Anda di halaman 1dari 15

No Pekerjaan Painter Per hari Unit

1 Painting Plafon 1 50 m2
2 Painting Dinding 1 50 m2
Jumlah pekerja 0

1-Jun-23
No Aktifitas Sibayak-6 Vol

Unit
A Persiapan
1 Isolasi Kelistrikan & Penyediaan source listrik temporary
B Pekerjaan dalam bangunan
1 DAPUR
2 Perbaikan atap bocor
3 Dapur kotor Spot
4 Dapur bersih Spot
5 Penggantian Lish Plafon
6 Dapur kotor 3.68 M2
7 Dapur bersih 3.68 M2
8 Penggantian Handle dan Pintu
9 Dapur kotor 1 Pcs
10 Penggantian Kran
11 Dapur kotor 1 Pcs
12 Service Kitchen Set
13 Dapur kotor 1 Spot
14 Dapur bersih 1 Spot
15 TOILET UTAMA
16 Penggantian Cover Set Closet 4 Set
17 Penggantian Exhaust Fan 1 Pcs
18 Service Kabinet 1 Pcs
19 Pemasangan Cermin 2 Pcs
20 CLOSET
21 Service Walk in Closet 1 Spot
22 Service Kabinet 2 Pcs
23 RUANG KELUARGA
24 Service Lemari 1 Pcs
25 RUANG TIDUR UTAMA-1
26 Service Lemari 1 Pcs
27 RUANG TIDUR -2
28 Service Lemari 1 Pcs
29 RUANG TIDUR -3
30 Service Lemari 1 Pcs
31 PENGECATAN
32 Plafon & Dinding 622.13 M2
33 Jendela, teralis & Pintu 117 M2
34 PENGGANTIAN LAMPU TL 3 Pcs
35 PENGGANTIAN LAMPU Bohlam 6 Pcs
36 PENGGANTIAN LAMPU Kipas 10 Pcs
37 PENGGANTIAN SMOKE DETECTOR 10 Pcs
C Pekerjaan Luar bangunan
1 Install Scaffolding
2 Perbaikan piri-piri plafon plus rangka 56.02 Meter
3 Penggantian Listplank GRC 8.64 Meter
4 Perbaikan Walkway Teras 58 Meter
5 Service & perapihan parit 11.2 Meter
6 Pembongkaran talang air existing 7 Meter
7 Penggantian kawat nyamuk 11.6 Meter
8 Service / Penggantian atap bocor TBA Spot
9 Pemasangan Kran baru 3 Pcs
10 Pengecatan bagian luar rumah (dinding, plafon, listplank, etc) 186 M2
11 PENGGANTIAN LAMPU Bohlam 8 Pcs
12 Pembongkaran Scaffolding

List Pekerja Scaffolder 1


Carpenter 2
Interior 2
Interior (Alumunium) 1
6
J
6
2-Jun-23

0.50
0.50
1
1
1
S
3-Jun-23 0
0

4-Jun-23 M
S
6

5-Jun-23

1
1
1
1
1
1
6

Sl

6-Jun-23

0.50
0.50
0.50
0.50

1
1
1
1
6

7-Jun-23

1
2
2
1
6

8-Jun-23

1
2
J
6

9-Jun-23

1
2
S
0

10-Jun-23
0

11-Jun-23
S
6

12-Jun-23

0.50
0.50
0.50
2
6

Sl

13-Jun-23
6

14-Jun-23
5

15-Jun-23
J
0

16-Jun-23
S
0

17-Jun-23
0

18-Jun-23
S
0

19-Jun-23
0

Sl

20-Jun-23
0

21-Jun-23
0

22-Jun-23
J
0

23-Jun-23
S
0

24-Jun-23
0

25-Jun-23
S
0

26-Jun-23
0.50

2
2 2 2
2
2 2
1
1
1
2
0.50
2 2
0.50 1
2
0

Sl
27-Jun-23
0

R
28-Jun-23 0

29-Jun-23 K
J
0

30-Jun-23
S
0

1-Jul-23
0

2-Jul-23
S
0

3-Jul-23
0

Sl

4-Jul-23
Jumlah pekerja 0

1-Jun-23
No Aktifitas Sibayak-7 Vol
Unit
A Persiapan
1 Isolasi Kelistrikan & Penyediaan source listrik temporary
B Pekerjaan dalam bangunan
1 Porch Room
2 Pembongkaran dinding / partisi 1 Spot
3 Perbaikan dinding di ruang port 2.52 M2
4 Service Pintu & Jendela Alumunium 2 Pcs
5 Ruang Tidur Utama - 1
6 Service Kabinet 1 Unit
7 Toilet Ruang Tidur Utama
8 Pemasangan Exhaust baru 1 Unit
9 Walk-in Closet
10 Service Lemari 2 Unit
11 Toilet
12 Pemasangan Exhaust baru 1 Unit
13 Ruang Tidur - 2
14 Service Kabinet 1 Unit
15 Penggantian List Profil Kusen 5 Meter
16 Ruang Tidur - 3
17 Penggantian List Profil Kusen 1 Spot
18 Service Kabinet 1 Unit
19 Ruang Tidur - 4
20 Hanya pengecatan
21 Ruang Keluarga
22 Penggantian Pintu 1 Pcs
23 Dapur Bersih
24 Service Kabinet 1 Unit
25 Dapur Kotor
26 Hanya pengecatan
27 Gudang
28 Service Lemari 1 Unit
29 Toilet Belakang
30 Hanya pengecatan
31 PENGECATAN
32 Plafon & Dinding 700 M2
33 Jendela, teralis & Pintu 107 M2
34 PENGGANTIAN LAMPU TL 3 Spot
35 PENGGANTIAN LAMPU Bohlam 6 Spot
36 PENGGANTIAN LAMPU Kipas 10 Spot
37 PENGGANTIAN SMOKE DETECTOR 10 Spot
C Pekerjaan Luar bangunan
1 Pemasangan Scaffolding
2 Pembongkaran Down Spot & talang air 70 Meter
3 Pemasangan talang air baru 70 Meter
4 Pemasangan Listplank GRC 24 Meter
5 Pembongkaran Plafon Existing 6.57 M2
6 Pemasangan Plafon baru 6.57 M2
7 Penggantian panel dinding 8.64 M2
8 Pembongkaran dinding 3.41 M2
9 Service & perapihan parit ( lebar 40 cm) 5.1 Meter
10 Pemasangan Kran tambahan 3 Pcs
11 Pengecatan bagian luar rumah (dinding, plafon, listplank, etc) 257 M2
12 PENGGANTIAN LAMPU Bohlam 8 Spot
13 Pembongkaran Scaffolding
14

List Pekerja Scaffolder 1


Carpenter 2
Interior 2
Interior (Alumunium) 1
6
J

2
6
2-Jun-23

S
3-Jun-23 0
0

4-Jun-23 M
S

2
2
6

5-Jun-23
6

Sl

6-Jun-23

2
2
6

7-Jun-23

2
1
2
6

8-Jun-23

2
1
1
2
J

1
2
6

9-Jun-23

1
S
0

10-Jun-23
0

11-Jun-23
S

1
2
6

12-Jun-23

1
2
6

Sl

13-Jun-23

1
1
6

14-Jun-23

0.50
0.50
6

15-Jun-23
J
6

16-Jun-23
S
0

17-Jun-23
0

18-Jun-23
S
0

19-Jun-23
0

Sl

20-Jun-23
0

21-Jun-23
0

22-Jun-23
J
0

23-Jun-23
S
0

24-Jun-23
0

25-Jun-23
S
0

26-Jun-23
1

2
2 2
2 1
2 2 1
0.50
0.50
0.50
1.50
2
1
1 1 2
1
1 1 1
0

Sl
27-Jun-23
0

R
28-Jun-23 0

29-Jun-23 K
J
0

30-Jun-23
S
0

1-Jul-23
0

2-Jul-23
S
0

3-Jul-23
0

Sl

4-Jul-23
Crew Sibayak 6 NAMA STATUS
Pmcow ZULHARMAINI READY TO USE
Scaffolder KAERUL ONA READY TO USE
Carpenter ALI MUTOFA READY TO USE
Carpenter SUWARJO READY TO USE
Interior NGATIMIN READY TO USE
Interior KUSWANTO READY TO USE
Interior (Alumunium) KUS YONO READY TO USE

Crew Sibayak 7 NAMA STATUS


Pmcow SUPARDI READY TO USE
Scaffolder CHOIRIL ANAM READY TO USE
Carpenter AMIN ROIS READY TO USE
Carpenter MASHURI READY TO USE
Interior SAHLAN READY TO USE
Interior MUSBAKIN READY TO USE
Interior (Alumunium) MASHURI READY TO USE
TIME SCHEDULE
PEKERJAAN : RENOVASI RUMAH DINAS

LOKASI PEKERJAAN : DURI

NAMA UNIT : SIBAYAK 06

TYPE JADWAL PELAKSANAAN PEKERJAAN


NO ITEM PEKERJAAN BOBOT (%) BULAN JUNI KET
CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
a b c h PROGRES PEKERJAAN
1 C 6.2.2 Cat emulsion interior : Jotun / ICI Pentiliteatau Pearl Glo / Propan 28.92 7.23 7.23 7.23 7.23 100%

2 C 6.2.1 Cat emulsion exterior : Jotun / ICI Wheatershield / Propan 12.44 6.22 6.22

3 C 6.1.1 Pengecatan walkway dan selasar menggunakan Technokote atau yang setara 2.04 2.04

4 C 6.3.2 Cat minyak Jotun, Nippon Paint, Propan 14.64 4.88 4.88 4.88

5 C 1.1.8 Atap Metal Roof, tebal min. 0.4mm, (Tara, Multiroof, Gerard, Sugi) 3.17 3.17
Plafon gypsum 9mm perforated, Jayaboard,
6 C 1.3.5 1.33 1.33
Knauf atau setara
7 C 1.3.13 Lis gypsum 3" x 1 " Model Floor type 0.13 0.13
75%
8 C 5.1.1.2 Yale lock, type knop/ tekan 2.53 2.53

9 C 7.2.2 Bingkai kayu decorative 0.02 0.02


Top kitchen kabinet dengan frosporming
10 C 7.1.2 1.19 1.19
HPL/Duropal
11 C 3.1.4 Exhaust Fan Ceiling mounted <8" 0.45 0.45

12 C 1.4.10 GRC 9 mm X 30 cm 0.63 0.63

13 C 6.1.1 Pengecatan walkway dan selasar menggunakan Technokote atau yang setara 2.04 2.04

14 C 8.3.1 Perancah 5.51 1.38 1.38 1.38 1.38


50%
15 C 7.3.4 Handle Stainlless " Hubben " 0.40 0.40

16 C 8.1.1 Carpentry services 0.27 0.27

17 C 2.2.1 Pasang 1/2 Bata 1:2 1.42 1.42

18 C2.2.3 Pekerjaan plesteran campuran 1:4 0.65 0.65

19 C 2.2.5 Acian semen mortar 0.44 0.44

20 C 5.4.5.1 Kawat nyamuk aluminium lebar 90 - 120 cm 1.32 1.32

21 C 7.1.3 Top kitchen kabinet dengan frosporming HPL Pelangi 15.49 7.75 7.75
25%
22 P 2.2.13 Hand Shower, Toto THX19N atau setara 0.26 0.26

23 P 2.2.5 Wall Faucet, Toto T23 - B13 atau setara 0.28 0.28

24 P 2.1.2 Cover & Seat, Toto atau setara compatible with existing Closet 0.40 0.40

25 P 5.3.5 Door W. Lock ( SES-LOCK) 0.71 0.71

26 E 2.1.2 Bulb LED E27, >=10W; <15W 0.29 0.29

27 E 2.1.3 TL LED, > 7W 0.04 0.04

28 E 3.3.1 Smoke detector, Hochiki atau setara 2.97 2.97 0%

GRAND TOTAL 100.00

4.55 16.92 22.67 17.57 12.78 10.03 15.48


WORK PLAN
4.55 21.47 44.14 61.71 74.49 84.52 100.00