ANALISA URAIAN
PEKERJAAN PERSIAPAN
SNI.A.6.4a 1 M' Pengukuran dan Pemasangan Bouwplank kayu tahun
Kaso Kayu Tahun
Papan Kayu Tahun
Paku 2"-5"
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PEKERJAAN TANAH
SNI- B.6,1 1 M3 Galian Tanah biasa
Pekerja
Mandor
PEKERJAAN PONDASI
SNI - C.6.9 1 M3 Pas. Pondasi Batu Kosong
Batu Kali Belah 15/20
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
Mandor
HARGA KOMPONEN
FAKTOR KOEFISIEN SATUAN HARGA SAT BHN/UPH (Rp)
BAHAN (Rp) UPAH (Rp)
asangan Bouwplank kayu tahun 44,865.00 15,800.00
0.016 M3 2,335,000.00 37,360.00
0.005 M3 2,335,000.00 11,675.00
0.02 Kg 25,000.00 500
0.2 Hari 65,000.00 13,000.00
0.1 Hari 80,000.00 8,000.00
0.02 Hari 85,000.00 1,700.00
0.006 Hari 90,000.00 540.00
51,000.00
0.8 Hari 65,000.00 32,500.00
0.05 Hari 90,000.00 810.00
16,997.00
0.5 Hari 65,000.00 32,500.00
0.009 Hari 90,000.00 810.00
144,000.00 20,400.00
1.2 M3 120,000.00 144,000.00
0.4 Hari 65,000.00 26,000.00
0.02 Hari 90,000.00 1,800.00
291,840.00 88,725.00
1.2 M3 200,000.00 240,000.00
0.432 M3 120,000.00 51,840.00
0.75 Hari 65,000.00 48,750.00
0.4 Hari 80,000.00 32,000.00
0.04 Hari 85,000.00 3,400.00
0.04 Hari 90,000.00 3,600.00
1 PC : 3 Kp : 10 Ps 432,829.20 170,625.00
1.2 M3 200,000.00 240,000.00
61 Kg 1,050.00 64,050.00
0.147 M3 273,600.00 40,219.20
0.492 M3 180,000.00 88,560.00
1 Hari 65,000.00 65,000.00
0.8 Hari 80,000.00 64,000.00
0.08 Hari 85,000.00 6,800.00
0.08 Hari 90,000.00 7,200.00
HARGA SATUAN PEKERJAAN (Rp)
60,665.00
51,000.00
16,997.00
164,400.00
380,565.00
603,454.20
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Rumah Tinggal
51,000.00 1,045,500.00
16,997.00 127,477.50
164,400.00 279,480.00
1,452,457.50
603,454.20 5,129,360.70
380,565.00 1,446,147.00
6,575,507.70
93,029.00 762,837.80
97,488.50 11,308,666.00
93,029.00 232,572.50
46,429.80 8,692,122.86
33,268.60 548,931.90
21,545,131.06
34,218,495.00
10,844,483.57
22,836,002.28
8,711,757.75
2,556,959.93
1,384,510.50
7,101,406.86
3,005,000.00
9,078,606.46
REKAPITULASI BIAYA KESELURUHAN
NO URAIAN PEKERJAAN
1 PEKERJAAN TANAH DAN URUGAN
2 PEKERJAAN PASANGAN PONDASI
3 PEKERJAAN BETON
4 PEKERJAAN KUSEN PINTU DAN JENDELA
5 PEKERJAAN ATAP DAN LANGIT LANGIT
6 PEKERJAAN KERAMIK LANTAI DAN DINDING
7 PEKERJAAN KUNCI DAN KACA
8 PEKERJAAN SANITASI
9 PEKERJAAN PENGECATAN
10 PEKERJAAN LISTRIK
11 PEKERJAAN INSTALASI AIR
12 PEKERJAAN LAIN - LAIN
JUMLAH
DIBULATKAN
JUMLAH HARGA (Rp)
1,452,457.50
6,575,597.70
34,218,495.00
21,545,131.06
22,836,002.28
8,711,757.75
2,556,959.93
1,384,510.50
7,101,406.86
3,005,000.00
9,078,606.46
3,026,800.00
120,255,530.42
120,226,000