Anda di halaman 1dari 6

PT.

SERIBU KUNCI NUSANTARA


CHECKLIST PROGRESS
Project Start Date Status Week 1 Week 2 We
Project 5-10/Juni/2023 12-17/Juni 2023 19-24/J
Detailing dan PPF 5 6 7 8 9 10 12 13 14 15 16 17 19
NO TASK LEAD DONE M T W T F S M T W T F S M
1 Madza 3 Hatchback 2023
1 Cuci Body
2 Poles
3 Body Kanan (Depan)
4 Body Kanan (Belakang)
5 Body Kiri (Belakang)
6 Body Kiri (Depan)
7 Kap Depan
8 Atas Mobil
9 Bember Belakang
10 Bember Depan
Xpander Mitsubishi
1 Pencucian Body DONE
2 Poles Body DONE
3 Cuci Kolongan DONE
4 Ban & Velg DONE
5 Glass Polis Kaca DONE
6 Vakum Interior DONE
7 Bersihin Interior DONE
8 Bersihin Sisa Lem DONE
9 Bersihin Emblem DONE
BMW X7 X-Drive 40i
1 Penerimaan Unit dan DONE
Aksesoris
Fitting Foot step Electrik DONE
2 (tidak cocok)

Mercedes-Benz AG Gle
1 Clay Body
2 Kaca FAUZI ON P
3 Interior
4 Bersihin Velg FABIAN DONE
5 Bersihin Kolongan FABIAN DONE
6 Bumper Belakangan (PPFINDRA DONE
7 Bagasi (PPF) INDRA DONE
8 Pintu Kanan Depan (PPF)
9 Pintu Kiri Depan(PPF)
10 Pemasangan Emblem
11 Cuci Body
12 Poles Detail

KETERANGAN :
HIJAU = SELESAI
KUNING = BLOK PENGERJAAN
MERAH = BELUM
Week 3 Week 4
19-24/Juni/2023 26-30/Juni/2023
20 21 22 23 24 26 27 28 29 30 31
T W T F S M T W T F S
Keterangan: Sudah = Hijau Belum = Merah Blocking = Orange
Libur = Biru