Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru

Pekanbaru - Prop Riau


URAIAN HARGA DASAR UPAH

UPAH DASAR UPAH PER JAM ASURANSI / UPAH JAM KERJA PEMBULATAN UPAH 1HARI,
NO KODE URAIAN SATUAN TUNJANGAN
(Rp./HARI) (Rp./JAM) JAMINAN EFEKTIF (Rp./JAM) 7 jam

(1) (2) (2a) (3) (4) = (3)/7 (5) = B x (4) (6) = A x (4) (7) = (4) + (5) + (6) (8) 9 = 7 x (7)

1 L01 Pekerja Biasa Jam 55,798.00 7,971.14 1992.79 975.67 10,939.60 10,940.00 76,577
2 L01.1 Pekerja Trampil Jam 65,734.00 9,390.57 2347.64 1149.41 12,887.62 12,890.00 90,213
3 L02.1 Tukang Jam 65,718.00 9,388.29 2347.07 1149.13 12,884.48 12,880.00 90,191
4 L02.2 Tukang Besi Jam 65,718.00 9,388.29 2347.07 1149.13 12,884.48 12,880.00 90,191
5 L02.3 Tukang Batu Jam 65,734.00 9,390.57 2347.64 1149.41 12,887.62 12,890.00 90,213
6 L02.4 Tukang Kayu Jam 65,734.00 9,390.57 2347.64 1149.41 12,887.62 12,890.00 90,213
7 L02.5 Tukang Listrik Jam 65,734.00 9,390.57 2347.64 1149.41 12,887.62 12,890.00 90,213
8 L03 Mandor Jam 85,607.00 12,229.57 3057.39 1496.90 16,783.86 16,780.00 117,487
9 L04 Operator Jam 85,607.00 12,229.57 3057.39 1496.90 16,783.86 16,780.00 117,487
10 L05 Pembantu Operator Jam 65,734.00 9,390.57 2347.64 1149.41 12,887.62 12,890.00 90,213
11 L06 Supir Jam 73,622.02 10,517.43 2629.36 1287.33 14,434.12 14,430.00 101,039
12 L07 Pembantu Supir Jam 48,643.16 6,949.02 1737.26 850.56 9,536.84 9,540.00 66,758
13 L08 Mekanik Jam 73,622.02 10,517.43 2629.36 1287.33 14,434.12 14,430.00 101,039
14 L09 Pembantu Mekanik Jam 48,643.16 6,949.02 1737.26 850.56 9,536.84 9,540.00 66,758

Note : Harga Dasar diperoleh dari

- Data Primer (Hasil Survey) dan Sekunder


- UMR ( Upah Minimum Regional )

465537457.xls Upah
Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6

Mayor Work Item


1 M01 Abu Batu m3 472,500.00
2 M02 Agregat Halus m 3
641,688.96
3 M03 Agregat Kasar m3 550,017.05
4 M04 Agregate Base Kelas A m 3
0.00
5 M05 Agregate Base Kelas B m3 0.00
6 M06 Angkur Mati 5 - 12 U set 0.00
7 M07 Angkur Hidup MA 5 - 12 Sc set 0.00
8 M08 Angkur Hidup 5 - 19 Sc set 0.00
9 M09 Angkur Mati 5-19 U set 0.00
10 M10 Aspal Curah Pertamina, Cilacap kg 5,885.00
11 M11 Aspal Curah (BP,Esso, Shell, Dll) Rata2 kg 7,677.42
12 M12 Aspal RC (Cilacap) kg 5,000.00
13 M13 Baja Tulangan Polos U24 kg 8,500.00
14 M14 Baja Tulangan U 32 Ulir kg 8,000.00
15 M15 Batu Bronjol m 3
82,500.00
16 M16 Batu Kali / Belah m3 165,000.00
17 M17 Bearing Pad Elastomer Uk. 300X300X30 bh 0.00
18 M18 Bearing Pad Elastomer Uk. 400X350X39 + Taper Plate bh 0.00
19 M19 Bearing Pad Elastomer Uk. 400X400X40 bh 0.00
20 M20 Bearing Pad Elastomer Uk. 450X400X52 bh 0.00
21 M21 Bearing Pad Elastomer Uk. 450X400X52 + Taper Plate bh 0.00
22 M22 Besi Siku 40X40X4 Mm kg 10,925.00
23 M23 Besi Siku 50X50X5 Mm kg 10,925.00
24 M24 Beton Curing m 2 0.00 Nilai Kompresi Kubus
25 M25 Beton Kelas A ( K = 415 kg/cm2 ) m3 1,036,000.00 488.24
26 M26 Beton Kelas B-1 ( K = 346 kg/cm ) 2
m 3
903,500.00 407.06
M26.a Beton Kelas B ( K = 290 kg/cm2 ) m3 938,000.00 341.18
27 M27 Beton Kelas C ( K = 210 kg/cm ) 2
m 3
877,250.00 247.06
28 M28 Beton Kelas D ( K = 145 kg/cm2 ) m3 728,000.00 170.59
29 M29 Beton Kelas E ( K = 105 kg/m )2
m 3
682,500.00 123.53
30 M30 Beton Kelas P ( FS = 45 kg/cm2 ) m3 745,000.00 400.00
31 M31 Cat Thermoplastik Marka Jalan, kg 56,105.00
32 M32 Glass Beads (Drop On) kg 36,019.31
33 M33 Duct (Sheath) Dia. 60-68 Mm m 1
0.00
34 M34 Duct (Sheath) Dia. 80-88 Mm m1 0.00
35 M35 Expansion Joint Header System (bentang s/d 30 m) m 1
0.00
36 M36 Expansion Joint Header System (bentang s/d 40 m) m 1
0.00
37 M37 Expansion Joint Type Modular 1 Seal m1 0.00
38 M38 Expansion Joint Type Modular 3 Seal m 1
0.00
39 M39 Rubber Expansion Joint Type Fixed 20 m1 0.00
40 M40 Geotekstil woven m 2 38,500.00
41 M41 Girder Grouting <60 mm m1 0.00
42 M42 Girder Stressing (MA/SD) ttk 0.00
43 M43 Girder Type I, 16,6 m H=1.7 m bh 40,690,000.00
44 M44 Girder Type I, 20,6 m H=125 bh 63,057,578.13
45 M45 Girder Type I, 25.8 m H=170 Cm bh 107,390,000.00

465537457.xls - Material 2/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
46 M46 Girder Type I, 30,6 m H=170 bh 170,160,000.00
47 M47 Girder Type I, 35,6 m H=170, bh 213,356,078.43
48 M48 Girder Type I, 38,6 m H=200 bh 228,273,725.49
49 M49 Girder Type I, 40 m H=230 bh 240,552,156.86
50 M50 Gorong2 Bertulang Type FJ Dia 100 m 1
1,091,666.67
51 M51 Gorong2 Bertulang Type FJ Dia 120 m1 1,507,562.50
52 M52 Gorong2 Bertulang Type FJ Dia 150 m 1
3,008,175.00
53 M53 Gorong2 Bertulang Type FJ Dia 60 m1 695,283.33
54 M54 Gorong2 Bertulang Type FJ Dia 80 m 1
1,038,022.92
55 M55 Gorong2 tak Bertulang Dia 60 m1 98,175.00
56 M56 Gorong2 tak Bertulang Dia 80 m 1
130,900.00
57 M57 Granular / Koral m 3
0.00
58 M58 Guard Rail Beam (3999X350X2.7) bh 0.00
59 M59 Guard Rail Post/tiang (1700X180X4,5 mm) bh 0.00
60 M60 Guard Rail, Blocking Piece (350X180X4,6 mm) bh 0.00
61 M61 Guard Rail, End Section bh 325,000.00
62 M62 Kabel Strand Dia. 12,7 Mm (Grade 270) kg 0.00
63 M63 Kawat Bindrat / Kawat beton kg 12,000.00
64 M64 Minyak Bensin Premium Pertamina Liter 5,113.50
65 M65 Minyak Pelumas /Olie Pertamina Liter 22,000.00
66 M66 Minyak Solar Pertamina Liter 4,583.00
67 M67 Minyak Tanah Pertamina Liter 5,881.80
68 M68 Pasir Beton, m 3
177,000.00
69 M69 Pasir Pasang, m3 185,000.00
70 M70 Pasir Urug m 3
135,000.00
71 M71 Plastic Sheet m2 3,500.00
72 M72 Pot Bearing 2500 Kn, H=10% (Moved) bh 0.00 Fixed=Rp.15.000.000

73 M73 Semen Zak (50 kg) kg 1,650.00


74 M74 Semen Curah kg 1,320.00
75 M75 Sirtu m3 162,000.00
76 M76 Tiang Pancang Prestress dia 500, Type A1 m1 479,000.00
77 M77 Tiang Pancang Prestress dia 600, Type A1 m 1
639,500.00
78 M78 Wire Mesh M-8 m2 120,000.00
78a M78a Gemuk / Grease kg 35,000.00
78b M78b Voided Slab Bentang 16.8 m 37,000,000.00
Minor Work Item
79 M79 AC, ¾ PK (Split) Type SAP-KC97GSA/L Unit 0.00
80 M80 AC, 1 PK (Split) Type SAP-KC97GSA/L unit 0.00
81 M81 AC, 2 PK (Split) Type SAP-KC97GSA/L unit 0.00
82 M82 Accoustic Tile 600 x 600 mm m 2 0.00
83 M83 Acetylen kg 0.00
84 M84 Air Curtain bh 0.00
85 M85 Akustik Amstrong 60 x 120 lbr 0.00
86 M86 Aluminium Daun Jendela bh 0.00
87 M87 Aluminium Frame Daun Pintu m' 0.00
88 M88 Aluminium Foile m2 0.00
89 M89 Aluminium Kusen/Frame, Natural 4" x 1 3/4" m 1
0.00
90 M90 Aluminium Wall Mounted m1 0.00

465537457.xls - Material 3/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
91 M91 Ampere Meter 500A bh 0.00
92 M92 Anchor Bar kg 0.00
93 M93 Angkur Baut dia. 12x33 bh 0.00
94 M94 Angkur Baut dia.16 - 60 cm bh 2,500.00
95 M95 Angkur Baut dia.19 - 60 cm bh 3,000.00
96 M96 Angkur Baut dia.20 - 60 cm bh 4,000.00
97 M97 Angkur Baut dia.22 - 60 cm bh 400.00
98 M98 Angkur Baut dia.25 - 60 cm bh 4,500.00
99 M99 Angkur Baut M 8 X 15 bh 5,000.00
100 M100 Angkur Locis bh 0.00
101 M101 Angle Clip bh 0.00
102 M102 Armateur + Lampu HPLN 50 W bh 0.00
103 M103 Armateur Baret Bulat + TL 32 W bh 0.00
104 M104 Atap Genteng Beton bh 0.00
105 M105 Atap Genteng Keramik Glazuur setara Kanmuri bh 5,816.13
106 M106 Atap Metal, Zink Aluminium Gelombang m2 0.00
107 M107 Atap Metal, Nok Atas m2 0.00
108 M108 Atap Seng Gelombang BJLS 30 m 2 0.00
109 M109 Auto Transformer bh 0.00
110 M110 Axial Fan dia. 12" bh 0.00
111 M111 Baja C 100.50.20.2,3 kg 10,604.00
112 M112 Baja C 150.75.20.4,5 kg 10,604.00
113 M113 Baja C 72.45.25.2,3 kg 10,604.00
114 M114 Baja C 75.45.25.2,3 kg 10,604.00
115 M115 Baja C 80.45.6,8 kg 10,604.00
116 M116 Baja INP kg 11,700.00
117 M117 Baja IWF/H Beam kg 11,700.00
118 M118 Baja Persegi kg 11,700.00
119 M119 Baja Siku 40.40.5 kg 10,925.00
120 M120 Baja Siku 50.50.5 kg 10,925.00
121 M121 Baja Siku 60.60.5 kg 10,925.00
122 M122 Baja Siku 70.70.7 kg 10,925.00
123 M123 Baja Struktur kg 11,700.00
124 M124 Bak Cuci Piring (Aluminium) 2 lobang bh 0.00
125 M125 Bak Air / Mandi Produksi Lokal bh 0.00
126 M126 Bangunan KSPT Booth bh 0.00
127 M127 Bangunan Toilet Long Booth bh 0.00
128 M128 Bangunan Toll Booth Long Type bh 0.00
129 M129 Bangunan Toll Booth Short Type bh 0.00
130 M130 Bata Merah Kelas 1 bh 425.00
131 M131 Batu Tempel Alam (Palimanan) m 2 25,850.00
132 M132 Batu Tempel Hitam m2 0.00
133 M133 Bekisting Kayu Borneo m 3
2,417,772.00
134 M134 Besi # 2x2x0.32 kg 0.00
135 M135 Besi # 6x6x0.32 kg 0.00
136 M136 Besi C 12x5.5x2x0.32 kg 0.00
137 M137 Besi C 15x5.5x2x0.32 kg 0.00
138 M138 Besi Hollow 30x30 kg 0.00

465537457.xls - Material 4/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
139 M139 Besi Hollow 40x40x5 kg 0.00
140 M140 Besi Pelat Strip kg 10,604.00
141 M141 Besi Pengaman, 10 mm m1 0.00
142 M142 Box Panel T = 1.8 mm2 + Assesoris bh 0.00
143 M143 Cat dasar/meni anti karat kg 59,811.82
144 M144 Cat besi Berwarna / Kilap kg 0.00
145 M145 Cat Kayu Super Gloss A365 ltr 0.00
146 M146 Cat Besi ICI Berwarna kg 63,840.00
147 M147 Cat Plamur Kayu kg 21,025.00
148 M148 Cat Plamur Tembok kg 58,500.00
149 M149 Cat Tembok ICI Emulsion ltr 63,840.00
150 M150 Cat Walk Baja Strip Rangka Besi Siku m 1

151 M151 Check Valve dia. 2 " Flange bh 0.00


152 M152 Check Valve dia. 2,5 " Flange bh 0.00
153 M153 Check Valve dia. 4 " Flange bh 0.00
154 M154 Conblok 6x112.5x225 abu-abu m 2 80,000.00
155 M155 Conduit dia. 5/8" m1 0.00
156 M156 Conduit Intercome bh 0.00
157 M157 Conduit Kabel m1 0.00
158 M158 Control Valve bh 0.00
159 M159 Controler Lampu LL Type MR Siemens (Accessories) Unit 0.00
160 M160 Cooper Rod Tape 1" Pen. Petir m 1
0.00
161 M161 Copper Plate Rod dia. 14 mm x 1500 mm bh 0.00
162 M162 Coupler (P 5-12) utk prestress set 0.00
163 M163 CrossTee m 1
0.00
164 M164 Curing Compound kg 28,000.00
165 M165 Daun Pintu Doubel Teakwood m2 0.00
166 M166 Daun Pintu Panel Kayu Kamper m 2 0.00
167 M167 Daun Pintu Teakwood + Formika m 2 0.00
168 M168 Deck Drain Type 1 & Ass bh 345,000.00
169 M169 Delinieator tipe A (Road Stud) bh 75,000.00
170 M170 Delinieator tipe B (Delineator Plastic Solar Cell) bh 0.00
171 M171 Delinieator tipe C bh
172 M172 Dina Bolt bh 0.00
173 M173 Dolken bh 0.00
174 M174 Duct Fresh Air Ls 0.00
175 M175 Epoxy Adhesive liter 0.00
176 M176 Exhouse fan H 360 CFM 60 x 60 Unit 0.00
177 M177 Fire Extinguisher, kap. 150 kg Tipe AL 150 PR bh 0.00
178 M178 Fire Hidrant Type 10L 3,5 Kg bh 0.00
179 M179 Flashing Light Unit unit 0.00
180 M180 Floor Drain bh 0.00
181 M181 Floor Drain Toto TX 1 B bh 0.00
182 M182 Foot Valve dia. 2,5 " bh 0.00
183 M183 Formika lbr 0.00
184 M184 Frame Rangka bh 0.00
185 M185 Fuse 3Phase MCB 10 A s/d 40 A bh 0.00
186 M186 Galian Tanah dalam 1 s/d 2 m m3 25,529.00

465537457.xls - Material 5/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
187 M187 Galian Tanah untuk Saluran Kabel m 1
19,439.00
188 M188 Gate Valve dia. 1½" bh 0.00
189 M189 Gate Valve dia. 2" + Flange bh 0.00
190 M190 Gate Valve dia. 2.5" + Flange bh 0.00
191 M191 Gate Valve dia. 3 " + Flange bh 0.00
192 M192 Gate Valve dia. 4" + Flange bh 0.00
193 M193 Gebalan Rumput Embun m 2 2,500.00
194 M194 Generator Set 150 KVA 3 F 380 V 50 Hz unit 0.00
195 M195 Generator Set 30 KVA + AMF bh 0.00
196 M196 Generator Set 60 KVA + AMF bh 0.00
197 M197 Genteng Metal m2 0.00
198 M198 Geotextile Non Woven m 2 0.00
199 M199 Gording Baja Light Up Channel C150x650x20.3,2 kg 0.00
200 M200 GRC Panel, t=8 mm unit 0.00
201 M201 GRC t =10mm lbr 0.00
202 M202 Grounding Kabel bh 0.00
203 M203 Gypsum Ceiling 9mm m2 0.00
204 M204 Gypsum Ceiling 12 mm m 2 0.00
205 M205 Hidrant Box + Slang 50 m + Nozel unit
206 M206 Hollow Metal (Usuk 5/7+ Reng 3/4) m2 0.00
207 M207 Hollow Steel 60 x 30 x 1.3 kg
208 M208 Ijuk ikat 0.00
209 M209 Instalasi Kabel (ut post Tension) m 1
0.00
210 M210 Jet Pump (Sanyo 500w) + Sumur Pantek bh
211 M211 Jokey Pump 80 gln/menit (100 m) -18,6 kw unit
212 M212 Kabel 3C-2,5 mm2 m1 0.00
213 M213 Kabel BCC 50 mm2 m 1

214 M214 Kabel Intercome m1 0.00


215 M215 Kabel NYAHY1 -05 mm2 m 1

216 M216 Kabel NYFGBY 3x35 mm2 m1 165,141.60


217 M217 Kabel NYFGBY 4 x 10 mm2 m 1
91,468.00
218 M218 Kabel NYFGBY 4 x 120 mm2 m 1
612,518.40
219 M219 Kabel NYFGBY 4 x 150 mm2 m1 748,342.40
220 M220 Kabel NYFGBY 4 x 16 mm2 m 1
109,907.20
221 M221 Kabel NYFGBY 4 x 25 mm2 m1 193,076.00
222 M222 Kabel NYFGBY 4 x 35 mm2 m 1
204,360.00
223 M223 Kabel NYFGBY 4 x 4 mm2 m1 46,800.00
224 M224 Kabel NYFGBY 4 x 50 mm2 m 1
339,872.00
225 M225 Kabel NYFGBY 4 x 6 mm2 m1 58,135.00
226 M226 Kabel NYFGBY 4 x 70 mm2 m 1
362,856.00
227 M227 Kabel NYFGBY 4 x 95 mm2 m1 490,516.00
228 M228 Kabel NYM 2x1.5 mm2 m 1
9,030.00
229 M229 Kabel NYM 2x2.5 mm2 m 1
12,720.00
230 M230 Kabel NYM 3 x 2.5mm2 m1 16,770.00
231 M231 Kabel NYM 3C-10 mm2 m 1
60,825.00
232 M232 Kabel NYM 3x16 mm2 m1 82,000.00
233 M233 Kabel NYR/GBY600/1000V 32x10mm" m 1

234 M234 Kabel NYR/GBY600/1000V 32x16mm" m1

465537457.xls - Material 6/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
235 M235 Kabel NYY 3C-2.5 mm2 m 1
18,900.00
236 M236 Kabel NYY 3C-4 mm2 m1 29,256.00
237 M237 Kabel NYY 4C-10 mm2 m 1
86,028.00
238 M238 Kabel NYY 4C-2,5 mm2 m1 25,560.00
239 M239 Kabel NYY, 4 x 120 mm2 m 1
540,621.00
240 M240 Kabel NYY, 4 x 150 mm2 m1 657,560.00
241 M241 Kabel NYY, 4 x 16 mm2 m 1
99,875.00
242 M242 Kabel NYY, 4 x 25 mm2 m1 175,960.00
243 M243 Kabel NYY, 4 x 35 mm2 m1 180,250.00
244 M244 Kabel NYY, 4 x 4 mm2 m1 38,520.00
245 M245 Kabel NYY, 4 x 50 mm2 m 1
315,625.00
246 M246 Kabel NYY, 4 x 6 mm2 m 1
53,676.00
247 M247 Kabel NYY, 4 x 70 mm2 m1 320,650.00
248 M248 Kabel NYY, 4 x 95 mm2 m1 432,560.00
249 M249 Kaca Bening 6 mm m2 102,500.00
250 M250 Kaca Reflective Glass (Stopsol) 6 mm m 2 0.00
251 M251 Kaca Reflective Glass (Stopsol) 10 mm m2 0.00
252 M252 Karpus Beton bh
253 M253 Karpus bh
254 M254 Kawat BC (Tembaga) m1
255 M255 Kawat BRC 190 m1
256 M256 Kawat Bronjong kg
257 M257 Kawat Duri 10 kg ( P.60 m ) kg 14,000.00
258 M258 Kawat Harmonika 4 cm m2 50,000.00
259 M259 Kawat Las kg 50,000.00
260 M260 Kawat Penggantung GRC m1
261 M261 Kayu Kamper Balok Samarinda Oven m3 5,000,000.00
262 M262 Kayu Kamper Papan Samarinda m3 5,583,795.00
263 M263 Kayu Lisplank Kamper m 3
0.00
264 M264 Kayu / BalokPerancah m3 0.00
265 M265 Kayu Reng m 1

266 M266 Keramik 20 x 20 setara Roman m2 0.00


267 M267 Keramik 30 x 30 motif, setara Roman m2 45,000.00
268 M268 Keramik Plint 10x20 m2 0.00
269 M269 Keramik Plint 10x30 m2 0.00
270 M270 Kertas Gosok/Ampelas lbr 0.00
271 M271 Kitchen Zink Stainless 1 Lobang Standard bh 0.00
272 M272 Kitchen Zink Stainless 2 Lobang bh 0.00
273 M273 Kitchen Zink Stainless Standard bh 0.00
274 M274 Klem bh 0.00
275 M275 Klem Conduit bh
276 M276 Klem Support Kabel BCC 50 mm2 Ls 0.00
277 M277 Klem Tembaga bh 0.00
278 M278 Kloset Duduk Toto C420 bh 0.00
279 M279 Kloset Jongkok C 2 bh 0.00
280 M280 Kolom Baja Hexagonal kg
281 M281 Kotak Penangkal Lengkap bh 0.00
282 M282 Kran Bebek San Eui 1/2" bh 0.00

465537457.xls - Material 7/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
283 M283 Kran kebun / tembok bh 0.00
284 M284 Kran air Toto bh 50,000.00
285 M285 Kuas Roll bh 0.00
286 M286 Kuda2 WF Prismatik 450x300
287 M287 Kunci Gembok Uk. 60 mm bh 50,250.00
288 M288 Kunci Tanam Cilinder ex LOGO bh 150,600.00
289 M289 Kunci Tanam Double Slag Besar Ex Yale bh 68,950.00
290 M290 Kunci Tanam Double Slag Kecil Ex Yale bh 53,500.00
291 M291 Kunci Tanam Type 9011 Ex RRT bh 106,240.00
292 M292 Kursi Putar bh 0.00
293 M293 Kusen Aluminum Warna 3'' x 1½ '' m 1
0.00
294 M294 Kusen Kayu Kamper m 3
0.00
295 M295 Lampu 60 W bh 0.00
296 M296 Lampu CRXC 808/SON-T150 W (u.bridge) unit 0.00
297 M297 Lampu Detector bh 0.00
298 M298 Lampu Emergensi unit 0.00
299 M299 Lampu HPLN 50 W bh 0.00
300 M300 Lampu HPS 150 W setara Phillips unit 1,453,305.00
301 M301 Lampu HPS 250 W setara Phillips bh 1,729,000.00
302 M302 Lampu HPS 400 W setara Phillips unit 2,055,690.00
303 M303 Lampu HPS 1000 W setara Phillips unit 2,269,960.00
304 M304 Lampu Pijar 5 Watt s/d 100 Watt bh 3,500.00
305 M305 Lampu Rotary bh 0.00
306 M306 Lampu SRP 822 SON 250 W unit 1,729,000.00
307 M307 Lampu Taman Mercuri 50w T2m (terpasang) unit 833,420.00
308 M308 Lampu TL 1x40 W+ cover unit 0.00
309 M309 Lampu TL Bulat 20 Watt bh 0.00
310 M310 Las Dop bh 0.00
311 M311 Lem PVC bh 0.00
312 M312 Lisplank Alumunium Cladding (Lokal) L 50x50x5 m1
313 M313 Lisplank Kayu Kamper 3/25 m1 0.00
314 M314 Listplank GRC t=110 cm m 1
0.00
315 M315 Listplank GRC t=60 cm m1 0.00
316 M316 Magnetic Contactor 225A NC bh 0.00
317 M317 Magnetic Contactor 225A NQ bh 0.00
318 M318 Main Tee m 1
0.00
319 M319 Material Screed Floor Harderner kg 0.00
320 M320 MCB 1 Phase bh 0.00
321 M321 MCB 3 Phase bh 0.00
322 M322 Meni Kayu (cat dasar) kg 58,074.00
323 M323 Motor Penggerak bh 0.00
324 M324 Mould Oil kg 0.00
325 M325 Moveable Genset 30 KVA Silent Type + AMF bh 0.00
326 M326 Moveable Genset 60 KVA Silent Type + AMF bh 0.00
327 M327 Mur Baut kg 16,000.00
328 M328 Mur Baut untuk Baja (HTB) bh 0.00
329 M329 Paku kg 0.00
330 M330 Paku Beton bh 0.00

465537457.xls - Material 8/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
331 M331 Paku Ramset + Mesiu bh 0.00
332 M332 Panel Lampu Tipe SS bh 0.00
333 M333 Panel Lampu Tipe DB bh 0.00
334 M334 Panel Utama Pos Tol bh 0.00
335 M335 Papan List m 1
0.00
336 M336 Papan List Kayu Kamper 10 cm m1 0.00
337 M337 Partisi Gypsum + rangka hollow dan terpasang m 2 0.00
338 M338 Paving Block ( t=10 cm) m 2 0.00
339 M339 Paving Block (t = 8 cm) m 2 0.00
340 M340 Paving Stone m 2 0.00
341 M341 PC Tile 20 x 20 Cm m2 0.00
342 M342 Pelat Aluminium setara Alucobest m 2 204,600.00
343 M343 Pelat Aluminium 4 x 8 x 1 mm m2 0.00
344 M344 Pelat alumunium 4x 8 x 2 mm m 2 0.00
345 M345 Pengecatan Besi m2 0.00
346 M346 Penggantung Pipa Baja Dia.2" m 1
0.00
347 M347 Pig Tail bh 0.00
348 M348 Pilar Hidrant + Instalasi unit 0.00
349 M349 Pintu Baja bh 0.00
350 M350 Pintu Baja (panel) bh 0.00
351 M351 Pintu Pagar BRC 190 X120 panel 0.00
352 M352 Pipa Besi dia. 3" m 1
0.00
353 M353 Pipa BS Sch 40 dia. 2" m 1
0.00
354 M354 Pipa BS Sch 40 dia. 2.5" m1 0.00
355 M355 Pipa BS Sch 40 dia. 4" m 1
0.00
356 M356 Pipa dia. 1 1/4" m1 26,333.33
357 M357 Pipa Gal. Med. dia. 1 1/2" m1 26,483.33
358 M358 Pipa Gal. Med. dia. 1" m1 19,266.67
359 M359 Pipa Galv. Dia. 0.5 " ( 6m ) m 1
7,500.00
360 M360 Pipa Galv. Dia. ¾ " ( 6m ) m1 19,266.67
361 M361 Pipa Galv. Dia. 2 " ( 6m ) m1 126,780.33
362 M362 Pipa Galv. Dia. 2.5 " ( 6m ) m 1
253,336.74
363 M363 Pipa Galvanis dia 6" m1 572,318.88
364 M364 Pipa Galvanish STK - 114.3 (5 ") bt 401,743.60
365 M365 Pipa Galvanish STK - 190.7 (8 ") bt 604,695.00
366 M366 Pipa Galvanish STK - 190.7 (8 ") bt 604,695.00
367 M367 Pipa baja galvanish (12 ") bt 5,485,757.20
368 M368 Pipa Hollow dia 2" m1 92,246.67
369 M369 Pipa Hollow dia 3" m1 154,545.60
370 M370 Pipa Pvc D 10 Cm/4" kelas AW m1 94,850.00
371 M371 Pipa Pvc D 15 Cm/6" kelas AW m1 199,580.00
372 M372 Pipa Pvc D 20 Cm/8" kelas AW m1 347,320.00
373 M373 Pipa PVC dia 2½'' kelas AW m 1
83,135.00
374 M374 Pipa PVC dia. 1.5" kelas AW m1 44,545.00
375 M375 Pipa PVC dia. 2" kelas AW m 1
56,850.00
376 M376 Pipa PVC dia. 25 mm (1") kelas AW m1 25,880.00
377 M377 Pipa PVC, dia. 3" kelas AW m 1
168,180.00
378 M378 Pipa PVC, dia. 3/4" kelas AW m1 18,870.00

465537457.xls - Material 9/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
379 M379 Pipa PVC. dia. 1/2" kelas AW m 1
13,720.00
380 M380 Plat Adjust (16x16x0.5) kg 0.00
381 M381 Plat Angker (16x16x10) kg 0.00
382 M382 Plat Baja Galvanized kg 0.00
383 M383 Plat Besi t = 25 mm kg 35,100.00
384 M384 Plat Besi Tebal 2-5mm kg 0.00
385 M385 Plywood 12 Mm m 2 230,522.50
386 M386 Plywood 15 mm lbr 203,079.50
387 M387 Plywood 18 mm lbr 219,545.00
388 M388 Plywood 12 mm lapis Phenolfilm m 2 0.00
389 M389 Plywood 9 mm lbr 0.00
390 M390 Polycarbonat m 2 0.00
391 M391 Pondasi Tiang Lampu Jalan bh 0.00
392 M392 Porselin 11x11 m 2 0.00
393 M393 Portable Fire Extinghuiser 3,5 kg bh 0.00
394 M394 Pressure Gauge bh 0.00
395 M395 Pressure Tank 500 Liter bh 0.00
396 M396 Prime Coat kg 0.00
397 M397 Public Address Lengkap Terpasang unit 0.00
398 M398 Pull Box bh 0.00
399 M399 PVC Elbow dia. 4" bh 0.00
400 M400 PVC, D = 50 mm m 1
0.00
401 M401 Quarry Tile m 2 0.00
402 M402 Rangka Jendela Kayu Kamper m2 0.00
403 M403 Rangka LisplankL 50.50.5 m 1
0.00
404 M404 Reflektive Sheeting High Intensive Grade (berikut plat aluminium) m2 1,235,000.00
405 M405 Rib/Base Plate kg 0.00
406 M406 Rockfon Type Decor m 2 0.00
407 M407 Roda Pintu Dorong bh 0.00
408 M408 Roll Cat Tembok bh 0.00
409 M409 Safety Valve bh 0.00
410 M410 Sakelar double (setara Broco) bh 0.00
411 M411 Saklar Tunggal bh 0.00
412 M412 Sambungan Pipa Galv dia. 0.5 " bh 0.00
413 M413 Sambungan Pipa Galv dia. 0.5 " bh 0.00
414 M414 Sambungan dia. 1.5 " (PVC) bh 0.00
415 M415 Sambungan dia. 1/2" (PVC) bh 0.00
416 M416 Sambungan Pipa Gal. dia. 1" bh 0.00
417 M417 Sambungan Pipa Gal. dia. 1/2" bh 0.00
418 M418 Sambungan Pipa Gal. dia. 2" bh 0.00
419 M419 Sambungan Pipa PVC. dia. 3" bh 0.00
420 M420 Sambungan Pipa PVC. dia. 4" bh 0.00
421 M421 Sambungan Pipa PVC. dia. 6" bh 0.00
422 M422 Sambungan Pipa PVC dia. 2 " bh 0.00
423 M423 Sealant kg 35,000.00
424 M424 Selector Switch bh 0.00
425 M425 Semen Putih zak 65,000.00
426 M426 Seng BJLS 30, l= 60 cm lb. 0.00

465537457.xls - Material 10/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
427 M427 Seng BWG 180 x 80 x 0,03 cm m 2 0.00
428 M428 Seng SWG 21 m2 0.00
429 M429 Seng SWG 22,t=0,71 mm, b=0,89 m m 2 0.00
430 M430 Snap In Rail m 0.00
431 M431 Socket PVC 1/2" bh 0.00
432 M432 Socket PVC 2" bh 0.00
433 M433 Socket Galvanis 2" bh 0.00
434 M434 Socket Galvanis 6" bh 0.00
435 M435 Soket Galvanis dia. 1.5" bh 6,000.00
436 M436 Soket PVC dia. 8'' bh 0.00
437 M437 Splitzer 1" Pen. Petir bh 54,000.00
438 M438 Stainer dia 2.5" bh 0.00
439 M439 Stainer dia 4" bh 0.00
440 M440 Steel Bracket m 1
0.00
441 M441 Steel Conduit, dia. 100 mm m1 0.00
442 M442 Steel Conduit, dia. 150 mm m 1
0.00
443 M443 Steel Conduit, dia. 50 mm m1 0.00
444 M444 Stop Kontak (Setara Broco) bh 7,500.00
445 M445 Sumur Dalam/Artesis unit 0.00
446 M446 Sumur Pantek bh 0.00
447 M447 Tanah Urug (Borrow) m 3 32,500.00
448 M448 Tangki Air 11000 Ltr bh 0.00
449 M449 Tangki Air 1M3 Dia.150cm bh 0.00
450 M450 Tangki Air 250 Liter bh 0.00
451 M451 Tangki Air 300 Liter bh 0.00
452 M452 Tangki Air 5200 Ltr bh 0.00
453 M453 Tangki Air 550 Ltr bh 0.00
454 M454 Tangki Air Fiber Glass 4000 ltr bh 0.00
455 M455 Tanki 3000 Liter bh 0.00
456 M456 Tee Dust 3/4 " bh 0.00
457 M457 Tee Galvanis 2" bh 0.00
458 M458 Tee PVC dia. 4 " bh 0.00
459 M459 Tegel Plin 10 x 20 bh 0.00
460 M460 Terminal End bh 0.00
461 M461 Terminal Intercome bh 0.00
462 M462 Termisida Anti Rayap (Antitermit) m 2 0.00
463 M463 Test Box bh 0.00
464 M464 Thinner ltr 0.00
465 M465 Tiang Lampu Lalu Lintas Tipe 1 (terpasang) bh 0.00
466 M466 Tiang Lampu Lalu Lintas Tipe 2 (Terpasang) bh 0.00
467 M467 Tiang Galvanis BRC ( Ø 2") bh 0.00
468 M468 Tiang Lampu High Mast Polygonal H = 30 m bh 0.00
469 M469 Tiang lampu PJU oct. h=13m (lengan ganda) bh 7,628,600.00
470 M470 Tiang lampu PJU oct. h=13m (lengan tunggal) bh 6,588,900.00
471 M471 Tiang pancang mini pile 20 x 20 terpasang m 1
0.00
472 M472 Tiang pancang segitiga 20 x 20 m1 0.00
473 M473 Tiang pancang segitiga 28 x 28 m 1
0.00
474 M474 Tiang pancang segitiga 32 x 32 m1 0.00

465537457.xls - Material 11/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
475 M475 Timer Swicth TR 609-22 /220 V Digital bh 0.00
476 M476 Trekstang m1 0.00
477 M477 Trekstang Besi Dia.10mm
478 M478 Tripleks t= 4 mm (122x244) lbr 0.00
479 M479 Trolly (Utk Fire Extinguisher 150 kg) bh 0.00
480 M480 Ubin Mozaik m2 0.00
481 M481 Urinoir U,57 m 2 0.00
482 M482 Volt Meter 500 V bh 0.00
483 M483 Wall Angle " L" m 1
0.00
484 M484 Wastafel Toto bh 0.00
485 M485 Water Level bh 0.00
486 M486 Waterproofing kg 0.00
487 M487 Wire BCC 50 mm2 m1 0.00
488 M488 Wire BCC 95 mm2 m 1
0.00
489 M489 Wire BCC, 10 mm2 m1 0.00
490 M490 Wire BCC, 16 mm2 m 1
0.00
491 M491 Wire BCC, 25 mm2 m1 0.00
492 M492 Wire BCC, 6 mm2 m 1
0.00
493 M493 Wire BCC, 70 mm2 m1 0.00
494 M494 Wire Mesh M-6 m 2 0.00
495 M495 Wire Mesh M-8 m 2 0.00
496 M496 Roof Drain bh 0.00
497 M497 Stair noising bh 0.00
498 M498 Clean Out Pipe 4" bh 0.00
499 M499 Epoxy Premarking ltr 45,000.00
500 M500 Girder Type I, 16,6 m H=90 bh 0.00
501 M501 Girder Type I, 20,6 m H=160 bh 0.00
502 M502 Girder Type I, 25.8 m H=160 bh 0.00
503 M503 Girder Type I, 30,6 m H=160 bh 0.00
504 M504 Girder Type I, 30,6 m H=170, as 185 cm bh 0.00
505 M505 Girder Type I, 38,6 m H=200 bh 0.00
506 M506 Girder Type I, 40 m H=210 bh 0.00
507 M507 Ekspansion Joint Type Alldin (Moved 50) m1 0.00
508 M508 Ekspansion Joint Type Alldin (Moved 100) m 1
0.00
509 M509 Pot Bearing 2500 KN, H=10% (Fixed) bh 0.00 Merk Wabo
510 M510 Girder Type I, 40 m H=200 bh 0.00
511 M511 Girder Type C, 40 m H=200 bh 0.00
512 M512 Rumah Lampu Spp 668 150 W bh 0.00
513 M513 Rumah Lampu Spp 668 250 W bh 0.00
514 M514 Rumah Lampu Spp 668 400 W bh 0.00
515 M515 Rumah Lampu Type SMF 330, 250 W bh 0.00
516 M516 Rumah Lampu Type SMF 330, 400 W bh 0.00
517 M517 Rumah Lampu Type MVf 057, 1000 W bh 0.00

0 0 M 0.00
518 M518 Saluran, Beton Precast U-5070 m1 0.00 DS - 3B
519 M519 Saluran, Beton Precast U-6080 m 1
506,084.60 DS - 6
520 M520 Saluran, Beton Precast U-8080 m1 0.00 DS - 6A

465537457.xls - Material 12/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BAHAN

No. Kode Jenis Bahan Satuan Har. Sat Keterangan


Urut (Rp)
1 2 3 4 5 6
521 M521 Saluran, Beton Precast U-80100 m 1
0.00 DS - 7

1 MP1 Pohon Keben Pohon 29,900.00


2 Pohon Bodhi, tinggi 200 - 300 cm Pohon 30,300.00
3 Pohon Sukun, tinggi 100 cm Pohon 75,000.00
4 Pohon Mahoni, tinggi 60 - 70 cm Pohon 35,100.00
5 Pohon Pinus, tinggi 200 cm Pohon 49,800.00
6 Pohon Spatodea, tinggi 150-200 cm Pohon 29,900.00
7 Pohon Nyamplung, tinggi 150 -250 cm Pohon 69,400.00
8 Pohon Salam, tinggi 50 - 100 cm Pohon 15,000.00
9 Pohon Glodogan, tinggi 150 - 200 cm Pohon 40,500.00
10 Pohon Bintaro, tinggi 150 cm Pohon 70,000.00
11 Pohon Kayu manis, tinggi 200 cm Pohon 64,900.00
12 Pohon Trengguli, tinggi 150 - 200 cm Pohon 21,800.00
13 Pohon Golden, tinggi 100 - 150 cm Pohon 18,050.00
14 Kesumba Pohon
15 Oleander Pot 3,100.00
16 Pohon Bogenville, tinggi 200 cm Pot 36,200.00
17 Pohon Flamboyan, tinggi 150 cm Pohon 21,800.00
18 Pohon Cemara gunung, tinggi 200 cm Pohon 3,300.00
19 Nimba, tinggi 100 - 200 cm Pohon 24,400.00
20 Pohon Kayu putih, tinggi 200 - 300 cm Pohon 49,100.00
21 Pohon Dadap merah, tinggi 150 - 200 cm Pohon 31,800.00
22 Pohon Sawo kecik, tinggi 200 cm Pohon 80,000.00
23 Bunga kupu-kupu, tinggi 150 - 200 cm Pohon 90,600.00
24 Pohon Trevetia Pohon

465537457.xls - Material 13/49


Pembangunan Area Parkir Terminal Baru Bandar Udara Sultan Syarif Kasim II Pekanbaru
Pekanbaru - Prop Riau
RINGKASAN HARGA DASAR BIAYA PERALATAN
No. Kode Jenis Peralatan Satuan Har. Sat
Bahan Bakar &
Tenaga Total
Pelumas
Urut (Rp)
1 2 3 4 5

1 E01 Asphalt Mixing Plant Jam 1,301,860.23 1,154,916.00 55,450.00 2,512,226.23


2 E02 Asphalt Finisher Jam 159,872.88 91,570.50 29,670.00 281,113.38
3 E03 Asphalt Sprayer Jam 43,029.46 101,745.00 29,670.00 174,444.46
4 E04 Bulldozer 100-150 Hp Jam 180,000.00 142,443.00 29,670.00 352,113.00
5 E05 Compressor 4000-6500 L/M Jam 27,000.00 61,047.00 29,670.00 117,717.00
6 E06 Concrete Mixer 0.3-0.6 M3 Jam 5,133.79 15,261.75 29,670.00 50,065.54
7 E07 Crane 10-15 Ton Jam 147,015.22 122,094.00 29,670.00 298,779.22
8 E08 Dump Truck 3-4 M3 Jam 47,629.12 101,745.00 29,670.00 179,044.12
9 E09 Dump Truck 10-14 M3 Jam 400,000.00 127,181.25 29,670.00 556,851.25
10 E10 Excavator 100-160 Hp Jam 145,000.00 162,792.00 29,670.00 337,462.00
11 E11 Flat Bed Truck 3-4 M3 w/Crane 4 Ton Jam 60,330.22 101,745.00 29,670.00 191,745.22
12 E12 Generator Set 250 KVA Jam 49,500.00 457,852.50 29,670.00 537,022.50
13 E13 Motor Grader >100 Hp Jam 150,000.00 111,919.50 29,670.00 291,589.50
14 E14 Track Loader 75-100 Hp Jam 143,204.89 91,570.50 29,670.00 264,445.39
15 E15 Wheel Loader 1.0-1.6 M3 Jam 133,361.54 106,832.25 29,670.00 269,863.79
16 E16 Three Wheel Roller 6-8 T Jam 159,144.77 55,959.75 29,670.00 244,774.52
17 E17 Tandem Roller 6-8 T. Jam 90,000.00 50,872.50 29,670.00 170,542.50
18 E18 Tire Roller 8-10 T. Jam 120,000.00 61,047.00 29,670.00 210,717.00
19 E19 Vibratory Roller 5-8 T. Jam 135,000.00 76,308.75 29,670.00 240,978.75
20 E20 Concrete Vibrator Jam 1,283.45 10,174.50 29,670.00 41,127.95
21 E21 Stone Crusher Jam 185,133.26 223,839.00 42,560.00 451,532.26
22 E22 Water Pump 70-100 Mm Jam 3,269.35 6,104.70 29,670.00 39,044.05
23 E23 Water Tanker 3000-4500 L. Jam 57,041.06 101,745.00 29,670.00 188,456.06
24 E24 Pedestrian Roller Jam 6,747.46 11,191.95 29,670.00 47,609.41
25 E25 Padfoot Roller / Baby roller, Jam 1,950.84 5,087.25 29,670.00 36,708.09
26 E26 Jack Hammer Jam 4,489.81 - 29,670.00 34,159.81
27 E27 Fulvi Mixer Jam 86,126.74 76,308.75 29,670.00 192,105.49
28 E28 Concrete Pump Jam 144,699.24 79,287.50 29,670.00 253,656.74
29 E29 Trailer 45 Ton / Boogie truck Jam 180,713.02 138,753.13 29,670.00 349,136.14
30 E30 Pile Driver + Hammer Jam 149,743.63 19,821.88 29,670.00 199,235.50
31 E31 Crane On Track 35 Ton Jam 103,299.59 99,109.38 29,670.00 232,078.97
32 E32 Welding Set Jam 9,129.53 31,715.00 29,670.00 70,514.53
33 E33 Bore Pile Machine Jam 96,447.96 118,931.25 29,670.00 245,049.21
34 E34 Asphalt Liquid Mixer Jam 5,879.30 3,964.38 29,670.00 39,513.67
35 E35 Trailler 15 Ton Jam 162,862.93 118,931.25 29,670.00 311,464.18
36 E36 Cold Milling Jam 83,448.64 99,109.38 29,670.00 212,228.01
37 E37 Asphalt/Concrete Cutter Jam 891.55 8,721.63 29,670.00 39,283.17
38 E38 Concrete Mixing Plant Jam 831,398.17 63,430.00 29,670.00 924,498.17
39 E39 Truck Mixers Jam 234,726.04 99,109.38 29,670.00 363,505.42
40 E40 Concrete Paver Finisher Jam 1,184,283.50 111,002.50 29,670.00 1,324,956.00
41 E41 Crane 45 Ton Jam 103,299.59 - - 103,299.59
42 E42 Crane 120 Ton Jam 156,000.00 - - 156,000.00
43 E43 Line Marker Truck Jam 148,475.14 16,682.60 1,668.26 166,826.00
44 E44 Flat Bed Truck w/ Crane 4 Ton Jam 60,330.22 101,745.00 29,670.00 191,745.22
45 E45 Traveller Beam Set Jam - - - -
46 E46 Hydraulic Jack 150 Ton Jam - - - -
47 E47 Tower Crane (60 m - 4 ton) Jam -
48 E48 Pipa Tremie Jam 20,000.00
49 E49 Bekisting Vertical (Climb. Form)/m2 Jam -
50 E50 Carriage Formwork Traveller (CFT) Jam -
51 E51 Single Cage Elevator (Hoist) Jam -
52 E52 Launching Girder Jam 195,694.72 1,500,000,000.00
-

465537457.xls Alat
Pekanbaru

BIAYA BIAYA
Ket BIAYA PASTI DATA PRIMER RENTAL ALAT
PERAWATAN PEMILIKAN
PT.RATU
OWNING COST WIJAYA KARYA
TEKNIK
6 SK Gub. DKI SK Gub Jabar

Sewa Alat 1,114,285.71 870,725.23 431,135.00 1,301,860.23 210,000.00


Sewa Alat 796,850.00 107,417.52 52,455.36 159,872.88 114,000.00
Alat Baru 320,000.00 28,779.46 14,250.00 43,029.46 9,000.00
Sewa Alat 345,000.00 114,126.51 47,812.50 161,939.01 180,000.00 210,000.00
Sewa Alat 375,000.00 15,664.42 6,562.50 22,226.92 27,000.00
Sewa Alat 3,727.54 1,406.25 5,133.79
Sewa Alat 103,608.97 43,406.25 147,015.22
Sewa Alat 155,000.00 33,566.62 14,062.50 47,629.12 45,600.00
Sewa Alat 150,000.00 25,407.28 14,062.50 39,469.78 95,000.00
Sewa Alat 257,000.00 141,085.17 64,062.50 205,147.67 145,000.00 144,000.00
Sewa Alat 42,517.72 17,812.50 60,330.22
Sewa Alat 12,979.09 5,437.50 18,416.59 49,500.00
Sewa Alat 178,500.00 136,955.84 62,187.50 199,143.34 150,000.00 144,000.00
Sewa Alat 100,923.64 42,281.25 143,204.89
Sewa Alat 93,986.54 39,375.00 133,361.54
Sewa Alat 112,157.27 46,987.50 159,144.77
Sewa Alat 87,273.21 36,562.50 123,835.71 90,000.00
Sewa Alat 485,700.00 87,024.57 36,458.33 123,482.91 102,000.00
Sewa Alat 185,500.00 150,294.46 56,700.00 206,994.46 135,000.00 120,000.00
Sewa Alat 931.89 351.56 1,283.45
Sewa Alat 127,320.76 57,812.50 185,133.26 120,000.00
Sewa Alat 2,248.42 1,020.94 3,269.35
Sewa Alat 39,228.56 17,812.50 57,041.06
Sewa Alat 4,755.27 1,992.19 6,747.46
Sewa Alat 149,500.00 1,416.47 534.38 1,950.84
Sewa Alat 1,043.71 393.75 1,437.46
Sewa Alat 63,839.24 22,287.50 86,126.74
Sewa Alat 102,846.56 41,852.68 144,699.24 120,000.00
Sewa Alat 128,443.75 52,269.27 180,713.02
Sewa Alat 110,993.63 38,750.00 149,743.63
Sewa Alat 69,656.73 33,642.86 103,299.59
Sewa Alat 6,767.03 2,362.50 9,129.53
Sewa Alat 68,769.39 27,678.57 96,447.96
Sewa Alat 4,473.05 1,406.25 5,879.30
Alat Baru 103,279.60 59,583.33 162,862.93
Alat Baru 59,073.64 24,375.00 83,448.64
Alat Baru 631.13 260.42 891.55
Alat Baru 527,231.50 304,166.67 831,398.17
Alat Baru 166,163.54 68,562.50 234,726.04 77,200.00
300M3/7 Jam 756,075.16 428,208.33 1,184,283.50 1,594,285.71 1377.77777777778
Alat Baru 0.00
Alat Baru 0.00 156,000.00
0.00
0.00
0.00
0.00
TOTAL
BIAYA
PASTI / JAM
0.00
(Rp.)
0.00
0.00

(e1 + e2)

465537457.xls Alat
URAIAN ANALISA ALAT
RENCANA TEKNIK AKHIR JALAN TOL CINERE - JAGORAWI

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 40.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,449,080,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 8.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,200.0 Jam Sewa Alat
c. Harga Alat (*) B' 3,449,080,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 344,908,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.26061 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 674,147.06 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 5,748.47 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 679,895.53 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 0.00 Rupiah


Bahan Bakar Pemanasan Material = 12 x 0.7Cp x Ms H2 1,539,888.00 Rupiah Khusus AMP

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 0.00 Rupiah

3. Perawatan dan = (12,5 % - 17,5 %) x B' K 431,135.00 Rupiah


perbaikan W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 38,670.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 2,026,473.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 2,706,368.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 16/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 90.0 HP
3. Kapasitas Cp 33.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,175,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 559,523,809.5 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 117,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 106,718.12 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 699.40 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 107,417.52 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 61,870.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 29,700.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 52,455.36 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 173,695.86 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 281,113.38 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 17/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 800.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 190,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 190,000,000.0 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 19,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 28,589.46 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 190.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 28,779.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 68,745.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 14,250.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 145,665.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 174,444.46 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 18/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 140.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,275,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 510,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 127,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 113,489.01 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 637.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 114,126.51 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 96,243.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 46,200.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 47,812.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 219,925.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 334,052.01 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 19/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 10.0 Bar
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 175,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 70,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 17,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 15,576.92 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 87.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 15,664.42 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 41,247.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 19,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 6,562.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 97,279.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 112,943.92 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 20/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 25,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 15,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 3,708.79 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 18.75 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 3,727.54 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 10,311.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 4,950.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,406.25 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 46,338.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 50,065.54 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 21/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 120.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,157,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 463,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 115,750,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 103,030.22 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 578.75 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 103,608.97 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 82,494.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 39,600.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 43,406.25 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 195,170.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 298,779.22 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 22/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 M3 E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 375,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 150,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 37,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 33,379.12 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 187.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 33,566.62 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 68,745.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 14,062.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 145,477.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 179,044.12 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 23/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 M3 E09
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 375,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 150,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 37,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 33,379.12 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 187.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 33,566.62 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 85,931.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 41,250.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 14,062.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 170,913.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 204,480.37 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 24/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 100-160 HP E10
2. Tenaga Pw 160.0 HP
3. Kapasitas Cp 1.3 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,025,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 683,333,333.3 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 102,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 140,231.00 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 854.17 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 141,085.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 109,992.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 52,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 64,062.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 256,524.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 397,609.67 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 25/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 475,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 190,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 47,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 42,280.22 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 237.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 42,517.72 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 68,745.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 17,812.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 149,227.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 191,745.22 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 26/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 450.0 HP 1 HP=0.7 KVA
3. Kapasitas Cp 252.0 KVA RATE OUTPUT
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun =80 %
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 145,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 58,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 14,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 12,906.59 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 72.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 12,979.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 309,352.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 148,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 5,437.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 492,960.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 505,939.09 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 27/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 110.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 995,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 663,333,333.3 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 99,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 136,126.68 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 829.17 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 136,955.84 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 75,619.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 36,300.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 62,187.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 203,777.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 340,732.84 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 28/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 90.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,127,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 451,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 112,750,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 100,359.89 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 563.75 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 100,923.64 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 61,870.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 29,700.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 42,281.25 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 163,521.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 264,445.39 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 29/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 105.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,050,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 420,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 105,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 93,461.54 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 525.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 93,986.54 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 72,182.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 34,650.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 39,375.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 175,877.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 269,863.79 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 30/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,253,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 501,200,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 125,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 111,530.77 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 626.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 112,157.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 37,809.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 18,150.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 46,987.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 132,617.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 244,774.52 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 31/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 975,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 390,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 97,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 86,785.71 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 487.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 87,273.21 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 34,372.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 16,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 36,562.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 117,105.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 204,378.21 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 32/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T. E18
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,800.0 Jam
c. Harga Alat B 875,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,440.0 Jam Sewa Alat
c. Harga Alat (*) B' 350,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 87,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 86,538.46 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 486.11 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 87,024.57 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 41,247.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 19,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 36,458.33 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 127,175.33 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 214,199.91 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 33/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 7.0 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,008,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 604,800,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 100,800,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 149,538.46 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 756.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 150,294.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 51,558.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 24,750.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 56,700.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 162,678.75 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 312,973.21 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 34/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 3,125,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam Sewa Alat
c. Harga Alat (*) B' 1,875,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 312,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 927.20 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 4.69 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 931.89 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 6,874.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,300.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 351.56 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 40,196.06 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 41,127.95 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 35/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 30.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 925,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 616,666,666.7 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 92,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 126,549.93 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 770.83 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 127,320.76 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 151,239.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 72,600.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,812.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 25,780.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 324,211.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 451,532.26 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 36/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 800.0 Jam
c. Harga Alat B 6,534,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 640.0 Jam Sewa Alat
c. Harga Alat (*) B' 4,356,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 653,400 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 2,234.80 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 13.61 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 2,248.42 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 4,124.70 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,980.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,020.94 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 36,795.64 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 39,044.05 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 37/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 285,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 190,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 28,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 38,991.06 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 237.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 39,228.56 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 68,745.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 17,812.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 149,227.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 188,456.06 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 38/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 11.0 HP
3. Kapasitas Cp 0.980 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 42,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,280.0 Jam Sewa Alat
c. Harga Alat (*) B' 17,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 4,250,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 4,728.71 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 26.56 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 4,755.27 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 7,561.95 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,630.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,992.19 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 42,854.14 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 47,609.41 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 39/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 0.170 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 4,750,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam Sewa Alat
c. Harga Alat (*) B' 2,850,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 475,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 1,409.34 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 7.13 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 1,416.47 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 3,437.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,650.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 534.38 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 35,291.63 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 36,708.09 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 40/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 3,500,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 800.0 Jam Sewa Alat
c. Harga Alat (*) B' 2,100,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 350,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 1,038.46 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 5.25 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 1,043.71 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 2,062.35 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 990.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 393.75 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 33,116.10 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 34,159.81 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 41/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 713,200,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 285,280,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 71,320,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 63,482.64 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 356.60 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 63,839.24 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 51,558.75 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 24,750.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 22,287.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 128,266.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 192,105.49 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 42/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,125,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 535,714,285.7 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 112,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 102,176.92 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 669.64 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 102,846.56 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 57,287.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 22,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 41,852.68 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 150,810.18 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 253,656.74 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 43/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,404,998,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 669,046,666.7 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 140,499,800 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 127,607.44 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 836.31 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 128,443.75 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 100,253.13 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 38,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 52,269.27 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 220,692.40 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 349,136.14 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 44/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,240,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 496,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 124,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 110,373.63 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 620.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 110,993.63 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 14,321.88 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 5,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 38,750.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 88,241.88 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 199,235.50 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 45/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,256,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 358,857,142.9 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 125,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 69,208.16 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 448.57 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 69,656.73 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 71,609.38 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 27,500.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 33,642.86 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 162,422.23 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 232,078.97 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 46/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 75,600,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 30,240,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 7,560,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 6,729.23 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 37.80 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 6,767.03 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 22,915.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 8,800.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 2,362.50 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 63,747.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 70,514.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 47/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,240,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 354,285,714.3 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 124,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 68,326.53 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 442.86 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 68,769.39 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 85,931.25 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 33,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 27,678.57 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 176,279.82 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 245,049.21 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 48/49


URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 30,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Sewa Alat
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Sewa Alat
c. Harga Alat (*) B' 18,000,000.0 Rupiah Sewa Alat

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 4,450.55 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 22.50 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 4,473.05 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 2,864.38 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,100.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,406.25 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 16,780.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,890.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 35,040.63 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 39,513.67 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,780.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,890.00 Rp./Jam
4. Bahan Bakar Bensin Mb 4,583.00 Liter
5. Bahan Bakar Solar Ms 4,583.00 Liter
6. Minyak Pelumas Mp 22,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

465537457.xls - Anal. Alat 49/49