3 *Pekerjaan Teras
Pengecetan Dinding Luar Bangunan Lama 24.15 M2
Pembongkaran Granit Lama 10.625 M2
Pemasnagan Granit Baru 10.625 M2
Rp 115,000 Rp 517,500
Rp 973,343 Rp 3,863,200
Rp 5,500,000 Rp 2,425,500
Rp 145,000 Rp 4,176,000
Rp 85,000 Rp 4,896,000
Rp 4,500,000 Rp 1,728,000
Rp 4,500,000 Rp 3,510,000
Rp 4,500,000 Rp 3,150,000
Rp 4,500,000 Rp 2,592,000
Rp 85,000 Rp 2,278,000
Rp 340,000 Rp 2,584,000
Rp 37,712 Rp 3,182,893
Rp 26,000 Rp 1,170,000
Rp 185,000 Rp 2,442,000
Rp 850,000 Rp 1,020,000
Total Rp 39,535,092
Rp 800,000 Rp 9,600,000
Rp 1,650,000 Rp 6,740,250
Rp 650,000 Rp 2,437,500
Rp 625,000 Rp 7,087,500
Total Rp 25,865,250
Rp 37,712 Rp 910,745
Rp 45,000 Rp 478,125
Rp 320,000 Rp 3,400,000
Total Rp 4,788,870
Rp 345,000 Rp 2,072,070
Rp 121,000 Rp 1,717,716
Rp 171,423 Rp 381,845
Rp 82,000 Rp 4,937,220
Rp 27,333 Rp 1,000,400
Total Rp 10,109,251
Rp 45,000 Rp 1,053,000
Rp 65,000 Rp 346,320
Rp 345,000 Rp 8,073,000
Rp 85,000 Rp 446,250
Rp 21,000 Rp 1,065,960
Rp 18,000 Rp 3,187,800
Rp 185,000 Rp 740,000
Rp 85,000 Rp 510,000
Rp 40,000 Rp 240,000
Total Rp 15,662,330
Rp 6,000,000 Rp 6,000,000
Rp 5,000,000 Rp 5,000,000
Rp 2,100,000 Rp 2,100,000
Total Rp 13,100,000
Rp 200,000 Rp 1,800,000
Rp 200,000 Rp 3,000,000
Rp 350,000 Rp 350,000
Rp 300,000 Rp 600,000
Total Rp 5,750,000
Jumlah Rp 114,810,793
P L T LUAS VOLUME
Jemabatan 8 0.75 0.2 1.2
Pondasi Batu Belah 7.2 0.27 1.944
Sloof 20/15 7.2 0.2 0.15 0.216
Pagar Beton Samping 7.2 3 13.8
Galian 1 1 4.5 4.5
Pondasi Batu Belah Tapak (sycopen) 1 1 2.1 2.1
Pondasi Tapak 0.8 0.8 0.6 0.384
Kolom 65/35 0.3 0.65 4 0.78
Kolom 35/25 0.35 0.25 8 0.7
Balok 20/30 0.2 0.3 9.6 0.576
Afweking Beton 0.85 1.2 21.6 88.56
Pemasnagan Batu Alam 0.3 0.65 4 7.6
Pemasnagan Roasterq 1 1.8 1.8
Pemasangan Kanopi 5 2.4 12
Pemasangan Keramik 40X40 0.4 0.4 22 13.2
Pemasangan Pintu Cutting Besi 2.15 1.1 1 2.365 4.085
Pekerjaan Pembuatan Pagar Besi 6.3 1.8 11.34
Pengecetan Dinding Luar 5.7 3.5 19.95
Pengecatan Tiang Luar 1.2 3.5 4.2 24.15
Pembongkaran Granit Lama 2.5 4.25 10.625
Penambahan Dinding Keramik Kamar Mandi 5.46 2.6 6.006
Upgrade Dinding Keramik Kamar Mandi 5.46 2.6 14.196
Upgrade Lantai Keramik Kamar Mandi 1.65 1.35 2.2275
Upgrade Lantai Granit 3.9 3.9 15.21
15.6
Upgrade Dinding Dapur 3.6 0.8 2.88
Upgrade Keramik Meja Dapur 3.6 0.6 2.16
Upgrade Keramik Lantai Dapur 0.6 0.6 60 21.6
Bongkar Keramik 0.6 0.6 65 23.4
Pengecatan Dinding 0.6 35 3.5 73.5 21
Pengecatan DInding 50.4 25.2 28 103.6
Bongkar Dinding 2.4 2.22 5.328
Bongkar Pasang Keramik Kolam Ikan 0.5 0.5 21 5.25
Bongkar Pasang Kanopi 2.5 1.5 3.75
No Uraian Satuan
1 2 3
A Tenaga Kerja
1 Pekerja OH
2 Mandor OH
4 5 6
Rp -
Rp -
Rp 235,750.00
0.15 Rp 35,362.50
Rp 271,112.50