( RAB )
DESA : BAYANGAN
KEGIATAN : PEKERJAAN Jl. TANI
SUB KEGIATAN : PEKERJAAN RABAT BETO ( 250 x 2,50 M²)
TAHUN ANGG. : 2019
1 2 3 4 5 6
I BAHAN
1 Semen Portland 50 Kg Zak 1,131.00 80,800.00 91,384,800.00
2 Pasir Urug M³ 95.00 95,800.00 9,101,000.00
3 Pasir Pasang M³ 153.00 186,400.00 28,519,200.00
4 Batu Khali/Pecah M³ 101.00 181,000.00 18,281,000.00
5 Kerikil M³ 180.00 186,400.00 33,552,000.00
6 Kayu Kelas III M³ 1.50 2,030,000.00 3,045,000.00
7 Tbl 3 mm Lbr 172.00 62,100.00 10,681,200.00
8 Papan proyek Bh 1.00 200,000.00 200,000.00
Sub Total I 194,764,200.00
II ALAT
Cangkul Bh 6.00 77,000.00 462,000.00
Sekop Bh 7.00 102,800.00 719,600.00
Ember Bh 11.00 15,300.00 168,300.00
Benang Nilon Bh 4.00 10,000.00 40,000.00
Argo Bh 3.00 565,500.00 1,696,500.00
Terpal Bh 1.00 269,800.00 269,800.00
Sub Total II 3,356,200.00
III UPAH
1 Pekerja OH 1,345.00 90,000.00 121,050,000.00
2 Tukang OH 150.00 110,000.00 16,500,000.00
Sub Total III 137,550,000.00
I Pekerjaan Persiapan
Panjang Galian
Tingi Galian
Lebar Galian
Volume
Volume
IV
V Pekerjaan Cor Rabat SP. 1 : 3 : 5
A Vol. Pasir Urug Dibawah Pondasi
Panjang
Tingi/ Tbl
Lebar
Volume
e Pekerjaan
n Batu SP. 1 : 5
: 1436 M¹ ( 2 Sisi )
Tingi Rata-rata : 0.85 0.80 0.84 0.82 0.73 0.80 0.80 0.70 0.78 0.78 0.74 = 8.64
0.76 0.78 0.79 0.75 0.79 = 3.87 + 8.64 = 12.51
12.51 ÷ 16 = 0.7819
Total Tgg Rata : 0.35 Cm
: 0.15 Cm Lebar Bawah : 0.20 = 0.25 M² ( Vol. Luas Pas. Batu )
bawah Pondasi
: 1436 M¹ ( 2 Sisi ) `
: 0.05 Cm
: 0.20 Cm
: 97.04 M³ ###
at SP. 1 : 3 : 5
bawah Pondasi
: 689 M¹ ( 2 Sisi )
: 0.11 Cm
: 2.45 Cm
( A.2.3.1.1 ) Pek. Galian Pondasi Untuk Kedalaman Kurang Lebih Dari 1 Meter Tanah Biasa
Sub Total ( b )
C Peralatan
Sub Total ( c )
Jumlah ( a + b + C )
Overhead & Profit ( 15 %)
Jumlah Total
Pek. Acian 1 M²
No Uraian Kode satuan Keofisien Volume
A Tenaga
Pekerja L.01 OH 0.150 0.000
Tukang Batu L.02 OH 0.075 0.000
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.030
Sub Total ( a )
B Bahan
Semen Portland Kg 0.3500 0.0000
Sub Total ( b )
C Peralatan
Sub Total ( c )
Jumlah ( a + b + C )
Overhead & Profit ( 15 %)
Jumlah Total
Jumlah Harga Sat Jumlah Harga
120,000.00 -
145,036,000.00
189,006,411.19
5 %)
189,006,411.19
Tanah Biasa
-
-
-
-
29,079,000.00
5 %)
29,079,000.00
Jumlah Harga Sat Jumlah Harga
10,480,320.00
13,391,520.00
5 %)
13,391,520.00
98,274,332.94
5 %)
98,274,332.94
69,324,151.38
5 %)
210,069,004.32
69,324,151.38
0.000 100,000.00 -
0.000 125,000.00 -
-
-
-
0.0000 1,540.00 -
0.0000 175,000.00 -
-
-
5 %)
-
0.000 100,000.00 -
0.000 125,000.00 -
-
-
-
0.0000 1,540.00 -
0.0000 175,000.00 -
-
-
5 %)
-
0.000 100,000.00 -
0.000 125,000.00 -
-
-
-
0.0000 1,540.00 -
-
-
5 %)
-
Tabel Koreksi Pek. Jl. Rabat Beton
A TENAGA
Mandor
B BAHAN
Kerikil 809.58878
Pek. Pas. Jumlah
Pek. Acian Ket.
Pelesteran Realisasi
150.780 150.780 M³
164.910 164.910 M³
116.448 116.448 M³
809.589 809.589 M³