Anda di halaman 1dari 1

DAFTAR PERHITUNGAN DAN PEMBAYARAN OVERTIME

PT. PROPERNAS GRIYA UTAMA - WILAYAH II (PENAMBAHAN PIPA & PINDAH KANTOR)

Overtime
UMR Jam Jam Koef. Perhitungan Lembur yang Ket.
No. Nama Tanggal
Tabalong Masuk Pulang diterima
Jam 1 2 3 4 Jml (Rp)
1 Aswad 2.972.632 05/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
08/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
13/05/2021 19,00 23,59 4 4 8 Idul Fitri
14/05/2021 0,01 7,00 6 6 12 Idul Fitri
14/05/2021 19,00 24,59 5 5 10 Idul Fitri
26/05/2021 9,00 17,00 7 7 7 Pindah Kantor
27/05/2021 9,00 24,00 14 14 14 Pindah Kantor
Sub Total 61 838.523
2 Sandi 2.972.632 05/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
08/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
09/05/2021 8,00 17,00 8 8 8 Instal Stall
10/05/2021 8,00 17,00 8 8 8 Instal Stall
14/05/2021 7,00 19,00 11 8 1 2 27 Idul Fitri
27/05/2021 19,00 23,00 3 3 3 Pindah Kantor
28/05/2021 10,00 17,00 6 6 6 Pindah Kantor
Sub Total 62 852.269
3 Rusliadi 2.972.632 05/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
08/05/2021 8,00 14,00 5 5 5 Pek.Turun Pipa
13/05/2021 0,01 7,00 6 6 12 Idul Fitri
13/05/2021 7,00 19,00 11 8 1 3 31 Idul Fitri
26/05/2021 9,00 17,00 7 7 7 Pindah Kantor
27/05/2021 9,00 24,00 14 14 14 Pindah Kantor
Sub Total 74 1.017.224
Total 2.708.016

Tabalong, 28 Mei 2021


Dibuat Oleh,

Dimaz S.
Koordinator Legal

Anda mungkin juga menyukai