PEKERJAAN JUMLAH
NILAI PERSENTASE NILAI PERSENTASE
JALAN SEP. 70 M' 109,144,400.00 50% 109,308,900.00 50% 218,453,300.00
TPT SEP. 31 M' 33,357,500.00 70% 14,042,500.00 30% 47,400,000.00
BRONJONG SEP. 9 M' 77,733,900.00 50% 77,842,800.00 50% 155,576,700.00
TOTAL 220,235,800.00 201,194,200.00 421,430,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN KEGIATAN FISIK DANA DESA TA.2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
PEKERJAAN GALIAN PEMBENTUKAN BADAN JALAN, Sep. 95 M' x 4 M'
PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M'
Terbilang : Dua Ratus Delapan Belas Juta Empat Ratus Lima Puluh Tiga Ribu Tiga Ratus Rupiah
SISOBALAURU, 2021
KODE
URAIAN HARGA SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
PEKERJAAN GALIAN PEMBENTUKAN BADAN JALAN, Sep. 95 M' x 4 M'
PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M'
1 Pek. Pembersihan Semak pada Damija K-210
A. Upah
- Pekerja HOK 14.00 100,000.00 1,400,000.00
B. Bahan - - - -
C. Peralatan - - - -
B. Bahan
- Batu Gunung Belah 10/15 M3 42.00 187,500.00 7,875,000.00
- Batu Pecah 5/7 (Manual) M3 17.00 187,500.00 3,187,500.00
C. Peralatan
- Mobilisasi Kali 1.00 7,752,000.00 7,752,000.00
- Mesin gilas roda besi 6 - 8 T Jam 5.00 355,300.00 1,776,500.00
- Meteran uk. 50.0 m Bh 2.00 63,600.00 127,200.00
- Gerobak sorong Unit 10.00 605,500.00 6,055,000.00
- Sekop besar + gagang Bh 17.00 113,800.00 1,934,600.00
- Cangkul + gagang Bh 17.00 113,800.00 1,934,600.00
- Plengki Rotan Bh 26.00 20,700.00 538,200.00
- Gayung Aspal (kaleng) Bh 4.00 16,750.00 67,000.00
- Kaleng Siram Aspal Bh 4.00 33,500.00 134,000.00
- Sarung Tangan Pekerja (karet) Psg 26.00 14,800.00 384,800.00
- Tembilang/penggali + gagang Bh 14.00 66,900.00 936,600.00
- Pecok/Bolak baling + gagang Bh 15.00 139,400.00 2,091,000.00
- Martil Batu Uk. 3 Kg (godam) Bh 9.00 222,200.00 1,999,800.00
B. Bahan
- Batu Pecah 5/7 (Manual) M3 18.00 187,500.00 3,375,000.00
- Batu Pecah 3/5 (Manual) M3 10.00 225,000.00 2,250,000.00
C. Peralatan
- Mesin gilas roda besi 6 - 8 T Jam 3.00 355,300.00 1,065,900.00
B. Bahan
- Minyak Bakar Ltr 103.00 11,200.00 1,153,600.00
- Aspal KG 135.00 13,600.00 1,836,000.00
- Kayu Api/Kayu Bakar M3 1.50 120,000.00 180,000.00
C. Peralatan - - - -
B. Bahan
- Batu Pecah 3/5 (Manual) M3 11.00 225,000.00 2,475,000.00
- Kepala Pasir M3 1.00 181,300.00 181,300.00
- Aspal KG 1,149.00 13,600.00 15,626,400.00
- Kayu Api/Kayu Bakar M3 2.00 120,000.00 240,000.00
C. Peralatan
- Mesin gilas roda besi 6 - 8 T Jam 3.00 355,300.00 1,065,900.00
- Demobilisasi Kali 1.00 7,752,000.00 7,752,000.00
B. Bahan - - - -
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
Terbilang : Dua Ratus Delapan Belas Juta Empat Ratus Lima Puluh Tiga Ribu Tiga Ratus Rupiah
SISOBALAURU, 2021
SISOBALAURU, 2021
14.000
67.000
42.000
17.000
5.000
27.000
18.000
10.000
4.000
2.000
3.000
2.000
2.000
103.000
135.000
AAN
DIBULATKAN
10
33.000
2.000
11.000
6.000
3.000
1.000
1,149.000
3.000
27.000
32.000
90.000
449.000
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
K-210. Pengupasan Tanah dan Pembersihan Semak pada Damija
PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
L L P
1 2 3 4 5 6 7=(5x6)
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
LEBAR LEBAR
PANJANG KUANTITAS KOEF.
RATA - PENGHAM KUANTITAS
RATA BRUTO
PARAN
NO. STATION / LETAK SISI
(m) (m) ( M2 )
(m) ( m2 )
L L P ( Ltr/m2 )
1 2 3 4 5 6 7=(5x6) 8 9=(7x8)
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
L L P
1 2 3 4 5 6 7=(5x6)
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
Sketsa
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
0,30 0,30
0,40 0,40
0,50 3,00 0,50
POT. TIPIKAL MELINTANG PENGASPALAN JALAN
P0+000 - P0+087
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN PENGASPALAN JALAN RUAS JALAN UMUM, Sep. 87 M' x 3 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M
Sketsa
130
60
50
POT. TIPIKAL MELINTANG GALIAN PARIT TANAH
SEP. 223 M' (KANAN)
LEBAR
LEBAR TINGGI
BAWAH PANJANG
ATAS LUAS
LUAS RATA -
KUANTITAS
NO. STATION / LETAK SISI RATA
( m2 )
(m) ( M3 )
(m) (
(m) m2 )
(m)
L1 L2 T A P
1 2 3 4 5 6 7=(((4+5)/2)*6) 8 9 10=(8x9)
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M
Sketsa
130
60
50
POT. TIPIKAL MELINTANG GALIAN PARIT TANAH
SEP. 25 M' (KIRI)
LEBAR
LEBAR TINGGI
BAWAH PANJANG
ATAS LUAS
LUAS RATA -
KUANTITAS
NO. STATION / LETAK SISI RATA
( m2 )
(m) ( M3 )
(m) (
(m) m2 )
(m)
L1 L2 T A P
1 2 3 4 5 6 7=(((4+5)/2)*6) 8 9 10=(8x9)
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PARIT TANAH, Sep. 248 M
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PEMBENTUKAN BADAN JALAN, Sep. 95 M' x 4 M'
Sketsa
95 m'
30
4,00
POT. TIPIKAL MELINTANG GALIAN BADAN JALAN
P0+000
150
4,00
POT. TIPIKAL MELINTANG GALIAN BADAN JALAN
P0+048
30
4,00
POT. TIPIKAL MELINTANG GALIAN BADAN JALAN
P0+095
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEKERJAAN GALIAN PEMBENTUKAN BADAN JALAN, Sep. 95 M' x 4 M'
SISOBALAURU, 2021
B. Bahan
- Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 4.00 21,200.00 84,800.00
- Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 4.00 27,900.00 111,600.00
- Paku Biasa Kg 0.50 20,000.00 10,000.00
C. Peralatan
- Meteran uk. 5.0 m Bh 1.00 30,200.00 30,200.00
- Gerobak sorong Unit 2.00 605,500.00 1,211,000.00
- Sekop besar + gagang Bh 2.00 113,800.00 227,600.00
- Raskam besi Bh 2.00 50,200.00 100,400.00
- Raskam Plastik Bh 2.00 33,500.00 67,000.00
- Cangkul + gagang Bh 3.00 113,800.00 341,400.00
- Tembilang/penggali + gagang Bh 2.00 66,900.00 133,800.00
- Ember cor Bh 8.00 13,400.00 107,200.00
- Sendok Semen Bh 4.00 30,100.00 120,400.00
- Pecok/Bolak baling + gagang Bh 2.00 139,400.00 278,800.00
- Selang Ukur Glg 1.00 16,800.00 16,800.00
- Palu/Penokok Bh 2.00 46,900.00 93,800.00
- Drum Plastik 200 ltr (Tampungan Air Hujan) Bh 1.00 328,400.00 328,400.00
- Benang Tukang (Nilon) Glg 1.00 16,800.00 16,800.00
- Sarung Tangan Pekerja (karet) Psg 9.00 14,800.00 133,200.00
B. Bahan
- Semen PC Zak 75.00 99,300.00 7,447,500.00
- Pasir Pasangan M3 12.00 181,300.00 2,175,600.00
- Batu Gunung Belah 10/15 M3 28.00 187,500.00 5,250,000.00
C. Peralatan - - - -
B. Bahan
- Semen PC Zak 8.00 99,300.00 794,400.00
- Pasir Pasangan M3 2.00 181,300.00 362,600.00
C. Peralatan - - - -
B. Bahan
- Semen PC Zak 4.00 99,300.00 397,200.00
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
SISOBALAURU, 2021
SISOBALAURU, 2021
8.000
35.000
18.000
2.000
75.000
12.000
28.000
15.000
8.000
1.000
8.000
2.000
AAN
DIBULATKAN
10
10.000
5.000
1.000
4.000
6.000
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.3.2.1.2. Pemasangan 1 m3 batu belah campuran 1SP : 4PP
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 11.38
11.38
11.38
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 11.38
11.38
11.38
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Plasteran Permukaan
yang tampak Camp. 1 : 3
25 50
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.4.4.2.27. Pemasangan 1 m2 acian
PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
50 25 Plasteran Permukaan
yang tampak Camp. 1 : 3
& Acian
100
5 45 5 50
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. TEMBOK PENAHAN TANAH 2 Tpt Sep. 36.40 M' & Tinggi 1.50 M' (Kanan = 18.20 M' + Kiri = 18.20 M')
Sketsa
Plasteran Permukaan 25 50
yang tampak Camp. 1 : 3
& Acian
100
50 5 45 5
55
POT. TIPIKAL MELINTANG TEMBOK PENAHAN TANAH
SEP. 18,20 M' & TINGGI 1,50 M'
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.01
5.01
5.01
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN KEGIATAN FISIK DANA DESA TA.2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Terbilang : Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh Ratus Rupiah
SISOBALAURU, 2021
KODE
URAIAN HARGA SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
1 Pek. Galian Tanah A.2.3.1.1.
A. Upah
- Pekerja HOK 48.00 100,000.00 4,800,000.00
B. Bahan
- Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 18.00 21,200.00 381,600.00
- Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 36.00 27,900.00 1,004,400.00
- Paku Biasa Kg 2.00 20,000.00 40,000.00
C. Peralatan
- Meteran uk. 5.0 m Bh 1.00 30,200.00 30,200.00
- Meteran uk. 50.0 m Bh 1.00 63,600.00 63,600.00
- Gerobak Sorong Unit 4.00 605,500.00 2,422,000.00
- Sekop besar + gagang Bh 4.00 113,800.00 455,200.00
- Cangkul + gagang Bh 4.00 113,800.00 455,200.00
- Tembilang/penggali + gagang Bh 4.00 66,900.00 267,600.00
- Linggis Ulir Bh 4.00 39,100.00 156,400.00
- Pecok/Bolak baling + gagang Bh 5.00 139,400.00 697,000.00
- Sarung Tangan Pekerja (karet) Psg 9.00 14,800.00 133,200.00
- Selang Ukur Glg 1.00 16,800.00 16,800.00
- Palu/Penokok Bh 4.00 46,900.00 187,600.00
- Benang Tukang (Nilon) Glg 2.00 16,800.00 33,600.00
- Tang Kakak tua (pengikat kawat) Bh 4.00 42,925.00 171,700.00
- Unting unting Bh 2.00 22,300.00 44,600.00
- Plengki Rotan Bh 9.00 20,700.00 186,300.00
- Martil Batu Uk. 3 Kg (godam) Bh 4.00 222,200.00 888,800.00
B. Bahan
- Kayu Bulat Ø 7 cm - 8 cm Btg 42.00 8,400.00 352,800.00
C. Peralatan - - - -
B. Bahan
- Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 1.00 13,380,000.00 13,380,000.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 1 Unit 50.00 376,900.00 18,845,000.00
C. Peralatan - - - -
B. Bahan
- Kawat Bronjong Pabrikasi Type - 2 Unit 60.00 599,900.00 35,994,000.00
C. Peralatan - - - -
B. Bahan - - - -
C. Peralatan - - - -
Terbilang : Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh Ratus Rupiah
SISOBALAURU, 2021
SISOBALAURU, 2021
48.000
18.000
12.000
15.000
65.000
50.000
27.000
117.000
60.000
DIBULATKAN
10
9.000
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
100 50
100 50 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 11
Geotextile Non Woven 100 50 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 10
250 gr/m2
100 50 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 9
Timbunan Tanah 100 50 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 8
(dari Sisa Galian) 400 400
100 50 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 7
Pasangan Bronjong
dengan Kawat Pabrikasi 100 50 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 6
100 100 TYP E TYP E TYP E TYP E TYP E
50 50 50 1 X1 1 X1 1 X1 1 X1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 4
100 100 100 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 2 X 1 TYP E 2 X 1 LAYER 2
100 100 100 50 50 TYP E 1 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 TYP E 2 X 1 TYP E 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
1.00 63.00
63.00
63.00
2021
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.07.b Pemasangan Cerucuk Kayu Bulat (Ø 7cm - 8cm) 1 m
PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
100 50
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11
Geotextile Non Woven 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 10
250 gr/m2
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
Timbunan Tanah 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 8
(dari Sisa Galian) 400 400
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 7
Pasangan Bronjong
dengan Kawat Pabrikasi 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 6
100 100 TYPE TYPE TYPE TYPE TYPE
50 50 50 1 X1 1 X1 1 X1 1 X1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
100 50
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11
Geotextile Non Woven 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 10
250 gr/m2
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
Timbunan Tanah 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 8
(dari Sisa Galian) 400 400
100 50 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 7
Pasangan Bronjong
dengan Kawat Pabrikasi 100 50 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 6
100 100 TYPE TYPE TYPE TYPE TYPE
50 50 50 1 X1 1 X1 1 X1 1 X1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 1 X1
LAYER 5
100 100 100 MTA 50 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
Galian Pondasi 100 100 100 50 150 150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2
100 100 100 50 50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1
50 300
Cerucuk Kayu Bulat
Ø 7cm - 8cm
350 350
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4 LAYER 5
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4
Tampak Depan Bronjong TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 2
VOLUME KUANTITAS
JUMLAH
NO. STATION / LETAK SISI (M3)
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 1 Kanan 2.00 1.00 0.50 9.00 9.00 9.00
2 LAPIS - 2 Kanan 2.00 1.00 0.50 6.00 6.00 6.00
3 LAPIS - 3 Kanan 2.00 1.00 0.50 9.00 9.00 9.00
4 LAPIS - 4 Kanan 2.00 1.00 0.50 6.00 6.00 6.00
5 LAPIS - 5 Kanan 2.00 1.00 0.50 5.00 5.00 5.00
6 LAPIS - 6 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
7 LAPIS - 7 Kanan 2.00 1.00 0.50 4.00 4.00 4.00
8 LAPIS - 8 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
9 LAPIS - 9 Kanan 2.00 1.00 0.50 4.00 4.00 4.00
10 LAPIS - 10 Kanan 2.00 1.00 0.50 1.00 1.00 1.00
Jumlah halaman ini 46.00 46.00
Jumlah s/d halaman ini
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4 LAYER 5
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4
Tampak Depan Bronjong TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 2
VOLUME KUANTITAS
JUMLAH (M3)
NO. STATION / LETAK SISI
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
11 LAPIS - 11 Kanan 2.00 1.00 0.50 4.00 4.00 4.00
12 LAPIS - 12 Kanan 2.00 1.00 0.50 1.00
13 LAPIS - 13 Kanan 2.00 1.00 0.50 4.00
14 LAPIS - 14 Kanan 2.00 1.00 0.50 1.00
15 LAPIS - 15 Kanan 2.00 1.00 0.50 4.00
16 LAPIS - 16 Kanan 2.00 1.00 0.50 1.00
17 LAPIS - 17 Kanan 2.00 1.00 0.50 4.00
SISOBALAURU, 2021
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.06.b.4.(1) Pasangan bronjong pabrikasi Type - 1 uk. (2,0 mm x 1,0 mm x 0,5 mm)
PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4 LAYER 5
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4
Tampak Depan Bronjong TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 2
VOLUME KUANTITAS
JUMLAH
NO. STATION / LETAK SISI (M3)
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 1 Kanan 3.00 1.00 0.50 8.00 12.00 8.00
2 LAPIS - 2 Kanan 3.00 1.00 0.50 10.00 15.00 10.00
3 LAPIS - 3 Kanan 3.00 1.00 0.50 8.00 12.00 8.00
4 LAPIS - 4 Kanan 3.00 1.00 0.50 10.00 15.00 10.00
5 LAPIS - 5 Kanan 3.00 1.00 0.50 6.00 9.00 6.00
6 LAPIS - 6 Kanan 3.00 1.00 0.50 4.00 6.00 4.00
7 LAPIS - 7 Kanan 3.00 1.00 0.50 2.00 3.00 2.00
8 LAPIS - 8 Kanan 3.00 1.00 0.50 4.00 6.00 4.00
9 LAPIS - 9 Kanan 3.00 1.00 0.50 2.00 3.00 2.00
10 LAPIS - 10 Kanan 3.00 1.00 0.50 4.00 6.00 4.00
Jumlah halaman ini 87.00 58.00
Jumlah s/d halaman ini
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 11 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 9
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 1 X 1
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 4 LAYER 5
TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 3
150 50 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1 LAYER 2 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 2 X 1 TYPE 2 X 1
50 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 1 TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 4
Tampak Depan Bronjong TYPE 1 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 TYPE 2 X 1 TYPE 1 X 1 LAYER 2
VOLUME KUANTITAS
JUMLAH
NO. STATION / LETAK SISI (M3)
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
11 LAPIS - 11 Kanan 3.00 1.00 0.50 2.00 3.00 2.00
12 LAPIS - 12 Kanan 3.00 1.00 0.50 4.00
13 LAPIS - 13 Kanan 3.00 1.00 0.50 2.00
14 LAPIS - 14 Kanan 3.00 1.00 0.50 4.00
15 LAPIS - 15 Kanan 3.00 1.00 0.50 2.00
16 LAPIS - 16 Kanan 3.00 1.00 0.50 4.00
17 LAPIS - 17 Kanan 3.00 1.00 0.50 2.00
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN :
KABUPATEN / KOTA :
PROVINSI :
NO. RAB : PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
BIDANG :
KEGIATAN :
### :
### :
Sketsa
VOLUME KUANTITAS
JUMLAH
NO. STATION / LETAK SISI (M3)
P ( L (m T n V
m4 ) ) (m ) ( UNIT )
1 2 3 5 6 7 8=(4x5x6x7) 9=7
1 LAPIS - 4 Kanan 3.00 1.50 0.50 3.00 6.75 3.00
2 LAPIS - 6 Kanan 3.00 1.50 0.50 3.00 6.75 3.00
3
4
5
6
7
8
9
10
Jumlah halaman ini 13.50 6.00
Jumlah s/d halaman ini 13.50 6.00
0 0
0 0
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. P.06.b.4.(3) Pasangan bronjong pabrikasi Type - 3 uk. (3,0 mm x 1,5 mm x 0,5 mm)
PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
DESA : SISOBALAURU
KECAMATAN :
KABUPATEN / KOTA :
PROVINSI :
NO. RAB : PEK. BRONJONG PENAHAN 1 Tpt Sep. 9 M'
BIDANG :
KEGIATAN :
### :
### :
0 0
TAKE OF SHEET (TOS)
PERHITUNGAN VOLUME
SNI. A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
Timbunan Tanah
(dari Sisa Galian) 50 50 50 50
50
50
50
50
MTA
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
50
50 Timbunan Tanah
(dari Sisa Galian)
38
MTA
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
88
50 Timbunan Tanah
(dari Sisa Galian)
82
MTA
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
KEGIATAN : PEK. BRONJONG PENAHAN 1 Tpt Sep. 14 M' & Tinggi 5.50 M'
Sketsa
32
Timbunan Tanah
41
(dari Sisa Galian)
MTA
SISOBALAURU, 2021
(n) (m3)
18 19=(16x17x18)
4.00 7.00
7.00
2021
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 3.08
3.08
2021
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 5.95
5.95
2021
JUMLAH KUANTITAS
(n) (m3)
18 19=(16x17x18)
1.00 0.67
0.67
16.70
2021
DAFTAR HARGA BAHAN/MATERIAL, ALAT BANTU, SEWA ALAT BERAT DAN UPAH
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
HARGA UPAH
No Uraian Tenaga Kerja Sat. Keterangan Produktifitas
(Rp.)
A. UPAH TENAGA KERJA :
1 Pekerja OH 100,000 1 HARI = 8 JAM KERJA
2 Tukang Kayu, Batu dan Besi OH 120,000 1 HARI = 8 JAM KERJA
3 Tukang Siram Aspal OH 225,000 1 HARI = 8 JAM KERJA
4 Kepala Tukang OH 140,000 1 HARI = 8 JAM KERJA
A1. UPAH TENAGA KERJA PENGUMPUL :
1 Batu Kali/Sungai belah 15-20 cm OH 150,000.00 1 HARI = 8 JAM KERJA
2 Tanah Timbunan Biasa OH 72,600.00 1 HARI = 8 JAM KERJA
A2. UPAH TENAGA KERJA PEMECAH BATU :
1 Batu Kali/Sungai belah 15-20 cm OH 150,000.00 1 HARI = 8 JAM KERJA
2 Batu Gunung belah 10-15 cm OH 150,000.00 1 HARI = 8 JAM KERJA
3 Batu Pecah 5-7 cm Jenis Keras (Manual) OH 150,000.00 1 HARI = 8 JAM KERJA
4 Batu Pecah 3-5 cm Jenis Keras (Manual) OH 180,000.00 1 HARI = 8 JAM KERJA
5 Batu Pecah 2-3 cm Jenis Keras (Manual) OH 270,000.00 1 HARI = 8 JAM KERJA
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) OH 484,000.00 1 HARI = 8 JAM KERJA
A3. UPAH TENAGA KERJA PENGGALIAN :
1 Tanah Timbunan Biasa OH 72,600.00 1 HARI = 8 JAM KERJA
A4. UPAH ANGKUT / PIKUL PUNDAK TENAGA MANUSIA SAMPAI DI LOKASI PEKERJAAN :
1 Batu Kali/Sungai belah 15-20 cm OH 56,250.00 1 HARI = 8 JAM KERJA
2 Batu Gunung belah 10-15 cm OH 56,250.00 1 HARI = 8 JAM KERJA
3 Batu Pecah 5-7 cm Jenis Keras (Manual) OH 56,250.00 1 HARI = 8 JAM KERJA
4 Batu Pecah 3-5 cm Jenis Keras (Manual) OH 56,250.00 1 HARI = 8 JAM KERJA
5 Batu Pecah 2-3 cm Jenis Keras (Manual) OH 56,250.00 1 HARI = 8 JAM KERJA
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) OH 56,250.00 1 HARI = 8 JAM KERJA
7 Kepala Pasir OH 56,250.00 1 HARI = 8 JAM KERJA
8 Pasir Pasangan OH 56,250.00 1 HARI = 8 JAM KERJA
9 Tanah Timbunan Biasa OH 187,500.00 1 HARI = 8 JAM KERJA
10 Semen Portland @50 kg Type PCC OH 6,000.00 1 HARI = 8 JAM KERJA
11 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) OH 1,350.00 1 HARI = 8 JAM KERJA
12 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m OH 900.00 1 HARI = 8 JAM KERJA
13 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' OH 900.00 1 HARI = 8 JAM KERJA
DAFTAR HARGA BAHAN/MATERIAL, ALAT BANTU, SEWA ALAT BERAT DAN UPAH
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
(Rp.) (Rp.)
B. BAHAN :
B1. MATERIAL / BAHAN YANG DIDATANGKAN :
1 Batu Gunung belah 15-20 cm M³ 187,500 326,400 KEC. HILIDUHO (Ds. Sisobahili)
2 Batu Gunung belah 10-15 cm M³ 187,500 326,400 KEC. HILIDUHO (Ds. Sisobahili)
3 Batu Pecah 5-7 cm Jenis Keras (Manual) M³ 187,500 357,000 KEC. HILIDUHO (Ds. Sisobahili)
4 Batu Pecah 3-5 cm Jenis Keras (Manual) M³ 225,000 357,000 KEC. HILIDUHO (Ds. Sisobahili)
5 Base B M³ 681,300 351,900 KEC. HILIDUHO (Ds. Hiligodu)
6 Kerikil Sungai di saring, uk. 0.5 - 2 cm M³ 187,500 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
7 Kerikil Sungai tidak di saring M³ 150,000 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
8 Kepala Pasir M³ 181,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
9 Pasir Pasangan M³ 181,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
10 Pasir Urug M³ 136,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
11 Sirtu M³ 136,300 249,900 KEC. HILIDUHO (Ds. Ononamolo-I)
12 Tanah Timbunan Biasa M³ 90,800 147,900 KEC. HILIDUHO
13 Kayu Jenis Keras M³ 3,345,000 122,400 KEC. HILIDUHO
14 Kayu Sembarang (Tanpa Jenis) M³ 2,676,000 122,400 KEC. HILIDUHO
15 Kayu Api/Kayu Bakar M³ 120,000 122,400 KEC. HILIDUHO
16 Batang Kelapa uk. Ø 20/25 cm Btg 190,000 20,400 KEC. HILIDUHO
17 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) Btg 8,400 1,700 KEC. HILIDUHO
18 Kayu Bulat Ø 10-15 cm; 3,5 m Btg 12,000 3,400 KEC. HILIDUHO
19 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 21,200 1,000 KEC. HILIDUHO
20 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 27,900 1,300 KEC. HILIDUHO
B2. MATERIAL (PABRIKASI / TOKO / DISTRIBUTOR) :
1 Semen Portland @50 kg Type PCC Zak 99,300 10,000 GUNUNGSITOLI
2 Kawat Beton/Kawat Ikat Kg 29,000 - GUNUNGSITOLI
3 Kawat Bronjong Pabrikasi Type - 1 Unit 376,900 9,400 GUNUNGSITOLI
4 Kawat Bronjong Pabrikasi Type - 2 Unit 599,900 14,200 GUNUNGSITOLI
5 Kawat Bronjong Pabrikasi Type - 3 Unit 780,500 19,300 GUNUNGSITOLI
6 Paku Biasa Kg 20,000 - GUNUNGSITOLI
7 Aspal Kg 13,600 600 GUNUNGSITOLI
8 Minyak Solar (Non Subsidi) Ltr 9,400 - GUNUNGSITOLI
9 Minyak Bakar / Tanah (Non Subsidi) Ltr 11,200 - GUNUNGSITOLI
10 Minyak Bensin Ltr 6,500 - GUNUNGSITOLI
11 Minyak Pelumas/Olie Ltr 44,600 - GUNUNGSITOLI
12 Minyak Bekisting Kg 10,100 - GUNUNGSITOLI
13 Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 13,380,000 68,100 GUNUNGSITOLI
DAFTAR HARGA BAHAN/MATERIAL, ALAT BANTU, SEWA ALAT BERAT DAN UPAH
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
HARGA SEWA,
MOBILISASI DAN Keterangan Produktifitas
No Uraian Alat Berat Sat. DEMOBILISASI + PPh
(Rp.)
D. SEWA ALAT BERAT :
1 HARI = 5 JAM KERJA
1 Mesin gilas roda besi 6 - 8 T Jam 355,300
(ANL. K - BM Thn.1995)
2 Mobilisasi Ls 7,752,000 1 KALI
3 Demobilisasi Ls 7,752,000 1 KALI
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
Ketua
DAFTAR ANALISA HARGA UPAH TENAGA KERJA
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
A4. UPAH ANGKUT / PIKUL PUNDAK TENAGA MANUSIA SAMPAI DI LOKASI PEKERJAAN
1 Batu Kali/Sungai belah 15-20 cm OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
2 Batu Gunung belah 10-15 cm OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
3 Batu Pecah 5-7 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
4 Batu Pecah 3-5 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
5 Batu Pecah 2-3 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
6 Batu Kali Pecah 1-2 cm Jenis Keras (Manual) OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
7 Kepala Pasir OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
8 Pasir Pasangan OH 375,000.00 0.15 56,250.00 56,250.00 56,250.00 1 HARI = 8 JAM KERJA
9 Tanah Timbunan Biasa OH 375,000.00 0.50 187,500.00 187,500.00 187,500.00 1 HARI = 8 JAM KERJA
10 Semen Portland @50 kg Type PCC OH 40,000.00 0.15 6,000.00 6,000.00 6,000.00 1 HARI = 8 JAM KERJA
11 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) OH 9,000.00 0.15 1,350.00 1,350.00 1,350.00 1 HARI = 8 JAM KERJA
12 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m OH 6,000.00 0.15 900.00 900.00 900.00 1 HARI = 8 JAM KERJA
13 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' OH 6,000.00 0.15 900.00 900.00 900.00 1 HARI = 8 JAM KERJA
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Km) (Rp.) (Km) (Rp.) (Rp.) (Rp.)
B. BAHAN :
B1. MATERIAL / BAHAN YANG DIDATANGKAN :
1 Batu Gunung belah 15-20 cm M³ 150,000 37,500 - - 187,500 - - 10.00 320,000 6,400 326,400 I-a
2 Batu Gunung belah 10-15 cm M³ 150,000 37,500 - - 187,500 - - 10.00 320,000 6,400 326,400 I-a
3 Batu Pecah 5-7 cm Jenis Keras (Manual) M³ 150,000 37,500 - - 187,500 - - 10.00 350,000 7,000 357,000 I-a
4 Batu Pecah 3-5 cm Jenis Keras (Manual) M³ 180,000 45,000 - - 225,000 - - 10.00 350,000 7,000 357,000 I-a
5 Base B M³ 545,000 136,300 - - 681,300 - - 11.00 345,000 6,900 351,900 I-a
6 Kerikil Sungai di saring, uk. 0.5 - 2 cm M³ 150,000 37,500 - - 187,500 - - 7.00 245,000 4,900 249,900 I-a
7 Kerikil Sungai tidak di saring M³ 120,000 30,000 - - 150,000 - - 7.00 245,000 4,900 249,900 I-a
8 Kepala Pasir M³ 145,000 36,300 - - 181,300 - - 7.00 245,000 4,900 249,900 I-a
9 Pasir Pasangan M³ 145,000 36,300 - - 181,300 - - 7.00 245,000 4,900 249,900 I-a
10 Pasir Urug M³ 109,000 27,300 - - 136,300 - - 7.00 245,000 4,900 249,900 I-a
11 Sirtu M³ 109,000 27,300 - - 136,300 - - 7.00 245,000 4,900 249,900 I-a
12 Tanah Timbunan Biasa M³ 72,600 18,200 - - 90,800 - - 3.00 145,000 2,900 147,900 I-a
13 Kayu Jenis Keras M³ 3,000,000 - 300,000 45,000 3,345,000 - - 3.00 120,000 2,400 122,400 I-a
14 Kayu Sembarang (Tanpa Jenis) M³ 2,400,000 - 240,000 36,000 2,676,000 - - 3.00 120,000 2,400 122,400 I-a
15 Kayu Api/Kayu Bakar M³ 120,000 - - - 120,000 - - 3.00 120,000 2,400 122,400 I-a
16 Batang Kelapa uk. Ø 20/25 cm Btg 190,000 - - - 190,000 - - 3.00 20,000 400 20,400 I-a
17 Kayu Bulat Ø 7 - 8 cm; 3,5 m (dolo-dolo) Btg 8,400 - - - 8,400 - - 3.00 1,600 100 1,700 I-a
18 Kayu Bulat Ø 10-15 cm; 3,5 m Btg 12,000 - - - 12,000 - - 3.00 3,300 100 3,400 I-a
19 Papan Bekisting,uk. 0.20 m x 0.02 m x 2.0 m Lbr 19,000 - 1,900 300 21,200 - - 3.00 900 100 1,000 I-a
20 Kayu segi/Broti, uk. 5 - 7 cm. Pjg. 3.00 M' Btg 25,000 - 2,500 400 27,900 - - 3.00 1,200 100 1,300 I-a
B2. MATERIAL (PABRIKASI / TOKO / DISTRIBUTOR)
1 Semen Portland @50 kg Type PCC Zak 89,000 - 8,900 1,400 99,300 - - - - - 10,000 I-b
2 Kawat Beton/Kawat Ikat Kg 26,000 - 2,600 400 29,000 - - - - - - I-b
3 Kawat Bronjong Pabrikasi Type - 1 Unit 338,000 - 33,800 5,100 376,900 20.00 5,500 10.00 3,700 200 9,400 I-b
4 Kawat Bronjong Pabrikasi Type - 2 Unit 538,000 - 53,800 8,100 599,900 20.00 8,300 10.00 5,600 300 14,200 I-b
5 Kawat Bronjong Pabrikasi Type - 3 Unit 700,000 - 70,000 10,500 780,500 20.00 11,300 10.00 7,600 400 19,300 I-b
6 Paku Biasa Kg 17,900 - 1,800 300 20,000 - - - - - - I-b
7 Aspal Kg 12,100 - 1,300 200 13,600 20.00 300 10.00 200 100 600 I-b
8 Minyak Solar (Non Subsidi) Ltr 9,400 - - - 9,400 - - - - - - I-b
9 Minyak Bakar / Tanah (Non Subsidi) Ltr 11,200 - - - 11,200 - - - - - - I-b
10 Minyak Bensin Ltr 6,500 - - - 6,500 - - - - - - I-b
11 Minyak Pelumas/Olie Ltr 40,000 - 4,000 600 44,600 - - - - - - I-b
12 Minyak Bekisting Kg 9,000 - 900 200 10,100 - - - - - - I-b
13 Geotextile Non Woven 250 gr/m2 (4mx100m) Roll 12,000,000 - 1,200,000 180,000 13,380,000 20.00 39,700 10.00 27,000 1,400 68,100 I-b
Biaya angkut dengan truk
PAJAK MBLB PPN PPh 22 HARGA TOTAL PPh 23 BIAYA TOTAL
Harga
BAHAN, Bukit ONGKOS
Bahan/Material, Alat
MATERIAL DAN ANGKUT Kategori
No Jenis Bahan Sat. Sedang Jelek
ALAT BANTU DENGAN TRUK Biaya
di Quarry/toko
(Termasuk Pajak) (Termasuk Pajak)
25% 10% 1,5 % Jarak Angkut Ongkos Angkut Jarak Angkut Ongkos Angkut 2%
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Km) (Rp.) (Km) (Rp.) (Rp.) (Rp.)
C. ALAT BANTU (TOKO / DISTRIBUTOR)
1 Meteran uk. 5.0 m Bh 27,000 - 2,700 500 30,200 - - - - - - II - a
2 Meteran uk. 50.0 m Bh 57,000 - 5,700 900 63,600 - - - - - - II - a
3 Sendok Semen Bh 26,900 - 2,700 500 30,100 - - - - - - II - a
4 Raskam Besi Bh 45,000 - 4,500 700 50,200 - - - - - - II - a
5 Raskam Plastik Bh 30,000 - 3,000 500 33,500 - - - - - - II - a
6 Sekop besar + gagang Bh 102,000 - 10,200 1,600 113,800 - - - - - - II - a
7 Cangkul + gagang Bh 102,000 - 10,200 1,600 113,800 - - - - - - II - a
8 Martil Batu Uk. 3 Kg (godam) Bh 199,200 - 20,000 3,000 222,200 - - - - - - II - a
9 Tembilang/penggali + gagang Bh 60,000 - 6,000 900 66,900 - - - - - - II - a
10 Pecok/Bolak baling + gagang Bh 125,000 - 12,500 1,900 139,400 - - - - - - II - a
11 Linggis Ulir Bh 35,000 - 3,500 600 39,100 - - - - - - II - a
12 Palu/Penokok Bh 42,000 - 4,200 700 46,900 - - - - - - II - a
13 Drum Plastik 200 ltr (Tampungan Air Hujan) Bh 294,400 - 29,500 4,500 328,400 - - - - - - II - a
14 Selang Ukur Glg 15,000 - 1,500 300 16,800 - - - - - - II - a
15 Tenda / Terpal Plastik A2 uk. 4 x 6 m Lbr 150,000 - 15,000 2,300 167,300 - - - - - - II - a
16 Sarung Tangan Pekerja (karet) Psg 13,200 - 1,400 200 14,800 - - - - - - II - a
17 Gerobak Sorong Unit 543,000 - 54,300 8,200 605,500 - - - - - - II - a
18 Plengki Rotan Bh 18,500 - 1,900 300 20,700 - - - - - - II - a
19 Ember Cor Bh 12,000 - 1,200 200 13,400 - - - - - - II - a
20 Kaleng Siram Aspal Bh 30,000 - 3,000 500 33,500 - - - - - - II - a
21 Gayung Aspal (kaleng) Bh 14,950 - 1,500 300 16,750 - - - - - - II - a
22 Gergaji Bh 45,000 - 4,500 700 50,200 - - - - - - II - a
23 Waterpass Bh 51,000 - 5,100 800 56,900 - - - - - - II - a
24 Unting unting Bh 20,000 - 2,000 300 22,300 - - - - - - II - a
25 Tang Kakak tua (pengikat kawat) Bh 38,425 - 3,900 600 42,925 - - - - - - II - a
26 Pahat Batu Bh 20,000 - 2,000 300 22,300 - - - - - - II - a
27 Benang Tukang (Nilon) Glg 15,000 - 1,500 300 16,800 - - - - - - II - a
SISOBALAURU, 2021
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
Sumber Quarry/toko
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
GUNUNGSITOLI
DAFTAR ANALISA HARGA MOBILISASI, DEMOBILISASI DAN SEWA ALAT BERAT
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
PPh 23
1 Mesin gilas roda besi 6 - 8 T Jam 348,400.00 6,900.00 355,300.00 355,300.00 355,300.00
SISOBALAURU, 2021
DESA : SISOBALAURU
KECAMATAN : HILIDUHO
KABUPATEN / KOTA : NIAS
PROVINSI : SUMATERA UTARA
NO. RAB :
BIDANG : PEMBANGUNAN DESA
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 800,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 800,000,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 60,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 20,000.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 9,400.00 Liter
6. Minyak Pelumas Mp 44,600.00 Liter
SISOBALAURU, 2021
Keterangan
Luar Desa
Luar Desa
Material Lokal
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Luar Desa
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Material Lokal
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
Gunungsitoli
TERMASUK
ATERIAL
KET.
Sampai Lokasi
Sampai Lokasi
Sampai Lokasi
Sampai Lokasi
OR PC 210
AGUSTUS 2020
URAIAN ANALISA ALAT
11.
12.
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 4.50 Kilometer
7.00 Km = a C 7.00 Km = b
A B
1.00 Km = c
Base Camp --------->
D
Kalkulasi Jarak Rata-Rata =
20 ....................................
21 ....................................
22 ....................................
ORMASI
.............
meter
meter
ode Pelaksanaan)
ANALISA HARGA SATUAN PEKERJAAN
Analisa : Tambahan I
Pekerjaan : Bronjong kawat galvanis pabrikasi
Satuan : M3
A. UPAH
1. Pekerja Org/Hari 1.500 65,000.00
2. Mandor Org/Hari 0.025 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type I Unit 1.000 424,022.34
Sub Total B
C. PERALATAN
Sub Total C
Analisa : Tambahan II
Pekerjaan : Bronjong kawat galvanis pabrikasi
Satuan : M3
A. UPAH
1. Pekerja Org/Hari 2.250 65,000.00
2. Mandor Org/Hari 0.038 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type II Unit 0.667 711,033.51
Sub Total B
C. PERALATAN
Sub Total C
A. UPAH
1. Pekerja Org/Hari 3.375 65,000.00
2. Mandor Org/Hari 0.056 80,000.00
Sub Total A
B. BAHAN
1. Batu kali M3 1.100 349,226.00
2. Kawat bronjong pabrikasi Type III Unit 0.444 973,188.34
Sub Total B
C. PERALATAN
Sub Total C
HARGA ( Rp. )
TOTAL
97,500.00
2,000.00
99,500.00
384,148.60
424,022.34
808,170.94
907,670.94
136,150.64
22,000.00
1,065,821.58
1,065,821.00
NALISA HARGA SATUAN PEKERJAAN
HARGA ( Rp. )
TOTAL
146,250.00
3,040.00
149,290.00
384,148.60
474,259.35
858,407.95
1,007,697.95
151,154.69
22,000.00
1,180,852.64
1,180,852.00
NALISA HARGA SATUAN PEKERJAAN
HARGA ( Rp. )
TOTAL
219,375.00
4,480.00
223,855.00
384,148.60
432,095.62
816,244.22
1,040,099.22
156,014.88
22,000.00
1,218,114.10
1,218,114.00
REKAPITULASI BIAYA
PROPINSI : SUMATERA UTARA
KABUPATEN : NIAS
DINAS : PEKERJAAN UMUM KABUPATEN NIAS
NAMA PROYEK : SUMATERA UTARA
JUMLAH BIAYA
NO URAIAN PEKERJAAN
(Rp.)
I. #REF! #REF!
V. #REF! #REF!
Terbilang Seratus Lima Puluh Lima Juta Lima Ratus Tujuh Puluh Enam Ribu Tujuh
0
0
0
### ###
### ###
### ###
### ###
### ###
### ###
###
### ###
### ###
#REF!
#REF!
#REF!
0
RENCANA ANGGARAN BIAYA
PROVINSI : SUMATERA UTARA
KABUPATEN / KOTA :
KECAMATAN :
DESA :
JENIS KEGIATAN :
VOLUME PENANGANAN :
SUMBER DANA :
BIAYA :
TAHUN ANGGARAN :
KODE
URAIAN H. SATUAN JLH. HARGA
NO ANALISA SAT. VOLUME
PEKERJAAN
PEKERJAAN Rp. Rp.
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Biaya Sewa Direksikeet Los Buruh Dan Gudang - Ls 1.00 2,500,000.00 2,500,000.00
2 Biaya Pengukuran Dan Pematokan - Ls 1.00 5,000,000.00 5,000,000.00
3 Pembersihan Semak Pada Damija K-210 m2 7,475.20 3,388.00 25,325,977.60
JLH. PEK. "I" 32,825,977.60
Terbilang : Empat Milyar Tujuh Puluh Tiga Juta Dua Ratus Empat Puluh Lima Ribu Rupiah
Disetujui : Diperiksa :
KUASA PENGGUNA ANGGARAN (KPA) / DIREKSI LAPANGAN
PEJABAT PEMBUAT KOMITMEN (PPK) DINAS PEKERJAAN UMUM
DINAS PEKERJAAN UMUM PEMERINTAH KABUPATEN NIAS
PEMERINTAH KABUPATEN NIAS
Diketahui :
Plt KEPALA DINAS PEKERJAAN UMUM KABUPATEN NIAS
MAZDAN ALMAHDALI, BE