I PEKERJAAN PERSIAPAN
1 Gudang Material & kantor kontraktor 1.00 ls Incl Paket Kebakaran -
2 Air Kerja By Owner
3 Listrik kerja By Owner
4 Asuransi jamsostek 1.00 ls -
5 CAR 1.00 ls -
6 Keamanan lingkungan By Owner
7 Site management 1.00 ls -
8 Penginapan pekerja 1.00 ls -
9 Pembersihan area 5,265.00 m2 -
10 Safety & Protection ( Erection Methode & Wealding ) 1.00 Ls -
Pekerjaan proteksi kiri kanan setinggi bangunan existing
- Safety Net, Walk Way, Fire Blunket, Terpal, Scaffolding ( Staging ) & APD
- Proteksi Debu & Air Hujan
Note :
Pekerjaan tanggul kiri kanan antisipasi erection saat hujan dan bongkar kembali,
sudetan menuju saluran air hujan serta normalisasi lantai kembali
TOTAL I (PEKERJAAN PERSIAPAN) -
B PEK BAJA
1 Extend existing column IWF 250x125x6x9, H-2500 4,970.00 kg -
2 Additional Top Plate Existing Kolom T-10 mm 666.66 Kg -
3 Top Girder WF 150x75x7 ( Harus di Pasang ) 4,932.66 Kg -
4 Rafter IWF 250x125x6x9 : Rafter lama difabrikasi ulang kembali 23,430.00 kg -
5 New Rafter IWF 250x125x6x9 ( New Rafter 5 Span ) 5,325.00 kg -
6 CNP 150x50x20x2,3 : Gording Atap lama dipasang kembali 20,919.60 kg -
7 New CNP 150x50x20x2,3 : Gording Atap ( 5 Span Rafter) 4,172.00 kg -
8 New mur & baut, base plate, couple plate, trecstank,dan ikatan angin 4,931.96 kg -
9 Cat zincchromate + finish 1,723.96 m2 -
C PENUTUP ATAP
1 Atap Zincalume tebal 0,45 mm lama (60% dipasang kembali) 3,440.80 m2 -
2 New Atap Zincalume tebal 0,45 mm (40% luasan) 2,293.87 m2 -
3 Insulation Zelltech AT 01B lama (di bongkar akan rusak ) - m2 -
4 New Insulation Zelltech Type ZT - 01 RBF, Tebal 4 mm 5,734.66 m2 -
5 Atap Transparan ex Zelltech 874.81 m' -
6 New Nok ZA tebal 0,45 mm 162.00 m' -
TOTAL II (PEKERJAAN MENAIKAN LEVEL ATAP) -
C PEKERJAAN TALANG
1 L 40x40x4 @ 300; New Rangka talang 2,117.02 kg -
2 Cat zinchromate + finish 139.97 m2 -
3 New FRP Gutter 356.50 m' -
4 Pipa PVC 4" talang tegak (new 50% dan old 50%) 410.67 m' -
F PEKERJAAN ELECTRICAL
1 Pemindahan Instalasi Air Bersih 2" 162.00 M -
2 Normalisasi Drainage Sepanjang Coridor ( antar DC 2 & DC 3 ) 162.00 M -
3 Pindah Intalasi Lampu 1.00 Ls -
- Lampu Existing di pindah, Penambahan kabel
4 Relokasi Penangkal Petir ( Incl Penambahan Kabel Ground ) 1.00 Ls -
5 Roof Fan 36"( Ball ), Incl Flashing 48.00 Unit -
Sub Total B -
TOTAL
JASA KONTRAKTOR
GRAND TOTAL
ROUNDED