REKAPITULASI

BILL OF QUANTITY (BOQ)


Kegiatan : PEMBANGUNAN SISTEM PENYEDIAAN AIR MINUM DAN SANITASI
Paket : PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI DIA 600 MM TERITIP, BALIKPAPAN
Lokasi : KOTA BALIKPAPAN
Sumber Dana : APBD PROVINSI KALIMANTAN TMUR
Tahun Anggaran : 2019

NO. URAIAN PEKERJAAN SATUAN VOLUME HARGA PAJAK (%) JUMLAH TOTAL JUMLAH

1 2 3 4 5 6 7 = (5 X 6) 8 = (5 + 7)

A. PEKERJAAN PERSIAPAN PAKET 1.00 #REF! 10.00 #REF! #REF!

B. PEKERJAAN PERPIPAAN PAKET 1.00 #REF! 10.00 #REF! #REF!

C. PEKERJAAN JEMBATAN PIPA PAKET 1.00 #REF! 10.00 #REF! #REF!

TOTAL NILAI Rp #REF!

SAMARINDA, 12 APRIL 2019


PENAWAR :
PT. NINDYA SEJAHTERA

ACHMAD RIZA KHADAFI


DIREKTUR
SPESIFIKASI
Program : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Kegiatan : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN / KOTA
Sub Kegiatan : PERLUASAN SPAM JARINGAN PERPIPAAN DIKAWASAN PERKOTAAN
Paket Pekerjaan
: LANJUTAN PEMBANGUNAN SISITEM PENYEDIAAN AIR MINUM (SPAM) BESERTA SARANA PRASARANA UNTUK PENDUKUNG BANGUNAN NEGARA DI
DESA MARGAHAYU KEC.LOAKULU

Lokasi : KECAMATAN TENGGARONG


TA : 2021

NO URAIAN PEKERJAAN Spesifikasi

1 2

I PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI


(SMKK)

Penyiapan RKK
Pembuatan dokumen Rencana Keselamatan Konstruksi SNI
1
Sosialisasi, promosi dan pelatihan
2 Pengarahan K3 (Safety Briefing) SNI
3 Spanduk (Banner) SNI
Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain
4 Pembatas area proyek SNI
APD antara lain
5 Topi pelindung (Safety Helmet) SNI
6 Rompi keselamatan (Safety Vest) SNI
7 Pelindung pernafasan dan mulut (Masker) SNI
8 Sepatu Keselamatan (Safety Shoes) SNI
Asuransi dan perizinan :
9 Asuransi SNI
Personel K3 Konstruksi :
10 Petugas K3
Fasilitas, sarana dan prasarana kesehatan :
Peralatan P3K (Kotak P3K, Obat Luka, Perban,dll) dan Pencegahan COVID-19 SNI
11
Rambu- Rambu yang diperlukan :
12 Rambu Informasi (Papan Nama Kegiatan) SNI
13 Rambu Peringatan SNI
Kegiatan dan peralatan terkait dengan pengendalian risiko Keselamatan Konstruksi :

14 Alat Pemadam Api Ringan (APAR) SNI

II PENGADAAN DAN PEMASANGAN PIPA

II.1 Pipa HDPE Ø 350 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 350 mm hdpe, Sdr17,Pe100,PN10,SNI
2 Pemasangan 1 m pipa HDPE Ø 350 mm SNI,butt fusion
3 Pengetesan 1 m pipa Ø 350 mm SNI,hydrotest
4 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m SNI, minimal manual
5 Pengurugan kembali 1 m3 galian tanah SNI, minimal manual
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) SNI, minimal manual

Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 150 mm hdpe, Sdr17,Pe100,PN10,SNI
2 Pemasangan 1 m pipa HDPE Ø 150 mm SNI,butt fusion
3 Pengetesan 1 m pipa Ø 150 mm SNI,hydrotest
4 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m SNI, minimal manual
5 Pengurugan kembali 1 m3 galian tanah SNI, minimal manual
SNI, minimal manual
NO URAIAN PEKERJAAN Spesifikasi

1 2

III PENGADAAN DAN PEMASANGAN ACCESSORIES PIPA


PENGADAAN
1 Reducer HDPE Ø 400 x 350 mm Hdpe,SNI
2 TEE HDPE Ø 350 x 100 mm Hdpe,SNI
3 Bend 90º (HDPE) Ø 100 mm Hdpe,SNI
4 Stube Flange (HDPE) Ø 100 mm Hdpe,SNI
5 Air Valve All Flange (CI) Ø 100 mm SNI,PN 16
6 Flange Steel Ø 100 mm SNI
7 Flange Steel Ø 75 mm SNI
8 Stube Flange (HDPE) Ø 350 mm Hdpe,SNI
9 Bend 45º (Steel) Ø 350 mm SNI
10 Flange Steel Ø 350 mm SNI
11 Pipa GI Ø 350 mm SNI
12 TEE HDPE Ø 300 x 250 mm Hdpe,SNI
13 Stube Flange (HDPE) Ø 250 mm Hdpe,SNI
14 Gate Valve All Flange (CI) Ø 300 mm SNI,Resilent
15 Stube Flange (HDPE) Ø 300 mm Hdpe,SNI
intake
1 Flange Steel Ø 100 mm SNI
2 Reducer Steel Ø 150 x 100 mm SNI
3 Bend 90º (steel) Ø 150 mm SNI
4 Flange Steel Ø 150 mm SNI
5 #NAME? SNI,Resilent
6 Check Valve (swing) Ø 150 mm (CI) SNI,PN 16
7 Kelam Pipa + 2bh Mur Baut ` SNI
8 Pipa GI Ø 150 mm SNI
9 Stube Flange (HDPE) Ø 150 mm Hdpe,SNI
hidder distribusi
1 Check Valve Wafer Ø 200 mm (CI) SNI
2 Flexible Joint Ø 200 mm SNI
3 Gate Valve buterfly Ø 200 mm SNI, CI
4 Reducer Steel Ø 200 x 150 mm SNI
5 Dismantling Joint Ø 200 mm SNI
6 Flange Steel Ø 200 mm SNI
7 Bend 90º (Steel) Ø 200 mm SNI
8 Pipa GI Ø 200 mm SNI
9 Flange Steel Ø 150 mm SNI
10 Blind Flange Ø 250 mm SNI
11 Flange Steel Ø 250 mm SNI
12 Bend 45º (Steel) Ø 250 mm SNI
13 Water Meter Ø 250 mm SNI, PN 10
14 Gate Valve All Flange (CI) Ø 250 mm SNI,Resilent
15 Bend 90º (Steel) Ø 250 mm SNI
16 Pipa GI Ø 250 mm SNI
17 Presure Gauge min.10 Bar SNI
PEMASANGAN
1 Pemasangan 1 buah Valve dan Air Valve Ø 100 mm SNI
2 Pemasangan 1 buah Valve Ø 150 mm SNI
3 Pemasangan 1 buah Valve Ø 200 mm SNI
4 Pemasangan 1 buah Valve Ø 250 mm SNI
5 Pemasangan 1 buah Valve Ø 300 mm SNI
6 Pemasangan 1 m pipa GIP Ø 350 mm SNI
7 Pemasangan 1 m pipa GIP Ø 250 mm SNI
8 Pemasangan 1 m pipa GIP Ø 150 mm SNI
9 Pemasangan 1 buah Tee Ø 350 mm SNI
10 Pemasangan 1 buah Tee Ø 300 mm SNI
11 Pekerjaan 1 inch pengelasan dengan las listrik SNI
12 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis SNI
NO URAIAN PEKERJAAN Spesifikasi

1 2

IV PEKERJAAN LAIN-LAIN & UTILITAS

1 #NAME? SNI
2 Pasangan 1 m3 Pondasi Batu Gunung 1 : 5 SNI
3 Pengurugan 1 m3 dengan Sirtu SNI

BOX CHAMBER
1 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m SNI
2 Pembesian 1 kg dengan besi polos atau besi ulir SNI
3 Pemasangan 1 m2 bekisting sloof SNI
4 Membuat 1 m3 beton mutu f’c = 14,5 Mpa SNI

V #NAME?
1 #NAME? SNI
2 #NAME? SNI
3 #NAME? SNI
4 #NAME? SNI
5 #NAME? Manual dg alat bantu
6 #NAME? SNI
#NAME?
#NAME?
#NAME?
1 #NAME? SNI, 75 ltr/h
2 #NAME? SNI, 690 rpm
3 #NAME? SNI
4 #NAME? SNI
5 #NAME? SNI
6 #NAME? Lokal, Kayu ulin
#NAME?
1 #NAME? SNI
2 #NAME? SNI
3 #NAME? SNI
4 #NAME? SNI
5 #NAME? SNI
6 #NAME? SNI

VI #NAME?
#NAME?
1 #NAME? SNI
#NAME?
2 #NAME? SNI
3 #NAME? SNI
4 #NAME? SNI
5 #NAME? SNI
6 #NAME? SNI
7 #NAME? SNI
8 #NAME? SNI
Pekerjaan Struktur
#NAME?
9 #NAME? SNI
10 #NAME? SNI
11 #NAME? SNI
#NAME?
12 #NAME? SNI
13 #NAME? SNI
14 #NAME? SNI
#NAME?
15 #NAME? SNI
16 #NAME? SNI
17 #NAME? SNI
#NAME?
18 #NAME? SNI
NO URAIAN PEKERJAAN Spesifikasi

1 2
19 #NAME? SNI
20 #NAME? SNI
#NAME?
21 #NAME? SNI
22 #NAME? SNI
23 #NAME? SNI
#NAME?
24 #NAME? SNI
25 #NAME? SNI
26 #NAME? SNI
27 #NAME? SNI
#NAME?
28 #NAME? SNI
29 #NAME? SNI
30 #NAME? SNI
31 #NAME? SNI
32 #NAME? SNI
#NAME?
33 #NAME? SNI
34 #NAME? SNI
35 #NAME? SNI
36 #NAME? SNI
37 #NAME? SNI
#NAME?
38 #NAME? SNI
39 #NAME? SNI
40 #NAME? SNI
41 #NAME? SNI
#NAME?
42 #NAME? SNI
43 #NAME? SNI

VII #NAME?
1 #NAME? SNI
2 #NAME? SNI
3 #NAME? SNI
4 #NAME? SNI
5 #NAME? SNI
6 #NAME? SNI

VIII #NAME?
1 #NAME? SNI
2 #NAME? SNI
3 #NAME? SNI

IX #NAME?
1 #NAME? SNI,PLN
2 #NAME? SNI,PLN
3 #NAME? SNI,PLN
4 #NAME? SNI,PLN
5 #NAME? SNI,PLN
6 #NAME? SNI,PLN
7 #NAME? SNI,PLN
8 #NAME? SNI,PLN
9 #NAME? SNI,PLN
10 #NAME? SNI,PLN
11 #NAME? SNI,PLN
12 #NAME? SNI,PLN
13 #NAME? SNI,PLN
14 #NAME? SNI,PLN

X #NAME?
1 #NAME? Cast iron pump housing
#NAME? Ductile cast iron impeller
#NAME? cast iron motor
2 #NAME? SNI
3 #NAME? Ductile Cast iron material base
#NAME? Stainless stell impeller
#NAME? Motor standar IEC
4 #NAME? SNI
5 #NAME? SNI
6 #NAME? SNI
7 #NAME? SNI
HARGA PERKIRAAN SENDIRI ( HPS )

Program : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


Kegiatan : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN / KOTA
Sub Kegiatan : PENINGKATAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN
Paket Pekerjaan
: PENGADAN DAN PEMASANGAN SPAM 30 LTR/DTK DESA TUANA TUHA KEC. KENOHAN
Lokasi : DESA TUANA TUHA KEC. KENOHAN, KABUPATEN KUTAI KARTANEGARA
TA : 2022

NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7

I PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI


(SMKK)

Penyiapan RKK
Pembuatan dokumen Rencana Keselamatan Konstruksi
1 Ls 1.00 K.1 500,000.00 500,000.00
Sosialisasi, promosi dan pelatihan
2 Pengarahan K3 (Safety Briefing) Ls 1.00 K.2 400,000.00 400,000.00
3 Spanduk (Banner) Lb 4.00 K.3 45,000.00 180,000.00
Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain
4 Pembatas area proyek Ls 1.00 K.4 260,000.00 260,000.00
APD antara lain
5 Topi pelindung (Safety Helmet) Buah 15.00 K.5 50,000.00 750,000.00
6 Rompi keselamatan (Safety Vest) Buah 15.00 K.6 40,000.00 600,000.00
7 Pelindung pernafasan dan mulut (Masker) Box 3.00 K.7 100,000.00 300,000.00
8 Sepatu Keselamatan (Safety Shoes) Pasang 15.00 K.8 100,000.00 1,500,000.00
Asuransi dan perizinan :
9 Asuransi Ls 1.00 K.9 1,500,000.00 1,500,000.00
Personel K3 Konstruksi :
10 Petugas K3 Org 1.00 K.10 3,250,000.00 3,250,000.00
Fasilitas, sarana dan prasarana kesehatan :
Peralatan P3K
11 (Kotak P3K, Ls 1.00 K.11 2,350,000.00 2,350,000.00
Obat
Rambu-Luka,
Rambu yang diperlukan :
Perban,dll)
12 Rambu
dan Informasi (Papan Nama Kegiatan) Buah 4.00 K.12 500,000.00 2,000,000.00
13 Rambu Peringatan
Pencegahan Buah 4.00 K.13 75,000.00 300,000.00
COVID-19
Kegiatan dan peralatan terkait dengan pengendalian risiko Keselamatan Konstruksi :

14 Alat Pemadam Api Ringan (APAR) Buah 2.00 K.14 497,900.00 995,800.00

Sub Total I 14,885,800.00

II PEMBANGUNAN RUMAH POMPA DAN GUDANG


II.1 Pekerjaan Pendahuluan
1 m1 Pengukuran dan Pemasangan Bowplank m1 34.00 A.2.2.1.4. 34,086.00 1,158,924.00

II.2 Pekerjaan Struktur


1 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m m3 1.10 A.2.3.1.1. 115,402.50 126,942.75
poer plat 70x 70
2 1 m Cerucuk Ulin 10 x 10 (lokal) m1 180.00 P.07.b PU 105,344.03 18,961,924.50
3 Pemasangan 1 m2 bekisting pondasi m2 6.30 A.4.1.1.20 276,531.30 1,742,147.19
4 Pembesian 1 kg dengan besi polos atau besi ulir kg 241.74 A.4.1.1.17 23,233.11 5,616,370.80
5 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 1.10 A.4.1.1.7. 1,274,405.14 1,401,845.65
Pekerjaan Sloof 20/30
6 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 2.34 A.4.1.1.7. 1,274,405.14 2,982,108.02
7 Pembesian 1 kg dengan besi polos atau besi ulir kg 352.64 A.4.1.1.17 23,233.11 8,192,922.15
8 Pemasangan 1 m2 bekisting sloof m2 11.70 A.4.1.1.21 293,695.05 3,436,232.09
Pekerjaan Kolom 30/30
9 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 1.13 A.4.1.1.7. 1,274,405.14 1,440,077.81
10 Pembesian 1 kg dengan besi polos atau besi ulir kg 124.35 A.4.1.1.17 23,233.11 2,889,036.61
11 Pemasangan 1 m2 bekisting kolom m2 7.56 A.4.1.1.222 390,046.65 2,948,752.67
Pekerjaan Balok 20/30
12 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 2.90 A.4.1.1.7. 1,274,405.14 3,695,774.90
13 Pembesian 1 kg dengan besi polos atau besi ulir kg 436.73 A.4.1.1.17 23,233.11 10,146,593.95
14 Pemasangan 1 m2 bekisting Balok m2 19.32 A.4.1.1.223 393,496.65 7,602,355.28
Pekerjaan Lantai
15 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 7.69 A.4.1.1.7. 1,274,405.14 9,800,175.51
16 Pembesian 1 kg dengan besi polos atau besi ulir kg 1,646.10 A.4.1.1.17 23,233.11 38,244,014.14
17 Pemasangan 1 m2 bekisting Lantai m2 27.54 A.4.1.1.224 496,996.65 13,687,287.74
Pekerjaan Kolom Praktis 13/13
18 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.50 A.4.1.1.7. 1,274,405.14 637,202.57
19 Pembesian 1 kg dengan besi polos atau besi ulir kg 51.56 A.4.1.1.17 23,233.11 1,197,898.89
20 Pemasangan 1 m2 bekisting Balok m2 7.72 A.4.1.1.223 393,496.65 3,037,794.14
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
Pekerjaan Balok 13/15
21 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.51 A.4.1.1.7. 1,274,405.14 649,946.62
22 Pembesian 1 kg dengan besi polos atau besi ulir kg 92.25 A.4.1.1.17 23,233.11 2,143,253.94
23 Pemasangan 1 m2 bekisting sloof m2 7.15 A.4.1.1.21 293,695.05 2,099,919.61
Pekerjaan Gewel 13/13
24 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.34 A.4.1.1.7. 1,274,405.14 433,297.75
25 Pembesian 1 kg dengan besi polos atau besi ulir kg 102.16 A.4.1.1.17 23,233.11 2,373,494.01
26 Pemasangan 1 m2 bekisting Lantai m2 2.60 A.4.1.1.224 496,996.65 1,292,191.29

II.3 Pekerjaan Dinding Dan Lantai


1 Pemasangan Dinding Bata Merah 1/2 bata 1:5 m2 131.32 A.4.4.1.9. 179,064.43 23,514,740.95
2 Pemasangan Pelesteran 1m2 1sp:5pp 2 cm m2 262.64 A.4.4.2.16. 116,167.02 30,510,106.13
3 Pemasangan Acian 1m2 m2 262.64 A.4.4.2.27. 54,533.00 14,322,547.12
4 Pekerjaan Lantai Keramik 40 x 40 m2 42.00 A. 2.2.1.13.1.1 361,606.00 15,187,452.00

II.4 Pekerjaan Pintu ,Jendela & Penggantung


1 Pintu Roling Door RD m2 15.00 C 975,000.00 14,625,000.00
2 Pemasangan 1 m2 Dinding Terawang Roster m1 6.48 A.4.4.1.22. 88,212.13 571,614.60

II.5 Pekerjaan Atap & Plafond


1 Rangka Baja ringan /M2 terpasang m2 72.00 C 230,000.00 16,560,000.00
2 Pemasangan 1m2 Atap zincalum m2 72.00 A.4.4.2.42. 164,277.50 11,827,980.00
3 Pemasangan 1 m List Plank Clasiboard m1 32.40 A.4.4.2.27. 1 87,572.50 2,837,349.00
4 Rangka Plafond Metal Furimng/M2 terpasang m2 65.36 C 110,000.00 7,189,600.00
5 Pemasangan 1 m2 Plafond Clasiboard m2 65.36 A.4.4.2.27. 2 74,382.00 4,861,607.52

II.6 Pekerjaan Instalasi Listrik


1 Instalasi Listrik bh 12.00 C 345,300.00 4,143,600.00
2 Lampu LED 7 watt + Fitting bh 7.00 C 180,000.00 1,260,000.00
3 Saklar Tunggal bh 1.00 C 74,900.00 74,900.00
4 Saklar Ganda bh 3.00 C 81,800.00 245,400.00
5 Stop Kontak 1 Phase bh 4.00 C 81,800.00 327,200.00
6 BOX MCB uk 4 MCB bh 1.00 C 150,000.00 150,000.00

II.7 Pekerjaan Cata-catan


1 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali m2 11.34 A.4.7.1.20. 1 157,619.00 1,787,399.46
2 Pengecatan 1m2 Dinding/Plafon Baru m2 328.00 A.4.7.1.10. 39,767.00 13,043,576.00

Sub Total II 310,978,557.35

III PEMBANGUNAN RUMAH JAGA


III.1 Pekerjaan Pendahuluan
1 m1 Pengukuran dan Pemasangan Bowplank m1 Err:509 A.2.2.1.4. 34,086.00 Err:509

III.2 Pekerjaan Struktur


1 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m m3 0.86 A.2.3.1.1. 115,402.50 99,246.15
poer plat 70x 70
2 1 m Cerucuk Ulin 10 x 10 (lokal) m1 Err:509 P.07.b PU 105,344.03 Err:509
3 Pemasangan 1 m2 bekisting pondasi m2 Err:509 A.4.1.1.20 276,531.30 Err:509
4 Pembesian 1 kg dengan besi polos atau besi ulir kg Err:509 A.4.1.1.17 23,233.11 Err:509
5 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.80 A.4.1.1.7. 1,274,405.14 1,019,524.11
Pekerjaan Sloof 20/30
6 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
7 Pembesian 1 kg dengan besi polos atau besi ulir kg 269.78 A.4.1.1.17 23,233.11 6,267,827.07
8 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509
Pekerjaan Kolom 30/30
9 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.50 A.4.1.1.7. 1,274,405.14 637,202.57
10 Pembesian 1 kg dengan besi polos atau besi ulir kg 54.99 A.4.1.1.17 23,233.11 1,277,588.44
11 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan kolom 20/20
12 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
13 Pembesian 1 kg dengan besi polos atau besi ulir kg 56.43 A.4.1.1.17 23,233.11 1,311,044.12
14 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan Balok 20/30
15 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 2.30 A.4.1.1.7. 1,274,405.14 2,931,131.82
16 Pembesian 1 kg dengan besi polos atau besi ulir kg 345.32 A.4.1.1.17 23,233.11 8,022,855.82
17 Pemasangan 1 m2 bekisting Balok m2 Err:509 A.4.1.1.223 393,496.65 Err:509
Pekerjaan Balok Anak 20/20
18 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
19 Pembesian 1 kg dengan besi polos atau besi ulir kg 29.03 A.4.1.1.17 23,233.11 674,457.04
20 Pemasangan 1 m2 bekisting Balok m2 2.03 A.4.1.1.223 393,496.65 798,798.20
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
Pekerjaan Lantai
21 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 4.90 A.4.1.1.7. 1,274,405.14 6,244,585.18
22 Pembesian 1 kg dengan besi polos atau besi ulir kg 512.34 A.4.1.1.17 23,233.11 11,903,249.02
23 Pemasangan 1 m2 bekisting Lantai m2 20.43 A.4.1.1.224 496,996.65 10,153,641.56
Pekerjaan Kolom Praktis 13/13
24 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.71 A.4.1.1.7. 1,274,405.14 904,827.65
25 Pembesian 1 kg dengan besi polos atau besi ulir kg 225.40 A.4.1.1.17 23,233.11 5,236,741.87
26 Pemasangan 1 m2 bekisting kolom m2 10.97 A.4.1.1.222 390,046.65 4,278,811.75
Pekerjaan Balok 13/15
27 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.59 A.4.1.1.7. 1,274,405.14 751,899.03
28 Pembesian 1 kg dengan besi polos atau besi ulir kg 112.12 A.4.1.1.17 23,233.11 2,604,895.73
29 Pemasangan 1 m2 bekisting sloof m2 4.58 A.4.1.1.21 293,695.05 1,345,123.33
Pekerjaan Gewel 13/13
30 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.24 A.4.1.1.7. 1,274,405.14 305,857.23
31 Pembesian 1 kg dengan besi polos atau besi ulir kg 51.46 A.4.1.1.17 23,233.11 1,195,575.58
32 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509

III.3 Pekerjaan Dinding Dan Lantai


1 Pemasangan Dinding Bata Merah 1/2 bata 1:5 m2 Err:509 A.4.4.1.9. 179,064.43 Err:509
2 Pemasangan Pelesteran 1m2 1sp:5pp 2 cm m2 Err:509 A.4.4.2.16. 116,167.02 Err:509
3 Pemasangan Acian 1m2 m2 Err:509 A.4.4.2.27. 54,533.00 Err:509
4 Pekerjaan Lantai Keramik 40 x 40 m2 Err:509 A. 2.2.1.13.1.1 361,606.00 Err:509
5 Pekerjaan Lantai Keramik 20 x 20 m2 Err:509 A. 2.2.1.13.2.1 237,130.00 Err:509
6 1 M2 Pas. Dinding keramik 40 x 40 cm SNI 7395:2008 m2 5.1400 A. 2.2.1.13.3.1 369,012.00 1,896,721.68

III.4 Pekerjaan Pintu ,Jendela & Penggantung


1 Err:509 M1 Err:509 Err:509 Err:509 Err:509
2 Err:509 Bh Err:509 Err:509 Err:509 Err:509
3 Err:509 Bh Err:509 Err:509 Err:509 Err:509
4 Err:509 Bh Err:509 Err:509 Err:509 Err:509
5 Err:509 Bh Err:509 Err:509 Err:509 Err:509
6 Err:509 Bh Err:509 Err:509 Err:509 Err:509
7 Err:509 Bh Err:509 Err:509 Err:509 Err:509

III.5 Pekerjaan Atap & Plafond


1 Rangka Baja ringan /M2 terpasang m2 Err:509 C 230,000.00 Err:509
2 Pemasangan 1m2 Atap zincalum m2 Err:509 A.4.4.2.42. 164,277.50 Err:509
3 Pemasangan 1 m List Plank Clasiboard m1 Err:509 A.4.4.2.27. 1 87,572.50 Err:509
4 Rangka Plafond Metal Furimng/M2 terpasang m2 Err:509 C 110,000.00 Err:509
5 Pemasangan 1 m2 Plafond Clasiboard m2 Err:509 A.4.4.2.27. 2 74,382.00 Err:509

III.6 Pekerjaan Sanitair


1 Pemasangan 1 Bh Kloset Jongkok Bh 1.00 A.5.1.1.2 1,138,718.50 1,138,718.50
2 Pemasangan 1 Bh Bak cuci piring stainlessteel Bh 1.00 A.5.1.1.12 750,996.00 750,996.00
3 Pemasangan 1 Bh Floor drain Bh 1.00 A.5.1.1.14 43,907.00 43,907.00
4 Pemasangan 1 Bh kran diameter 1/2" atau 3/4" Bh 3.00 A.5.1.1.19 96,996.75 290,990.25
5 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" M1 12.00 A.5.1.1.25 30,387.60 364,651.20
6 Pemasangan 1 m' pipa PVC tipe AW diameter 3" M1 6.00 A.5.1.1.31 129,983.93 779,903.55
7 Pemasangan 1 m' pipa PVC tipe AW diameter 4" M1 6.00 A.5.1.1.32 184,321.43 1,105,928.55
8 Biotank 500 Ltr Bh 1.00 C 3,500,000.00 3,500,000.00

III.7 Pekerjaan Instalasi Listrik


1 Instalasi Listrik bh 12.00 C 345,300.00 4,143,600.00
2 Lampu LED 7 watt + Fitting bh 7.00 C 180,000.00 1,260,000.00
3 Saklar Tunggal bh 1.00 C 74,900.00 74,900.00
4 Saklar Ganda bh 3.00 C 81,800.00 245,400.00
5 Stop Kontak 1 Phase bh 4.00 C 81,800.00 327,200.00
6 BOX MCB uk 4 MCB bh 1.00 C 150,000.00 150,000.00

III.7 Pekerjaan Cat Catan


1 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali M2 14.00 A.4.7.1.20. 1 157,619.00 2,206,666.00
2 Pengecatan 1m2 Dinding/Plafon Baru M2 Err:509 A.4.7.1.10. 39,767.00 Err:509

Sub Total III Err:509


IV PEMBANGUNAN RUMAH DOSING
IV.1 Pekerjaan Pendahuluan
1 m1 Pengukuran dan Pemasangan Bowplank m2 Err:509 A.2.2.1.4. 34,086.00 Err:509

IV.2 Pekerjaan Struktur


NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
1 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m kg 0.87 A.2.3.1.1. 115,402.50 100,400.18
poer plat 70x 70
2 1 m Cerucuk Ulin 10 x 10 (lokal) m1 Err:509 P.07.b PU 105,344.03 Err:509
3 Pemasangan 1 m2 bekisting pondasi m2 Err:509 A.4.1.1.20 276,531.30 Err:509
4 Pembesian 1 kg dengan besi polos atau besi ulir kg Err:509 A.4.1.1.17 23,233.11 Err:509
5 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.87 A.4.1.1.7. 1,274,405.14 1,108,732.47
Pekerjaan Sloof 20/30
6 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
7 Pembesian 1 kg dengan besi polos atau besi ulir kg 377.70 A.4.1.1.17 23,233.11 8,775,143.76
8 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509
Pekerjaan Kolom 30/30
9 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.50 A.4.1.1.7. 1,274,405.14 637,202.57
10 Pembesian 1 kg dengan besi polos atau besi ulir kg 54.99 A.4.1.1.17 23,233.11 1,277,588.44
11 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan kolom 20/20
12 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.34 A.4.1.1.7. 1,274,405.14 433,297.75
13 Pembesian 1 kg dengan besi polos atau besi ulir kg 67.72 A.4.1.1.17 23,233.11 1,573,345.87
14 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan Balok 20/30
15 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 2.17 A.4.1.1.7. 1,274,405.14 2,765,459.15
16 Pembesian 1 kg dengan besi polos atau besi ulir kg 325.54 A.4.1.1.17 23,233.11 7,563,305.00
17 Pemasangan 1 m2 bekisting Balok m2 Err:509 A.4.1.1.223 393,496.65 Err:509
Pekerjaan Balok Anak 20/20
18 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.45 A.4.1.1.7. 1,274,405.14 573,482.31
19 Pembesian 1 kg dengan besi polos atau besi ulir kg 48.81 A.4.1.1.17 23,233.11 1,134,007.86
20 Pemasangan 1 m2 bekisting Balok m2 3.41 A.4.1.1.223 393,496.65 1,341,823.58
Pekerjaan Lantai
21 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 4.24 A.4.1.1.7. 1,274,405.14 5,403,477.79
22 Pembesian 1 kg dengan besi polos atau besi ulir kg 474.08 A.4.1.1.17 23,233.11 11,014,350.42
23 Pemasangan 1 m2 bekisting Lantai m2 17.68 A.4.1.1.224 496,996.65 8,786,900.77
Pekerjaan Kolom Praktis 13/13
24 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.39 A.4.1.1.7. 1,274,405.14 497,018.00
25 Pembesian 1 kg dengan besi polos atau besi ulir kg 123.78 A.4.1.1.17 23,233.11 2,875,793.74
26 Pemasangan 1 m2 bekisting kolom m2 6.03 A.4.1.1.222 390,046.65 2,351,981.30
Pekerjaan Balok 13/15
27 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.45 A.4.1.1.7. 1,274,405.14 573,482.31
28 Pembesian 1 kg dengan besi polos atau besi ulir kg 84.55 A.4.1.1.17 23,233.11 1,964,359.03
29 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509
Pekerjaan Gewel 13/13
30 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.25 A.4.1.1.7. 1,274,405.14 318,601.28
31 Pembesian 1 kg dengan besi polos atau besi ulir kg Err:509 A.4.1.1.17 23,233.11 Err:509
32 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509

IV.3 Pekerjaan Dinding Dan Lantai


1 Pemasangan Dinding Bata Merah 1/2 bata 1:5 m2 64.18 A.4.4.1.9. 179,064.43 11,492,355.12
2 Pemasangan Pelesteran 1m2 1sp:5pp 2 cm m2 Err:509 A.4.4.2.16. 116,167.02 Err:509
3 Pemasangan Acian 1m2 m2 Err:509 A.4.4.2.27. 54,533.00 Err:509
4 Pekerjaan Lantai Keramik 40 x 40 m2 Err:509 A. 2.2.1.13.1.1 361,606.00 Err:509
5 1 M2 Pas. Dinding keramik 40 x 40 cm SNI 7395:2008 m2 Err:509 A. 2.2.1.13.3.1 369,012.00 Err:509

IV.4 Pekerjaan Pintu ,Jendela & Penggantung


1 Pintu Roling Door RD M1 Err:509 C 975,000.00 Err:509
2 Pemasangan 1 m2 Dinding Terawang Roster Bh Err:509 A.4.4.1.22. 88,212.13 Err:509

IV.5 Pekerjaan Atap & Plafond


1 Rangka Baja ringan /M2 terpasang Bh Err:509 C 230,000.00 Err:509
2 Pemasangan 1m2 Atap zincalum Bh Err:509 A.4.4.2.42. 164,277.50 Err:509
3 Pemasangan 1 m List Plank Clasiboard M1 Err:509 A.4.4.2.27. 1 87,572.50 Err:509
4 Rangka Plafond Metal Furimng/M2 terpasang M1 Err:509 C 110,000.00 Err:509
5 Pemasangan 1 m2 Plafond Clasiboard M1 Err:509 A.4.4.2.27. 2 74,382.00 Err:509

IV.7 Pekerjaan Instalasi Listrik


1 Instalasi Listrik TTk Err:509 C 345,300.00 Err:509
2 Lampu LED 7 watt + Fitting bh Err:509 C 180,000.00 Err:509
3 Saklar Ganda bh Err:509 C 81,800.00 Err:509
4 Stop Kontak 1 Phase bh Err:509 C 81,800.00 Err:509
5 BOX MCB uk 4 MCB bh Err:509 C 150,000.00 Err:509
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7

IV.8 Pekerjaan Cat Catan


1 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali M2 Err:509 A.4.7.1.20. 1 157,619.00 Err:509
2 Pengecatan 1m2 Dinding/Plafon Baru M2 Err:509 A.4.7.1.10. 39,767.00 Err:509
Sub Total IV Err:509

V PEMBANGUNAN RUMAH GENSET


V.1 Pekerjaan Pendahuluan
1 m1 Pengukuran dan Pemasangan Bowplank m2 Err:509 A.2.2.1.4. 34,086.00 Err:509

V.2 Pekerjaan Struktur


1 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m kg 0.80 A.2.3.1.1. 115,402.50 92,322.00
poer plat 70x 70
2 1 m Cerucuk Ulin 10 x 10 (lokal) m1 Err:509 P.07.b PU 105,344.03 Err:509
3 Pemasangan 1 m2 bekisting pondasi m2 Err:509 A.4.1.1.20 276,531.30 Err:509
4 Pembesian 1 kg dengan besi polos atau besi ulir kg Err:509 A.4.1.1.17 23,233.11 Err:509
5 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.80 A.4.1.1.7. 1,274,405.14 1,019,524.11
Pekerjaan Sloof 20/30
6 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
7 Pembesian 1 kg dengan besi polos atau besi ulir kg 215.83 A.4.1.1.17 23,233.11 5,014,401.05
8 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509
Pekerjaan Kolom 30/30
9 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.50 A.4.1.1.7. 1,274,405.14 637,202.57
10 Pembesian 1 kg dengan besi polos atau besi ulir kg 54.99 A.4.1.1.17 23,233.11 1,277,588.44
11 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan kolom 20/20
12 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 Err:509 A.4.1.1.7. 1,274,405.14 Err:509
13 Pembesian 1 kg dengan besi polos atau besi ulir kg 56.43 A.4.1.1.17 23,233.11 1,311,044.12
14 Pemasangan 1 m2 bekisting kolom m2 Err:509 A.4.1.1.222 390,046.65 Err:509
Pekerjaan Balok 20/30
15 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 1.99 A.4.1.1.7. 1,274,405.14 2,536,066.22
16 Pembesian 1 kg dengan besi polos atau besi ulir kg 298.11 A.4.1.1.17 23,233.11 6,926,020.93
17 Pemasangan 1 m2 bekisting Balok m2 Err:509 A.4.1.1.223 393,496.65 Err:509
Pekerjaan Lantai
21 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 3.36 A.4.1.1.7. 1,274,405.14 4,282,001.26
22 Pembesian 1 kg dengan besi polos atau besi ulir kg 382.00 A.4.1.1.17 23,233.11 8,875,046.11
23 Pemasangan 1 m2 bekisting Lantai m2 13.99 A.4.1.1.224 496,996.65 6,952,983.13
Pekerjaan Kolom Praktis 13/13
24 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.54 A.4.1.1.7. 1,274,405.14 688,178.77
25 Pembesian 1 kg dengan besi polos atau besi ulir kg 170.67 A.4.1.1.17 23,233.11 3,965,194.03
26 Pemasangan 1 m2 bekisting kolom m2 8.31 A.4.1.1.222 390,046.65 3,241,287.66
Pekerjaan Balok 13/15
27 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.31 A.4.1.1.7. 1,274,405.14 395,065.59
28 Pembesian 1 kg dengan besi polos atau besi ulir kg 58.82 A.4.1.1.17 23,233.11 1,366,571.24
29 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509
Pekerjaan Gewel 13/13
30 Membuat 1 m3 beton mutu f’c = 19,3 MPa m3 0.20 A.4.1.1.7. 1,274,405.14 254,881.03
31 Pembesian 1 kg dengan besi polos atau besi ulir kg 44.11 A.4.1.1.17 23,233.11 1,024,812.26
32 Pemasangan 1 m2 bekisting sloof m2 Err:509 A.4.1.1.21 293,695.05 Err:509

V.3 Pekerjaan Dinding Dan Lantai


1 Pemasangan Dinding Bata Merah 1/2 bata 1:5 m2 49.08 A.4.4.1.9. 179,064.43 8,788,482.22
2 Pemasangan Pelesteran 1m2 1sp:5pp 2 cm m2 Err:509 A.4.4.2.16. 116,167.02 Err:509
3 Pemasangan Acian 1m2 m2 Err:509 A.4.4.2.27. 54,533.00 Err:509
4 Pekerjaan Lantai Keramik 40 x 40 m2 Err:509 A. 2.2.1.13.1.1 361,606.00 Err:509

V.4 Pekerjaan Pintu ,Jendela & Penggantung


1 Pintu Roling Door RD M1 Err:509 C 975,000.00 Err:509
2 Pemasangan 1 m2 Dinding Terawang Roster Bh Err:509 A.4.4.1.22. 88,212.13 Err:509

V.5 Pekerjaan Atap & Plafond


1 Rangka Baja ringan /M2 terpasang Bh 31.97 C 230,000.00 7,353,100.00
2 Pemasangan 1m2 Atap zincalum Bh 34.27 A.4.4.2.42. 164,277.50 5,629,789.93
3 Pemasangan 1 m List Plank Clasiboard M1 Err:509 A.4.4.2.27. 1 87,572.50 Err:509
4 Rangka Plafond Metal Furimng/M2 terpasang M1 28.66 C 110,000.00 3,152,600.00
5 Pemasangan 1 m2 Plafond Clasiboard M1 28.66 A.4.4.2.27. 2 74,382.00 2,131,788.12

V.6 Pekerjaan Instalasi Listrik


1 Instalasi Listrik TTk Err:509 C 345,300.00 Err:509
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
2 Lampu LED 7 watt + Fitting bh Err:509 C 180,000.00 Err:509
3 Saklar Tunggal bh Err:509 C 74,900.00 Err:509
4 Saklar Ganda bh Err:509 C 81,800.00 Err:509
5 Stop Kontak 1 Phase bh Err:509 C 81,800.00 Err:509
6 BOX MCB uk 4 MCB bh Err:509 C 150,000.00 Err:509

V.7 Pekerjaan Cat Catan


1 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali M2 6.79 A.4.7.1.20. 1 157,619.00 1,070,233.01
2 Pengecatan 1m2 Dinding/Plafon Baru M2 126.81 A.4.7.1.10. 39,767.00 5,042,853.27
Sub total V Err:509

VI PEKERJAAN JALAN ULIN DAN RUMAH INTAKE


VI.1 Pekerjaan Jalan Ulin
1 1 m Cerucuk Ulin 10 x 10 (lokal) m1 Err:509 P.07.b PU 105,344.03 Err:509
2 1 Bh Memasang Sunduk Kalang Kayu Ulin 5 x 10 Bh Err:509 A.11.Balok. 8 101,246.00 Err:509
3 Sloof & Balok Kayu Ulin 10/10 lokal m1 Err:509 A.11.Balok. 2 149,191.80 Err:509
4 Gelegar Kayu Ulin 5/10 m2 Err:509 A.11.Balok. 3 203,751.83 Err:509
5 1 M2 Lantai Papan Kayu Ulin 2/20 (Lokal) m2 Err:509 A.11.Balok. 4 108,321.95 Err:509
6 Balok Gapit Kayu Ulin m1 Err:509 A.11.Balok. 6 140,135.55 Err:509
7 Skoor Kayu Ulin 5/10 m3 Err:509 A.11.Balok. 5 12,662,928.30 Err:509
8 Pasang 1 M2 dinding dan Rangka Kayu Ulin M2 148.00 A.4.6.1 469,572.60 69,496,744.80
9 Rangka Baja ringan /M2 terpasang M2 21.84 C 230,000.00 5,023,200.00
10 Pemasangan 1m2 Atap zincalum M2 21.84 A.4.4.2.42. 164,277.50 3,587,820.60
11 Err:509 M1 5.30 Err:509 Err:509 Err:509
12 Err:509 Bh 2.00 Err:509 Err:509 Err:509
13 Err:509 bh 1.00 Err:509 Err:509 Err:509
14 Err:509 bh 6.00 Err:509 Err:509 Err:509
15 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali M2 38.40 A.4.7.1.20. 1 157,619.00 6,052,569.60

Sub total VI Err:509

VII PEKERJAAN WATER TREATMENT PLANT


VII.1 Pekerjaan Pondasi WTP
1 0 m1 - #N/A #N/A #N/A
2 0 m1 - #N/A #N/A #N/A
3 Biotank BIOAGA 0 6 m1 - #N/A #N/A #N/A
- Ukuran 990 X 990 X 1260 mm
4 - Kapasitas 5-7 Orang Bh - #N/A #N/A #N/A
5 -Penggalian
Volume 900 Liter
1 m3 tanah biasa sedalam 1 s/d 1,5 m m2 - 128,443.50 -
- Accessories A.2.3.1.1. 2
6 Pengurugan 1 m3 dengan pasir pasang kg 3,196.97 A.2.3.1.11. 253,161.00 809,348,122.17
7 Membuat 1 m3 beton mutu f’c = 21,7 MPa M3 - A.4.1.1.8. 1,213,606.59 -
VII.2 Pengadaan dan Pemasangan WTP
8 Pengadaan dan Pemasangan IPA Paket (Lengkap),Kapasitas . 30 Lt./Dt. Paket 1.00 RWM 1 2,675,000,000.00 2,675,000,000.00
Paket IPA Konstruksi Fibber Glass ( Bak Flokulasi, Sedimentasi & Filtrasi )
- Sistem Baak Wash tidak menggunakan Pompa
- Pompa Dosing 3 Unit Termasuk panel dan instalasi selang kimia
- 3 Bh Penggerak/Pengaduk Mixer dan Panelnya
- Tangki Bahan Kimia 6 Unit
- Accessories : Pipa Inlet, Outlet, Back wash, Valve, Ben, Tee Penguras Dll
- Pemasangan Paket IPA di lapangan
- Uji Coba dan Comisioning
- Pemasangan Paket IPA di lapangan

9 Pengadaan Alat -Alat Laboratorium, Uji Air Bersih Paket 1.00 RWM F.1 40,000,000.00 40,000,000.00
- Comparator PH & Cloor
- Turbidimeter
- Neraca Farmasi
- Timbangan Max 100 Kg
- Jartest 6 mix
Sub total VII #N/A

VIII PEKERJAAN RESERVOAR


VIII.1 Pekerjaan Pondasi Reservoar
1 0 m1 - #N/A #N/A #N/A
2 0 m1 - #N/A #N/A #N/A
3 0 m1 - #N/A #N/A #N/A
4 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m Bh 1.30 A.2.3.1.1. 2 128,443.50 166,976.55
5 0 m2 - - #N/A #N/A
6 0 kg - - #N/A #N/A
7 Membuat 1 m3 beton mutu f’c = 21,7 MPa M3 - A.4.1.1.8. 1,213,606.59 -

VIII.1 Pengadaan dan Pemasangan Reservoar


1 Pengadaan dan Pemasangan Reservoir Paket 1.00 RWM 1 1,653,000,000.00 1,653,000,000.00
Baja SS400 (Lengkap), Kaps. ± 400 M3.
- Diameter 15000 mm Tinggi 3000 mm
- Lubang Inlet, Outlet 3 bh, Penguras 1bh, Peluap 2bh (beserta Valvenya) dan Lubanng Udara 1bh, Lubang bkontrol 2bh
#NAME?
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
- Penutup Reservoir Baja
- Pemasangan paket Reservoir Baja di lapangan
- Uji Coba dan Comisioning

Sub total VIII #N/A

IX PENGADAAN DAN PEMASANGAN PIPA


Pengadaan Pipa
IX.1 Pipa HDPE Ø 200 mm, S 8 - SDR 17 (PN 10/PE 100)
1 Pipa HDPE Ø 200 mm M¹ 1,300.00 PE. 2 642,332.50 835,032,250.00
2 Pemasangan 1 m pipa HDPE Ø 200 mm M¹ 1,300.00 A.8.4.1.21 37,243.90 48,417,070.00
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m M¹ 390.00 A.2.3.1.1. 115,402.50 45,006,975.00
4 Pengurugan kembali 1 m3 galian tanah M3 349.18 A.2.3.1.9. 38,467.50 13,432,081.65
5 Pengetesan 1 m pipa Ø 200 mm M3 1,300.00 A.8.4.5.5 4,387.48 5,703,724.00

IX.2 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 75 mm M¹ 4,293.00 PE. 5 124,000.00 532,332,000.00
2 Pemasangan 1 m pipa HDPE Ø 75 mm M¹ 4,293.00 A.8.4.1.17.1 17,890.40 76,803,487.20
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m M¹ 450.77 A.2.3.1.1. 115,402.50 52,019,407.91
4 Pengurugan kembali 1 m3 galian tanah M3 436.98 A.2.3.1.9. 38,467.50 16,809,528.15
5 Pengetesan 1 m pipa Ø 75 mm M3 4,293.00 A.8.4.5.2 2,524.48 10,837,592.64

IX.3 PENGADAAN ACESSORIES


JALUR PIPA
1 Bend 90º (HDPE) Ø 200 mm Bh 2.00 Bn. 2 1,313,300.00 2,626,600.00
2 DOP HDPE Ø 200 mm Bh 1.00 Dp. 1,005,600.00 1,005,600.00
3 Stube Flange (HDPE) Ø 200 mm Bh 4.00 Sf. 2 1,459,000.00 5,836,000.00
4 Flange Steel Ø 200 mm Bh 12.00 Fs. 2 678,845.00 8,146,140.00
5 Bend 45º (Steel) Ø 200 mm Bh 8.00 Bn. 3 1,490,515.00 11,924,120.00
6 Flange Steel Ø 75 mm Bh 2.00 Fs. 5 246,100.00 492,200.00
7 Air Valve All Flange (CI) Ø 75 mm Bh 2.00 Av. 1 5,405,000.00 10,810,000.00
8 TEE HDPE Ø 200 x 75 mm Bh 6.00 tee. 3 1,680,000.00 10,080,000.00
9 Stube Flange (HDPE) Ø 75 mm Bh 16.00 Sf. 5 380,000.00 6,080,000.00
10 Gate Valve All Flange (CI) Ø 75 mm Bh 6.00 Gv. 2,922,400.00 17,534,400.00
11 Bend 90º (HDPE) Ø 75 mm Bh 9.00 Bn. 7 375,200.00 3,376,800.00
12 TEE HDPE Ø 75 x 75 mm Bh 8.00 tee. 7 346,150.00 2,769,200.00
13 DOP HDPE Ø 75 mm Bh 5.00 Dp. 138,000.00 690,000.00
14 Flange Steel Ø 75 mm Bh 12.00 Fs. 5 246,100.00 2,953,200.00
15 Bend 45º (steel) Ø 75 mm Bh 8.00 Bn. 6 186,000.00 1,488,000.00
16 Pipa GI Ø 75 mm m1 8.00 GI. 5 293,250.00 2,346,000.00
17 Pipa GI Ø 200 mm m1 12.00 GI. 2 966,191.00 11,594,292.00

INTAKE
1 Flange Steel Ø 100 mm Bh 1.00 Fs. 4 322,690.00 322,690.00
2 Reducer Steel Ø 150 x 100 mm Bh 1.00 Rd. 282,000.00 282,000.00
3 Bend 90º (steel) Ø 150 mm Bh 1.00 Bn. 516,000.00 516,000.00
4 Flange Steel Ø 150 mm Bh 2.00 Fs. 3 510,000.00 1,020,000.00
5 Butterfly Valve Ø 150 mm, CI All Flange Bh 1.00 Bv. 4,200,000.00 4,200,000.00
6 Check Valve (swing) Ø 150 mm (CI) Bh 1.00 Cv. 6,360,000.00 6,360,000.00
7 Flange Steel Ø 200 mm m1 1.00 Fs. 2 678,845.00 678,845.00
8 Pipa GI Ø 200 mm m1 4.00 GI. 2 966,191.00 3,864,764.00
9 Pipa GI Ø 150 mm Bh 9.00 GI. 3 715,000.00 6,435,000.00
10 Stube Flange (HDPE) Ø 200 mm Bh 2.00 Sf. 2 1,459,000.00 2,918,000.00
11 Bend 45º (HDPE) Ø 200 mm Bh 2.00 Bn. - -
12 Bend 90º (HDPE) Ø 200 mm Bh 2.00 Bn. 2 1,313,300.00 2,626,600.00

HEADER DISTRIBUSI
1 Bend 90º (Steel) Ø 250 mm Bh 2.00 Bn. 1,942,080.00 3,884,160.00
2 Bend 45º (Steel) Ø 250 mm Bh 2.00 Bn. 1 1,746,160.00 3,492,320.00
3 Flange Steel Ø 250 mm Bh 10.00 Fs. 1 1,020,000.00 10,200,000.00
4 Gate Valve All Flange (CI) Ø 250 mm Bh 2.00 Gv. 1 16,900,000.00 33,800,000.00
5 Water Meter Ø 250 mm Bh 2.00 WM. 22,200,000.00 44,400,000.00
6 Stube Flange (HDPE) Ø 250 mm Bh 2.00 Sf. 1 2,113,849.00 4,227,698.00
7 Bend 90º (HDPE) Ø 250 mm Bh 2.00 Bn. 1,788,000.00 3,576,000.00
8 Reducer HDPE Ø 250 x 200 mm Bh 1.00 Rd. 1 1,200,000.00 1,200,000.00
9 Dismantling Joint Ø 200 mm Bh 1.00 Dj. 1 4,168,800.00 4,168,800.00
10 Gate Valve buterfly Ø 200 mm Bh 2.00 Bv. 7,080,000.00 14,160,000.00
11 Bend 90º (Steel) Ø 200 mm Bh 3.00 Bn. 2 1,605,515.00 4,816,545.00
12 Reducer Steel Ø 200 x 150 mm Bh 2.00 Rd. 559,200.00 1,118,400.00
13 Flange Steel Ø 200 mm Bh 7.00 Fs. 2 678,845.00 4,751,915.00
14 Flange Steel Ø 150 mm Bh 2.00 Fs. 3 510,000.00 1,020,000.00
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 3 4.00 5 6.00 7
15 Flexible Joint Ø 200 mm Bh 1.00 Fj. 1 3,240,000.00 3,240,000.00
16 Check Valve Wafer Ø 200 mm (CI) Bh 1.00 Cv. 2,580,000.00 2,580,000.00
17 Blind Flange Ø 200 mm Bh 1.00 Bf. 2 475,000.00 475,000.00
18 Presure Gauge min.10 Bar Bh 2.00 RWM F.4 300,000.00 600,000.00
19 Pipa GI Ø 250 mm m1 24.00 GI. 1 1,186,416.00 28,473,984.00
20 Pipa GI Ø 200 mm m1 9.00 GI. 2 966,191.00 8,695,719.00

PEMASANGAN ACESSORIES
1 Pemasangan 1 buah Valve Ø 75 mm bh 8.00 A.8.4.3.1.1 226,262.50 1,810,100.00
2 Pemasangan 1 buah Valve Ø 150 mm bh 2.00 A.8.4.3.1 368,453.10 736,906.20
3 Pemasangan 1 buah Valve Ø 200 mm bh 3.00 A.8.4.3.2 467,619.90 1,402,859.70
4 Pemasangan 1 buah Valve Ø 250 mm bh 4.00 A.8.4.3.3 481,994.90 1,927,979.60
5 Pemasangan 1 m pipa GIP Ø 250 mm M¹ 24.00 A.8.4.1.38 235,177.30 5,644,255.20
6 Pemasangan 1 m pipa GIP Ø 200 mm M¹ 25.00 A.8.4.1.37 197,257.20 4,931,430.00
7 Pemasangan 1 m pipa GIP Ø 150 mm M¹ 9.00 A.8.4.1.36 125,421.30 1,128,791.70
8 Pemasangan 1 m pipa GIP Ø 75 mm M¹ 8.00 A.8.4.1.33.2 90,569.40 724,555.20
9 Pemasangan 1 buah Tee Ø 200 mm bh 6.00 A.8.4.3.16 71,927.90 431,567.40
10 Pemasangan 1 buah Tee Ø 75 mm bh 8.00 A.8.4.3.15.1 30,923.50 247,388.00
11 1 m Crossing Boring Pipa Ø 75 mm m1 20.00 A. 2.2.1.13.1 424,736.40 8,494,728.00
12 Pekerjaan 1 inch pengelasan dengan las listrik Inch 1,475.80 A.4.2.1.5. 12,160.53 17,946,512.02
13 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis M² 38.78 A.4.7.1.20. 157,619.00 6,112,464.82
14 1 Bh Suport Kayu Ulin 8/8 Bh 8.00 A.11.Balok. 9 485,779.93 3,886,239.47

Sub total IX 1,999,676,885.86

X PEKERJAAN MEKANIKAL ELEKTRIKAL


PENGADAAN DAN PEMASANGAN SAMBUNGAN LISTRI 82,5kVA
1 Kabel NYFGBY 4 X 10 mm M1 70.00 #REF! 165,000.00 11,550,000.00
2 Handle 250 Amper Merk Socomec lkp Box Set 1.00 C 13,560,000.00 13,560,000.00
3 Skun Skt 50 mm bh 8.00 C 1.00 8.00
4 MCCB 125 Amper bh 1.00 C 2,560,000.00 2,560,000.00
5 Pengepresan Kabel bh 8.00 C 120,000.00 960,000.00
6 Box Kwh Meter Set 1.00 C 6,300,000.00 6,300,000.00
7 Gelar Kabel NYFGBY 4 x 70 mm dan Gali Kabel M¹ 70.00 C 290,000.00 20,300,000.00
8 Pasang Handle 250 Amper Set 1.00 C 975,000.00 975,000.00
9 Transportasi Ls 1.00 C 15,000,000.00 15,000,000.00
10 Biaya Penyambungan Va 82,500.00 C 969.00 79,942,500.00
11 Uang Jaminan Langganan Va 82,500.00 C 163.00 13,447,500.00
12 Materai bh 2.00 C 10,000.00 20,000.00
13 Jaminan Instalasi Ls 1.00 C 6,000,000.00 6,000,000.00
14 Biaya Konsul ( Komite Nasional Keselamatan Untuk Instalasi Untuk Penerbitan SLO ) Ls 1.00 C 8,500,000.00 8,500,000.00

MEKANIKAL
1 Pengadaan dan Pemasangan Pompa Intake Submersible Pump Q 10 l/s Head 31 m Unit 1.00 RWM 1 101,151,360.00 101,151,360.00
Pump Housing : Cast Iron Impeller : ductile Cast Iron, Outlet DN 100
NBG 100-80-160/157 Power 11 Kw / 3X380-415 V / 50 Hz
2 Panel Pompa Intake Star Delta 15 Kw Unit 1.00 RWM 2 21,444,000.00 21,444,000.00
3 Pengadaan dan Pemasangan Pompa Distribusi Vertical Multistage Q 35 l/s Unit 1.00 RWM 3 273,792,000.00 273,792,000.00
4 SDP Panel Distribusi Unit 1.00 #REF! #N/A #N/A
5 Kabel NYFGBY 4 X 25 mm Unit 1.00 #REF! 335,000.00 335,000.00
6 Kabel NYYHY 4 x 35 M1 5.00 #REF! 435,000.00 2,175,000.00
7 Kabel NYFGBY 4 X 25 mm M1 130.00 #REF! 335,000.00 43,550,000.00

Sub total X #N/A


SPESIFIKASI TEKNIS

Program : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


Kegiatan : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA
Sub Kegiatan : PEMBANGUNAN SPAM JARINGAN PERPIPAAN DI KAWASAN PERKOTAAN
Paket Pekerjaan
: PEMBANGUNAN RESERVOAR DAN JARINGAN SPN DI DESA MARGAHAYU
Lokasi : DESA MARGAHAYU KEC. LOA KULU, KABUPATEN KUTAI KARTANEGARA
TA : 2022

NO URAIAN PEKERJAAN Spesifikasi Teknis

1 2 3

I PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI


(SMKK)

Penyiapan RKK
Pembuatan dokumen Rencana Keselamatan Konstruksi, Pembuatan prosedur dan instruksi
1 kerja, Penyiapan formulir Standar Proyek
Sosialisasi, promosi dan pelatihan
2 Pengarahan K3 (Safety Briefing) Standar Proyek
3 Spanduk (Banner) Standar Proyek
Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain
4 Pembatas area proyek Standar Proyek
APD antara lain
5 Topi pelindung (Safety Helmet) Standar Proyek
6 Rompi keselamatan (Safety Vest) Standar Proyek
7 Pelindung pernafasan dan mulut (Masker) Standar Proyek
8 Sepatu Keselamatan (Safety Shoes) Standar Proyek
Asuransi dan perizinan :
9 Asuransi Standar Proyek
Personel K3 Konstruksi :
10 Petugas K3 Standar Proyek
Fasilitas, sarana dan prasarana kesehatan :
Peralatan P3K (Kotak P3K, Obat Luka, Perban,dll) dan Pencegahan COVID-19
11 Standar Proyek
Rambu- Rambu yang diperlukan :
12 Rambu Informasi Standar Proyek
13 Rambu Peringatan Standar Proyek
Kegiatan dan peralatan terkait dengan pengendalian risiko Keselamatan Konstruksi :

14 Alat Pemadam Api Ringan (APAR) Standar Proyek

II PEKERJAAN PENDAHULUAN
1 Pembersihan 1 m2 lapangan Manual dengan alat bantu
2 m1 Pengukuran dan Pemasangan Bowplank Kayu Papan Meranti ( Lokal )

II.1 PEKERJAAN RESERVOAR


Pekerjaan Pondasi Reservoar
1 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m Manual dengan alat bantu
2 Pengadaan Pancang Mini Pile 20x20 Mini pile Square 20x20 K-500 (Double Inplate)
3 1 m' Memancang Tiang Mini Pile Pemancangan Menggunakan Alat Hydrolic Machine (Drop Machine)
4 1 Bh' Bobokan Tiang Mini Pile Manual dengan alat bantu
5 1 m Cerucuk Ulin 10/10 (lokal) Kayu Ulin (Lokal)
6 Pasangan 1 m3 Pondasi Batu Gunung 1 : 5 Manual dengan alat bantu
7 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
8 Pemasangan 1 m2 bekisting pondasi Manual dengan alat bantu, Kayu Papan Meranti ( Lokal )
9 Membuat 1 m3 beton mutu f’c = 7,4 MPa Manual dengan alat bantu, Concreet mixer 0,25-0,3 M3
10 Pembesian 1 kg dengan besi polos atau besi ulir Besi Beton
11 Membuat 1 m3 beton mutu f’c = 21,7 Mpa Ready Mix K 250, Ready Mix

Pengadaan dan Pemasangan Reservoar


12 Pengadaan dan Pemasangan Reservoir Pengadaan dan Pemasangan Reservoir
Baja SS400 (Lengkap), Kaps. ± 400 M3. Baja SS400 (Lengkap), Kaps. ± 400 M3.
- Diameter 15000 mm Tinggi 3000 mm Diameter 15000 mm Tinggi 3000 mm
- Dinding 10 mm Lantai 12mm Penutup 6 mm Dinding 10 mm Lantai 12mm Penutup 6 mm
- Lubang Inlet, Outlet 3 bh, Penguras 1bh, Peluap 2bh (beserta Valevnya) dan Lubanng Udara Lubang Inlet, Outlet 3 bh, Penguras 1bh, Peluap 2bh (beserta Valevnya) dan
1bh, Lubang bkontrol 2bh Lubanng Udara 1bh, Lubang bkontrol 2bh
- Penutup Reservoir Baja Penutup Reservoir Baja
- Pemasangan paket Reservoir Baja di lapangan Pemasangan paket Reservoir Baja di lapangan
- Tangga Inspeksi Reservoir Tangga Inspeksi Reservoir
- Uji Coba dan Comisioning Uji Coba dan Comisioning

Pengadaan dan Pemasangan Tiang & Lampu Led 100 Watt


13 Pengadaan dan Pemasangan Tiang & Lampu Led 100 Watt Manual dengan alat bantu

III PENGADAAN DAN PEMASANGAN PIPA


III.1 Pipa HDPE Ø 250 mm, S 8 - SDR 17 (PN 10/PE 100)
1 Pipa HDPE Ø 250 mm Pipa HDPE
NO URAIAN PEKERJAAN Spesifikasi Teknis

1 2 3
2 Pemasangan 1 m pipa HDPE Ø 250 mm Manual dengan alat bantu
3 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m Manual dengan alat bantu
4 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
5 Pengetesan 1 m pipa Ø 250 mm Hydrotes dengan pompa
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) Manual dengan alat bantu

III.2 Pipa HDPE Ø 200 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 200 mm Pipa HDPE
2 Pemasangan 1 m pipa HDPE Ø 200 mm Manual dengan alat bantu
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m Manual dengan alat bantu
4 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
5 Pengetesan 1 m pipa Ø 200 mm Hydrotes dengan pompa
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) Manual dengan alat bantu

III.3 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 150 mm Pipa HDPE
2 Pemasangan 1 m pipa HDPE Ø 150 mm Manual dengan alat bantu
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m Manual dengan alat bantu
4 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
5 Pengetesan 1 m pipa Ø 150 mm Hydrotes dengan pompa
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) Manual dengan alat bantu

III.4 Pipa HDPE Ø 100 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 100 mm Pipa HDPE
2 Pemasangan 1 m pipa HDPE Ø 100 mm Manual dengan alat bantu
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m Manual dengan alat bantu
4 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
5 Pengetesan 1 m pipa Ø 100 mm Hydrotes dengan pompa
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) Manual dengan alat bantu

III.5 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 75 mm Pipa HDPE
2 Pemasangan 1 m pipa HDPE Ø 75 mm Manual dengan alat bantu
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m Manual dengan alat bantu
4 Pengurugan kembali 1 m3 galian tanah Manual dengan alat bantu
5 Pengetesan 1 m pipa Ø 75 mm Hydrotes dengan pompa
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) Manual dengan alat bantu

III.6 PENGADAAN ACESSORIES


1 Pipa GI Ø 250 mm Galvanis Iron/Medium A
2 Pipa GI Ø 200 mm Galvanis Iron/Medium A
3 Pipa GI Ø 150 mm Galvanis Iron/Medium A
4 Pipa GI Ø 100 mm Galvanis Iron/Medium A
5 TEE Y Ø 250 x 200 mm (Steel) Steel, SNI
6 Gate Valve All Flange (CI) Ø 250 mm Cast Iron, SNI
7 Flange Steel Ø 250 mm Steel, SNI
8 Stube Flange (HDPE) Ø 250 mm HDPE, SNI
9 Gate Valve All Flange (CI) Ø 200 mm Cast Iron, SNI
10 Bend 45º (Steel) Ø 200 mm Steel, SNI
11 Flange Steel Ø 200 mm Steel, SNI
12 Stube Flange (HDPE) Ø 200 mm HDPE, SNI
13 Street Box Ø 100 mm Manual dengan alat bantu
14 Bend 90º (HDPE) Ø 200 mm HDPE, SNI
15 Bend 90º (Steel) Ø 200 mm Steel, SNI
16 Water Meter Ø 200 mm SNI
17 Check Valve (swing) Ø 200 CI SNI
18 Blind Flange Ø 200 mm Steel, SNI
19 Modulating Float Control Valve Ø 200 CI SNI
20 Bend 45º (Steel) Ø 250 mm Steel, SNI
21 Blind Flange Ø 250 mm Steel, SNI
22 Bend 45º (HDPE) Ø 250 mm HDPE, SNI
23 Reducer HDPE Ø 250 x 200 mm HDPE, SNI
24 TEE HDPE Ø 200 x 75 mm HDPE, SNI
25 Water Meter Ø 75 mm SNI
26 Stube Flange (HDPE) Ø 75 mm HDPE, SNI
27 Bend 90º (HDPE) Ø 75 mm HDPE, SNI
28 Butterfly Valve Ø 75 mm, CI All Flange Cast Iron, SNI
29 Flange Spigot Ø 75 mm (PVC) PVC, SNI
30 Reducer PVC Ø 75 x 50 mm (AW) PVC, SNI
31 Pipa PVC AW 2 " (rucika) PVC, SNI
32 Bend 90º (PVC) AW Ø 50 mm PVC, SNI
33 Socket Drat Ø 50 mm (PVC) AW PVC, SNI
34 Floating Valve 2 Pelampung Kuningan Kuningan
35 TEE HDPE Ø 200 x 150 mm HDPE, SNI
36 Water Meter Ø 150 mm SNI
37 Stube Flange (HDPE) Ø 150 mm HDPE, SNI
38 TEE HDPE Ø 150 x 75 mm HDPE, SNI
39 Bend 90º (HDPE) Ø 150 mm HDPE, SNI
40 Reducer HDPE Ø 150 x 100 mm HDPE, SNI
41 TEE HDPE Ø 100 x 75 mm HDPE, SNI
42 Bend 90º (HDPE) Ø 100 mm HDPE, SNI
43 Reducer HDPE Ø 100 x 75 mm HDPE, SNI
44 Bend 45º (HDPE) Ø 150 mm HDPE, SNI
45 DOP HDPE Ø 150 mm HDPE, SNI
NO URAIAN PEKERJAAN Spesifikasi Teknis

1 2 3
46 TEE HDPE Ø 200 x 100 mm HDPE, SNI
47 Bend 45º (HDPE) Ø 100 mm HDPE, SNI
48 Water Meter Ø 100 mm SNI
49 Stube Flange (HDPE) Ø 100 mm HDPE, SNI
50 Bend 90º (HDPE) Ø 100 mm HDPE, SNI
51 Bend 90º (PVC) AW Ø 75 mm PVC, SNI
52 TEE Ø 75 x 75 mm (PVC) AW PVC, SNI
53 TEE HDPE Ø 100 x 100 mm HDPE, SNI
54 TEE HDPE Ø 250 x 250 mm HDPE, SNI
55 Reducer HDPE Ø 200 x 100 mm HDPE, SNI
56 TEE HDPE Ø 75 x 75 mm HDPE, SNI
57 Bend 45º (steel) Ø 150 mm Steel, SNI
58 Flange Steel Ø 150 mm Steel, SNI
59 Bend 45º (steel) Ø 100 mm Steel, SNI
60 Flange Steel Ø 100 mm Steel, SNI
61 Gate Valve All Flange (CI) Ø 150 mm Cast Iron, SNI
62 Air Valve All Flange (CI) Ø 75 mm Cast Iron, SNI
63 Flange Steel Ø 75 mm Steel, SNI
64 Pipa PVC Ø AW 3 " (rucika) PVC, SNI
65 Klem Pipa 3" Steel

III.7 PEMASANGAN ACESSORIES


1 Pemasangan 1 m pipa GIP Ø 250 mm Manual dengan alat bantu
2 Pemasangan 1 m pipa GIP Ø 200 mm Manual dengan alat bantu
3 Pemasangan 1 m pipa GIP Ø 150 mm Manual dengan alat bantu
4 Pemasangan 1 m pipa GIP Ø 100 mm Manual dengan alat bantu
3 Pemasangan 1 buah Valve Ø 250 mm Manual dengan alat bantu
4 Pemasangan 1 buah Valve Ø 200 mm Manual dengan alat bantu
5 Pemasangan 1 buah Valve Ø 150 mm Manual dengan alat bantu
6 Pemasangan 1 buah Valve Ø 75 mm Manual dengan alat bantu
7 Pemasangan 1 buah Valve Ø 50 mm Manual dengan alat bantu
8 Pemasangan 1 buah Tee Ø 200 mm Manual dengan alat bantu
9 Pemasangan 1 buah Tee Ø 100 mm Manual dengan alat bantu
10 Pemasangan 1 buah Tee Ø 75 mm Manual dengan alat bantu
11 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis Manual dengan alat bantu
12 Pekerjaan 1 inch pengelasan dengan las listrik Standar WES Japan

III.8 PEKERJAAN LAIN - LAIN


1 Pembongkaran 1 m3 Beton / Aspal Manual dengan alat bantu
2 Membuat 1 m3 beton mutu f’c = 21,7 MPa Manual dengan alat bantu, Concreet mixer 0,25-0,3 M3
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Sub Kegiatan : -
Paket Pekerjaan : PERENCANAAN AIR BERSIH DAN AIR LIMBAH DIKAWASAN KUMUH KEC. BENGALON DAN KEC.
KONGBENG

Lokasi : KEC. BENGALON DAN KECAMATAN KONGBENG, KABUPATEN KUTAI TIMUR


TA : 2022

NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)

1 2 3

I PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI (SMKK) 16,685,800.00

II PEKERJAAN AIR BERSIH KEC. BENGALON 403,434,650.71

III PEKERJAAN AIR LIMBAH KEC. BENGALON 2,054,181,303.30

IV PEKERJAAN AIR BERSIH KEC. KONGBENG 3,225,598,007.70

V PEKERJAAN AIR LIMBAH KEC. KONGBENG 199,903,549.65

Jumlah 5,899,803,311.36
PPn 11% 648,978,364.25
Jumlah + PPn 11% 6,548,781,675.61
Dibulatkan 6,548,781,000.00
TERBILANG :
Enam Miliar Lima Ratus Empat Puluh Delapan Juta Tujuh Ratus Delapan Puluh Satu Ribu Rupiah

Pejabat Pembuat Komitmen


Dinas Pekerjaan Umum
Kab. Kutai Timur

Agus Rian Saputra, ST


Nip. 19830828 201001 1 010
RENCANA ANGGARAN BIAYA (RAB)

Paket Pekerjaan : PERENCANAAN AIR BERSIH DAN AIR LIMBAH DIKAWASAN KUMUH KEC. BENGALON DAN KEC. KONGBENG
Lokasi : KEC. BENGALON DAN KECAMATAN KONGBENG, KABUPATEN KUTAI TIMUR
TA : 2022

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOL KODE (Rp) (Rp)
1 2 3 4 5 6 7

I PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI (SMKK)

Penyiapan RKK
Pembuatan dokumen Rencana Keselamatan Konstruksi
1 Ls 1.00 K.1 500,000.00 500,000.00
Sosialisasi, promosi dan pelatihan
2 Pengarahan K3 (Safety Briefing) Ls 1.00 K.2 400,000.00 400,000.00
3 Spanduk (Banner) Lb 4.00 K.3 45,000.00 180,000.00
Alat Pelindung Kerja dan Alat Pelindung Diri
APK antara lain
4 Pembatas area proyek Ls 1.00 K.4 260,000.00 260,000.00
APD antara lain
5 Topi pelindung (Safety Helmet) Buah 25.00 K.5 50,000.00 1,250,000.00
6 Rompi keselamatan (Safety Vest) Buah 25.00 K.6 40,000.00 1,000,000.00
7 Pelindung pernafasan dan mulut (Masker) Box 2.00 K.7 100,000.00 200,000.00
8 Sepatu Keselamatan (Safety Shoes) Pasang 25.00 K.8 100,000.00 2,500,000.00
Asuransi dan perizinan :
9 Asuransi Ls 1.00 K.9 1,500,000.00 1,500,000.00
Personel K3 Konstruksi :
10 Petugas K3 Org 1.00 K.10 3,250,000.00 3,250,000.00
Fasilitas, sarana dan prasarana kesehatan :
Peralatan P3K (Kotak P3K, Obat Luka, Perban,dll) dan Pencegahan COVID-19
11 Ls 1.00 K.11 2,350,000.00 2,350,000.00
Rambu- Rambu yang diperlukan :
12 Rambu Informasi (Papan Nama Kegiatan) Buah 4.00 K.12 500,000.00 2,000,000.00
13 Rambu Peringatan Buah 4.00 K.13 75,000.00 300,000.00
Kegiatan dan peralatan terkait dengan pengendalian risiko Keselamatan Konstruksi :
14 Alat Pemadam Api Ringan (APAR) Buah 2.00 K.14 497,900.00 995,800.00

Sub Total I 16,685,800.00

II PEKERJAAN AIR BERSIH KEC. BENGALON

II.1 PENGADAAN DAN PEMASANGAN PIPA


II.1.2 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE 100)
1 Pipa HDPE Ø 75 mm M¹ 1,792.00 PE. 5 124,000.00 222,208,000.00
2 Pemasangan 1 m pipa HDPE Ø 75 mm M¹ 1,792.00 A.8.4.1.17.1 17,890.40 32,059,596.80
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m M3 188.16 A.2.3.1.1. 115,402.50 21,714,134.40
4 Pengurugan kembali 1 m3 galian tanah M3 181.27 A.2.3.1.9. 38,467.50 6,972,891.09
5 Pengetesan 1 m pipa Ø 75 mm M¹ 1,792.00 A.8.4.5.2 2,524.48 4,523,868.16
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) M3 53.76 A.2.3.1.10. 83,605.00 4,494,604.80

II.2 PENGADAAN DAN PEMASANGAN ACESSORIES PIPA


II.2.1 PENGADAAN ACESSORIES
1 Flange Spigot Ø 75 mm (PVC) Bh 1.00 Fsp. 1 105,000.00 105,000.00
2 TEE HDPE Ø 75 x 75 mm Bh 5.00 tee. 7 346,150.00 1,730,750.00
3 Gate Valve All Flange (CI) Ø 75 mm Bh 2.00 Gv. 2,922,400.00 5,844,800.00
4 DOP HDPE Ø 150 mm Bh 3.00 Dp. 1 575,000.00 1,725,000.00
5 DOP HDPE Ø 75 mm Bh 6.00 Dp. 138,000.00 828,000.00
6 Stube Flange (HDPE) Ø 75 mm Bh 5.00 Sf. 5 380,000.00 1,900,000.00
7 Street Box Ø 100 mm Bh 2.00 Sb. 1 222,000.00 444,000.00

II.2.2 PEMASANGAN ACESSORIES


1 Pemasangan 1 buah Valve Ø 75 mm Bh 3.00 A.8.4.3.1.1 226,262.50 678,787.50
2 Pemasangan 1 buah Tee Ø 75 mm Bh 2.00 A.8.4.3.15.1 30,923.50 61,847.00

II.3 PEKERJAAN LAIN - LAIN


1 Pembongkaran 1 m3 Beton / Aspal M3 4.50 A. 2.2.1.13. 2,096,031.40 9,432,141.30
2 Membuat 1 m3 beton mutu f’c = 21,7 MPa M3 4.50 A.4.1.1.8. 1,213,606.59 5,461,229.66
3 Pengadaan Dan Pemasangan Sambungan Rumah (SR) Unit 45.00 C 20 1,850,000.00 83,250,000.00

Sub total II 403,434,650.71

III PEKERJAAN AIR LIMBAH KEC. BENGALON

III.1 PENGADAAN DAN PEMASANGAN BIO SEPTICTANK

Biotank BIOAGA 6
- Ukuran 990 X 990 X 1260 mm
- Kapasitas 5-7 Orang unit 298.00 C 21 5,565,000.00 1,658,370,000.00
- Volume 900 Liter
- Accessories

III.2 PEKERJAAN SIPIL


NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
1 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m M3 387.40 A.2.3.1.1. 2 128,443.50 49,759,011.90
2 Pengurugan 1 m3 dengan pasir pasang M3 29.80 A.2.3.1.11. 253,161.00 7,544,197.80
3 Pengurugan kembali 1 m3 galian tanah M3 232.44 A.2.3.1.9. 38,467.50 8,941,385.70
4 Pemasangan 1 m' pipa PVC tipe AW diameter 4" M¹ 1,788.00 A.5.1.1.32 184,321.43 329,566,707.90

Sub total III 2,054,181,303.30

IV PEKERJAAN AIR BERSIH KEC. KONGBENG

IV.1 PENGADAAN DAN PEMASANGAN PIPA


IV.1.1 Pipa HDPE Ø 150 mm, S 8 - SDR 17 (PN 10/PE 100)
1 Pipa HDPE Ø 150 mm M¹ 1,390.00 PE. 3 385,103.00 535,293,170.00
2 Pemasangan 1 m pipa HDPE Ø 150 mm M¹ 1,390.00 A.8.4.1.20 23,743.50 33,003,465.00
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m M3 347.50 A.2.3.1.1. 115,402.50 40,102,368.75
4 Pengurugan kembali 1 m3 galian tanah M3 322.95 A.2.3.1.9. 38,467.50 12,423,045.47
5 Pengetesan 1 m pipa Ø 150 mm M¹ 1,390.00 A.8.4.5.4 3,490.48 4,851,767.20
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) M3 69.50 A.2.3.1.10. 83,605.00 5,810,547.50

IV.1.2 Pipa HDPE Ø 75 mm, S 8 - SDR 17 (PN 10/PE 100)


1 Pipa HDPE Ø 75 mm M¹ 11,065.00 PE. 5 124,000.00 1,372,060,000.00
2 Pemasangan 1 m pipa HDPE Ø 75 mm M¹ 11,065.00 A.8.4.1.17.1 17,890.40 197,957,276.00
3 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m M3 1,161.83 A.2.3.1.1. 115,402.50 134,077,509.56
4 Pengurugan kembali 1 m3 galian tanah M3 1,119.26 A.2.3.1.9. 38,467.50 43,055,267.82
5 Pengetesan 1 m pipa Ø 75 mm M¹ 11,065.00 A.8.4.5.2 2,524.48 27,933,371.20
6 Pemadatan tanah 1 m3 tanah ( per 20 cm) M3 331.95 A.2.3.1.10. 83,605.00 27,752,679.75

IV.2 PENGADAAN DAN PEMASANGAN ACESSORIES PIPA

IV.2.1 PENGADAAN ACESSORIES


1 Pipa GI Ø 150 mm M' 10.00 GI. 3 715,000.00 7,150,000.00
2 Pipa GI Ø 75 mm M' 44.00 GI. 5 293,250.00 12,903,000.00
3 Bend 90º (HDPE) Ø 75 mm Bh 8.00 Bn. 7 375,200.00 3,001,600.00
4 Bend 45º (steel) Ø 150 mm Bh 5.00 Bn. 4 383,000.00 1,915,000.00
5 Bend 45º (steel) Ø 75 mm Bh 24.00 Bn. 6 186,000.00 4,464,000.00
6 TEE HDPE Ø 150 x 150 mm Bh 3.00 tee. 962,040.00 2,886,120.00
7 TEE HDPE Ø 150 x 75 mm Bh 9.00 tee. 4 1,186,800.00 10,681,200.00
8 TEE HDPE Ø 75 x 75 mm Bh 36.00 tee. 7 346,150.00 12,461,400.00
9 TEE Y Ø 150 x 150 mm (CI) Bh 1.00 tee. 2,245,000.00 2,245,000.00
10 Gate Valve All Flange (CI) Ø 150 mm Bh 5.00 Gv. 3 6,500,000.00 32,500,000.00
11 Gate Valve All Flange (CI) Ø 75 mm Bh 21.00 Gv. 2,922,400.00 61,370,400.00
12 Air Valve All Flange (CI) Ø 75 mm Bh 2.00 Av. 1 5,405,000.00 10,810,000.00
13 DOP HDPE Ø 150 mm Bh 3.00 Dp. 1 575,000.00 1,725,000.00
14 DOP HDPE Ø 75 mm Bh 21.00 Dp. 138,000.00 2,898,000.00
15 Stube Flange (HDPE) Ø 150 mm Bh 12.00 Sf. 3 863,650.00 10,363,800.00
16 Stube Flange (HDPE) Ø 75 mm Bh 56.00 Sf. 5 380,000.00 21,280,000.00
17 Flange Steel Ø 150 mm Bh 6.00 Fs. 3 510,000.00 3,060,000.00
18 Flange Steel Ø 75 mm Bh 38.00 Fs. 5 246,100.00 9,351,800.00
19 Street Box Ø 100 mm Bh 23.00 Sb. 1 222,000.00 5,106,000.00

IV.2.2 PEMASANGAN ACESSORIES


1 Pemasangan 1 m pipa GIP Ø 150 mm M¹ 10.00 A.8.4.1.36 125,421.30 1,254,213.00
2 Pemasangan 1 m pipa GIP Ø 75 mm M¹ 44.00 A.8.4.1.33.2 90,569.40 3,985,053.60
3 Pemasangan 1 buah Valve Ø 150 mm Bh 5.00 A.8.4.3.1 368,453.10 1,842,265.50
4 Pemasangan 1 buah Valve Ø 75 mm Bh 21.00 A.8.4.3.1.1 226,262.50 4,751,512.50
5 Pemasangan 1 buah Tee Ø 150 mm Bh 13.00 A.8.4.3.15 40,344.30 524,475.90
6 Pemasangan 1 buah Tee Ø 75 mm Bh 36.00 A.8.4.3.15.1 30,923.50 1,113,246.00

IV.3 PEKERJAAN LAIN - LAIN & UTILITAS


1 1 m Crossing Boring Pipa Ø 150 mm M¹ 10.00 A. 2.2.1.13.3 849,472.80 8,494,728.00
2 Pembongkaran 1 m3 Beton / Aspal M3 51.64 A. 2.2.1.13. 2,096,031.40 108,240,895.52
3 Membuat 1 m3 beton mutu f’c = 21,7 MPa M3 51.64 A.4.1.1.8. 1,213,606.59 62,671,706.28
4 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis M² 15.07 A.4.7.1.20. 157,619.00 2,375,633.57
5 Pekerjaan 1 inch pengelasan dengan las listrik Inch 810.12 A.4.2.1.5. 12,160.53 9,851,489.58
6 Pengadaan Dan Pemasangan Sambungan Rumah (SR) Unit 200.00 C 20 1,850,000.00 370,000,000.00

Sub total IV 3,225,598,007.70

V PEKERJAAN AIR LIMBAH KEC. KONGBENG

V.1 PENGADAAN DAN PEMASANGAN BIO SEPTICTANK

Biotank BIOAGA 6
- Ukuran 990 X 990 X 1260 mm
- Kapasitas 5-7 Orang unit 29.00 C 21 5,565,000.00 161,385,000.00
- Volume 900 Liter
- Accessories

V.2 PEKERJAAN SIPIL


1 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m M3 37.70 A.2.3.1.1. 2 128,443.50 4,842,319.95
NO URAIAN PEKERJAAN SAT VOL KODE HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
2 Pengurugan 1 m3 dengan pasir pasang M3 2.90 A.2.3.1.11. 253,161.00 734,166.90
3 Pengurugan kembali 1 m3 galian tanah M3 22.62 A.2.3.1.9. 38,467.50 870,134.85
4 Pemasangan 1 m' pipa PVC tipe AW diameter 4" M¹ 174.00 A.5.1.1.32 184,321.43 32,071,927.95

Sub total V 199,903,549.65


Jumlah Sub Total 5,899,803,311.36
Detail D1 D2 D3 D4
1 Pipa GI Ø 150 mm 10
2 Pipa GI Ø 75 mm 44
3 Bend 90º (HDPE) Ø 75 mm 8 1
4 Bend 45º (steel) Ø 150 mm 5 1
5 Bend 45º (steel) Ø 75 mm 24
6 TEE HDPE Ø 150 x 150 mm 3 2 1
7 TEE HDPE Ø 150 x 75 mm 9 2 1
8 TEE HDPE Ø 75 x 75 mm 36 1 2
9 TEE Y Ø 150 x 150 mm (CI) 1 1
10 Gate Valve All Flange (CI) Ø 150 mm 5 3 1
11 Gate Valve All Flange (CI) Ø 75 mm 21 1
12 Air Valve All Flange (CI) Ø 75 mm 2
13 DOP HDPE Ø 150 mm 3 1 1
14 DOP HDPE Ø 75 mm 21 3 1
15 Stube Flange (HDPE) Ø 150 mm 12 6 2
16 Stube Flange (HDPE) Ø 75 mm 56 2
17 Flange Steel Ø 150 mm 6
18 Flange Steel Ø 75 mm 38
19 Street Box Ø 100 mm 23 0 1 1

Pembongkaran 1 m3 Beton / Aspal 51.641 0.49


Membuat 1 m3 beton mutu f’c = 21,7 MPa 51.641
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 15.072 0
Pekerjaan 1 inch pengelasan dengan las listrik 810.12

dana Rp 6,548,781,000
2 4 6
pagu Rp 5,934,802,000

deviasi -Rp 613,979,000


D5 D6 D7 D8 D9 D10 D11 D12 D13 D14 D15 D16

1
1 1 2 3 2 2 2 2 2 2 1

2 1 2 1

1 2 1 1 1

4 2 4 2

0 0 2 0 0 0 1 2 0 0 0 1

48 0.525 0.5775 0.225 0.1238 0.0619 0.496875 0.2775 0.391875

1 2 8 3 2 4 6
D17 D18 D19 D20 D21 D22 D23 D24 D25 D26

1 2 1

1 1 1
1 1 1 1 1 1 1 1 1

1
1 1 1 1 1 1 1 1

1
1 1 1 2 1 1
2
2 2 2 4 2 2 2 2

1 2 1 1 0 0 1 1 1 1

0.474
D27 D28 D29 S1 WO S2 S3 S4 WO S5 S6 S7
10
14 6 6 6 6 6
1 1 1
4
4 4 4 4 4 4

2
1 1 1 1

2 2 2
1 1

1 2 1
2
4 6 2 2 6 2 2
6
7 6 6 7 6 6
0 0 2 2 0 0 2 0 0 0

3.297 1.413 1.413 1.413 1.413 1.413 4.71


103.62 103.62 103.62 103.62 103.62 103.62 188.4
Jumlah Kebutuhan v

Biotank BIOAGA 6
- Ukuran 990 X 990 X 1260 mm
- Kapasitas 5-7 Orang 29 1
- Volume 900 Liter
- Accessories 29

Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m 37.7 1.3


Pengurugan 1 m3 dengan pasir pasang 2.9 0.1
Pengurugan kembali 1 m3 galian tanah 22.62 0.78
Pemasangan 1 m' pipa PVC tipe AW diameter 4" 174 6

Biotank BIOAGA 6
- Ukuran 990 X 990 X 1260 mm
- Kapasitas 5-7 Orang 298 1
- Volume 900 Liter
- Accessories 298
Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m 387.4 1.3
Pengurugan 1 m3 dengan pasir pasang 29.8 0.1
Pengurugan kembali 1 m3 galian tanah 232.44 0.78
Pemasangan 1 m' pipa PVC tipe AW diameter 4" 1788 6
p l t

1 1 1.3
1 1 0.1

1 1 1.3
1 1 0.1
DAFTAR HARGA BAHAN
Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5

A PIPA & ACCESSORIES


A.1 Pipa HDPE S 8 - SDR 17 (PN 10/PE 100)

1 Pipa HDPE Ø 250 mm PE. 1 M' 945,000.00


2 Pipa HDPE Ø 200 mm PE. 2 M' 642,332.50
3 Pipa HDPE Ø 150 mm PE. 3 M¹ 385,103.00
4 Pipa HDPE Ø 100 mm PE. 4 M' 181,831.00
5 Pipa HDPE Ø 75 mm PE. 5 M' 124,000.00

A.2 Pipa GIP A

1 Pipa GI Ø 250 mm GI. 1 M' 1,186,416.00


2 Pipa GI Ø 200 mm GI. 2 M' 966,191.00
3 Pipa GI Ø 150 mm GI. 3 M' 715,000.00
4 Pipa GI Ø 100 mm GI. 4 M' 387,000.00
5 Pipa GI Ø 75 mm GI. 5 M' 293,250.00
6 Pipa GI Ø 50 mm GI. 6 M' 197,000.00

A.3 Pipa PVC


1 Pipa PVC Ø AW 3 " (rucika) GI. 1 M' 75,000.00
2 Pipa PVC AW 2 " (rucika) GI. 2 M' 45,000.00

B ACCESSORIES PIPA
B.1 BEND
B.1.1 HDPE

1 Bend 45º (HDPE) Ø 250 mm Bn. 1 Bh 1,237,200.00


2 Bend 90º (HDPE) Ø 200 mm Bn. 2 Bh 1,313,300.00
3 Bend 90º (HDPE) Ø 150 mm Bn. 3 Bh 874,000.00
4 Bend 45º (HDPE) Ø 150 mm Bn. 4 Bh 600,000.00
5 Bend 90º (HDPE) Ø 100 mm Bn. 5 Bh 436,655.00
6 Bend 45º (HDPE) Ø 100 mm Bn. 6 Bh 398,000.00
7 Bend 90º (HDPE) Ø 75 mm Bn. 7 Bh 375,200.00

B.1.2 All Socket (PVC)

1 Bend 90º (PVC) AW Ø 75 mm Bn. 1 Bh 55,000.00


2 Bend 90º (PVC) AW Ø 50 mm Bn. 2 Bh 20,000.00

B.1.3 All Flange (CI)/Steel

1 Bend 45º (Steel) Ø 250 mm Bn. 1 Bh 1,746,160.00


2 Bend 90º (Steel) Ø 200 mm Bn. 2 Bh 1,605,515.00
3 Bend 45º (Steel) Ø 200 mm Bn. 3 Bh 1,490,515.00
4 Bend 45º (steel) Ø 150 mm Bn. 4 Bh 383,000.00
5 Bend 45º (steel) Ø 100 mm Bn. 5 Bh 265,000.00
6 Bend 45º (steel) Ø 75 mm Bn. 6 Bh 186,000.00

B.2 Reducer
B.2.1 HDPE

1 Reducer HDPE Ø 250 x 200 mm Rd. 1 Bh 1,200,000.00


2 Reducer HDPE Ø 200 x 100 mm Rd. 2 Bh 527,000.00
3 Reducer HDPE Ø 150 x 100 mm Rd. 3 Bh 419,750.00
Reducer HDPE Ø 150 x 75 mm Rd. Bh
4 Reducer HDPE Ø 100 x 75 mm Rd. 4 Bh 199,200.00

B.2.2 All Socket (PVC)

1 Reducer PVC Ø 75 x 50 mm (AW) Rd. 1 Bh 45,000.00

B.2.3 Reducer Stell

1 Reducer CI Ø 75 x 50 mm Rd. 1 Bh 87,000.00

B.3 TEE
B.3.1 HDPE
Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
1 TEE HDPE PO Ø 500 x 150 mm tee. 1 Bh
2 TEE HDPE Ø 400 x 400 mm tee. 2 Bh
3 TEE HDPE Ø 400 x 350 mm tee. 3 Bh
4 TEE HDPE RT Ø 400 x 300 mm tee. 4 Bh
5 TEE HDPE Ø 400 x 250 mm tee. 5 Bh
6 TEE HDPE Ø 400 x 200 mm tee. 6 Bh
7 TEE HDPE PO Ø 400 x 150 mm tee. 7 Bh
8 TEE HDPE PO Ø 400 x 100 mm tee. 8 Bh
9 TEE HDPE Ø 350 x 350 mm tee. 9 Bh
10 TEE HDPE Ø 350 x 300 mm tee. 10 Bh
11 TEE HDPE Ø 350 x 250 mm tee. 11 Bh
12 TEE HDPE Ø 350 x 200 mm tee. 12 Bh
13 TEE HDPE Ø 350 x 150 mm tee. 13 Bh
14 TEE HDPE Ø 350 x 100 mm tee. 14 Bh 3,009,600.00
15 TEE HDPE Ø 300 x 250 mm tee. 15 Bh 3,960,000.00
16 TEE HDPE Ø 300 x 100 mm tee. 16 Bh
17 TEE HDPE Ø 300 x 75 mm tee. 17 Bh
18 TEE HDPE Ø 300 x 150 mm tee. 18 Bh
19 TEE HDPE Ø 300 x 100 mm tee. 19 Bh
TEE HDPE Ø 250 x 250 mm tee. Bh 2,650,000.00
TEE HDPE Ø 250 x 200 mm tee. Bh 2,500,000.00
TEE HDPE Ø 250 x 150 mm tee. Bh
TEE HDPE Ø 250 x 100 mm tee. Bh
TEE HDPE Ø 250 x 75 mm tee. Bh 1,582,800.00
TEE HDPE Ø 200 x 200 mm tee. Bh
1 TEE HDPE Ø 200 x 150 mm tee. 1 Bh 1,397,000.00
2 TEE HDPE Ø 200 x 100 mm tee. 2 Bh 1,348,600.00
3 TEE HDPE Ø 200 x 75 mm tee. 3 Bh 1,680,000.00
TEE Y HDPE Ø 150 x 150 mm tee. Bh 1,100,000.00
TEE HDPE Ø 150 x 150 mm tee. Bh 962,040.00
TEE HDPE Ø 150 x 100 mm tee. Bh 1,016,760.00
4 TEE HDPE Ø 150 x 75 mm tee. 4 Bh 1,186,800.00
TEE HDPE Ø 150 x 50 mm tee. Bh
5 TEE HDPE Ø 100 x 100 mm tee. 5 Bh 484,150.00
6 TEE HDPE Ø 100 x 75 mm tee. 6 Bh 347,300.00
TEE HDPE Ø 100 x 50 mm tee. Bh 360,000.00
7 TEE HDPE Ø 75 x 75 mm tee. 7 Bh 346,150.00
TEE HDPE Ø 75 x 50 mm tee. Bh
TEE HDPE Ø 50 x 50 mm tee. Bh

B.3.2 TEE Y (Steel)

1 TEE Y Ø 250 x 200 mm (Steel) tee. 1 Bh 2,660,000.00


TEE Y Ø 200 x 200 mm (CI) tee. Bh
TEE Y Ø 200 x 150 mm (CI) tee. Bh
Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
TEE Y Ø 200 x 100 mm (CI) tee. Bh
TEE Y Ø 200 x 75 mm (CI) tee. Bh
TEE Y Ø 150 x 150 mm (CI) tee. Bh 2,245,000.00
TEE Y Ø 150 x 100 mm (CI) tee. Bh
TEE Y Ø 150 x 75 mm (CI) tee. Bh
TEE Y Ø 100 x 100 mm (CI) tee. Bh
TEE Y Ø 100 x 75 mm (CI) tee. Bh
TEE Y Ø 75 x 75 mm (CI) tee. Bh

HDPE E.2.2
TEE PVC RRJ Ø 100 x 75 mm tee. Bh
TEE PVC RRJ Ø 75 x 75 mm tee. Bh

B.3.3 TEE All Socket (PVC)


1 TEE Ø 75 x 75 mm (PVC) AW tee. 1 Bh 110,000.00

B.4 VALVE
B.4.1 Gate Valve

1 Gate Valve All Flange (CI) Ø 250 mm Gv. 1 Bh 16,900,000.00


2 Gate Valve All Flange (CI) Ø 200 mm Gv. 2 Bh 10,500,000.00
3 Gate Valve All Flange (CI) Ø 150 mm Gv. 3 Bh 6,500,000.00
4 Gate Valve All Flange (CI) Ø 100 mm Gv. 4 Bh 3,750,000.00
Gate Valve All Flange (CI) Ø 75 mm Gv. Bh 2,922,400.00
Gate Valve All Flange (CI) Ø 50 mm Gv. Bh

B.4.2 Check Valve

1 Check Valve (swing) Ø 200 CI Cv. 1 Bh 17,100,000.00


2 Modulating Float Control Valve Ø 200 CI Cv. 2 Bh 77,600,000.00
3 Floating Valve 2 Pelampung Kuningan Cv. 3 Bh 750,000.00

B.3.3 Air Valve


B.3.3.1 Single

1 Air Valve All Flange (CI) Ø 100 mm Av. 1 Bh 7,100,000.00


1 Air Valve All Flange (CI) Ø 75 mm Av. 1 Bh 5,405,000.00
2 Air Valve All Flange (CI) Ø 50 mm Av. 2 Bh 4,440,000.00
3 Air Valve All Flange (CI) Ø 25 mm Av. 3 Bh
4 Double Air Valve Ø 100 mm Av. 4 Bh
5 Double Air Valve Ø 75 mm Av. 5 Bh

B.4 Butterfly Valve

1 Butterfly Valve Ø 75 mm, CI All Flange Bv. 1 Bh 1,350,000.00


Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
B.6 DOP HDPE

1 DOP HDPE Ø 150 mm Dp. 1 Bh 575,000.00


DOP HDPE Ø 100 mm Dp. Bh 300,000.00
DOP HDPE Ø 75 mm Dp. Bh 138,000.00
DOP HDPE Ø 50 mm Dp. Bh

B.7 CONNECTOR
B.7.1 Stube Flange (HDPE)

1 Stube Flange (HDPE) Ø 250 mm Sf. 1 Bh 2,113,849.00


2 Stube Flange (HDPE) Ø 200 mm Sf. 2 Bh 1,459,000.00
3 Stube Flange (HDPE) Ø 150 mm Sf. 3 Bh 863,650.00
4 Stube Flange (HDPE) Ø 100 mm Sf. 4 Bh 507,150.00
5 Stube Flange (HDPE) Ø 75 mm Sf. 5 Bh 380,000.00

E.7.2 Flange

1 Flange Steel Ø 250 mm Fs. 1 Bh 1,020,000.00


2 Flange Steel Ø 200 mm Fs. 2 Bh 678,845.00
3 Flange Steel Ø 150 mm Fs. 3 Bh 510,000.00
4 Flange Steel Ø 100 mm Fs. 4 Bh 322,690.00
5 Flange Steel Ø 75 mm Fs. 5 Bh 246,100.00

B.8 Flange Socket

1 Socket Drat Ø 50 mm (PVC) AW Fsd. 1 Bh 30,000.00

B.9 Flange Spigot

1 Flange Spigot Ø 75 mm (PVC) Fsp. 1 Bh 105,000.00


Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
B.10 Blind Flange

1 Blind Flange Ø 250 mm Bf. 1 Bh 525,000.00


2 Blind Flange Ø 200 mm Bf. 2 Bh 475,000.00

B.11 Water Meter

1 Water Meter Ø 200 mm WM. 1 Bh 9,750,000.00


2 Water Meter Ø 150 mm WM. 2 Bh 6,750,000.00
3 Water Meter Ø 100 mm WM. 3 Bh 4,500,000.00
4 Water Meter Ø 75 mm WM. 4 Bh 2,500,000.00

B.12 Street Box

1 Street Box Ø 100 mm Sb. 1 Bh 222,000.00

C RESERVOIR

1 Pengadaan dan Pemasangan Reservoir RWM 1 Paket 1,653,000,000.00


Baja SS400 (Lengkap), Kaps. ± 400 M3.
- Diameter 15000 mm Tinggi 3000 mm
- Dinding 10 mm Lantai 12mm Penutup 6 mm
- Lubang Inlet, Outlet 3 bh, Penguras 1bh, Peluap 2bh (beserta Valvenya) dan Lubanng Udara 1bh, Lubang bkontrol 2bh
- Penutup Reservoir Baja
- Pemasangan paket Reservoir Baja di lapangan
- Tangga Inspeksi Reservoir
- Uji Coba dan Comisioning

E Material Lainnya

1 Semen Portland C1 Kg 1,400.00


2 Kerikil (Maks 30mm) C2 M³ 400,000.00
3 Pasir Pasang C3 M³ 150,000.00
4 Beton Ready Mix Fc 21,7 mpa / K250 C4 M3 1,850,000.00
5 Air / M3 C5 M³ 60,000.00
6 Air /ltr C6 ltr 60.00
7 Kayu Begisting C7 M³ 2,985,000.00
8 Kayu Ulin Balok 10 x 10 (Lokal) C8 M³ 6,522,000.00
Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
9 Minyak Begisting C9 Liter 30,000.00
10 Paku Biasa C 10 Kg 22,000.00
11 Besi Beton C 11 Kg 17,000.00
12 Kawat Beton C 12 Kg 20,000.00
13 Cat Dasar C 13 Kg 50,000.00
14 Cat minyak C 14 Kg 135,000.00
15 Minyak Pelumas C 15 Liter 35,000.00
16 Kawat Las Listrik C 16 Kg 47,000.00
17 Bahan bakar(Pertalite) C 17 Ltr 10,000.00
18 Klem Pipa 3" C 18 Bh 11,280.00
19 Mini Pile 20x20 C 19 M1 300,000.00
20 Pengadaan Dan Pemasangan Sambungan Rumah (SR) C 20 Unit 1,850,000.00
21 Biotank BIOAGA 6 C 21 unit 5,565,000.00
- Ukuran 990 X 990 X 1260 mm
- Kapasitas 5-7 Orang
- Volume 900 Liter
- Accessories
Harga
No. Uraian Kode Satuan
(Rupiah)
1 2 3 4 5
F Peralatan

1 Tripot/Tackel & handle crane 2 T D1 Hari 125,000.00


2 Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 Hari 435,000.00
3 Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 250/90 D3 Hari 550,000.00
4 Tripot Pancang 5m dan Hammer 0,2 ton D4 Hari 125,000.00
5 Mesin Hydrostatic test D5 Jam 30,500.00
6 Mesin Las D6 Jam 121,750.00
7 Crane Service D7 Jam 751,000.00
8 Alat Pancang D8 Jam 750,000.00
9 Concreat Mixer 0.25-0.35 M3 D9 Hari 350,000.00
m1 Pengukuran dan Pemasangan Bowplank A.2.2.1.4.
Pembersihan 1 m2 lapangan A.2.2.1.9.
Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m A.2.3.1.1.
Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m A.2.3.1.1. 2
Pengurugan kembali 1 m3 galian tanah A.2.3.1.9.
Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10.
Pengurugan 1 m3 dengan pasir pasang A.2.3.1.11.
Pengurugan 1 m3 dengan tanah urug A.2.3.1.11. 1
1 m Cerucuk Ulin 10 x 10 (lokal) P.07.b PU
Pengurugan 1 m3 dengan Sirtu A.2.3.1.14.
Pasangan 1 m3 Pondasi Batu Gunung 1 : 5 A.3.2.1.3.
Pembongkaran 1 m3 Beton / Aspal A. 2.2.1.13.
Pekerjaan Lantai Keramik 40 x 40 A. 2.2.1.13.1.1
Pekerjaan Lantai Keramik 20 x 20 A. 2.2.1.13.2.1
1 M2 Pas. Dinding keramik 40 x 40 cm SNI 7395:2008 A. 2.2.1.13.3.1
1 m Crossing Boring Pipa Ø 75 mm A. 2.2.1.13.1
1 m Crossing Boring Pipa Ø 100 mm A. 2.2.1.13.2
1 m Crossing Boring Pipa Ø 150 mm A. 2.2.1.13.3
1 m Crossing Boring Pipa Ø 200 mm A. 2.2.1.13.4
1 m Crossing Boring Pipa Ø 250 mm A. 2.2.1.13.5
Pembuangan 1 m3 tanah sejauh 30 meter A.2.3.1.8.
Membuat 1 m3 beton mutu f’c = 7,4 MPa A.4.1.1.2
Membuat 1 m3 beton mutu f’c = 14,5 Mpa A.4.1.1.5.
Membuat 1 m3 beton mutu f’c = 19,3 MPa A.4.1.1.7.
Membuat 1 m3 beton mutu f’c = 21,7 MPa A.4.1.1.8.
Membuat 1 m3 beton mutu f’c = 21,7 Mpa Ready Mix A.4.1.1.8.1
Pemasangan 1 m2 bekisting pondasi A.4.1.1.20
Pemasangan 1 m2 bekisting sloof A.4.1.1.21
Pemasangan 1 m2 bekisting kolom A.4.1.1.222
Pemasangan 1 m2 bekisting Balok A.4.1.1.223
Pemasangan 1 m2 bekisting Lantai A.4.1.1.224
Pemasangan 1 m2 bekisting Dinding A.4.1.1.225
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17
Pekerjaan 1 inch pengelasan dengan las listrik A.4.2.1.5.
Pemasangan 1M2 Paving block tebal 6 cm A.4.4.3.64.
Pemasangan Dinding Bata Merah 1/2 bata 1:5 A.4.4.1.9.
Pemasangan 1 m2 Dinding Terawang Roster A.4.4.1.22.
Pemasangan Pelesteran 1m2 1sp:5pp 2 cm A.4.4.2.16.
Pemasangan Acian 1m2 A.4.4.2.27.
Pemasangan 1m2 Atap zincalum A.4.4.2.42.
Pemasangan 1 m List Plank Clasiboard A.4.4.2.27. 1
Pemasangan 1 m2 Plafond Clasiboard A.4.4.2.27. 2
List Plafond gypsum A.4.5.1.8.
Pemasangan 1 m2 Plafond gypsum A.4.5.1.7.
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kela A.4.6.1.1.
Pemasangan 1 Bh Kunci tanam biasa A.4.6.2.3
Pemasangan 1 Bh Engsel Pintu A.4.6.2.4
Pemasangan 1 Bh Engsel Jendela A.4.6.2.6
Pemasangan 1 Bh Kunci Slot A.4.6.2.5
Pemasangan 1 Bh Kloset Jongkok A.5.1.1.2
Pemasangan 1 Bh Bak cuci piring stainlessteel A.5.1.1.12
Pemasangan 1 Bh Floor drain A.5.1.1.14
Pemasangan 1 Bh kran diameter 1/2" atau 3/4" A.5.1.1.19
Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" A.5.1.1.25
Pemasangan 1 m' pipa PVC tipe AW diameter 3" A.5.1.1.31
Pemasangan 1 m' pipa PVC tipe AW diameter 4" A.5.1.1.32
Pemasangan 1 m pipa PVC Ø 150 mm A.8.4.1.4
Pemasangan 1 m pipa HDPE Ø 75 mm A.8.4.1.17.1
Pemasangan 1 m pipa HDPE Ø 100 mm A.8.4.1.18
Pemasangan 1 m pipa HDPE Ø 150 mm A.8.4.1.20
Pemasangan 1 m pipa HDPE Ø 200 mm A.8.4.1.21
Pemasangan 1 m pipa HDPE Ø 250 mm A.8.4.1.22
Pemasangan 1 m pipa HDPE Ø 300 mm A.8.4.1.23
Pemasangan 1 m pipa HDPE Ø 350 mm A.8.4.1.23.1
Pemasangan 1 m pipa GIP Ø 75 mm A.8.4.1.33.2
Pemasangan 1 m pipa GIP Ø 100 mm A.8.4.1.34
Pemasangan 1 m pipa GIP Ø 150 mm A.8.4.1.36
Pemasangan 1 m pipa GIP Ø 200 mm A.8.4.1.37
Pemasangan 1 m pipa GIP Ø 250 mm A.8.4.1.38
Pemasangan 1 m pipa GIP Ø 300 mm A.8.4.1.39
Pemasangan 1 m pipa GIP Ø 350 mm A.8.4.1.39.a
Pemasangan 1 buah Valve Ø 50 mm A.8.4.3.1.0
Pemasangan 1 buah Valve Ø 75 mm A.8.4.3.1.1
Pemasangan 1 buah Valve dan Air Valve Ø 100 mm A.8.4.3.1.2
Pemasangan 1 buah Valve Ø 150 mm A.8.4.3.1
Pemasangan 1 buah Valve Ø 200 mm A.8.4.3.2
Pemasangan 1 buah Valve Ø 250 mm A.8.4.3.3
Pemasangan 1 buah Valve Ø 300 mm A.8.4.3.4
Pemasangan 1 buah Valve Ø 350 mm A.8.4.3.4.a
Pemasangan 1 buah Tee Ø 75 mm A.8.4.3.15.1
Pemasangan 1 buah Tee Ø 100 mm A.8.4.3.15.2
Pemasangan 1 buah Tee Ø 150 mm A.8.4.3.15
Pemasangan 1 buah Tee Ø 200 mm A.8.4.3.16
Pemasangan 1 buah Tee Ø 250 mm A.8.4.3.17
Pemasangan 1 buah Tee Ø 300 mm A.8.4.3.18
Pemasangan 1 buah Tee Ø 350 mm A.8.4.3.18.a
Pengetesan 1 m pipa Ø 75 mm A.8.4.5.2
Pengetesan 1 m pipa Ø 100 mm A.8.4.5.3
Pengetesan 1 m pipa Ø 150 mm A.8.4.5.4
Pengetesan 1 m pipa Ø 200 mm A.8.4.5.5
Pengetesan 1 m pipa Ø 250 mm A.8.4.5.6
Pengetesan 1 m pipa Ø 300 mm A.8.4.5.7
Pengetesan 1 m pipa Ø 350 mm A.8.4.5.7.a
Pengecatan 1m2 Dinding/Plafon Baru A.4.7.1.10.
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis A.4.7.1.20.
Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali A.4.7.1.20. 1
Pengecatan 1 m2 permukaan fiber A.4.7.1.20. 2
Pasang 1 M2 dinding dan Rangka Kayu Ulin A.4.6.1
Pasang 1 M Kandangrasi Pagar Ulin A.4.6.1.1
Pemasangan M2 Fiber (2/1:CSM/WR) A.11.fibe. 1
Pengadaan Pancang Mini Pile 20x20 A.11.mini pile. 1
1 m' Memancang Tiang Mini Pile A.11.mini pile. 2
1 Bh' Bobokan Tiang Mini Pile A.11.mini pile. 3
(K3) Pengadaan & Pemasangan Baja Frofil A.11.baja Profil. 1
1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 2 M Lokal A.11.Balok. 1.1
1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 3 M Lokal A.11.Balok. 1.2
1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 4 M Lokal A.11.Balok. 1.3
Sloof & Balok Kayu Ulin 10/10 lokal A.11.Balok. 2
Gelegar Kayu Ulin 5/10 A.11.Balok. 3
1 M2 Lantai Papan Kayu Ulin 2/20 (Lokal) A.11.Balok. 4
Skoor Kayu Ulin 5/10 A.11.Balok. 5
Balok Gapit Kayu Ulin A.11.Balok. 6
Pagar Kandangrasi Kayu Ulin, Uk 5/10, Uk 10/10 Lokal A.11.Balok. 7
1 Bh Memasang Sunduk Kalang Kayu Ulin 5 x 10 A.11.Balok. 8
1 Bh Suport Kayu Ulin 8/8

.1

.2

1
2
3
4

5
6
7

8
9
10

11
12
13

14
15
16
17
18
19

20
21
22

23
24
25

.3
1
2
3
4

.4

1.4

.5

.6

.7
Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali m2
34,086 m1 Pengukuran dan Pemasangan Bowplank
4,180 m1 Pengukuran dan Pemasangan Bowplank
115,403 Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m
128,444 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m
38,468 Pengurugan kembali 1 m3 galian tanah
83,605 Pemadatan tanah 1 m3 tanah ( per 20 cm)
253,161 Pengurugan 1 m3 dengan pasir pasang
142,761 Pengurugan 1 m3 dengan tanah urug
105,344 1 m Cerucuk Ulin 10/10 (lokal)
46,161 Pengurugan 1 m3 dengan Sirtu
1,303,554 Pasangan 1 m3 Pondasi Batu Gunung 1 : 5
2,096,031 Pembongkaran 1 m3 Beton / Aspal
361,606 Pekerjaan Lantai Keramik 40 x 40
237,130 Pekerjaan Lantai Keramik 20 x 20
369,012 1 M2 Pas. Dinding keramik 40 x 40 cm SNI 7395:2008
424,736 1 m Crossing Boring Pipa Ø 75 mm
566,315 1 m Crossing Boring Pipa Ø 100 mm
849,473 1 m Crossing Boring Pipa Ø 150 mm
1,132,630 1 m Crossing Boring Pipa Ø 200 mm
1,415,788 1 m Crossing Boring Pipa Ø 250 mm
50,577 Pembuangan 1 m3 tanah sejauh 30 meter
1,083,568 Membuat 1 m3 beton mutu f’c = 7,4 MPa
1,204,994 Membuat 1 m3 beton mutu f’c = 14,5 Mpa
1,274,405 Membuat 1 m3 beton mutu f’c = 19,3 MPa
1,213,607 Membuat 1 m3 beton mutu f’c = 21,7 MPa
2,212,244 Membuat 1 m3 beton mutu f’c = 21,7 Mpa Ready Mix
276,531 Pemasangan 1 m2 bekisting pondasi
293,695 Pemasangan 1 m2 bekisting sloof
390,047 Pemasangan 1 m2 bekisting kolom
393,497 Pemasangan 1 m2 bekisting Balok
496,997 Pemasangan 1 m2 bekisting Lantai
496,824 Pemasangan 1 m2 bekisting Dinding
23,233 Pembesian 1 kg dengan besi polos atau besi ulir
12,161 Pekerjaan 1 inch pengelasan dengan las listrik
43,988 Pemasangan 1M2 Paving block tebal 6 cm
179,064 Pemasangan Dinding Bata Merah 1/2 bata 1:5
88,212 Pemasangan 1 m2 Dinding Terawang Roster
116,167 Pemasangan Pelesteran 1m2 1sp:5pp 2 cm
54,533 Pemasangan Acian 1m2
164,278 Pemasangan 1m2 Atap zincalum
87,573 Pemasangan 1 m List Plank Clasiboard
74,382 Pemasangan 1 m2 Plafond Clasiboard
213,785 List Plafond gypsum
143,844 Pemasangan 1 m2 Plafond gypsum
13,240,669 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
293,020 Pemasangan 1 Bh Kunci tanam biasa
155,020 Pemasangan 1 Bh Engsel Pintu
120,520 Pemasangan 1 Bh Engsel Jendela
84,863 Pemasangan 1 Bh Kunci Slot
1,138,719 Pemasangan 1 Bh Kloset Jongkok
750,996
43,907 Pemasangan 1 Bh Floor drain
96,997
30,388 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
129,984 Pemasangan 1 m' pipa PVC tipe AW diameter 3"
184,321 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
29,270 Pemasangan 1 m pipa PVC Ø 150 mm
17,890 Pemasangan 1 m pipa HDPE Ø 75 mm
18,569 Pemasangan 1 m pipa HDPE Ø 100 mm
23,744 Pemasangan 1 m pipa HDPE Ø 150 mm
37,244 Pemasangan 1 m pipa HDPE Ø 200 mm
59,531 Pemasangan 1 m pipa HDPE Ø 250 mm
95,931 Pemasangan 1 m pipa HDPE Ø 300 mm
166,387 Pemasangan 1 m pipa HDPE Ø 350 mm
90,569 Pemasangan 1 m pipa GIP Ø 75 mm
99,084 Pemasangan 1 m pipa GIP Ø 100 mm
125,421 Pemasangan 1 m pipa GIP Ø 150 mm
197,257 Pemasangan 1 m pipa GIP Ø 200 mm
235,177 Pemasangan 1 m pipa GIP Ø 250 mm
237,346 Pemasangan 1 m pipa GIP Ø 300 mm
268,765 Pemasangan 1 m pipa GIP Ø 350 mm
79,017 Pemasangan 1 buah Valve Ø 75 mm
226,263 Pemasangan 1 buah Valve Ø 75 mm
283,661 Pemasangan 1 buah Valve dan Air Valve Ø 100 mm
368,453 Pemasangan 1 buah Valve Ø 150 mm
467,620 Pemasangan 1 buah Valve Ø 200 mm
481,995 Pemasangan 1 buah Valve Ø 250 mm
567,295 Pemasangan 1 buah Valve Ø 300 mm
776,630 Pemasangan 1 buah Valve Ø 350 mm
30,924 Pemasangan 1 buah Tee Ø 75 mm
33,018 Pemasangan 1 buah Tee Ø 100 mm
40,344 Pemasangan 1 buah Tee Ø 150 mm
71,928 Pemasangan 1 buah Tee Ø 200 mm
105,501 Pemasangan 1 buah Tee Ø 250 mm
522,082 Pemasangan 1 buah Tee Ø 300 mm
616,053 Pemasangan 1 buah Tee Ø 350 mm
2,524 Pengetesan 1 m pipa Ø 75 mm
2,800 Pengetesan 1 m pipa Ø 100 mm
3,490 Pengetesan 1 m pipa Ø 150 mm
4,387 Pengetesan 1 m pipa Ø 200 mm
5,629 Pengetesan 1 m pipa Ø 250 mm
7,147 Pengetesan 1 m pipa Ø 300 mm
8,890 Pengetesan 1 m pipa Ø 350 mm
39,767 Pengecatan 1m2 Dinding/Plafon Baru
157,619 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis
157,619 Pengecatan 1 m2 permukaan Kayu dengan cat Minyak 3 kali
97,268 Pengecatan 1 m2 permukaan fiber
469,573 Pasang 1 M2 dinding dan Rangka Kayu Ulin
470,400 Pasang 1 M Kandangrasi Pagar Ulin
2,589,965 Pemasangan M2 Fiber (2/1:CSM/WR)
378,940 Pengadaan Pancang Mini Pile 20x20
186,707 1 m' Memancang Tiang Mini Pile
65,748 1 Bh' Bobokan Tiang Mini Pile
26,450 (K3) Pengadaan & Pemasangan Baja Frofil
232,023 1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 2 M Lokal
370,536 1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 3 M Lokal
464,046 1 Bh Pekerjaan Pancang Kayu Ulin 10 x 10 x 4 M Lokal
149,192 Sloof & Balok Kayu Ulin 10/10 lokal
203,752 Gelegar Kayu Ulin 10/10 lokal
108,322 1 M2 Dinding & Lantai Papan Kayu Ulin 2.5/20
12,662,928 Skoor Kayu Ulin 5/10
140,136 Balok Gapit Kayu Ulin
276,684 Pagar Kandangrasi Kayu Ulin, Uk 5/10, Uk 10/10 Lokal
101,246 1 Bh Memasang Sunduk Kalang Kayu Ulin 5 x 10
0

0
ANALISA HARGA SATUAN SNI
A.2.2.1.4. m1 Pengukuran dan Pemasangan Bowplank

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.100 128,000.00 12,800.00
Tukang kayu U2 OH 0.100 140,000.00 14,000.00
Kepala Tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 29,200.00
B BAHAN
Kayu Begisting C7 M3 0.127 2,985,000.00 379,095.00
Paku Biasa C 10 Kg 0.020 22,000.00 440.00

JUMLAH HARGA BAHAN 440.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 29,640.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 4,446.00
F Harga Satuan Pekerjaan (D+E) 34,086.00

A.2.2.1.9. Pembersihan 1 m2 lapangan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.025 128,000.00 3,200.00
Mandor U7 OH 0.003 174,000.00 435.00
JUMLAH TENAGA KERJA 3,635.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 3,635.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 545.25
F Harga Satuan Pekerjaan (D+E) 4,180.25

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 0 s/d 1 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.750 128,000.00 96,000.00
Mandor U7 OH 0.025 174,000.00 4,350.00
JUMLAH TENAGA KERJA 100,350.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 100,350.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 15,052.50
F Harga Satuan Pekerjaan (D+E) 115,402.50

A.2.3.1.1. 2 Penggalian 1 m3 tanah biasa sedalam 1 s/d 1,5 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.825 128,000.00 105,600.00
Mandor U7 OH 0.035 174,000.00 6,090.00
JUMLAH TENAGA KERJA 111,690.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 111,690.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 16,753.50
F Harga Satuan Pekerjaan (D+E) 128,443.50
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.250 128,000.00 32,000.00
Mandor U7 OH 0.008 174,000.00 1,450.00
JUMLAH TENAGA KERJA 33,450.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 33,450.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 5,017.50
F Harga Satuan Pekerjaan (D+E) 38,467.50

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.500 128,000.00 64,000.00
Mandor U7 OH 0.050 174,000.00 8,700.00
JUMLAH TENAGA KERJA 72,700.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 72,700.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 10,905.00
F Harga Satuan Pekerjaan (D+E) 83,605.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir pasang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.300 128,000.00 38,400.00
Mandor U7 OH 0.010 174,000.00 1,740.00
JUMLAH TENAGA KERJA 40,140.00
B BAHAN
Pasir pasang C3 m3 1.200 150,000.00 180,000.00

JUMLAH HARGA BAHAN 180,000.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 220,140.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 33,021.00
F Harga Satuan Pekerjaan (D+E) 253,161.00

A.2.3.1.11. 1 Pengurugan 1 m3 dengan tanah urug

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.300 128,000.00 38,400.00
Mandor U7 OH 0.010 174,000.00 1,740.00
JUMLAH TENAGA KERJA 40,140.00
B BAHAN
Tanah Urug C m3 1.200 70,000.00 84,000.00

JUMLAH HARGA BAHAN 84,000.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 124,140.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 18,621.00
F Harga Satuan Pekerjaan (D+E) 142,761.00
P.07.b PU 1 m Cerucuk Ulin 10 x 10 (lokal)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.150 128,000.00 19,200.00
Mandor U7 OH 0.015 174,000.00 2,610.00
JUMLAH TENAGA KERJA 21,810.00
B BAHAN
Kayu Ulin Balok 10 x 10 (Lokal) C8 m3 0.011 6,522,000.00 68,481.00

JUMLAH HARGA BAHAN 68,481.00


C
PERALATAN
Tripot Pancang 5m dan Hammer 0,2 ton D4 hari 0.011 125,000.00 1,312.50

JUMLAH HARGA ALAT 1,312.50


D Jumlah (A+B+C) 91,603.50
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 13,740.53
F Harga Satuan Pekerjaan (D+E) 105,344.03

A.3.2.1.3. Pasangan 1 m3 Pondasi Batu Gunung 1 : 5

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.500 128,000.00 192,000.00
Tukang Batu U2 OH 0.750 140,000.00 105,000.00
Kepala Tukang U6 OH 0.075 153,000.00 11,475.00
Mandor U7 OH 0.075 174,000.00 13,050.00
JUMLAH TENAGA KERJA 321,525.00
B BAHAN
Batu Gunung C m3 1.200 450,000.00 540,000.00
Semen portland C1 m3 136.000 1,400.00 190,400.00
Pasir Pasang C3 m3 0.544 150,000.00 81,600.00

JUMLAH HARGA BAHAN 812,000.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,133,525.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 170,028.75
F Harga Satuan Pekerjaan (D+E) 1,303,553.75

A. 2.2.1.13. Pembongkaran 1 m3 Beton / Aspal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 13.334 128,000.00 1,706,752.00
Mandor U7 OH 0.666 174,000.00 115,884.00
JUMLAH TENAGA KERJA 1,822,636.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,822,636.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 273,395.40
F Harga Satuan Pekerjaan (D+E) 2,096,031.40
A. 2.2.1.13.1.1 Pekerjaan Lantai Keramik 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.70 128,000.00 89,600.00
Tukang Batu U2 OH 0.350 140,000.00 49,000.00
Kepala Tukang U6 OH 0.040 153,000.00 6,120.00
Mandor U7 OH 0.040 174,000.00 6,960.00
JUMLAH TENAGA KERJA 151,680.00
B BAHAN
Keramik 40x40 C Bh 6.560 16,500.00 108,240.00
Semen Portland C1 Kg 10.40 1,400.00 14,560.00
Semen Warna C Kg 1.62 20,500.00 33,210.00
Pasir Pasang C3 M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 162,760.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 314,440.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 47,166.00
F Harga Satuan Pekerjaan (D+E) 361,606.00

A. 2.2.1.13.2.1 Pekerjaan Lantai Keramik 20 x 20

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.70 128,000.00 89,600.00
Tukang Batu U2 OH 0.350 140,000.00 49,000.00
Kepala Tukang U6 OH 0.040 153,000.00 6,120.00
Mandor U7 OH 0.040 174,000.00 6,960.00
JUMLAH TENAGA KERJA 151,680.00
B BAHAN
Keramik 20x20 C Bh 26.500 - -
Semen Portland C1 Kg 10.40 1,400.00 14,560.00
Semen Warna C Kg 1.62 20,500.00 33,210.00
Pasir Pasang C3 M3 0.05 150,000.00 6,750.00
JUMLAH HARGA BAHAN 54,520.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 206,200.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 30,930.00
F Harga Satuan Pekerjaan (D+E) 237,130.00

A. 2.2.1.13.3.1 1 M2 Pas. Dinding keramik 40 x 40 cm SNI 7395:2008

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.90 128,000.00 115,200.00
Tukang Batu U2 OH 0.500 140,000.00 70,000.00
Kepala Tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.050 174,000.00 8,700.00
JUMLAH TENAGA KERJA 201,550.00
B BAHAN
Keramik 20x40 C Bh 6.560 9,000.00 59,040.00
Semen Portland C1 Kg 9.30 1,400.00 13,020.00
Semen Warna C Kg 1.94 20,500.00 39,770.00
Pasir Pasang C3 M3 0.05 150,000.00 7,500.00
JUMLAH HARGA BAHAN 119,330.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 320,880.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 48,132.00
F Harga Satuan Pekerjaan (D+E) 369,012.00

A. 2.2.1.13.1 1 m Crossing Boring Pipa Ø 75 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 2.706 128,000.00 346,368.00
Mandor U7 OH 0.132 174,000.00 22,968.00
JUMLAH TENAGA KERJA 369,336.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 369,336.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 55,400.40
F Harga Satuan Pekerjaan (D+E) 424,736.40
A. 2.2.1.13.2 1 m Crossing Boring Pipa Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 3.608 128,000.00 461,824.00
Mandor U7 OH 0.176 174,000.00 30,624.00
JUMLAH TENAGA KERJA 492,448.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 492,448.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 73,867.20
F Harga Satuan Pekerjaan (D+E) 566,315.20

A. 2.2.1.13.3 1 m Crossing Boring Pipa Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 5.412 128,000.00 692,736.00
Mandor U7 OH 0.264 174,000.00 45,936.00
JUMLAH TENAGA KERJA 738,672.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 738,672.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 110,800.80
F Harga Satuan Pekerjaan (D+E) 849,472.80

A. 2.2.1.13.4 1 m Crossing Boring Pipa Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 7.216 128,000.00 923,648.00
Mandor U7 OH 0.352 174,000.00 61,248.00
JUMLAH TENAGA KERJA 984,896.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 984,896.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 147,734.40
F Harga Satuan Pekerjaan (D+E) 1,132,630.40

A. 2.2.1.13.5 1 m Crossing Boring Pipa Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 9.020 128,000.00 1,154,560.00
Mandor U7 OH 0.440 174,000.00 76,560.00
JUMLAH TENAGA KERJA 1,231,120.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,231,120.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 184,668.00
F Harga Satuan Pekerjaan (D+E) 1,415,788.00

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.330 128,000.00 42,240.00
Mandor U7 OH 0.010 174,000.00 1,740.00
JUMLAH TENAGA KERJA 43,980.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 43,980.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 6,597.00
F Harga Satuan Pekerjaan (D+E) 50,577.00

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 7,4 MPa K100

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.650 128,000.00 211,200.00
Tukang batu U2 OH 0.275 140,000.00 38,500.00
Kepala tukang U6 OH 0.028 153,000.00 4,284.00
Mandor U7 OH 0.083 174,000.00 14,442.00
JUMLAH TENAGA KERJA 268,426.00
B BAHAN
Semen Portland C1 kg 247.000 1,400.00 345,800.00
Pasir Pasang C3 M3 0.621 150,000.00 93,107.14
Kerikil (Maks 30mm) C2 M3 0.555 400,000.00 222,000.00
Air /ltr C6 liter 215.000 60.00 12,900.00
JUMLAH HARGA BAHAN 673,807.14
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 942,233.14
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 141,334.97
F Harga Satuan Pekerjaan (D+E) 1,083,568.11

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa K250

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.000 128,000.00 128,000.00
Tukang batu U2 OH 0.250 140,000.00 35,000.00
Kepala tukang U6 OH 0.025 153,000.00 3,825.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 167,695.00
B BAHAN
Semen Portland C1 kg 384.000 1,400.00 537,600.00
Pasir Pasang C3 M3 0.494 150,000.00 74,142.86
Kerikil (Maks 30mm) C2 M3 0.577 400,000.00 230,888.89
Air /ltr C6 liter 215.000 60.00 12,900.00
JUMLAH HARGA BAHAN 855,531.75
C PERALATAN
Alat Bantu
Concreat Mixer 0.25-0.35 M3 D9 Hari 0.092 350,000.00 32,083.33
JUMLAH HARGA ALAT 32,083.33
D Jumlah (A+B+C) 1,055,310.08
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 158,296.51
F Harga Satuan Pekerjaan (D+E) 1,213,606.59

A.4.1.1.8.1 Membuat 1 m3 beton mutu f’c = 21,7 Mpa Ready Mix K250

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.400 128,000.00 51,200.00
Tukang batu U2 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.040 174,000.00 6,960.00
JUMLAH TENAGA KERJA 73,690.00
B BAHAN
Beton Ready Mix Fc 21,7 mpa / K250 C4 M3 1.000 1,850,000.00 1,850,000.00

JUMLAH HARGA BAHAN 1,850,000.00


C PERALATAN
Alat Bantu

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,923,690.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 288,553.50
F Harga Satuan Pekerjaan (D+E) 2,212,243.50

A.4.1.1.20 Pemasangan 1 m2 bekisting pondasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.520 128,000.00 66,560.00
Tukang batu U2 OH 0.260 140,000.00 36,400.00
Kepala tukang U6 OH 0.026 153,000.00 3,978.00
Mandor U7 OH 0.026 174,000.00 4,524.00
JUMLAH TENAGA KERJA 111,462.00
B BAHAN
Kayu Begisting C7 m3 0.040 2,985,000.00 119,400.00
Paku Biasa C 10 kg 0.300 22,000.00 6,600.00
Minyak Begisting C9 liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 129,000.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 240,462.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 36,069.30
F Harga Satuan Pekerjaan (D+E) 276,531.30

A.4.1.1.21 Pemasangan 1 m2 bekisting sloof

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.520 128,000.00 66,560.00
Tukang batu U2 OH 0.260 140,000.00 36,400.00
Kepala tukang U6 OH 0.026 153,000.00 3,978.00
Mandor U7 OH 0.026 174,000.00 4,524.00
JUMLAH TENAGA KERJA 111,462.00
B BAHAN
Kayu Begisting C7 m3 0.045 2,985,000.00 134,325.00
Paku Biasa C 10 kg 0.300 22,000.00 6,600.00
Minyak Begisting C9 liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 143,925.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 255,387.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 38,308.05
F Harga Satuan Pekerjaan (D+E) 293,695.05

A.4.1.1.222 Pemasangan 1 m2 bekisting kolom

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.660 128,000.00 84,480.00
Tukang batu U2 OH 0.330 140,000.00 46,200.00
Kepala tukang U6 OH 0.033 153,000.00 5,049.00
Mandor U7 OH 0.033 174,000.00 5,742.00
JUMLAH TENAGA KERJA 141,471.00
B BAHAN
Kayu Begisting C7 m3 0.040 2,985,000.00 119,400.00
Plywood 9mm C Lbr 0.350 190,000.00 66,500.00
Paku Biasa C 10 kg 0.400 22,000.00 8,800.00
Minyak Begisting C9 liter 0.100 30,000.00 3,000.00
JUMLAH HARGA BAHAN 197,700.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 339,171.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 50,875.65
F Harga Satuan Pekerjaan (D+E) 390,046.65

A.4.1.1.223 Pemasangan 1 m2 bekisting Balok

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.660 128,000.00 84,480.00
Tukang batu U2 OH 0.330 140,000.00 46,200.00
Kepala tukang U6 OH 0.033 153,000.00 5,049.00
Mandor U7 OH 0.033 174,000.00 5,742.00
JUMLAH TENAGA KERJA 141,471.00
B BAHAN
Kayu Begisting C7 m3 0.040 2,985,000.00 119,400.00
Plywood 9mm C Lbr 0.350 190,000.00 66,500.00
Paku Biasa C 10 kg 0.400 22,000.00 8,800.00
Minyak Begisting C9 liter 0.200 30,000.00 6,000.00
JUMLAH HARGA BAHAN 200,700.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 342,171.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 51,325.65
F Harga Satuan Pekerjaan (D+E) 393,496.65

A.4.1.1.224 Pemasangan 1 m2 bekisting Lantai

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.660 128,000.00 84,480.00
Tukang batu U2 OH 0.330 140,000.00 46,200.00
Kepala tukang U6 OH 0.033 153,000.00 5,049.00
Mandor U7 OH 0.033 174,000.00 5,742.00
JUMLAH TENAGA KERJA 141,471.00
B BAHAN
Kayu Begisting C7 M³ 0.040 2,985,000.00 119,400.00
Plywood 9mm C Bh 0.350 190,000.00 66,500.00
Paku Biasa C 10 Kg 0.400 22,000.00 8,800.00
Minyak Begisting C9 Liter 0.200 30,000.00 6,000.00
Dolken Galam 5-8 2m C Bh 6.000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 290,700.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 432,171.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 64,825.65
F Harga Satuan Pekerjaan (D+E) 496,996.65

A.4.1.1.225 Pemasangan 1 m2 bekisting Dinding

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.660 128,000.00 84,480.00
Tukang batu U2 OH 0.330 140,000.00 46,200.00
Kepala tukang U6 OH 0.033 153,000.00 5,049.00
Mandor U7 OH 0.033 174,000.00 5,742.00
JUMLAH TENAGA KERJA 141,471.00
B BAHAN
Kayu Begisting C7 M³ 0.050 2,985,000.00 149,250.00
Plywood 9mm C Bh 0.350 190,000.00 66,500.00
Paku Biasa C 10 Kg 0.400 22,000.00 8,800.00
Minyak Begisting C9 Liter 0.200 30,000.00 6,000.00
Dolken Galam 5-8 2m C Bh 4.000 15,000.00 60,000.00
JUMLAH HARGA BAHAN 290,550.00
C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 432,021.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 64,803.15
F Harga Satuan Pekerjaan (D+E) 496,824.15

A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir


Asumsi Pembesian 10 kg dengan besi polos atau besi ulir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.070 128,000.00 8,960.00
Tukang besi U3 OH 0.070 140,000.00 9,800.00
Kepala tukang U6 OH 0.007 153,000.00 1,071.00
Mandor U7 OH 0.004 174,000.00 696.00
JUMLAH TENAGA KERJA 20,527.00
B BAHAN
Besi Beton C 11 kg 10.500 17,000.00 178,500.00
Kawat Beton C 12 kg 0.150 20,000.00 3,000.00

JUMLAH HARGA BAHAN 181,500.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 202,027.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 30,304.05
F Harga Satuan Pekerjaan (D+E) 232,331.05
Harga/ Kg F/10 23,233.11

A.4.2.1.5. Pekerjaan 1 inch pengelasan dengan las listrik


Asumsi Pengerjaan 10 cm/ 4 inch pengelasan dengan las listrik
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.040 128,000.00 5,120.00
Tukang besi U3 OH 0.020 140,000.00 2,800.00
Kepala tukang U6 OH 0.002 153,000.00 306.00
Mandor U7 OH 0.002 174,000.00 348.00
JUMLAH TENAGA KERJA 8,574.00
B BAHAN
Kawat las listrik C 16 Kg 0.400 47,000.00 18,800.00
Solar C Liter 0.300 9,700.00 2,910.00
Minyak Pelumas C 15 Liter 0.040 35,000.00 1,400.00
JUMLAH HARGA BAHAN 23,110.00
C PERALATAN
Mesin Las D6 Jam 0.170 121,750.00 20,697.50

JUMLAH HARGA ALAT 20,697.50


D Jumlah (A+B+C) 42,297.50
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 6,344.63
F Harga Satuan Pekerjaan (D+E) 48,642.13
Harga/ Inch F/4 12,160.53

A.4.4.3.64. Pemasangan 1M2 Paving block tebal 6 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.013 128,000.00 1,600.00
Kepala tukang U6 OH 0.250 153,000.00 38,250.00
Kepala tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.0013 174,000.00 226.20
JUMLAH TENAGA KERJA 47,726.20
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 38,250.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 5,737.50
F Harga Satuan Pekerjaan (D+E) 43,987.50

A.4.4.1.9. Pemasangan Dinding Bata Merah 1/2 bata 1:5

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.300 128,000.00 38,400.00
Tukang batu U2 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.0013 174,000.00 226.20
JUMLAH TENAGA KERJA 54,156.20
B BAHAN
Batu bata Merah C M3 65.000 1,250.00 81,250.00
Semen Portland C1 M3 9.680 1,400.00 13,552.00
Pasir Pasang C3 M3 0.045 150,000.00 6,750.00

JUMLAH HARGA BAHAN 101,552.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 155,708.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 23,356.23
F Harga Satuan Pekerjaan (D+E) 179,064.43
A.4.4.1.22. Pemasangan 1 m2 Dinding Terawang Roster

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.300 128,000.00 38,400.00
Tukang batu U2 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.0013 174,000.00 226.20
JUMLAH TENAGA KERJA 54,156.20
B BAHAN
Bata Terawang/Roster C M3 25.000 - -
Semen Portland C1 M3 11.500 1,400.00 16,100.00
Pasir Pasang C3 M3 0.043 150,000.00 6,450.00

JUMLAH HARGA BAHAN 22,550.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 76,706.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 11,505.93
F Harga Satuan Pekerjaan (D+E) 88,212.13

A.4.4.2.16. Pemasangan Pelesteran 1m2 1sp:5pp 2 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.400 128,000.00 51,200.00
Tukang batu U2 OH 0.200 140,000.00 28,000.00
Kepala tukang U6 OH 0.020 153,000.00 3,060.00
Mandor U7 OH 0.022 174,000.00 3,828.00
JUMLAH TENAGA KERJA 86,088.00
B BAHAN
Semen Portland C1 M3 6.912 1,400.00 9,676.80
Pasir Pasang C3 M3 0.035 150,000.00 5,250.00

JUMLAH HARGA BAHAN 14,926.80


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 101,014.80
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 15,152.22
F Harga Satuan Pekerjaan (D+E) 116,167.02

A.4.4.2.27. Pemasangan Acian 1m2

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.200 128,000.00 25,600.00
Tukang batu U2 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.010 174,000.00 1,740.00
JUMLAH TENAGA KERJA 42,870.00
B BAHAN
Semen Portland C1 M3 3.250 1,400.00 4,550.00

JUMLAH HARGA BAHAN 4,550.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 47,420.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 7,113.00
F Harga Satuan Pekerjaan (D+E) 54,533.00

A.4.4.2.42. Pemasangan 1m2 Atap zincalum

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.100 128,000.00 12,800.00
Tukang Besi U3 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 29,200.00
B BAHAN
Atap Galvalum atau Genteng Metal /m2 C bh 1.330 85,000.00 113,050.00
Paku Scrub atap C M3 0.020 30,000.00 600.00
JUMLAH HARGA BAHAN 113,650.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 142,850.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 21,427.50
F Harga Satuan Pekerjaan (D+E) 164,277.50
A.4.4.2.27. 1 Pemasangan 1 m List Plank Clasiboard

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.100 128,000.00 12,800.00
Tukang Besi U3 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 29,200.00
B BAHAN
List Plank Kalciboard 8x200x3000 C bh 1.010 45,000.00 45,450.00
Paku Scrub atap C M3 0.050 30,000.00 1,500.00
JUMLAH HARGA BAHAN 46,950.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 76,150.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 11,422.50
F Harga Satuan Pekerjaan (D+E) 87,572.50

A.4.4.2.27. 2 Pemasangan 1 m2 Plafond Clasiboard

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.100 128,000.00 12,800.00
Tukang Besi U3 OH 0.100 140,000.00 14,000.00
Kepala tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 29,200.00
B BAHAN
Calciboard 1.22x2.44 4 mm C bh 0.364 95,000.00 34,580.00
Paku Scrub atap C M3 0.030 30,000.00 900.00
JUMLAH HARGA BAHAN 35,480.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 64,680.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 9,702.00
F Harga Satuan Pekerjaan (D+E) 74,382.00

A.4.5.1.7. Pemasangan 1 m2 Plafond gypsum

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.100 128,000.00 12,800.00
Tukang Kayu U2 OH 0.500 140,000.00 70,000.00
Kepala tukang U6 OH 0.005 153,000.00 765.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 84,435.00
B BAHAN
Gypsum Board T = 9 mm C 19 Lbr 0.364 102,600.00 37,346.40
Paku Scrub Atap C M3 0.110 30,000.00 3,300.00
JUMLAH HARGA BAHAN 40,646.40
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 125,081.40
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 18,762.21
F Harga Satuan Pekerjaan (D+E) 143,843.61

A.4.5.1.8. List Plafond gypsum

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.500 128,000.00 64,000.00
Tukang besi U3 OH 0.500 140,000.00 70,000.00
Kepala tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.025 174,000.00 4,350.00
JUMLAH TENAGA KERJA 146,000.00
B BAHAN
List Gypsum profil C 19 M1 1.050 27,300.00 28,665.00
Tepung Gypsum C 19 Kg 0.150 74,900.00 11,235.00
JUMLAH HARGA BAHAN 39,900.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 185,900.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 27,885.00
F Harga Satuan Pekerjaan (D+E) 213,785.00
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 7.000 128,000.00 896,000.00
Tukang Kayu U2 OH 21.000 140,000.00 2,940,000.00
Kepala tukang U6 OH 2.100 153,000.00 321,300.00
Mandor U7 OH 0.350 174,000.00 60,900.00
JUMLAH TENAGA KERJA 4,218,200.00
B BAHAN
Kayu Ulin Balok 10 x 10 (Lokal) C8 m3 1.100 6,522,000.00 7,174,200.00
Lem kayu C 19 kg 1.000 87,100.00 87,100.00
Paku ulin C kg 1.250 27,300.00 34,125.00
JUMLAH HARGA BAHAN 7,295,425.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 11,513,625.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 1,727,043.75
F Harga Satuan Pekerjaan (D+E) 13,240,668.75

A.4.6.2.3 Pemasangan 1 Bh Kunci tanam biasa

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.010 128,000.00 1,280.00
Tukang Kayu U2 OH 0.500 140,000.00 70,000.00
Kepala tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 79,800.00
B BAHAN
Kunci Tanam Biasa C bh 1.000 175,000.00 175,000.00

JUMLAH HARGA BAHAN 175,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 254,800.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 38,220.00
F Harga Satuan Pekerjaan (D+E) 293,020.00

A.4.6.2.4 Pemasangan 1 Bh Engsel Pintu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.010 128,000.00 1,280.00
Tukang Kayu U2 OH 0.500 140,000.00 70,000.00
Kepala tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 79,800.00
B BAHAN
Engsel Pintu 4" C bh 1.000 55,000.00 55,000.00

JUMLAH HARGA BAHAN 55,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 134,800.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 20,220.00
F Harga Satuan Pekerjaan (D+E) 155,020.00

A.4.6.2.6 Pemasangan 1 Bh Engsel Jendela

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.010 128,000.00 1,280.00
Tukang Kayu U2 OH 0.500 140,000.00 70,000.00
Kepala tukang U6 OH 0.050 153,000.00 7,650.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 79,800.00
B BAHAN
Engsel Jendela 3" C bh 1.000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 104,800.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 15,720.00
F Harga Satuan Pekerjaan (D+E) 120,520.00
A.4.6.2.5 Pemasangan 1 Bh Kunci Slot

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.020 128,000.00 2,560.00
Tukang Kayu U2 OH 0.200 140,000.00 28,000.00
Kepala tukang U6 OH 0.020 153,000.00 3,060.00
Mandor U7 OH 0.001 174,000.00 174.00
JUMLAH TENAGA KERJA 33,794.00
B BAHAN
Kunci Slot C bh 1.000 40,000.00 40,000.00

JUMLAH HARGA BAHAN 40,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 73,794.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 11,069.10
F Harga Satuan Pekerjaan (D+E) 84,863.10

A.5.1.1.2 Pemasangan 1 Bh Kloset Jongkok

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.000 128,000.00 128,000.00
Tukang Batu U2 OH 1.500 140,000.00 210,000.00
Kepala tukang U6 OH 0.150 153,000.00 22,950.00
Mandor U7 OH 0.160 174,000.00 27,840.00
JUMLAH TENAGA KERJA 388,790.00
B BAHAN
Kloset Jongkok C bh 1.000 450,000.00 450,000.00
Semen Portland C1 bh 1.000 1,400.00 1,400.00
Pasir Pasang C3 bh 1.000 150,000.00 150,000.00
JUMLAH HARGA BAHAN 601,400.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 990,190.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 148,528.50
F Harga Satuan Pekerjaan (D+E) 1,138,718.50

A.5.1.1.12 Pemasangan 1 Bh Bak cuci piring stainlessteel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.030 128,000.00 3,840.00
Tukang Batu U2 OH 0.300 140,000.00 42,000.00
Kepala Tukang U6 OH 0.030 153,000.00 4,590.00
Mandor U7 OH 0.015 174,000.00 2,610.00
JUMLAH TENAGA KERJA 53,040.00
B BAHAN
Bak cuci Piring C Unit 1.000 600,000.00 600,000.00
JUMLAH HARGA BAHAN 600,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 653,040.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 97,956.00
F Harga Satuan Pekerjaan (D+E) 750,996.00

A.5.1.1.14 Pemasangan 1 Bh Floor drain

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.010 128,000.00 1,280.00
Tukang Batu U2 OH 0.100 140,000.00 14,000.00
Kepala Tukang U6 OH 0.010 153,000.00 1,530.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 17,680.00
B BAHAN
Floor Drain C bh 1.000 20,500.00 20,500.00

JUMLAH HARGA BAHAN 20,500.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 38,180.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 5,727.00
F Harga Satuan Pekerjaan (D+E) 43,907.00

A.5.1.1.19 Pemasangan 1 Bh kran diameter 1/2" atau 3/4"

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.010 128,000.00 1,280.00
Tukang Batu U2 OH 0.400 140,000.00 56,000.00
Kepala Tukang U6 OH 0.040 153,000.00 6,120.00
Mandor U7 OH 0.005 174,000.00 870.00
JUMLAH TENAGA KERJA 64,270.00
B BAHAN
Kran air C m 1.000 20,000.00 20,000.00
Sealtape C bh 0.025 3,000.00 75.00
JUMLAH HARGA BAHAN 20,075.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 84,345.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 12,651.75
F Harga Satuan Pekerjaan (D+E) 96,996.75

A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.036 128,000.00 4,608.00
Tukang Batu U2 OH 0.060 140,000.00 8,400.00
Kepala Tukang U6 OH 0.006 153,000.00 918.00
Mandor U7 OH 0.002 174,000.00 348.00
JUMLAH TENAGA KERJA 14,274.00
B BAHAN
Pipa PVC AW 1/2" C bh 1.000 9,000.00 9,000.00
Perlengkapan 35% x Bahan % 0.350 3,150.00

JUMLAH HARGA BAHAN 12,150.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 26,424.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 3,963.60
F Harga Satuan Pekerjaan (D+E) 30,387.60

A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW diameter 3"

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.081 128,000.00 10,368.00
Tukang Batu U2 OH 0.135 140,000.00 18,900.00
Kepala Tukang U6 OH 0.014 153,000.00 2,065.50
Mandor U7 OH 0.004 174,000.00 696.00
JUMLAH TENAGA KERJA 32,029.50
B BAHAN
Pipa PVC AW 3" C bh 1.000 60,000.00 60,000.00
Perlengkapan 35% x Bahan % 0.350 21,000.00

JUMLAH HARGA BAHAN 81,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 113,029.50
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 16,954.43
F Harga Satuan Pekerjaan (D+E) 129,983.93

A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4"

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.081 128,000.00 10,368.00
Tukang Batu U2 OH 0.135 140,000.00 18,900.00
Kepala Tukang U6 OH 0.014 153,000.00 2,065.50
Mandor U7 OH 0.004 174,000.00 696.00
JUMLAH TENAGA KERJA 32,029.50
B BAHAN
Pipa PVC AW 4" C bh 1.000 95,000.00 95,000.00
Perlengkapan 35% x Bahan % 0.350 33,250.00

JUMLAH HARGA BAHAN 128,250.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 160,279.50
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 24,041.93
F Harga Satuan Pekerjaan (D+E) 184,321.43
A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.118 128,000.00 15,104.00
Tukang pipa U4 OH 0.059 140,000.00 8,260.00
Mandor U7 OH 0.012 174,000.00 2,088.00
JUMLAH TENAGA KERJA 25,452.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari -

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 25,452.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 3,817.80
F Harga Satuan Pekerjaan (D+E) 29,269.80

A.8.4.1.17.1 Pemasangan 1 m pipa HDPE Ø 75 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.0375 128,000.00 4,800.00
Tukang pipa U4 OH 0.0185 140,000.00 2,590.00
Mandor U7 OH 0.0035 174,000.00 609.00
JUMLAH TENAGA KERJA 7,999.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 hari 0.019 435,000.00 8,265.00

JUMLAH HARGA ALAT 8,265.00


D Jumlah (A+B+C) 16,264.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 1,626.40
F Harga Satuan Pekerjaan (D+E) 17,890.40

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.040 128,000.00 5,120.00
Tukang pipa U4 OH 0.020 140,000.00 2,800.00
Mandor U7 OH 0.004 174,000.00 696.00
JUMLAH TENAGA KERJA 8,616.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 hari 0.019 435,000.00 8,265.00

JUMLAH HARGA ALAT 8,265.00


D Jumlah (A+B+C) 16,881.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 1,688.10
F Harga Satuan Pekerjaan (D+E) 18,569.10

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.062 128,000.00 7,936.00
Tukang pipa U4 OH 0.031 140,000.00 4,340.00
Mandor U7 OH 0.006 174,000.00 1,044.00
JUMLAH TENAGA KERJA 13,320.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 hari 0.019 435,000.00 8,265.00

JUMLAH HARGA ALAT 8,265.00


D Jumlah (A+B+C) 21,585.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 2,158.50
F Harga Satuan Pekerjaan (D+E) 23,743.50
A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.102 128,000.00 13,056.00
Tukang pipa U4 OH 0.051 140,000.00 7,140.00
Mandor U7 OH 0.010 174,000.00 1,740.00
JUMLAH TENAGA KERJA 21,936.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 250/90 D3 hari 0.019 550,000.00 10,450.00

JUMLAH HARGA ALAT 10,450.00


D Jumlah (A+B+C) 32,386.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 4,857.90
F Harga Satuan Pekerjaan (D+E) 37,243.90

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.133 128,000.00 17,024.00
Tukang pipa U4 OH 0.067 140,000.00 9,380.00
Mandor U7 OH 0.013 174,000.00 2,262.00
JUMLAH TENAGA KERJA 28,666.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 250/90 D3 hari 0.042 550,000.00 23,100.00

JUMLAH HARGA ALAT 23,100.00


D Jumlah (A+B+C) 51,766.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 7,764.90
F Harga Satuan Pekerjaan (D+E) 59,530.90
A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.400 128,000.00 51,200.00
Tukang pipa U4 OH 0.200 140,000.00 28,000.00
Mandor U7 OH 0.040 174,000.00 6,960.00
JUMLAH TENAGA KERJA 86,160.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 86,160.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 12,924.00
F Harga Satuan Pekerjaan (D+E) 99,084.00

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.506 128,000.00 64,768.00
Tukang pipa U4 OH 0.253 140,000.00 35,420.00
Mandor U7 OH 0.051 174,000.00 8,874.00
JUMLAH TENAGA KERJA 109,062.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 109,062.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 16,359.30
F Harga Satuan Pekerjaan (D+E) 125,421.30

A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.796 128,000.00 101,888.00
Tukang pipa U4 OH 0.398 140,000.00 55,720.00
Mandor U7 OH 0.080 174,000.00 13,920.00
JUMLAH TENAGA KERJA 171,528.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 171,528.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 25,729.20
F Harga Satuan Pekerjaan (D+E) 197,257.20
A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.949 128,000.00 121,472.00
Tukang pipa U4 OH 0.475 140,000.00 66,500.00
Mandor U7 OH 0.095 174,000.00 16,530.00
JUMLAH TENAGA KERJA 204,502.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 204,502.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 30,675.30
F Harga Satuan Pekerjaan (D+E) 235,177.30

A.8.4.3.1.0 Pemasangan 1 buah Valve Ø 50 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.300 128,000.00 38,400.00
Tukang pipa U4 OH 0.173 140,000.00 24,220.00
Mandor U7 OH 0.035 174,000.00 6,090.00

JUMLAH TENAGA KERJA 68,710.00


B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 68,710.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 10,306.50
F Harga Satuan Pekerjaan (D+E) 79,016.50

A.8.4.3.1.1 Pemasangan 1 buah Valve Ø 75 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.000 128,000.00 128,000.00
Tukang pipa U4 OH 0.373 140,000.00 52,220.00
Mandor U7 OH 0.095 174,000.00 16,530.00

JUMLAH TENAGA KERJA 196,750.00


B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 196,750.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 29,512.50
F Harga Satuan Pekerjaan (D+E) 226,262.50
A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.429 128,000.00 182,912.00
Tukang pipa U4 OH 0.715 140,000.00 100,100.00
Mandor U7 OH 0.143 174,000.00 24,882.00

JUMLAH TENAGA KERJA 307,894.00


B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Tripot/Tackel & handle crane 2 T D1 hari 0.100 125,000.00 12,500.00

JUMLAH HARGA ALAT 12,500.00


D Jumlah (A+B+C) 320,394.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 48,059.10
F Harga Satuan Pekerjaan (D+E) 368,453.10

A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.714 128,000.00 219,392.00
Tukang pipa U4 OH 0.857 140,000.00 119,980.00
Mandor U7 OH 0.171 174,000.00 29,754.00

JUMLAH TENAGA KERJA 369,126.00


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel & handle crane 2 T D1 hari 0.300 125,000.00 37,500.00

JUMLAH HARGA ALAT 37,500.00


D Jumlah (A+B+C) 406,626.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 60,993.90
F Harga Satuan Pekerjaan (D+E) 467,619.90

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 1.714 128,000.00 219,392.00
Tukang pipa U4 OH 0.857 140,000.00 119,980.00
Mandor U7 OH 0.171 174,000.00 29,754.00

JUMLAH TENAGA KERJA 369,126.00


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel & handle crane 2 T D1 hari 0.400 125,000.00 50,000.00

JUMLAH HARGA ALAT 50,000.00


D Jumlah (A+B+C) 419,126.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 62,868.90
F Harga Satuan Pekerjaan (D+E) 481,994.90
A.8.4.3.15.1 Pemasangan 1 buah Tee Ø 75 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.085 128,000.00 10,880.00
Tukang pipa U4 OH 0.046 140,000.00 6,440.00
Mandor U7 OH 0.008 174,000.00 1,305.00

JUMLAH TENAGA KERJA 18,625.00


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 m3 0.019 435,000.00 8,265.00

JUMLAH HARGA ALAT 8,265.00


D Jumlah (A+B+C) 26,890.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 4,033.50
F Harga Satuan Pekerjaan (D+E) 30,923.50

A.8.4.3.15.2 Pemasangan 1 buah Tee Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.095 128,000.00 12,160.00
Tukang pipa U4 OH 0.048 140,000.00 6,720.00
Mandor U7 OH 0.009 174,000.00 1,566.00

JUMLAH TENAGA KERJA 20,446.00


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 160/63 D2 m3 0.019 435,000.00 8,265.00

JUMLAH HARGA ALAT 8,265.00


D Jumlah (A+B+C) 28,711.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 4,306.65
F Harga Satuan Pekerjaan (D+E) 33,017.65
A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.216 128,000.00 27,648.00
Tukang pipa U4 OH 0.108 140,000.00 15,120.00
Mandor U7 OH 0.022 174,000.00 3,828.00

JUMLAH TENAGA KERJA 46,596.00


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Tripot/Tackel/ handle crane 2 T dan Alat Sambung HDPE 250/90 D3 hari 0.029 550,000.00 15,950.00

JUMLAH HARGA ALAT 15,950.00


D Jumlah (A+B+C) 62,546.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 9,381.90
F Harga Satuan Pekerjaan (D+E) 71,927.90
A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm

No Kode Satuan Koefisien Harga Satuan Jumlah Harga


Uraian
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.008 128,000.00 1,024.00
Mandor U7 OH 0.0008 174,000.00 139.20
JUMLAH TENAGA KERJA 1,163.20
B BAHAN
Air / M3 C5 m3 0.004 60,000.00 240.00
Bahan bakar(Pertalite) C 17 liter 0.060 10,000.00 600.00
Minyak Pelumas C 15 liter 0.002 35,000.00 70.00

JUMLAH HARGA BAHAN 910.00


C PERALATAN
Mesin Hydrostatic test D5 jam 0.004 30,500.00 122.00
JUMLAH HARGA ALAT 122.00
D Jumlah (A+B+C) 2,195.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 329.28
F Harga Satuan Pekerjaan (D+E) 2,524.48

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm

No Kode Satuan Koefisien Harga Satuan Jumlah Harga


Uraian
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.008 128,000.00 1,024.00
Mandor U7 OH 0.0008 174,000.00 139.20
JUMLAH TENAGA KERJA 1,163.20
B BAHAN
Air / M3 C5 m3 0.008 60,000.00 480.00
Bahan bakar(Pertalite) C 17 liter 0.060 10,000.00 600.00
Minyak Pelumas C 15 liter 0.002 35,000.00 70.00

JUMLAH HARGA BAHAN 1,150.00


C PERALATAN
Mesin Hydrostatic test D5 jam 0.004 30,500.00 122.00
JUMLAH HARGA ALAT 122.00
D Jumlah (A+B+C) 2,435.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 365.28
F Harga Satuan Pekerjaan (D+E) 2,800.48

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm

No Kode Satuan Koefisien Harga Satuan Jumlah Harga


Uraian
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.008 128,000.00 1,024.00
Mandor U7 OH 0.0008 174,000.00 139.20
JUMLAH TENAGA KERJA 1,163.20
B BAHAN
Air / M3 C5 m3 0.018 60,000.00 1,080.00
Bahan bakar(Pertalite) C 17 liter 0.060 10,000.00 600.00
Minyak Pelumas C 15 liter 0.002 35,000.00 70.00

JUMLAH HARGA BAHAN 1,750.00


C PERALATAN
Mesin Hydrostatic test D5 jam 0.004 30,500.00 122.00
JUMLAH HARGA ALAT 122.00
D Jumlah (A+B+C) 3,035.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 455.28
F Harga Satuan Pekerjaan (D+E) 3,490.48
A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm

No Kode Satuan Koefisien Harga Satuan Jumlah Harga


Uraian
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.008 128,000.00 1,024.00
Mandor U7 OH 0.0008 174,000.00 139.20
JUMLAH TENAGA KERJA 1,163.20
B BAHAN
Air / M3 C5 m3 0.031 60,000.00 1,860.00
Bahan bakar(Pertalite) C 17 liter 0.060 10,000.00 600.00
Minyak Pelumas C 15 liter 0.002 35,000.00 70.00

JUMLAH HARGA BAHAN 2,530.00


C PERALATAN
Mesin Hydrostatic test D5 jam 0.004 30,500.00 122.00
JUMLAH HARGA ALAT 122.00
D Jumlah (A+B+C) 3,815.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 572.28
F Harga Satuan Pekerjaan (D+E) 4,387.48

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm

No Kode Satuan Koefisien Harga Satuan Jumlah Harga


Uraian
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.008 128,000.00 1,024.00
Mandor U7 OH 0.0008 174,000.00 139.20
JUMLAH TENAGA KERJA 1,163.20
B BAHAN
Air / M3 C5 m3 0.049 60,000.00 2,940.00
Bahan bakar(Pertalite) C 17 liter 0.060 10,000.00 600.00
Minyak Pelumas C 15 liter 0.002 35,000.00 70.00

JUMLAH HARGA BAHAN 3,610.00


C PERALATAN
Mesin Hydrostatic test D5 jam 0.004 30,500.00 122.00
JUMLAH HARGA ALAT 122.00
D Jumlah (A+B+C) 4,895.20
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 734.28
F Harga Satuan Pekerjaan (D+E) 5,629.48

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.200 128,000.00 25,600.00
Tukang cat U5 OH 0.400 140,000.00 56,000.00
Kepala Tukang U6 OH 0.080 153,000.00 12,240.00
Mandor U7 OH 0.020
JUMLAH 174,000.00 3,480.00
TENAGA 97,320.00
B BAHAN KERJA
Cat dasar C 13 kg 0.110 50,000.00 5,500.00
Cat minyak C 14 kg 0.250 135,000.00 33,750.00
Kuas C bh 0.010 15,000.00 150.00
Thiner C ltr 0.010
JUMLAH 34,000.00 340.00
HARGA 39,740.00
C PERALATAN BAHAN

JUMLAH -
HARGA ALAT
D Jumlah (A+B+C) 137,060.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 20,559.00
F Harga Satuan Pekerjaan (D+E) 157,619.00

A.11.mini pile. 1 Pengadaan Pancang Mini Pile 20x20

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.022 128,000.00 2,816.00
Mandor U7 OH 0.011 174,000.00 1,914.00

JUMLAH TENAGA KERJA 4,730.00


B BAHAN
Mini Pile 20x20 C 19 M1 1.000 300,000.00 300,000.00
-
JUMLAH HARGA BAHAN 300,000.00
C PERALATAN
Crane Service D7 Jam 0.033 751,000.00 24,783.00

JUMLAH HARGA ALAT 24,783.00


D Jumlah (A+B+C) 329,513.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 49,426.95
F Harga Satuan Pekerjaan (D+E) 378,939.95

A.11.mini pile. 2 1 m' Memancang Tiang Mini Pile

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja U1 OH 0.022 128,000.00 2,816.00
Tukang Pancang U9 OH 0.056 140,000.00 7,840.00
Mandor U7 OH 0.011 174,000.00 1,914.00
Operator Pancang U8 OH 0.028 153,000.00 4,284.00
JUMLAH TENAGA KERJA 16,854.00
B BAHAN

-
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Pancang D8 Jam 0.194 750,000.00 145,500.00
JUMLAH HARGA ALAT 145,500.00
D Jumlah (A+B+C) 162,354.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 24,353.10
F Harga Satuan Pekerjaan (D+E) 186,707.10

A.11.mini pile. 3 1 Bh' Bobokan Tiang Mini Pile

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja OH 0.395 128,000.00 50,560.00
Mandor OH 0.038 174,000.00 6,612.00

JUMLAH TENAGA KERJA 57,172.00


B BAHAN

-
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 57,172.00
E Overhead & Profit (Contoh 15%) 15% x D (maksimum) 8,575.80
F Harga Satuan Pekerjaan (D+E) 65,747.80
HARGA DASAR SATUAN UPAH

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

Upah
1 Pekerja U1 O /hari 128,000.00
2 Tukang Kayu U2 O /hari 140,000.00
2 Tukang Batu U2 O /hari 140,000.00
3 Tukang Besi U3 O /hari 140,000.00
4 Tukang Pipa U4 O /hari 140,000.00
5 Tukang Cat U5 O /hari 140,000.00
6 Kepala Tukang U6 O /hari 153,000.00
7 Mandor U7 O /hari 174,000.00
8 Operator Pancang U8 O /hari 153,000.00
9 Tukang Pancang U9 O /hari 140,000.00

BIAYA PENERAPAN SMKK


1 Penyiapan RKK
a Pembuatan dokumen Rencana Keselamatan Konstruksi K.1 Ls 500,000.00
2 Sosialisasi, promosi dan pelatihan
a Pengarahan K3 (Safety Briefing) K.2 Ls 400,000.00
b Spanduk (Banner) K.3 Lb 45,000.00
3 Alat Pelindung Kerja dan Alat Pelindung Diri
a APK antara lain
b Pembatas area proyek K.4 Ls 260,000.00
c APD antara lain
d Topi pelindung (Safety Helmet) K.5 Buah 50,000.00
e Rompi keselamatan (Safety Vest) K.6 Buah 40,000.00
f Pelindung pernafasan dan mulut (Masker) K.7 Box 100,000.00
g Sepatu Keselamatan (Safety Shoes) K.8 Pasang 100,000.00
4 Asuransi dan perizinan :
a Asuransi K.9 Ls 1,500,000.00
5 Personel K3 Konstruksi :
a Petugas K3 K.10 Org 3,250,000.00
6 Fasilitas, sarana dan prasarana kesehatan :
Peralatan P3K (Kotak P3K, Obat Luka, Perban,dll) dan K.11 Ls 2,350,000.00
a Pencegahan COVID-19
7 Rambu- Rambu yang diperlukan :
a Rambu Informasi (Papan Nama Kegiatan) K.12 Buah 500,000.00
b Rambu Peringatan K.13 Buah 75,000.00
Kegiatan dan peralatan terkait dengan pengendalian risiko
8 Keselamatan Konstruksi :
a Alat Pemadam Api Ringan (APAR) K.14 Buah 497,900.00
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
NILAI GABUNGAN BARANG/JASA #REF!
TKDN
TOTAL
URAIAN PEKERJAAN
DN LN
Rp. (x 1000) % KDN Barang/Jasa Gabungan
(1) (2) (3) (4) (5) (7) (8)
BARANG
I. Material Langsung (Bahan baku) 100% 0% #REF! 100% Barang 74%
II. Peralatan (Barang jadi) 100% 0% #REF! 100% Barang 8%
A. Sub Total Barang 100% 0% #REF! 100% Barang 82%
JASA
III. Manajemen Proyek
100% 0% #REF! 100% Jasa 3%
dan Perekayasaan
IV. Alat Kerja / Fasilitas Kerja 100% 0% #REF! 100% Barang 10%
V. Konstruksi dan Fabrikasi 100% 0% #REF! 100% Jasa 5%
VI. Jasa Umum
Sub Total Jasa 0% 0% #REF! 100% Barang & Jasa 18%

C. TOTAL = ( A + B ) 0% 0% #REF! 100% Barang & Jasa 100%

Capaian nilai TKDN di atas dinyatakan sendiri oleh : PT. NINDYA SEJAHTERA

= #REF! - -
= 82%
#REF!

= #REF! -
= 18%
#REF!

SAMARINDA, 12 APRIL 2019


PENAWAR :
PT. NINDYA SEJAHTERA

ACHMAD RIZA KHADAFI


DIREKTUR
TIME SCHEDULE RENCANA

Program : -

Kegiatan : -

### : #NAME?

Lokasi : KEC. BENGALON DAN KECAMATAN KONGBENG, KABUPATEN KUTAI TIMUR


TA : 2022

Bulan 1 Bulan 2
NO URAIAN PEKERJAAN Bobot KET
M1 M2 M3 M4 M5 M6 M7 M8
1 2
100
PENERAPAN SITEM MANEJEMEN KESELAMATAN KONSTRUKSI (SMKK)
I #NAME? #NAME?

#NAME?
II #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 50

III #NAME? #NAME? #NAME? #NAME?

IV #NAME? #NAME? #NAME? #NAME?

V #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

VI PEKERJAAN AIR LIMBAH KEC. BENGALON #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME?
VII #NAME? #NAME? #NAME? #NAME? #NAME?

VIII #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

IX #NAME? #NAME? #NAME? #NAME?

X #NAME? #NAME? #NAME? #NAME?


0
Jumlah #NAME?
Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Komulatif Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

Pejabat Pembuat Komitmen


Dinas Pekerjaan Umum

ABDUL MUCHLIS. ST