HARGA HARGA No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN ( Rp.) ( Rp.)
1. Mandor (L03) Jam 20,000.00 140,000.00
2. Operator (L04) Jam 16,428.57 115,000.00 3. Pembantu Operator (L05) Jam 14,285.71 100,000.00 4. Sopir / Driver (L06) Jam 16,428.57 115,000.00 5. Pembantu Sopir / Driver (L07) Jam 14,285.71 100,000.00 6. Mekanik (L08) Jam 16,428.57 115,000.00 7. Pembantu Mekanik (L09) Jam 14,285.71 100,000.00
HARGA SATUAN BAHAN
HARGA No. URAIAN KODE SATUAN SATUAN KETERANGAN ( Rp.)
1 Pasir M01a M3 325,000.00 Lokasi Pekerjaan
2 Lolos screen2 ukuran ( 0 - 5) M3 971,086.95 Base Camp 3 Filler M05 Kg 1,522.00 Proses/Base Camp 4 Aspal M10 KG 21,450.00 Base Camp 5 Kerosen / Minyak Tanah M11 LITER 16,000.00 Base Camp 6 Semen / PC (50kg) M12 Zak 76,100.00 Base Camp 7 Semen / PC (kg) M12 Kg 1,522.00 Base Camp 8 Solar M21 LITER 14,900.00 Pertamina 9 Minyak Pelumas / Olie M22 LITER 50,000.00 Pertamina 10 Agr.Base Kelas A M26 M3 979,121.15 Base Camp 11 Agr.Base Kelas B M27 M3 931,383.20 Base Camp 12 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 930,857.97 Lokasi Pekerjaan