Anda di halaman 1dari 2

CHECKLIST

PENGEMBANGAN JARINGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DESA PABUARAN KECAMATAN BOJONGGEDE

SESUAI KONTRAK REALISASI


NO URAIAN PEKERJAAN
VOLUME SATUAN CEK KETERANGAN

A PEKERJAAN PERSIAPAN
1 Sewa Kantor Direksi/Gudang 1.00 ls
2 Papan nama proyek 1.00 Unit

B PENGADAAN PIPA DAN ACCS


I PENGADAAN PIPA PVC SC
1 Pipa PVC SC dia. 1 1/2" 300.00 m'

II PENGADAAN DAN PEMASANGAN AKSESORIES JARINGAN


1 Tee PVC dia. 1 1/2" x 1 1/2" 1.00 bh
2 Knee PVC dia. 1 1/2" 6.00 bh
3 Gate Valve Draat dia. 1 1/2" FH 1.00 bh
4 Valve Socket dia. 1 1/2" 4.00 bh
5 Seal tape 4.00 roll
6 Lem PVC 2.00 kg
7 Dop dia. 1 1/2" 3.00 bh
8 Box street valve sedang 1.00 bh

III PENGADAAN DAN PEMASANGAN AKSESORIS WASHOUT


Washout Jaringan
1 Pipa PVC SC dia. 1 1/2" 2.00 m'
3 Gate Valve Draat dia. 1 1/2" FH 2.00 bh
4 Valve Socket dia. 1 1/2" 4.00 bh
5 Seal tape 4.00 roll
6 Box street valve sedang 2.00 bh

C PEMASANGAN PIPA/ACCS DAN BANGUNAN AIR


PEMASANGAN PIPA DAN ACCESSORIES
I PEKERJAAN TANAH
1 Galian pipa PVC dia. 1 1/2" pada tanah keras 300.00 m'
2 Bongkaran Rabat Beton 300.00 m'
3 Perbaikan Rabat Beton Bekas Bongkaran 5.67 m3

II PEKERJAAN PEMASANGAN PIPA


1 Pemasangan 1m Pipa PVC 1,5 300.00 m

III PEKERJAAN POMPA DAN GALIAN SUMUR


A Pompa Deep Well 1.00 unit
1 Pipa PVC dia. 6" 42.00 meter
2 Pipa dia. 4" PVC 24.00 meter
2 Pipa Sumersible PVC dia. 1 1/2" 78.00 meter
Pipa Screen PVC dia. 6" 18.00 meter
3 Pipa Screen PVC dia. 4" 8.00 meter
4 Pengadaan dan Pemasangan Submersible Pump 1,5 HP Head 80 m 1.00 unit
5 Pumping test 1 x 24 jam 1.00 dihit
6 Panel Pompa + WLC 1.00 unit
7 Pas. Stabilizer 3000 watt 1.00 ls
8 Pek. Pembuatan Rumah Sumur Bor 1.00 unit
9 Accessories 1.00 dihit
1. Accessories Pipa Inlet
- Gate Valve Draat dia. 1 1/2" FH : 2 bh
- Valve Socket dia. 1 1/2" : 6 bh
- Check Valve dia. 1 1/2 : 1 bh
2. Accessories Pipa Jambang
- Dop dia. 6"
10 Pengkabelan NYYHY 3x2,5 mm dan NYYHY 3X0,75 MM + 78.00 meter
Selubung pipa dia 1"
11 Tali Tambang Plastik dia. 12mm 78.00 meter
12 Flange PVC dia. 6"/Kepala Sumur 1.00 bh
13 Koral Jagung 1.00 dihit
14 Cementation 1.00 dihit
15 Olie berikut Solar 1.00 dihit
16 Pengeboran Bore Hole dia. 6" 0-50 meter 50.00 meter
17 Pengeboran Bore Hole dia. 6" > 50 meter 40.00 meter
18 Reaming Bore Hole dia. 8" 90.00 meter
19 Electrical Well Logging 1.00 ls

IV BANGUNAN AIR
1 Menara Beton 5m + Reservoar 1.00 dihit
A Inlet
1 Pipa PVC dia. 1 1/2" 13.00 m'
2 Knee dia. 1 1/2" 3.00 bh
B Outlet
1 Pipa PVC dia. 1 1/2" 13.00 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
3 Knee GI dia. 1 1/2" 1.00 bh
4 Knee PVC dia. 1 1/2" 2.00 bh
5 Gate Valve Draat dia. 1 1/2" FH 1.00 bh
6 Valve Socket dia. 1 1/2" 2.00 bh
7 Seal tape 2.00 roll
8 Box street valve sedang 1.00 bh
C Washout
1 Pipa PVC dia. 1 1/2" 7.50 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
4 Knee PVC dia. 1 1/2" 2.00 bh
D Overflow
1 Pipa PVC dia. 1 1/2" 6.00 m'
2 Wall pipe dia. 1 1/2" draat (panjang 50 cm) 1.00 bh
3 Knee PVC dia. 1 1/2" 2.00 bh
4 Gate Valve Draat dia. 1 1/2" FH 1.00 bh
5 Valve Socket dia. 1 1/2" 2.00 bh
6 Seal tape 2.00 roll
7 Box street valve sedang 1.00 bh
E Ventilasi
1 Pipa GI 1 1/2" 1.00 m'
2 Tee GI 1 1/2" x 1 1/2" 1.00 bh
3 Knee GI dia. 1 1/2" 2.00 bh
F Pekerjaan Lainnya
1 Pas. Instalasi Titik lampu 2.00 ttk
2 Pas. Instalasi Stop kontak 1.00 ttk
3 Pas. Saklar Broko Seri Standard ( 1 Phase ) 1.00 ttk
4 Pas. Stop Kontak Broko Standard ( 1 Phase ) 1.00 ttk
5 Pas. Lampu LED 11 Watt 2.00 bh
6 Pas. Glass Blok uk. 20x20 24.00 bh
7 Pas. Rooster uk. 20x20 22.00 bh

D PEKERJAAN LAIN LAIN


1 Pekerjaan Sambungan Rumah 15.00 unit
1 Mobilisasi 1.00 ls
2 Penyambungan Listrik Daya 2200 watt + Instalasi 1.00 ls
3 Uji Coba /pengetesan sistem 1.00 ls
4 Uji Lab Kualitas air 1.00 ls
5 As Built Drawing 1.00 ls
6 Pelaporan dan Dokumentasi 1.00 ls
7 Biaya Kesehatan & Keselamatan Kerja (K3) 1.00 dihit
JUMLAH D -