Anda di halaman 1dari 7

BACK UP DATA JALAN AISYAH 122 127 124.

50
PEKERJAAN Galian Biasa
BAGIAN KIRI BAGIAN KANAN
No. STATION
TEBAL (m) LEBAR (m) AREA (m2) TEBAL (m) LEBAR (m)

A B C E F = ((C+D):2)xE C E

2 S T A.0+ 000 0.18 0.60 0.11 0.18 0.60

3 S T A.0+ 125 0.18 0.60 0.11 0.18 0.60

PEKERJAAN Pasangan Batu

BAGIAN KIRI
LEBAR LEBAR
TINGGI JARAK VOLUME
No. STATION ATAS BAWAH AREA STATION
(m) (m3)
(m2)
(m)
(m) (m)
A B C D E F = ((C+D):2)xE L M = (KxL)

Bagian Kiri Bagian Kanan


1 S T A.0+ 000 0.30 0.60 1.00 0.45 S T A.0+
26.00 11.70
2 S T A.0+ 26.00 0.30 0.60 1.00 0.45 S T A.0+

2 S T A.0+ 127.00 0.30 0.60 0.80 0.36 S T A.0+


101.00 36.36

PEKERJAAN Pondasi Cerucuk, Pengadaan dan Pemancangan

BAGIAN KIRI
JARAK/ JUMLAH/
No. STATION PANJANG/ VOLUME
JARAK (m)
TITIK (m3)
SEGMEN TITIK
A B C D E F = ((C+D):2)xE N = (LxM)

1 S T A.0+ 0.00
124.50 2.20 57.59 2.00 115.18
2 S T A.0+ 125

PEKERJAAN PASANGAN PIPA PVC

BAGIAN KIRI
JARAK/ JUMLAH/
No. STATION PANJANG/ VOLUME
JARAK (m)
TITIK (m3)
SEGMEN TITIK
A B C D E F = ((C+D):2)xE N = (LxM)

1 S T A.0+ 0.00
124.50 1.50 84.00 0.70 58.80
2 S T A.0+ 125
BAGIAN KANAN AREA VOLUME
VOLUME
RATA- JARAK (m) KUMULATI SATUAN
AREA (m ) 2 (m3)
RATA (m2) F (m3)
F = ((C+D):2)xE L = (K1+K2):2 M N = (LxM) O P

0.11
0.11 124.50 13.45 13.45 M3 12.84 58,142.86
0.11 (0.61) (35,234.57)

JUMLAH 13.45 M3

BAGIAN KANAN AREA


LEBAR LEBAR VOLUME
TINGGI RATA- JARAK VOLUME
STATION ATAS BAWAH AREA KUMULATIF
RATA (m) (m3)
(m2) (m3)
(m) (m2)
(m) (m)
G H I J = ((G+H):2)x I K = (F1+J1):2 L M = (KxL) N

Bagian Kanan
0.00 0.30 0.60 1.00 0.45
26.00 11.70 23.40
26.00 0.30 0.60 1.00 0.45

122.00 0.30 0.60 0.80 0.36


96.00 34.56 70.92

JUMLAH 94.32

BAGIAN KANAN
VOLUME
JARAK/ JUMLAH/
PANJANG/ VOLUME KUMULATI SATUAN
JARAK (m)
TITIK (m3) F (m3)
SEGMEN TITIK
C D E F = ((C+D):2)xE N = (LxM) O P
124.50 2.20 57.59 2.00 115.18 230.36 M1 218.00
Kurang -12.36

JUMLAH 230.36 M1

BAGIAN KANAN
VOLUME
JARAK/ JUMLAH/
PANJANG/ VOLUME KUMULATI SATUAN
JARAK (m)
TITIK (m3) F (m3)
SEGMEN TITIK
C D E F = ((C+D):2)xE N = (LxM) O P

124.50 1.50 84.00 0.70 58.80 117.60 M1

JUMLAH 117.60 M1
Rab Awal Konversi
Galan 746,554.29 746,554.29 781,788.86
Pas. Batu 115,421,743.79 113,048,586.45
Ulin 21,177,142.86 143,239,974.95 22,378,181.82
Pipa 6,641,088.29 7,712,231.57
Jumlah 143,986,529.23 -

Total + 65,740.54

SATUAN

M3 96.30 1,198,564.32
Lebih 1.98 2,373,157.35

M3

M3
`
97,142.86 Pas. Batu + 2,373,157.35 2,373,157.35
(1,201,038.96) Galian - (35,234.57)
Ulin - (1,201,038.96) (2,307,416.81)
Pipa - (1,071,143.27)
65,740.54 65,740.54

Kurang 101.27 65,580.20


-16.33 (1,071,143.27)
Konversi
781,788.86

143,138,999.83

143,920,788.69

0.5 0.5 1

0.5 0.5 1

0.5

Anda mungkin juga menyukai