VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
1 PERSIAPAN
.pipa API 5L / ASTM A53 grade B Ø 6" WT 7,11 mm Sch. 40 m 18.00 18.00 - -
.pipa API 5L / ASTM A53 grade B Ø 3" WT 5,49 mm Sch. 40 m 18.00 18.00 - -
.elbow 45° Ø 6" sch. 40 ASTM A-234 WPB bh 6.00 6.00 - -
.elbow 45° Ø 3" sch. 40 ASTM A-234 WPB bh 2.00 2.00 - -
.slip on flanges A105, #150 Ø 6" RF bh 6.00 6.00 - -
.slip on flanges A105, #150 Ø 3" RF bh 2.00 2.00 - -
.bolt & nut ls 1.00 1.00 - -
.packing klingerit ls 1.00 1.00 - -
.grill penutup jalur pipa m 12.00 12.00 - -
2 PEKERJAAN RENOVASI FILLING SHED
2.1 Pekerjaan Sipil
2.1.1 Pekerjaan Pondasi dan Sloof
6 Pondasi tiang adk.1:2:3 ukuran 70 x 70 x 30 cm m3 2.65 2.65 - -
.pembesian utama Ø12 kg 325.99 325.99 - -
7 Kolom pondasi beton adk.1:2:3 ukuran 30 x 30 cm m3 1.13 1.13 - -
.pembesian utama 8 x Ø12 kg 156.60 156.60 - -
.sengkang Ø10-150 kg 93.21 93.21 - -
8 Sloof ukuran 30 x 20 cm m3 8.67 8.67 - -
.pembesian utama 4 x Ø12 kg 569.12 569.12 - -
.sengkang Ø8-150 kg 483.41 483.41 - -
2.1.2 Pekerjaan Perluasan Lantai
.wiremesh lantai dan rabatan Ø 10 mm m2 160.00 160.00 - -
2.1.3 Pekerjaan Pengecoran Taman
4 Lantai beton K-250 m3 9.36 9.36 - -
.wiremesh lantai Ø 10 mm m2 93.60 93.60 - -
2.1.4 Pekerjaan Parit
5 Cor beton bertulang m3 12.88 12.88 - -
.pembesian utama (22 bh) dengan besi ulir D12 kg 149.74 149.74 - -
.sengkang dengan besi polos SNI (Ø 10 mm - 100) kg 1531.39 1531.39 - -
6 Grill penutup parit plat strip 50x5 dan besi siku 50x50x5 m 92.00 92.00 - -
VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
1 Flushing Pipa ls 1.00 1.00 - -
2 Pipa Ø 3" API 5L / ASTM A53 grade B Ø 3" WT 5,49 mm Sch. 40 m 113.00 113.00 - -
4 Bolt & nut flange Ø 5/8" L 3-¾" ls 1.00 1.00 - -
5 Packing klingerit 1000 uk. 150 x 200 cm tebal 4 mm m2 0.95 0.95 - -
6 Slip On Flange A105 #150 Ø 3" carbon steel bh 66.00 66.00 - -
8 Equal Tee Ø 3" A-234 WPB Schd. 40 bh 8.00 8.00 - -
9 Blind Flange A105 #150 Ø 3" carbon steel bh 8.00 8.00 - -
11 Plat bonding set 33.00 33.00 - -
12 Elbow 90° welded Ø 3" carbon steel schd. 40 ASTM A-234 bh 46.00 46.00 - -
14 U- Bolt incl. accessories set 26.00 26.00 - -
16 Pengecatan Pipa 3 layer 200µ (Primer 50µ, Second Coat 100µ, Finish Coat 50µ) m2 7.89 7.89 - -
17 Dye penetrant test pipa dengan flange Ø 4" untuk seluruh join ls 1.00 1.00 - -
18 Radiography test 10 joint ls 1.00 1.00 - -
VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
I PEKERJAAN PERSIAPAN
1 Survey, pengukuran, pembuatan shop drawing ls 1.00 1.00 - -
2 Direksi keet uk. 4 m x 6 m m2 24.00 24.00 - -
3 Pengadaan air dan listrik kerja ls 1.00 0.75 - 0.25
4 Sewa scaffolding ls 1.00 0.00 - 1.00
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 0.80 - 0.20
6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam kom ls 1.00 1.00 - -
II PEKERJAAN PENGURUGAN DAN PENGECORAN 0.00
1 Pembersihan lahan m2 4664.00 4664.00 - -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat m3 2332.00 2332.00 - -
3 Bekisting m2 60.00 0.00 - 60.00
7
Pembesian Wiremesh M8 -150 (2 lapis) kg 45149.20 33861.90 - 11,287.30
8
Besi Beton Ø8 kg 6772.38 0.00 - 6,772.38
9
Pemasangan cansteen dan pengecatan m 195.00 0.00 - 195.00
10
Pengujian tekan beton dan sand cone test tanah urug di laboratorium pek 1.00 0.00 - 1.00
III PEKERJAAN PEMBANGUNAN PAGAR 0.00
Pagar Tembok Depan dan Samping 0.00
1 Pembongkaran pagar seng eksisting m 154.00 154.00 - -
2 Bouwplank m 154.00 154.00 - -
3 Galian tanah m3 71.87 71.87 - -
4 Kayu gelam Ø10 cm btg 108.00 108.00 - -
5 Pasir urug tebal 10 cm m3 6.53 6.53 - -
6 Urugan kembali dan pemadatan m3 62.05 62.05 - -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting m3 9.83 9.83 - -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting m3 3.82 3.82 - -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting m3 4.32 4.32 - -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting m3 2.87 2.87 - -
11 Dinding 1/2 bata ad. 1 : 4 m2 235.69 235.69 - -
12 Plesteran camp. 1 : 4 tebal 15 mm m2 604.80 604.80 - -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris m' 16.20 16.20 - -
14 Besi siku uk. 60.60.6 mm kg 146.97 146.97 - -
15 Kawat duri 6 lapis m 924.00 924.00 - -
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci m2 10.00 0.00 - 10.00
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 604.80 0.00 - 604.80
18 Mengecat besi siku dan pagar m2 15.12 15.12 - -
3.2. Pembuatan Parit dan Bak Kontrol - 0.00 0.00 - -
1 Galian tanah dan bongkar parit m3 100.94 100.94 - -
2 Pasir urug tebal 5 cm m3 7.21 0.00 - 7.21
3 Pasangan 1/2 bata merah 1 PC : 2 Psr m2 350.20 332.69 - 17.51
4 Plesteran camp. 1 : 2 tebal 15 mm m2 350.20 332.69 - 17.51
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr bh 1.00 0.00 - 1.00
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 0.00
4.1 Pondasi - 32 titik ; Kedalaman 18 m 0.00
1 Pengadaan tiang pancang spun pile 500 mm (bottom) m 192.00 192.00 - -
2 Pengadaan tiang pancang spun pile 500 mm (middle) m 384.00 384.00 - -
3 Pengangkutan tiang pancang ketitik pancang m 576.00 576.00 - -
4 Pemancangan tiang pancang m 576.00 576.00 - -
5 Penyambungan tiang pancang bh 64.00 64.00 - -
6 Pemotongan tiang pancang bh 32.00 32.00 - -
7 PDA Test titik 1.00 1.00 - -
8 Galian tanah m3 126.00 126.00 - -
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) - 0.00 0.00 - -
0 - Bekisting m2 38.40 38.40 - -
0 - Besi Beton D16-150 kg 1617.92 1617.92 - -
0 - Beton K-250 m3 11.52 11.52 - -
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) - 0.00 0.00 - -
0 - Bekisting m2 28.80 28.80 - -
0 - Besi Beton D16-150 kg 1440.96 1440.96 - -
0 - Beton K-250 m3 10.80 10.80 - -
PHYSICAL CHECK
VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
11 Pedestal uk. 50 cm x 50 cm x 70 cm - 0.00 0.00 - -
0 - Bekisting m2 44.80 44.80 - -
0 - Besi Beton 12-D16 kg 606.72 606.72 - -
0 - Ring Besi Beton Ø10-150 mm kg 276.19 276.19 - -
0 - Beton K-250 m3 5.60 3.92 - 1.68
12 Sloof uk. 30 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting m2 304.20 304.20 - -
0 - Besi Beton 12-D16 kg 4436.64 4436.64 - -
0 - Ring Besi Beton Ø10-150 mm kg 1923.48 1923.48 - -
0 - Beton K-250 m3 35.10 35.10 - -
13 Kolom uk. 50 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting (2x pakai) m2 288.00 244.80 - 43.20
0 - Besi Beton 12-D16 kg 3514.37 2987.21 - 527.16
0 - Ring Besi Beton Ø10-150 mm kg 986.40 838.44 - 147.96
0 - Beton K-250 m3 72.00 36.00 - 36.00
14 Balok Tengah uk. 30 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting m2 304.20 0.00 - 304.20
0 - Besi Beton 12-D16 kg 4436.64 0.00 - 4,436.64
0 - Ring Besi Beton Ø10-150 mm kg 1923.48 0.00 - 1,923.48
0 - Beton K-250 m3 35.10 0.00 - 35.10
15 Balok Atap uk. 30 cm x 40 cm - 0.00 0.00 - -
0 - Bekisting m2 257.40 0.00 - 257.40
0 - Besi Beton 10-D16 kg 3697.20 0.00 - 3,697.20
0 - Ring Besi Beton Ø10-150 mm kg 1538.78 0.00 - 1,538.78
0 - Beton K-250 m3 28.08 0.00 - 28.08
16 Lantai I / Ground Floor - 0.00 0.00 - -
0 - Urugan pasir t = 35 cm m3 183.75 0.00 - 183.75
0 - Besi Beton Ø10 - 200 mm kg 3236.63 0.00 - 3,236.63
0 - Cor K-250 tebal 12 cm (termasuk teras) m3 63.18 0.00 - 63.18
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 501.50 0.00 - 501.50
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 100.00 0.00 - 100.00
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.00 - 25.00
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.00 - 24.00
17 Lantai II - 0.00 0.00 - -
0 - Bondek tebal 0,70 mm m2 525.00 0.00 - 525.00
0 - Besi Beton Ø10 - 200 mm kg 3236.63 0.00 - 3,236.63
0 - Cor K-250 tebal 12 cm m3 63.00 0.00 - 63.00
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 500.00 0.00 - 500.00
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 110.00 0.00 - 110.00
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.00 - 25.00
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.00 - 24.00
18 Dinding Bata - 0.00 0.00 - -
0 - Dinding bata 1 : 4 m2 744.60 0.00 - 744.60
0 - Plesteran camp. 1 : 4 tebal 15 mm m2 1489.20 0.00 - 1,489.20
0 - Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 1489.20 0.00 - 1,489.20
19 Tangga - 0.00 0.00 - -
0 - Galian tanah pondasi uk. 160 x 60 x 60 cm m3 0.58 0.00 - 0.58
0 - Pasir urug pondasi tebal 10 cm m3 0.10 0.00 - 0.10
0 - Lantai kerja tebal 5 cm m3 0.05 0.00 - 0.05
0 - Bekisting m2 15.00 0.00 - 15.00
0 - Besi Beton Ø10 - 200 mm kg 462.40 0.00 - 462.40
0 - Beton K-250 m3 11.01 0.00 - 11.01
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 25.50 0.00 - 25.50
0 - Handrail/railing bahan stainless steel 304 tangga dan teras m' 20.00 0.00 - 20.00
4.2. Atap dan Plafon - 0.00 0.00 - -
1 Rangka atap baja ringan tebal 1,2 mm m2 606.24 0.00 - 606.24
2 Atap multiroof pasir tebal 0,40 mm m2 606.24 0.00 - 606.24
3 Talang air berikut rangka m 100.00 0.00 - 100.00
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris m 40.00 0.00 - 40.00
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
7 List profil plafond gypsum (lantai 1 & 2) m 210.00 0.00 - 210.00
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
4.3. Pintu, Kusen, Jendela dan Partisi - 0.00 0.00 - -
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan akses pcs 2.00 0.00 - 2.00
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci pcs 1.00 0.00 - 1.00
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm m2 290.40 0.00 - 290.40
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci pcs 13.00 0.00 - 13.00
5 Pintu kaca UPVC kamar mandi pcs 13.00 0.00 - 13.00
PHYSICAL CHECK
VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
6 Bouvenlight alumunium uk. 40x60 cm pcs 8.00 0.00 - 8.00
7 Partisi kaca tebal 5 mm rangka alumunium m2 376.95 0.00 - 376.95
8 Cutting sticker sandblast m2 369.60 0.00 - 369.60
9 Vertical blind jendela m2 290.40 0.00 - 290.40
4.4. Fasad & Logo - 0.00 0.00 - -
1 Pondasi beton uk 80x80cm include tulangan m3 1.28 1.28 - -
2 Anchor Bolt M20 bh 12.00 0.00 - 12.00
3 Dyna Bolt M20 bh 8.00 0.00 - 8.00
4 Base Plate 300 x 300 x 12 mm thk bh 2.00 0.00 - 2.00
5 Besi H 300 x 300 x 10 x15 mm @ 12 m kg 2256.00 0.00 - 2,256.00
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m kg 512.00 0.00 - 512.00
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow m2 270.36 0.00 - 270.36
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium pek 1.00 0.00 - 1.00
4.5. Backdrop Lobby & R. Utama - 0.00 0.00 - -
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby m2 13.30 0.00 - 13.30
2 Backdrop uk. 120 cm x 350 cm di lobby m2 4.20 0.00 - 4.20
3 Backdop uk. 500 cm x 350 cm diruang FTM m2 17.50 0.00 - 17.50
4 Backdop uk. 600 cm x 350 cm diruang rapat m2 21.00 0.00 - 21.00
5 Memasang Logo dan nama Fuel Terminal Medan Group pek 1.00 0.00 - 1.00
6 Lampu backdrop TL LED 8W incl. instalasi set 2.00 0.00 - 2.00
4.6. Elektrikal - 0.00 0.00 - -
a. Instalasi Listrik - 0.00 0.00 - -
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru m 250.00 0.00 - 250.00
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor m 2000.00 0.00 - 2,000.00
3 Lampu TL LED 2 x 36 watt incl. Kap RM bh 64.00 0.00 - 64.00
4 Lampu Downlight LED 19W incl. kap lampu dan accessories bh 32.00 0.00 - 32.00
5 Saklar Ganda bh 43.00 0.00 - 43.00
6 Saklar Seri+stop kontak bh 10.00 0.00 - 10.00
7 Stop Kontak Dinding bh 21.00 0.00 - 21.00
8 Stop Kontak Tanam bh 17.00 0.00 - 17.00
9 Pipa conduit 20 mm dan aksesories m 2000.00 0.00 - 2,000.00
10 Pipa galvanis Ø 3" termasuk aksessories m 250.00 0.00 - 250.00
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi unit 1.00 0.00 - 1.00
b. AC dan Exhaust Fan - 0.00 0.00 - -
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 9.00 0.00 - 9.00
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 10.00 0.00 - 10.00
3 Exhaust Fan 12 inci unit 5.00 0.00 - 5.00
4 Stop kontak AC dan Fan pcs 24.00 0.00 - 24.00
c. Lampu Penerangan Areal Kantor - 0.00 0.00 - -
1 Galian tanah pondasi dan jalur kabel m3 10.18 0.00 - 10.18
2 Pasir urug m3 4.04 0.00 - 4.04
3 Pemasangan bata bh 2020.00 0.00 - 2,020.00
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting bh 14.00 0.00 - 14.00
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang bh 14.00 0.00 - 14.00
6 Lampu LED jenis street light 70 watt bh 14.00 0.00 - 14.00
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris m 400.00 0.00 - 400.00
8 Pipa PVC Ø 2" termasuk aksessories m 50.00 0.00 - 50.00
d. Perangkat Access Door - 0.00 0.00 - -
1 Electric Dropbolt (Bracket include) unit 2.00 0.00 - 2.00
2 Finger Print unit 2.00 0.00 - 2.00
3 Power Supply Finger Print (incl adaptor) 12VDC unit 2.00 0.00 - 2.00
4 Wireless Door Bell unit 2.00 0.00 - 2.00
5 Push Button unit 2.00 0.00 - 2.00
4.7. Lightning Protection & Grounding - 0.00 0.00 - -
1 Penangkal Petir, include: set 1.00 0.00 - 1.00
- Head Terminal R150 - 0.00 0.00 - -
- Pipa Support Galvanized 2" 2 meter - 0.00 0.00 - -
- Kabel konduktor NYA 50 mm - 0.00 0.00 - -
- Kabel Grounding BC 50 mm - 0.00 0.00 - -
- Grounding rod 12 m - 0.00 0.00 - -
- As Grounding - 0.00 0.00 - -
- Bak kontrol dan busbar - 0.00 0.00 - -
- Accessories - 0.00 0.00 - -
2 Grounding, include: set 1.00 0.00 - 1.00
- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L) - 0.00 0.00 - -
- Coupling Rod, Stainless Steel - 0.00 0.00 - -
- Grounding Connector, Stainless Steel 3 Branch - 0.00 0.00 - -
- Driving Stud Dia. 3/4" - 0.00 0.00 - -
- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D) - 0.00 0.00 - -
PHYSICAL CHECK
VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
- C clamp connector - 0.00 0.00 - -
- Concrete Pit - 0.00 0.00 - -
0 Size : - 0.00 0.00 - -
- 450 mm x 450 mm c/w concrete cover - 0.00 0.00 - -
- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length - 0.00 0.00 - -
4.8. Plumbing dan Perlengkapan - 0.00 0.00 - -
a. Instalasi air - 0.00 0.00 - -
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris m' 120.00 0.00 - 120.00
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris m' 112.00 0.00 - 112.00
3 Closet duduk lengkap dengan jet washer unit 8.00 0.00 - 8.00
4 Urinoir lengkap dengan aksesories unit 4.00 0.00 - 4.00
5 Wastafel lengkap dengan hand washer unit 4.00 0.00 - 4.00
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah set 1.00 0.00 - 1.00
7 Floor drain pcs 4.00 0.00 - 4.00
8 Penyambungan jalur PDAM sampai ke kantor ls 1.00 0.00 - 1.00
b. Tandon Air dan Pompa - 0.00 0.00 - -
1 Tandon air kapasitas 1500 liter unit 1.00 0.00 - 1.00
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories unit 1.00 0.00 - 1.00
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm set 1.00 0.00 - 1.00
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan - 0.00 0.00 - -
1 Galian tanah m3 28.08 0.00 - 28.08
2 Beton K-225 tebal 15 cm m3 8.04 0.00 - 8.04
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm m2 45.00 0.00 - 45.00
4 Ijuk, pasir, kerikil untuk penyaringan ls 1.00 0.00 - 1.00
5 Pipa vent. Ø 1" Set 1.00 0.00 - 1.00
V PEKERJAAN PENYELESAIAN 0.00
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan ls 1.00 0.00 - 1.00
2 Pembersihan lokasi kerja ls 1.00 0.00 - 1.00
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) 1.00 0.80 ls - 38,000,000 38,000,000 30,400,000 (7,600,000)
6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam kompone 1.00 1.00 ls - 35,000,000 35,000,000 35,000,000 -
II PEKERJAAN PENGURUGAN DAN PENGECORAN 2,507,489,813 862,089,958 (1,645,399,854)
1 Pembersihan lahan 4,664.00 4,664.00 m2 - 7,000 32,648,000 32,648,000 -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat 2,332.00 2,332.00 m3 50,000 139,000 440,748,000 440,748,000 -
3 Bekisting 60.00 - m2 155,000 129,000 17,040,000 - (17,040,000)
Kayu gelam Ø10 cm 1,035.75 828.60 btg 35,000 5,000 41,430,000 33,144,000 (8,286,000)
4
5 Lantai kerja tebal 5 cm 207.15 - m3 490,000 310,000 165,720,000 - (165,720,000)
828.60 - m3 1,149,000 320,000 1,217,213,400 - (1,217,213,400)
6 Beton Cor Ready Mix K. 300 tebal 20 cm
7 Pembesian Wiremesh M8 -150 (2 lapis) 45,149.20 33,861.90 kg 8,000 2,500 474,066,611 355,549,958 (118,516,653)
8 Besi Beton Ø8 6,772.38 - kg 8,000 2,000 67,723,802 - (67,723,802)
9 Pemasangan cansteen dan pengecatan 195.00 - m 150,000 70,000 42,900,000 - (42,900,000)
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 1.00 - pek - 8,000,000 8,000,000 - (8,000,000)
III PEKERJAAN PEMBANGUNAN PAGAR 415,822,299 375,396,499 (40,425,800)
1 Pembongkaran pagar seng eksisting 154.00 154.00 m - 4,000 616,000 616,000 -
2 Bouwplank 154.00 154.00 m 83,000 33,000 17,864,000 17,864,000 -
3 Galian tanah 71.87 71.87 m3 - 60,000 4,312,440 4,312,440 -
4 Kayu gelam Ø10 cm 108.00 108.00 btg 35,000 5,000 4,320,000 4,320,000 -
5 Pasir urug tebal 10 cm 6.53 6.53 m3 283,000 47,000 2,156,220 2,156,220 -
6 Urugan kembali dan pemadatan 62.05 62.05 m3 - 80,000 4,963,680 4,963,680 -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting 9.83 9.83 m3 3,000,000 1,300,000 42,260,400 42,260,400 -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting 3.82 3.82 m3 3,700,000 1,300,000 19,110,000 19,110,000 -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting 4.32 4.32 m3 7,300,000 1,800,000 39,312,000 39,312,000 -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting 2.87 2.87 m3 5,700,000 1,600,000 20,925,450 20,925,450 -
11 Dinding 1/2 bata ad. 1 : 4 235.69 235.69 m2 100,000 70,000 40,067,300 40,067,300 -
12 Plesteran camp. 1 : 4 tebal 15 mm 604.80 604.80 m2 22,000 78,000 60,480,000 60,480,000 -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris 16.20 16.20 m' 32,000 17,000 793,800 793,800 -
14 Besi siku uk. 60.60.6 mm 146.97 146.97 kg 9,000 8,000 2,498,429 2,498,429 -
15 Kawat duri 6 lapis 924.00 924.00 m 5,500 15,000 18,942,000 18,942,000 -
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci 10.00 - m2 680,000 370,000 10,500,000 - (10,500,000)
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 604.80 - m2 16,000 15,000 18,748,800 - (18,748,800)
18 Mengecat besi siku dan pagar 15.12 15.12 m2 31,000 28,000 892,080 892,080 -
3.2. Pembuatan Parit dan Bak Kontrol - - 0 - - - - -
1 Galian tanah dan bongkar parit 100.94 100.94 m3 - 60,000 6,056,400 6,056,400 -
2 Pasir urug tebal 5 cm 7.21 - m3 283,000 47,000 2,379,300 - (2,379,300)
3 Pasangan 1/2 bata merah 1 PC : 2 Psr 350.20 332.69 m2 100,000 70,000 59,534,000 56,557,300 (2,976,700)
4 Plesteran camp. 1 : 2 tebal 15 mm 350.20 332.69 m2 22,000 78,000 35,020,000 33,269,000 (1,751,000)
Page 7
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-
Page 9
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-
Page 10
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-
Page 12
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-
Page 13
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
I Pekerjaan Persiapan :
1 Survey, pengukuran, pembuatan shop drawing ls 1.00 1.00 - - 3,500,000 - 3,500,000 - 3,500,000
2 Direksi keet uk. 4 m x 6 m m2 24.00 24.00 - 800,000 600,000 19,200,000 14,400,000 19,200,000 14,400,000
3 Pengadaan air dan listrik kerja ls 1.00 0.75 (0.25) - 20,000,000 - 20,000,000 - 15,000,000
4 Sewa scaffolding ls 1.00 - (1.00) - 22,000,000 - 22,000,000 - -
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 0.80 (0.20) - 38,000,000 - 38,000,000 - 30,400,000
Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk
6 dalam komponen upah <safety helmet, safety shoes, safety vest, pakaian kerja dan tanda ls 1.00 1.00 - - 35,000,000 - 35,000,000 - 35,000,000
pengenal> ,APD diluar komponen upah <safety glass dan gloves>, obat-obatan <P3K>, A
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci pcs 1.00 - (1.00) 2,900,000.00 450,000 2,900,000 450,000 - -
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm m2 290.40 - (290.40) 375,000.00 50,000 108,900,000 14,520,000 - -
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci pcs 13.00 - (13.00) 1,800,000.00 350,000 23,400,000 4,550,000 - -
5 Pintu kaca UPVC kamar mandi pcs 13.00 - (13.00) 2,350,000.00 123,000 30,550,000 1,599,000 - -
6 Bouvenlight alumunium uk. 40x60 cm pcs 8.00 - (8.00) 700,000.00 150,000 5,600,000 1,200,000 - -
7 Partisi kaca tebal 5 mm rangka alumunium m2 376.95 - (376.95) 417,000.00 50,000 157,188,150 18,847,500 - -
8 Cutting sticker sandblast m2 369.60 - (369.60) 80,000.00 25,000 29,568,000 9,240,000 - -
9 Vertical blind jendela m2 290.40 - (290.40) 320,000.00 145,000 92,928,000 42,108,000 - -
4.4. Fasad & Logo - - - - - - - - - -
1 Pondasi beton uk 80x80cm include tulangan m3 1.28 1.28 - 3,467,000.00 1,150,000 4,437,760 1,472,000 4,437,760 1,472,000
2 Anchor Bolt M20 bh 12.00 - (12.00) 53,000.00 10,000 636,000 120,000 - -
3 Dyna Bolt M20 bh 8.00 - (8.00) 25,000.00 10,000 200,000 80,000 - -
4 Base Plate 300 x 300 x 12 mm thk bh 2.00 - (2.00) 750,000.00 250,000 1,500,000 500,000 - -
5 Besi H 300 x 300 x 10 x15 mm @ 12 m kg 2,256.00 - (2,256.00) 9,000.00 2,500 20,304,000 5,640,000 - -
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m kg 512.00 - (512.00) 9,000.00 2,500 4,608,000 1,280,000 - -
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow m2 270.36 - (270.36) 500,000.00 100,000 135,180,000 27,036,000 - -
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium pek 1.00 - (1.00) 15,000,000.00 3,000,000 15,000,000 3,000,000 - -
4.5. Backdrop Lobby & R. Utama - - - - - - - - - -
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby m2 13.30 - (13.30) 125,000.00 60,000 1,662,500 798,000 - -
2 Backdrop uk. 120 cm x 350 cm di lobby m2 4.20 - (4.20) 900,000.00 650,000 3,780,000 2,730,000 - -
3 Backdop uk. 500 cm x 350 cm diruang FTM m2 17.50 - (17.50) 900,000.00 650,000 15,750,000 11,375,000 - -
4 Backdop uk. 600 cm x 350 cm diruang rapat m2 21.00 - (21.00) 900,000.00 650,000 18,900,000 13,650,000 - -
5 Memasang Logo dan nama Fuel Terminal Medan Group pek 1.00 - (1.00) 3,500,000.00 1,000,000 3,500,000 1,000,000 - -
6 Lampu backdrop TL LED 8W incl. instalasi set 2.00 - (2.00) 121,000.00 185,000 242,000 370,000 - -
4.6. Elektrikal - - - - - - - - - -
a. Instalasi Listrik - - - - - - - - - -
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru m 250.00 - (250.00) 215,000.00 20,000 53,750,000 5,000,000 - -
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor m 2,000.00 - (2,000.00) 11,000.00 2,000 22,000,000 4,000,000 - -
3 Lampu TL LED 2 x 36 watt incl. Kap RM bh 64.00 - (64.00) 358,000.00 55,000 22,912,000 3,520,000 - -
4 Lampu Downlight LED 19W incl. kap lampu dan accessories bh 32.00 - (32.00) 91,000.00 55,000 2,912,000 1,760,000 - -
5 Saklar Ganda bh 43.00 - (43.00) 21,000.00 175,000 903,000 7,525,000 - -
6 Saklar Seri+stop kontak bh 10.00 - (10.00) 14,000.00 175,000 140,000 1,750,000 - -
7 Stop Kontak Dinding bh 21.00 - (21.00) 13,000.00 175,000 273,000 3,675,000 - -
8 Stop Kontak Tanam bh 17.00 - (17.00) 45,000.00 175,000 765,000 2,975,000 - -
9 Pipa conduit 20 mm dan aksesories m 2,000.00 - (2,000.00) 3,800.00 7,000 7,600,000 14,000,000 - -
10 Pipa galvanis Ø 3" termasuk aksessories m 250.00 - (250.00) 195,000.00 48,000 48,750,000 12,000,000 - -
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi unit 1.00 - (1.00) 1,250,000.00 800,000 1,250,000 800,000 - -
b. AC dan Exhaust Fan - - - - - - - - - -
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 9.00 - (9.00) 6,390,000.00 450,000 57,510,000 4,050,000 - -
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 10.00 - (10.00) 9,750,000.00 450,000 97,500,000 4,500,000 - -
3 Exhaust Fan 12 inci unit 5.00 - (5.00) 350,000.00 143,000 1,750,000 715,000 - -
4 Stop kontak AC dan Fan pcs 24.00 - (24.00) 13,000.00 175,000 312,000 4,200,000 - -
c. Lampu Penerangan Areal Kantor - - - - - - - - - -
1 Galian tanah pondasi dan jalur kabel m3 10.18 - (10.18) - 115,000 - 1,170,700 - -
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
- -
- -
- (5,000,000.00)
- (22,000,000.00)
- (7,600,000.00)
- -
- (34,600,000)
- -
- -
(9,300,000) (7,740,000)
(7,250,250) (1,035,750)
(101,503,500) (64,216,500)
(952,061,400) (265,152,000)
(90,298,402) (28,218,251)
(54,179,041) (13,544,760)
(29,250,000) (13,650,000)
- (8,000,000)
(1,243,842,593.39) (401,557,260.98)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(6,800,000) (3,700,000)
(9,676,800) (9,072,000)
- -
- -
- -
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
(2,040,430) (338,870)
(1,751,000) (1,225,700)
(385,220) (1,365,780)
(2,570,000) (1,500,000)
(23,223,450) (17,202,350)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(1,589,280) (557,760)
- -
- -
- -
- -
- -
- -
(15,120,000) (7,084,800)
(5,060,690) (1,317,888)
(1,287,252) (369,900)
(34,056,000) (11,952,000)
- -
(106,470,000) (49,888,800)
(42,591,744) (11,091,600)
(16,734,276) (4,808,700)
(33,204,600) (11,653,200)
- -
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
(90,090,000) (42,213,600)
(35,493,120) (9,243,000)
(13,387,421) (3,846,960)
(26,563,680) (9,322,560)
- -
(52,001,250) (8,636,250)
(28,158,638) (8,091,563)
(59,768,280) (20,975,760)
(88,264,000) (65,195,000)
(7,700,000) (3,200,000)
(1,950,000) (3,200,000)
(1,872,000) (780,000)
- -
(56,175,000) (29,400,000)
(28,158,638) (8,091,563)
(59,598,000) (20,916,000)
(85,000,000) (65,000,000)
(18,700,000) (3,520,000)
(1,950,000) (3,200,000)
(1,872,000) (780,000)
- -
(74,460,000) (52,122,000)
(36,485,400) (120,625,200)
(23,827,200) (22,338,000)
- -
- (66,240)
(27,168) (4,512)
(30,480) (21,840)
(5,250,000) (2,460,000)
(4,439,001) (1,155,990)
(10,455,700) (3,411,860)
(4,335,000) (3,315,000)
(17,000,000) (10,000,000)
- -
(72,748,268) (12,124,711)
(109,122,402) (30,311,778)
(20,000,000) (10,300,000)
(7,000,000) (2,400,000)
(141,750,000) (73,500,000)
(99,750,000) (99,750,000)
(3,990,000) (3,150,000)
(16,800,000) (15,750,000)
- -
(15,000,000) (900,000)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
(2,900,000) (450,000)
(108,900,000) (14,520,000)
(23,400,000) (4,550,000)
(30,550,000) (1,599,000)
(5,600,000) (1,200,000)
(157,188,150) (18,847,500)
(29,568,000) (9,240,000)
(92,928,000) (42,108,000)
- -
- -
(636,000) (120,000)
(200,000) (80,000)
(1,500,000) (500,000)
(20,304,000) (5,640,000)
(4,608,000) (1,280,000)
(135,180,000) (27,036,000)
(15,000,000) (3,000,000)
- -
(1,662,500) (798,000)
(3,780,000) (2,730,000)
(15,750,000) (11,375,000)
(18,900,000) (13,650,000)
(3,500,000) (1,000,000)
(242,000) (370,000)
- -
- -
(53,750,000) (5,000,000)
(22,000,000) (4,000,000)
(22,912,000) (3,520,000)
(2,912,000) (1,760,000)
(903,000) (7,525,000)
(140,000) (1,750,000)
(273,000) (3,675,000)
(765,000) (2,975,000)
(7,600,000) (14,000,000)
(48,750,000) (12,000,000)
(1,250,000) (800,000)
- -
(57,510,000) (4,050,000)
(97,500,000) (4,500,000)
(1,750,000) (715,000)
(312,000) (4,200,000)
- -
- (1,170,700)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
(1,145,200) (181,800)
(1,111,000) (5,050,000)
(12,600,000) (10,500,000)
(36,400,000) (4,900,000)
(21,000,000) (3,500,000)
(10,800,000) (1,200,000)
(8,750,000) (2,750,000)
- -
(970,000) -
(18,000,000) -
(360,000) -
(700,000) -
(70,000) -
- -
(16,500,000) (1,700,000)
- -
- -
- -
- -
- -
- -
- -
- -
(6,500,000) (900,000)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(5,760,000) (2,040,000)
(33,936,000) (4,592,000)
(20,680,000) (5,856,000)
(9,840,000) (2,200,000)
(3,968,000) (1,948,000)
(17,100,000) -
(124,000) (80,000)
- (3,500,000)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
Material Jasa
- -
(4,200,000) (300,000)
(7,100,000) (550,000)
(8,500,000) (2,500,000)
- -
- (3,229,200)
(7,605,840) (2,669,280)
(1,350,000) (4,680,000)
(1,500,000) -
(700,000) (155,000)
(2,823,180,176) (1,164,759,514)
- (2,500,000)
- (5,000,000)
- (7,500,000)
(4,090,246,220) (1,625,619,125)
(5,715,865,345)
(457,269,228)
(6,173,134,573)
(6,173,000,000)
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 24.984% 0.467% 1.00 0.80 80.00% 19.987% 0.374% 0.20
Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam
6 komponen upah <safety helmet, safety shoes, safety vest, pakaian kerja dan tanda pengenal> ,APD diluar ls 1.00 23.011% 0.431% 1.00 1.00 100.00% 23.011% 0.431% -
komponen upah <safety glass dan gloves>, obat-obatan <P3K>, A
II PEKERJAAN PENGURUGAN DAN PENGECORAN 100.000% 30.843% 34.381% 10.604%
1 Pembersihan lahan m2 4,664.00 1.302% 0.402% 4,664.00 4,664.00 100.00% 1.302% 0.402% -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat m3 2,332.00 17.577% 5.421% 2,332.00 2,332.00 100.00% 17.577% 5.421% -
3 Bekisting m2 60.00 0.680% 0.210% 60.00 - 0.00% 0.000% 0.000% 60.00
Beton Cor Ready Mix K. 300 tebal 20 cm 48.543% 14.972% 0.00% 0.000% 0.000% 828.60
6 m3 828.60 828.60 -
7 Pembesian Wiremesh M8 -150 (2 lapis) kg 45,149.20 18.906% 5.831% 45,149.20 33,861.90 75.00% 14.180% 4.373% 11,287.30
8 Besi Beton Ø8 kg 6,772.38 2.701% 0.833% 6,772.38 - 0.00% 0.000% 0.000% 6,772.38
9 Pemasangan cansteen dan pengecatan m 195.00 1.711% 0.528% 195.00 - 0.00% 0.000% 0.000% 195.00
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium pek 1.00 0.319% 0.098% 1.00 - 0.00% 0.000% 0.000% 1.00
III PEKERJAAN PEMBANGUNAN PAGAR 100.000% 5.115% 90.278% 4.618%
1 Pembongkaran pagar seng eksisting m 154.00 0.148% 0.008% 154.00 154.00 100.00% 0.148% 0.008% -
2 Bouwplank m 154.00 4.296% 0.220% 154.00 154.00 100.00% 4.296% 0.220% -
3 Galian tanah m3 71.87 1.037% 0.053% 71.87 71.87 100.00% 1.037% 0.053% -
4 Kayu gelam Ø10 cm 108.00 1.039% 0.053% 108.00 108.00 100.00% 1.039% 0.053% -
btg
5 Pasir urug tebal 10 cm m3 6.53 0.519% 0.027% 6.53 6.53 100.00% 0.519% 0.027% -
6 Urugan kembali dan pemadatan m3 62.05 1.194% 0.061% 62.05 62.05 100.00% 1.194% 0.061% -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting m3 9.83 10.163% 0.520% 9.83 9.83 100.00% 10.163% 0.520% -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting m3 3.82 4.596% 0.235% 3.82 3.82 100.00% 4.596% 0.235% -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting m3 4.32 9.454% 0.484% 4.32 4.32 100.00% 9.454% 0.484% -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting m3 2.87 5.032% 0.257% 2.87 2.87 100.00% 5.032% 0.257% -
11 Dinding 1/2 bata ad. 1 : 4 m2 235.69 9.636% 0.493% 235.69 235.69 100.00% 9.636% 0.493% -
12 Plesteran camp. 1 : 4 tebal 15 mm m2 604.80 14.545% 0.744% 604.80 604.80 100.00% 14.545% 0.744% -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris m' 16.20 0.191% 0.010% 16.20 16.20 100.00% 0.191% 0.010% -
Page 26 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 27 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 28 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 29 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 30 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 31 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN
Page 32 of 64
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Survey, pengukuran, pembuatan shop drawing 0.000% 0.000% 0.043% 0.043% 0.043%
3 Pengadaan air dan listrik kerja 0.000% 0.000% 0.246% 0.185% 0.185%
4 Sewa scaffolding 0.000% 0.000% 0.271% 0.000% 0.000%
Mengetahui,
Pjs. Fuel Terminal Manager Medan Group
Eri Wibowo
RPD.03a
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN
MATERIAL MATERIAL JASA JASA
6 Beton Cor Ready Mix K. 300 tebal 20 cm 11.711% 0.000% 3.262% 0.000% 0.000%
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 0.000% 0.000% 0.098% 0.000% 0.000%
Mengetahui,
Pjs. Fuel Terminal Manager Medan Group
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Pembongkaran pagar seng eksisting 0.000% 0.000% 0.008% 0.008% 0.008%
2 Bouwplank 0.157% 0.157% 0.063% 0.063% 0.220%
3 Galian tanah 0.000% 0.000% 0.053% 0.053% 0.053%
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Pengadaan tiang pancang spun pile 500 mm (bottom) 1.299% 1.299% 0.000% 0.000% 1.299%
2 Pengadaan tiang pancang spun pile 500 mm (middle) 2.825% 2.825% 0.000% 0.000% 2.825%
3 Pengangkutan tiang pancang ketitik pancang 0.000% 0.000% 0.177% 0.177% 0.177%
4 Pemancangan tiang pancang 0.000% 0.000% 0.602% 0.602% 0.602%
5 Penyambungan tiang pancang 0.000% 0.000% 0.197% 0.197% 0.197%
6 Pemotongan tiang pancang 0.000% 0.000% 0.118% 0.118% 0.118%
7 PDA Test 0.000% 0.000% 0.086% 0.086% 0.086%
8 Galian tanah 0.000% 0.000% 0.178% 0.178% 0.178%
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) 0.000% 0.000% 0.000% 0.000% 0.000%
- Bekisting 0.076% 0.076% 0.061% 0.061% 0.137%
- Besi Beton D16-150 0.191% 0.191% 0.050% 0.050% 0.241%
- Beton K-250 0.134% 0.134% 0.047% 0.047% 0.181%
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) 0.000% 0.000% 0.000% 0.000% 0.000%
- Bekisting 0.057% 0.057% 0.046% 0.046% 0.103%
- Besi Beton D16-150 0.170% 0.170% 0.044% 0.044% 0.214%
- Beton K-250 0.126% 0.126% 0.044% 0.044% 0.170%
Mengetahui,
Pjs. Fuel Terminal Manager Medan Group
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
11 Pedestal uk. 50 cm x 50 cm x 70 cm
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
18 Dinding Bata
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci 0.036% 0.000% 0.006% 0.000% 0.000%
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm 1.340% 0.000% 0.179% 0.000% 0.000%
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci 0.288% 0.000% 0.056% 0.000% 0.000%
5 Pintu kaca UPVC kamar mandi 0.376% 0.000% 0.020% 0.000% 0.000%
6 Bouvenlight alumunium uk. 40x60 cm 0.069% 0.000% 0.015% 0.000% 0.000%
7 Partisi kaca tebal 5 mm rangka alumunium 1.934% 0.000% 0.232% 0.000% 0.000%
8 Cutting sticker sandblast 0.364% 0.000% 0.114% 0.000% 0.000%
9 Vertical blind jendela 1.143% 0.000% 0.518% 0.000% 0.000%
4.4. Fasad & Logo 0.000% 0.000% 0.000% 0.000% 0.000%
1 Pondasi beton uk 80x80cm include tulangan 0.055% 0.055% 0.018% 0.018% 0.073%
2 Anchor Bolt M20 0.008% 0.000% 0.001% 0.000% 0.000%
3 Dyna Bolt M20 0.002% 0.000% 0.001% 0.000% 0.000%
4 Base Plate 300 x 300 x 12 mm thk 0.018% 0.000% 0.006% 0.000% 0.000%
5 Besi H 300 x 300 x 10 x15 mm @ 12 m 0.250% 0.000% 0.069% 0.000% 0.000%
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m 0.057% 0.000% 0.016% 0.000% 0.000%
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka 1.663% 0.000% 0.333% 0.000% 0.000%
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium 0.185% 0.000% 0.037% 0.000% 0.000%
4.5. Backdrop Lobby & R. Utama 0.000% 0.000% 0.000% 0.000% 0.000%
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby 0.020% 0.000% 0.010% 0.000% 0.000%
2 Backdrop uk. 120 cm x 350 cm di lobby 0.046% 0.000% 0.034% 0.000% 0.000%
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
3 Backdop uk. 500 cm x 350 cm diruang FTM 0.194% 0.000% 0.140% 0.000% 0.000%
4 Backdop uk. 600 cm x 350 cm diruang rapat 0.232% 0.000% 0.168% 0.000% 0.000%
5 Memasang Logo dan nama Fuel Terminal Medan Group 0.043% 0.000% 0.012% 0.000% 0.000%
6 Lampu backdrop TL LED 8W incl. instalasi 0.003% 0.000% 0.005% 0.000% 0.000%
4.6. Elektrikal
a. Instalasi Listrik
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru 0.661% 0.000% 0.062% 0.000% 0.000%
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor 0.271% 0.000% 0.049% 0.000% 0.000%
3 Lampu TL LED 2 x 36 watt incl. Kap RM 0.282% 0.000% 0.043% 0.000% 0.000%
4 Lampu Downlight LED 19W incl. kap lampu dan accessories 0.036% 0.000% 0.022% 0.000% 0.000%
5 Saklar Ganda 0.011% 0.000% 0.093% 0.000% 0.000%
6 Saklar Seri+stop kontak 0.002% 0.000% 0.022% 0.000% 0.000%
7 Stop Kontak Dinding 0.003% 0.000% 0.045% 0.000% 0.000%
8 Stop Kontak Tanam 0.009% 0.000% 0.037% 0.000% 0.000%
9 Pipa conduit 20 mm dan aksesories 0.093% 0.000% 0.172% 0.000% 0.000%
10 Pipa galvanis Ø 3" termasuk aksessories 0.600% 0.000% 0.148% 0.000% 0.000%
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi 0.015% 0.000% 0.010% 0.000% 0.000%
b. AC dan Exhaust Fan
Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories
1
dan gas)
0.707% 0.000% 0.050% 0.000% 0.000%
Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories
2
dan gas)
1.199% 0.000% 0.055% 0.000% 0.000%
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Galian tanah pondasi dan jalur kabel 0.000% 0.000% 0.014% 0.000% 0.000%
2 Pasir urug 0.014% 0.000% 0.002% 0.000% 0.000%
3 Pemasangan bata 0.014% 0.000% 0.062% 0.000% 0.000%
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting 0.155% 0.000% 0.129% 0.000% 0.000%
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang 0.448% 0.000% 0.060% 0.000% 0.000%
6 Lampu LED jenis street light 70 watt 0.258% 0.000% 0.043% 0.000% 0.000%
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris 0.133% 0.000% 0.015% 0.000% 0.000%
8 Pipa PVC Ø 2" termasuk aksessories 0.108% 0.000% 0.034% 0.000% 0.000%
d. Perangkat Access Door
- Kabel Grounding BC 50 mm
- Grounding rod 12 m
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
- As Grounding
- Accessories
- C clamp connector
- Concrete Pit
Size :
a. Instalasi air
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris 0.071% 0.000% 0.025% 0.000% 0.000%
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris 0.417% 0.000% 0.056% 0.000% 0.000%
3 Closet duduk lengkap dengan jet washer 0.254% 0.000% 0.072% 0.000% 0.000%
4 Urinoir lengkap dengan aksesories 0.121% 0.000% 0.027% 0.000% 0.000%
5 Wastafel lengkap dengan hand washer 0.049% 0.000% 0.024% 0.000% 0.000%
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah 0.210% 0.000% 0.000% 0.000% 0.000%
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Tandon air kapasitas 1500 liter 0.052% 0.000% 0.004% 0.000% 0.000%
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories 0.087% 0.000% 0.007% 0.000% 0.000%
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm 0.105% 0.000% 0.031% 0.000% 0.000%
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan
Mengetahui,
Pjs. Fuel Terminal Manager Med
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan 0.000% 0.000% 0.031% 0.000% 0.000%
2 Pembersihan lokasi kerja 0.000% 0.000% 0.062% 0.000% 0.000%
Mengetahui,
Pjs. Fuel Terminal Manager Med
Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
Pengawas Lapangan
Inspector RPD I ### Direktur
###
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) 24.984% 80.000% 19.987%
6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam
23.011% 100.000% 23.011%
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat 17.577% 100.000% 17.577%
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 0.319% 0.000% 0.000%
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
1 Pembongkaran pagar seng eksisting 0.148% 100.000% 0.148%
2 Bouwplank 4.296% 100.000% 4.296%
3 Galian tanah 1.037% 100.000% 1.037%
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
1 Pengadaan tiang pancang spun pile 500 mm (bottom) 2.092% 100.000% 2.092%
2 Pengadaan tiang pancang spun pile 500 mm (middle) 4.550% 100.000% 4.550%
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
11 Pedestal uk. 50 cm x 50 cm x 70 cm
12 Sloof uk. 30 cm x 50 cm
13 Kolom uk. 50 cm x 50 cm
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
17 Lantai II
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
18 Dinding Bata
- Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 0.915% 0.000% 0.000%
19 Tangga
- Handrail/railing bahan stainless steel 304 tangga dan teras 0.535% 0.000% 0.000%
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris 0.186% 0.000% 0.000%
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) 4.265% 0.000% 0.000%
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) 0.645% 0.000% 0.000%
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan aksesories 0.315% 0.000% 0.000%
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci 0.066% 0.000% 0.000%
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm 2.446% 0.000% 0.000%
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci 0.554% 0.000% 0.000%
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow 3.214% 0.000% 0.000%
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium 0.357% 0.000% 0.000%
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby 0.049% 0.000% 0.000%
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
5 Memasang Logo dan nama Fuel Terminal Medan Group 0.089% 0.000% 0.000%
4.6. Elektrikal
a. Instalasi Listrik
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru 1.164% 0.000% 0.000%
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor 0.515% 0.000% 0.000%
4 Lampu Downlight LED 19W incl. kap lampu dan accessories 0.093% 0.000% 0.000%
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi 0.041% 0.000% 0.000%
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 1.220% 0.000% 0.000%
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 2.021% 0.000% 0.000%
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting 0.458% 0.000% 0.000%
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang 0.818% 0.000% 0.000%
3 Power Supply Finger Print (incl adaptor) 12VDC 0.007% 0.000% 0.000%
- Kabel Grounding BC 50 mm
- Grounding rod 12 m
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
- As Grounding
- Accessories
- C clamp connector
- Concrete Pit
Size :
a. Instalasi air
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris 0.155% 0.000% 0.000%
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris 0.763% 0.000% 0.000%
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah 0.339% 0.000% 0.000%
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories 0.152% 0.000% 0.000%
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm 0.218% 0.000% 0.000%
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
tnk 07a
LAPORAN KEMAJUAN PEKERJAAN
BOBOT PRESTASI
PRESTASI
TERHADA TOTAL TIAP
NO. PERINCIAN PEKERJAAN TERHADAP
P JENIIS
KONTRAK
KONTRAK PEKERJAAN
I PEKERJAAN PERSIAPAN 1.871% 77.252% 1.445%
II PEKERJAAN PENGURUGAN DAN PENGECORAN 30.843% 34.381% 10.604%
III PEKERJAAN PEMBANGUNAN PAGAR 5.115% 90.278% 4.618%
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 62.078% 20.981% 13.025%
V PEKERJAAN PENYELESAIAN 0.092% 0.000% 0.000%
TOTAL
RPD. 03
BERITA ACARA LAPANGAN
NO. BA - /Q21050/2021-S5
TENTANG
LAPORAN KEMAJUAN PEKERJAAN
Pada hari ini Senin tanggal Delapan bulan November tahun Dua ribu dua puluh satu, kami yang
bertandatangan di bawah ini :
1. OLOAN PANJAITAN
Dalam hal ini bertindak untuk dan atas nama PT PERTAMINA (PERSERO) yang selanjutnya disebut
PERUSAHAAN.
2. M. AGUNG IRVANSYAH
Dalam hal ini bertindak sebagai Pimpinan Pelaksana Pekerjaan dari dan selaku atas nama
PT ARTA GUSTI UTAMA untuk selanjutnya disebut PELAKSANA PEKERJAAN.
Sesuai dengan Surat Perjanjian Borongan (SPBNo. 3950099135 Tanggal 01 Maret 2021
Telah mengadakan pemeriksaan bersama dengan hasil bahwa pekerjaan telah dikerjakan sesuai Surat
Perjanjian Borongan tersebut di atas. Menurut penilaian bersama pelaksanaan telah mencapai 29,692 %
sesuai dengan Laporan Kemajuan Pekerjaan (RPD. 03 / RPD. 03a) sebagai lampiran yang tidak
terpisahkan.
Demikian berita acara ini ditandatangani oleh kedua belah pihak di atas materai yang cukup dan dibuat
dalam rangkap dua yang masing-masing mempunyai kekuatan hukum yang sama.
RPD. 03b
BERITA ACARA
PENYERAHAN TERMIN PEKERJAAN
No. BA- …….. /F12470/2017-S5
1. JUREMI
Dalam hal ini bertindak selaku Technical Services Region Manager II untuk dan atas nama
PT. PERTAMINA (PERSERO) yang selanjutnya disebut PERUSAHAAN.
2. 0
Dalam hal ini bertindak sebagai Direktur Utama pekerjaan dari dan selaku demikian untuk dan atas
nama PT. Sinar Habib Agung Putra untuk selanjutnya disebut KONTRAKTOR.
Menerangkan bahwa pada hari Selasa tanggal Enam belas bulan Mei tahun Dua ribu tujuh belas telah
mengadakan pemeriksaan dengan hasil bahwa pekerjaan telah dikerjakan sesuai dengan Pokok - Pokok
Perjanjian tersebut di atas.
Demikian Berita Acara ini dibuat menurut keadaan sebenarnya untuk dapat dipergunakan sebagaimana
mestinya.
KONTRAKTOR PERUSAHAAN
0 JUREMI
TNK. 404
RENCANA KERJA & LAPORAN HARIAN
LOKASI BELAWAN
NO. PO .
NO. KONTRAK 3950099135 TGL. 01 Maret 2021
TENAGA KERJA BAHAN / MATERIAL / PERALATAN YANG MASUK PERALATAN KERJA YANG DIGUNAKAN
Jabatan Jumlah Nama & Type Spesifikasi & Ukuran Pabrik Pembuat Jumlah Nama & Type Kapasitas Jumlah
Site Manager org.
Mandor "
Kepala Tukang "
Tukang "
Pembantu Tukang "
Pekerja "
Jumlah org.
RENCANA PEKERJAAN YANG DILAKSANAKAN PEKERJAAN YANG DIHASILKAN