provisional) Unit 1 50,000,000 50,000,000
- Box Tombol Manual Pressurize Fan Unit 1 1,500,000 1,500,000
- Grounding System termasuk Bak Kontrol (max. 0,5 ohm) Ttk 1 10,000,000 10,000,000
- Kabel Interface FRC 2 x 1,5 mm2 + PVC HI Conduit dia. 20 mm dari FACP ke :
- Panel LVMDP (2 unit) m 50 41,450 2,072,500
- Sound System m 10 41,450 414,500
- Elevator / Lift (6 unit) m 820 41,450 33,989,000
- Panel Genset m 30 41,450 1,243,500
- Pompa Hydrant m 20 41,450 829,000

- Kabel Interface FRC 2 x 1,5 mm2 + PVC HI Conduit dia. 20 mm dari Box Tombol
manual Pressurize Fan ke :
- Panel PP - PF.1 m 100 41,450 4,145,000
- Panel PP - PF.2 m 160 41,450 6,632,000
- FRC 2 x 2,5 mm2 dari FACP ke Announciator m 55 50,000 2,750,000
B Biaya Testing Commisioning Pekerjaan Fire Alarm Ls 1 5,000,000 5,000,000
C Fire Stop area shaff elektronik Ttk 23 500,000 11,500,000

Sub Total - 1 450,582,059


Lantai Dasar
A Peralatan dan Instalasi
- Terminal Box Fire Alarm (TBF - DS) Unit 1 9,500,000 9,500,000
- Smoke Detector (Solid State) Bh 20 444,171 8,883,420
- Lampu Indicator Bh 18 106,986 1,925,748
- ROR Temperatur Heat Detector (Solid State) Bh 1 200,384 200,384
- Alarm Bell Bh 3 627,244 1,881,732
- Indicator Lamp Bh 3 Include Alarm Bell -
- Manual Break Glass Bh 3 518,056 1,554,168
- Fireman Telephone (Outlet) Bh 3 235,512 706,536
- Kabel FRC 2 x 2,5 mm2 dari FACP ke TBF - DS m 63 50,000 3,150,000
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 20 114,326 2,286,520
- ROR Temperatur Heat Detector (Solid State) Ttk 18 114,326 2,057,868
- Lampu Indicator Ttk 1 114,326 114,326
- Flow Switch Ttk 2 530,000 1,060,000
- Tamper Switch Ttk 2 530,000 1,060,000
- FRC 2 x 2,5 mm2 + PVC HI Conduit 20 mm untuk :
- Alarm Bell Ttk 3 670,138 2,010,414
- Indicator Lamp Ttk 3 670,138 2,010,414
- Manual Break Glass Ttk 3 670,138 2,010,414
- Fireman Telephone (Outlet) Ttk 3 670,138 2,010,414
Lantai - 2
B Peralatan dan Instalasi (Koridor & Public Area)
- Terminal Box Fire Alarm (TBF - L.2) Unit 1 4,992,544 4,992,544
- Smoke Detector (Solid State) Bh 20 444,171 8,883,420
- Lampu Indicator Bh 5 106,986 534,930

Page 1 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.5 : PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Sat Vol Harga Total


- Alarm Bell Bh 3 627,244 1,881,732
- Indicator Lamp Bh 3 Include Alarm Bell -
- Manual Break Glass Bh 3 518,056 1,554,168
- Fireman Telephone (Outlet) Bh 3 235,512 706,536
- Kabel FRC 2 x 2,5 mm2 dari FACP ke TBF - L.2 m 67 50,000 3,350,000
- Kabel FRC 2 x 2,5 mm2 dari TBF - DS ke TBF - L.2 m 10 50,000 500,000
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 20 114,326 2,286,520
- Lampu Indicator Ttk 5 114,326 571,630
- Flow Switch Ttk 2 530,000 1,060,000
- Tamper Switch Ttk 2 530,000 1,060,000
- FRC 2 x 2,5 mm2 + PVC HI Conduit 20 mm untuk :
- Alarm Bell Ttk 3 670,138 2,010,414
- Indicator Lamp Ttk 3 670,138 2,010,414
- Manual Break Glass Ttk 3 670,138 2,010,414
- Fireman Telephone (Outlet) Ttk 3 670,138 2,010,414
C Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Smoke Detector (Solid State) Bh 24 444,171 10,660,104
- Lampu Indicator Bh 24 106,986 2,567,664
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 24 114,326 2,743,824
- Lampu Indicator Ttk 24 114,326 2,743,824

Sub Total - 2 96,560,910


Lantai - 3
A Peralatan dan Instalasi (Koridor)
- Terminal Box Fire Alarm (TBF - L.3) Unit 1 4,992,544 4,992,544
- Smoke Detector (Solid State) Bh 15 444,171 6,662,565
- Lampu Indicator Bh 3 106,986 320,958
- Alarm Bell Bh 3 627,244 1,881,732
- Indicator Lamp Bh 3 Include Alarm Bell -
- Manual Break Glass Bh 3 518,056 1,554,168
- Fireman Telephone (Outlet) Bh 3 235,512 706,536
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.3 m 70 89,600 6,272,000
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 15 114,326 1,714,890
- Lampu Indicator Ttk 3 114,326 342,978
- Flow Switch Ttk 2 530,000 1,060,000
- Tamper Switch Ttk 2 530,000 1,060,000
- FRC 2 x 2,5 mm2 + PVC HI Conduit 20 mm untuk :
- Alarm Bell Ttk 3 670,138 2,010,414
- Indicator Lamp Ttk 3 670,138 2,010,414
- Manual Break Glass Ttk 3 670,138 2,010,414
- Fireman Telephone (Outlet) Ttk 3 670,138 2,010,414
B Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Smoke Detector (Solid State) Bh 24 444,171 10,660,104
- Lampu Indicator Bh 24 106,986 2,567,664
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 24 114,326 2,743,824
- Lampu Indicator Ttk 24 114,326 2,743,824
C Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Smoke Detector (Solid State) Bh 45 444,171 19,987,695
- Lampu Indicator Bh 15 106,986 1,604,790
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 45 114,326 5,144,670
- Lampu Indicator Ttk 15 114,326 1,714,890

Sub Total - 3 81,777,488

Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
A Peralatan dan Instalasi (Koridor)
- Terminal Box Fire Alarm (TBF - L.4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24) Unit 14 4,992,544 69,895,616
- Smoke Detector (Solid State) Bh 210 444,171 93,275,910
- Lampu Indicator Bh 42 106,986 4,493,412
- Alarm Bell Bh 42 627,244 26,344,248
- Indicator Lamp Bh 42 Include Alarm Bell -
Manual Break Glass Bh 42 518,056 21,758,352
Fireman Telephone (Outlet) Bh 42 235,512 9,891,504
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.4 m 73 89,600 6,540,800
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.6 m 79 89,600 7,078,400
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.7 m 82 89,600 7,347,200
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.9 m 88 89,600 7,884,800
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.10 m 91 89,600 8,153,600
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.12 m 97 89,600 8,691,200
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.13 m 100 89,600 8,960,000

Page 2 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.5 : PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Sat Vol Harga Total


Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.15 m 106 89,600 9,497,600
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.16 m 109 89,600 9,766,400
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.18 m 115 89,600 10,304,000
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.19 m 118 89,600 10,572,800
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.21 m 124 89,600 11,110,400
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.22 m 127 89,600 11,379,200
Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.24 m 133 89,600 11,916,800
NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 210 114,326 24,008,460
- Lampu Indicator Ttk 42 114,326 4,801,692
- Flow Switch Ttk 28 530,000 14,840,000
- Tamper Switch Ttk 28 530,000 14,840,000
FRC 2 x 2,5 mm2 + PVC HI Conduit 20 mm untuk :
- Alarm Bell Ttk 42 670,138 28,145,796
- Indicator Lamp Ttk 42 670,138 28,145,796
- Manual Break Glass Ttk 42 670,138 28,145,796
- Fireman Telephone (Outlet) Ttk 42 670,138 28,145,796
B Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Smoke Detector (Solid State) Bh 336 444,171 149,241,456
- Lampu Indicator Bh 336 106,986 35,947,296
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 336 114,326 38,413,536
- Lampu Indicator Ttk 336 114,326 38,413,536
C Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Smoke Detector (Solid State) Bh 630 444,171 279,827,730
- Lampu Indicator Bh 210 106,986 22,467,060
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 630 114,326 72,025,380
- Lampu Indicator Ttk 210 114,326 24,008,460

Sub Total - 4 1,186,280,032


Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
A Peralatan dan Instalasi
- Terminal Box Fire Alarm (TBF - L.5, 8, 11, 14, 17, 20, 23) Unit 7 4,992,544 34,947,808
- Smoke Detector (Solid State) Bh 112 444,171 49,747,152
- Lampu Indicator Bh 21 106,986 2,246,706
- Alarm Bell Bh 21 627,244 13,172,124
- Indicator Lamp Bh 21 Include Alarm Bell -
- Manual Break Glass Bh 21 518,056 10,879,176
- Fireman Telephone (Outlet) Bh 21 235,512 4,945,752
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.5 m 76 89,600 6,809,600
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.8 m 85 89,600 7,616,000
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.11 m 94 89,600 8,422,400
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.14 m 103 89,600 9,228,800
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.17 m 112 89,600 10,035,200
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.20 m 121 89,600 10,841,600
- Kabel FRC 2 x 2 x 2,5 mm2 dari FACP ke TBF - L.23 m 130 89,600 11,648,000
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 112 114,326 12,804,512
- Lampu Indicator Ttk 21 114,326 2,400,846
- Flow Switch Ttk 14 530,000 7,420,000
- Tamper Switch Ttk 14 530,000 7,420,000
- FRC 2 x 2,5 mm2 + PVC HI Conduit 20 mm untuk :
- Alarm Bell Ttk 21 670,138 14,072,898
- Indicator Lamp Ttk 21 670,138 14,072,898
- Manual Break Glass Ttk 21 670,138 14,072,898
- Fireman Telephone (Outlet) Ttk 21 670,138 14,072,898
B Denah Unit Type - 1 (Typical untuk 22 unit kamar)
- Smoke Detector (Solid State) Bh 154 444,171 68,402,334
- Lampu Indicator Bh 154 106,986 16,475,844
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 154 114,326 17,606,204
- Lampu Indicator Ttk 154 114,326 17,606,204
C Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Smoke Detector (Solid State) Bh 315 444,171 139,913,865
- Lampu Indicator Bh 105 106,986 11,233,530
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 315 114,326 36,012,690
- Lampu Indicator Ttk 105 114,326 12,004,230
D Lantai Atap (R. Mesin)
- Smoke Detector (Solid State) Bh 3 444,171 1,332,513
- Lampu Indicator Bh 3 106,986 320,958
- NYA 2 x (1 x 1,5 mm2) + PVC HI Conduit 20 mm untuk :
- Smoke Detector (Solid State) Ttk 3 114,326 342,978
- Lampu Indicator Ttk 3 114,326 342,978

Page 3 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.5 : PEKERJAAN FIRE ALARM

No. Uraian Pekerjaan Sat Vol Harga Total


35,118,470
Sub Total - 5 588,471,596

Ke Penjumlahan Total 2,403,672,085

Page 4 of 4
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.6 : PEKERJAAN TATA SUARA

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga Tata Suara sudah termasuk pembuatan lubang diplafon, perapihan dan bahan
pendukung lainnya.

V Pekerjaan Tata Suara dan instalasinya meliputi pengadaan dan pemasangan kecuali
disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A Ruang Kontrol
- Central Terminal Box (CTB) Unit 1 9,962,775 9,962,775
- Selector Switch ……. Zone Unit 1 27,867,928 27,867,928
- Power Amplifier 120 Watt Unit 8 3,100,000 24,800,000
- Equalizer Unit 1 4,000,000 4,000,000
- Mixer Pre-Amplifier Unit 1 8,500,000 8,500,000
- DVD/MP3 Player c/w Radio AM/FM Tuner Set 1 4,127,232 4,127,232
- Call Station Remote c/w Keypad Unit 3 3,230,659 9,691,977
- Back up Battery 4 jam c/w Rectifier & Surge Arrester (UPS 2 KVA Back up 4 jam) Unit 1 50,000,000 50,000,000
- Rak peralatan termasuk Instalasi kabel integrasi ke semua peralatan di ruang kontrol Ls 1 42,501,203 42,501,203
- Grounding System termasuk Bak Kontrol (max. 0,1 ohm) Set 1 10,000,000 10,000,000
B Biaya Testing Commisioning Pekerjaan Tata Suara Ls 1 500,000 500,000
C Lantai Dasar
- Fire Dome Speaker + Box 3 W Bh 2 486,000 972,000
- Ceiling Speaker + Box 3 Watt Bh 3 156,700 470,100
- Horn Speaker 15 W Bh 3 402,313 1,206,939
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 3 311,317 933,951
- FRC 4 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Fire Dome Speaker + Box 3 Wat Ttk 2 809,210 1,618,420
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Horn Speaker 15 Watt Ttk 3 440,506 1,321,518
D Lantai - 2
- Terminal Box Speaker (TBS - L.2) Unit 1 969,150 969,150
- Fire Dome Speaker + Box 3 W Bh 2 486,000 972,000
- Ceiling Speaker + Box 3 Watt Bh 14 156,700 2,193,800
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.2 m 67 19,672 1,318,024
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 14 440,506 6,167,084
- FRC 4 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Fire Dome Speaker + Box 3 Wat Ttk 2 809,210 1,618,420
E Lantai - 3
- Fire Dome Speaker + Box 3 W Bh 2 486,000 972,000
- Ceiling Speaker + Box 3 Watt Bh 11 156,700 1,723,700
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 11 440,506 4,845,566
- FRC 4 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Fire Dome Speaker + Box 3 Wat Ttk 2 809,210 1,618,420
F Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
- Fire Dome Speaker + Box 3 W Bh 28 486,000 13,608,000
- Ceiling Speaker + Box 3 Watt Bh 154 156,700 24,131,800
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 154 440,506 67,837,924
- FRC 4 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Fire Dome Speaker + Box 3 Wat Ttk 28 809,210 22,657,880

A Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)


- Terminal Box Speaker (TBS - L.5, 8, 11, 14, 17, 20, 23) Unit 7 969,150 6,784,050
- Fire Dome Speaker + Box 3 W Bh 14 486,000 6,804,000
- Ceiling Speaker + Box 3 Watt Bh 84 156,700 13,162,800
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.5 m 76 19,672 1,495,072
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.8 m 85 19,672 1,672,120
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.11 m 94 19,672 1,849,168
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.14 m 103 19,672 2,026,216
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.17 m 112 19,672 2,203,264
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.20 m 121 19,672 2,380,312
- NYMHY 3 x 2,5 mm2 + PVC HI Conduit dia. 20 mm dari CTB ke TBS - L.23 m 130 19,672 2,557,360
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 84 440,506 37,002,504
- FRC 4 x 2,5 mm2 + PVC HI Conduit dia. 20 mm untuk Fire Dome Speaker + Box 3 Wat Ttk 14 809,210 11,328,940

Page 1 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.6 : PEKERJAAN TATA SUARA

No. Uraian Pekerjaan Sat Vol Harga Total


B Lantai Atap
- Ceiling Speaker + Box 3 Watt Bh 3 156,700 470,100
- NYMHY 4 x 1,5 mm2 + PVC HI Conduit dia. 20 mm untuk Ceiling Speaker + Box 3 Wa Ttk 3 440,506 1,321,518

Ke Penjumlahan Total 440,165,235

Page 2 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.7 : PEKERJAAN MATV

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga MATV sudah termasuk pembuatan lubang diplafon, perapihan dan bahan
pendukung lainnya.

V Pekerjaan MATV dan instalasinya meliputi pengadaan dan pemasangan kecuali


disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A Ruang Kontrol
- Master Amplifire ….. W Unit 1 16,710,000 16,710,000
- Box IF Unit 1 1,000,000 1,000,000
- Power Devider Unit 1 750,000 750,000
- Domulator Digital Unit 8 4,500,000 36,000,000
- Modulator Digital Unit 4 4,500,000 18,000,000
- Active Combiner Unit 1 2,500,000 2,500,000
- Rak peralatan termasuk Instalasi kabel integrasi ke semua peralatan di ruang kontrol Ls 1 6,000,000 6,000,000
- Grounding System termasuk Bak Kontrol (max. 1 ohm) Set 1 10,000,000 10,000,000
B Biaya Testing Commisioning Pekerjaan MATV Ls 1 5,000,000 5,000,000
C Area Shaff
- Tap Off 3 Way Bh 7 68,200 477,400
- Tap Off 2 Way Bh 1 57,200 57,200
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm :
- Dari Active Combiner ke Tap Off m 812 19,092 15,502,704
D Lantai Dasar
- Booster Penguat Sinyal Bh 1 3,300,000 3,300,000
- Splitter 3 Way Bh 1 68,200 68,200
- TV Outlet Bh 3 77,770 233,310
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm :
- Dari Splitter di Lt. 2 ke Booster m 10 19,092 190,920
- Dari Booster ke Splitter 3 Way m 14 19,092 267,288
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 3 189,065 567,195
E Lantai - 2
- Booster Penguat Sinyal Bh 1 3,300,000 3,300,000
- Splitter 2 Way Bh 1 57,200 57,200
- Splitter 3 Way Bh 12 68,200 818,400
- TV Outlet Bh 1 77,770 77,770
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm :
- Dari Tap Off area shaff Lt. 3 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 3 19,092 57,276
- Dari Booster ke Splitter 3 Way m 40 19,092 763,680
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 1 189,065 189,065
- Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- TV Outlet Bh 24 77,770 1,866,480
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 24 136,756 3,282,144

Sub Total - 1 127,227,152


A Lantai - 3
- Booster Penguat Sinyal Bh 3 3,300,000 9,900,000
- Splitter 2 Way Bh 1 57,200 57,200
- Splitter 3 Way Bh 19 68,200 1,295,800
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm :
- Dari Tap Off area shaff Lt. 3 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- TV Outlet Bh 24 77,770 1,866,480
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 24 136,756 3,282,144
- Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- TV Outlet Bh 15 77,770 1,166,550
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 15 136,756 2,051,340
B Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
- Booster Penguat Sinyal Bh 42 3,300,000 138,600,000

Page 1 of 3
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.7 : PEKERJAAN MATV

No. Uraian Pekerjaan Sat Vol Harga Total


- Splitter 2 Way Bh 14 57,200 800,800
- Splitter 3 Way Bh 266 68,200 18,141,200
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 4)
- Dari Tap Off area shaff Lt. 3 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 6)
- Dari Tap Off area shaff Lt. 6 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 7)
- Dari Tap Off area shaff Lt. 6 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 9)
- Dari Tap Off area shaff Lt. 9 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 10)
- Dari Tap Off area shaff Lt. 9 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 12)
- Dari Tap Off area shaff Lt. 12 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 13)
- Dari Tap Off area shaff Lt. 12 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268

Sub Total - 2 192,206,010

A Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 15)
- Dari Tap Off area shaff Lt. 12 ke Splitter 2 Way m 13 19,092 248,196
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 16)
- Dari Tap Off area shaff Lt. 15 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 18)
- Dari Tap Off area shaff Lt. 18 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 19)
- Dari Tap Off area shaff Lt. 18 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 21)
- Dari Tap Off area shaff Lt. 21 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 22)
- Dari Tap Off area shaff Lt. 21 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 24)
- Dari Tap Off area shaff Lt. 24 ke Splitter 2 Way m 3 19,092 57,276
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Denah Unit Type - (Typical untuk 24 unit kamar)
- TV Outlet Bh 336 77,770 26,130,720
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 336 136,756 45,950,016
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- TV Outlet Bh 210 77,770 16,331,700
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 210 136,756 28,718,760

Sub Total - 3 130,419,228


A Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
- Booster Penguat Sinyal Bh 21 3,300,000 69,300,000
- Splitter 2 Way Bh 7 57,200 400,400
- Splitter 3 Way Bh 126 68,200 8,593,200
- TV Outlet Bh 7 77,770 544,390

Page 2 of 3
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.7 : PEKERJAAN MATV

No. Uraian Pekerjaan Sat Vol Harga Total


- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 7 189,065 1,323,455
- Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 5)
- Dari Tap Off area shaff Lt. 6 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 8)
- Dari Tap Off area shaff Lt. 9 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 11)
- Dari Tap Off area shaff Lt. 12 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 14)
- Dari Tap Off area shaff Lt. 15 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 17)
- Dari Tap Off area shaff Lt. 18 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 20)
- Dari Tap Off area shaff Lt. 21 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm : (Lantai - 23)
- Dari Tap Off area shaff Lt. 24 ke Splitter 2 Way m 10 19,092 190,920
- Dari Splitter 2 Way ke Booster m 13 19,092 248,196
- Dari Booster ke Splitter 3 Way m 79 19,092 1,508,268
Denah Unit Type - 1 (Typical untuk 22 unit kamar)
- TV Outlet Bh 154 77,770 11,976,580
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 154 136,756 21,060,424
Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- TV Outlet Bh 105 77,770 8,165,850
- Coaxial Cable 5C-2V 75 Ohm + PVC HI Conduit 20 mm untuk TV Outlet Ttk 105 136,756 14,359,380
Lantai Atap
B Antena Yogi TV Local Channel VHF + tiang Unit 2 14,075,000 28,150,000
C Box Mixing Unit 1 250,000 250,000
D Coaxial Cable 7C-2V 75 Ohm + PVC HI Conduit 20 mm dari Master Ampli ke :
- Antena Yogi TV Local Channel VHF + tiang m 100 19,092 1,909,200

Sub Total - 4 179,664,567

Ke Penjumlahan Total 629,516,957

Page 3 of 3
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.8 : PEKERJAAN CCTV

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga CCTV sudah termasuk pembuatan lubang diplafon, perapihan dan bahan
pendukung lainnya.

V Pekerjaan CCTV dan instalasinya meliputi pengadaan dan pemasangan kecuali


disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A Ruang Kontrol
- Core Switch 8 Port 10/100 2 Gigabit SFP Unit 1 9,300,000 9,300,000
- Distribution Switch Unit 1 5,000,000 5,000,000
- Network Video Recorder (NVR) Manager …... Channel Unit 6 354,447,000 2,126,682,000
- Server PC Workstation for IP CCTV & Data termasuk EMS Software + Monitor + Keybor Set 1 17,500,000 17,500,000
- Printer Report Unit 1 2,500,000 2,500,000
- Multi Screen LED Monitor 32" (Playback) termasuk HDMI cable & wall Bracket Unit 6 6,535,466 39,212,796
- UPS 1 KVA Backup 2 jam Unit 1 5,000,000 5,000,000
- Router dan Modem Unit 1 500,000 500,000
- Rak peralatan termasuk Instalasi kabel integrasi ke semua peralatan di ruang kontrol Ls 1 24,751,831 24,751,831
- Grounding System termasuk Bak Kontrol (max. 0,5 ohm) Ttk 1 10,000,000 10,000,000
B Biaya Testing Commisioning Pekerjaan CCTV Ls 1 5,000,000 5,000,000
C Area Shaff
- Switching 24 Port Unit 4 1,300,000 5,200,000
- Kabel FO Multimote 2 Core + PVC HI Conduit 20 mm dari Distribution Switch ke m 166 16,698 2,771,868
Switching 24 Port
D Lantai Dasar
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 3 1,550,972 4,652,916
- IP CCTV Camera Fixed Bullet Built-in Fixed lens + Bracket Bh 4 2,200,000 8,800,000
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens m 102 22,022 2,246,244
- IP CCTV Camera Fixed Bullet Built-in Fixed lens + Bracket m 152 22,022 3,347,344
E Lantai - 2
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 3 1,550,972 4,652,916
- IP CCTV Camera Fixed Bullet Built-in Fixed lens + Bracket Bh 2 2,200,000 4,400,000
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens m 111 22,022 2,444,442
- IP CCTV Camera Fixed Bullet Built-in Fixed lens + Bracket m 42 22,022 924,924
F Lantai - 3
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 3 1,550,972 4,652,916
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens m 120 22,022 2,642,640
G Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 42 1,550,972 65,140,824
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 4) m 129 22,022 2,840,838
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 6) m 147 22,022 3,237,234
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 7) m 102 22,022 2,246,244
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 9) m 147 22,022 3,237,234
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 10) m 120 22,022 2,642,640
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 12) m 147 22,022 3,237,234
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 13) m 156 22,022 3,435,432
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 15) m 102 22,022 2,246,244
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 16) m 111 22,022 2,444,442
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 18) m 129 22,022 2,840,838
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 19) m 138 22,022 3,039,036
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 21) m 156 22,022 3,435,432
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 22) m 165 22,022 3,633,630
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 24) m 111 22,022 2,444,442
A Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 42 1,550,972 65,140,824
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 5) m 138 22,022 3,039,036
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 8) m 111 22,022 2,444,442
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 11) m 138 22,022 3,039,036
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 14) m 165 22,022 3,633,630
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 17) m 120 22,022 2,642,640

Page 1 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.8 : PEKERJAAN CCTV

- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 20) m 147 22,022 3,237,234
- IP CCTV Camera Fixed Dome Built-in Fixed lens (Lt. 23) m 102 22,022 2,246,244
A Lantai Atap
- IP CCTV Camera Fixed Dome Built-in Fixed lens Bh 6 1,550,972 9,305,832
- UTP Cat.6 + PVC HI Conduit 20 mm dari untuk :
- IP CCTV Camera Fixed Dome Built-in Fixed lens m By Lift

Ke Penjumlahan Total 2,493,013,499

Page 2 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.9 : PEKERJAAN TRIPPLE PLY ONU

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Pekerjaan Tripple Ply ONU dan instalasinya meliputi pengadaan dan pemasangan kecuali
disebutkan lain dalam Bill of Quantity.

V Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A RUANG PROVIDER
- Server Farm Switch …... Port Unit 1 309,663,200 309,663,200
- OLT (Optical Line Terminal) …. Port Unit 1 157,498,600 157,498,600
- Core Switch Unit 1 22,750,000 22,750,000
- IP PABX Unit 1 273,560,000 273,560,000
- Network Managemen System Unit 1 50,835,200 50,835,200
- Internet Service Unit 1 50,823,357 50,823,357
- Anti Virus Fire Wall Unit 4 30,000,000 120,000,000
- UPS 1 KVA 4 Jam (Provisional) Unit 1 50,000,000 50,000,000
- Rak peralatan termasuk Instalasi kabel integrasi ke semua peralatan di ruang kontrol Ls 1 21,560,000 21,560,000
B Grounding System termasuk Bak Kontrol (max. 1 ohm) Ttk 1 10,000,000 10,000,000
C Biaya Testing Commissioning Tripple Ply ONU Ls 1 5,000,000 5,000,000
D Lantai Dasar
- Access Switch (Lt. DS) Unit 1 15,000,000 15,000,000
- Passive Optical Splitter (POS 1:2) Unit 1 962,305 962,305
- Passive Optical Splitter (POS 1:4) Unit 3 962,305 2,886,915
- Optical Network Unit (ONU) Unit 10 22,499,800 224,998,000
- Kabel Serat Optic (SO) 6 Core Multimode + PVC HI Conduit dia. 20 mm dari Core Swi m 63 55,055 3,468,465
Access Switch (Lt. DS)
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk :
- Passive Optical Splitter (POS 1:2) Ttk 1 243,722 243,722
- Passive Optical Splitter (POS 1:4) Ttk 3 243,722 731,166
- Optical Network Unit (ONU) Ttk 10 243,722 2,437,220
E Lantai - 2
- Access Switch (Lt. 2) Unit 1 2,125,000 2,125,000
- Passive Optical Splitter (POS 1:2) Unit 2 962,305 1,924,610
- Passive Optical Splitter (POS 1:4) Unit 8 962,305 7,698,440
- Optical Network Unit (ONU) Unit 1 22,499,800 22,499,800
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm dari Core Switch ke m 66 55,055 3,633,630
Access Switch (Lt. 2)
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk :
- Passive Optical Splitter (POS 1:2) Ttk 2 243,722 487,444
- Passive Optical Splitter (POS 1:4) Ttk 8 243,722 1,949,776
- Optical Network Unit (ONU) Ttk 1 243,722 243,722
- Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Optical Network Terminal (ONT) Unit 24 2,125,000 51,000,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 24 243,722 5,849,328

A Lantai - 3
- Access Switch (Lt. 3) Unit 1 2,125,000 2,125,000
- Passive Optical Splitter (POS 1:2) Unit 1 962,305 962,305
- Passive Optical Splitter (POS 1:4) Unit 13 962,305 12,509,965
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm dari Core Switch ke m 69 55,055 3,798,795
Access Switch (Lt. 3)
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk :
- Passive Optical Splitter (POS 1:2) Ttk 1 243,722 243,722
- Passive Optical Splitter (POS 1:4) Ttk 13 243,722 3,168,386
- Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Optical Network Terminal (ONT) Unit 24 2,125,000 51,000,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 24 243,722 5,849,328
- Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Optical Network Terminal (ONT) Unit 15 2,125,000 31,875,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 15 243,722 3,655,830
B Lantai - 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24 (Typical untuk 14 Lantai)
- Access Switch (Lt. 4, 6, 7, 9, 10, 12, 13, 15, 16, 18, 19, 21, 22, 24) Unit 14 2,125,000 29,750,000
- Passive Optical Splitter (POS 1:2) Unit 14 962,305 13,472,270
- Passive Optical Splitter (POS 1:4) Unit 182 962,305 175,139,510

Page 1 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.9 : PEKERJAAN TRIPPLE PLY ONU

No. Uraian Pekerjaan Sat Vol Harga Total


- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm dari Core Switch ke :
- Access Switch (Lt. 4) m 72 55,055 3,963,960
- Access Switch (Lt. 6) m 78 55,055 4,294,290
- Access Switch (Lt. 7) m 81 55,055 4,459,455
- Access Switch (Lt. 9) m 87 55,055 4,789,785
- Access Switch (Lt. 10) m 90 55,055 4,954,950
- Access Switch (Lt. 12) m 96 55,055 5,285,280
- Access Switch (Lt. 13) m 99 55,055 5,450,445
- Access Switch (Lt. 15) m 105 55,055 5,780,775
- Access Switch (Lt. 16) m 108 55,055 5,945,940
- Access Switch (Lt. 18) m 114 55,055 6,276,270
- Access Switch (Lt. 19) m 117 55,055 6,441,435
- Access Switch (Lt. 21) m 123 55,055 6,771,765
- Access Switch (Lt. 22) m 126 55,055 6,936,930
- Access Switch (Lt. 24) m 132 55,055 7,267,260
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk :
- Passive Optical Splitter (POS 1:2) Ttk 14 243,722 3,412,108
- Passive Optical Splitter (POS 1:4) Ttk 182 243,722 44,357,404
- Denah Unit Type - 1 (Typical untuk 24 unit kamar)
- Optical Network Terminal (ONT) Unit 336 2,125,000 714,000,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 336 243,722 81,890,592
- Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Optical Network Terminal (ONT) Unit 210 2,125,000 446,250,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 210 243,722 51,181,620

A Lantai - 5, 8, 11, 14, 17, 20, 23 (Typical untuk 7 Lantai)


- Access Switch (Lt. 5, 8, 11, 14, 17, 20, 23) Unit 7 2,125,000 14,875,000
- Passive Optical Splitter (POS 1:2) Unit 7 962,305 6,736,135
- Passive Optical Splitter (POS 1:4) Unit 84 962,305 80,833,620
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm dari Core Switch ke :
- Access Switch (Lt. 5) m 75 55,055 4,129,125
- Access Switch (Lt. 8) m 84 55,055 4,624,620
- Access Switch (Lt. 11) m 93 55,055 5,120,115
- Access Switch (Lt. 14) m 102 55,055 5,615,610
- Access Switch (Lt. 17) m 111 55,055 6,111,105
- Access Switch (Lt. 20) m 120 55,055 6,606,600
- Access Switch (Lt. 23) m 129 55,055 7,102,095
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk :
- Passive Optical Splitter (POS 1:2) Ttk 7 243,722 1,706,054
- Passive Optical Splitter (POS 1:4) Ttk 84 243,722 20,472,648
- Denah Unit Type - 1 (Typical untuk 22 unit kamar)
- Optical Network Terminal (ONT) Unit 308 2,125,000 654,500,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 308 243,722 75,066,376
- Denah Unit Type - 2 (Typical untuk 15 unit kamar)
- Optical Network Terminal (ONT) Unit 210 2,125,000 446,250,000
- Kabel Serat Optic (SO) 6 Core + PVC HI Conduit dia. 20 mm untuk ONU Ttk 210 243,722 51,181,620

Ke Penjumlahan Total
4,564,020,998

Page 2 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.10 : PEKERJAAN ACCESS CARD

No. Uraian Pekerjaan Sat Vol Harga Total


CATATAN HARGA (PRICING NOTES)

I Harga satuan instalasi kabel ruangan sudah harus termasuk bahan /pipa pelindung, support,
penggantung, klem, cable schoen, isolasi dan perlengkapan pendukung lainnya.

II Harga satuan kabel luar sudah harus termasuk bahan / pipa pelindung, support, isolasi,
galian, urugan, pemadatan / perapihan, pembuangan tanah dan bahan pendukung lainnya.

III Harga satuan kabel tray & kabel ladder sudah harus termasuk support, fitting
penyambungan, penggantung dan bahan pendukung lainnya.

IV Harga Access Control sudah termasuk pembuatan lubang diplafon, perapihan dan bahan
pendukung lainnya.

V Pekerjaan Access Control dan instalasinya meliputi pengadaan dan pemasangan kecuali
disebutkan lain dalam Bill of Quantity.

VI Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

A Ruang Kontrol
- Server PC termasuk EMS Software + Monitor Unit 1 85,000,000 85,000,000
- Printer Ink Jet Unit 1 5,000,000 5,000,000
- Access Door Controller Unit 1 50,000,000 50,000,000
- Grounding System termasuk Bak Kontrol (max. 0,5 ohm) Ttk 1 10,000,000 10,000,000
C Biaya Testing Commisioning Pekerjaan Access Control Ls 1 5,000,000 5,000,000
B Lantai Dasar
- Reader Interface Master (RIM) Unit 5 27,500,000 137,500,000
- Exit Push Button Bh 3 500,000 1,500,000
- Electric Door Locking Bh 3 2,250,000 6,750,000
- Electric Magnetic Door Contact Bh 3 2,000,000 6,000,000
- Card Reader (Proximity Type) Bh 5 4,500,000 22,500,000
- FRC STP 18 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm :
- dari Access Door Controller ke RIM m 50 93,049 4,652,450
- dari RIM ke RIM Lt.DS m 50 93,049 4,652,450
- FRC STP 22 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm : (Area Lift)
- Dari Reader Interface Master (RIM) ke Card Reader (CR) m 100 41,624 4,162,400
- FRC STP 22 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm : (Area Lobby Lift)
- Dari Reader Interface Master (RIM) ke Exit Push Button m 30 41,624 1,248,720
- Dari Reader Interface Master (RIM) ke Electronic Door LockingButton m 30 41,624 1,248,720
- Dari Reader Interface Master (RIM) ke Electric Magnetic Door Contact m 30 41,624 1,248,720
- Dari Reader Interface Master (RIM) ke Card Reader (CR) m 30 41,624 1,248,720
C Lantai - 2
- Reader Interface Master (RIM) Unit 3 27,500,000 82,500,000
- Exit Push Button Bh 2 500,000 1,000,000
- Electric Door Locking Bh 2 2,250,000 4,500,000
- Electric Magnetic Door Contact Bh 2 2,000,000 4,000,000
- Card Reader (Proximity Type) Bh 3 4,500,000 13,500,000
- FRC STP 18 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm :
- dari Access Door Controller ke RIM m 30 93,049 2,791,470
- dari RIM ke RIM Lt.2 m 40 93,049 3,721,960
- FRC STP 22 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm : (Area Lift)
- Dari Reader Interface Master (RIM) ke Card Reader (CR) m 100 41,624 4,162,400
- FRC STP 22 AWG 2 Pair + NYM 3 x 2,5 mm2 + PVC HI Conduit 20 mm : (Area Lobby Lift)
- Dari Reader Interface Master (RIM) ke Exit Push Button m 20 41,624 832,480
- Dari Reader Interface Master (RIM) ke Electronic Door LockingButton m 20 41,624 832,480
- Dari Reader Interface Master (RIM) ke Electric Magnetic Door Contact m 20 41,624 832,480
- Dari Reader Interface Master (RIM) ke Card Reader (CR) m 20 41,624 832,480

Ke Penjumlahan Total 467,217,930

Page 1 of 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.11 : PEKERJAAN GENSET & INSTALASINYA

No. Uraian Pekerjaan Sat Vol Harga Total

Catatan Harga

I Harga penawaran sudah harus memperhitungkan semua peralatan utama serta


peralatan bantu yang diperlukan dalam pemasangan instalasi sampai sempurnanya
sistem, seperti yang diuraikan dalam spesifikasi , gambar dan petunjuk dari pabrik pembuat.

II Harga satuan pekerjaan yang ditawarkan harus sesuai gambar dan spesifikasi kecuali
disebutkan lain dalam Bill of Quantity.

III Semua item pekerjaan meliputi Pengadaan dan Pemasangan, kecuali disebutkan
lain dalam item tersebut.

A Pengadaan Unit Diesel Genset Unit 1 1,600,000,000 1,600,000,000


Kapasitas: 550 KVA / 4000/220 V / 1500 Rpm / 50 Hz / 3 Ph
Tipe: Prime (Silent)
lengkap dengan battery accu, automatic battery charger, peralatan over
current charger, radiator, vibrator isolator rubber mounting, muppler sound
filter, grounding dan alat bantu lain.
B Upah Pemasangan Unit Diesel Genset Unit 1 27,500,000 27,500,000
Kapasitas: 550 KVA / 4000/220 V / 1500 Rpm / 50 Hz / 3 Ph
Tipe: Prime (Silent)
lengkap dengan battery accu, automatic battery charger, peralatan over
current charger, radiator, vibrator isolator rubber mounting, muppler sound
filter, grounding dan alat bantu lain.
C Panel Kontrol Genset ( PKG ) (untuk Genset kap. 550 KVA) Unit 1 96,250,000 96,250,000
D Kabel power NYY 4 x (2 x 1 x 300 mm2) dari PKG ke Unit Genset m 10 3,729,880 37,298,800
E System Grounding :
- Pengadaan dan pemasangan Bak Kontrol sistem grounding Genset & PKG Ttk 2 10,000,000 20,000,000
c/w Bak kontrol uk. 400 x 300 x 400 mm dan Electroda Cooper dia. 1"
dengan maximum pentanahan R < 1 ohm termasuk perlengkapan bantu lainnya/
F System Grounding :
- Kabel BCC 70 mm2 m 20 117,601 2,352,020
- Kabel BCC 35 mm2 m 2 59,818 119,636
- Kabel NYA 70 mm2 m 5 117,601 588,005
G Pipa knalpot dia. 10" panjang 15 meter dari genset sampai keluar (sesuai gambar) Set 1 30,000,000 30,000,000
termasuk isolasi, support dan alat bantu lainnya.
H Pengadaan & pemasangan Critical Mufler residential termasuk vibration isolator, hanger, Set 1 20,000,000 20,000,000
isolasi dan drain sesuai kebutuhan
I Pengadaan dan pemasangan Storage Tank kapasitas 6000 liter terbuat dari plat dengan Unit 1 40,000,000 40,000,000
ketebalan 6 mm minimal lengkap dengan manhole, vent, sight glass, Fuel Level Indicator,
Electrode Fuel Level kontrol termasuk kabel kontrolnya, drain valve & pondasi (dudukan).
J Pengadaan & pemasangan Daily Tank kap. 500 liter terbuat dari plat tebal 4 mm Unit 1 4,000,000 4,000,000
minimal, lengkap dengan manhole, vent, sight glass, Level kontrol, drain valve &
pondasi (dudukan) dengan kontruksi baja dipabrikasi dan difinising sesuai approval
meterial.
K Panel Gear Pump (P - GP) (Provisional) Unit 1 10,000,000 10,000,000
L Pompa Bahan bakar type Gear kap. 30 LPM ; Head 1,2 Bar Unit 1 3,500,000 3,500,000
M Hand Fuel Pump kap. 15 LPM Unit 1 1,500,000 1,500,000
A Kabel kontrol NYA 1 x 2,5 mm2 + Conduit PVC dia. 20 mm ke :
- Fuel Pump (Gear) Ls 1 1,000,000 1,000,000
- Level Switch (Daily Tank) Ls 1 1,000,000 1,000,000
- Level Switch (Storage Tank) Ls 1 1,000,000 1,000,000
B Box Penutup Quick Coupling Unit 1 1,000,000 1,000,000
C Instalsi pipa bahan bakar Black Steel Medium (Provisional)
- Pipa diameter 80 mm m 15 256,369 3,845,535
- Pipa diameter 65 mm m 2 201,403 402,806
- Pipa diameter 50 mm m 2 249,816 499,632
- Pipa diameter 25 mm m 25 109,482 2,737,050
- Fitting diameter 80 mm Bh 3 148,071 444,213

Page 1 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.11 : PEKERJAAN GENSET & INSTALASINYA

No. Uraian Pekerjaan Sat Vol Harga Total


- Fitting diameter 65 mm Bh 1 135,476 135,476
- Quick Coupling (QC) (in Fill) diameter 3" Bh 1 6,500,000 6,500,000
- Gate Valve diameter 65 mm2 Bh 1 3,649,470 3,649,470
- Gate Valve diameter 25 mm2 Bh 6 328,680 1,972,080
- Check Valve diameter 25 mm2 Bh 6 386,760 2,320,560
- Foot Valve diameter 25 mm2 Bh 3 4,160,145 12,480,435
- Flame Arester Cup diameter 25 mm2 Bh 3 115,000 345,000
D Biaya testing & commissioning meliputi test parcial atau test keseluruhan system Ls 1 50,000,000 50,000,000
termasuk menyediakan tenaga ahli dan melatih personil Pemberi Tugas termasuk biaya
Enginer sesuai permintaan pemberi tugas dan spesifikasi
(selama testing & commissioning bahan bakar di tanggung pemborong)
E Pekerjaan Persiapan Ls 1 5,000,000 5,000,000

Ke Penjumlahan Total 1,987,440,718

Page 2 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.12 : PEKERJAAN ELEVATOR & INSTALASINYA

Harga Satuan Total Harga


No. Uraian Pekerjaan Unit Vol
Material Upah Material Upah
Catatan Harga

I Harga penawaran sudah harus memperhitungkan semua


peralatan utama serta peralatan bantu yang diperlukan dalam
pemasangan instalasi sampai sesuai dengan jumlah Lift & escalator yang
tergambar ataupun terurai dalam spesifikasi teknis dan petunjuk
dari pabrik pembuat sehingga didapatkan suatu instalasi yang
baik dan sempurna dalam pemasangannya.

II Harga penawaran sudah harus memperhitungkan semua profil


baja (separator beam) untuk tumpuan / pengikat guide rail pada
sisi kereta, Hoisting Hook, cinder concrete, Buffer, pit ladder,
profil baja yang diperlukan untuk dudukan traction machine
termasuk pengecatan anti karat.dan Hair line stainless steel,
lampu ( untuk interrior di atas dan dinding sangkar lift penumpang,
dan Lift Service ).

III Pengadaan dokumen yang diperlukan sebanyak 5 (lima) copy


(termasuk yang asli) yang terdiri dari Opration Manual,
Maintenance Manual, Repair Shop Manual, Catalogue, daftar
suku cadangan, Gambar as built drawing, semua electronic dan
electric wiring dan dokumen yang lain yang diperlukan.

IV Semua paket pekerjaan Lift dan instalasinya merupakan


Pengadaan dan Pemasangan, kecuali disebutkan lain dalam Bill
of Quantity

V Harga penawaran sudah termasuk Testing Commissioning dan


training operation serta masa jaminan seluruh peralatan
adalah 1 tahun

VI Semua pengurusan izin-izin dari pihak yang berwenang


sehubungan dengan pemasangan instalasi ini dan menyangkut
biaya pengurusannya sudah harus termasuk dalam penawaran
pekerjaan ini

A Pasanger Lift (PL - 1 & PL - 2) Unit 2 840,000,000 100,000,000 1,680,000,000 200,000,000


Kapasitas : 15 Orang / 1.050 Kg
Kecepatan : 105 MPM
Power control : AC - VVVF
Jumlah stop : 24 Stop / 24 Lantai
Melayani : Lt. 1 s/d Lt.24
Door Type : Centre Opening
Operation control : Duplex
Uk. dalam kereta (agar diis : 1.600 (W) x 1.500 (D) x (H) mm
Uk. Pintu (agar diisi) : 900 (W) x 2.100 (H) mm
Uk. Hoistway : 2.050 (D) x 4.200 (W) mm
Uk. Mesin Room : Machine Room
Pit Dept : 2.100 mm
Over Head : 5.000 mm
Power Listrik : ... Kw / 380 V / 3 Ph / 50 Hz
B Pasanger Lift (PL - 3 & PL - 4) Unit 2 840,000,000 100,000,000 1,680,000,000 200,000,000
Kapasitas : 15 Orang / 1.050 Kg
Kecepatan : 105 MPM
Power control : AC - VVVF
Jumlah stop : 24 Stop / 24 Lantai
Melayani : Lt. 1 s/d Lt.24
Door Type : Centre Opening
Operation control : Duplex
Uk. dalam kereta (agar diis : 1.600 (W) x 1.500 (D) x (H) mm
Uk. Pintu (agar diisi) : 900 (W) x 2.100 (H) mm
Uk. Hoistway : 2.050 (D) x 4.200 (W) mm
Uk. Mesin Room : Machine Room
Pit Dept : 2.100 mm
Over Head : 5.000 mm
Power Listrik : ... Kw / 380 V / 3 Ph / 50 Hz
C Service Lift / Fire Lift (SL - 1 & SL - 2) Unit 2 1,200,000,000 115,000,000 2,400,000,000 230,000,000
Kapasitas : 1.600 Kg
Kecepatan : 105 LPM
Power control : AC - VVVF
Jumlah stop : 24 Stop / 24 Lantai
Melayani : Lt. 1 s/d Lt.24
Door Type : Side Opening
Operation control : Simplex
Uk. dalam kereta (agar diis : 1.500 (W) x 2.500 (D) x(H) mm
Uk. Pintu (agar diisi) : 1.300 (W) x 2.100 (H) mm
Uk. Hoistway : 2.300 (D) x 3.050 (W) mm
Uk. Mesin Room : Machine Room
Pit Dept : 2.100 mm
Over Head : 5.000 mm
Power Listrik : ... Kw / 380 V / 3 Ph / 50 Hz
D Pengadaan dan pemasangan Automatic Rescue Device (ARD) Unit 6 25,000,000 - 150,000,000
E Panel kontrol Lift termasuk kabel power / control ke :
- Pasanger Lift (PL - 1) Set 1 Termasuk

Page 1 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.12 : PEKERJAAN ELEVATOR & INSTALASINYA

Harga Satuan Total Harga


No. Uraian Pekerjaan Unit Vol
Material Upah Material Upah
- Pasanger Lift (PL - 2) Set 1 Termasuk
- Pasanger Lift (PL - 3) Set 1 Termasuk
- Pasanger Lift (PL - 4) Set 1 Termasuk
- Service Lift / Fire Lift (SL - 1) Set 1 Termasuk
- Service Lift / Fire Lift (SL - 1) Set 1 Termasuk
F Checker Plate di ruang mesin Lift Bh 3 100,000,000 300,000,000
G Earthquake Safety Device di Ruang Mesin Lift Bh 3 30,000,000 90,000,000
H Interphone di Ruang Mesin Lift Bh 3 Termasuk
I Seal Support Ls 1 Termasuk
A Pengadaan & pemasangan Peralatan kontrol Lift & Monitoring Set 1 65,000,000 65,000,000
lengkap dengan pengabelan dan alat bantu lain yang diperlukan
termasuk pengonekan kabel yang datang dari panel power Listrik
(untuk mengontrol semua Lift)
B System Grounding Set 1 10,000,000 10,000,000
C Biaya Testing Commissioning Ls 1 10,000,000 10,000,000
D Pekerjaan Persiapan Ls 1 5,000,000 5,000,000

Ke Penjumlahan Total 5,760,000,000 1,260,000,000

Page 2 of 2
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.13 : PEKERJAAN SYSTEM STP

No. Uraian Pekerjaan Sat Vol Harga Total


PEKERJAAN STP KAPASITAS 295 M3/HARI
RECYCLING KAPASITAS 295 M3/HARI
A SYSTEM PENYARINGAN
- Bar Screen (SUS 304) uk. 700 x 600 x 500 mm Set 1 13,750,000 13,750,000
- Grease Trap (SUS 304) uk. 400 x 400 x 300 mm Set 1 9,350,000 9,350,000
B EQUALIZATION SYSTEM :
- Equalizing Pump Unit 2 20,707,500 41,415,000
- System instalasi Ls 1 26,400,000 26,400,000
C AERATION TANK SYSTEM Ls 1 123,200,000 123,200,000
D SEDIMENTATION SYSTEM Ls 1 16,500,000 16,500,000
E SLUDGE SYSTEM Ls 1 8,800,000 8,800,000
F DESINFECTANT SYSTEM (Dosing Pump) Unit 1 14,300,000 14,300,000
G EFFLUENT SYSTEM (Effluent Pump) Unit 2 33,412,500 66,825,000
H Mekanikal & Elektrikal System :
- Blower Unit 2 105,875,000 211,750,000
- Panel STP Unit 1 124,960,000 124,960,000
- Instalasi pemipaan Ls 1 151,800,000 151,800,000
- Flow Meter diameter 3" Unit 1 10,450,000 10,450,000
- Exhaust Fan (Axial) 9800 CFM Unit 1 29,700,000 29,700,000
- Intake Fan (Axial) 8400 CFM Unit 1 27,720,000 27,720,000
- Instalasi Ducting Ls 1 84,150,000 84,150,000
- Lampu penerangan & Instalasi kabel Ttk 16 19,360,000 309,760,000
I Pekerjaan Persiapan Ls 1 56,100,000 56,100,000
- Mobilisasi, Akomodasi, Logistik, Training Operator, Manual Instruction.
- Proyek Manajemen dan Biaya Administrasi Lapangan
- Alat - alat Keselamatan Kerja
- Rapat Proyek
- Keamanan Proyek (area kerja atau gudang atau kantor kontraktor)
- Photo - photo Kemajuan Pekerjaan
- Pengadaan gambar (Shop atau As Build)
- Pembuatan dokumen kontrak 5 set
- Asuransi Tenaga kerja ( ASTEK ) untuk pekerja pemborong
- Biaya Koordinasi lapangan perbulan semenjak kontraktor berada
dilapangan sampai dengan selesainya pekerjaan serah terima pertama.

J Pekerjaan Lain - lain


- Testing & Commissioning Ls 1 16,500,000 16,500,000
- Ijin Pembuangan Limbah Cair (IPLC) Ls 1 55,000,000 55,000,000

Total STP 1,398,430,000


PEKERJAAN RECYCLING SYSTEM KAPASITAS 295 M3/HARI
A Filter Feed Pump Type Centrifugal / Kap. 12 m3/jam / Head 2 Bar Unit 2 19,800,000 39,600,000
B Sand Filter Bahan Mild Steel Kap. 12 m3/jam (Manual Backwash) Unit 1 68,838,000 68,838,000
C Carbon Filter Bahan Mild Steel Kap. 12 m3/jam (Manual Backwash) Unit 1 81,620,000 81,620,000

Total Recycling STP 190,058,000

Penjumlahan Total 1,588,488,000

Page 1 of 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL & ELEKTRIKAL
DAFTAR No. 4.14 : PEKERJAAN GONDOLA DAN INSTALASINYA

No. Uraian Pekerjaan Sat Vol Harga Total


1 Hoist Unit 1 71,500,000 71,500,000
Position : On Platform
Rating Lifting : 630 kg
Lifting Speed : 9,5 M/Min
Power Consumpt : 1,5 Kw / 380 V / 50 Hz
Safety Device : Safety Lock SKL 800 AT
Brake Torque : 15 kN
Rotation Speed : 1420 rpm
Wire Rope Diameter : Ø 8,3 mm
2 PANEL CONTROL Unit 1 19,250,000 19,250,000
Type : Box Panel Water Proof
Component : Schneider
3 WIRE ROPE M 400 77,000 30,800,000
Type : FC
Structur : 4 x 31 (Galvanized)
B. Strenght : 3600 kg
Main Rope : 2 x 100 Mtr
Safety Rope : 2 x 100 Mtr
Country Of Origin :
4 PLATFORM / CRADLE Unit 1 18,150,000 18,150,000
Construction : Hollow Steel with Aluminium Bordes
Size / Dimension : 2000 x 650 x 1000
Weight : ± 90 kg
5 CABLE POWER M 100 66,000 6,600,000
Type : NYMHY
Brand : Metal
Structure : 5 x 2,5 mm2
6 WIRE WINDER Unit 1 22,000,000 22,000,000
Wire drum : Allumunium with as Stainless
Motor :
Country Of Origin :
7
Unit Gondola : Single Fix Arm + 6.000 mm Set 1 330,000,000 330,000,000
Rail Installation : IWF 150 x 75 x 5 x 7 mm (Galvanized) m 230 935,000 215,050,000
Plate Sitting Rail : Plate 300 x 150 x 10 mm (Galvanized) Pcs 460 330,000 151,800,000
Anchore : 5/8 x 300 mm (Galvanized) Pcs 230 132,000 30,360,000
8 SAFETY EQUIPMENT
Nylon Rope dia. 16 mm m 100 33,000 3,300,000
Safety Helmet Pcs 2 825,000 1,650,000
Body Harnesh Pcs 2 2,750,000 5,500,000
Auto Stop Pcs 2 3,850,000 7,700,000
9 LAIN - LAIN
Izin Depnaker Ls 1 11,000,000 11,000,000
Biaya Training Operator & Test Comisioning Ls 1 11,000,000 11,000,000
Biaya Mobilisasi & Install Ls 1 16,500,000 16,500,000

TOTAL 952,160,000