Qty HARGA
No Deskripsi Unit Keterangan
PMAS Upah Sub Total Upah
4 PEKERJAAN BAJA
- Pekerjaan kolom Pipa hitam dia 6 inchi SCH 40 1,017.36 kg 4,000 4,069,440
- Truss Double Siku L 60 x 65 x 6 mm 2,333.27 kg 4,000 9,333,072
Fabrication & Erection
- besi Ø16mm bracing kolom & Winfd bracing 113.76 kg 4,000 455,040
- Pekerjaan LCH 125x50x2, Gording & bracing kolom 1,229.64 kg 4,000 4,918,573
- Pekerjaan Pengecatan 137.41 m² 15,000 2,061,122 Warna pelita greeen
- Turn Buckle ∅16 8.00 pcs 10,000 80,000
- Sagrod ∅12 mm (Include Nuts, Rings) 49.75 kg 4,000 198,987
- M.S Plate 10 mm 415.42 kg 4,000 1,661,688
- M.S Plate 12 mm, Base Plate & Stifner 97.27 kg 4,000 389,084
- Bolts & Nuts ∅ 20 mm. (Supporting Truss Double Siku, Include Rings) 104.00 pcs 500 52,000 Baut baja hitam
- Bolts & Nuts ∅ 12 mm (Supporting Purlin, Include Rings) 104.00 pcs 500 52,000 Baut baja hitam
1 PEKERJAAN BAJA
- Pekerjaan kolom Pipa hitam dia 6 inchi SCH 40 1,119.10 kg
- Truss Double Siku L 60 x 65 x 6 mm 2,566.59 kg
- besi Ø16mm bracing kolom & Winfd bracing 125.14 kg
- Pekerjaan LCH 125x50x2, Gording & bracing kolom 1,352.61 kg
- Pekerjaan Pengecatan 151.15 m²
- Turn Buckle ∅16 8.00 pcs
- Sagrod ∅12 mm (Include Nuts, Rings) 54.72 kg
- M.S Plate 10 mm 456.96 kg
- M.S Plate 12 mm, Base Plate & Stifner 107.00 kg
- Bolts & Nuts ∅ 20 mm. (Supporting Truss Double Siku, Include Rings) 104.00 pcs
- Bolts & Nuts ∅ 12 mm (Supporting Purlin, Include Rings) 104.00 pcs
3 PEKERJAAN FINISHING
- Finishing & kebersihan lokasi kerja 1.00 lot
Total Upah
HARGA
Keterangan
Upah Sub Total Upah
4,100 4,588,294
4,100 10,523,039
Fabrication & Erection
4,100 513,058
4,100 5,545,691
15,000 2,267,234 Warna pelita greeen
10,000 80,000
4,100 224,357
4,100 1,873,553
4,100 438,692
500 52,000 Baut baja hitam
500 52,000 Baut baja hitam
1,023,357 1,023,357
35,000,000
35,000,000
-
BILL OF QUANTITY
Pekerjaan : Atap Jembatan Timbang
Lokasi : PT. Mustika Sembuluh 1
4 PEKERJAAN BAJA
- Column, WF 250 x 125 x 6 x 9 1,678.91 kg 4,000 6,715,648
- Rafter, WF 250 x 125 x 6 x 9 1,231.36 kg 4,000 4,925,440
- Over Hang, WF 200 x 100 x 5.5 x 8 238.56 Kg 4,000 954,240 Fabrication & Erection
- Tie Beam, WF 200 x 100 x 5.5 x 8 766.80 Kg 4,000 3,067,200
- Purlin, LCH 125 x 50 x 20 x 2.3 1,685.60 kg 4,000 6,742,400
- Pekerjaan Pengecatan 168.04 M2 15,000 2,520,554 Zinchromate + cat finish warna pelita green
- MS Plate 6mm, dudukan gording 117.60 kg 4,000 470,400
- Trackstank Round bar ∅16 mm 151.68 kg 4,000 606,720
- Turnbuckle ∅16mm 12.00 pcs 10,000 120,000
- Sagrod ∅12 mm (Include Nuts, Rings) 74.62 kg 4,000 298,480
- Base Plate 12 mm 37.98 kg 4,000 151,926
- Stifner MS Plate 12 mm 16.56 kg 4,000 66,241
- Bolts & Nuts ∅ 12 mm (Include Ring Plat) dudukan gording 224.00 Pcs 500 112,000
Baut + ring + mur baja hitam
- Bolts & Nuts ∅ 19 mm (Include Ring Plat) struktur 100.00 pcs 500 50,000
5 PEKERJAAN ATAP
- Atap Bluescope 0.45mm TCT, Hijau Pabrik 289.80 m2 15,000 4,347,000 Type Spandek II
- Nok Bluescope 0.45mm TCT, 40 cm. Hijau Pabrik 21.00 m 15,000 315,000
6 PEKERJAAN TAlANG AIR
- Pekerjaan pemasangan talang air, MS Plate (tebal 3mm) 21M 484.66 Kg 5,000 2,423,295
- Pekerjaan penggantung talang air, siku 50x40x4 22.08 kg 4,000 88,320
- Pekerjaan saluran air pipa 4 inch dan accesories 24.00 m 30,000 720,000
- Pekerjaan elbow 4 inch dan accesories 8.00 pcs 10,000 80,000
- Pekerjaan corong 4 inch dan accesories 4.00 pcs 10,000 40,000
1 PEKERJAAN BAJA
- Column, WF 250 x 125 x 6 x 9 1,846.80 kg
- Rafter, WF 250 x 125 x 6 x 9 1,354.50 kg
- Over Hang, WF 200 x 100 x 5.5 x 8 262.42 Kg
- Tie Beam, WF 200 x 100 x 5.5 x 8 843.48 Kg
- Purlin, LCH 125 x 50 x 20 x 2.3 1,854.16 kg
- Pekerjaan Pengecatan 184.84 M2
- MS Plate 6mm, dudukan gording 129.36 kg
- Trackstank Round bar ∅16 mm 166.85 kg
- Turnbuckle ∅16mm 12.00 pcs
- Sagrod ∅12 mm (Include Nuts, Rings) 82.08 kg
- Base Plate 12 mm 41.78 kg
- Stifner MS Plate 12 mm 18.22 kg
- Bolts & Nuts ∅ 12 mm (Include Ring Plat) dudukan gording 224.00 Pcs
- Bolts & Nuts ∅ 19 mm (Include Ring Plat) struktur 100.00 pcs
2 PEKERJAAN ATAP
- Atap Bluescope 0.45mm TCT, Hijau Pabrik 318.78 m2
- Nok Bluescope 0.45mm TCT, 40 cm. Hijau Pabrik 21.00 m
Total Upah
HARGA
Keterangan
Upah Sub Total Upah
4,100 7,571,893
4,100 5,553,434
4,100 1,075,906 Fabrication & Erection
4,100 3,458,268
4,100 7,602,056
15,000 2,772,610 Zinchromate + cat finish warna pelita green
4,100 530,376
4,100 684,077
10,000 120,000
4,100 336,536
4,100 171,296
4,100 74,687
500 112,000
Baut + ring + mur baja hitam
500 50,000
5,000 2,665,625
4,100 99,581
30,000 720,000
10,000 80,000
10,000 40,000
1,184,956 1,184,956
40,000,000
40,000,000
-
4,000 6,715,648
4,000 4,925,440
4,000 954,240
4,000 3,067,200
4,000 6,742,400
4,000 470,400
4,000 606,720
4,000 298,480
4,000 151,926
4,000 66,241
15,000 4,347,000
-
-
4,000 1,938,636
4,000 88,320
-
-
-
30,372,651