KEGIATAN :

PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :

HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME
(Rp)

1 2 3 4
K. PEKERJAAN SANITASI
LANTAI 1
1 Bak Mandi Fiberglass 2 Bh
2 Closet Jongkok 2 Bh
3 Closet Duduk 1 Bh
4 Kran Air 1/2" 3 Bh
5 Floor Drain 3 Bh
6 Pipa PVC AW 1/2" 14.68 M'
7 Pemasangan Pipa PVC 3" 48.71 M'
8 Pipa PVC AW 4" Ke Saptictank 7.32 M'
9 Bak Saptictank Biofil 5000 M3 1 Bh
10 Peresapan 1 Bh
11 Wastafel 2 Bh
12 Cermin Wastafel 3 Bh
13 Test Dan Uji Comisioning Lt.1 dan Lt.2 1.00 Ls

LANTAI 2
1 Bak Mandi Fiberglass Bh
2 Closet Jongkok Bh
3 Kran Air 1/2" Bh
4 Flordrain Bh
5 Pipa PVC AW 1/2" M'
6 Pemasangan Pipa PVC 3" M'
7 Pipa PVC AW 4" Ke Saptictank M'
8 Cermin Wastafel Bh
9 Pompa dorong Transfer (Resorvoir Ke Profil Tank) Bh
Type : Sanyo PH250 B
Kapasitas : 30 Ltr/Menit
Head : 42 m
Power : In = 660 Watt, Out = 250 Watt Bh

10 Pompa Dorong Distribusi (Profil Tank Ke WC) Bh


Type : Sanyo PH258 JP
Kapasitas : 35 Ltr/Menit
Head : 30 m
Power : In = 500 Watt, Out = 250 Watt
BACK UP

KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
PEMBAYARAN KONTRAK

K. PEKERJAAN SANITASI
LANTAI 1
2000

400 400 400 350 150 150 150


Dis tribus i dari lantai Pipa Pvc 1"
2

 SAFT

KM/WC KM/WC KM/WC


-0.05 -0.05 -0.05

300

300
R.FOTO SIDIK JARI R.KERJA R.PLHUT
±0.00 ±0.00 ±0.00

R.DOKUMENTASI
 ±0.00

200
PEND AFTARAN HAJI REGULER
±0.00

250 PERBANKAN SYARIAH

700
±0.00 R.TUNGGU
±0.00
1410

1410
R.TUNGGU R.TUNGGU
PERBANKAN SYARIAH ±0.00 ±0.00
250

±0.00

110
110


TERAS
300

300
-0.05

     
400 400 400 400 400

1 Bak Mandi Fiberglass JUMLAH 2.00 Bh


2

2 Closet Jongkok JUMLAH 2.00 Bh


2

3 Closet Duduk JUMLAH 1.00 Bh


1

4 Kran Air 1/2" JUMLAH 3.00 Bh


3

5 Floor Drain JUMLAH 3.00 Bh


3

6 Pipa PVC AW 1/2" PANJANG DARI LT 1 KE LT 2 14.68 M'


14.68

DOKUMENTASI
BACK UP

KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK

K. PEKERJAAN SANITASI
LANTAI 1

Ke sa luran
Ke sa luran Ke sa luran
2000 Pipa Pvc 3"
Pipa Pvc 3" Pipa Pvc 3"
Pipa Pvc 4"

400 400 400 350 150 150 150

 SAFT

KM/WC KM/WC KM/WC


-0.05 -0.05 -0.05

300

300
R. FOTO SIDIK JARI R. KERJA R.PLHUT
±0.00 ± 0. 00 ±0.00

R. DOKUMENTASI

 ±0.00

200
PE ND AFTAR AN HAJI REGULER
±0.00

PERBANK AN SYARIAH

250
±0. 00 R.TUNGGU

700
±0 .00

1410
1410

R.TUNGGU R.T UNGGU


PERBANK AN SYARIAH ± 0. 00 ±0. 00
250

±0. 00

110
110

Ke sa luran Ke sa luran Ke sa luran

Pipa Pvc 3"  Pipa Pvc 3" Pipa Pvc 3"

TERAS
300

300
-0. 05

     
400 400 400 400 400

7 Pemasangan Pipa PVC 3" Ins. Air Kotor Pembuangan Air Hujan Dari LT.2 Ke Saluran 48.71 M'
13.91 34.8

8 Pipa PVC AW 4" Ke Saptictank PANJANG DARI LT 1 KE SAPTICTANK 7.32 M'


7.32

9 Bak Saptictank Biofil 5000 M3 JUMLAH 1.00 Bh


1

10 Peresapan JUMLAH 1.00 Bh


1

11 Wastafel JUMLAH 2.00 Bh


2

12 Cermin Wastafel JUMLAH 3.00 Bh


3

13 Test Dan Uji Comisioning Lt.1 dan Lt.2 JUMLAH 1.00 Ls


1

DOKUMENTASI
BACK UP

KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK

K. PEKERJAAN SANITASI
LANTAI 2
2000

400 400 400


Pipa Pvc 3"
350 150 150 150
Pip a Pvc 3"

Pipa Pvc 4"

 Floor d rain Floor drain Saft ke lantai 1


Distr ibusi ke lantai 1
Distribusi dari profil tank

P ip a Pvc 1"
Pipa Pvc 3"
Floor drain

Saft ke lantai 1

300

300
GUDANG KM/WC KM/WC
±0.00 -0.05 -0.05


200
250

700
1410

1410
R.SERBAGUNA
+4.40
250

110
110

Pipa Pvc 3" P ipa Pvc 3" Pip a Pvc 3"


Floor drain Floor drain
Floor drain
300

300
     
400 400 400 400 400

1 Bak Mandi Fiberglass JUMLAH 2.00 Bh


2

2 Closet Jongkok JUMLAH 2.00 Bh


2

3 Kran Air 1/2" JUMLAH 2.00 Bh


2

4 Flordrain JUMLAH 2.00 Bh


2

5 Pipa PVC AW 1/2" PANJANG DARI LT 2 KE PROFIL 9.24 M'


9.24

DOKUMENTASI
BACK UP

KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK

K. PEKERJAAN SANITASI
LANTAI 2

Ke sa luran
Ke sa luran Ke saluran
2000 Pipa Pvc 3"
Pipa Pvc 3" Pipa Pvc 3"
Pipa Pvc 4"

400 400 400 350 150 150 150

 SAFT

KM/WC KM/WC KM/WC


-0 .05 -0.05 -0.05

300

300
R.FOTO SIDIK JARI R. KERJA R.PLH UT
±0. 00 ±0. 00 ±0.00

R.DOKUMENTASI

 ±0 .00

200
PENDAFTARAN HA JI REGULER
±0.00

PE RBAN KAN SYARIAH

250
±0 .00 R.TUNGGU

700
±0. 00

1410
1410

R .T UNGGU R. TUNGGU
PE RBAN KAN SYARIAH ±0.00 ±0.00
250

±0 .00

110
110

Ke saluran Ke sa luran Ke sa luran

Pipa Pvc 3"  Pipa Pvc 3" Pipa Pvc 3"

TERAS
300

300
-0. 05

     
400 400 400 400 400

6 Pemasangan Pipa PVC 3" Ins. Air Kotor Pembuangan Air Hujan dari Top Floor Sampai Lt 2 39.23 M'
9.23 30

7 Pipa PVC AW 4" Ke Saptictank Panjang Dari Lt.2 Ke Lt.1 9.22 M'
9.22

8 Cermin Wastafel JUMLAH 1.00 Bh


1

9 Pompa dorong Transfer (Resorvoir Ke Profil Tank) JUMLAH 1.00 Bh


1

10 Pompa Dorong Distribusi (Profil Tank Ke WC) JUMLAH 1.00 Bh


1