PEKERJAAN JUMLAH
NILAI PERSENTASE NILAI PERSENTASE
JALAN SEP. 70 M' 263,426,400.00 80% 65,253,200.00 20% 328,679,600.00
TPT SEP. 31 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
BRONJONG SEP. 9 M' 156,911,300.00 93% 12,000,000.00 7% 168,911,300.00
TOTAL #VALUE! #VALUE! #VALUE!
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN KEGIATAN FISIK DANA DESA (P.APBDes TA.2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A
2022)
Terbilang : Tiga Ratus Dua Puluh Delapan Juta Enam Ratus Tujuh Puluh Sembilan Ribu Enam Ratus Rupiah
SISOBALAURU, 2022
KODE
URAIAN HARGA SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
1 Pek. Pembersihan Semak pada Damija K-210
A. Upah
- Pekerja HOK 13.00 100,000.00 1,300,000.00
B. Bahan - - - -
C. Peralatan - - - -
B. Bahan
- Batu Gunung Belah 10/15 M3 29.00 187,500.00 5,437,500.00
- Batu Pecah 5/7 (Manual) M3 12.00 187,500.00 2,250,000.00
C. Peralatan
- Mobilisasi Kali 1.00 7,752,000.00 7,752,000.00
- Mesin gilas roda besi 6 - 8 T Jam 3.00 414,200.00 1,242,600.00
- Meteran uk. 50.0 m Bh 1.00 63,600.00 63,600.00
- Gerobak sorong Unit 5.00 605,500.00 3,027,500.00
- Sekop besar + gagang Bh 15.00 113,800.00 1,707,000.00
- Cangkul + gagang Bh 15.00 113,800.00 1,707,000.00
- Plengki Rotan Bh 20.00 20,700.00 414,000.00
- Gayung Aspal (kaleng) Bh 4.00 16,750.00 67,000.00
- Kaleng Siram Aspal Bh 4.00 33,500.00 134,000.00
- Sarung Tangan Pekerja (karet) Psg 20.00 14,800.00 296,000.00
- Tembilang/penggali + gagang Bh 3.00 66,900.00 200,700.00
- Pecok/Bolak baling + gagang Bh 3.00 139,400.00 418,200.00
- Martil Batu Uk. 3 Kg (godam) Bh 2.00 222,200.00 444,400.00
- Raskam besi Bh 1.00 50,200.00 50,200.00
- Raskam Plastik Bh 1.00 33,500.00 33,500.00
- Ember cor Bh 2.00 13,400.00 26,800.00
- Sendok Semen Bh 1.00 30,100.00 30,100.00
- Selang Ukur Glg 1.00 16,800.00 16,800.00
- Palu/Penokok Bh 1.00 46,900.00 46,900.00
- Benang Tukang (Nilon) Glg 1.00 16,800.00 16,800.00
- Meteran uk. 5.0 m Bh 2.00 30,200.00 60,400.00
- Linggis Ulir Bh 2.00 39,100.00 78,200.00
- Tang Kakak tua (pengikat kawat) Bh 4.00 42,925.00 171,700.00
- Unting unting Bh 1.00 22,300.00 22,300.00
B. Bahan
- Batu Pecah 5/7 (Manual) M3 16.00 187,500.00 3,000,000.00
- Batu Pecah 3/5 (Manual) M3 9.00 225,000.00 2,025,000.00
- Batu Pecah 2/3 (Manual) M3 3.00 290,000.00 870,000.00
- Batu Pecah 1/2 (Manual) M3 2.00 562,500.00 1,125,000.00
C. Peralatan
- Mesin gilas roda besi 6 - 8 T Jam 2.00 414,200.00 828,400.00
B. Bahan
- Minyak Bakar Ltr 90.00 11,200.00 1,008,000.00
- Aspal KG 118.00 12,800.00 1,510,400.00
- Kayu Api/Kayu Bakar M3 1.50 106,000.00 159,000.00
C. Peralatan - - - -
B. Bahan
- Batu Pecah 3/5 (Manual) M3 10.00 225,000.00 2,250,000.00
- Batu Pecah 2/3 (Manual) M3 6.00 290,000.00 1,740,000.00
- Batu Pecah 1/2 (Manual) M3 3.00 562,500.00 1,687,500.00
- Kepala Pasir M3 1.00 181,300.00 181,300.00
- Aspal KG 1,004.00 12,800.00 12,851,200.00
- Kayu Api/Kayu Bakar M3 2.00 106,000.00 212,000.00
C. Peralatan
- Mesin gilas roda besi 6 - 8 T Jam 3.00 414,200.00 1,242,600.00
- Demobilisasi Kali 1.00 7,752,000.00 7,752,000.00
B. Bahan - - - -
C. Peralatan - - - -
B. Bahan
- Sirtu M3 96.00 136,300.00 13,084,800.00
C. Peralatan - - - -
B. Bahan
- Semen PC Zak 5.00 101,300.00 506,500.00
- Pasir Pasangan M3 1.00 181,300.00 181,300.00
- Batu Gunung Belah 10/15 M3 2.00 187,500.00 375,000.00
C. Peralatan - - - -
B. Bahan
- Semen PC Zak 2.00 101,300.00 202,600.00
- Pasir Pasangan M3 1.00 181,300.00 181,300.00
C. Peralatan - - - -
B. Bahan
- Semen PC Zak 1.00 101,300.00 101,300.00
C. Peralatan - - - -
B. Bahan
- Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 18.00 21,200.00 381,600.00
- Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 36.00 27,900.00 1,004,400.00
- Paku Biasa Kg 2.00 20,000.00 40,000.00
C. Peralatan - - - -
B. Bahan
- Kayu Bulat Ø 7 cm - 8 cm Btg 42.00 8,400.00 352,800.00
C. Peralatan - - - -
B. Bahan
- Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 1.00 13,380,000.00 13,380,000.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 1 Unit 51.00 376,900.00 19,221,900.00
- Batu Gunung Belah 15/20 M3 67.00 187,500.00 12,562,500.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 2 Unit 54.00 599,900.00 32,394,600.00
- Batu Gunung Belah 15/20 M3 106.00 187,500.00 19,875,000.00
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
Terbilang : Tiga Ratus Dua Puluh Delapan Juta Enam Ratus Tujuh Puluh Sembilan Ribu Enam Ratus Rupiah
SISOBALAURU, 2022
SISOBALAURU, 2022
Pemasangan 1 m2 acian
2.000
1.000
1.000
URAIAN KEBUTUHAN TERHADAP ANALISA SATUAN PEKERJAAN
DIBULATKAN
10
G PENAHAN (PERMEN PUPR No. 01/2022)
Penggalian 1 m3 tanah biasa sedalam 1 m'
48.000
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
L L P
1 2 3 4 5 6 7=(5x6)
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
LEBAR LEBAR
PANJANG KUANTITAS KOEF.
RATA - PENGHAM KUANTITAS
RATA BRUTO
PARAN
NO. STATION / LETAK SISI
(m) (m) ( M2 )
(m) ( m2 )
L L P ( Ltr/m2 )
1 2 3 4 5 6 7=(5x6) 8 9=(7x8)
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
L L P
1 2 3 4 5 6 7=(5x6)
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
0,30 0,30
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
0,30 0,30
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
Sketsa
350
50
2000
POT. TIPIKAL MEMANJANG TIMBUNAN BADAN JALAN
P0+000 - P0+020
100 200
100 200
50
POT. TIPIKAL MELINTANG TIMBUNAN BADAN JALAN POT. TIPIKAL MELINTANG TIMBUNAN BADAN JALAN
P0+000 P0+020
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN, Sep. 76 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PASANGAN BATU LOONING JEMBATAN 1 Tpt (Kanan) Uk. 2.50 x 1.10 M'
Sketsa
250 60
240 50
10 10
85 85
15 15
SISOBALAURU, 2022
(m3)
19=(16x17x18)
1.32
1.32
1.32
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PASANGAN BATU LOONING JEMBATAN 1 Tpt (Kanan) Uk. 2.50 x 1.10 M'
Sketsa
250 60
240 50
10 10
85 85
15 15
SISOBALAURU, 2022
KUANTITAS
(m2)
19=(16x17x18)
1.50
0.12
0.50
0.25
0.05
0.85
4.08
0.75
0.18
0.25
0.05
8.58
8.58
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.4.4.2.27. Pemasangan 1 m2 acian
LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PASANGAN BATU LOONING JEMBATAN 1 Tpt (Kanan) Uk. 2.50 x 1.10 M'
Sketsa
250 60
240 50
10 10
85 85
15 15
SISOBALAURU, 2022
KUANTITAS
(m2)
19=(16x17x18)
1.50
0.12
0.50
0.25
0.05
0.85
4.08
0.75
0.18
0.25
0.05
8.58
8.58
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' / Tinggi 0.50 -1.50 M')
Sketsa
1400
100 50
Geotextile Non Woven
100 50 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 9
250 gr/m2
Timbunan Tanah 100 50 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 8
(dari Sisa Galian)
100 50 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 7
Pasangan Bronjong
300 300
dengan Kawat Pabrikasi 100 50 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 6
100 100 TYP E TYP E TYP E TYP E TYP E
50 50 50 1 X1 1 X1 1 X1 1 X1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 4
100 100 100 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 2
100 100 100 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Tampak Samping Bronjong, Sep. 14 M' Tampak Depan Bronjong, Sep. 14 M'
Skala 1:100 Skala 1:100
SISOBALAURU, 2022
(n) (m3)
18 19=(16x17x18)
1.00 63.00
63.00
63.00
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.07.b Pemasangan Cerucuk Kayu Bulat (Ø 7cm - 8cm) 1 m
LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
Sketsa
1400
100 50
Geotextile Non Woven
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
250 gr/m2
Timbunan Tanah 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 8
(dari Sisa Galian)
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 7
Pasangan Bronjong
300 300
dengan Kawat Pabrikasi 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 6
100 100 TYPE TYPE TYPE TYPE TYPE
50 50 50 1 X1 1 X1 1 X1 1 X1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Tampak Samping Bronjong, Sep. 14 M' Tampak Depan Bronjong, Sep. 14 M'
Skala 1:100 Skala 1:100
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
Sketsa
1400
100 50
Geotextile Non Woven
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
250 gr/m2
Timbunan Tanah 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 8
(dari Sisa Galian)
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 7
Pasangan Bronjong
300 300
dengan Kawat Pabrikasi 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 6
100 100 TYPE TYPE TYPE TYPE TYPE
50 50 50 1 X1 1 X1 1 X1 1 X1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Tampak Samping Bronjong, Sep. 14 M' Tampak Depan Bronjong, Sep. 14 M'
Skala 1:100 Skala 1:100
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
Sketsa
TYPE 1 X 1
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
100 100 100 100 100 100 100 100 100 100 100 100 100
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 3
VOLUME KUANTITAS
JUMLAH (M3)
NO. STATION / LETAK SISI
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 1 Kanan 2.00 1.00 0.50 9.00 9.00 9.00
2 LAPIS - 2 Kanan 2.00 1.00 0.50 6.00 6.00 6.00
3 LAPIS - 3 Kanan 2.00 1.00 0.50 9.00 9.00 9.00
4 LAPIS - 4 Kanan 2.00 1.00 0.50 6.00 6.00 6.00
5 LAPIS - 5 Kanan 2.00 1.00 0.50 5.00 5.00 5.00
6 LAPIS - 6 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
7 LAPIS - 7 Kanan 2.00 1.00 0.50 4.00 4.00 4.00
8 LAPIS - 8 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
9 LAPIS - 9 Kanan 2.00 1.00 0.50 4.00 4.00 4.00
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
Sketsa
TYPE 1 X 1 LAYER 3
600
50 TYP E 1 X 1 LAYER 3
150 50 TYP E 1 X 1 TYP E 1 X 1 LAYER 2
50 TYP E 1 X 1 TYP E 1 X 1 TYP E 1 X 1 LAYER 1
EXISTING BRONJONG
VOLUME KUANTITAS
JUMLAH (M3)
NO. STATION / LETAK SISI
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 1 Kanan 2.00 1.00 0.50 3.00 3.00 3.00
2 LAPIS - 2 Kanan 2.00 1.00 0.50 2.00 2.00 2.00
3 LAPIS - 3 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
Sketsa
TYPE 1 X 1
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
100 100 100 100 100 100 100 100 100 100 100 100 100
TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 3
VOLUME KUANTITAS
JUMLAH (M3)
NO. STATION / LETAK SISI
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 1 Kanan 3.00 1.00 0.50 8.00 12.00 8.00
2 LAPIS - 2 Kanan 3.00 1.00 0.50 10.00 15.00 10.00
3 LAPIS - 3 Kanan 3.00 1.00 0.50 8.00 12.00 8.00
4 LAPIS - 4 Kanan 3.00 1.00 0.50 10.00 15.00 10.00
5 LAPIS - 5 Kanan 3.00 1.00 0.50 6.00 9.00 6.00
6 LAPIS - 6 Kanan 3.00 1.00 0.50 4.00 6.00 4.00
7 LAPIS - 7 Kanan 3.00 1.00 0.50 2.00 3.00 2.00
8 LAPIS - 8 Kanan 3.00 1.00 0.50 4.00 6.00 4.00
9 LAPIS - 9 Kanan 3.00 1.00 0.50 2.00 3.00 2.00
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' /
Tinggi 0.50 -1.50 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' / Tinggi 0.50 -1.50 M')
Sketsa
Timbunan Tanah
(dari Sisa Galian) 50 50
50
50
MTA
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' / Tinggi 0.50 -1.50 M')
Sketsa
50
50 Timbunan Tanah
(dari Sisa Galian)
38
MTA
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' / Tinggi 0.50 -1.50 M')
Sketsa
88
50 Timbunan Tanah
(dari Sisa Galian)
82
MTA
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN BRONJONG PENAHAN 2 Tpt (Sep. 14 M' / Tinggi 4.50 M' dan Sep. 6M' / Tinggi 0.50 -1.50 M')
Sketsa
32
Timbunan Tanah
41
(dari Sisa Galian)
MTA
SISOBALAURU, 2022
(n) (m3)
18 19=(16x17x18)
2.00 3.50
3.50
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 3.08
3.08
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.95
5.95
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 0.67
0.67
13.20
DAFTAR HARGA BAHAN/MATERIAL, ALAT BANTU, SEWA ALAT BERAT DAN UPAH
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA
SISOBALAURU (P.APBDes T.A 2022)
HARGA UPAH
No Uraian Tenaga Kerja Sat. Keterangan Produktifitas
(Rp.)
A. UPAH TENAGA KERJA :
1 Pekerja Tidak Terlatih / Biasa OH 100,000 1 HARI = 8 JAM KERJA
2 Tukang Kayu, Batu dan Besi OH 130,000 1 HARI = 8 JAM KERJA
3 Tukang Siram Aspal OH 225,000 1 HARI = 8 JAM KERJA
4 Kepala Tukang OH 160,000 1 HARI = 8 JAM KERJA
5 Pembantu Operator OH 100,000 1 HARI = 5 JAM KERJA
6 Operator OH 300,000 1 HARI = 5 JAM KERJA
(Rp.) (Rp.)
B. BAHAN :
B1. MATERIAL / BAHAN YANG DIDATANGKAN :
1 Batu Gunung belah 15-20 cm M³ 187,500 326,400 KEC. HILIDUHO (Ds. Sisobahili)
2 Batu Gunung belah 10-15 cm M³ 187,500 326,400 KEC. HILIDUHO (Ds. Sisobahili)
3 Batu Pecah 5-7 cm Jenis Keras (Manual) M³ 187,500 357,000 KEC. HILIDUHO (Ds. Sisobahili)
4 Batu Pecah 3-5 cm Jenis Keras (Manual) M³ 225,000 357,000 KEC. HILIDUHO (Ds. Sisobahili)
5 Batu Pecah 2-3 cm Jenis Keras (Manual) M³ 290,000 326,400 KEC. HILIDUHO (Ds. Sisobahili)
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) M³ 562,500 326,400 KEC. HILIDUHO (Ds. Hiligodu)
7 Kerikil Sungai di saring, uk. 0.5 - 2 cm M³ 187,500 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
8 Kerikil Sungai tidak di saring M³ 150,000 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
9 Kepala Pasir M³ 181,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
10 Pasir Pasangan M³ 181,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
11 Pasir Urug M³ 136,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
12 Sirtu M³ 136,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
13 Tanah Timbunan Biasa M³ 90,800 147,900 KEC. HILIDUHO
14 Kayu Jenis Keras M³ 3,345,000 122,400 KEC. HILIDUHO
15 Kayu Sembarang (Tanpa Jenis) M³ 2,676,000 122,400 KEC. HILIDUHO
16 Kayu Api/Kayu Bakar M³ 106,000 122,400 KEC. HILIDUHO
17 Batang Kelapa uk. Ø 20/25 cm Btg 190,000 20,400 KEC. HILIDUHO
18 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) Btg 8,400 1,700 KEC. HILIDUHO
19 Kayu Bulat Ø 10-15 cm; 3,5 m Btg 12,000 3,400 KEC. HILIDUHO
20 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 21,200 1,000 KEC. HILIDUHO
21 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 27,900 1,300 KEC. HILIDUHO
B2. MATERIAL (PABRIKASI / TOKO / DISTRIBUTOR) :
1 Semen Portland @50 kg Type PCC Zak 101,300 10,000 GUNUNGSITOLI
2 Kawat Beton/Kawat Ikat Kg 29,000 - GUNUNGSITOLI
3 Kawat Bronjong Pabrikasi Type - 1 Unit 376,900 9,400 GUNUNGSITOLI
4 Kawat Bronjong Pabrikasi Type - 2 Unit 599,900 14,200 GUNUNGSITOLI
5 Kawat Bronjong Pabrikasi Type - 3 Unit 780,500 19,300 GUNUNGSITOLI
6 Paku Biasa Kg 20,000 - GUNUNGSITOLI
7 Aspal Kg 12,800 600 GUNUNGSITOLI
8 Minyak Solar / Dexlite (Non Subsidi) Ltr 17,100 - GUNUNGSITOLI
DAFTAR HARGA BAHAN/MATERIAL, ALAT BANTU, SEWA ALAT BERAT DAN UPAH
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA
SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA
SISOBALAURU (P.APBDes T.A 2022)
HARGA SEWA,
MOBILISASI DAN Keterangan Produktifitas
No Uraian Alat Berat Sat. DEMOBILISASI + PPh
(Rp.)
D. SEWA ALAT BERAT :
1 HARI = 5 JAM KERJA
1 Mesin gilas roda besi 6 - 8 T Jam 414,200
(ANL. K - BM Thn.1995)
2 Mobilisasi Ls 7,752,000 1 KALI
3 Demobilisasi Ls 7,752,000 1 KALI
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA
SISOBALAURU (P.APBDes T.A 2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Km) (Rp.) (Km) (Rp.) (Rp.) (Rp.)
B. BAHAN :
B1. MATERIAL / BAHAN YANG DIDATANGKAN :
1 Batu Gunung belah 15-20 cm M³ 150,000 37,500 - - 187,500 - - 10.00 320,000 6,400 326,400 I-a
2 Batu Gunung belah 10-15 cm M³ 150,000 37,500 - - 187,500 - - 10.00 320,000 6,400 326,400 I-a
3 Batu Pecah 5-7 cm Jenis Keras (Manual) M³ 150,000 37,500 - - 187,500 - - 10.00 350,000 7,000 357,000 I-a
4 Batu Pecah 3-5 cm Jenis Keras (Manual) M³ 180,000 45,000 - - 225,000 - - 10.00 350,000 7,000 357,000 I-a
5 Batu Pecah 2-3 cm Jenis Keras (Manual) M³ 232,000 58,000 - - 290,000 - - 10.00 320,000 6,400 326,400 I-a
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) M³ 450,000 112,500 - - 562,500 - - 10.00 320,000 6,400 326,400 I-a
7 Kerikil Sungai di saring, uk. 0.5 - 2 cm M³ 150,000 37,500 - - 187,500 - - 7.00 245,000 4,900 249,900 I-a
8 Kerikil Sungai tidak di saring M³ 120,000 30,000 - - 150,000 - - 7.00 245,000 4,900 249,900 I-a
9 Kepala Pasir M³ 145,000 36,300 - - 181,300 - - 7.00 245,000 4,900 249,900 I-a
10 Pasir Pasangan M³ 145,000 36,300 - - 181,300 - - 7.00 245,000 4,900 249,900 I-a
11 Pasir Urug M³ 109,000 27,300 - - 136,300 - - 7.00 245,000 4,900 249,900 I-a
12 Sirtu M³ 109,000 27,300 - - 136,300 - - 7.00 245,000 4,900 249,900 I-a
13 Tanah Timbunan Biasa M³ 72,600 18,200 - - 90,800 - - 3.00 145,000 2,900 147,900 I-a
14 Kayu Jenis Keras M³ 3,000,000 - 300,000 45,000 3,345,000 - - 3.00 120,000 2,400 122,400 I-a
15 Kayu Sembarang (Tanpa Jenis) M³ 2,400,000 - 240,000 36,000 2,676,000 - - 3.00 120,000 2,400 122,400 I-a
16 Kayu Api/Kayu Bakar M³ 106,000 - - - 106,000 - - 3.00 120,000 2,400 122,400 I-a
17 Batang Kelapa uk. Ø 20/25 cm Btg 190,000 - - - 190,000 - - 3.00 20,000 400 20,400 I-a
18 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) Btg 8,400 - - - 8,400 - - 3.00 1,600 100 1,700 I-a
19 Kayu Bulat Ø 10-15 cm; 3,5 m Btg 12,000 - - - 12,000 - - 3.00 3,300 100 3,400 I-a
20 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 19,000 - 1,900 300 21,200 - - 3.00 900 100 1,000 I-a
21 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 25,000 - 2,500 400 27,900 - - 3.00 1,200 100 1,300 I-a
B2. MATERIAL (PABRIKASI / TOKO / DISTRIBUTOR)
1 Semen Portland @50 kg Type PCC Zak 90,800 - 9,100 1,400 101,300 - - - - - 10,000 I-b
2 Kawat Beton/Kawat Ikat Kg 26,000 - 2,600 400 29,000 - - - - - - I-b
3 Kawat Bronjong Pabrikasi Type - 1 Unit 338,000 - 33,800 5,100 376,900 20.00 5,500 10.00 3,700 200 9,400 I-b
4 Kawat Bronjong Pabrikasi Type - 2 Unit 538,000 - 53,800 8,100 599,900 20.00 8,300 10.00 5,600 300 14,200 I-b
5 Kawat Bronjong Pabrikasi Type - 3 Unit 700,000 - 70,000 10,500 780,500 20.00 11,300 10.00 7,600 400 19,300 I-b
6 Paku Biasa Kg 17,900 - 1,800 300 20,000 - - - - - - I-b
7 Aspal Kg 11,400 - 1,200 200 12,800 20.00 300 10.00 200 100 600 I-b
8 Minyak Solar / Dexlite (Non Subsidi) Ltr 17,100 - - - 17,100 - - - - - - I-b
9 Minyak Bakar / Tanah (Non Subsidi) Ltr 11,200 - - - 11,200 - - - - - - I-b
10 Minyak Bensin / Pertamax (Non Subsidi) Ltr 14,500 - - - 14,500 - - - - - - I-b
11 Minyak Pelumas/Olie Ltr 40,000 - 4,000 600 44,600 - - - - - - I-b
12 Minyak Bekisting Kg 9,000 - 900 200 10,100 - - - - - - I-b
13 Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 12,000,000 - 1,200,000 180,000 13,380,000 20.00 39,700 10.00 27,000 1,400 68,100 I-b
Biaya angkut dengan truk
PAJAK MBLB PPN PPh 22 HARGA TOTAL PPh 23 BIAYA TOTAL
Harga
BAHAN, Bukit ONGKOS
Bahan/Material, Alat
MATERIAL DAN ANGKUT Kategori
No Jenis Bahan Sat. Sedang Jelek
ALAT BANTU DENGAN TRUK Biaya
di Quarry/toko
(Termasuk Pajak) (Termasuk Pajak)
25% 10% 1,5 % Jarak Angkut Ongkos Angkut Jarak Angkut Ongkos Angkut 2%
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Km) (Rp.) (Km) (Rp.) (Rp.) (Rp.)
C. ALAT BANTU (TOKO / DISTRIBUTOR)
1 Meteran uk. 5.0 m Bh 27,000 - 2,700 500 30,200 - - - - - - II - a
2 Meteran uk. 50.0 m Bh 57,000 - 5,700 900 63,600 - - - - - - II - a
3 Sendok Semen Bh 26,900 - 2,700 500 30,100 - - - - - - II - a
4 Raskam Besi Bh 45,000 - 4,500 700 50,200 - - - - - - II - a
5 Raskam Plastik Bh 30,000 - 3,000 500 33,500 - - - - - - II - a
6 Sekop besar + gagang Bh 102,000 - 10,200 1,600 113,800 - - - - - - II - a
7 Cangkul + gagang Bh 102,000 - 10,200 1,600 113,800 - - - - - - II - a
8 Martil Batu Uk. 3 Kg (godam) Bh 199,200 - 20,000 3,000 222,200 - - - - - - II - a
9 Tembilang/penggali + gagang Bh 60,000 - 6,000 900 66,900 - - - - - - II - a
10 Pecok/Bolak baling + gagang Bh 125,000 - 12,500 1,900 139,400 - - - - - - II - a
11 Linggis Ulir Bh 35,000 - 3,500 600 39,100 - - - - - - II - a
12 Palu/Penokok Bh 42,000 - 4,200 700 46,900 - - - - - - II - a
13 Drum Plastik 200 ltr (Tampungan Air Hujan) Bh 294,400 - 29,500 4,500 328,400 - - - - - - II - a
14 Selang Ukur Glg 15,000 - 1,500 300 16,800 - - - - - - II - a
15 Tenda / Terpal Plastik A2 uk. 4 x 6 m Lbr 150,000 - 15,000 2,300 167,300 - - - - - - II - a
16 Sarung Tangan Pekerja (karet) Psg 13,200 - 1,400 200 14,800 - - - - - - II - a
17 Gerobak Sorong Unit 543,000 - 54,300 8,200 605,500 - - - - - - II - a
18 Plengki Rotan Bh 18,500 - 1,900 300 20,700 - - - - - - II - a
19 Ember Cor Bh 12,000 - 1,200 200 13,400 - - - - - - II - a
20 Kaleng Siram Aspal Bh 30,000 - 3,000 500 33,500 - - - - - - II - a
21 Gayung Aspal (kaleng) Bh 14,950 - 1,500 300 16,750 - - - - - - II - a
22 Gergaji Bh 45,000 - 4,500 700 50,200 - - - - - - II - a
23 Waterpass Bh 51,000 - 5,100 800 56,900 - - - - - - II - a
24 Unting unting Bh 20,000 - 2,000 300 22,300 - - - - - - II - a
25 Tang Kakak tua (pengikat kawat) Bh 38,425 - 3,900 600 42,925 - - - - - - II - a
26 Pahat Batu Bh 20,000 - 2,000 300 22,300 - - - - - - II - a
27 Benang Tukang (Nilon) Glg 15,000 - 1,500 300 16,800 - - - - - - II - a
SISOBALAURU, 2022
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
Sumber Quarry/toko
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
DAFTAR ANALISA HARGA MOBILISASI, DEMOBILISASI DAN SEWA ALAT BERAT
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
PPh 23
1 Mesin gilas roda besi 6 - 8 T Jam 406,100.00 8,100.00 414,200.00 414,200.00 414,200.00
SISOBALAURU, 2022
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : LANJUTAN PEMBANGUNAN JALAN DI UJUNG JEMBATAN NO'OU DESA SISOBALAURU (P.APBDes T.A 2022)
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 800,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 800,000,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 60,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,000.00 Rp./Jam
4. Bahan Bakar Bensin Mb 14,500.00 Liter
5. Bahan Bakar Solar Ms 17,100.00 Liter
6. Minyak Pelumas Mp 44,600.00 Liter
SISOBALAURU, 2022
SISOBALAURU, 2021
B. Bahan
- Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 4.00 21,200.00 84,800.00
- Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 4.00 27,900.00 111,600.00
- Paku Biasa Kg 0.50 20,000.00 10,000.00
C. Peralatan
- Meteran uk. 5.0 m Bh 1.00 30,200.00 30,200.00
- Gerobak sorong Unit 2.00 605,500.00 1,211,000.00
- Sekop besar + gagang Bh 2.00 113,800.00 227,600.00
- Raskam besi Bh 2.00 50,200.00 100,400.00
- Raskam Plastik Bh 2.00 33,500.00 67,000.00
- Cangkul + gagang Bh 3.00 113,800.00 341,400.00
- Tembilang/penggali + gagang Bh 2.00 66,900.00 133,800.00
- Ember cor Bh 8.00 13,400.00 107,200.00
- Sendok Semen Bh 4.00 30,100.00 120,400.00
- Pecok/Bolak baling + gagang Bh 2.00 139,400.00 278,800.00
- Selang Ukur Glg 1.00 16,800.00 16,800.00
- Palu/Penokok Bh 2.00 46,900.00 93,800.00
- Drum Plastik 200 ltr (Tampungan Air Hujan) Bh 1.00 328,400.00 328,400.00
- Benang Tukang (Nilon) Glg 1.00 16,800.00 16,800.00
- Sarung Tangan Pekerja (karet) Psg 9.00 14,800.00 133,200.00
Sub. Total.1
1 Pek. Pasangan batu A.3.2.1.2.
A. Upah
- Pekerja HOK #VALUE! 100,000.00 #VALUE!
- Tukang HOK #VALUE! 130,000.00 #VALUE!
B. Bahan
- Semen PC Zak #VALUE! 101,300.00 #VALUE!
- Pasir Pasangan M3 #VALUE! 181,300.00 #VALUE!
- Batu Gunung Belah 10/15 M3 #VALUE! 187,500.00 #VALUE!
C. Peralatan - - - -
B. Bahan
- Semen PC Zak #VALUE! 101,300.00 #VALUE!
- Pasir Pasangan M3 #VALUE! 181,300.00 #VALUE!
C. Peralatan - - - -
B. Bahan
- Semen PC Zak #VALUE! 101,300.00 #VALUE!
C. Peralatan - - - -
SISOBALAURU, 2021
SISOBALAURU, 2021
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
AAN
DIBULATKAN
10
#VALUE!
#VALUE!
#VALUE!
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN KEGIATAN FISIK DANA DESA (P.APBDes TA.2022)
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Terbilang : Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh Ratus Rupiah
SISOBALAURU, 2021
KODE
URAIAN HARGA SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
1 Pek. Galian Tanah A.2.3.1.1.
A. Upah
- Pekerja HOK 48.00 100,000.00 4,800,000.00
B. Bahan
- Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 18.00 21,200.00 381,600.00
- Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 36.00 27,900.00 1,004,400.00
- Paku Biasa Kg 2.00 20,000.00 40,000.00
C. Peralatan
- Meteran uk. 5.0 m Bh 1.00 30,200.00 30,200.00
- Meteran uk. 50.0 m Bh 1.00 63,600.00 63,600.00
- Gerobak Sorong Unit 4.00 605,500.00 2,422,000.00
- Sekop besar + gagang Bh 4.00 113,800.00 455,200.00
- Cangkul + gagang Bh 4.00 113,800.00 455,200.00
- Tembilang/penggali + gagang Bh 4.00 66,900.00 267,600.00
- Linggis Ulir Bh 4.00 39,100.00 156,400.00
- Pecok/Bolak baling + gagang Bh 5.00 139,400.00 697,000.00
- Sarung Tangan Pekerja (karet) Psg 9.00 14,800.00 133,200.00
- Selang Ukur Glg 1.00 16,800.00 16,800.00
- Palu/Penokok Bh 4.00 46,900.00 187,600.00
- Benang Tukang (Nilon) Glg 2.00 16,800.00 33,600.00
- Tang Kakak tua (pengikat kawat) Bh 4.00 42,925.00 171,700.00
- Unting unting Bh 2.00 22,300.00 44,600.00
- Plengki Rotan Bh 9.00 20,700.00 186,300.00
- Martil Batu Uk. 3 Kg (godam) Bh 4.00 222,200.00 888,800.00
B. Bahan
- Kayu Bulat Ø 7 cm - 8 cm Btg 42.00 8,400.00 352,800.00
C. Peralatan - - - -
B. Bahan
- Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 1.00 13,380,000.00 13,380,000.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 1 Unit 45.00 376,900.00 16,960,500.00
- Batu Gunung Belah 15/20 M3 59.00 187,500.00 11,062,500.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 2 Unit 54.00 599,900.00 32,394,600.00
- Batu Gunung Belah 15/20 M3 106.00 187,500.00 19,875,000.00
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
Terbilang : Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh Ratus Rupiah
SISOBALAURU, 2021
SISOBALAURU, 2021
48.000
18.000
8.000
14.000
59.000
45.000
25.000
106.000
54.000
DIBULATKAN
10
7.000
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.06.b.4.(3) Pasangan bronjong pabrikasi Type - 3 uk. (3,0 mm x 1,5 mm x 0,5 mm)
PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
DESA : SISOBALAURU
KECAMATAN :
KABUPATEN / KOTA :
PROVINSI :
NO. RAB : PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
BIDANG :
KEGIATAN :
### :
### :
Sketsa
VOLUME KUANTITAS
JUMLAH
NO. STATION / LETAK SISI (M3)
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 4 Kanan 3.00 1.50 0.50 3.00 6.75 3.00
2 LAPIS - 6 Kanan 3.00 1.50 0.50 3.00 6.75 3.00
3
4
5
6
7
8
9
10
Jumlah halaman ini 13.50 6.00
Jumlah s/d halaman ini 13.50 6.00
0 0
0 0
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.06.b.4.(3) Pasangan bronjong pabrikasi Type - 3 uk. (3,0 mm x 1,5 mm x 0,5 mm)
PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
DESA : SISOBALAURU
KECAMATAN :
KABUPATEN / KOTA :
PROVINSI :
NO. RAB : PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
BIDANG :
KEGIATAN :
### :
### :
0 0
DAFTAR ANALISA HARGA UPAH TENAGA KERJA
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
A4. UPAH ANGKUT / PIKUL PUNDAK TENAGA MANUSIA SAMPAI DI LOKASI PEKERJAAN
1 Batu Kali/Sungai belah 15-20 cm OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
2 Batu Gunung belah 10-15 cm OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
3 Batu Pecah 5-7 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
4 Batu Pecah 3-5 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
5 Batu Pecah 2-3 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
7 Kepala Pasir OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
8 Pasir Pasangan OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
9 Tanah Timbunan Biasa OH 375,000.00 0.50 187,500.00 187,500.00 187,500.00 1 HARI = 8 JAM KERJA
10 Semen Portland @50 kg Type PCC OH 40,000.00 0.15 6,000.00 6,000.00 6,000.00 1 HARI = 8 JAM KERJA
11 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) OH 9,000.00 0.15 1,350.00 1,350.00 1,350.00 1 HARI = 8 JAM KERJA
12 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m OH 6,000.00 0.15 900.00 900.00 900.00 1 HARI = 8 JAM KERJA
13 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' OH 6,000.00 0.15 900.00 900.00 900.00 1 HARI = 8 JAM KERJA
SISOBALAURU, 2021
Keterangan
Luar Desa
Luar Desa
Material Lokal
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
TERMASUK
ATERIAL
KET.
Sampai Lokasi
Sampai Lokasi
Sampai Lokasi
Sampai Lokasi
OR PC 210
AGUSTUS 2020
URAIAN ANALISA ALAT
11.
12.
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 4.50 Kilometer
7.00 Km = a C 7.00 Km = b
A B
1.00 Km = c
Base Camp --------->
D
Kalkulasi Jarak Rata-Rata =
20 ....................................
21 ....................................
22 ....................................
ORMASI
.............
meter
meter
ode Pelaksanaan)
ANALISA HARGA SATUAN PEKERJAAN
Analisa : Tambahan I
Pekerjaan : Bronjong kawat galvanis pabrikasi
Satuan : M3
A. UPAH
1. Pekerja Org/Hari 1.500 65,000.00
2. Mandor Org/Hari 0.025 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type I Unit 1.000 424,022.34
Sub Total B
C. PERALATAN
Sub Total C
Analisa : Tambahan II
Pekerjaan : Bronjong kawat galvanis pabrikasi
Satuan : M3
A. UPAH
1. Pekerja Org/Hari 2.250 65,000.00
2. Mandor Org/Hari 0.038 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type II Unit 0.667 711,033.51
Sub Total B
C. PERALATAN
Sub Total C
A. UPAH
1. Pekerja Org/Hari 3.375 65,000.00
2. Mandor Org/Hari 0.056 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type III Unit 0.444 973,188.34
Sub Total B
C. PERALATAN
Sub Total C
HARGA ( Rp. )
TOTAL
97,500.00
2,000.00
99,500.00
384,148.60
424,022.34
808,170.94
907,670.94
136,150.64
22,000.00
1,065,821.58
1,065,821.00
NALISA HARGA SATUAN PEKERJAAN
HARGA ( Rp. )
TOTAL
146,250.00
3,040.00
149,290.00
384,148.60
474,259.35
858,407.95
1,007,697.95
151,154.69
22,000.00
1,180,852.64
1,180,852.00
NALISA HARGA SATUAN PEKERJAAN
HARGA ( Rp. )
TOTAL
219,375.00
4,480.00
223,855.00
384,148.60
432,095.62
816,244.22
1,040,099.22
156,014.88
22,000.00
1,218,114.10
1,218,114.00
REKAPITULASI BIAYA
PROPINSI : SUMATERA UTARA
KABUPATEN : NIAS
DINAS : PEKERJAAN UMUM KABUPATEN NIAS
NAMA PROYEK : SUMATERA UTARA
JUMLAH BIAYA
NO URAIAN PEKERJAAN
(Rp.)
I. #REF! #REF!
V. #REF! #REF!
Terbilang Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh
0
0
0
### ###
### ###
### ###
### ###
### ###
### ###
###
### ###
### ###
#REF!
#REF!
#REF!
0
RENCANA ANGGARAN BIAYA
PROVINSI : SUMATERA UTARA
KABUPATEN / KOTA :
KECAMATAN :
DESA :
JENIS KEGIATAN :
VOLUME PENANGANAN :
SUMBER DANA :
BIAYA :
TAHUN ANGGARAN :
KODE
URAIAN H. SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Biaya Sewa Direksikeet Los Buruh Dan Gudang - Ls 1.00 2,500,000.00 2,500,000.00
2 Biaya Pengukuran Dan Pematokan - Ls 1.00 5,000,000.00 5,000,000.00
3 Pembersihan Semak Pada Damija K-210 m2 7,475.20 3,388.00 25,325,977.60
JLH. PEK. "I" 32,825,977.60
Terbilang : Empat Milyar Tujuh Puluh Tiga Juta Dua Ratus Empat Puluh Lima Ribu Rupiah
Disetujui : Diperiksa :
KUASA PENGGUNA ANGGARAN (KPA) / DIREKSI LAPANGAN
PEJABAT PEMBUAT KOMITMEN (PPK) DINAS PEKERJAAN UMUM
DINAS PEKERJAAN UMUM PEMERINTAH KABUPATEN NIAS
PEMERINTAH KABUPATEN NIAS
Diketahui :
Plt KEPALA DINAS PEKERJAAN UMUM KABUPATEN NIAS
MAZDAN ALMAHDALI, BE
NIP 19600221 198503 1 018