NO RINCIAN KEGIATAN DAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (RP) JUMLAH HARGA (RP)
I PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pembersihan Lokasi
1.1 Stake Out Lokasi 1.00 Ls
2 Mobilisasi Demobilsasi
2.1 DT 09 1.00 Ls
3 Alat Berat
3.1 Excavator 8,760.00 Jam
4 Man Power Org
SUB TOTAL I
II PEKERJAAN TANAH
1 Galian Tanah 6,720.00 m3
SUB TOTAL II
III PEKERJAAN PENGECORAN DASAR PARIT
1 Beton 720.00 m3
1.1 Semen 276,480.00 kg
1.2 Pasir 498,240.00 kg
1.3 Split 748,080.00 `kg
SUB TOTAL IV
GRAND TOTAL