BILL of QUANTITY
i PEKERJAAN PERSIAPAN
1 Pemeriksaaan kesehatan / Medical Checkup 12.00 org 750,000.00 9,000,000.00
2 Tes PCR Swap 12.00 org 450,000.00 5,400,000.00
Mobilisasi Material, alat & tenaga kerja dari lokasi Proyek di Camp KM 21 FSP ke
3 1.00 ls 21,825,000.00 21,825,000.00
Camp KM 73 BT
4 Bauwplank , pengukuran & APD 1.00 ls 11,068,200.00 11,068,200.00
Pengadaan kelengkapan kendaraan sesuai standar PT.IP ( Lampu Rotary, Radio Mobil
5 1.00 ls 10,000,000.00 10,000,000.00
Merk Icom type F6123D, APAR ).
6 Biaya konsumsi ( Makan & minum ) selama proyek berlangsung ; Selama 75 hari kerja 1.00 ls 67,500,000.00 67,500,000.00
v PEKERJAAN ATAP
1 Rangka Baja Ringan , ex-Taso/Mega Truss/Ibi Truss 75/0.75" ; reng Taso 32/45 620.00 m2 270,600.00 167,772,000.00
2 Atap Seng Soka ex-Garuda sakti; merah/biru/silver/hijau ; 180x75 cm t= 0.25mm 477.63 lbr 129,030.00 61,628,551.11
3 Lisplang - Kalsiplank 200 mm, t = 9 mm 108.00 m' 30,750.00 3,321,000.00
4 Bubungan ex-Soka "merah maroon" 71.00 m' 67,000.00 4,757,000.00
vi PEKERJAAN PENGECATAN
1 Cat Dinding & Eternit ; ex-Nippon Paint -Vinilex super white 545.00 kg 67,000.00 36,515,000.00
2 Sealer / Base Coat ; vinilex 5180 ; per 25kg/can 150.00 kg 50,592.00 7,588,800.00
3 Pengecatan kusen & daun jendela ; ex-wood stain Mowilex 503 36.00 kg 117,800.00 4,240,800.00
4 Roll Brush 6" ; eterna /SNI 6.00 pcs 62,000.00 372,000.00
5 Kuas 4" SNI 5.00 pcs 25,000.00 125,000.00
6 Kuas 3" SNI 4.00 pcs 18,500.00 74,000.00
ix PEKERJAAN M & E
1 TL Lamp 1 x 8 watt "ex-Philips T8/8W PUTIH" 58.00 unit 97,500.00 5,655,000.00
2 Exchaust fan 10 " ; ex-MASPION MV16 EX / PANASONIC FV 25 RUN 20.00 unit 598,000.00 11,960,000.00
3 Panel Box Sekring/MCB 60x40x15 cm ; ex-MASKO 1.00 unit 1,000,000.00 1,000,000.00
4 AC Split 1 PK ; ex-DAIKIN / SHARP AH-A9Ucy Turbo cool Series 20.00 unit 4,946,360.00 98,927,200.00
5 Waterheather 30 ltr "ARISTON DOVE PLUS 30SH" 20.00 unit 2,457,000.00 49,140,000.00
6 Stop Kontak Waterheather+box "MK" ; EX-CLIPSAL/BROCO/SCHEINEDER 20.00 pcs 83,200.00 1,664,000.00
7 Stop Kontak+box "MK" ; EX-CLIPSAL/BROCO/SCHEINEDER 22.00 pcs 41,600.00 915,200.00
8 Saklar double +box "MK" ; EX-CLIPSAL/BROCO/SCHEINEDER 20.00 pcs 46,800.00 936,000.00
9 Kabel "NYY" 3 x4 mm2-100M ; cover hitam ; ex-ETERNA /KABEL METAL 3.00 roll 1,488,000.00 4,464,000.00
10 Kabel "NYY" 3 x 2.5 mm2-100M ; ex-ETERNA/SUPREME/KABEL METAL 12.00 roll 1,820,000.00 21,840,000.00
11 Housing MCB 2 group ; ex-MASKO 20.00 unit 52,000.00 1,040,000.00