HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
IV PEKERJAAN BETON
1 Pek. Sloof, Uk. 15 x 20 cm beton bertulang 1 Pc : 2 Psr : 3 Krl 0.62 M3 5,462,200.00 3,386,564.00
1 Pek. Kolom teras, Uk. 20 x 20 cm beton bertulang 1 Pc : 2 Psr : 3 Krl 0.06 M3 5,462,200.00 327,732.00
1
2 Pek. Kolom praktis, Uk. 12 x 12 cm beton bertulang 1 Pc : 2 Psr : 3 Krl 22.00 M 88,635.00 1,949,970.00
3 Pek. Balok , beton bertulang 1 Pc : 2 Psr : 3 Krl 5.40 M1 111,990.00 604,746.00
4 Pek. Ring balok, Uk.10 x 15 cm beton bertulang 1 Pc : 2 Psr : 3 Krl 24.00 M1 111,990.00 2,687,760.00
5 Pek. Plat beton bertulang 1 Pc : 2 Psr : 3 Krl 0.61 M3 5,961,350.00 3,636,423.50
Jumlah 12,593,195.50
V PEKERJAAN PLESTERAN
1 Pek. Plesteran dinding trasram camp. 1 Pc : 2 Ps T. 15 mm 10.54 M2 108,888.80 1,147,687.95
2 Pek. Plesteran dinding camp. 1 Pc : 5 Ps T. 15 mm 113.40 M2 78,240.80 8,872,506.72
Jumlah 10,020,194.67
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
VI PEKERJAAN KUSEN/JENDELA/KACA
3
1 Pek. Kosen pintu , jendela kayu Kalapi/sejenis 0.67 M 7,981,250.00 5,347,437.50
2 Pek. Pintu panil kayu jati 6.40 M2 615,000.00 3,936,000.00
3 Pek. Bingkai jendela kaca kayu jati 1.60 M2 453,000.00 724,800.00
2
4 Pek. Pas. Kaca bening 5 mm 3.75 M 101,600.00 10,008,237.50
Jumlah 20,016,475.00
IX PEKERJAAN PENGGANTUNG/PENGUNCI
1 Pas. Kunci pintu 2 x putar 4.00 Buah 180,900.00 723,600.00
2 Pas. Engsel pintu dalam type kupu-kupu standar 12.00 Buah 47,850.00 574,200.00
3 Pas. Engsel jendela type kupu-kupu standard 10.00 Buah 36,900.00 369,000.00
4 Pas. Grendel jendela standard 5.00 Buah 32,850.00 164,250.00
5 Pas. Kait angin jendela standard 10.00 Buah 27,850.00 278,500.00
Jumlah 2,109,550.00
X PEKERJAAN SANITAIR
1 Pas. Kloset jongkok 1.00 Buah 393,200.00 393,200.00
2 Pas. Kran air 1.00 Buah 75,050.00 75,050.00
3 Pas. Floor drain 1.00 Buah 46,900.00 46,900.00
4 Pas. Septicktank + Peresapan 1.00 Unit 600,000.00 600,000.00
Jumlah 1,115,150.00
`
XI PEKERJAAN PENGECATAN / FINISHING
1 Pek. Cat tembok 3 x jalan 123.94 M2 14,530.00 1,800,848.20
2
2 Pek. Cat dasar/kilap kosen 3 x jalan 6.20 M 19,780.00 122,636.00
3 Pek. Cat dasar/kilap Plafond 3 x jalan 37.00 M2 14,530.00 537,610.00
4 Pek. Vernis daun pintu/jendela 3 x jalan 12.80 M2 34,400.00 440,320.00
Jumlah 2,901,414.20
PEKERJAAN : -
LOKASI : -
TAHUN : -
-
Jumlah Harga Bahan -
C PERALATAN
-
-
Jumlah Harga Alat -
D Jumlah ( A + B + ) 45,000.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 45,000.00
A.4.4.1.10. Pemasangan 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1/2 batu campuran 1
SP : 5 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L. 01 OH 0.3000 60,000.00 18,000.00
2 Tukang L. 02 OH 0.1000 70,000.00 7,000.00
3 Kepala Tukang L. 03 OH 0.0100 - -
4 Mandor L. 04 OH 0.0150 - -
Jumlah Tenaga Kerja 25,000.00
B BAHAN
3
1 Bata merah M 70.0000 450.00 31,500.00
2 Semen portland Kg 9.6000 6,200.00 59,520.00
3 Pasir pasang M3 0.0450 100,000.00 4,500.00
Jumlah Harga Bahan 95,520.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + ) 120,520.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 120,520.00
ANL.SUPL Pemasangan 1 buah roster beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L. 01 OH 0.0150 60,000.00 900.00
2 Tukang L. 02 OH 0.1500 70,000.00 10,500.00
3 Kepala Tukang L. 03 OH 0.0150 - -
4 Mandor L. 04 OH 0.0008 - -
Jumlah Tenaga Kerja 11,400.00
B BAHAN
1 Beton roster Bh 1.0000 7,500.00 7,500.00
-
Jumlah Harga Bahan 7,500.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + ) 18,900.00
E Overhead & Profit 0% x D -
F Harga Satuan Pekerjaan ( D + E ) 18,900.00
A.4.7.1.10. Pengecatan 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat pentup)
Dibuat Oleh :
…....................................
…................
DAFTAR UPAH KERJA DAN HARGA BAHAN
PEKERJAAN : -
LOKASI : -
TAHUN : -
HARGA
NO. U R A I A N SATUAN
SATUAN
I UPAH TENAGA KERJA
1 Pekerja OH Rp 60,000.00
2 Tukang OH Rp 70,000.00
II HARGA BAHAN
1 Tanah Timbunan Biasa M3 Rp 45,000.00
2 Pasir Urug M3 Rp 85,000.00
3 Pasir Pasang M3 Rp 100,000.00
4 Pasir Beton M3 Rp 100,000.00
5 Portland Cement (PC) 50 Kg Kg Rp 6,200.00
3
6 Kerikil Beton/Suplit 2 - 3 cm M Rp 115,000.00
7 Batu Gunung M3 Rp 110,000.00
8 Batu Bata Bh Rp 450.00
9 Beton Roster Standar Bh Rp 7,500.00
10 Besi Beton 24 Polos Kg Rp 3,500.00
11 Atap spandeks zincalume M2 Rp 32,000.00
12 Nok spandeks zincalume M1 Rp 30,000.00
13 Seng Plat BJLS 20 Lbr Rp 50,000.00
14 Kawat Bindrat/Kawat Beton Kg Rp 22,000.00
15 Paku 5 - 12 cm Kg Rp 17,000.00
16 Paku 1 - 4 cm Kg Rp 17,000.00
17 Paku Tripleks Kg Rp 35,000.00
18 Paku Seng Kg Rp 30,000.00
19 Sekerup Kg Rp 30,000.00
20 Paku Sekerup Gypsum/Calsiboard Kg Rp 30,000.00
21 Sealent Tube Rp 25,000.00
22 Balok Kayu Kls I M3 Rp 1,500,000.00
23 Balok Kayu Kelapi / Sejenis M3 Rp 1,500,000.00
24 Balok Kayu Kls II M3 Rp 1,200,000.00
3
25 Balok Kayu Kls III M Rp 1,200,000.00
26 Papan Kayu Kls II M3 Rp 1,200,000.00
27 Papan Kayu Kls I M3 Rp 1,500,000.00
28 Dolken dia. 8 - 10 cm Btg Rp 4,000.00
1
29 List kaca 1 x 1 cm M Rp 650.00
30 Multipleks tebal 9 mm Lbr Rp 150,000.00
31 Gibsun Lbr Rp 62,000.00
32 Kaca bening 5 mm M2 Rp 75,000.00
33 Plamir Tembok Kg Rp 4,000.00
34 Plamir Kayu Kg Rp 6,000.00
35 Amplas Lbr Rp 5,000.00
36 Cat dasar kayu merk Glotex Kg Rp 30,000.00
HARGA
NO. U R A I A N SATUAN SATUAN
37 Cat kilap kayu merk Avian Kg Rp 3,000.00
38 Cat/Seal Coat anti lumut untuk Seng merk Yoko Kg Rp 13,000.00
39 Cat Residu Kg Rp 20,000.00
40 Cat Tembok Kg Rp 15,000.00
41 Lem Kayu Kg Rp 30,000.00
42 Dempul Kayu Kg Rp 20,000.00
43 Vernis kayu Ltr Rp 12,000.00
44 Cat Meny seng/besi Kg Rp 20,000.00
45 Meny Kayu Kg Rp 20,000.00
46 Minyak Cat Ltr Rp 20,000.00
47 Minyak Bekisting Ltr Rp 10,000.00
48 Kuas Biasa 3 " Bh Rp 11,000.00
49 Kuas Roll Bh Rp 35,000.00
50 Kran Air dia 3/4" Bh Rp 30,000.00
51 Floor Drain Bh Rp 35,000.00
52 Klosed Jongkok Standard Bh Rp 100,000.00
53 Seal tape Bh Rp 6,000.00
54 Septic Tank dan Peresapan Unit Rp 500,000.00
55 Kunci Tanam 2 x putar Bh Rp 125,000.00
56 Engsel Pintu Besar Bh Rp 50,000.00
57 Kunci Tanam Biasa Bh Rp 75,000.00
58 Engsel Pintu Type Kupu-Kupu Bh Rp 30,000.00
59 Engsel Jendela Type Kupu Kupu Bh Rp 25,000.00
60 Grendel Jendela Bh Rp 15,000.00
61 Kait-kait Angin Bh Rp 10,000.00
62 Grendel Pintu Besar Bh Rp 20,000.00
1
63 Main Truss C 75 - 80 M Rp 4,500.00
64 Main Truss C 75 - 60 M1 Rp 4,000.00
65 Baut (Srew driver) Bh Rp 300.00
66 Dynabolt Bh Rp 1,000.00
67 Reng Baja Ringan M1 Rp 4,500.00
68 Kalsiplank Lbr Rp 20,000.00
Dibuat Oleh :
…....................................
…................