PENGEMBANGAN JARINGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DESA PABUARAN KECAMATAN BOJONGGEDE
A PEKERJAAN PERSIAPAN
1 Sewa Kantor Direksi/Gudang 1.00 ls
2 Papan nama proyek 1.00 Unit
IV BANGUNAN AIR
1 Menara Beton 5m + Reservoar 1.00 dihit
A Inlet
1 Pipa PVC dia. 1 1/2" 13.00 m'
2 Knee dia. 1 1/2" 3.00 bh
B Outlet
1 Pipa PVC dia. 1 1/2" 13.00 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
3 Knee GI dia. 1 1/2" 1.00 bh
4 Knee PVC dia. 1 1/2" 2.00 bh
5 Gate Valve Draat dia. 1 1/2" FH 1.00 bh
6 Valve Socket dia. 1 1/2" 2.00 bh
7 Seal tape 2.00 roll
8 Box street valve sedang 1.00 bh
C Washout
1 Pipa PVC dia. 1 1/2" 7.50 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
4 Knee PVC dia. 1 1/2" 2.00 bh
D Overflow
1 Pipa PVC dia. 1 1/2" 6.00 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
3 Knee PVC dia. 1 1/2" 2.00 bh
4 Gate Valve Draat dia. 1 1/2" FH 1.00 bh
5 Valve Socket dia. 1 1/2" 2.00 bh
6 Seal tape 2.00 roll
7 Box street valve sedang 1.00 bh
E Ventilasi
1 Pipa GI 1 1/2" 1.00 m'
2 Tee GI 1 1/2" x 1 1/2" 1.00 bh
3 Knee GI dia. 1 1/2" 2.00 bh
F Pekerjaan Lainnya
1 Pas. Instalasi Titik lampu 2.00 ttk
2 Pas. Instalasi Stop kontak 1.00 ttk
3 Pas. Saklar Broko Seri Standard ( 1 Phase ) 1.00 ttk
4 Pas. Stop Kontak Broko Standard ( 1 Phase ) 1.00 ttk
5 Pas. Lampu LED 11 Watt 2.00 bh
6 Pas. Glass Blok uk. 20x20 24.00 bh
7 Pas. Rooster uk. 20x20 22.00 bh