Anda di halaman 1dari 3

DAFTAR VOLUME DAN SPESIFIKASI

Nagori : Parsaoran Sibisa

Kecamatan : Ajibata

Kabupaten : Toba

Provinsi : Sumatera Utara

Kegiatan : PENGADAAN PIPA

NO URAIAN PEKERJAAN SAT VOLUME KETERANGAN SPESIFIKASI

B PENGADAAN PIPA DAN ACCESSORIES

I Pipa Transmisi dan Distribusi

1 Pipa PVC 3" Btg 3 PVC SNI S-12,5

2 Pipa PVC 2" Btg 35 PVC SNI S-12,5

II Accessories Pipa

1 Reducer PVC3" x 2" Bh 1 PVC SNI

2 Reducer Tee PVC 2" x 1,5" Bh 1 PVC SNI

3 Reducer PVC 2" x 1,5" Bh 1 PVC SNI

4 Tee PVC 2" Bh 3 PVC SNI

5 Dop PVC 2" Bh 4 PVC SNI

6 Dop PVC 1,5" Bh 2 PVC SNI


PAKET VOLUME DAN SPESIFIKASI

PROGRAM : PAMSIMAS
PEKERJAAN : PENGADAAN PIPA
LOKASI : DUSUN I
KECAMATAN : TAPIAN DOLOK

NO URAIAN PEKERJAAN SAT VOLUME KETERANGAN SPESIFIKASI

B PENGADAAN PIPA DAN ACCESSORIES


I Pipa Transmisi dan Distribusi
1 Pipa PVC 4" Btg 50 PVC SNI S-12,5
2 Pipa PVC 3" Btg 50 PVC SNI S-12,5
3 Pipa PVC 2" Btg 87 PVC SNI S-12,5
4 Pipa PVC 1 1/2" Btg 111 PVC SNI S-12,5

II Accessories Pipa
1 Coupler Reducer PE 4"x3" Bh 1 HDPE SNI
2 Coupler Reducer PE 3"x2" Bh 2 HDPE SNI
3 Coupler PE 3" Bh 1 HDPE SNI
4 Dop 2" Bh 1 PVC SNI
5 Dop 1,5" Bh 5 PVC SNI
6 Tee PVC 2" Bh 4 PVC SNI

Batu Silangit ,......Nopember 2018


Diperiksa Oleh, Diajukan oleh

Maikensi Siallagan Abdi Gunawan Ruslan Saragih Didit Triswanto


FS FM-WSS Koor. KKM Ketua Satlak
RINCIAN RENCANA ANGGARAN BIAYA

Nagori : Batu Silangit


Kecamatan : Tapian Dolok
Kabupaten : Simalungun
Provinsi : Sumatera Utara
Kegiatan : Pengadaan Pipa

HARGA SATUAN
NO URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.)
(Rp.)

B PENGADAAN PIPA DAN ACCESSORIES


I Pipa Transmisi dan Distribusi
1 Pipa PVC 4" Btg 50 488,000 24,400,000
2 Pipa PVC 3" Btg 50 330,000 16,500,000
3 Pipa PVC 2" Btg 87 188,000 16,356,000
4 Pipa PVC 1 1/2" Btg 111 170,000 18,870,000
SUB TOTAL (I) 76,126,000

II Accessories Pipa
1 Coupler Reducer PE 4"x3" Bh 1 1,088,000 1,088,000
2 Coupler Reducer PE 3"x2" Bh 2 739,000 1,478,000
3 Coupler PE 3" Bh 1 499,000 499,000
4 Dop 2" Ls 1 26,000 26,000
5 Dop 1,5" Bh 5 20,000 100,000
6 Tee PVC 2" Bh 4 38,000 152,000
SUB TOTAL (II) 3,343,000
GRAND TOTAL (I+II) 79,469,000

Marihat Marsada, Juli 2019


Disetujui

Penyedia barang/jasa/Kontraktor

..................................................

Anda mungkin juga menyukai