1 1 1 Belanja Pegawai
Tunjanga Kades
1 1 2
Siltap Perdes & Tunjangan Perdes
1 1 2 1 Belanja Pegawai
1 1 4 Operasional Kantor
- Buku Kwitansi Bh 1 Th
- Sapu Lidi 2 Bh 1 Th -
- Sulak 2 Bh 1 Th -
- Sikat WC 2 Bh 1 Th 15,000
d. Penggandaan 4,187,077
- Foto copy 2007 1 Th 250
f. Konsumsi 5,400,000
- Konsumsi harian 11 Bl 25 Th 4,125,000
9. Pakaian Dinas
j. Honor Kebersihan
k. Wifi 4,200,000
- Yaumi 12 Bl 1 Th 150,000 600,000
1 1 5 1 Belanja Pegawai
Transport Rapat
Rapat Bulanan 5 org 6 keg 50,000
ATK 4,000,000
Pembelian Laptop
1 1 7 1 Belanja Pegawai -
1 1 7
Dukungan Penggalian Keg Operas Pajak Daerah dan Retribusi
1 1 7 1 Belanja Barang dan Jasa -
a Belanja Pegawai
- Insentif Keg Mutasi SPPT PBB/ Pendataa 7 org 7 org 300,000 2,100,000
32,760,000
13,902,584
11,449,186
Rp 2,000,000 Rp 3,492,208
Rp -
6,187,077
11,400,000
-
6,000,000
321 sisa
30,900,000
4,000,000
Rp 2,000,000
Rp 2,000,000
Rp 2,000,000
Rp 4,000,000
Rp 2,000,000
Rp 12,000,000
13,750,000
42,244,334
-
852,500
687,500
852,500
147,500
5,500,000
RENCANA ANGGARAN BIAYA/DPA
DESA MEJASEM TIMUR KECAMATAN KRAMAT KABUPATEN TEGAL
TAHUN ANGGARAN 2020
Bidang : Bidang Pelaksanaan Pembangunan Desa
Sub Bidang : Pendidikan
Kegiatan : Insentif dan Operasional Guru Paud
Waktu Pelaksanaan : Bulan Januari s/d Desember 2020
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 1 1 Insentif dan Operasional Guru Paud
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Sarana Prasarana Pos Kesehatan Desa (PKD)
ATK
Benda Pos
Belanja Modal
2 2 2 1 Belanja Pegawai -
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
a ATK
bh 1 th -
- Box file
b Benda Pos
d Belanja Rapat
2 2 2 2 Belanja Modal
2 2 1 Drainase RT 2 RW 2
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Belanja Modal
JUMLAH (Rp.) 28,100,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
- Dokumentasi
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
2 2 1 Pengaspalan RT 04 RW 01
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
- Konsumsi Rapat 5 org 3 keg 5,000 75,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1
Jalan Baru Perkerasan Makadam/Telford RT. 06 RW. 01
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Pengaspalan RT. 03 RW 02
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
2 2 1 Pengaspalan RT 03 RW 03
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Pembangunan RTLH DD
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
ATK
b Benda Pos
d Belanja Rapat
2 2 1 2 Belanja Modal
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
1 2 1 Pembangunan Jamban Umum/MCK
1 2 1 1 Belanja Modal -
- Upah Tenaga Kerja 10 org 1 th 340,000 3,400,000
- Material 10 pkt 1 th 1,396,550 13,965,500
- Pasang Patok Profil 10 pkt 1 th 63,450 634,500
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Pelatihan Pemularsahan Jenazah
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 1 rim 1 keg 60,000 60,000
- Tinta Printer 1 bh 1 keg 55,000 55,000
- Bolpoin Standar 5 bh 1 keg 2,000 10,000
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Buku Kwitansi Kecil 2 bh 1 th 7,000 14,000
- Buku Kwitansi Besar 2 bh 1 th 10,000 20,000
- Buku Tulis 10 bh 1 th 5,000 50,000
- Lim Kertas Tanggung 5 bh 1 th 9,000 45,000
- Spidol 5 bh 1 th 12,000 60,000
Belanja Foto Copy/ Penggandaan
- Foto Copi 244 lbr 1 th 250 61,000
- Penjilidan 5 bk 1 keg 10,000 50,000
Benda Pos
- Materai 6000 10 lbr 1 keg 6,500 65,000
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 1 keg 9,500,000 9,500,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Pelatihan Pemularsahan Jenazah
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 2 bh 1 keg 35,000 70,000
- Bolpoin Standar 5 bh 1 keg 2,000 10,000
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Buku Kwitansi Kecil 3 bh 1 th 7,000 21,000
- Buku Kwitansi Besar 2 bh 1 th -
- Buku Tulis 6 bh 1 th 5,000 30,000
- Lim Kertas Tanggung 4 bh 1 th -
- Spidol 2 bh 1 th 12,000 24,000
- Banner 1 1 100,000 100,000
Belanja Foto Copy/ Penggandaan
- Foto Copi 300 lbr 1 th 250 75,000
- Penjilidan 5 bk 1 keg 5,000 25,000
- Dokumentasi 20 1 3,500 70,000
Benda Pos
- Materai 6000 10 lbr 1 keg 6,500 65,000
2 2 1 2 Belanja Konsumsi
Belanja Snack 30 ls 1 keg 10,000 300,000
Belanja Nasi Kotak 30 1 20,000 600,000
Honor Narasumber
Honor Narasumber 2 1 500,000 1,000,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Pemetaan dan Analisis Kemiskinan
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 2 bh 1 keg 35,000 70,000
- Bolpoin Standar 5 bh 1 keg 2,000 10,000
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Buku Kwitansi Kecil 3 bh 1 th 7,000 21,000
- Spidol 2 bh 1 th 12,000 24,000
Belanja Foto Copy/ Penggandaan
- Foto Copy 250 lbr 1 th 250 62,500
- Penjilidan 5 bk 1 keg 5,000 25,000
- Dokumentasi 15 1 3,500 52,500
2 2 1 2 Belanja Konsumsi
- Belanja Snack 10 ls 5 keg 10,000 500,000
- Belanja Nasi Kotak 10 Is 5 20,000 1,000,000
Honor Pelaksana Kegiatan
- Ketua Pelaksana Kegiatan 1 org 5 Keg 250,000 1,250,000
- Sekretaris Pelaksana Kegiatan 1 org 5 Keg 150,000 750,000
- Anggota Pelaksana Kegiatan 1 org 5 Keg 125,000 625,000
Honor Entry Data 2 org 5 Keg 550,000 5,500,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 2 Operasional Transportasi Dinas
2 2 2 1 Belanja Modal -
- Service Mobil Ambulance Desa 1 unit 9 bln 500,000 4,500,000
- Service Motor Dinas 2 unit 12 bln 100,000 2,400,000
JUMLAH (Rp.) 6,900,000
Kalijambe, Januari 2020
Disetujui/Mengesahkan Pelaksana Kegiatan/PTPKD
Kepala Desa
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Gerbang/Gapura Desa
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
a Honor Tim Pelaksana Kegiatan
- Petugas Pelaksana Anggaran 1 org 1 keg 700,000 700,000
2 Honor Tim Pemeriksa Keg Infrastruktur -
- Ketua 1 org 1 keg 235,000 235,000
- Sekretaris 1 org 1 keg 205,000 205,000
- Anggota 1 org 1 keg 170,000 170,000
2 2 1 2 Belanja ATK Dan Benda Pos
ATK
- Jasa Perencanaan/ gambar 1 pkt 1 keg 620,000 620,000
- Papan Kegiatan 1 pkt 1 keg 150,000 150,000
- Prasasti 1 pkt 1 keg 300,000 300,000
b Benda Pos
- Materai 6000 5 lbr 1 keg 6,500 32,500
- Materai 3000 lbr 1 keg -
c Belanja Foto Copy/ Penggandaan
- Foto Copy 664 lbr 1 th 250 166,000
- Penjilidan 3 bk 1 keg 5,000 15,000
- Dokumentasi 15 lbr 1 keg 3,500 52,500
d Belanja Rapat
- Konsumsi Rapat 10 org 3 keg 10,000 300,000
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 1 Pkt 59,054,000 59,054,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Pembangunan Jembatan RT. 05 RW. 01
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan -
2 2 1 1 Belanja Pegawai
a Honor Tim Pelaksana Kegiatan
- Petugas Pelaksana Anggaran 1 org 1 keg 1,350,000 1,350,000
2 Honor Tim Pemeriksa Keg Infrastruktur -
- Ketua 1 org 1 keg 340,000 340,000
- Sekretaris 1 org 1 keg 290,000 290,000
- Anggota 1 org 1 keg 240,000 240,000
2 2 1 2 Belanja ATK Dan Benda Pos
ATK
- Jasa Perencanaan/ gambar 1 pkt 1 keg 1,000,000 1,000,000
- Papan Kegiatan 1 pkt 1 keg 100,000 100,000
- Prasasti 1 pkt 1 keg 170,000 170,000
b Benda Pos
- Materai 6000 50 lbr 1 keg 6,500 325,000
- Materai 3000 30 lbr 1 keg 3,500 105,000
c Belanja Foto Copy/ Penggandaan
- Foto Copy 980 lbr 1 th 250 245,000
- Penjilidan 3 bk 1 keg 5,000 15,000
- Dokumentasi 20 lbr 1 keg 3,500 70,000
d Belanja Rapat
- Konsumsi Rapat 10 org 3 keg 10,000 300,000
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 1 Pkt 65,000,000 65,000,000
Belanja Upah Tenaga Kerja 1 ls 1 pkt 30,450,000 30,450,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Jumantik
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 1 rim 1 keg 50,000 50,000
- Amplop Tanggung 1 bh 1 keg 11,500 11,500
- Snallhecter Plastik 4 bh 1 keg 4,000 16,000
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Banner 1 1 75,000 75,000
-
Belanja Foto Copy/ Penggandaan
- Foto Copi 400 lbr 1 th 250 100,000
- Penjilidan 4 bk 1 keg 5,000 20,000
- Dokumentasi 5 1 3,500 17,500
2 2 1 2 Belanja Konsumsi
Belanja Snack 10 ls 3 keg 10,000 300,000
Belanja Nasi Kotak 10 3 20,000 600,000
-
JUMLAH (Rp.) 3,000,000
Disetujui/Mengesahkan Pelaksana Kegiatan/PTPKD
Kepala Desa
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Posbindu
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 1 rim 1 keg 50,000 50,000
- Amplop Tanggung 1 bh 1 keg 11,500 11,500
- Snallhecter Plastik 4 bh 1 keg 4,000 16,000
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Banner 1 1 75,000 75,000
-
Belanja Foto Copy/ Penggandaan
- Foto Copi 200 lbr 1 th 250 50,000
- Penjilidan 4 bk 1 keg 5,000 20,000
- Dokumentasi 5 1 3,500 17,500
2 2 1 2 Belanja Konsumsi
Belanja Snack 10 ls 5 keg 10,000 500,000
Belanja Nasi Kotak 10 5 20,000 1,000,000
-
JUMLAH (Rp.) 3,000,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
1 2 1 Pemeliharaan Sarana Prasarana Kesehatan
1 2 1 1 Belanja Modal -
- Mobil Ambulance Desa 1 unit 1 th 250,000,000 250,000,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
1 2 1 Penyelenggaraan Informasi Publik Desa
1 2 1 1 Belanja Modal -
- Pembuatan Banner Informasi Desa 1 pkt 1 th 2,090,000 1,090,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 8 Penangan Stunting
2 2 8 1 Belanja Barang dan Jasa -
ATK
- Kertas HVS 1 rim 1 keg 50,000 50,000
- Bolpoin Standart 5 bh 1 keg 2,000 10,000
- Stopmap Kertas 10 bh 1 keg 1,000 10,000
- Buku Kwitansi 3 Bh 1 Th 7,000 21,000
- Spidol Snowman 2 Bh 1 Th 12,000 24,000
- Banner 1 Bh 1 Th 75,000 75,000
-
Belanja Foto Copy/ Penggandaan
- Foto Copy 200 lbr 1 th 250 50,000
- Penjilidan 5 bk 1 keg 5,000 25,000
- Dokumentasi 10 1 3,500 35,000
2 2 1 2 Belanja Konsumsi
Belanja Snack 20 Org 3 keg 10,000 600,000
Belanja Nasi Kotak 20 Org 3 keg 20,000 1,200,000
Honor Narasumber 1 3 keg 300,000 900,000
-
-
JUMLAH (Rp.) 3,000,000
500,000
500,000
3,174,500
61,841,500
13,000,000 112,500
61,954,000
130,032,000
1,697,100
40,200,000
Rp 281,000
Rp 250,000
Rp 200,000
Rp 175,000
Rp 150,000
Rp 78,500
Rp 20,000
Rp 52,500
Rp 150,000
Rp 1,357,000
2,150,000 2007000
56,200,000
3,452,000
124,000,000
1,081,200
22,200,000
Rp 261,000
Rp 250,000
Rp 200,000
Rp 175,000
Rp 125,000
Rp 88,000
Rp 20,000
Rp 35,000
Rp 150,000
961,000 Rp 1,304,000
135,700
1,996,700
Rp 176,000
Rp 155,000
Rp 135,000
Rp 105,000
Rp 90,000
Rp 62,500
Rp 15,000
Rp 17,500
Rp 75,000
Rp 831,000
BELUM
35,202,000
1,310,000
1,950,000
500,000
4600
267,600
4,155,000
44,645,900
7300
Rp 276,000
Rp 250,000
Rp 200,000
Rp 175,000
Rp 125,000
Rp 51,500
Rp 20,000
Rp 52,500
Rp 150,000
Rp 1,300,000
33800
27570000
FIX
3,000,000
600,000
235,000
140,000
1,700,000
330,000
1,969,250
263,750
2,500,000
Semen 10 sak 1 Rp 85,000
Pasir 20 Karung 1 Rp 25,000
Paku 50 kg 1 Rp 30,000
Kayu Usuk 49 batang 1 Rp 20,000
Kayu Papa 50 Lembar 1 Rp 30,000
Genteng 2000 bh 1 Rp 3,000
Keramik 20 dus 1 Rp 75,000
Batu belah 5 m3 1 Rp 400,000
Bambu 50 btg 1 Rp 8,000
cat kayu 5 klg 1 Rp 45,000
cat tembok 2 pail 1 Rp 150,000
GRC 25 lmbr 1 Rp 100,000
engsel 8 bh 1 Rp 50,000
kunci pintu 2 bh 1 Rp 75,000 Rp 18,805,000
upah peker 10 hok 1 Rp 85,000
upah tkg 3 hok 1 Rp 115,000 Rp 1,195,000
Rp 850,000 3 Rp 2,550,000
Rp 500,000 3 Rp 1,500,000
Rp 1,500,000 3 Rp 4,500,000
Rp 980,000 3 Rp 2,940,000
Rp 1,500,000 3 Rp 4,500,000
Rp 6,000,000 3 Rp 18,000,000
Rp 1,500,000 3 Rp 4,500,000
Rp 2,000,000 3 Rp 6,000,000
Rp 400,000 3 Rp 1,200,000
Rp 225,000 3 Rp 675,000
Rp 300,000 3 Rp 900,000
Rp 2,500,000 3 Rp 7,500,000
Rp 400,000 3 Rp 1,200,000
Rp 150,000 3 Rp 450,000 Rp 56,415,000
Rp 850,000 3 Rp 2,550,000
Rp 345,000 3 Rp 1,035,000 Rp 3,585,000
Rp 20,000,000 Rp 60,000,000
RENCANA ANGGARAN BIAYA/DPA
DESA MEJASEM TIMUR KECAMATAN KRAMAT KABUPATEN TEG
TAHUN ANGGARAN 2019
Sumber Dana DD
1 2 3 4
1 3 1 Honor Kegiatan E- Survei
- Honor E Survey 2
JUMLAH (Rp.)
Disetujui/Mengesahkan
Kepala Desa
BENI PURWONUGROHO
BIAYA/DPA
KRAMAT KABUPATEN TEGAL
N 2019
HARGA
JUMLAH
VOLUME SATUAN
(Rp.) (Rp.)
4 5 6
15,400,000
Pelaksana Kegiatan/PTPKD
KARSOYO
RENCANA ANGGARAN BIAYA/DPA
DESA MEJASEM TIMUR KECAMATAN KRAMAT KABUPATEN TEGAL
TAHUN ANGGARAN 2019
Sumber Dana DD
1 2 3 4
2 2 1 Rabat Beton RT 2,3 & Gang Waru RW 01
2 2 1 1 Belanja Pegawai
- Ketua 1 org 10
- Sekretaris 1 org 10
- Anggota 4 org 10
- Ketua 1 org 1
- Sekretaris 1 org 1
- Anggota 1 org 1
a ATK
- Tinta Printer 10 bh 1
- Stopmap Kertas 20 Bh 1
- Buku Kwitansi Kecil 5 bh 1
- Spidol 5 bh 1
- Snalhecter Plastik 30 bh 1
15 bh 1
- Box file
b Benda Pos
- Penjilidan 10 bk 1
d Belanja Rapat
f Prasasti 1 bh 1
2 2 1 2 Belanja Modal
Tenaga Kerja 1 ls 1
JUMLAH (Rp.)
Disetujui/Mengesahkan
Kepala Desa
BENI PURWONUGROHO
RENCANA ANGGARAN BIAYA/DPA
DESA MEJASEM TIMUR KECAMATAN KRAMAT KABUPATEN TEGAL
TAHUN ANGGARAN 2019
Sumber Dana DD
1 2 3 4
2 2 1 Draenase RT 01, 02 RW 05
2 2 1 Biaya Operasional Tim Pelaksana Kegiatan
2 2 1 1 Belanja Pegawai
a Honor Tim Pelaksana Kegiatan
- Penanggung Jawab 1 org 5
- Ketua 1 org 5
- Sekretaris 1 org 5
- Anggota 4 org 5
2 Honor Tim Pemeriksa Keg Infrastruktur
- Ketua 1 org 1
- Sekretaris 1 org 1
- Anggota 1 org 1
2 2 1 2 Belanja Barang dan Jasa
a ATK
- Kertas HVS 4 rim 1
- Tinta Printer 4 bh 1
- Bolpoin Ball Linner 10 bh 1
- Stopmap Kertas 20 Bh 1
- Buku Kwitansi Kecil 2 bh 1
- Buku Kwitansi Besar 2 bh 1
- Lem Kertas Tanggung 2 bh 1
- Spidol 5 bh 1
- Snalhecter Plastik 8 bh 1
- Box file 5 bh 1
b Benda Pos
- Materai 6000 7 lbr 1
- Materai 3000 5 lbr 1
c Belanja Foto Copy/ Penggandaan
- Foto Copi 988 lbr 1
- Penjilidan 5 bk 1
d Belanja Rapat
- Rapat Koordinasi TPK 10 org 1
e Papan Nama Kegiatan 1 lbr 1
f Prasasti 1 bh 1
9 Belanja Dokumentasi 6 lbr 1
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 74
Tenaga Kerja 1 ls 1
JUMLAH (Rp.)
Disetujui/Mengesahkan
Kepala Desa
BENI PURWONUGROHO
DPA
KABUPATEN TEGAL
Th 1,000 20,000
th 7,000 35,000
th 10,000 50,000
th 9,000 45,000
th 12,000 60,000
th 4,000 120,000
th 20,000 300,000
th 250 802,000
bh 1,450,000 114,000,000
th 9,500,000 28,500,000
150,000,000
Pelaksana Kegiatan/PTPKD
KARSOYO
DPA
KABUPATEN TEGAL
bh 1,450,000 53,200,000
th 9,500,000 13,300,000
70,000,000
Pelaksana Kegiatan/PTPKD
KARSOYO
RENCANA ANGGARAN BIAYA/DPA
DESA KALIJAMBE KECAMATAN TARUB KABUPATEN TEGAL
TAHUN ANGGARAN 2020
a. ATK -
- Stopmap Kertas 10 bh 1 th -
- Tinta Printer 1 bh 1 th -
b. Penggandaan
c. Jamuan rapat
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
3 1 90
Pelaksanaan HUT RI Tingkat Desa
3 1 90 1 Belanja Barang dan Jasa -
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
a. ATK -
b. Penggandaan
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
3 4 2 Pembinaan LPMD
a. ATK -
c. Jamuan rapat 20 1 -
d. Belanja dokumentasi
3 4 3
Operasional Kegiatan TP PKK
3 4 3 1 Belanja Barang dan Jasa
a. ATK -
d. Belanja dokumentasi
e. Perjalanan Dinas
3 4 96
Peningkatan Peran dan Fungsi KPMD
3 4 96 1 Belanja Barang dan Jasa
a. ATK -
c. Belanja dokumentasi
Sumber Dana DD
HARGA
JUMLAH
NO. KODE REKENING URAIAN VOLUME SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6
4 4 1 Membuat Puding
4 4 1 1 Belanja Transpot Pelatihan
Transpot Narsum 3 org 3 keg 300000 2,700,000
Transpot Peserta 20 org 3 keg 30000 1,800,000
4 4 1 2 Belanja Barang dan Jasa
a ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 3 btl 1 keg 35,000 105,000
- Bolpoin boksi 3 bh 1 keg 12,000 36,000
- Stopmap Snallhecter 10 Bh 1 Th 4,000 40,000
- Buku Kwitansi Kecil 2 bh 1 th 7,000 14,000
- Buku Kwitansi Besar 2 bh 1 th 10,000 20,000
- Lem Kertas Tanggung 2 bh 1 th 9,000 18,000
- Spidol 3 bh 1 th 12,000 36,000
- Snalhecter Plastik 10 bh 1 th 4,000 40,000
- Box file 2 bh 1 th 20,000 40,000
Benda Pos
- Materai 6000 10 lbr 1 keg 6,500 65,000
Belanja Foto Copy/ Penggandaan
- Foto Copy 364 lbr 1 th 250 91,000
- Penjilidan 5 bk 1 keg 5,000 25,000
Belanja Dokumentasi 20 lbr 1 keg 3,500 70,000
b Konsumsi
Snack 20 dus 3 keg 10,000 600,000
Maksi dus 20 dus 3 keg 20,000 1,200,000
c Bahan Pemularsahan Jenazah 1 ls 1 th 3,000,000 3,000,000
186,000
RENCANA ANGGARAN BIAYA/DPA
DESA MEJASEM TIMUR KECAMATAN KRAMAT KABUPATEN TEGAL
TAHUN ANGGARAN 2019
4 2 1
Bidang Pertanian dan Peternakan
4 2 1 1 Belanja Barang dan Jasa -
Sumber Dana DD
4 3 1
Musyawarah Desa
4 3 1 1
Belanja Barang dan Jasa
a ATK
10 bh 1 th 20,000 200,000
- Box file
Benda Pos
b Musyawarah Desa
Sumber Dana DD
11 bh 1 th 20,000 220,000
- Box file
Benda Pos
b Kegiatan PKK
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
3 bh 1 th 20,000 60,000
- Box file
Benda Pos
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
4 4 1 2
Belanja Barang dan Jasa
a ATK
2 bh 1 th 20,000 40,000
- Box file
Benda Pos
b Konsumsi
Sumber Dana DD
HARGA
JUMLAH
NO. KODE REKENING URAIAN VOLUME SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Pembangunan Saluran Tersier
2 2 1 Biaya Operasional Tim Pelaksana -
Kegiatan
2 2 1 1 Belanja Pegawai
a Honor Tim Pelaksana Kegiatan
- Petugas Pelaksana Anggaran 1 org 1 keg 500,000 500,000
2 Honor Tim Pemeriksa Keg Infrastruktur -
- Ketua 1 org 1 keg 155,000 155,000
- Sekretaris 1 org 1 keg 120,000 120,000
- Anggota 1 org 1 keg 105,000 105,000
2 2 1 2 Belanja Barang dan Jasa
Jasa Perencanaan/ gambar 1 pkt 1 keg 110,000 110,000
a ATK
- Kertas HVS 1 rim 1 keg 50,000 50,000
- Tinta Printer 2 bh 1 keg -
- Bolpoin Ball Linner 2 bh 1 keg -
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Buku Kwitansi Kecil 1 bh 1 th 7,000 7,000
- Buku Kwitansi Besar 1 bh 1 th 10,000 10,000
- Lem Kertas Tanggung 1 bh 1 th 9,000 9,000
- Spidol 2 bh 1 th 12,000 24,000
- Snalhecter Plastik 4 bh 1 th 4,000 16,000
- Box file 2 bh 1 th -
b Benda Pos
- Materai 6000 lbr 1 keg 6,500 -
- Materai 3000 lbr 1 keg 3,500 -
c Belanja Foto Copy/ Penggandaan
- Foto Copi 280 lbr 1 th 250 70,000
- Penjilidan 3 bk 1 keg 10,000 30,000
d Belanja Rapat
- Rapat Koordinasi TPK 10 org 2 keg 10,000 200,000
e Papan Nama Kegiatan 1 lbr 1 keg 50,000 50,000
f Prasasti 1 bh 1 keg 100,000 100,000
9 Belanja Dokumentasi 10 lbr 1 keg 3,500 35,000
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 1 pkt 10,477,000 10,477,000
AGUS SUYONO, S. Pd
Sumber Dana DD
HARGA
JUMLAH
NO. KODE REKENING URAIAN VOLUME SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6
2 2 1 Pembangunan Saluran Tersier
2 2 1 Biaya Operasional Tim Pelaksana -
Kegiatan
2 2 1 1 Belanja Pegawai
a Honor Tim Pelaksana Kegiatan
- Petugas Pelaksana Anggaran 1 org 1 keg 700,000 700,000
2 Honor Tim Pemeriksa Keg Infrastruktur -
- Ketua 1 org 1 keg 235,000 235,000
- Sekretaris 1 org 1 keg 205,000 205,000
- Anggota 1 org 1 keg 170,000 170,000
2 2 1 2 Belanja Barang dan Jasa
Jasa Perencanaan/ gambar 1 pkt 1 keg 620,000 620,000
a ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 2 bh 1 keg -
- Bolpoin Ball Linner 2 bh 1 keg -
- Stopmap Kertas 10 Bh 1 Th 1,000 10,000
- Buku Kwitansi Kecil 1 bh 1 th 7,000 7,000
- Buku Kwitansi Besar 1 bh 1 th 10,000 10,000
- Lem Kertas Tanggung 1 bh 1 th 9,000 9,000
- Spidol 2 bh 1 th 12,000 24,000
- Snalhecter Plastik 4 bh 1 th 4,000 16,000
- Box file 2 bh 1 th 20,000 40,000
b Benda Pos
- Materai 6000 20 lbr 1 keg 6,500 130,000
- Materai 3000 10 lbr 1 keg 3,500 35,000
c Belanja Foto Copy/ Penggandaan
- Foto Copi 280 lbr 1 th 250 70,000
- Penjilidan 3 bk 1 keg 10,000 30,000
d Belanja Rapat
- Rapat Koordinasi TPK 10 org 3 keg 10,000 300,000
e Papan Nama Kegiatan 1 lbr 1 keg 50,000 50,000
f Prasasti 1 bh 1 keg 150,000 150,000
9 Belanja Dokumentasi 10 lbr 1 keg 3,500 35,000
2 2 1 2 Belanja Modal
Belanja Material Bangunan 1 ls 1 pkt 59,054,000 59,054,000
AGUS SUYONO, S. Pd
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
4 4 1 Bantuan Keg PKK (Pelatihan Membuat Bunga Dari Sedotan)
4 4 1 1 Belanja Transpot Pelatihan
Transpot Narsum 1 org 2 keg 250000 500,000
Transpot Peserta 30 org 2 keg 25000 1,500,000
4 4 1 2 Belanja Barang dan Jasa
a ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 3 btl 1 keg 35,000 105,000
- Bolpoin boksi 5 bh 1 keg 12,000 60,000
- Stopmap Snallhecter 10 Bh 1 Th 4,000 40,000
- Buku Kwitansi Kecil 2 bh 1 th 7,000 14,000
- Buku Kwitansi Besar 2 bh 1 th 10,000 20,000
- Lem Kertas Tanggung 2 bh 1 th 9,000 18,000
- Spidol 10 bh 1 th 12,000 120,000
- Snalhecter Plastik 10 bh 1 th 4,000 40,000
- Box file 2 bh 1 th 20,000 40,000
Benda Pos
- Materai 6000 10 lbr 1 keg 6,500 65,000
Belanja Foto Copy/ Penggandaan
- Foto Copy 332 lbr 1 th 250 83,000
- Penjilidan 5 bk 1 keg 5,000 25,000
Belanja Dokumentasi 20 lbr 1 keg 3,500 70,000
b Konsumsi
Snack 30 dus 2 keg 10,000 600,000
Nasi Kotak 30 dus 2 keg 20,000 1,200,000
c Bahan Membuat Bunga 1 ls 1 th 1,900,000 1,900,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
3 1 90 Pelaksanaan Keg. PKK (Pelatihan Paduan Suara)
3 1 90 1 Belanja Transpot Pelatihan
Transpot Narsum 1 org 2 keg 250000 500,000
-
Konsumsi
Snack 25 dus 2 keg 10,000 500,000
Nasi Kotak 20 dus 2 keg 25,000 1,000,000
JUMLAH (Rp.) 2,000,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
3 1 90 Pelaksanaan Keg. Penanggulangan Bencana Desa
3 1 90 1 Belanja Modal
- Belanja Material 1 pkt 1 th 10000000 10,000,000
-
-
-
JUMLAH (Rp.) 10,000,000
Sumber Dana DD
HARGA SATUAN JUMLAH
NO. KODE REKENING URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
4 4 1 HUT RI
4 4 1 1 Belanja Kegiatan HUT RI
Transpot Narsum 1 org 2 keg -
Transpot Peserta 30 org 2 keg -
4 4 1 2 Belanja Barang dan Jasa
a ATK
- Kertas HVS 2 rim 1 keg 50,000 100,000
- Tinta Printer 3 btl 1 keg 35,000 105,000
- Bolpoin boksi 5 bh 1 keg 12,000 60,000
- Stopmap Snallhecter 10 Bh 1 Th 4,000 40,000
- Buku Kwitansi Kecil 2 bh 1 th 7,000 14,000
- Buku Kwitansi Besar 2 bh 1 th 10,000 20,000
- Lem Kertas Tanggung 2 bh 1 th 9,000 18,000
- Spidol 10 bh 1 th 12,000 120,000
- Snalhecter Plastik 10 bh 1 th 4,000 40,000
- Box file 2 bh 1 th 20,000 40,000
Benda Pos
- Materai 6000 10 lbr 1 keg 6,500 65,000
Belanja Foto Copy/ Penggandaan
- Foto Copy 332 lbr 1 th 250 83,000
- Penjilidan 5 bk 1 keg 5,000 25,000
Belanja Dokumentasi 20 lbr 1 keg 3,500 70,000
b Konsumsi
Snack 30 dus 2 keg 10,000 600,000
Nasi Kotak 30 dus 2 keg 20,000 1,200,000
c Bahan Membuat Bunga 1 ls 1 th 1,900,000 1,900,000