JUMLAH
NO. URAIAN KEGIATAN
FIXED PRICE (Rp.) UNIT PRICE (Rp.)
I. BELANJA KEPERLUAN PERKANTORAN
TENAGA KERJA ( FIXED PRICE) Rp 474.279.746,19
Untuk 12 Bulan Rp 5.691.356.954,24
PPN 11 % Rp 626.049.264,97
Jumlah Rp 6.317.406.219,21
Dibulatkan Rp 6.317.406.000,00
MERRYANI PURBA
Diirektur
PEKERJAAN KONTRAK SERVICE PEMELIHARAAN WISMA DPR RI
TAHUN ANGGARAN 2023
SATUA HARGA SAT. JUMLAH
NO PEKERJAAN VOLUME JUMLAH (Rp.)
N (Rp.) HARGA (Rp.)
I. BELANJA KEPERLUAN PERKANTORAN
- TENAGA KERJA ( FIXED PRICE) 474.279.746,19
A PERSONIL INTI 1 / 1 bulan 36.417.250,00 36.417.250,00
B PERSONIL PENDUKUNG 1 / 1 bulan 327.771.550,00 327.771.550,00
SUB TOTAL 364.188.800,00
MANAGEMENT FEE 36.418.880,00
II TUNJANGAN PERSONIL INTI 1 / 1 bulan 6.873.148,98 6.873.148,98
IV TUNJANGAN PERSONIL PENDUKUNG 1 / 1 bulan 61.861.417,20 61.861.417,20
C OPERASIONAL 1 / 1 bulan 4.937.500,00 4.937.500,00
WAKTU
NO ITEM SAT.
BULAN
VOLUME HARGA SAT. (Rp.) BIAYA/BULAN (Rp.)
A PERSONIL INTI
I GAJI POKOK PERSONIL INTI
1 Manajer Kawasan org/bulan 1 / 1 1 11.285.550,00 11.285.550,00
2 Staf Tehnik Arsitek atau Sipil org/bulan 1 / 1 1 9.424.850,00 9.424.850,00
3 Staf Tehnik Mekanikal Elektrikal org/bulan 1 / 1 1 9.424.850,00 9.424.850,00
4 Staf Administrasi & Keuangan org/hari 1 / 1 1 4.782.000,00 4.782.000,00
5 Uang Makan org/hari 1 / 20 4 15.000,00 1.200.000,00
6 Uang Lembur org/jam 3 / 4 2 12.500,00 300.000,00
SUB TOTAL I 36.417.250,00
MANAGEMENT FEE SUB TOTAL I 10% 3.641.725,00
II TUNJANGAN PERSONIL INTI
1 Gaji Ke-13 LS 1 / 12 1 36.417.250,00 3.034.770,83
2 BPJS
- Jaminan Kecelakaan Kerja % 1 / 1 0,54% 36.417.250,00 196.653,15
- Jaminan Kematian % 1 / 1 0,30% 36.417.250,00 109.251,75
- Jaminan Hari Tua % 1 / 1 3,70% 36.417.250,00 1.347.438,25
- Jaminan Kesehatan % 1 / 1 4,00% 36.417.250,00 1.456.690,00
- Jaminan Pensiun % 1 / 1 2,00% 36.417.250,00 728.345,00
SUB TOTAL II 6.873.148,98
B PERSONIL PENDUKUNG
III GAJI POKOK PERSONIL PENDUKUNG
1 Pengawas Sipil & Arsitektur org/bulan 1 / 1 1 4.782.000,00 4.782.000,00
2 Tukang Sipil dan Arsitektur org/bulan 1 / 1 7 4.782.850,00 33.479.950,00
3 Teknisi Mekanikal & Elektrikal org/bulan 1 / 1 1 4.782.850,00 4.782.850,00
4 Pekerja Mekanikal & Elektrikal org/bulan 1 / 1 5 4.555.000,00 22.775.000,00
5 Pengawas Tata Graha dan Lanskap org/bulan 1 / 1 5 4.782.850,00 23.914.250,00
6 Pekerja Tata Graha org/bulan 1 / 1 25 4.555.000,00 113.875.000,00
7 Pekerja Tata Kawasan org/bulan 1 / 1 18 4.555.000,00 81.990.000,00
8 Pekerja Kolam Renang org/bulan 1 / 1 2 4.555.000,00 9.110.000,00
9 Pekerja Laundry org/bulan 1 / 1 4 4.555.000,00 18.220.000,00
10 Pekerja Banquet org/bulan 1 / 1 3 4.555.000,00 13.665.000,00
11 Uang Makan org/hari 1 / 20 71 300.000,00 1.065.000,00
12 Uang Lembur org/jam 3 / 4 10 15.000,00 112.500,00
SUB TOTAL III 327.771.550,00
MANAGEMENT FEE SUB TOTAL III 10% 32.777.155,00
IV TUNJANGAN PERSONIL PENDUKUNG
1 Gaji Ke-13 LS 1 / 12 1 327.771.550,00 27.314.295,83
2 BPJS terdiri :
- Jaminan Kecelakaan Kerja % 1 / 1 0,54% 327.771.550,00 1.769.966,37
- Jaminan Kematian % 1 / 1 0,30% 327.771.550,00 983.314,65
- Jaminan Hari Tua % 1 / 1 3,70% 327.771.550,00 12.127.547,35
- Jaminan Kesehatan % 1 / 1 4,00% 327.771.550,00 13.110.862,00
- Jaminan Pensiun % 1 / 1 2,00% 327.771.550,00 6.555.431,00
SUB TOTAL IV 61.861.417,20
C OPERASIONAL
V PERALATAN/PERLENGKAPAN KANTOR
1 Seragam Stel 2 / 12 75 190.000,00 2.375.000,00
2 Sepatu lengkap pasang 1 / 12 75 350.000,00 2.187.500,00
3 ATK ls 1 / 12 1 4.500.000,00 375.000,00
SUB TOTAL V 4.937.500,00
F CAT
F1 CAT MERK JOTUN
1 Cat tembok (luar) putih 20 ltr 3 klg 1.700.000,00 5.100.000,00
2 Cat tembok (luar) warna 20 ltr 3 klg 1.700.000,00 5.100.000,00
3 Cat tembok (dalam) putih 20 ltr 3 klg 900.000,00 2.700.000,00
4 Cat tembok (dalam) warna 20 ltr 3 klg 1.300.000,00 3.900.000,00
5 Cat besi putih 2,5 ltr 5 klg 600.000,00 3.000.000,00
6 Cat besi warna 2,5 ltr 5 klg 600.000,00 3.000.000,00
SUB TOTAL F1 22.800.000,00
F2 CAT MERK PROPAN
1 Eco Emulsion Acrylic Emulsion Paint 5 kg 5 Kg 2 Klng 275.000,00 550.000,00
2 Eco Emulsion Acrylic Emulsion Paint 25 kg 25 Kg 2 Klng 262.500,00 525.000,00
3 Eco Emulsion Alkali Resisting Primer 21 kg 21 Kg 2 Klng 300.000,00 600.000,00
4 Cat Kayu dan besi Synthetic 2000 2.5 ltr 2,5 Ltr 2 Klng 70.000,00 140.000,00
5 Cat Kayu dan besi Synthetic 3000 5 ltr 5 Ltr 2 Klng 500.000,00 1.000.000,00
6 Thinner 3.8 ltr 3,8 Ltr 2 Klng 95.000,00 190.000,00
7 Propan Stone Care Pelapis Batu Alam (Solvent Based) 2.5 ltr 2,5 Ltr 2 Klng 100.000,00 200.000,00
8 Propan Stone Care Pelapis Batu Alam (Solvent Based) Dof/Matt 2.5 ltr 2,5 Ltr 2 Klng 100.000,00 200.000,00
9 Propan Aqua Stone Care Pelapis Batu Alam (Water Based) 2.5 ltr 2,5 Ltr 2 Klng 100.000,00 200.000,00
10 Propan Stone Care Cat Batu Candi (Solvent Based) 2.5 ltr 2,5 Ltr 2 Klng 100.000,00 200.000,00
11 Propan Stone Care Cat Batu Candi (Solvent Based) Super Black 2.5 ltr 2,5 Ltr 2 Klng 100.000,00 200.000,00
12 Decorshield Arcylic Weather Shield Base A 20 Ltr 2 Klng 25.000,00 50.000,00
13 Eco Emulsion Acrylic Emulsion Paint Base A 25 Kg 2 Klng 35.000,00 70.000,00
SUB TOTAL F2 4.125.000,00
F3 CAT MERK DULUX
1 Cat tembok (luar) putih isi 2,5 ltr = 3,5 kg Dulux WeatherShield 2,5 ltr 3 klg 325.000,00 975.000,00
2 Cat tembok (dalam) putih isi 2,5 ltr = 3,5 kg 2,5 ltr 3 klg 300.000,00 750.000,00
3 Cat tembok (luar) putih dan warna isi 20,5 ltr=28 kg 20,5 ltr 3 klg 2.000.000,00 41.000.000,00
4 Cat tembok (dalam) putih dan warna isi 20,5 ltr=28 kg 20,5 ltr 3 klg 2.000.000,00 41.000.000,00
SUB TOTAL F3 83.725.000,00
F4 CAT LAIN-LAIN
1 Cat kayu / besi Mowilex 3 klg 26.700,00 80.100,00
2 Cat Duco Nipple 2000 3 kg 34.300,00 102.900,01
3 Cat Duco Danagloses 3 kg 52.800,00 158.400,00
4 Dempul Duco (Sanpolac) 3 kg 21.500,00 64.499,99
5 Meni kayu (5kg) Nippon 3 klg 44.850,00 134.550,00
6 Meni besi (5kg) Nippon 3 klg 48.100,00 144.300,01
7 Pelitur 3 kg 27.675,00 83.025,00
8 Soda api 3 kg 25.500,00 76.500,00
9 Thinner cat 3 ltr 18.525,00 55.575,00
10 Lem kayu putih Racol 3 kg 19.980,00 59.940,00
11 Lem kayu fox (1kg) 3 kg 22.600,00 67.800,01
12 Amplas kayu/besi 3 lbr 15.600,00 46.800,00
SUB TOTAL F4 1.074.390,01
Harga Sat. Jumlah Total
No. Uraian Kegiatan Volume Volume
(Rp.) (Rp.) (Rp.)
F5 FINISHING FURNITURE & INTERIOR EX IMPRA
1 Wood Stain warna standard 5 kg 120.000,00 600.000,00
2 Dempul kayu 5 kg 75.000,00 375.000,00
3 Melamik 5 kg 45.000,00 225.000,00
4 Sanding Sealer 5 kg 100.000,00 500.000,00
SUB TOTAL F5 1.700.000,00
F6 WATER PROOFING
1 Aquaproof 20 kg 5 pail 950.000,00 4.750.000,00
2 Teknnokote cat lapangan 5 kg 5 klg 300.000,00 1.500.000,00
SUB TOTAL F6 6.250.000,00
F7 Lapisan Wallpaper
1 Wallpapaer standar 100 m2 150.000,00 15.000.000,00
SUB TOTAL F7 15.000.000,00
SUB TOTAL F : F1+F2+F3+F4+F5+F6+F7 (Untuk 12 bulan) 134.674.390,01
SUB TOTAL F : F1+F2+F3+F4+F5+F6+F7 (Untuk 1 bulan) 11.222.865,83
G KACA DAN SUNBLAST
G1 Kaca Standar / Lembaran
1 Polos tebal 5mm 120 x 84 10 m2 200.000,00 2.000.000,00
SUB TOTAL G1 2.000.000,00
G2 KACA TEMPERED
1 Clear tebal 10 mm 5 m2 450.000,00 2.250.000,00
SUB TOTAL G2 G2 2.250.000,00
G3 SUNBLAST
1 Kaca Film 60 % 10 m2 150.000,00 1.500.000,00
SUB TOTAL G3 1.500.000,00
G4 ALAT KUNCI DAN PENGGANTUNG
1 Silinder Kunci Pintu Ex Wilca/Solid 25 bh 300.000,00 7.500.000,00
2 Handle Pintu 25 bh 108.000,00 2.700.000,00
3 Handle pintu kamar mandi 25 bh 100.000,00 2.500.000,00
4 Engsel pintu 10 bh 37.800,00 378.000,00
5 Engsel sendok 20 bh 22.200,00 444.000,00
6 Handle Lemari 10 bh 45.000,00 450.000,00
7 Kunci Lemari 10 bh 27.000,00 270.000,00
8 Kunci Slot Jendela 10 bh 144.000,00 1.440.000,00
9 Engsel Jendela 10 bh 52.200,00 522.000,00
SUB TOTAL G4 16.204.000,00
SUB TOTAL G=(G1+G2+G3+G4) Untuk 12 bulan 21.954.000,00
SUB TOTAL G=(G1+G2+G3+G4) Untuk 1 bulan 1.829.500,00
H KOMPONEN PANEL
H1 MCCB 3 Pase
1 MCCB 160A/55kA MG/Schneider 1 buah 113.400,00 113.400,00
2 MCCB 125A/50kA MG/Schneider 1 buah 152.700,00 152.700,00
3 MCCB 100A/36kA MG/Schneider 1 buah 197.400,00 197.400,00
SUB TOTAL H1 463.500,00
H2 CONTACTOR
1 Contactor LC1D18 1 buah 540.000,00 540.000,00
SUB TOTAL H2 540.000,00
H3 MCB 1 PASE
1 MCB 6A, 10A, 16A dan 20A Schneider 20 buah 100.000,00 2.000.000,00
2 MCB 25A, 32A, dan 40A Schneider 15 buah 175.000,00 2.625.000,00
SUB TOTAL H3 4.625.000,00
H4 MCB 3 PASE
1 MCB 6A, 10A, 16A dan 20A Schneider 15 buah 300.000,00 4.500.000,00
2 MCB 25A, 32A, dan 40A Schneider 6 buah 350.000,00 2.100.000,00
SUB TOTAL H4 6.600.000,00
H5 Accesories panel
1 Emergency Push Button (XB4-BS542) TELE 1 buah 100.000,00 100.000,00
2 Amper Meter 0-1500 (96 x 96 mm) GAE 1 buah 230.000,00 230.000,00
3 Trafo Arus CT 1500/5A (CT 110) GAE 1 buah 1.500.000,00 1.500.000,00
4 Volt Meter Selector Switch (7 Position) GAE 1 buah 95.400,00 95.400,00
Harga Sat. Jumlah Total
No. Uraian Kegiatan Volume Volume
(Rp.) (Rp.) (Rp.)
5 Frequaency Meter (Pointer) GAE 1 buah 300.000,00 300.000,00
6 Hour Counter (46 x 48 mm) GAE 1 buah 112.800,00 112.800,00
7 Phase Failure Relay (RCM-50) GAE 1 buah 353.400,00 353.400,00
8 Timer Relay + Socket (H3CRA) OMRON 1 buah 750.000,00 750.000,00
9 Relay Countrol 220/24 + Socket (LY4) OMRON 1 buah 2.500.000,00 2.500.000,00
10 Volt Meter 0-30 V DC KELES 1 buah 250.000,00 250.000,00
11 Selector Switch (A/M) K&K 1 buah 110.000,00 110.000,00
12 Speed Adjuster 5k Ohm (Rheostat)Spectrol 1 buah 3.500.000,00 3.500.000,00
13 Voltage Adjuster 5K Ohm (Rheostat) Spectrol 1 buah 3.500.000,00 3.500.000,00
14 Sirene/Alarm IMPORT 1 buah 1.500.000,00 1.500.000,00
15 Fuse Countrol Lokal 1 buah 100.000,00 100.000,00
16 Pilot Lamp (RST) (XB7) TELE 1 buah 75.000,00 75.000,00
17 Volt Meter 0-500v (96x96mm) GAE 1 buah 700.000,00 700.000,00
18 Push Button (ON/OFF)(XB7) TELE 1 buah 75.000,00 75.000,00
20 Under Voltage Relay 220/250 V (MN) MG 1 buah 2.300.000,00 2.300.000,00
22 Indicator Lamp (XB7) EV.4 Eks. TELE 1 buah 1.750.000,00 1.750.000,00
SUB TOTAL H5 19.801.600,00
SUB TOTAL H =( H1 + H2 + H3+ H4 + H5 ) Untuk 12 bulan 32.030.100,00
SUB TOTAL H =( H1 + H2 + H3+ H4 + H5 ) Untuk 1 bulan 2.669.175,00
KABEL LISTRIK
I NYM (SNI, SPLN)
1 2 X 1,5 mm (50 m) 2 roll 450.000,00 900.000,00
2 3 x 2,5 mm (50 m) 2 roll 850.000,00 1.700.000,00
4 4 x 2,5 mm (50 m) 1 roll 1.300.000,00 1.300.000,00
5 4 x 6 mm (50 m) 1 roll 5.000.000,00 5.000.000,00
6 4 x 10 mm (50 m) 1 roll 6.500.000,00 6.500.000,00
SUB TOTAL Kabel Listrik NYM ( SNI, SPLN) 15.400.000,00
I1 NYF GBY (SNI, SPLN)
1 3 x 2,5 mm 50 m 2.300.000,00 115.000.000,00
2 4 x 6 mm 25 m 1.800.000,00 45.000.000,00
3 4 x 10 mm 25 m 2.500.000,00 62.500.000,00
SUB TOTAL Kabel Listrik NYM ( SNI, SPLN) 222.500.000,00
SUB TOTAL KABEL LISTIK = I + II (Untuk 12 bulan) 237.900.000,00
SUB TOTAL KABEL LISTIK = I + II (Untuk 1 bulan) 19.825.000,00
PEKERJAAN KONTRAK SERVICE PEMELIHARAAN WISMA DPR RI TAHUN ANGGARAN 2023
PEKERJAAN TAMAN (UNIT PRICE)
5.081.583