REKAPITULASI TENAGA KERJA PADAT KARYA BPJN KALTENG T.

A 2021

Tanggal 05-03-21 15:17


TENAGA KERJA KEGIATAN PADAT KARYA
BALAI / SATKER / PPK TOTAL TENAGA KERJA
REV. DRAINASE RUTIN JEMBATAN

BPJN KALTENG 1320 147 1467


SATKER PJN WIL I KALTENG 541 55 596
PPK 1.1 Prov. Kalteng 78 78
PPK 1.2 Prov. Kalteng 125 10 135
PPK 1.3 Prov. Kalteng 148 5 153
PPK 1.4 Prov. Kalteng 190 40 230

SATKER PJN WIL II KALTENG 384 10 394


PPK 2.1 Prov. Kalteng 162 0 162
PPK 2.2 Prov. Kalteng 80 10 90
PPK 2.5 Prov. Kalteng 82 0 82
PPK 2.6 Prov. Kalteng 60 0 60

SATKER PJN WIL III KALTENG 395 82 477


PPK 3.1 Prov. Kalteng 116 116
PPK 3.2 Prov. Kalteng 71 24 95
PPK 3.3 Prov. Kalteng 65 16 81
PPK 3.4 Prov. Kalteng 48 22 70
PPK 3.5 Prov. Kalteng 95 20 115

SATKER SKPD TP-01 0 0 0


PPK TP.01 0 0 0