PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME
(Rp)
1 2 3 4
K. PEKERJAAN SANITASI
LANTAI 1
1 Bak Mandi Fiberglass 2 Bh
2 Closet Jongkok 2 Bh
3 Closet Duduk 1 Bh
4 Kran Air 1/2" 3 Bh
5 Floor Drain 3 Bh
6 Pipa PVC AW 1/2" 14.68 M'
7 Pemasangan Pipa PVC 3" 48.71 M'
8 Pipa PVC AW 4" Ke Saptictank 7.32 M'
9 Bak Saptictank Biofil 5000 M3 1 Bh
10 Peresapan 1 Bh
11 Wastafel 2 Bh
12 Cermin Wastafel 3 Bh
13 Test Dan Uji Comisioning Lt.1 dan Lt.2 1.00 Ls
LANTAI 2
1 Bak Mandi Fiberglass Bh
2 Closet Jongkok Bh
3 Kran Air 1/2" Bh
4 Flordrain Bh
5 Pipa PVC AW 1/2" M'
6 Pemasangan Pipa PVC 3" M'
7 Pipa PVC AW 4" Ke Saptictank M'
8 Cermin Wastafel Bh
9 Pompa dorong Transfer (Resorvoir Ke Profil Tank) Bh
Type : Sanyo PH250 B
Kapasitas : 30 Ltr/Menit
Head : 42 m
Power : In = 660 Watt, Out = 250 Watt Bh
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
PEMBAYARAN KONTRAK
K. PEKERJAAN SANITASI
LANTAI 1
2000
SAFT
300
300
R.FOTO SIDIK JARI R.KERJA R.PLHUT
±0.00 ±0.00 ±0.00
R.DOKUMENTASI
±0.00
200
PEND AFTARAN HAJI REGULER
±0.00
700
±0.00 R.TUNGGU
±0.00
1410
1410
R.TUNGGU R.TUNGGU
PERBANKAN SYARIAH ±0.00 ±0.00
250
±0.00
110
110
TERAS
300
300
-0.05
400 400 400 400 400
DOKUMENTASI
BACK UP
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK
K. PEKERJAAN SANITASI
LANTAI 1
Ke sa luran
Ke sa luran Ke sa luran
2000 Pipa Pvc 3"
Pipa Pvc 3" Pipa Pvc 3"
Pipa Pvc 4"
SAFT
300
300
R. FOTO SIDIK JARI R. KERJA R.PLHUT
±0.00 ± 0. 00 ±0.00
R. DOKUMENTASI
±0.00
200
PE ND AFTAR AN HAJI REGULER
±0.00
PERBANK AN SYARIAH
250
±0. 00 R.TUNGGU
700
±0 .00
1410
1410
±0. 00
110
110
TERAS
300
300
-0. 05
400 400 400 400 400
7 Pemasangan Pipa PVC 3" Ins. Air Kotor Pembuangan Air Hujan Dari LT.2 Ke Saluran 48.71 M'
13.91 34.8
DOKUMENTASI
BACK UP
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK
K. PEKERJAAN SANITASI
LANTAI 2
2000
P ip a Pvc 1"
Pipa Pvc 3"
Floor drain
Saft ke lantai 1
300
300
GUDANG KM/WC KM/WC
±0.00 -0.05 -0.05
200
250
700
1410
1410
R.SERBAGUNA
+4.40
250
110
110
Floor drain Floor drain
Floor drain
300
300
400 400 400 400 400
DOKUMENTASI
BACK UP
KEGIATAN :
PEKERJAAN :
NOMOR KONTRAK :
TANGGAL :
LOKASI :
TAHUN ANGGARAN :
WAKTU PELAKSANAAN :
VOLUME
NO ITEM
PEMBAYARAN ITEM PEKERJAAN PERHITUNGAN SAT KETERANGAN
KONTRAK
K. PEKERJAAN SANITASI
LANTAI 2
Ke sa luran
Ke sa luran Ke saluran
2000 Pipa Pvc 3"
Pipa Pvc 3" Pipa Pvc 3"
Pipa Pvc 4"
SAFT
300
300
R.FOTO SIDIK JARI R. KERJA R.PLH UT
±0. 00 ±0. 00 ±0.00
R.DOKUMENTASI
±0 .00
200
PENDAFTARAN HA JI REGULER
±0.00
250
±0 .00 R.TUNGGU
700
±0. 00
1410
1410
R .T UNGGU R. TUNGGU
PE RBAN KAN SYARIAH ±0.00 ±0.00
250
±0 .00
110
110
TERAS
300
300
-0. 05
400 400 400 400 400
6 Pemasangan Pipa PVC 3" Ins. Air Kotor Pembuangan Air Hujan dari Top Floor Sampai Lt 2 39.23 M'
9.23 30
7 Pipa PVC AW 4" Ke Saptictank Panjang Dari Lt.2 Ke Lt.1 9.22 M'
9.22
DOKUMENTASI