PHYSICAL CHECK

PEKERJAAN RENOVASI BANGUNAN FILLING SHED TBBM LUBUK LINGGAU


NOMOR KONTRAK PPJ-002/F12470/2017-S5
TGL. 24 Mei 2017
PELAKSANA PEKERJAAN PT. Sinar Habib Agung Putra
WAKTU PELAKSANAAN 240 (Dua ratus empat puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 1.382.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
1 PERSIAPAN
.pipa API 5L / ASTM A53 grade B Ø 6" WT 7,11 mm Sch. 40 m 18.00 18.00 - -
.pipa API 5L / ASTM A53 grade B Ø 3" WT 5,49 mm Sch. 40 m 18.00 18.00 - -
.elbow 45° Ø 6" sch. 40 ASTM A-234 WPB bh 6.00 6.00 - -
.elbow 45° Ø 3" sch. 40 ASTM A-234 WPB bh 2.00 2.00 - -
.slip on flanges A105, #150 Ø 6" RF bh 6.00 6.00 - -
.slip on flanges A105, #150 Ø 3" RF bh 2.00 2.00 - -
.bolt & nut ls 1.00 1.00 - -
.packing klingerit ls 1.00 1.00 - -
.grill penutup jalur pipa m 12.00 12.00 - -
2 PEKERJAAN RENOVASI FILLING SHED
2.1 Pekerjaan Sipil
2.1.1 Pekerjaan Pondasi dan Sloof
6 Pondasi tiang adk.1:2:3 ukuran 70 x 70 x 30 cm m3 2.65 2.65 - -
.pembesian utama Ø12 kg 325.99 325.99 - -
7 Kolom pondasi beton adk.1:2:3 ukuran 30 x 30 cm m3 1.13 1.13 - -
.pembesian utama 8 x Ø12 kg 156.60 156.60 - -
.sengkang Ø10-150 kg 93.21 93.21 - -
8 Sloof ukuran 30 x 20 cm m3 8.67 8.67 - -
.pembesian utama 4 x Ø12 kg 569.12 569.12 - -
.sengkang Ø8-150 kg 483.41 483.41 - -
2.1.2 Pekerjaan Perluasan Lantai
.wiremesh lantai dan rabatan Ø 10 mm m2 160.00 160.00 - -
2.1.3 Pekerjaan Pengecoran Taman
4 Lantai beton K-250 m3 9.36 9.36 - -
.wiremesh lantai Ø 10 mm m2 93.60 93.60 - -
2.1.4 Pekerjaan Parit
5 Cor beton bertulang m3 12.88 12.88 - -
.pembesian utama (22 bh) dengan besi ulir D12 kg 149.74 149.74 - -
.sengkang dengan besi polos SNI (Ø 10 mm - 100) kg 1531.39 1531.39 - -
6 Grill penutup parit plat strip 50x5 dan besi siku 50x50x5 m 92.00 92.00 - -

2.2 Pekerjaan Struktur Baja


1 Baja IWF 200 x 100 x 5,5 x 8mm --kolom & kuda-kuda-- btg 33.00 33.00 - -
2 Baja IWF 150 x 75 x 5 x 7 mm --gelagar-- btg 24.00 24.00 - -
3 Gording CNP 100 x 50 x 20 x 3,2 mm btg 144.00 144.00 - -
4 Wind verband (ikatan angin) besi Ø 12mm & turn buckle (jarum keras) set 32.00 32.00 - -
5 Anchor bolt & nut M20 (Ø 3/4) - L 45cm set 72.00 72.00 - -
6 Bolt & nut M16 ls 1.00 1.00 - -
7 Pelat tapakan uk. 30 cm x 30 cm --pondasi tiang-- bh 18.00 18.00 - -
8 Pelat tapakan uk. 20 cm x 15 cm --gelagar-- bh 18.00 18.00 - -
9 Pelat tapakan uk. 30 cm x 20 cm --kuda-kuda-- bh 48.00 48.00 - -

2.3 Pekerjaan Arsitektur


1 Atap spandeck alumunium tebal 0,45 mm m2 818.63 818.63 - -
2 Lisplank aluminium composite panel (ACP) 4mm lebar 0,9m coating PVDF 0,3mm incl. rangka hollow m2 90.00 90.00 - -
3 Talang air seng BJLS 0,4 mm m 90.00 90.00 - -
4 Pipa pembuangan talang air galvanize Ø 4" include accessories m 24.00 24.00 - -
5 Kerangka talang besi L 50.50.5 m 180.00 180.00 - -
6 Rabung alumunium m 90.00 90.00 - -
7 Huruf dan lambang Pertamina bahan acrilic set 1.00 1.00 - -
8 Pembongkaran pulau pengisian berikut keramik lama ls 1.00 1.00 - -
9 Pemasangan keramik uk. 30x30 perekat 1 : 3 --bay-- m2 22.36 22.36 - -
10 Selimut Beton Bertulang adk. 1 : 2 : 3 untuk pulau pengisian m3 11.23 11.23 - -
.pembesian utama (8bh) dengan besi ulir SNI D 12 kg 638.69 638.69 - -
.sengkang dengan besi polos SNI (Ø 8 mm - 150) kg 461.16 461.16 - -
12 ACP Pelapis Rumah Meter incl kaca dan accessories, rangka hollow ls 1.00 1.00 - -
13 Tangga rumah meter ls 1.00 1.00 - -
14 Pengecatan rangka Filling Shed (2 lapis) m2 659.52 659.52 - -

2.4 Pekerjaan Elektrikal


1 Lampu LED explosion proof 60 Watt set 16.00 16.00 - -
2 Saklar Explosion Proof set 1.00 1.00 - -
3 Kabel NYY 3x2,5 mm dan accessories m 84.00 84.00 - -
4 Pipa galvanize Ø 3/4" L 6 m include accessories m 84.00 84.00 - -
5 Kabel BC grounding m 50.00 50.00 - -

2.5 Pekerjaan Mekanikal


PHYSICAL CHECK

PEKERJAAN RENOVASI BANGUNAN FILLING SHED TBBM LUBUK LINGGAU


NOMOR KONTRAK PPJ-002/F12470/2017-S5
TGL. 24 Mei 2017
PELAKSANA PEKERJAAN PT. Sinar Habib Agung Putra
WAKTU PELAKSANAAN 240 (Dua ratus empat puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 1.382.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
1 Flushing Pipa ls 1.00 1.00 - -
2 Pipa Ø 3" API 5L / ASTM A53 grade B Ø 3" WT 5,49 mm Sch. 40 m 113.00 113.00 - -
4 Bolt & nut flange Ø 5/8" L 3-¾" ls 1.00 1.00 - -
5 Packing klingerit 1000 uk. 150 x 200 cm tebal 4 mm m2 0.95 0.95 - -
6 Slip On Flange A105 #150 Ø 3" carbon steel bh 66.00 66.00 - -
8 Equal Tee Ø 3" A-234 WPB Schd. 40 bh 8.00 8.00 - -
9 Blind Flange A105 #150 Ø 3" carbon steel bh 8.00 8.00 - -
11 Plat bonding set 33.00 33.00 - -
12 Elbow 90° welded Ø 3" carbon steel schd. 40 ASTM A-234 bh 46.00 46.00 - -
14 U- Bolt incl. accessories set 26.00 26.00 - -
16 Pengecatan Pipa 3 layer 200µ (Primer 50µ, Second Coat 100µ, Finish Coat 50µ) m2 7.89 7.89 - -
17 Dye penetrant test pipa dengan flange Ø 4" untuk seluruh join ls 1.00 1.00 - -
18 Radiography test 10 joint ls 1.00 1.00 - -

Terminal BBM Lubuk Linggau, 30 Mei 2017

PT. Sinar Habib Agung Putra Diperiksa oleh, Diperiksa oleh,


Direktur Utama, OH. Terminal BBM Lubuk Linggau Inspector - TS Region II

Djuliyanto Putra Handoyo Suhendra Tigor Susanto


PHYSICAL CHECK

PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN


NOMOR KONTRAK 3950099135
TGL. 01 Maret 2021
PELAKSANA PEKERJAAN PT Artha Gusti Utama
WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 8.780.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
I PEKERJAAN PERSIAPAN
1 Survey, pengukuran, pembuatan shop drawing ls 1.00 1.00 - -
2 Direksi keet uk. 4 m x 6 m m2 24.00 24.00 - -
3 Pengadaan air dan listrik kerja ls 1.00 0.75 - 0.25
4 Sewa scaffolding ls 1.00 0.00 - 1.00

5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 0.80 - 0.20

6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam kom ls 1.00 1.00 - -
II PEKERJAAN PENGURUGAN DAN PENGECORAN 0.00
1 Pembersihan lahan m2 4664.00 4664.00 - -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat m3 2332.00 2332.00 - -
3 Bekisting m2 60.00 0.00 - 60.00

4 Kayu gelam Ø10 cm btg 1035.75 828.60 - 207.15

5 Lantai kerja tebal 5 cm m3 207.15 0.00 - 207.15

6 Beton Cor Ready Mix K. 300 tebal 20 cm m3 828.60 0.00 - 828.60

7
Pembesian Wiremesh M8 -150 (2 lapis) kg 45149.20 33861.90 - 11,287.30
8
Besi Beton Ø8 kg 6772.38 0.00 - 6,772.38
9
Pemasangan cansteen dan pengecatan m 195.00 0.00 - 195.00
10
Pengujian tekan beton dan sand cone test tanah urug di laboratorium pek 1.00 0.00 - 1.00
III PEKERJAAN PEMBANGUNAN PAGAR 0.00
Pagar Tembok Depan dan Samping 0.00
1 Pembongkaran pagar seng eksisting m 154.00 154.00 - -
2 Bouwplank m 154.00 154.00 - -
3 Galian tanah m3 71.87 71.87 - -
4 Kayu gelam Ø10 cm btg 108.00 108.00 - -
5 Pasir urug tebal 10 cm m3 6.53 6.53 - -
6 Urugan kembali dan pemadatan m3 62.05 62.05 - -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting m3 9.83 9.83 - -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting m3 3.82 3.82 - -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting m3 4.32 4.32 - -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting m3 2.87 2.87 - -
11 Dinding 1/2 bata ad. 1 : 4 m2 235.69 235.69 - -
12 Plesteran camp. 1 : 4 tebal 15 mm m2 604.80 604.80 - -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris m' 16.20 16.20 - -
14 Besi siku uk. 60.60.6 mm kg 146.97 146.97 - -
15 Kawat duri 6 lapis m 924.00 924.00 - -
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci m2 10.00 0.00 - 10.00
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 604.80 0.00 - 604.80
18 Mengecat besi siku dan pagar m2 15.12 15.12 - -
3.2. Pembuatan Parit dan Bak Kontrol - 0.00 0.00 - -
1 Galian tanah dan bongkar parit m3 100.94 100.94 - -
2 Pasir urug tebal 5 cm m3 7.21 0.00 - 7.21
3 Pasangan 1/2 bata merah 1 PC : 2 Psr m2 350.20 332.69 - 17.51
4 Plesteran camp. 1 : 2 tebal 15 mm m2 350.20 332.69 - 17.51
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr bh 1.00 0.00 - 1.00
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 0.00
4.1 Pondasi - 32 titik ; Kedalaman 18 m 0.00
1 Pengadaan tiang pancang spun pile 500 mm (bottom) m 192.00 192.00 - -
2 Pengadaan tiang pancang spun pile 500 mm (middle) m 384.00 384.00 - -
3 Pengangkutan tiang pancang ketitik pancang m 576.00 576.00 - -
4 Pemancangan tiang pancang m 576.00 576.00 - -
5 Penyambungan tiang pancang bh 64.00 64.00 - -
6 Pemotongan tiang pancang bh 32.00 32.00 - -
7 PDA Test titik 1.00 1.00 - -
8 Galian tanah m3 126.00 126.00 - -
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) - 0.00 0.00 - -
0 - Bekisting m2 38.40 38.40 - -
0 - Besi Beton D16-150 kg 1617.92 1617.92 - -
0 - Beton K-250 m3 11.52 11.52 - -
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) - 0.00 0.00 - -
0 - Bekisting m2 28.80 28.80 - -
0 - Besi Beton D16-150 kg 1440.96 1440.96 - -
0 - Beton K-250 m3 10.80 10.80 - -
PHYSICAL CHECK

PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN


NOMOR KONTRAK 3950099135
TGL. 01 Maret 2021
PELAKSANA PEKERJAAN PT Artha Gusti Utama
WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 8.780.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
11 Pedestal uk. 50 cm x 50 cm x 70 cm - 0.00 0.00 - -
0 - Bekisting m2 44.80 44.80 - -
0 - Besi Beton 12-D16 kg 606.72 606.72 - -
0 - Ring Besi Beton Ø10-150 mm kg 276.19 276.19 - -
0 - Beton K-250 m3 5.60 3.92 - 1.68
12 Sloof uk. 30 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting m2 304.20 304.20 - -
0 - Besi Beton 12-D16 kg 4436.64 4436.64 - -
0 - Ring Besi Beton Ø10-150 mm kg 1923.48 1923.48 - -
0 - Beton K-250 m3 35.10 35.10 - -
13 Kolom uk. 50 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting (2x pakai) m2 288.00 244.80 - 43.20
0 - Besi Beton 12-D16 kg 3514.37 2987.21 - 527.16
0 - Ring Besi Beton Ø10-150 mm kg 986.40 838.44 - 147.96
0 - Beton K-250 m3 72.00 36.00 - 36.00
14 Balok Tengah uk. 30 cm x 50 cm - 0.00 0.00 - -
0 - Bekisting m2 304.20 0.00 - 304.20
0 - Besi Beton 12-D16 kg 4436.64 0.00 - 4,436.64
0 - Ring Besi Beton Ø10-150 mm kg 1923.48 0.00 - 1,923.48
0 - Beton K-250 m3 35.10 0.00 - 35.10
15 Balok Atap uk. 30 cm x 40 cm - 0.00 0.00 - -
0 - Bekisting m2 257.40 0.00 - 257.40
0 - Besi Beton 10-D16 kg 3697.20 0.00 - 3,697.20
0 - Ring Besi Beton Ø10-150 mm kg 1538.78 0.00 - 1,538.78
0 - Beton K-250 m3 28.08 0.00 - 28.08
16 Lantai I / Ground Floor - 0.00 0.00 - -
0 - Urugan pasir t = 35 cm m3 183.75 0.00 - 183.75
0 - Besi Beton Ø10 - 200 mm kg 3236.63 0.00 - 3,236.63
0 - Cor K-250 tebal 12 cm (termasuk teras) m3 63.18 0.00 - 63.18
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 501.50 0.00 - 501.50
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 100.00 0.00 - 100.00
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.00 - 25.00
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.00 - 24.00
17 Lantai II - 0.00 0.00 - -
0 - Bondek tebal 0,70 mm m2 525.00 0.00 - 525.00
0 - Besi Beton Ø10 - 200 mm kg 3236.63 0.00 - 3,236.63
0 - Cor K-250 tebal 12 cm m3 63.00 0.00 - 63.00
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 500.00 0.00 - 500.00
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 110.00 0.00 - 110.00
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.00 - 25.00
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.00 - 24.00
18 Dinding Bata - 0.00 0.00 - -
0 - Dinding bata 1 : 4 m2 744.60 0.00 - 744.60
0 - Plesteran camp. 1 : 4 tebal 15 mm m2 1489.20 0.00 - 1,489.20
0 - Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 1489.20 0.00 - 1,489.20
19 Tangga - 0.00 0.00 - -
0 - Galian tanah pondasi uk. 160 x 60 x 60 cm m3 0.58 0.00 - 0.58
0 - Pasir urug pondasi tebal 10 cm m3 0.10 0.00 - 0.10
0 - Lantai kerja tebal 5 cm m3 0.05 0.00 - 0.05
0 - Bekisting m2 15.00 0.00 - 15.00
0 - Besi Beton Ø10 - 200 mm kg 462.40 0.00 - 462.40
0 - Beton K-250 m3 11.01 0.00 - 11.01
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 25.50 0.00 - 25.50
0 - Handrail/railing bahan stainless steel 304 tangga dan teras m' 20.00 0.00 - 20.00
4.2. Atap dan Plafon - 0.00 0.00 - -
1 Rangka atap baja ringan tebal 1,2 mm m2 606.24 0.00 - 606.24
2 Atap multiroof pasir tebal 0,40 mm m2 606.24 0.00 - 606.24
3 Talang air berikut rangka m 100.00 0.00 - 100.00
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris m 40.00 0.00 - 40.00
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
7 List profil plafond gypsum (lantai 1 & 2) m 210.00 0.00 - 210.00
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) m2 1050.00 0.00 - 1,050.00
4.3. Pintu, Kusen, Jendela dan Partisi - 0.00 0.00 - -
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan akses pcs 2.00 0.00 - 2.00
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci pcs 1.00 0.00 - 1.00
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm m2 290.40 0.00 - 290.40
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci pcs 13.00 0.00 - 13.00
5 Pintu kaca UPVC kamar mandi pcs 13.00 0.00 - 13.00
PHYSICAL CHECK

PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN


NOMOR KONTRAK 3950099135
TGL. 01 Maret 2021
PELAKSANA PEKERJAAN PT Artha Gusti Utama
WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 8.780.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
6 Bouvenlight alumunium uk. 40x60 cm pcs 8.00 0.00 - 8.00
7 Partisi kaca tebal 5 mm rangka alumunium m2 376.95 0.00 - 376.95
8 Cutting sticker sandblast m2 369.60 0.00 - 369.60
9 Vertical blind jendela m2 290.40 0.00 - 290.40
4.4. Fasad & Logo - 0.00 0.00 - -
1 Pondasi beton uk 80x80cm include tulangan m3 1.28 1.28 - -
2 Anchor Bolt M20 bh 12.00 0.00 - 12.00
3 Dyna Bolt M20 bh 8.00 0.00 - 8.00
4 Base Plate 300 x 300 x 12 mm thk bh 2.00 0.00 - 2.00
5 Besi H 300 x 300 x 10 x15 mm @ 12 m kg 2256.00 0.00 - 2,256.00
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m kg 512.00 0.00 - 512.00
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow m2 270.36 0.00 - 270.36
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium pek 1.00 0.00 - 1.00
4.5. Backdrop Lobby & R. Utama - 0.00 0.00 - -
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby m2 13.30 0.00 - 13.30
2 Backdrop uk. 120 cm x 350 cm di lobby m2 4.20 0.00 - 4.20
3 Backdop uk. 500 cm x 350 cm diruang FTM m2 17.50 0.00 - 17.50
4 Backdop uk. 600 cm x 350 cm diruang rapat m2 21.00 0.00 - 21.00
5 Memasang Logo dan nama Fuel Terminal Medan Group pek 1.00 0.00 - 1.00
6 Lampu backdrop TL LED 8W incl. instalasi set 2.00 0.00 - 2.00
4.6. Elektrikal - 0.00 0.00 - -
a. Instalasi Listrik - 0.00 0.00 - -
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru m 250.00 0.00 - 250.00
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor m 2000.00 0.00 - 2,000.00
3 Lampu TL LED 2 x 36 watt incl. Kap RM bh 64.00 0.00 - 64.00
4 Lampu Downlight LED 19W incl. kap lampu dan accessories bh 32.00 0.00 - 32.00
5 Saklar Ganda bh 43.00 0.00 - 43.00
6 Saklar Seri+stop kontak bh 10.00 0.00 - 10.00
7 Stop Kontak Dinding bh 21.00 0.00 - 21.00
8 Stop Kontak Tanam bh 17.00 0.00 - 17.00
9 Pipa conduit 20 mm dan aksesories m 2000.00 0.00 - 2,000.00
10 Pipa galvanis Ø 3" termasuk aksessories m 250.00 0.00 - 250.00
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi unit 1.00 0.00 - 1.00
b. AC dan Exhaust Fan - 0.00 0.00 - -
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 9.00 0.00 - 9.00
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 10.00 0.00 - 10.00
3 Exhaust Fan 12 inci unit 5.00 0.00 - 5.00
4 Stop kontak AC dan Fan pcs 24.00 0.00 - 24.00
c. Lampu Penerangan Areal Kantor - 0.00 0.00 - -
1 Galian tanah pondasi dan jalur kabel m3 10.18 0.00 - 10.18
2 Pasir urug m3 4.04 0.00 - 4.04
3 Pemasangan bata bh 2020.00 0.00 - 2,020.00
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting bh 14.00 0.00 - 14.00
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang bh 14.00 0.00 - 14.00
6 Lampu LED jenis street light 70 watt bh 14.00 0.00 - 14.00
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris m 400.00 0.00 - 400.00
8 Pipa PVC Ø 2" termasuk aksessories m 50.00 0.00 - 50.00
d. Perangkat Access Door - 0.00 0.00 - -
1 Electric Dropbolt (Bracket include) unit 2.00 0.00 - 2.00
2 Finger Print unit 2.00 0.00 - 2.00
3 Power Supply Finger Print (incl adaptor) 12VDC unit 2.00 0.00 - 2.00
4 Wireless Door Bell unit 2.00 0.00 - 2.00
5 Push Button unit 2.00 0.00 - 2.00
4.7. Lightning Protection & Grounding - 0.00 0.00 - -
1 Penangkal Petir, include: set 1.00 0.00 - 1.00
- Head Terminal R150 - 0.00 0.00 - -
- Pipa Support Galvanized 2" 2 meter - 0.00 0.00 - -
- Kabel konduktor NYA 50 mm - 0.00 0.00 - -
- Kabel Grounding BC 50 mm - 0.00 0.00 - -
- Grounding rod 12 m - 0.00 0.00 - -
- As Grounding - 0.00 0.00 - -
- Bak kontrol dan busbar - 0.00 0.00 - -
- Accessories - 0.00 0.00 - -
2 Grounding, include: set 1.00 0.00 - 1.00
- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L) - 0.00 0.00 - -
- Coupling Rod, Stainless Steel - 0.00 0.00 - -
- Grounding Connector, Stainless Steel 3 Branch - 0.00 0.00 - -
- Driving Stud Dia. 3/4" - 0.00 0.00 - -
- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D) - 0.00 0.00 - -
PHYSICAL CHECK

PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN


NOMOR KONTRAK 3950099135
TGL. 01 Maret 2021
PELAKSANA PEKERJAAN PT Artha Gusti Utama
WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK 12 April 2021 sampai dengan 08 Oktober 2021
NILAI KONTRAK Rp. 8.780.000.000,-

VOLUME
NO. ITEM PEKERJAAN REALISASI
SATUAN KONTRAK TAMBAH KURANG
FISIK
- C clamp connector - 0.00 0.00 - -
- Concrete Pit - 0.00 0.00 - -
0 Size : - 0.00 0.00 - -
- 450 mm x 450 mm c/w concrete cover - 0.00 0.00 - -
- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length - 0.00 0.00 - -
4.8. Plumbing dan Perlengkapan - 0.00 0.00 - -
a. Instalasi air - 0.00 0.00 - -
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris m' 120.00 0.00 - 120.00
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris m' 112.00 0.00 - 112.00
3 Closet duduk lengkap dengan jet washer unit 8.00 0.00 - 8.00
4 Urinoir lengkap dengan aksesories unit 4.00 0.00 - 4.00
5 Wastafel lengkap dengan hand washer unit 4.00 0.00 - 4.00
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah set 1.00 0.00 - 1.00
7 Floor drain pcs 4.00 0.00 - 4.00
8 Penyambungan jalur PDAM sampai ke kantor ls 1.00 0.00 - 1.00
b. Tandon Air dan Pompa - 0.00 0.00 - -
1 Tandon air kapasitas 1500 liter unit 1.00 0.00 - 1.00
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories unit 1.00 0.00 - 1.00
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm set 1.00 0.00 - 1.00
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan - 0.00 0.00 - -
1 Galian tanah m3 28.08 0.00 - 28.08
2 Beton K-225 tebal 15 cm m3 8.04 0.00 - 8.04
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm m2 45.00 0.00 - 45.00
4 Ijuk, pasir, kerikil untuk penyaringan ls 1.00 0.00 - 1.00
5 Pipa vent. Ø 1" Set 1.00 0.00 - 1.00
V PEKERJAAN PENYELESAIAN 0.00
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan ls 1.00 0.00 - 1.00
2 Pembersihan lokasi kerja ls 1.00 0.00 - 1.00

Fuel Terminal Medan Group - Belawan, 15 November 2021

PT Arta Gusti Utama Diperiksa oleh, Diperiksa oleh,


Direktur, OH. Terminal BBM Kijang Inspector - TS Region I

M. Agung Irvansyah Mashuril Husni Tigor Susanto


PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
I PEKERJAAN PERSIAPAN 152,100,000 117,500,000 (5,000,000)
1 Survey, pengukuran, pembuatan shop drawing 1.00 1.00 ls - 3,500,000 3,500,000 3,500,000 -
2 Direksi keet uk. 4 m x 6 m 24.00 24.00 m2 800,000 600,000 33,600,000 33,600,000 -
3 Pengadaan air dan listrik kerja 1.00 0.75 ls - 20,000,000 20,000,000 15,000,000 (5,000,000)
4 Sewa scaffolding 1.00 - ls - 22,000,000 22,000,000 - (22,000,000)

5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) 1.00 0.80 ls - 38,000,000 38,000,000 30,400,000 (7,600,000)

6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam kompone 1.00 1.00 ls - 35,000,000 35,000,000 35,000,000 -
II PEKERJAAN PENGURUGAN DAN PENGECORAN 2,507,489,813 862,089,958 (1,645,399,854)
1 Pembersihan lahan 4,664.00 4,664.00 m2 - 7,000 32,648,000 32,648,000 -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat 2,332.00 2,332.00 m3 50,000 139,000 440,748,000 440,748,000 -
3 Bekisting 60.00 - m2 155,000 129,000 17,040,000 - (17,040,000)

Kayu gelam Ø10 cm 1,035.75 828.60 btg 35,000 5,000 41,430,000 33,144,000 (8,286,000)
4
5 Lantai kerja tebal 5 cm 207.15 - m3 490,000 310,000 165,720,000 - (165,720,000)
828.60 - m3 1,149,000 320,000 1,217,213,400 - (1,217,213,400)
6 Beton Cor Ready Mix K. 300 tebal 20 cm
7 Pembesian Wiremesh M8 -150 (2 lapis) 45,149.20 33,861.90 kg 8,000 2,500 474,066,611 355,549,958 (118,516,653)
8 Besi Beton Ø8 6,772.38 - kg 8,000 2,000 67,723,802 - (67,723,802)
9 Pemasangan cansteen dan pengecatan 195.00 - m 150,000 70,000 42,900,000 - (42,900,000)
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 1.00 - pek - 8,000,000 8,000,000 - (8,000,000)
III PEKERJAAN PEMBANGUNAN PAGAR 415,822,299 375,396,499 (40,425,800)
1 Pembongkaran pagar seng eksisting 154.00 154.00 m - 4,000 616,000 616,000 -
2 Bouwplank 154.00 154.00 m 83,000 33,000 17,864,000 17,864,000 -
3 Galian tanah 71.87 71.87 m3 - 60,000 4,312,440 4,312,440 -
4 Kayu gelam Ø10 cm 108.00 108.00 btg 35,000 5,000 4,320,000 4,320,000 -
5 Pasir urug tebal 10 cm 6.53 6.53 m3 283,000 47,000 2,156,220 2,156,220 -
6 Urugan kembali dan pemadatan 62.05 62.05 m3 - 80,000 4,963,680 4,963,680 -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting 9.83 9.83 m3 3,000,000 1,300,000 42,260,400 42,260,400 -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting 3.82 3.82 m3 3,700,000 1,300,000 19,110,000 19,110,000 -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting 4.32 4.32 m3 7,300,000 1,800,000 39,312,000 39,312,000 -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting 2.87 2.87 m3 5,700,000 1,600,000 20,925,450 20,925,450 -
11 Dinding 1/2 bata ad. 1 : 4 235.69 235.69 m2 100,000 70,000 40,067,300 40,067,300 -
12 Plesteran camp. 1 : 4 tebal 15 mm 604.80 604.80 m2 22,000 78,000 60,480,000 60,480,000 -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris 16.20 16.20 m' 32,000 17,000 793,800 793,800 -
14 Besi siku uk. 60.60.6 mm 146.97 146.97 kg 9,000 8,000 2,498,429 2,498,429 -
15 Kawat duri 6 lapis 924.00 924.00 m 5,500 15,000 18,942,000 18,942,000 -
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci 10.00 - m2 680,000 370,000 10,500,000 - (10,500,000)
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 604.80 - m2 16,000 15,000 18,748,800 - (18,748,800)
18 Mengecat besi siku dan pagar 15.12 15.12 m2 31,000 28,000 892,080 892,080 -
3.2. Pembuatan Parit dan Bak Kontrol - - 0 - - - - -
1 Galian tanah dan bongkar parit 100.94 100.94 m3 - 60,000 6,056,400 6,056,400 -
2 Pasir urug tebal 5 cm 7.21 - m3 283,000 47,000 2,379,300 - (2,379,300)
3 Pasangan 1/2 bata merah 1 PC : 2 Psr 350.20 332.69 m2 100,000 70,000 59,534,000 56,557,300 (2,976,700)
4 Plesteran camp. 1 : 2 tebal 15 mm 350.20 332.69 m2 22,000 78,000 35,020,000 33,269,000 (1,751,000)

Page 7
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr 1.00 - bh 2,570,000 1,500,000 4,070,000 - (4,070,000)
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 5,046,807,204 1,058,867,513 (3,987,939,691)
4.1 Pondasi - 32 titik ; Kedalaman 18 m
1 Pengadaan tiang pancang spun pile 500 mm (bottom) 192.00 192.00 m 550,000 - 105,600,000 105,600,000 -
2 Pengadaan tiang pancang spun pile 500 mm (middle) 384.00 384.00 m 598,000 - 229,632,000 229,632,000 -
3 Pengangkutan tiang pancang ketitik pancang 576.00 576.00 m - 25,000 14,400,000 14,400,000 -
4 Pemancangan tiang pancang 576.00 576.00 m - 85,000 48,960,000 48,960,000 -
5 Penyambungan tiang pancang 64.00 64.00 bh - 250,000 16,000,000 16,000,000 -
6 Pemotongan tiang pancang 32.00 32.00 bh - 300,000 9,600,000 9,600,000 -
7 PDA Test 1.00 1.00 titik - 7,000,000 7,000,000 7,000,000 -
8 Galian tanah 126.00 126.00 m3 - 115,000 14,490,000 14,490,000 -
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) - - 0 - - - - -
0 - Bekisting 38.40 38.40 m2 160,000 130,000 11,136,000 11,136,000 -
0 - Besi Beton D16-150 1,617.92 1,617.92 kg 9,600 2,500 19,576,832 19,576,832 -
0 - Beton K-250 11.52 11.52 m3 946,000 332,000 14,722,560 14,722,560 -
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) - - 0 - - - - -
0 - Bekisting 28.80 28.80 m2 160,000 130,000 8,352,000 8,352,000 -
0 - Besi Beton D16-150 1,440.96 1,440.96 kg 9,600 2,500 17,435,616 17,435,616 -
0 - Beton K-250 10.80 10.80 m3 946,000 332,000 13,802,400 13,802,400 -
11 Pedestal uk. 50 cm x 50 cm x 70 cm - - 0 - - - - -
0 - Bekisting 44.80 44.80 m2 160,000 130,000 12,992,000 12,992,000 -
0 - Besi Beton 12-D16 606.72 606.72 kg 9,600 2,500 7,341,312 7,341,312 -
0 - Ring Besi Beton Ø10-150 mm 276.19 276.19 kg 8,700 2,500 3,093,350 3,093,350 -
0 - Beton K-250 5.60 3.92 m3 946,000 332,000 7,156,800 5,009,760 (2,147,040)
12 Sloof uk. 30 cm x 50 cm - - 0 - - - - -
0 - Bekisting 304.20 304.20 m2 350,000 164,000 156,358,800 156,358,800 -
0 - Besi Beton 12-D16 4,436.64 4,436.64 kg 9,600 2,500 53,683,344 53,683,344 -
0 - Ring Besi Beton Ø10-150 mm 1,923.48 1,923.48 kg 8,700 2,500 21,542,976 21,542,976 -
0 - Beton K-250 35.10 35.10 m3 946,000 332,000 44,857,800 44,857,800 -
13 Kolom uk. 50 cm x 50 cm - - 0 - - - - -
0 - Bekisting (2x pakai) 288.00 244.80 m2 350,000 164,000 148,032,000 125,827,200 (22,204,800)
0 - Besi Beton 12-D16 3,514.37 2,987.21 kg 9,600 2,500 42,523,853 36,145,275 (6,378,578)
0 - Ring Besi Beton Ø10-150 mm 986.40 838.44 kg 8,700 2,500 11,047,680 9,390,528 (1,657,152)
0 - Beton K-250 72.00 36.00 m3 946,000 332,000 92,016,000 46,008,000 (46,008,000)
14 Balok Tengah uk. 30 cm x 50 cm - - 0 - - - - -
0 - Bekisting 304.20 - m2 350,000 164,000 156,358,800 - (156,358,800)
0 - Besi Beton 12-D16 4,436.64 - kg 9,600 2,500 53,683,344 - (53,683,344)
0 - Ring Besi Beton Ø10-150 mm 1,923.48 - kg 8,700 2,500 21,542,976 - (21,542,976)
0 - Beton K-250 35.10 - m3 946,000 332,000 44,857,800 - (44,857,800)
15 Balok Atap uk. 30 cm x 40 cm - - 0 - - - - -
0 - Bekisting 257.40 - m2 350,000 164,000 132,303,600 - (132,303,600)
0 - Besi Beton 10-D16 3,697.20 - kg 9,600 2,500 44,736,120 - (44,736,120)
0 - Ring Besi Beton Ø10-150 mm 1,538.78 - kg 8,700 2,500 17,234,381 - (17,234,381)
0 - Beton K-250 28.08 - m3 946,000 332,000 35,886,240 - (35,886,240)
16 Lantai I / Ground Floor - - 0 - - - - -
0 - Urugan pasir t = 35 cm 183.75 - m3 283,000 47,000 60,637,500 - (60,637,500)
0 - Besi Beton Ø10 - 200 mm 3,236.63 - kg 8,700 2,500 36,250,200 - (36,250,200)
0 - Cor K-250 tebal 12 cm (termasuk teras) 63.18 - m3 946,000 332,000 80,744,040 - (80,744,040)
Page 8
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 501.50 - m2 176,000 130,000 153,459,000 - (153,459,000)
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 100.00 - m' 77,000 32,000 10,900,000 - (10,900,000)
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 25.00 - m2 78,000 128,000 5,150,000 - (5,150,000)
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 24.00 - m' 78,000 32,500 2,652,000 - (2,652,000)
17 Lantai II - - 0 - - - - -
- Bondek tebal 0,70 mm 525.00 - m2 107,000 56,000 85,575,000 - (85,575,000)
- Besi Beton Ø10 - 200 mm 3,236.63 - kg 8,700 2,500 36,250,200 - (36,250,200)
- Cor K-250 tebal 12 cm 63.00 - m3 946,000 332,000 80,514,000 - (80,514,000)
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 500.00 - m2 170,000 130,000 150,000,000 - (150,000,000)
- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 110.00 - m' 170,000 32,000 22,220,000 - (22,220,000)
- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 25.00 - m2 78,000 128,000 5,150,000 - (5,150,000)
- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 24.00 - m' 78,000 32,500 2,652,000 - (2,652,000)
18 Dinding Bata - - 0 - - - - -
- Dinding bata 1 : 4 744.60 - m2 100,000 70,000 126,582,000 - (126,582,000)
- Plesteran camp. 1 : 4 tebal 15 mm 1,489.20 - m2 24,500 81,000 157,110,600 - (157,110,600)
- Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 1,489.20 - m2 16,000 15,000 46,165,200 - (46,165,200)
19 Tangga - - 0 - - - - -
0 - Galian tanah pondasi uk. 160 x 60 x 60 cm 0.58 - m3 - 115,000 66,240 - (66,240)
0 - Pasir urug pondasi tebal 10 cm 0.10 - m3 283,000 47,000 31,680 - (31,680)
0 - Lantai kerja tebal 5 cm 0.05 - m3 635,000 455,000 52,320 - (52,320)
0 - Bekisting 15.00 - m2 350,000 164,000 7,710,000 - (7,710,000)
0 - Besi Beton Ø10 - 200 mm 462.40 - kg 9,600 2,500 5,594,991 - (5,594,991)
0 - Beton K-250 11.01 - m3 950,000 310,000 13,867,560 - (13,867,560)
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 25.50 - m2 170,000 130,000 7,650,000 - (7,650,000)
0 - Handrail/railing bahan stainless steel 304 tangga dan teras 20.00 - m' 850,000 500,000 27,000,000 - (27,000,000)
4.2. Atap dan Plafon - - 0 - - - - -
1 Rangka atap baja ringan tebal 1,2 mm 606.24 - m2 120,000 20,000 84,872,979 - (84,872,979)
2 Atap multiroof pasir tebal 0,40 mm 606.24 - m2 180,000 50,000 139,434,180 - (139,434,180)
3 Talang air berikut rangka 100.00 - m 200,000 103,000 30,300,000 - (30,300,000)
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris 40.00 - m 175,000 60,000 9,400,000 - (9,400,000)
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) 1,050.00 - m2 135,000 70,000 215,250,000 - (215,250,000)
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) 1,050.00 - m2 95,000 95,000 199,500,000 - (199,500,000)
7 List profil plafond gypsum (lantai 1 & 2) 210.00 - m 19,000 15,000 7,140,000 - (7,140,000)
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) 1,050.00 - m2 16,000 15,000 32,550,000 - (32,550,000)
4.3. Pintu, Kusen, Jendela dan Partisi - - 0 - - - - -
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan aksesorie 2.00 - pcs 7,500,000 450,000 15,900,000 - (15,900,000)
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci 1.00 - pcs 2,900,000 450,000 3,350,000 - (3,350,000)
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm 290.40 - m2 375,000 50,000 123,420,000 - (123,420,000)
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci 13.00 - pcs 1,800,000 350,000 27,950,000 - (27,950,000)
5 Pintu kaca UPVC kamar mandi 13.00 - pcs 2,350,000 123,000 32,149,000 - (32,149,000)
6 Bouvenlight alumunium uk. 40x60 cm 8.00 - pcs 700,000 150,000 6,800,000 - (6,800,000)
7 Partisi kaca tebal 5 mm rangka alumunium 376.95 - m2 417,000 50,000 176,035,650 - (176,035,650)
8 Cutting sticker sandblast 369.60 - m2 80,000 25,000 38,808,000 - (38,808,000)
9 Vertical blind jendela 290.40 - m2 320,000 145,000 135,036,000 - (135,036,000)
4.4. Fasad & Logo - - 0 - - - - -
1 Pondasi beton uk 80x80cm include tulangan 1.28 1.28 m3 3,467,000 1,150,000 5,909,760 5,909,760 -
2 Anchor Bolt M20 12.00 - bh 53,000 10,000 756,000 - (756,000)

Page 9
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
3 Dyna Bolt M20 8.00 - bh 25,000 10,000 280,000 - (280,000)
4 Base Plate 300 x 300 x 12 mm thk 2.00 - bh 750,000 250,000 2,000,000 - (2,000,000)
5 Besi H 300 x 300 x 10 x15 mm @ 12 m 2,256.00 - kg 9,000 2,500 25,944,000 - (25,944,000)
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m 512.00 - kg 9,000 2,500 5,888,000 - (5,888,000)
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow 270.36 - m2 500,000 100,000 162,216,000 - (162,216,000)
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium 1.00 - pek 15,000,000 3,000,000 18,000,000 - (18,000,000)
4.5. Backdrop Lobby & R. Utama - - 0 - - - - -
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby 13.30 - m2 125,000 60,000 2,460,500 - (2,460,500)
2 Backdrop uk. 120 cm x 350 cm di lobby 4.20 - m2 900,000 650,000 6,510,000 - (6,510,000)
3 Backdop uk. 500 cm x 350 cm diruang FTM 17.50 - m2 900,000 650,000 27,125,000 - (27,125,000)
4 Backdop uk. 600 cm x 350 cm diruang rapat 21.00 - m2 900,000 650,000 32,550,000 - (32,550,000)
5 Memasang Logo dan nama Fuel Terminal Medan Group 1.00 - pek 3,500,000 1,000,000 4,500,000 - (4,500,000)
6 Lampu backdrop TL LED 8W incl. instalasi 2.00 - set 121,000 185,000 612,000 - (612,000)
4.6. Elektrikal - - 0 - - - - -
a. Instalasi Listrik - - 0 - - - - -
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru 250.00 - m 215,000 20,000 58,750,000 - (58,750,000)
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor 2,000.00 - m 11,000 2,000 26,000,000 - (26,000,000)
3 Lampu TL LED 2 x 36 watt incl. Kap RM 64.00 - bh 358,000 55,000 26,432,000 - (26,432,000)
4 Lampu Downlight LED 19W incl. kap lampu dan accessories 32.00 - bh 91,000 55,000 4,672,000 - (4,672,000)
5 Saklar Ganda 43.00 - bh 21,000 175,000 8,428,000 - (8,428,000)
6 Saklar Seri+stop kontak 10.00 - bh 14,000 175,000 1,890,000 - (1,890,000)
7 Stop Kontak Dinding 21.00 - bh 13,000 175,000 3,948,000 - (3,948,000)
8 Stop Kontak Tanam 17.00 - bh 45,000 175,000 3,740,000 - (3,740,000)
9 Pipa conduit 20 mm dan aksesories 2,000.00 - m 3,800 7,000 21,600,000 - (21,600,000)
10 Pipa galvanis Ø 3" termasuk aksessories 250.00 - m 195,000 48,000 60,750,000 - (60,750,000)
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi 1.00 - unit 1,250,000 800,000 2,050,000 - (2,050,000)
b. AC dan Exhaust Fan - - 0 - - - - -
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 9.00 - unit 6,390,000 450,000 61,560,000 - (61,560,000)
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 10.00 - unit 9,750,000 450,000 102,000,000 - (102,000,000)
3 Exhaust Fan 12 inci 5.00 - unit 350,000 143,000 2,465,000 - (2,465,000)
4 Stop kontak AC dan Fan 24.00 - pcs 13,000 175,000 4,512,000 - (4,512,000)
c. Lampu Penerangan Areal Kantor - - 0 - - - - -
1 Galian tanah pondasi dan jalur kabel 10.18 - m3 - 115,000 1,170,700 - (1,170,700)
2 Pasir urug 4.04 - m3 283,465 45,000 1,327,000 - (1,327,000)
3 Pemasangan bata 2,020.00 - bh 550 2,500 6,161,000 - (6,161,000)
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting 14.00 - bh 900,000 750,000 23,100,000 - (23,100,000)
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang 14.00 - bh 2,600,000 350,000 41,300,000 - (41,300,000)
6 Lampu LED jenis street light 70 watt 14.00 - bh 1,500,000 250,000 24,500,000 - (24,500,000)
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris 400.00 - m 27,000 3,000 12,000,000 - (12,000,000)
8 Pipa PVC Ø 2" termasuk aksessories 50.00 - m 175,000 55,000 11,500,000 - (11,500,000)
d. Perangkat Access Door - - 0 - - - - -
1 Electric Dropbolt (Bracket include) 2.00 - unit 485,000 - 970,000 - (970,000)

Page 10
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
2 Finger Print 2.00 - unit 9,000,000 - 18,000,000 - (18,000,000)
3 Power Supply Finger Print (incl adaptor) 12VDC 2.00 - unit 180,000 - 360,000 - (360,000)
4 Wireless Door Bell 2.00 - unit 350,000 - 700,000 - (700,000)
5 Push Button 2.00 - unit 35,000 - 70,000 - (70,000)
4.7. Lightning Protection & Grounding - - 0 - - - - -
1 Penangkal Petir, include: 1.00 - set 16,500,000 1,700,000 18,200,000 - (18,200,000)
- Head Terminal R150 - - 0 - - - - -
- Pipa Support Galvanized 2" 2 meter - - 0 - - - - -
- Kabel konduktor NYA 50 mm - - 0 - - - - -
- Kabel Grounding BC 50 mm - - 0 - - - - -
- Grounding rod 12 m - - 0 - - - - -
- As Grounding - - 0 - - - - -
- Bak kontrol dan busbar - - 0 - - - - -
- Accessories - - 0 - - - - -
2 Grounding, include: 1.00 - set 6,500,000 900,000 7,400,000 - (7,400,000)
- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L) - - 0 - - - - -
- Coupling Rod, Stainless Steel - - 0 - - - - -
- Grounding Connector, Stainless Steel 3 Branch - - 0 - - - - -
- Driving Stud Dia. 3/4" - - 0 - - - - -
- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D) - - 0 - - - - -
- C clamp connector - - 0 - - - - -
- Concrete Pit - - 0 - - - - -
0 Size : - - 0 - - - - -
- 450 mm x 450 mm c/w concrete cover - - 0 - - - - -
- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length - - 0 - - - - -
4.8. Plumbing dan Perlengkapan - - 0 - - - - -
a. Instalasi air - - 0 - - - - -
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris 120.00 - m' 48,000 17,000 7,800,000 - (7,800,000)
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris 112.00 - m' 303,000 41,000 38,528,000 - (38,528,000)
3 Closet duduk lengkap dengan jet washer 8.00 - unit 2,585,000 732,000 26,536,000 - (26,536,000)
4 Urinoir lengkap dengan aksesories 4.00 - unit 2,460,000 550,000 12,040,000 - (12,040,000)
5 Wastafel lengkap dengan hand washer 4.00 - unit 992,000 487,000 5,916,000 - (5,916,000)
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah 1.00 - set 17,100,000 - 17,100,000 - (17,100,000)
7 Floor drain 4.00 - pcs 31,000 20,000 204,000 - (204,000)
8 Penyambungan jalur PDAM sampai ke kantor 1.00 - ls - 3,500,000 3,500,000 - (3,500,000)
b. Tandon Air dan Pompa - - 0 - - - - -
1 Tandon air kapasitas 1500 liter 1.00 - unit 4,200,000 300,000 4,500,000 - (4,500,000)
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories 1.00 - unit 7,100,000 550,000 7,650,000 - (7,650,000)
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm 1.00 - set 8,500,000 2,500,000 11,000,000 - (11,000,000)
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan - - 0 - - - - -
1 Galian tanah 28.08 - m3 - 115,000 3,229,200 - (3,229,200)
2 Beton K-225 tebal 15 cm 8.04 - m3 946,000 332,000 10,275,120 - (10,275,120)
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm 45.00 - m2 30,000 104,000 6,030,000 - (6,030,000)
4 Ijuk, pasir, kerikil untuk penyaringan 1.00 - ls 1,500,000 - 1,500,000 - (1,500,000)
5 Pipa vent. Ø 1" 1.00 - Set 700,000 155,000 855,000 - (855,000)
V PEKERJAAN PENYELESAIAN 7,500,000 - (7,500,000)
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan 1.00 - ls - 2,500,000 2,500,000 - (2,500,000)
2 Pembersihan lokasi kerja 1.00 - ls - 5,000,000 5,000,000 - (5,000,000)
Page 11
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH

Page 12
PERINCIAN PEKERJAAN TAMBAH KURANG
PEKERJAAN PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG PELAKSANA PEKERJAAN PT Artha Gusti Utama
BELAWAN
LOKASI TBBM KIJANG WAKTU PELAKSANAAN 180 (Seratus delapan puluh) Hari Kalender
PERIODE 12 April 2021 sampai dengan 08 Oktober 2021
NO. KONTRAK 3950099135
TGL. 01 Maret 2021 NILAI KONTRAK Rp. 8.780.000.000,-

KUANTITAS TOTAL HARGA


NO. SCOPE OF WORKING
KONTRAK REALISASI UNIT MATERIAL JASA KONTRAK REALISASI SELISIH
REKAPITULASI
I PEKERJAAN PERSIAPAN 152,100,000 117,500,000 (5,000,000)
II PEKERJAAN PENGURUGAN DAN PENGECORAN 2,507,489,813 862,089,958 (1,645,399,854)
III PEKERJAAN PEMBANGUNAN PAGAR 415,822,299 375,396,499 (40,425,800)
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 5,046,807,204 1,058,867,513 (3,987,939,691)
V PEKERJAAN PENYELESAIAN 7,500,000 - (7,500,000)

TOTAL 8,129,719,315 2,413,853,970 (5,686,265,345)


KEUNTUNGAN & RESIKO ( K&R ) 10% 650,377,545 193,108,318 (568,626,535)
TOTAL + K&R 8,780,096,861 2,606,962,288 (6,254,891,880)
GRAND TOTAL 8,780,096,861 2,606,962,288
DIBULATKAN 8,780,000,000 2,607,000,000 (6,255,000,000)

Harga kontrak semula

Page 13
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

I Pekerjaan Persiapan :
1 Survey, pengukuran, pembuatan shop drawing ls 1.00 1.00 - - 3,500,000 - 3,500,000 - 3,500,000
2 Direksi keet uk. 4 m x 6 m m2 24.00 24.00 - 800,000 600,000 19,200,000 14,400,000 19,200,000 14,400,000
3 Pengadaan air dan listrik kerja ls 1.00 0.75 (0.25) - 20,000,000 - 20,000,000 - 15,000,000
4 Sewa scaffolding ls 1.00 - (1.00) - 22,000,000 - 22,000,000 - -
5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 0.80 (0.20) - 38,000,000 - 38,000,000 - 30,400,000

Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk
6 dalam komponen upah <safety helmet, safety shoes, safety vest, pakaian kerja dan tanda ls 1.00 1.00 - - 35,000,000 - 35,000,000 - 35,000,000
pengenal> ,APD diluar komponen upah <safety glass dan gloves>, obat-obatan <P3K>, A

Sub Total I 19,200,000 132,900,000 19,200,000 98,300,000


II PEKERJAAN PENGURUGAN DAN PENGECORAN
1 Pembersihan lahan m2 4,664.00 4,664.00 - - 7,000 - 32,648,000 - 32,648,000
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat m3 2,332.00 2,332.00 - 50,000 139,000 116,600,000 324,148,000 116,600,000 324,148,000
3 Bekisting m2 60.00 - (60.00) 155,000 129,000 9,300,000 7,740,000 - -
4 Kayu gelam Ø10 cm btg 1,035.75 828.60 (207.15) 35,000 5,000 36,251,250 5,178,750 29,001,000 4,143,000
5 Lantai kerja tebal 5 cm m3 207.15 - (207.15) 490,000 310,000 101,503,500 64,216,500 - -
6 Beton Cor Ready Mix K. 300 tebal 20 cm m3 828.60 - (828.60) 1,149,000 320,000 952,061,400 265,152,000 - -
7 Pembesian Wiremesh M8 -150 (2 lapis) kg 45,149.20 33,861.90 (11,287.30) 8,000 2,500 361,193,608 112,873,003 270,895,206 84,654,752
8 Besi Beton Ø8 kg 6,772.38 - (6,772.38) 8,000 2,000 54,179,041 13,544,760 - -
9 Pemasangan cansteen dan pengecatan m 195.00 - (195.00) 150,000 70,000 29,250,000 13,650,000 - -
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium pek 1.00 - (1.00) - 8,000,000 - 8,000,000 - -
Sub Total II 1,660,338,800 847,151,013 416,496,206 445,593,752
III PEKERJAAN PEMBANGUNAN PAGAR
1 Pembongkaran pagar seng eksisting m 154.00 154.00 - - 4,000 - 616,000 - 616,000
2 Bouwplank m 154.00 154.00 - 83,000.00 33,000 12,782,000 5,082,000 12,782,000 5,082,000
3 Galian tanah m3 71.87 71.87 - - 60,000 - 4,312,440 - 4,312,440
4 Kayu gelam Ø10 cm btg 108.00 108.00 - 35,000.00 5,000 3,780,000 540,000 3,780,000 540,000
5 Pasir urug tebal 10 cm m3 6.53 6.53 - 283,000.00 47,000 1,849,122 307,098 1,849,122 307,098
6 Urugan kembali dan pemadatan m3 62.05 62.05 - - 80,000 - 4,963,680 - 4,963,680
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting m3 9.83 9.83 - 3,000,000.00 1,300,000 29,484,000 12,776,400 29,484,000 12,776,400
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting m3 3.82 3.82 - 3,700,000.00 1,300,000 14,141,400 4,968,600 14,141,400 4,968,600
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting m3 4.32 4.32 - 7,300,000.00 1,800,000 31,536,000 7,776,000 31,536,000 7,776,000
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting m3 2.87 2.87 - 5,700,000.00 1,600,000 16,339,050 4,586,400 16,339,050 4,586,400
11 Dinding 1/2 bata ad. 1 : 4 m2 235.69 235.69 - 100,000.00 70,000 23,569,000 16,498,300 23,569,000 16,498,300
12 Plesteran camp. 1 : 4 tebal 15 mm m2 604.80 604.80 - 22,000.00 78,000 13,305,600 47,174,400 13,305,600 47,174,400
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris m' 16.20 16.20 - 32,000.00 17,000 518,400 275,400 518,400 275,400
14 Besi siku uk. 60.60.6 mm kg 146.97 146.97 - 9,000.00 8,000 1,322,698 1,175,731 1,322,698 1,175,731
15 Kawat duri 6 lapis m 924.00 924.00 - 5,500.00 15,000 5,082,000 13,860,000 5,082,000 13,860,000
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci m2 10.00 - (10.00) 680,000.00 370,000 6,800,000 3,700,000 - -
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 604.80 - (604.80) 16,000.00 15,000 9,676,800 9,072,000 - -
18 Mengecat besi siku dan pagar m2 15.12 15.12 - 31,000.00 28,000 468,720 423,360 468,720 423,360
3.2. Pembuatan Parit dan Bak Kontrol - - - - - - - - - -
1 Galian tanah dan bongkar parit m3 100.94 100.94 - - 60,000 - 6,056,400 - 6,056,400
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

2 Pasir urug tebal 5 cm m3 7.21 - (7.21) 283,000.00 47,000 2,040,430 338,870 - -


3 Pasangan 1/2 bata merah 1 PC : 2 Psr m2 350.20 332.69 (17.51) 100,000.00 70,000 35,020,000 24,514,000 33,269,000 23,288,300
4 Plesteran camp. 1 : 2 tebal 15 mm m2 350.20 332.69 (17.51) 22,000.00 78,000 7,704,400 27,315,600 7,319,180 25,949,820
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr bh 1.00 - (1.00) 2,570,000.00 1,500,000 2,570,000 1,500,000 - -
Sub Total III 217,989,620 197,832,679 194,766,170 180,630,329
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI
4.1 Pondasi - 32 titik ; Kedalaman 18 m - - - - - - - - - -
1 Pengadaan tiang pancang spun pile 500 mm (bottom) m 192.00 192.00 - 550,000.00 - 105,600,000 - 105,600,000 -
2 Pengadaan tiang pancang spun pile 500 mm (middle) m 384.00 384.00 - 598,000.00 - 229,632,000 - 229,632,000 -
3 Pengangkutan tiang pancang ketitik pancang m 576.00 576.00 - - 25,000 - 14,400,000 - 14,400,000
4 Pemancangan tiang pancang m 576.00 576.00 - - 85,000 - 48,960,000 - 48,960,000
5 Penyambungan tiang pancang bh 64.00 64.00 - - 250,000 - 16,000,000 - 16,000,000
6 Pemotongan tiang pancang bh 32.00 32.00 - - 300,000 - 9,600,000 - 9,600,000
7 PDA Test titik 1.00 1.00 - - 7,000,000 - 7,000,000 - 7,000,000
8 Galian tanah m3 126.00 126.00 - - 115,000 - 14,490,000 - 14,490,000
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) - - - - - - - - - -
0 - Bekisting m2 38.40 38.40 - 160,000.00 130,000 6,144,000 4,992,000 6,144,000 4,992,000
0 - Besi Beton D16-150 kg 1,617.92 1,617.92 - 9,600.00 2,500 15,532,032 4,044,800 15,532,032 4,044,800
0 - Beton K-250 m3 11.52 11.52 - 946,000.00 332,000 10,897,920 3,824,640 10,897,920 3,824,640
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) - - - - - - - - - -
0 - Bekisting m2 28.80 28.80 - 160,000.00 130,000 4,608,000 3,744,000 4,608,000 3,744,000
0 - Besi Beton D16-150 kg 1,440.96 1,440.96 - 9,600.00 2,500 13,833,216 3,602,400 13,833,216 3,602,400
0 - Beton K-250 m3 10.80 10.80 - 946,000.00 332,000 10,216,800 3,585,600 10,216,800 3,585,600
11 Pedestal uk. 50 cm x 50 cm x 70 cm - - - - - - - - - -
0 - Bekisting m2 44.80 44.80 - 160,000.00 130,000 7,168,000 5,824,000 7,168,000 5,824,000
0 - Besi Beton 12-D16 kg 606.72 606.72 - 9,600.00 2,500 5,824,512 1,516,800 5,824,512 1,516,800
0 - Ring Besi Beton Ø10-150 mm kg 276.19 276.19 - 8,700.00 2,500 2,402,870 690,480 2,402,870 690,480
0 - Beton K-250 m3 5.60 3.92 (1.68) 946,000.00 332,000 5,297,600 1,859,200 3,708,320 1,301,440
12 Sloof uk. 30 cm x 50 cm - - - - - - - - - -
0 - Bekisting m2 304.20 304.20 - 350,000.00 164,000 106,470,000 49,888,800 106,470,000 49,888,800
0 - Besi Beton 12-D16 kg 4,436.64 4,436.64 - 9,600.00 2,500 42,591,744 11,091,600 42,591,744 11,091,600
0 - Ring Besi Beton Ø10-150 mm kg 1,923.48 1,923.48 - 8,700.00 2,500 16,734,276 4,808,700 16,734,276 4,808,700
0 - Beton K-250 m3 35.10 35.10 - 946,000.00 332,000 33,204,600 11,653,200 33,204,600 11,653,200
13 Kolom uk. 50 cm x 50 cm - - - - - - - - - -
0 - Bekisting (2x pakai) m2 288.00 244.80 (43.20) 350,000.00 164,000 100,800,000 47,232,000 85,680,000 40,147,200
0 - Besi Beton 12-D16 kg 3,514.37 2,987.21 (527.16) 9,600.00 2,500 33,737,933 8,785,920 28,677,243 7,468,032
0 - Ring Besi Beton Ø10-150 mm kg 986.40 838.44 (147.96) 8,700.00 2,500 8,581,680 2,466,000 7,294,428 2,096,100
0 - Beton K-250 m3 72.00 36.00 (36.00) 946,000.00 332,000 68,112,000 23,904,000 34,056,000 11,952,000
14 Balok Tengah uk. 30 cm x 50 cm - - - - - - - - - -
0 - Bekisting m2 304.20 - (304.20) 350,000.00 164,000 106,470,000 49,888,800 - -
0 - Besi Beton 12-D16 kg 4,436.64 - (4,436.64) 9,600.00 2,500 42,591,744 11,091,600 - -
0 - Ring Besi Beton Ø10-150 mm kg 1,923.48 - (1,923.48) 8,700.00 2,500 16,734,276 4,808,700 - -
0 - Beton K-250 m3 35.10 - (35.10) 946,000.00 332,000 33,204,600 11,653,200 - -
15 Balok Atap uk. 30 cm x 40 cm - - - - - - - - - -
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

0 - Bekisting m2 257.40 - (257.40) 350,000.00 164,000 90,090,000 42,213,600 - -


0 - Besi Beton 10-D16 kg 3,697.20 - (3,697.20) 9,600.00 2,500 35,493,120 9,243,000 - -
0 - Ring Besi Beton Ø10-150 mm kg 1,538.78 - (1,538.78) 8,700.00 2,500 13,387,421 3,846,960 - -
0 - Beton K-250 m3 28.08 - (28.08) 946,000.00 332,000 26,563,680 9,322,560 - -
16 Lantai I / Ground Floor - - - - - - - - - -
0 - Urugan pasir t = 35 cm m3 183.75 - (183.75) 283,000.00 47,000 52,001,250 8,636,250 - -
0 - Besi Beton Ø10 - 200 mm kg 3,236.63 - (3,236.63) 8,700.00 2,500 28,158,638 8,091,563 - -
0 - Cor K-250 tebal 12 cm (termasuk teras) m3 63.18 - (63.18) 946,000.00 332,000 59,768,280 20,975,760 - -
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 501.50 - (501.50) 176,000.00 130,000 88,264,000 65,195,000 - -
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 100.00 - (100.00) 77,000.00 32,000 7,700,000 3,200,000 - -
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 - (25.00) 78,000.00 128,000 1,950,000 3,200,000 - -
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 - (24.00) 78,000.00 32,500 1,872,000 780,000 - -
17 Lantai II - - - - - - - - - -
0 - Bondek tebal 0,70 mm m2 525.00 - (525.00) 107,000.00 56,000 56,175,000 29,400,000 - -
0 - Besi Beton Ø10 - 200 mm kg 3,236.63 - (3,236.63) 8,700.00 2,500 28,158,638 8,091,563 - -
0 - Cor K-250 tebal 12 cm m3 63.00 - (63.00) 946,000.00 332,000 59,598,000 20,916,000 - -
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 500.00 - (500.00) 170,000.00 130,000 85,000,000 65,000,000 - -
0 - Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 110.00 - (110.00) 170,000.00 32,000 18,700,000 3,520,000 - -
0 - Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 - (25.00) 78,000.00 128,000 1,950,000 3,200,000 - -
0 - Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 - (24.00) 78,000.00 32,500 1,872,000 780,000 - -
18 Dinding Bata - - - - - - - - - -
0 - Dinding bata 1 : 4 m2 744.60 - (744.60) 100,000.00 70,000 74,460,000 52,122,000 - -
0 - Plesteran camp. 1 : 4 tebal 15 mm m2 1,489.20 - (1,489.20) 24,500.00 81,000 36,485,400 120,625,200 - -
0 - Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 1,489.20 - (1,489.20) 16,000.00 15,000 23,827,200 22,338,000 - -
19 Tangga - - - - - - - - - -
0 - Galian tanah pondasi uk. 160 x 60 x 60 cm m3 0.58 - (0.58) - 115,000 - 66,240 - -
0 - Pasir urug pondasi tebal 10 cm m3 0.10 - (0.10) 283,000.00 47,000 27,168 4,512 - -
0 - Lantai kerja tebal 5 cm m3 0.05 - (0.05) 635,000.00 455,000 30,480 21,840 - -
0 - Bekisting m2 15.00 - (15.00) 350,000.00 164,000 5,250,000 2,460,000 - -
0 - Besi Beton Ø10 - 200 mm kg 462.40 - (462.40) 9,600.00 2,500 4,439,001 1,155,990 - -
0 - Beton K-250 m3 11.01 - (11.01) 950,000.00 310,000 10,455,700 3,411,860 - -
0 - Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 25.50 - (25.50) 170,000.00 130,000 4,335,000 3,315,000 - -
0 - Handrail/railing bahan stainless steel 304 tangga dan teras m' 20.00 - (20.00) 850,000.00 500,000 17,000,000 10,000,000 - -
4.2. Atap dan Plafon - - - - - - - - - -
1 Rangka atap baja ringan tebal 1,2 mm m2 606.24 - (606.24) 120,000.00 20,000 72,748,268 12,124,711 - -
2 Atap multiroof pasir tebal 0,40 mm m2 606.24 - (606.24) 180,000.00 50,000 109,122,402 30,311,778 - -
3 Talang air berikut rangka m 100.00 - (100.00) 200,000.00 103,000 20,000,000 10,300,000 - -
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris m 40.00 - (40.00) 175,000.00 60,000 7,000,000 2,400,000 - -
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) m2 1,050.00 - (1,050.00) 135,000.00 70,000 141,750,000 73,500,000 - -
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) m2 1,050.00 - (1,050.00) 95,000.00 95,000 99,750,000 99,750,000 - -
7 List profil plafond gypsum (lantai 1 & 2) m 210.00 - (210.00) 19,000.00 15,000 3,990,000 3,150,000 - -
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) m2 1,050.00 - (1,050.00) 16,000.00 15,000 16,800,000 15,750,000 - -
4.3. Pintu, Kusen, Jendela dan Partisi - - - - - - - - - -
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan pcs 2.00 - (2.00) 7,500,000.00 450,000 15,000,000 900,000 - -
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci pcs 1.00 - (1.00) 2,900,000.00 450,000 2,900,000 450,000 - -
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm m2 290.40 - (290.40) 375,000.00 50,000 108,900,000 14,520,000 - -
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci pcs 13.00 - (13.00) 1,800,000.00 350,000 23,400,000 4,550,000 - -
5 Pintu kaca UPVC kamar mandi pcs 13.00 - (13.00) 2,350,000.00 123,000 30,550,000 1,599,000 - -
6 Bouvenlight alumunium uk. 40x60 cm pcs 8.00 - (8.00) 700,000.00 150,000 5,600,000 1,200,000 - -
7 Partisi kaca tebal 5 mm rangka alumunium m2 376.95 - (376.95) 417,000.00 50,000 157,188,150 18,847,500 - -
8 Cutting sticker sandblast m2 369.60 - (369.60) 80,000.00 25,000 29,568,000 9,240,000 - -
9 Vertical blind jendela m2 290.40 - (290.40) 320,000.00 145,000 92,928,000 42,108,000 - -
4.4. Fasad & Logo - - - - - - - - - -
1 Pondasi beton uk 80x80cm include tulangan m3 1.28 1.28 - 3,467,000.00 1,150,000 4,437,760 1,472,000 4,437,760 1,472,000
2 Anchor Bolt M20 bh 12.00 - (12.00) 53,000.00 10,000 636,000 120,000 - -
3 Dyna Bolt M20 bh 8.00 - (8.00) 25,000.00 10,000 200,000 80,000 - -
4 Base Plate 300 x 300 x 12 mm thk bh 2.00 - (2.00) 750,000.00 250,000 1,500,000 500,000 - -
5 Besi H 300 x 300 x 10 x15 mm @ 12 m kg 2,256.00 - (2,256.00) 9,000.00 2,500 20,304,000 5,640,000 - -
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m kg 512.00 - (512.00) 9,000.00 2,500 4,608,000 1,280,000 - -
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow m2 270.36 - (270.36) 500,000.00 100,000 135,180,000 27,036,000 - -
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium pek 1.00 - (1.00) 15,000,000.00 3,000,000 15,000,000 3,000,000 - -
4.5. Backdrop Lobby & R. Utama - - - - - - - - - -
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby m2 13.30 - (13.30) 125,000.00 60,000 1,662,500 798,000 - -
2 Backdrop uk. 120 cm x 350 cm di lobby m2 4.20 - (4.20) 900,000.00 650,000 3,780,000 2,730,000 - -
3 Backdop uk. 500 cm x 350 cm diruang FTM m2 17.50 - (17.50) 900,000.00 650,000 15,750,000 11,375,000 - -
4 Backdop uk. 600 cm x 350 cm diruang rapat m2 21.00 - (21.00) 900,000.00 650,000 18,900,000 13,650,000 - -
5 Memasang Logo dan nama Fuel Terminal Medan Group pek 1.00 - (1.00) 3,500,000.00 1,000,000 3,500,000 1,000,000 - -
6 Lampu backdrop TL LED 8W incl. instalasi set 2.00 - (2.00) 121,000.00 185,000 242,000 370,000 - -
4.6. Elektrikal - - - - - - - - - -
a. Instalasi Listrik - - - - - - - - - -
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru m 250.00 - (250.00) 215,000.00 20,000 53,750,000 5,000,000 - -
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor m 2,000.00 - (2,000.00) 11,000.00 2,000 22,000,000 4,000,000 - -
3 Lampu TL LED 2 x 36 watt incl. Kap RM bh 64.00 - (64.00) 358,000.00 55,000 22,912,000 3,520,000 - -
4 Lampu Downlight LED 19W incl. kap lampu dan accessories bh 32.00 - (32.00) 91,000.00 55,000 2,912,000 1,760,000 - -
5 Saklar Ganda bh 43.00 - (43.00) 21,000.00 175,000 903,000 7,525,000 - -
6 Saklar Seri+stop kontak bh 10.00 - (10.00) 14,000.00 175,000 140,000 1,750,000 - -
7 Stop Kontak Dinding bh 21.00 - (21.00) 13,000.00 175,000 273,000 3,675,000 - -
8 Stop Kontak Tanam bh 17.00 - (17.00) 45,000.00 175,000 765,000 2,975,000 - -
9 Pipa conduit 20 mm dan aksesories m 2,000.00 - (2,000.00) 3,800.00 7,000 7,600,000 14,000,000 - -
10 Pipa galvanis Ø 3" termasuk aksessories m 250.00 - (250.00) 195,000.00 48,000 48,750,000 12,000,000 - -
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi unit 1.00 - (1.00) 1,250,000.00 800,000 1,250,000 800,000 - -
b. AC dan Exhaust Fan - - - - - - - - - -
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 9.00 - (9.00) 6,390,000.00 450,000 57,510,000 4,050,000 - -
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 10.00 - (10.00) 9,750,000.00 450,000 97,500,000 4,500,000 - -
3 Exhaust Fan 12 inci unit 5.00 - (5.00) 350,000.00 143,000 1,750,000 715,000 - -
4 Stop kontak AC dan Fan pcs 24.00 - (24.00) 13,000.00 175,000 312,000 4,200,000 - -
c. Lampu Penerangan Areal Kantor - - - - - - - - - -
1 Galian tanah pondasi dan jalur kabel m3 10.18 - (10.18) - 115,000 - 1,170,700 - -
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

2 Pasir urug m3 4.04 - (4.04) 283,465.24 45,000 1,145,200 181,800 - -


3 Pemasangan bata bh 2,020.00 - (2,020.00) 550.00 2,500 1,111,000 5,050,000 - -
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting bh 14.00 - (14.00) 900,000.00 750,000 12,600,000 10,500,000 - -
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang bh 14.00 - (14.00) 2,600,000.00 350,000 36,400,000 4,900,000 - -
6 Lampu LED jenis street light 70 watt bh 14.00 - (14.00) 1,500,000.00 250,000 21,000,000 3,500,000 - -
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris m 400.00 - (400.00) 27,000.00 3,000 10,800,000 1,200,000 - -
8 Pipa PVC Ø 2" termasuk aksessories m 50.00 - (50.00) 175,000.00 55,000 8,750,000 2,750,000 - -
d. Perangkat Access Door - - - - - - - - - -
1 Electric Dropbolt (Bracket include) unit 2.00 - (2.00) 485,000.00 - 970,000 - - -
2 Finger Print unit 2.00 - (2.00) 9,000,000.00 - 18,000,000 - - -
3 Power Supply Finger Print (incl adaptor) 12VDC unit 2.00 - (2.00) 180,000.00 - 360,000 - - -
4 Wireless Door Bell unit 2.00 - (2.00) 350,000.00 - 700,000 - - -
5 Push Button unit 2.00 - (2.00) 35,000.00 - 70,000 - - -
4.7. Lightning Protection & Grounding - - - - - - - - - -
1 Penangkal Petir, include: set 1.00 - (1.00) 16,500,000.00 1,700,000 16,500,000 1,700,000 - -
- Head Terminal R150 - - - - - - - - - -
- Pipa Support Galvanized 2" 2 meter - - - - - - - - - -
- Kabel konduktor NYA 50 mm - - - - - - - - - -
- Kabel Grounding BC 50 mm - - - - - - - - - -
- Grounding rod 12 m - - - - - - - - - -
- As Grounding - - - - - - - - - -
- Bak kontrol dan busbar - - - - - - - - - -
- Accessories - - - - - - - - - -
2 Grounding, include: set 1.00 - (1.00) 6,500,000.00 900,000 6,500,000 900,000 - -
- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L) - - - - - - - - - -
- Coupling Rod, Stainless Steel - - - - - - - - - -
- Grounding Connector, Stainless Steel 3 Branch - - - - - - - - - -
- Driving Stud Dia. 3/4" - - - - - - - - - -
- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D) - - - - - - - - - -
- C clamp connector - - - - - - - - - -
- Concrete Pit - - - - - - - - - -
0 Size : - - - - - - - - - -
- 450 mm x 450 mm c/w concrete cover - - - - - - - - - -
- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length - - - - - - - - - -
4.8. Plumbing dan Perlengkapan - - - - - - - - - -
a. Instalasi air - - - - - - - - - -
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris m' 120.00 - (120.00) 48,000.00 17,000 5,760,000 2,040,000 - -
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris m' 112.00 - (112.00) 303,000.00 41,000 33,936,000 4,592,000 - -
3 Closet duduk lengkap dengan jet washer unit 8.00 - (8.00) 2,585,000.00 732,000 20,680,000 5,856,000 - -
4 Urinoir lengkap dengan aksesories unit 4.00 - (4.00) 2,460,000.00 550,000 9,840,000 2,200,000 - -
5 Wastafel lengkap dengan hand washer unit 4.00 - (4.00) 992,000.00 487,000 3,968,000 1,948,000 - -
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah set 1.00 - (1.00) 17,100,000.00 - 17,100,000 - - -
7 Floor drain pcs 4.00 - (4.00) 31,000.00 20,000 124,000 80,000 - -
8 Penyambungan jalur PDAM sampai ke kantor ls 1.00 - (1.00) - 3,500,000 - 3,500,000 - -
REKAPITULASI BIAYA PEKERJAAN TAMBAH/KURANG (+/-)
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

SESUAI POKOK - POKOK PERJANJIAN NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


V O L U M E Harga Satuan Jumlah Harga Kontrak Jumlah Harga Realisasi
No. Uraian Pekerjaan Satuan Kontrak Realisasi Selisih
Material Jasa Material Jasa Material Jasa

b. Tandon Air dan Pompa - - - - - - - - - -


1 Tandon air kapasitas 1500 liter unit 1.00 - (1.00) 4,200,000.00 300,000 4,200,000 300,000 - -
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories unit 1.00 - (1.00) 7,100,000.00 550,000 7,100,000 550,000 - -
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm set 1.00 - (1.00) 8,500,000.00 2,500,000 8,500,000 2,500,000 - -
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan - - - - - - - - - -
1 Galian tanah m3 28.08 - (28.08) - 115,000 - 3,229,200 - -
2 Beton K-225 tebal 15 cm m3 8.04 - (8.04) 946,000.00 332,000 7,605,840 2,669,280 - -
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm m2 45.00 - (45.00) 30,000.00 104,000 1,350,000 4,680,000 - -
4 Ijuk, pasir, kerikil untuk penyaringan ls 1.00 - (1.00) 1,500,000.00 - 1,500,000 - - -
5 Pipa vent. Ø 1" Set 1.00 - (1.00) 700,000.00 155,000 700,000 155,000 - -
Sub Total IV 3,597,893,897 1,448,913,306 774,713,721 284,153,792
V PEKERJAAN PENYELESAIAN
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan ls 1.00 - (1.00) - 2,500,000 - 2,500,000 - -
2 Pembersihan lokasi kerja ls 1.00 - (1.00) - 5,000,000 - 5,000,000 - -
Sub Total V - 7,500,000 - -

SUB TOTAL 5,495,422,317 2,634,296,999 1,405,176,097 1,008,677,873


MATERIAL + JASA 8,129,719,315 2,413,853,970
RESIKO & KEUNTUNGAN 8% 650,377,545 193,108,318
TOTAL 8,780,096,861 2,606,962,288
PEMBULATAN 8,780,000,000 2,607,000,000

PELAKSANA : Medan,15 November 2021


PT Arta Gusti Utama Sr.Spv. Engineering - TS Reg.II Sr.Spv. R&C TS-Region II Technical Services Region Mana
Direktur,

M. Agung Irvansyah REDDY ANUGRAHADI SAEFUDIN JUHRI JUREMI


PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

- -
- -
- (5,000,000.00)
- (22,000,000.00)
- (7,600,000.00)

- -

- (34,600,000)

- -
- -
(9,300,000) (7,740,000)
(7,250,250) (1,035,750)
(101,503,500) (64,216,500)
(952,061,400) (265,152,000)
(90,298,402) (28,218,251)
(54,179,041) (13,544,760)
(29,250,000) (13,650,000)
- (8,000,000)
(1,243,842,593.39) (401,557,260.98)

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(6,800,000) (3,700,000)
(9,676,800) (9,072,000)
- -
- -
- -
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

(2,040,430) (338,870)
(1,751,000) (1,225,700)
(385,220) (1,365,780)
(2,570,000) (1,500,000)
(23,223,450) (17,202,350)

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(1,589,280) (557,760)
- -
- -
- -
- -
- -
- -
(15,120,000) (7,084,800)
(5,060,690) (1,317,888)
(1,287,252) (369,900)
(34,056,000) (11,952,000)
- -
(106,470,000) (49,888,800)
(42,591,744) (11,091,600)
(16,734,276) (4,808,700)
(33,204,600) (11,653,200)
- -
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

(90,090,000) (42,213,600)
(35,493,120) (9,243,000)
(13,387,421) (3,846,960)
(26,563,680) (9,322,560)
- -
(52,001,250) (8,636,250)
(28,158,638) (8,091,563)
(59,768,280) (20,975,760)
(88,264,000) (65,195,000)
(7,700,000) (3,200,000)
(1,950,000) (3,200,000)
(1,872,000) (780,000)
- -
(56,175,000) (29,400,000)
(28,158,638) (8,091,563)
(59,598,000) (20,916,000)
(85,000,000) (65,000,000)
(18,700,000) (3,520,000)
(1,950,000) (3,200,000)
(1,872,000) (780,000)
- -
(74,460,000) (52,122,000)
(36,485,400) (120,625,200)
(23,827,200) (22,338,000)
- -
- (66,240)
(27,168) (4,512)
(30,480) (21,840)
(5,250,000) (2,460,000)
(4,439,001) (1,155,990)
(10,455,700) (3,411,860)
(4,335,000) (3,315,000)
(17,000,000) (10,000,000)
- -
(72,748,268) (12,124,711)
(109,122,402) (30,311,778)
(20,000,000) (10,300,000)
(7,000,000) (2,400,000)
(141,750,000) (73,500,000)
(99,750,000) (99,750,000)
(3,990,000) (3,150,000)
(16,800,000) (15,750,000)
- -
(15,000,000) (900,000)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

(2,900,000) (450,000)
(108,900,000) (14,520,000)
(23,400,000) (4,550,000)
(30,550,000) (1,599,000)
(5,600,000) (1,200,000)
(157,188,150) (18,847,500)
(29,568,000) (9,240,000)
(92,928,000) (42,108,000)
- -
- -
(636,000) (120,000)
(200,000) (80,000)
(1,500,000) (500,000)
(20,304,000) (5,640,000)
(4,608,000) (1,280,000)
(135,180,000) (27,036,000)
(15,000,000) (3,000,000)
- -
(1,662,500) (798,000)
(3,780,000) (2,730,000)
(15,750,000) (11,375,000)
(18,900,000) (13,650,000)
(3,500,000) (1,000,000)
(242,000) (370,000)
- -
- -
(53,750,000) (5,000,000)
(22,000,000) (4,000,000)
(22,912,000) (3,520,000)
(2,912,000) (1,760,000)
(903,000) (7,525,000)
(140,000) (1,750,000)
(273,000) (3,675,000)
(765,000) (2,975,000)
(7,600,000) (14,000,000)
(48,750,000) (12,000,000)
(1,250,000) (800,000)
- -
(57,510,000) (4,050,000)
(97,500,000) (4,500,000)
(1,750,000) (715,000)
(312,000) (4,200,000)
- -
- (1,170,700)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

(1,145,200) (181,800)
(1,111,000) (5,050,000)
(12,600,000) (10,500,000)
(36,400,000) (4,900,000)
(21,000,000) (3,500,000)
(10,800,000) (1,200,000)
(8,750,000) (2,750,000)
- -
(970,000) -
(18,000,000) -
(360,000) -
(700,000) -
(70,000) -
- -
(16,500,000) (1,700,000)
- -
- -
- -
- -
- -
- -
- -
- -
(6,500,000) (900,000)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
(5,760,000) (2,040,000)
(33,936,000) (4,592,000)
(20,680,000) (5,856,000)
(9,840,000) (2,200,000)
(3,968,000) (1,948,000)
(17,100,000) -
(124,000) (80,000)
- (3,500,000)
PEKERJAAN TAMBAH/KURANG (+/-)
A FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

NOMOR PPJ-002/F12470/2017-S5 TANGGAL 24 MEI 2017


Jumlah Harga Selisih (+/-)

Material Jasa

- -
(4,200,000) (300,000)
(7,100,000) (550,000)
(8,500,000) (2,500,000)
- -
- (3,229,200)
(7,605,840) (2,669,280)
(1,350,000) (4,680,000)
(1,500,000) -
(700,000) (155,000)
(2,823,180,176) (1,164,759,514)

- (2,500,000)
- (5,000,000)
- (7,500,000)

(4,090,246,220) (1,625,619,125)
(5,715,865,345)
(457,269,228)
(6,173,134,573)
(6,173,000,000)

Medan,15 November 2021


Technical Services Region Manager II
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis
Kontrak Dikerjakan Pengawas
kerja (%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
I PEKERJAAN PERSIAPAN 100.000% 1.871% 77.252% 1.445%
1 Survey, pengukuran, pembuatan shop drawing ls 1.00 2.301% 0.043% 1.00 1.00 100.00% 2.301% 0.043% -
2 Direksi keet uk. 4 m x 6 m m2 24.00 22.091% 0.413% 24.00 24.00 100.00% 22.091% 0.413% -
3 Pengadaan air dan listrik kerja ls 1.00 13.149% 0.246% 1.00 0.75 75.00% 9.862% 0.185% 0.25
4 Sewa scaffolding ls 1.00 14.464% 0.271% 1.00 - 0.00% 0.000% 0.000% 1.00

5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) ls 1.00 24.984% 0.467% 1.00 0.80 80.00% 19.987% 0.374% 0.20

Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam
6 komponen upah <safety helmet, safety shoes, safety vest, pakaian kerja dan tanda pengenal> ,APD diluar ls 1.00 23.011% 0.431% 1.00 1.00 100.00% 23.011% 0.431% -
komponen upah <safety glass dan gloves>, obat-obatan <P3K>, A
II PEKERJAAN PENGURUGAN DAN PENGECORAN 100.000% 30.843% 34.381% 10.604%
1 Pembersihan lahan m2 4,664.00 1.302% 0.402% 4,664.00 4,664.00 100.00% 1.302% 0.402% -
2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat m3 2,332.00 17.577% 5.421% 2,332.00 2,332.00 100.00% 17.577% 5.421% -
3 Bekisting m2 60.00 0.680% 0.210% 60.00 - 0.00% 0.000% 0.000% 60.00

Kayu gelam Ø10 cm 1.652% 0.510% 80.00% 1.322% 0.408% 207.15


4 btg 1,035.75 1,035.75 828.60
5 Lantai kerja tebal 5 cm m3 207.15 6.609% 2.038% 207.15 - 0.00% 0.000% 0.000% 207.15

Beton Cor Ready Mix K. 300 tebal 20 cm 48.543% 14.972% 0.00% 0.000% 0.000% 828.60
6 m3 828.60 828.60 -
7 Pembesian Wiremesh M8 -150 (2 lapis) kg 45,149.20 18.906% 5.831% 45,149.20 33,861.90 75.00% 14.180% 4.373% 11,287.30
8 Besi Beton Ø8 kg 6,772.38 2.701% 0.833% 6,772.38 - 0.00% 0.000% 0.000% 6,772.38
9 Pemasangan cansteen dan pengecatan m 195.00 1.711% 0.528% 195.00 - 0.00% 0.000% 0.000% 195.00
10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium pek 1.00 0.319% 0.098% 1.00 - 0.00% 0.000% 0.000% 1.00
III PEKERJAAN PEMBANGUNAN PAGAR 100.000% 5.115% 90.278% 4.618%
1 Pembongkaran pagar seng eksisting m 154.00 0.148% 0.008% 154.00 154.00 100.00% 0.148% 0.008% -
2 Bouwplank m 154.00 4.296% 0.220% 154.00 154.00 100.00% 4.296% 0.220% -
3 Galian tanah m3 71.87 1.037% 0.053% 71.87 71.87 100.00% 1.037% 0.053% -

4 Kayu gelam Ø10 cm 108.00 1.039% 0.053% 108.00 108.00 100.00% 1.039% 0.053% -
btg
5 Pasir urug tebal 10 cm m3 6.53 0.519% 0.027% 6.53 6.53 100.00% 0.519% 0.027% -
6 Urugan kembali dan pemadatan m3 62.05 1.194% 0.061% 62.05 62.05 100.00% 1.194% 0.061% -
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting m3 9.83 10.163% 0.520% 9.83 9.83 100.00% 10.163% 0.520% -
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting m3 3.82 4.596% 0.235% 3.82 3.82 100.00% 4.596% 0.235% -
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting m3 4.32 9.454% 0.484% 4.32 4.32 100.00% 9.454% 0.484% -
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting m3 2.87 5.032% 0.257% 2.87 2.87 100.00% 5.032% 0.257% -
11 Dinding 1/2 bata ad. 1 : 4 m2 235.69 9.636% 0.493% 235.69 235.69 100.00% 9.636% 0.493% -
12 Plesteran camp. 1 : 4 tebal 15 mm m2 604.80 14.545% 0.744% 604.80 604.80 100.00% 14.545% 0.744% -
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris m' 16.20 0.191% 0.010% 16.20 16.20 100.00% 0.191% 0.010% -

Page 26 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis
Kontrak Dikerjakan Pengawas
kerja (%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
14Besi siku uk. 60.60.6 mm kg 146.97 0.601% 0.031% 146.97 146.97 100.00% 0.601% 0.031% -
15Kawat duri 6 lapis m 924.00 4.555% 0.233% 924.00 924.00 100.00% 4.555% 0.233% -
16Pintu pagar besi uk. 5m x 2m include rel dan kunci m2 10.00 2.525% 0.129% 10.00 - 0.00% 0.000% 0.000% 10.00
17Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 604.80 4.509% 0.231% 604.80 - 0.00% 0.000% 0.000% 604.80
18Mengecat besi siku dan pagar m2 15.12 0.215% 0.011% 15.12 15.12 100.00% 0.215% 0.011% -
3.2.
Pembuatan Parit dan Bak Kontrol 0.000%
1
Galian tanah dan bongkar parit m3 100.94 1.456% 0.074% 100.94 100.94 100.00% 1.456% 0.074% -
2
Pasir urug tebal 5 cm m3 7.21 0.572% 0.029% 7.21 - 0.00% 0.000% 0.000% 7.21
3
Pasangan 1/2 bata merah 1 PC : 2 Psr m2 350.20 14.317% 0.732% 350.20 332.69 95.00% 13.601% 0.696% 17.51
4
Plesteran camp. 1 : 2 tebal 15 mm m2 350.20 8.422% 0.431% 350.20 332.69 95.00% 8.001% 0.409% 17.51
5
Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr bh 1.00 0.979% 0.050% 1.00 - 0.00% 0.000% 0.000% 1.00
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 100.000% 62.078% 20.981% 13.025% -
4.1Pondasi - 32 titik ; Kedalaman 18 m
1
Pengadaan tiang pancang spun pile 500 mm (bottom) m 192.00 2.092% 1.299% 192.00 192.00 100.00% 2.092% 1.299% -
2
Pengadaan tiang pancang spun pile 500 mm (middle) m 384.00 4.550% 2.825% 384.00 384.00 100.00% 4.550% 2.825% -
3
Pengangkutan tiang pancang ketitik pancang m 576.00 0.285% 0.177% 576.00 576.00 100.00% 0.285% 0.177% -
4
Pemancangan tiang pancang m 576.00 0.970% 0.602% 576.00 576.00 100.00% 0.970% 0.602% -
5
Penyambungan tiang pancang bh 64.00 0.317% 0.197% 64.00 64.00 100.00% 0.317% 0.197% -
6
Pemotongan tiang pancang bh 32.00 0.190% 0.118% 32.00 32.00 100.00% 0.190% 0.118% -
7
PDA Test titik 1.00 0.139% 0.086% 1.00 1.00 100.00% 0.139% 0.086% -
8
Galian tanah m3 126.00 0.287% 0.178% 126.00 126.00 100.00% 0.287% 0.178% -
9
Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir)
- Bekisting m2 38.40 0.221% 0.137% 38.40 38.40 100.00% 0.221% 0.137% -
- Besi Beton D16-150 kg 1,617.92 0.388% 0.241% 1,617.92 1,617.92 100.00% 0.388% 0.241% -
- Beton K-250 m3 11.52 0.292% 0.181% 11.52 11.52 100.00% 0.292% 0.181% -
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah)
- Bekisting m2 28.80 0.165% 0.103% 28.80 28.80 100.00% 0.165% 0.103% -
- Besi Beton D16-150 kg 1,440.96 0.345% 0.214% 1,440.96 1,440.96 100.00% 0.345% 0.214% -
- Beton K-250 m3 10.80 0.273% 0.170% 10.80 10.80 100.00% 0.273% 0.170% -
11 Pedestal uk. 50 cm x 50 cm x 70 cm
- Bekisting m2 44.80 0.257% 0.160% 44.80 44.80 100.00% 0.257% 0.160% -
- Besi Beton 12-D16 kg 606.72 0.145% 0.090% 606.72 606.72 100.00% 0.145% 0.090% -
- Ring Besi Beton Ø10-150 mm kg 276.19 0.061% 0.038% 276.19 276.19 100.00% 0.061% 0.038% -
- Beton K-250 m3 5.60 0.142% 0.088% 5.60 3.92 70.00% 0.099% 0.062% 1.68
12 Sloof uk. 30 cm x 50 cm
- Bekisting m2 304.20 3.098% 1.923% 304.20 304.20 100.00% 3.098% 1.923% -
- Besi Beton 12-D16 kg 4,436.64 1.064% 0.660% 4,436.64 4,436.64 100.00% 1.064% 0.660% -
- Ring Besi Beton Ø10-150 mm kg 1,923.48 0.427% 0.265% 1,923.48 1,923.48 100.00% 0.427% 0.265% -
- Beton K-250 m3 35.10 0.889% 0.552% 35.10 35.10 100.00% 0.889% 0.552% -

Page 27 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis Pengawas
kerja Kontrak Dikerjakan
(%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
13 Kolom uk. 50 cm x 50 cm
- Bekisting (2x pakai) m2 288.00 2.933% 1.821% 288.00 244.80 85.00% 2.493% 1.548% 43.20
- Besi Beton 12-D16 kg 3,514.37 0.843% 0.523% 3,514.37 2,987.21 85.00% 0.716% 0.445% 527.16
- Ring Besi Beton Ø10-150 mm kg 986.40 0.219% 0.136% 986.40 838.44 85.00% 0.186% 0.116% 147.96
- Beton K-250 m3 72.00 1.823% 1.132% 72.00 36.00 50.00% 0.912% 0.566% 36.00
14 Balok Tengah uk. 30 cm x 50 cm
- Bekisting m2 304.20 3.098% 1.923% 304.20 - 0.00% 0.000% 0.000% 304.20
- Besi Beton 12-D16 kg 4,436.64 1.064% 0.660% 4,436.64 - 0.00% 0.000% 0.000% 4,436.64
- Ring Besi Beton Ø10-150 mm kg 1,923.48 0.427% 0.265% 1,923.48 - 0.00% 0.000% 0.000% 1,923.48
- Beton K-250 m3 35.10 0.889% 0.552% 35.10 - 0.00% 0.000% 0.000% 35.10
15 Balok Atap uk. 30 cm x 40 cm
- Bekisting m2 257.40 2.622% 1.627% 257.40 - 0.00% 0.000% 0.000% 257.40
- Besi Beton 10-D16 kg 3,697.20 0.886% 0.550% 3,697.20 - 0.00% 0.000% 0.000% 3,697.20
- Ring Besi Beton Ø10-150 mm kg 1,538.78 0.341% 0.212% 1,538.78 - 0.00% 0.000% 0.000% 1,538.78
- Beton K-250 m3 28.08 0.711% 0.441% 28.08 - 0.00% 0.000% 0.000% 28.08
16 Lantai I / Ground Floor
- Urugan pasir t = 35 cm m3 183.75 1.202% 0.746% 183.75 - 0.00% 0.000% 0.000% 183.75
- Besi Beton Ø10 - 200 mm kg 3,236.63 0.718% 0.446% 3,236.63 - 0.00% 0.000% 0.000% 3,236.63
- Cor K-250 tebal 12 cm (termasuk teras) m3 63.18 1.600% 0.993% 63.18 - 0.00% 0.000% 0.000% 63.18
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 501.50 3.041% 1.888% 501.50 - 0.00% 0.000% 0.000% 501.50
- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 100.00 0.216% 0.134% 100.00 - 0.00% 0.000% 0.000% 100.00
- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.102% 0.063% 25.00 - 0.00% 0.000% 0.000% 25.00
- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.053% 0.033% 24.00 - 0.00% 0.000% 0.000% 24.00
17 Lantai II
- Bondek tebal 0,70 mm m2 525.00 1.696% 1.053% 525.00 - 0.00% 0.000% 0.000% 525.00
- Besi Beton Ø10 - 200 mm kg 3,236.63 0.718% 0.446% 3,236.63 - 0.00% 0.000% 0.000% 3,236.63
- Cor K-250 tebal 12 cm m3 63.00 1.595% 0.990% 63.00 - 0.00% 0.000% 0.000% 63.00
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 500.00 2.972% 1.845% 500.00 - 0.00% 0.000% 0.000% 500.00
- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 m' 110.00 0.440% 0.273% 110.00 - 0.00% 0.000% 0.000% 110.00
- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 m2 25.00 0.102% 0.063% 25.00 - 0.00% 0.000% 0.000% 25.00
- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 m' 24.00 0.053% 0.033% 24.00 - 0.00% 0.000% 0.000% 24.00
18 Dinding Bata
- Dinding bata 1 : 4 m2 744.60 2.508% 1.557% 744.60 - 0.00% 0.000% 0.000% 744.60
- Plesteran camp. 1 : 4 tebal 15 mm m2 1,489.20 3.113% 1.933% 1,489.20 - 0.00% 0.000% 0.000% 1,489.20
- Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup m2 1,489.20 0.915% 0.568% 1,489.20 - 0.00% 0.000% 0.000% 1,489.20
19 Tangga
- Galian tanah pondasi uk. 160 x 60 x 60 cm m3 0.58 0.001% 0.001% 0.58 - 0.00% 0.000% 0.000% 0.58
- Pasir urug pondasi tebal 10 cm m3 0.10 0.001% 0.000% 0.10 - 0.00% 0.000% 0.000% 0.10
- Lantai kerja tebal 5 cm m3 0.05 0.001% 0.001% 0.05 - 0.00% 0.000% 0.000% 0.05
- Bekisting m2 15.00 0.153% 0.095% 15.00 - 0.00% 0.000% 0.000% 15.00
- Besi Beton Ø10 - 200 mm kg 462.40 0.111% 0.069% 462.40 - 0.00% 0.000% 0.000% 462.40
- Beton K-250 m3 11.01 0.275% 0.171% 11.01 - 0.00% 0.000% 0.000% 11.01
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 m2 25.50 0.152% 0.094% 25.50 - 0.00% 0.000% 0.000% 25.50
- Handrail/railing bahan stainless steel 304 tangga dan teras m' 20.00 0.535% 0.332% 20.00 - 0.00% 0.000% 0.000% 20.00
4.2. Atap dan Plafon

Page 28 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis
Kontrak Dikerjakan Pengawas
kerja (%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
1 Rangka atap baja ringan tebal 1,2 mm m2 606.24 1.682% 1.044% 606.24 - 0.00% 0.000% 0.000% 606.24
2 Atap multiroof pasir tebal 0,40 mm m2 606.24 2.763% 1.715% 606.24 - 0.00% 0.000% 0.000% 606.24
3 Talang air berikut rangka m 100.00 0.600% 0.373% 100.00 - 0.00% 0.000% 0.000% 100.00
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris m 40.00 0.186% 0.116% 40.00 - 0.00% 0.000% 0.000% 40.00
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) m2 1,050.00 4.265% 2.648% 1,050.00 - 0.00% 0.000% 0.000% 1,050.00
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) m2 1,050.00 3.953% 2.454% 1,050.00 - 0.00% 0.000% 0.000% 1,050.00
7 List profil plafond gypsum (lantai 1 & 2) m 210.00 0.141% 0.088% 210.00 - 0.00% 0.000% 0.000% 210.00
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) m2 1,050.00 0.645% 0.400% 1,050.00 - 0.00% 0.000% 0.000% 1,050.00
4.3. Pintu, Kusen, Jendela dan Partisi
1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan aksesories pcs 2.00 0.315% 0.196% 2.00 - 0.00% 0.000% 0.000% 2.00
2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci pcs 1.00 0.066% 0.041% 1.00 - 0.00% 0.000% 0.000% 1.00
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm m2 290.40 2.446% 1.518% 290.40 - 0.00% 0.000% 0.000% 290.40
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci pcs 13.00 0.554% 0.344% 13.00 - 0.00% 0.000% 0.000% 13.00
5 Pintu kaca UPVC kamar mandi pcs 13.00 0.637% 0.395% 13.00 - 0.00% 0.000% 0.000% 13.00
6 Bouvenlight alumunium uk. 40x60 cm pcs 8.00 0.135% 0.084% 8.00 - 0.00% 0.000% 0.000% 8.00
7 Partisi kaca tebal 5 mm rangka alumunium m2 376.95 3.488% 2.165% 376.95 - 0.00% 0.000% 0.000% 376.95
8 Cutting sticker sandblast m2 369.60 0.769% 0.477% 369.60 - 0.00% 0.000% 0.000% 369.60
9 Vertical blind jendela m2 290.40 2.676% 1.661% 290.40 - 0.00% 0.000% 0.000% 290.40
4.4. Fasad & Logo
1 Pondasi beton uk 80x80cm include tulangan m3 1.28 0.117% 0.073% 1.28 1.28 100.00% 0.117% 0.073% -
2 Anchor Bolt M20 bh 12.00 0.015% 0.009% 12.00 - 0.00% 0.000% 0.000% 12.00
3 Dyna Bolt M20 bh 8.00 0.006% 0.003% 8.00 - 0.00% 0.000% 0.000% 8.00
4 Base Plate 300 x 300 x 12 mm thk bh 2.00 0.040% 0.025% 2.00 - 0.00% 0.000% 0.000% 2.00
5 Besi H 300 x 300 x 10 x15 mm @ 12 m kg 2,256.00 0.514% 0.319% 2,256.00 - 0.00% 0.000% 0.000% 2,256.00
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m kg 512.00 0.117% 0.072% 512.00 - 0.00% 0.000% 0.000% 512.00
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow m2 270.36 3.214% 1.995% 270.36 - 0.00% 0.000% 0.000% 270.36
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium pek 1.00 0.357% 0.221% 1.00 - 0.00% 0.000% 0.000% 1.00
4.5. Backdrop Lobby & R. Utama
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby m2 13.30 0.049% 0.030% 13.30 - 0.00% 0.000% 0.000% 13.30
2 Backdrop uk. 120 cm x 350 cm di lobby m2 4.20 0.129% 0.080% 4.20 - 0.00% 0.000% 0.000% 4.20
3 Backdop uk. 500 cm x 350 cm diruang FTM m2 17.50 0.537% 0.334% 17.50 - 0.00% 0.000% 0.000% 17.50
4 Backdop uk. 600 cm x 350 cm diruang rapat m2 21.00 0.645% 0.400% 21.00 - 0.00% 0.000% 0.000% 21.00
5 Memasang Logo dan nama Fuel Terminal Medan Group pek 1.00 0.089% 0.055% 1.00 - 0.00% 0.000% 0.000% 1.00
6 Lampu backdrop TL LED 8W incl. instalasi set 2.00 0.012% 0.008% 2.00 - 0.00% 0.000% 0.000% 2.00

Page 29 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis Pengawas
kerja Kontrak Dikerjakan
(%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
4.6. Elektrikal
a. Instalasi Listrik
1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru m 250.00 1.164% 0.723% 250.00 - 0.00% 0.000% 0.000% 250.00
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor m 2,000.00 0.515% 0.320% 2,000.00 - 0.00% 0.000% 0.000% 2,000.00
3 Lampu TL LED 2 x 36 watt incl. Kap RM bh 64.00 0.524% 0.325% 64.00 - 0.00% 0.000% 0.000% 64.00
4 Lampu Downlight LED 19W incl. kap lampu dan accessories bh 32.00 0.093% 0.057% 32.00 - 0.00% 0.000% 0.000% 32.00
5 Saklar Ganda bh 43.00 0.167% 0.104% 43.00 - 0.00% 0.000% 0.000% 43.00
6 Saklar Seri+stop kontak bh 10.00 0.037% 0.023% 10.00 - 0.00% 0.000% 0.000% 10.00
7 Stop Kontak Dinding bh 21.00 0.078% 0.049% 21.00 - 0.00% 0.000% 0.000% 21.00
8 Stop Kontak Tanam bh 17.00 0.074% 0.046% 17.00 - 0.00% 0.000% 0.000% 17.00
9 Pipa conduit 20 mm dan aksesories m 2,000.00 0.428% 0.266% 2,000.00 - 0.00% 0.000% 0.000% 2,000.00
10 Pipa galvanis Ø 3" termasuk aksessories m 250.00 1.204% 0.747% 250.00 - 0.00% 0.000% 0.000% 250.00
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi unit 1.00 0.041% 0.025% 1.00 - 0.00% 0.000% 0.000% 1.00
b. AC dan Exhaust Fan
1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 9.00 1.220% 0.757% 9.00 - 0.00% 0.000% 0.000% 9.00
2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) unit 10.00 2.021% 1.255% 10.00 - 0.00% 0.000% 0.000% 10.00
3 Exhaust Fan 12 inci unit 5.00 0.049% 0.030% 5.00 - 0.00% 0.000% 0.000% 5.00
4 Stop kontak AC dan Fan pcs 24.00 0.089% 0.056% 24.00 - 0.00% 0.000% 0.000% 24.00
c. Lampu Penerangan Areal Kantor
1 Galian tanah pondasi dan jalur kabel m3 10.18 0.023% 0.014% 10.18 - 0.00% 0.000% 0.000% 10.18
2 Pasir urug m3 4.04 0.026% 0.016% 4.04 - 0.00% 0.000% 0.000% 4.04
3 Pemasangan bata bh 2,020.00 0.122% 0.076% 2,020.00 - 0.00% 0.000% 0.000% 2,020.00
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting bh 14.00 0.458% 0.284% 14.00 - 0.00% 0.000% 0.000% 14.00
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang bh 14.00 0.818% 0.508% 14.00 - 0.00% 0.000% 0.000% 14.00
6 Lampu LED jenis street light 70 watt bh 14.00 0.485% 0.301% 14.00 - 0.00% 0.000% 0.000% 14.00
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris m 400.00 0.238% 0.148% 400.00 - 0.00% 0.000% 0.000% 400.00
8 Pipa PVC Ø 2" termasuk aksessories m 50.00 0.228% 0.141% 50.00 - 0.00% 0.000% 0.000% 50.00
d. Perangkat Access Door
1 Electric Dropbolt (Bracket include) unit 2.00 0.019% 0.012% 2.00 - 0.00% 0.000% 0.000% 2.00
2 Finger Print unit 2.00 0.357% 0.221% 2.00 - 0.00% 0.000% 0.000% 2.00
3 Power Supply Finger Print (incl adaptor) 12VDC unit 2.00 0.007% 0.004% 2.00 - 0.00% 0.000% 0.000% 2.00
4 Wireless Door Bell unit 2.00 0.014% 0.009% 2.00 - 0.00% 0.000% 0.000% 2.00
5 Push Button unit 2.00 0.001% 0.001% 2.00 - 0.00% 0.000% 0.000% 2.00
4.7. Lightning Protection & Grounding
1 Penangkal Petir, include: set 1.00 0.361% 0.224% 1.00 - 0.00% 0.000% 0.000% 1.00
- Head Terminal R150
- Pipa Support Galvanized 2" 2 meter
- Kabel konduktor NYA 50 mm
- Kabel Grounding BC 50 mm
- Grounding rod 12 m
- As Grounding
- Bak kontrol dan busbar
- Accessories
2 Grounding, include: set 1.00 0.147% 0.091% 1.00 - 0.00% 0.000% 0.000% 1.00
- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L)

Page 30 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis Pengawas
kerja Kontrak Dikerjakan
(%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
- Coupling Rod, Stainless Steel
- Grounding Connector, Stainless Steel 3 Branch
- Driving Stud Dia. 3/4"
- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D)
- C clamp connector
- Concrete Pit
Size :
- 450 mm x 450 mm c/w concrete cover
- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length
4.8. Plumbing dan Perlengkapan
a. Instalasi air
1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris m' 120.00 0.155% 0.096% 120.00 - 0.00% 0.000% 0.000% 120.00
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris m' 112.00 0.763% 0.474% 112.00 - 0.00% 0.000% 0.000% 112.00
3 Closet duduk lengkap dengan jet washer unit 8.00 0.526% 0.326% 8.00 - 0.00% 0.000% 0.000% 8.00
4 Urinoir lengkap dengan aksesories unit 4.00 0.239% 0.148% 4.00 - 0.00% 0.000% 0.000% 4.00
5 Wastafel lengkap dengan hand washer unit 4.00 0.117% 0.073% 4.00 - 0.00% 0.000% 0.000% 4.00
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah set 1.00 0.339% 0.210% 1.00 - 0.00% 0.000% 0.000% 1.00
7 Floor drain pcs 4.00 0.004% 0.003% 4.00 - 0.00% 0.000% 0.000% 4.00
8 Penyambungan jalur PDAM sampai ke kantor ls 1.00 0.069% 0.043% 1.00 - 0.00% 0.000% 0.000% 1.00
b. Tandon Air dan Pompa
1 Tandon air kapasitas 1500 liter unit 1.00 0.089% 0.055% 1.00 - 0.00% 0.000% 0.000% 1.00
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories unit 1.00 0.152% 0.094% 1.00 - 0.00% 0.000% 0.000% 1.00
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm set 1.00 0.218% 0.135% 1.00 - 0.00% 0.000% 0.000% 1.00
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan
1 Galian tanah m3 28.08 0.064% 0.040% 28.08 - 0.00% 0.000% 0.000% 28.08
2 Beton K-225 tebal 15 cm m3 8.04 0.204% 0.126% 8.04 - 0.00% 0.000% 0.000% 8.04
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm m2 45.00 0.119% 0.074% 45.00 - 0.00% 0.000% 0.000% 45.00
4 Ijuk, pasir, kerikil untuk penyaringan ls 1.00 0.030% 0.018% 1.00 - 0.00% 0.000% 0.000% 1.00
5 Pipa vent. Ø 1" Set 1.00 0.017% 0.011% 1.00 - 0.00% 0.000% 0.000% 1.00
V PEKERJAAN PENYELESAIAN 100.000% 0.092% 0.000% 0.000%
1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan ls 1.00 33.333% 0.031% 1.00 - 0.00% 0.000% 0.000% 1.00
2 Pembersihan lokasi kerja ls 1.00 66.667% 0.062% 1.00 - 0.00% 0.000% 0.000% 1.00

Page 31 of 64
L A P O R A N MINGGUAN
MINGGU KE 31 PEMBORONG PT Artha Gusti Utama
PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG
PERIODE LAPORAN 08 November 2021 - 13 November 2021 PEKERJAAN BELAWAN

NO. KONTRAK 3950099135

TANGGAL 01 Maret 2021

Volume Bobot Terhadap Realisasi Kumulatif s/d Minggu ini


Jenis % Terhadap Volume Catatan
Satuan dalam Rekalkulasi
Item Uraian Pekerjaan Kontrak Belum
Volume Lingkup Pekerjaan Volume Volume (%) Jenis Pengawas
kerja Kontrak Dikerjakan
(%) (%) Pekerjaan Pekerjaan
(1) (2) (3) (4) (5) (6) (7) (8) (9 = 8:7) (10 = 9x5) (11 = 9x6) (12 = 7-8)
REKAPITULASI
I PEKERJAAN PERSIAPAN 100.00% 1.87% 77.25% 1.45%
II PEKERJAAN PENGURUGAN DAN PENGECORAN 100.00% 30.84% 34.38% 10.60%
III PEKERJAAN PEMBANGUNAN PAGAR 100.00% 5.11% 90.28% 4.62%
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 100.00% 62.08% 20.98% 13.02%
V PEKERJAAN PENYELESAIAN 100.00% 0.09% 0.00% 0.00%
TOTAL 100.000% 29.692%

Belawan, 15 November 2021


Disiapkan oleh : Diperiksa oleh :
PT. Arta Gusti Utama Pengawas Harian
Direktur FT Medan Group
Spv. Maintenance Planning & Serv.

M. Agung Irvansyah Hernawan

Page 32 of 64
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PERSIAPAN


BOBOT THDP KONTRAK : 1.871%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

1 Survey, pengukuran, pembuatan shop drawing 0.000% 0.000% 0.043% 0.043% 0.043%

2 Direksi keet uk. 4 m x 6 m 0.236% 0.236% 0.177% 0.177% 0.413%

3 Pengadaan air dan listrik kerja 0.000% 0.000% 0.246% 0.185% 0.185%
4 Sewa scaffolding 0.000% 0.000% 0.271% 0.000% 0.000%

Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat


5 0.000% 0.000% 0.467% 0.374% 0.374%
pancang)

Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD


minimum sudah masuk dalam komponen upah <safety helmet, safety shoes,
6 0.000% 0.000% 0.431% 0.431% 0.431%
safety vest, pakaian kerja dan tanda pengenal> ,APD diluar komponen upah
<safety glass dan gloves>, obat-obatan <P3K>, A

TOTAL 0.236% 1.635% 1.445%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah

Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a

JENIS PEKERJAAN : PEKERJAAN PENGURUGAN DAN PENGECORAN


BOBOT THDP KONTRAK : 30.843%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN
MATERIAL MATERIAL JASA JASA

1 Pembersihan lahan 0.000% 0.000% 0.402% 0.402% 0.402%

Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan


2 1.434% 1.434% 3.987% 3.987% 5.421%
alat berat

3 Bekisting 0.114% 0.000% 0.095% 0.000% 0.000%

4 Kayu gelam Ø10 cm 0.446% 0.357% 0.064% 0.051% 0.408%

5 Lantai kerja tebal 5 cm 1.249% 0.000% 0.790% 0.000% 0.000%

6 Beton Cor Ready Mix K. 300 tebal 20 cm 11.711% 0.000% 3.262% 0.000% 0.000%

7 Pembesian Wiremesh M8 -150 (2 lapis) 4.443% 3.332% 1.388% 1.041% 4.373%

8 Besi Beton Ø8 0.666% 0.000% 0.167% 0.000% 0.000%

9 Pemasangan cansteen dan pengecatan 0.360% 0.000% 0.168% 0.000% 0.000%

10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 0.000% 0.000% 0.098% 0.000% 0.000%

TOTAL 20.423% 10.420% 10.604%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah

Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN PAGAR


BOBOT THDP KONTRAK : 5.115%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
1 Pembongkaran pagar seng eksisting 0.000% 0.000% 0.008% 0.008% 0.008%
2 Bouwplank 0.157% 0.157% 0.063% 0.063% 0.220%
3 Galian tanah 0.000% 0.000% 0.053% 0.053% 0.053%

4 Kayu gelam Ø10 cm 0.046% 0.046% 0.007% 0.007% 0.053%

5 Pasir urug tebal 10 cm 0.023% 0.023% 0.004% 0.004% 0.027%


6 Urugan kembali dan pemadatan 0.000% 0.000% 0.061% 0.061% 0.061%
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting 0.363% 0.363% 0.157% 0.157% 0.520%
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting 0.174% 0.174% 0.061% 0.061% 0.235%
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting 0.388% 0.388% 0.096% 0.096% 0.484%
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting 0.201% 0.201% 0.056% 0.056% 0.257%
11 Dinding 1/2 bata ad. 1 : 4 0.290% 0.290% 0.203% 0.203% 0.493%
12 Plesteran camp. 1 : 4 tebal 15 mm 0.164% 0.164% 0.580% 0.580% 0.744%
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris 0.006% 0.006% 0.003% 0.003% 0.010%
14 Besi siku uk. 60.60.6 mm 0.016% 0.016% 0.014% 0.014% 0.031%
15 Kawat duri 6 lapis 0.063% 0.063% 0.170% 0.170% 0.233%
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci 0.084% 0.000% 0.046% 0.000% 0.000%
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 0.119% 0.000% 0.112% 0.000% 0.000%
18 Mengecat besi siku dan pagar 0.006% 0.006% 0.005% 0.005% 0.011%
3.2. Pembuatan Parit dan Bak Kontrol 0.000% 0.000% 0.000% 0.000% 0.000%
1 Galian tanah dan bongkar parit 0.000% 0.000% 0.074% 0.074% 0.074%
2 Pasir urug tebal 5 cm 0.025% 0.000% 0.004% 0.000% 0.000%
3 Pasangan 1/2 bata merah 1 PC : 2 Psr 0.431% 0.409% 0.302% 0.286% 0.696%
4 Plesteran camp. 1 : 2 tebal 15 mm 0.095% 0.090% 0.336% 0.319% 0.409%
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr 0.032% 0.000% 0.018% 0.000% 0.000%

TOTAL 2.681% 2.433% 4.618%


Fuel Terminal BBM Medan Group, 15 November 2021
Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

4.1 Pondasi - 32 titik ; Kedalaman 18 m

1 Pengadaan tiang pancang spun pile 500 mm (bottom) 1.299% 1.299% 0.000% 0.000% 1.299%
2 Pengadaan tiang pancang spun pile 500 mm (middle) 2.825% 2.825% 0.000% 0.000% 2.825%
3 Pengangkutan tiang pancang ketitik pancang 0.000% 0.000% 0.177% 0.177% 0.177%
4 Pemancangan tiang pancang 0.000% 0.000% 0.602% 0.602% 0.602%
5 Penyambungan tiang pancang 0.000% 0.000% 0.197% 0.197% 0.197%
6 Pemotongan tiang pancang 0.000% 0.000% 0.118% 0.118% 0.118%
7 PDA Test 0.000% 0.000% 0.086% 0.086% 0.086%
8 Galian tanah 0.000% 0.000% 0.178% 0.178% 0.178%
9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir) 0.000% 0.000% 0.000% 0.000% 0.000%
- Bekisting 0.076% 0.076% 0.061% 0.061% 0.137%
- Besi Beton D16-150 0.191% 0.191% 0.050% 0.050% 0.241%
- Beton K-250 0.134% 0.134% 0.047% 0.047% 0.181%
10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah) 0.000% 0.000% 0.000% 0.000% 0.000%
- Bekisting 0.057% 0.057% 0.046% 0.046% 0.103%
- Besi Beton D16-150 0.170% 0.170% 0.044% 0.044% 0.214%
- Beton K-250 0.126% 0.126% 0.044% 0.044% 0.170%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah

Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo

RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

11 Pedestal uk. 50 cm x 50 cm x 70 cm

- Bekisting 0.088% 0.088% 0.072% 0.072% 0.160%


- Besi Beton 12-D16 0.072% 0.072% 0.019% 0.019% 0.090%
- Ring Besi Beton Ø10-150 mm 0.030% 0.030% 0.008% 0.008% 0.038%
- Beton K-250 0.065% 0.046% 0.023% 0.016% 0.062%
12 Sloof uk. 30 cm x 50 cm

- Bekisting 1.310% 1.310% 0.614% 0.614% 1.923%


- Besi Beton 12-D16 0.524% 0.524% 0.136% 0.136% 0.660%
- Ring Besi Beton Ø10-150 mm 0.206% 0.206% 0.059% 0.059% 0.265%
- Beton K-250 0.408% 0.408% 0.143% 0.143% 0.552%
13 Kolom uk. 50 cm x 50 cm

- Bekisting (2x pakai) 1.240% 1.054% 0.581% 0.494% 1.548%


- Besi Beton 12-D16 0.415% 0.353% 0.108% 0.092% 0.445%
- Ring Besi Beton Ø10-150 mm 0.106% 0.090% 0.030% 0.026% 0.116%
- Beton K-250 0.838% 0.419% 0.294% 0.147% 0.566%
14 Balok Tengah uk. 30 cm x 50 cm

- Bekisting 1.310% 0.000% 0.614% 0.000% 0.000%


- Besi Beton 12-D16 0.524% 0.000% 0.136% 0.000% 0.000%
- Ring Besi Beton Ø10-150 mm 0.206% 0.000% 0.059% 0.000% 0.000%
- Beton K-250 0.408% 0.000% 0.143% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

15 Balok Atap uk. 30 cm x 40 cm

- Bekisting 1.108% 0.000% 0.519% 0.000% 0.000%


- Besi Beton 10-D16 0.437% 0.000% 0.114% 0.000% 0.000%
- Ring Besi Beton Ø10-150 mm 0.165% 0.000% 0.047% 0.000% 0.000%
- Beton K-250 0.327% 0.000% 0.115% 0.000% 0.000%
16 Lantai I / Ground Floor

- Urugan pasir t = 35 cm 0.640% 0.000% 0.106% 0.000% 0.000%


- Besi Beton Ø10 - 200 mm 0.346% 0.000% 0.100% 0.000% 0.000%
- Cor K-250 tebal 12 cm (termasuk teras) 0.735% 0.000% 0.258% 0.000% 0.000%
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 1.086% 0.000% 0.802% 0.000% 0.000%
- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 0.095% 0.000% 0.039% 0.000% 0.000%
- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 0.024% 0.000% 0.039% 0.000% 0.000%
- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 0.023% 0.000% 0.010% 0.000% 0.000%
17 Lantai II

- Bondek tebal 0,70 mm 0.691% 0.000% 0.362% 0.000% 0.000%


- Besi Beton Ø10 - 200 mm 0.346% 0.000% 0.100% 0.000% 0.000%
- Cor K-250 tebal 12 cm 0.733% 0.000% 0.257% 0.000% 0.000%
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 1.046% 0.000% 0.800% 0.000% 0.000%
- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 0.230% 0.000% 0.043% 0.000% 0.000%
- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 0.024% 0.000% 0.039% 0.000% 0.000%
- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 0.023% 0.000% 0.010% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
18 Dinding Bata

- Dinding bata 1 : 4 0.916% 0.000% 0.641% 0.000% 0.000%


- Plesteran camp. 1 : 4 tebal 15 mm 0.449% 0.000% 1.484% 0.000% 0.000%
- Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 0.293% 0.000% 0.275% 0.000% 0.000%
19 Tangga 0.000% 0.000% 0.000% 0.000% 0.000%
- Galian tanah pondasi uk. 160 x 60 x 60 cm 0.000% 0.000% 0.001% 0.000% 0.000%
- Pasir urug pondasi tebal 10 cm 0.000% 0.000% 0.000% 0.000% 0.000%
- Lantai kerja tebal 5 cm 0.000% 0.000% 0.000% 0.000% 0.000%
- Bekisting 0.065% 0.000% 0.030% 0.000% 0.000%
- Besi Beton Ø10 - 200 mm 0.055% 0.000% 0.014% 0.000% 0.000%
- Beton K-250 0.129% 0.000% 0.042% 0.000% 0.000%
- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 0.053% 0.000% 0.041% 0.000% 0.000%
- Handrail/railing bahan stainless steel 304 tangga dan teras 0.209% 0.000% 0.123% 0.000% 0.000%
4.2. Atap dan Plafon 0.000% 0.000% 0.000% 0.000% 0.000%
1 Rangka atap baja ringan tebal 1,2 mm 0.895% 0.000% 0.149% 0.000% 0.000%
2 Atap multiroof pasir tebal 0,40 mm 1.342% 0.000% 0.373% 0.000% 0.000%
3 Talang air berikut rangka 0.246% 0.000% 0.127% 0.000% 0.000%
4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris 0.086% 0.000% 0.030% 0.000% 0.000%
5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) 1.744% 0.000% 0.904% 0.000% 0.000%
6 Plafond gypsum tebal 9 mm (lantai 1 & 2) 1.227% 0.000% 1.227% 0.000% 0.000%
7 List profil plafond gypsum (lantai 1 & 2) 0.049% 0.000% 0.039% 0.000% 0.000%
8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) 0.207% 0.000% 0.194% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

4.3. Pintu, Kusen, Jendela dan Partisi


Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl.
1
handle dan aksesories
0.185% 0.000% 0.011% 0.000% 0.000%

2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci 0.036% 0.000% 0.006% 0.000% 0.000%
3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm 1.340% 0.000% 0.179% 0.000% 0.000%
4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci 0.288% 0.000% 0.056% 0.000% 0.000%
5 Pintu kaca UPVC kamar mandi 0.376% 0.000% 0.020% 0.000% 0.000%
6 Bouvenlight alumunium uk. 40x60 cm 0.069% 0.000% 0.015% 0.000% 0.000%
7 Partisi kaca tebal 5 mm rangka alumunium 1.934% 0.000% 0.232% 0.000% 0.000%
8 Cutting sticker sandblast 0.364% 0.000% 0.114% 0.000% 0.000%
9 Vertical blind jendela 1.143% 0.000% 0.518% 0.000% 0.000%
4.4. Fasad & Logo 0.000% 0.000% 0.000% 0.000% 0.000%
1 Pondasi beton uk 80x80cm include tulangan 0.055% 0.055% 0.018% 0.018% 0.073%
2 Anchor Bolt M20 0.008% 0.000% 0.001% 0.000% 0.000%
3 Dyna Bolt M20 0.002% 0.000% 0.001% 0.000% 0.000%
4 Base Plate 300 x 300 x 12 mm thk 0.018% 0.000% 0.006% 0.000% 0.000%
5 Besi H 300 x 300 x 10 x15 mm @ 12 m 0.250% 0.000% 0.069% 0.000% 0.000%
6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m 0.057% 0.000% 0.016% 0.000% 0.000%
7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka 1.663% 0.000% 0.333% 0.000% 0.000%
8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium 0.185% 0.000% 0.037% 0.000% 0.000%
4.5. Backdrop Lobby & R. Utama 0.000% 0.000% 0.000% 0.000% 0.000%
1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby 0.020% 0.000% 0.010% 0.000% 0.000%
2 Backdrop uk. 120 cm x 350 cm di lobby 0.046% 0.000% 0.034% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Medan Group

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
3 Backdop uk. 500 cm x 350 cm diruang FTM 0.194% 0.000% 0.140% 0.000% 0.000%
4 Backdop uk. 600 cm x 350 cm diruang rapat 0.232% 0.000% 0.168% 0.000% 0.000%
5 Memasang Logo dan nama Fuel Terminal Medan Group 0.043% 0.000% 0.012% 0.000% 0.000%
6 Lampu backdrop TL LED 8W incl. instalasi 0.003% 0.000% 0.005% 0.000% 0.000%
4.6. Elektrikal

a. Instalasi Listrik

1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru 0.661% 0.000% 0.062% 0.000% 0.000%
2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor 0.271% 0.000% 0.049% 0.000% 0.000%
3 Lampu TL LED 2 x 36 watt incl. Kap RM 0.282% 0.000% 0.043% 0.000% 0.000%
4 Lampu Downlight LED 19W incl. kap lampu dan accessories 0.036% 0.000% 0.022% 0.000% 0.000%
5 Saklar Ganda 0.011% 0.000% 0.093% 0.000% 0.000%
6 Saklar Seri+stop kontak 0.002% 0.000% 0.022% 0.000% 0.000%
7 Stop Kontak Dinding 0.003% 0.000% 0.045% 0.000% 0.000%
8 Stop Kontak Tanam 0.009% 0.000% 0.037% 0.000% 0.000%
9 Pipa conduit 20 mm dan aksesories 0.093% 0.000% 0.172% 0.000% 0.000%
10 Pipa galvanis Ø 3" termasuk aksessories 0.600% 0.000% 0.148% 0.000% 0.000%
11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi 0.015% 0.000% 0.010% 0.000% 0.000%
b. AC dan Exhaust Fan
Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories
1
dan gas)
0.707% 0.000% 0.050% 0.000% 0.000%
Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories
2
dan gas)
1.199% 0.000% 0.055% 0.000% 0.000%

3 Exhaust Fan 12 inci 0.022% 0.000% 0.009% 0.000% 0.000%


4 Stop kontak AC dan Fan 0.004% 0.000% 0.052% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Med

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

c. Lampu Penerangan Areal Kantor

1 Galian tanah pondasi dan jalur kabel 0.000% 0.000% 0.014% 0.000% 0.000%
2 Pasir urug 0.014% 0.000% 0.002% 0.000% 0.000%
3 Pemasangan bata 0.014% 0.000% 0.062% 0.000% 0.000%
4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting 0.155% 0.000% 0.129% 0.000% 0.000%
5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang 0.448% 0.000% 0.060% 0.000% 0.000%
6 Lampu LED jenis street light 70 watt 0.258% 0.000% 0.043% 0.000% 0.000%
7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris 0.133% 0.000% 0.015% 0.000% 0.000%
8 Pipa PVC Ø 2" termasuk aksessories 0.108% 0.000% 0.034% 0.000% 0.000%
d. Perangkat Access Door

1 Electric Dropbolt (Bracket include) 0.012% 0.000% 0.000% 0.000% 0.000%


2 Finger Print 0.221% 0.000% 0.000% 0.000% 0.000%
3 Power Supply Finger Print (incl adaptor) 12VDC 0.004% 0.000% 0.000% 0.000% 0.000%
4 Wireless Door Bell 0.009% 0.000% 0.000% 0.000% 0.000%
5 Push Button 0.001% 0.000% 0.000% 0.000% 0.000%
4.7. Lightning Protection & Grounding

1 Penangkal Petir, include: 0.203% 0.000% 0.021% 0.000% 0.000%


- Head Terminal R150

- Pipa Support Galvanized 2" 2 meter

- Kabel konduktor NYA 50 mm

- Kabel Grounding BC 50 mm

- Grounding rod 12 m

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Med

Eri Wibowo

RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA
- As Grounding

- Bak kontrol dan busbar

- Accessories

2 Grounding, include: 0.080% 0.000% 0.011% 0.000% 0.000%


- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L)

- Coupling Rod, Stainless Steel

- Grounding Connector, Stainless Steel 3 Branch

- Driving Stud Dia. 3/4"

- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D)

- C clamp connector

- Concrete Pit

Size :

- 450 mm x 450 mm c/w concrete cover

- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length

4.8. Plumbing dan Perlengkapan

a. Instalasi air

1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris 0.071% 0.000% 0.025% 0.000% 0.000%
2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris 0.417% 0.000% 0.056% 0.000% 0.000%
3 Closet duduk lengkap dengan jet washer 0.254% 0.000% 0.072% 0.000% 0.000%
4 Urinoir lengkap dengan aksesories 0.121% 0.000% 0.027% 0.000% 0.000%
5 Wastafel lengkap dengan hand washer 0.049% 0.000% 0.024% 0.000% 0.000%
6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah 0.210% 0.000% 0.000% 0.000% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah


Mengetahui,
Pjs. Fuel Terminal Manager Med

Eri Wibowo
RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

7 Floor drain 0.002% 0.000% 0.001% 0.000% 0.000%


8 Penyambungan jalur PDAM sampai ke kantor 0.000% 0.000% 0.043% 0.000% 0.000%
b. Tandon Air dan Pompa

1 Tandon air kapasitas 1500 liter 0.052% 0.000% 0.004% 0.000% 0.000%
2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories 0.087% 0.000% 0.007% 0.000% 0.000%
3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm 0.105% 0.000% 0.031% 0.000% 0.000%
c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan

1 Galian tanah 0.000% 0.000% 0.040% 0.000% 0.000%


2 Beton K-225 tebal 15 cm 0.094% 0.000% 0.033% 0.000% 0.000%
3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm 0.017% 0.000% 0.058% 0.000% 0.000%
4 Ijuk, pasir, kerikil untuk penyaringan 0.018% 0.000% 0.000% 0.000% 0.000%
5 Pipa vent. Ø 1" 0.009% 0.000% 0.002% 0.000% 0.000%

TOTAL 44.256% 17.822% 13.025%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah

Mengetahui,
Pjs. Fuel Terminal Manager Med

Eri Wibowo

RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PENYELESAIAN


BOBOT THDP KONTRAK : 0.092%

PRESTASI
BOBOT PRETASI BOBOT PRETASI
NO. ITEM PEKERJAAN TOTAL
MATERIAL MATERIAL JASA JASA

1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan 0.000% 0.000% 0.031% 0.000% 0.000%
2 Pembersihan lokasi kerja 0.000% 0.000% 0.062% 0.000% 0.000%

TOTAL 0.000% 0.092% 0.000%

Fuel Terminal BBM Medan Group, 15 November 2021


Pengawas Lapangan Pelaksana Pekerjaan
Inspector RPD I Direktur

Tigor Susanto M. Agung Irvansyah

Mengetahui,
Pjs. Fuel Terminal Manager Med

Eri Wibowo

RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : #REF!


BOBOT THDP KONTRAK : #REF!

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

TOTAL #REF! #REF!

Pengawas Lapangan
Inspector RPD I ### Direktur
###

Tigor Susanto ### M. Agung Irvansyah

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PERSIAPAN


BOBOT THDP KONTRAK : 1.871%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

1 Survey, pengukuran, pembuatan shop drawing 2.301% 100.000% 2.301%

2 Direksi keet uk. 4 m x 6 m 22.091% 100.000% 22.091%

3 Pengadaan air dan listrik kerja 13.149% 75.000% 9.862%

4 Sewa scaffolding 14.464% 0.000% 0.000%

5 Mobilisasi dan demobilisasi material, peralatan dan pekerja (termasuk alat pancang) 24.984% 80.000% 19.987%

6 Sarana dan Fasilitas K3LL (Safety Man, spanduk, rambu-rambu, APD minimum sudah masuk dalam
23.011% 100.000% 23.011%

TOTAL 100.000% 77.252%

Fuel Terminal Medan Group - Belawan, 15 NovembeDiperiksa oleh, Diperiksa oleh,


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

RPD.03a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PENGURUGAN DAN PENGECORAN


BOBOT THDP KONTRAK : 30.843%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

1 Pembersihan lahan 1.302% 100.000% 1.302%

2 Tanah urug setinggi 50 cm berikut perataan dan pemadatan menggunakan alat berat 17.577% 100.000% 17.577%

3 Bekisting 0.680% 0.000% 0.000%

4 Kayu gelam Ø10 cm 1.652% 80.000% 1.322%

5 Lantai kerja tebal 5 cm 6.609% 0.000% 0.000%

6 Beton Cor Ready Mix K. 300 tebal 20 cm 48.543% 0.000% 0.000%

7 Pembesian Wiremesh M8 -150 (2 lapis) 18.906% 75.000% 14.180%

8 Besi Beton Ø8 2.701% 0.000% 0.000%

9 Pemasangan cansteen dan pengecatan 1.711% 0.000% 0.000%

10 Pengujian tekan beton dan sand cone test tanah urug di laboratorium 0.319% 0.000% 0.000%

TOTAL 100.000% 34.381%

Fuel Terminal Medan Group - Belawan, 15 NovembeDiperiksa oleh, Diperiksa oleh,


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN PAGAR


BOBOT THDP KONTRAK : 5.115%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN
1 Pembongkaran pagar seng eksisting 0.148% 100.000% 0.148%
2 Bouwplank 4.296% 100.000% 4.296%
3 Galian tanah 1.037% 100.000% 1.037%

4 Kayu gelam Ø10 cm 1.039% 100.000% 1.039%

5 Pasir urug tebal 10 cm 0.519% 100.000% 0.519%


6 Urugan kembali dan pemadatan 1.194% 100.000% 1.194%
7 Pondasi setapak beton ad. 1:2:3 uk. 100x100m, tulangan Ø 12-150 include bekisting 10.163% 100.000% 10.163%
8 Sloof 20/15 cm beton ad. 1:2:3, tulangan 4 Ø10, sengkang Ø8-150 include bekisting 4.596% 100.000% 4.596%
9 Kolom 20/20 cm beton ad. 1:2:3, tulangan 8 Ø10, sengkang Ø8-150 include bekisting 9.454% 100.000% 9.454%
10 Ring balok 15/15 cm beton ad. 1:2:3, tulangan 6 Ø10, sengkang Ø8-150 include bekisting 5.032% 100.000% 5.032%
11 Dinding 1/2 bata ad. 1 : 4 9.636% 100.000% 9.636%
12 Plesteran camp. 1 : 4 tebal 15 mm 14.545% 100.000% 14.545%
13 Pipa PVC 1/2" incl. elbow dan soket dan aksesoris 0.191% 100.000% 0.191%
14 Besi siku uk. 60.60.6 mm 0.601% 100.000% 0.601%
15 Kawat duri 6 lapis 4.555% 100.000% 4.555%
16 Pintu pagar besi uk. 5m x 2m include rel dan kunci 2.525% 0.000% 0.000%
17 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 4.509% 0.000% 0.000%
18 Mengecat besi siku dan pagar 0.215% 100.000% 0.215%
3.2. Pembuatan Parit dan Bak Kontrol
1 Galian tanah dan bongkar parit 1.456% 100.000% 1.456%
2 Pasir urug tebal 5 cm 0.572% 0.000% 0.000%
3 Pasangan 1/2 bata merah 1 PC : 2 Psr 14.317% 95.000% 13.601%
4 Plesteran camp. 1 : 2 tebal 15 mm 8.422% 95.000% 8.001%
5 Bak kontrol terbuka menggunakan bata merah 1 PC : 2 Psr 0.979% 0.000% 0.000%

TOTAL 100.000% 90.278%

Fuel Terminal Medan Group - Belawan, 15 NovembeDiperiksa oleh, Diperiksa oleh,


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

4.1 Pondasi - 32 titik ; Kedalaman 18 m

1 Pengadaan tiang pancang spun pile 500 mm (bottom) 2.092% 100.000% 2.092%

2 Pengadaan tiang pancang spun pile 500 mm (middle) 4.550% 100.000% 4.550%

3 Pengangkutan tiang pancang ketitik pancang 0.285% 100.000% 0.285%

4 Pemancangan tiang pancang 0.970% 100.000% 0.970%

5 Penyambungan tiang pancang 0.317% 100.000% 0.317%

6 Pemotongan tiang pancang 0.190% 100.000% 0.190%

7 PDA Test 0.139% 100.000% 0.139%

8 Galian tanah 0.287% 100.000% 0.287%

9 Pile Cap uk. 120 cm x 120 cm x 40 cm (pinggir)

- Bekisting 0.221% 100.000% 0.221%

- Besi Beton D16-150 0.388% 100.000% 0.388%

- Beton K-250 0.292% 100.000% 0.292%

10 Pile Cap uk. 150 cm x 150 cm x 40 cm (tengah)

- Bekisting 0.165% 100.000% 0.165%

- Besi Beton D16-150 0.345% 100.000% 0.345%

- Beton K-250 0.273% 100.000% 0.273%

Fuel Terminal Medan Group - Belawan, 15 NovembeDiperiksa oleh, Diperiksa oleh,


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

11 Pedestal uk. 50 cm x 50 cm x 70 cm

- Bekisting 0.257% 100.000% 0.257%

- Besi Beton 12-D16 0.145% 100.000% 0.145%

- Ring Besi Beton Ø10-150 mm 0.061% 100.000% 0.061%

- Beton K-250 0.142% 70.000% 0.099%

12 Sloof uk. 30 cm x 50 cm

- Bekisting 3.098% 100.000% 3.098%

- Besi Beton 12-D16 1.064% 100.000% 1.064%

- Ring Besi Beton Ø10-150 mm 0.427% 100.000% 0.427%

- Beton K-250 0.889% 100.000% 0.889%

13 Kolom uk. 50 cm x 50 cm

- Bekisting (2x pakai) 2.933% 85.000% 2.493%

- Besi Beton 12-D16 0.843% 85.000% 0.716%

- Ring Besi Beton Ø10-150 mm 0.219% 85.000% 0.186%

- Beton K-250 1.823% 50.000% 0.912%

14 Balok Tengah uk. 30 cm x 50 cm

- Bekisting 3.098% 0.000% 0.000%

- Besi Beton 12-D16 1.064% 0.000% 0.000%

- Ring Besi Beton Ø10-150 mm 0.427% 0.000% 0.000%

- Beton K-250 0.889% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 NovembeDiperiksa oleh, Diperiksa oleh,


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

15 Balok Atap uk. 30 cm x 40 cm

- Bekisting 2.622% 0.000% 0.000%

- Besi Beton 10-D16 0.886% 0.000% 0.000%

- Ring Besi Beton Ø10-150 mm 0.341% 0.000% 0.000%

- Beton K-250 0.711% 0.000% 0.000%

16 Lantai I / Ground Floor

- Urugan pasir t = 35 cm 1.202% 0.000% 0.000%

- Besi Beton Ø10 - 200 mm 0.718% 0.000% 0.000%

- Cor K-250 tebal 12 cm (termasuk teras) 1.600% 0.000% 0.000%

- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 3.041% 0.000% 0.000%

- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 0.216% 0.000% 0.000%

- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 0.102% 0.000% 0.000%

- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 0.053% 0.000% 0.000%

17 Lantai II

- Bondek tebal 0,70 mm 1.696% 0.000% 0.000%

- Besi Beton Ø10 - 200 mm 0.718% 0.000% 0.000%

- Cor K-250 tebal 12 cm 1.595% 0.000% 0.000%

- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 2.972% 0.000% 0.000%

- Plin keramik lantai uk. 60 x 10 cm spesi 1 : 4 0.440% 0.000% 0.000%

- Keramik lantai kamar mandi uk. 40 x 40 cm spesi 1 : 4 0.102% 0.000% 0.000%

- Plin keramik lantai uk. 40 x 10 cm spesi 1 : 4 0.053% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

18 Dinding Bata

- Dinding bata 1 : 4 2.508% 0.000% 0.000%

- Plesteran camp. 1 : 4 tebal 15 mm 3.113% 0.000% 0.000%

- Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup 0.915% 0.000% 0.000%

19 Tangga

- Galian tanah pondasi uk. 160 x 60 x 60 cm 0.001% 0.000% 0.000%

- Pasir urug pondasi tebal 10 cm 0.001% 0.000% 0.000%

- Lantai kerja tebal 5 cm 0.001% 0.000% 0.000%

- Bekisting 0.153% 0.000% 0.000%

- Besi Beton Ø10 - 200 mm 0.111% 0.000% 0.000%

- Beton K-250 0.275% 0.000% 0.000%

- Keramik lantai uk. 60 x 60 cm spesi 1 : 4 0.152% 0.000% 0.000%

- Handrail/railing bahan stainless steel 304 tangga dan teras 0.535% 0.000% 0.000%

4.2. Atap dan Plafon

1 Rangka atap baja ringan tebal 1,2 mm 1.682% 0.000% 0.000%

2 Atap multiroof pasir tebal 0,40 mm 2.763% 0.000% 0.000%

3 Talang air berikut rangka 0.600% 0.000% 0.000%

4 Instalasi pipa air PVC Ø 4" tipe D incl. elbow, soket dan aksesoris 0.186% 0.000% 0.000%

5 Rangka besi hollow uk. 40x40 cm tebal 0,5 mm (lantai 1 & 2) 4.265% 0.000% 0.000%

6 Plafond gypsum tebal 9 mm (lantai 1 & 2) 3.953% 0.000% 0.000%

7 List profil plafond gypsum (lantai 1 & 2) 0.141% 0.000% 0.000%

8 Mengecat 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup (lantai 1 & 2) 0.645% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

4.3. Pintu, Kusen, Jendela dan Partisi

1 Pintu dan partition depan kaca tempered 10 mm list stainless uk. 500 x 400 cm incl. handle dan aksesories 0.315% 0.000% 0.000%

2 Pintu samping kaca tempered 10 mm, 1 daun uk. 210 x 100 cm incld. handle dan kunci 0.066% 0.000% 0.000%

3 Jendela kaca 5 mm kusen alumunium uk. 400 x 330 cm 2.446% 0.000% 0.000%

4 Pintu kaca 5 mm rangka alumunium incld. handle dan kunci 0.554% 0.000% 0.000%

5 Pintu kaca UPVC kamar mandi 0.637% 0.000% 0.000%

6 Bouvenlight alumunium uk. 40x60 cm 0.135% 0.000% 0.000%

7 Partisi kaca tebal 5 mm rangka alumunium 3.488% 0.000% 0.000%

8 Cutting sticker sandblast 0.769% 0.000% 0.000%

9 Vertical blind jendela 2.676% 0.000% 0.000%

4.4. Fasad & Logo

1 Pondasi beton uk 80x80cm include tulangan 0.117% 100.000% 0.117%

2 Anchor Bolt M20 0.015% 0.000% 0.000%

3 Dyna Bolt M20 0.006% 0.000% 0.000%

4 Base Plate 300 x 300 x 12 mm thk 0.040% 0.000% 0.000%

5 Besi H 300 x 300 x 10 x15 mm @ 12 m 0.514% 0.000% 0.000%

6 Besi WF 200 x 100 x 5½ x 8 mm @ 12 m 0.117% 0.000% 0.000%

7 Aluminium Composit Panel (ACP) thicknes 4 mm coating PVDF (eksterior) include rangka hollow 3.214% 0.000% 0.000%

8 Memasang Logo dan nama Fuel Terminal Medan Group Bahan Alumunium 0.357% 0.000% 0.000%

4.5. Backdrop Lobby & R. Utama

1 Pasang kaca cermin, tebal 5 mm berikut rangka di lobby 0.049% 0.000% 0.000%

2 Backdrop uk. 120 cm x 350 cm di lobby 0.129% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

3 Backdop uk. 500 cm x 350 cm diruang FTM 0.537% 0.000% 0.000%

4 Backdop uk. 600 cm x 350 cm diruang rapat 0.645% 0.000% 0.000%

5 Memasang Logo dan nama Fuel Terminal Medan Group 0.089% 0.000% 0.000%

6 Lampu backdrop TL LED 8W incl. instalasi 0.012% 0.000% 0.000%

4.6. Elektrikal

a. Instalasi Listrik

1 Kabel NYFGBY 4 x 70 mm2 dari panel utama ke kantor baru 1.164% 0.000% 0.000%

2 Kabel NYM 3 x 2,5 mm2 untuk instalasi kantor 0.515% 0.000% 0.000%

3 Lampu TL LED 2 x 36 watt incl. Kap RM 0.524% 0.000% 0.000%

4 Lampu Downlight LED 19W incl. kap lampu dan accessories 0.093% 0.000% 0.000%

5 Saklar Ganda 0.167% 0.000% 0.000%

6 Saklar Seri+stop kontak 0.037% 0.000% 0.000%

7 Stop Kontak Dinding 0.078% 0.000% 0.000%

8 Stop Kontak Tanam 0.074% 0.000% 0.000%

9 Pipa conduit 20 mm dan aksesories 0.428% 0.000% 0.000%

10 Pipa galvanis Ø 3" termasuk aksessories 1.204% 0.000% 0.000%

11 Panel baru uk. 700 x 500 x 200 m dan aksessories berikut instalasi 0.041% 0.000% 0.000%

b. AC dan Exhaust Fan

1 Split Air Conditioner 1½PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 1.220% 0.000% 0.000%

2 Split Air Conditioner 2PK, 230V, 1 ph, 50Hz, Inverter Compressor (include accessories dan gas) 2.021% 0.000% 0.000%

3 Exhaust Fan 12 inci 0.049% 0.000% 0.000%

4 Stop kontak AC dan Fan 0.089% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

c. Lampu Penerangan Areal Kantor

1 Galian tanah pondasi dan jalur kabel 0.023% 0.000% 0.000%

2 Pasir urug 0.026% 0.000% 0.000%

3 Pemasangan bata 0.122% 0.000% 0.000%

4 Pondasi beton uk. 40 x 40 x 60 cm, beton ad. 1:2:3, tulangan Ø8-150 include bekisting 0.458% 0.000% 0.000%

5 Tiang galvanis segi delapan tinggi 7 meter; galvanized; include angkur 4 bh per tiang 0.818% 0.000% 0.000%

6 Lampu LED jenis street light 70 watt 0.485% 0.000% 0.000%

7 Kabel NYRGBY 3 x 2,5 mm2 dan aksesoris 0.238% 0.000% 0.000%

8 Pipa PVC Ø 2" termasuk aksessories 0.228% 0.000% 0.000%

d. Perangkat Access Door

1 Electric Dropbolt (Bracket include) 0.019% 0.000% 0.000%

2 Finger Print 0.357% 0.000% 0.000%

3 Power Supply Finger Print (incl adaptor) 12VDC 0.007% 0.000% 0.000%

4 Wireless Door Bell 0.014% 0.000% 0.000%

5 Push Button 0.001% 0.000% 0.000%

4.7. Lightning Protection & Grounding

1 Penangkal Petir, include: 0.361% 0.000% 0.000%

- Head Terminal R150

- Pipa Support Galvanized 2" 2 meter

- Kabel konduktor NYA 50 mm

- Kabel Grounding BC 50 mm

- Grounding rod 12 m

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

- As Grounding

- Bak kontrol dan busbar

- Accessories

2 Grounding, include: 0.147% 0.000% 0.000%

- Grounding Rod, Stainless Steel Dia. 3/4" x 3000mm (L)

- Coupling Rod, Stainless Steel

- Grounding Connector, Stainless Steel 3 Branch

- Driving Stud Dia. 3/4"

- Copper Ground Bus 380mm (W) x 38mm (H) x 5mm (D)

- C clamp connector

- Concrete Pit

Size :

- 450 mm x 450 mm c/w concrete cover

- Conduit pipe,PVC Conduit size 1" Dia., 3000 mm Length

4.8. Plumbing dan Perlengkapan

a. Instalasi air

1 Instalasi pipa air bersih PVC 3/4" tipe AW incl. elbow, soket dan aksesoris 0.155% 0.000% 0.000%

2 Instalasi pipa air kotor PVC 4" tipe D incl. elbow, soket dan aksesoris 0.763% 0.000% 0.000%

3 Closet duduk lengkap dengan jet washer 0.526% 0.000% 0.000%

4 Urinoir lengkap dengan aksesories 0.239% 0.000% 0.000%

5 Wastafel lengkap dengan hand washer 0.117% 0.000% 0.000%

6 Kitchen set uk. 2,5m x 2m incl. kitchen sink, kran, kabinet atas bawah 0.339% 0.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI


BOBOT THDP KONTRAK : 62.078%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

7 Floor drain 0.004% 0.000% 0.000%

8 Penyambungan jalur PDAM sampai ke kantor 0.069% 0.000% 0.000%

b. Tandon Air dan Pompa

1 Tandon air kapasitas 1500 liter 0.089% 0.000% 0.000%

2 Pengadaan pompa ai+radar incl. rangka baja pengaman dan accessories 0.152% 0.000% 0.000%

3 Menara Tandon air dari besi Siku 70.70.7 mm & 50.50.5 mm 0.218% 0.000% 0.000%

c. Septictank uk. 4,5 x 2,5 x 2 m dan Sumur Resapan

1 Galian tanah 0.064% 0.000% 0.000%

2 Beton K-225 tebal 15 cm 0.204% 0.000% 0.000%

3 Plesteran tebal 2 cm 1 : 3 dan acian tebal 2 mm 0.119% 0.000% 0.000%

4 Ijuk, pasir, kerikil untuk penyaringan 0.030% 0.000% 0.000%

5 Pipa vent. Ø 1" 0.017% 0.000% 0.000%

TOTAL 100.000% 20.981%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni


RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : PEKERJAAN PENYELESAIAN


BOBOT THDP KONTRAK : 0.092%

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

1 Pembuatan asbuilt drawing, dokumentasi dan pelaporan 33.333% 0.000% 0.000%

2 Pembersihan lokasi kerja 66.667% 0.000% 0.000%

TOTAL 100.000% 0.000%

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama Inspector - TS Region I OH. Terminal BBM Kijang
Direktur,

M. Agung Irvansyah Tigor Susanto Mashuril Husni

tnk 07a
RINCIAN PRETASI PEKERJAAN
PEKERJAAN : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

JENIS PEKERJAAN : #REF!


BOBOT THDP KONTRAK : #REF!

PRESTASI PRESTASI
NO. ITEM PEKERJAAN BOBOT MASING² TOTAL
PEKERJAAN

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

TOTAL #REF! #REF!

Fuel Terminal Medan Group - Belawan, 15 November 2021


PT Arta Gusti Utama ### Inspector - TS Region I OH. Terminal BBM Kijang
Direktur, ###

M. Agung Irvansyah ### Tigor Susanto Mashuril Husni

tnk 07a
LAPORAN KEMAJUAN PEKERJAAN

PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG


PEKERJAAN : BELAWAN
NOMOR KONTRAK : 3950099135 tanggal 01 Maret 2021
LAPORAN KE : 31 ( Tiga Puluh Satu )
PERIODE : 08 November 2021 - 13 November 2021
WAKTU PELAKSANAAN : 180 (Seratus delapan puluh) Hari Kalender
PERIODE MASA KONTRAK : 12 April 2021 sampai dengan 08 Oktober 2021

BOBOT PRESTASI
PRESTASI
TERHADA TOTAL TIAP
NO. PERINCIAN PEKERJAAN TERHADAP
P JENIIS
KONTRAK
KONTRAK PEKERJAAN
I PEKERJAAN PERSIAPAN 1.871% 77.252% 1.445%
II PEKERJAAN PENGURUGAN DAN PENGECORAN 30.843% 34.381% 10.604%
III PEKERJAAN PEMBANGUNAN PAGAR 5.115% 90.278% 4.618%
IV PEKERJAAN PEMBANGUNAN KANTOR 2 LANTAI 62.078% 20.981% 13.025%
V PEKERJAAN PENYELESAIAN 0.092% 0.000% 0.000%

TOTAL

DIBULATKAN 100.000% 29.692%

Medan, 08 November 2021

Pelaksana Pekerjaan Menyetujui,


PT Arta Gusti Utama Direksi Pekerjaan
Direktur,

M. Agung Irvansyah Oloan Panjaitan

RPD. 03
BERITA ACARA LAPANGAN
NO. BA - /Q21050/2021-S5

TENTANG
LAPORAN KEMAJUAN PEKERJAAN

Pada hari ini Senin tanggal Delapan bulan November tahun Dua ribu dua puluh satu, kami yang
bertandatangan di bawah ini :

1. OLOAN PANJAITAN

Dalam hal ini bertindak untuk dan atas nama PT PERTAMINA (PERSERO) yang selanjutnya disebut
PERUSAHAAN.

2. M. AGUNG IRVANSYAH

Dalam hal ini bertindak sebagai Pimpinan Pelaksana Pekerjaan dari dan selaku atas nama
PT ARTA GUSTI UTAMA untuk selanjutnya disebut PELAKSANA PEKERJAAN.

Sesuai dengan Surat Perjanjian Borongan (SPBNo. 3950099135 Tanggal 01 Maret 2021

Mengenai pekerjaan : PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL


LPG BELAWAN

Telah mengadakan pemeriksaan bersama dengan hasil bahwa pekerjaan telah dikerjakan sesuai Surat
Perjanjian Borongan tersebut di atas. Menurut penilaian bersama pelaksanaan telah mencapai 29,692 %
sesuai dengan Laporan Kemajuan Pekerjaan (RPD. 03 / RPD. 03a) sebagai lampiran yang tidak
terpisahkan.

Demikian berita acara ini ditandatangani oleh kedua belah pihak di atas materai yang cukup dan dibuat
dalam rangkap dua yang masing-masing mempunyai kekuatan hukum yang sama.

PERUSAHAAN PELAKSANA PEKERJAAN


PT PERTAMINA (PERSERO) PT.ARTA GUSTI UTAMA

Nama : OLOAN PANJAITAN Nama : 'M. AGUNG IRVANSYAH


Jabatan : Region Manager RPD I Jabatan : Direktur

RPD. 03b
BERITA ACARA
PENYERAHAN TERMIN PEKERJAAN
No. BA- …….. /F12470/2017-S5

Menunjuk dan sesuai dengan Pokok - Pokok Perjanjian (PPJ) :


Nomor : -
Tanggal : -
Mengenai Pekerjaan : -

Kami yang bertandatangan dibawah ini :

1. JUREMI
Dalam hal ini bertindak selaku Technical Services Region Manager II untuk dan atas nama
PT. PERTAMINA (PERSERO) yang selanjutnya disebut PERUSAHAAN.

2. 0

Dalam hal ini bertindak sebagai Direktur Utama pekerjaan dari dan selaku demikian untuk dan atas
nama PT. Sinar Habib Agung Putra untuk selanjutnya disebut KONTRAKTOR.

Menerangkan bahwa pada hari Selasa tanggal Enam belas bulan Mei tahun Dua ribu tujuh belas telah
mengadakan pemeriksaan dengan hasil bahwa pekerjaan telah dikerjakan sesuai dengan Pokok - Pokok
Perjanjian tersebut di atas.

Pelaksanaan telah mencapai 35,339%, sesuai dengan Berita Acara Lapangan


tanggal 15 Mei 2017 sebagai lampiran yang tidak terpisahkan dari Berita Acara ini.

Demikian Berita Acara ini dibuat menurut keadaan sebenarnya untuk dapat dipergunakan sebagaimana
mestinya.

KONTRAKTOR PERUSAHAAN

0 JUREMI

TNK. 404
RENCANA KERJA & LAPORAN HARIAN

HARI & TANGGAL


PELAKSANA PEKERJAAN PT Artha Gusti Utama
PEKERJAAN & LOKASI PEMBANGUNAN KANTOR BESERTA FASILITAS PENDUKUNG TERMINAL LPG BELAWAN

LOKASI BELAWAN
NO. PO .
NO. KONTRAK 3950099135 TGL. 01 Maret 2021
TENAGA KERJA BAHAN / MATERIAL / PERALATAN YANG MASUK PERALATAN KERJA YANG DIGUNAKAN
Jabatan Jumlah Nama & Type Spesifikasi & Ukuran Pabrik Pembuat Jumlah Nama & Type Kapasitas Jumlah
Site Manager org.
Mandor "
Kepala Tukang "
Tukang "
Pembantu Tukang "
Pekerja "

Jumlah org.
RENCANA PEKERJAAN YANG DILAKSANAKAN PEKERJAAN YANG DIHASILKAN

JAM KERJA CUACA HARI INI


Pagi
Istirahat
Siang
Lembur
PEKERJAAN TERTUNDA CATATAN PENGAWAS
Jenis Hambatan Jumlah Jam

PT Arta Gusti Utama


Direktur, Inspector - TS Region I

M. Agung Irvansyah Tigor Susanto