Anda di halaman 1dari 3

PEMERINTAH KOTA TARAKAN

PERUSAHAAN UMUM DAERAH AIR MINUM TIRTA ALAM TARAKAN


Jl. Slamet Riyadi No.34 Tarakan 77111 TIRTA DHARMA

RENCANA RINCIAN ANGGARAN BIAYA YANG AKAN DI AJUKAN MENJADI PERWALI

HARGA (Rp)
NO URAIAN/JENIS BARANG SATUAN VOLUME
SATUAN JUMLAH
A. BAHAN :
1 Clamp Sadle Ø 4" - 3" - 2" x 1¼" PE Bh 1.00 201,750.00 201,750.00
2 Ferrule Cutter Ø 1¼" x ½" Bh 1.00 101,500.00 101,500.00
3 Pipa HDPE Ø 20 mm M' 8.00 10,200.00 81,600.00
4 Lockable Valve Magnetic Ø ½" Bh 1.00 239,000.00 239,000.00
5 Brass Water Meter Ø ½" Set 1.00 339,000.00 339,000.00
6 Brass Gate Meter / Stop Kran Ø ½" Bh 1.00 61,500.00 61,500.00
7 Box Water Meter Bh 1.00 46,600.00 46,600.00
8 Valve Socket Ø ½" PVC Bh 1.00 6,500.00 6,500.00
9 Pipa PVC Ø 20 mm M' 0.80 12,750.00 10,200.00
10 Pit Kran Ø ½" Bh 1.00 33,250.00 33,250.00
11 Knee Foucet PVC Ø ½" Bh 1.00 5,000.00 5,000.00
12 Knee PVC Ø ½" Bh 1.00 5,000.00 5,000.00
13 Dop PVC Ø ½" Bh 1.00 5,000.00 5,000.00
14 Tee PVC Ø ½" x ½" Bh 1.00 5,000.00 5,000.00
15 Seal Tape Roll 2.00 4,500.00 9,000.00
16 Lem PVC Tube 1.00 17,125.00 17,125.00
17 Segel / Lak Water Meter Ø ½" Bh 1.00 18,000.00 18,000.00
TOTAL A (PEKERJAAN PENGADAAN BAHAN) 1,185,025.00

B. UPAH KERJA :
1 Penggalian/Penimbunan & Pemasangan Ls 1.00 400,000.00 400,000.00
2 Pemasangan Pondasi Water Meter Ls 1.00 185,000.00 185,000.00
TOTAL B (PEKERJAAN PEMASANGAN) 585,000.00

C. BIAYA LAIN-LAIN :
1 Jasa Survey Lapangan Ls 1.00 180,000.00 180,000.00
2 Biaya Administrasi Ls 1.00 50,000.00 50,000.00
TOTAL C (BIAYA LAIN-LAIN) 230,000.00

D. TOTAL (A+B+C) 2,000,025.00


DIBULATKAN 2,000,000.00
Terbilang : Dua Juta Rupiah
Tarakan,14 Mei 2020
PEMERINTAH KOTA TARAKAN
PERUSAHAAN UMUM DAERAH AIR MINUM TIRTA ALAM TARAKAN
Jl. Slamet Riyadi No.34 Tarakan 77111

RENCANA RINCIAN ANGGARAN BIAYA YANG AKAN DI AJUKAN MENJADI PERWALI

NO URAIAN/JENIS BARANG SATUAN VOLUME

A. BAHAN :
1 Clamp Sadle Ø 4" - 3" - 2" x 1¼" PE Bh 1.00
2 Male Thread Elbow Ø 20 mm x ½" PE Bh 2.00
3 Pipa HDPE Ø 20 mm M' 20.00
4 Lockable Valve Magnetic Ø ½" Bh 1.00
5 Water Meter Ø ½" Bh 1.00
6 Coupling Brass Ø ½" Bh 1.00
7 Elbow M-F GIP Ø ½" Bh 1.00
8 Gate Valve Ø ½" Bh 1.00
9 Box Water Meter Bh 1.00
10 Valve Socket Ø ½" PVC Bh 1.00
11 Pipa PVC Ø 20 mm M' 0.80
12 Pit Kran Ø ½" Bh 1.00
13 Knee Foucet PVC Ø ½" Bh 1.00
14 Knee PVC Ø ½" Bh 1.00
15 Dop PVC Ø ½" Bh 1.00
16 Tee PVC Ø ½" x ½" Bh 1.00
17 Seal Tape Roll 2.00
18 Lem PVC Tube 1.00
19 Segel / Lak Water Meter Ø ½" Bh 1.00
TOTAL A (PEKERJAAN PENGADAAN BAHAN)

B. UPAH KERJA :
1 Penggalian/Penimbunan & Pemasangan Ls 1.00
2 Pemasangan Pondasi Water Meter Ls 1.00
TOTAL B (PEKERJAAN PEMASANGAN)

C. BIAYA LAIN-LAIN :
1 Jasa Survey Lapangan Ls 1.00
2 Biaya Administrasi Ls 1.00
TOTAL C (BIAYA LAIN-LAIN)

D. TOTAL (A+B+C)
DIBULATKAN
Terbilang : Dua Juta Rupiah
RAKAN
UM TIRTA ALAM TARAKAN
n 77111 TIRTA DHARMA

DI AJUKAN MENJADI PERWALI

HARGA (Rp)
SATUAN JUMLAH

201,750.00 201,750.00
21,500.00 43,000.00
8,500.00 170,000.00
253,500.00 253,500.00
290,000.00 290,000.00
49,125.00 49,125.00
5,500.00 5,500.00
56,500.00 56,500.00
46,600.00 46,600.00
3,000.00 3,000.00
12,750.00 10,200.00
33,250.00 33,250.00
3,000.00 3,000.00
3,000.00 3,000.00
3,000.00 3,000.00
3,000.00 3,000.00
2,375.00 4,750.00
17,125.00 17,125.00
16,700.00 16,700.00
1,213,000.00

400,000.00 400,000.00
185,000.00 185,000.00
585,000.00

152,000.00 152,000.00
50,000.00 50,000.00
202,000.00

2,000,000.00
2,000,000.00

Tarakan,14 Mei 2020

Anda mungkin juga menyukai