30 30
40
40
60
60
EL. -040 EL. -040
REVISI
NO. KETERANGAN TGL PARAF
20
10 5 20
20
10 5 20
EL. -060 SLOOP 15/20 SLOOP 15/20 EL. -060 SLOOP 15/20 SLOOP 15/20
MUKA TANAH MUKA TANAH
PEMBERI TUGAS
150
150
150
150
6 D 16 6 D 16
3 Ø 8 - 10
3 Ø 8 - 10
KOLOM PEDESTAL 25/25 CM KOLOM PEDESTAL 25/25 CM
PEMERINTAH KABUPATEN GARUT
KECAMATAN CIKELET
Jl. Raya Cimari Cikelet - Garut 44177
D 13 - 15 D 13 - 15
MENGETAHUI/MENYETUJUI
D 13 - 15 D 13 - 15
PEJABAT PEMBUAT KOMITMEN (PPK)
EL. -210 PONDASI TELAPAK BETON EL. -210 PONDASI TELAPAK BETON
UK. 100 x 100 x 20 CM UK. 100 x 100 x 20 CM
10 5 20 10
10 5 20 10
30
30
EL. -240 EL. -240 Drs. ANWAR
NIP. 19650806 199603 1 001
15
15
EL. -255 EL. -255
KEGIATAN
PEKERJAAN
PERENCANA
KOLOM BETON 25/25 CM
SLOOP 15/20
3 D 16
PT. Galuh Rekasindo Konsultan
Natural Resources and Regional Development, Surveying and Mapping, Architects, Planning,
System Analysts, GIS, Environmental Assessment, Engineering Consultants etc.
37.5
2 D 12 PENANGGUNG JAWAB
1
25
D 13 - 15
D 13 - 15
100
25
25
DETAIL PONDASI
TELAPAK BETON TYPE P1
37.5 25 37.5 POTONGAN - 3 ARSITEKTUR SIPIL
100
KOLOM PEDESTAL 1
SKALA 1 : 25