Anda di halaman 1dari 1

PT PLN (PERSERO)

UID Banten

FORM PEMESANAN (RESERVATION SLIP)


NOMOR: 0016951079
COST CENTER:
PLANT: 5613 PLN UP3 Cikupa ORDER NO (HAR):
MOV. TYPE: 221 GI for project WBS ELEMENT (PDP): I.5613.22.09.0009.005.11
ASSET NO/SUBNUMBER (CADANG): -/-
BUSINESS AREA: 5613 UP3 Cikupa

PEKERJAAN & LOKASI NOMOR SPK


AI.0029.SPK/23-PKT1 MUHAYAR / PT. NILAM CIPTA 0029.SPK/DAN.01.02/2023

No No Material Nama Material Jumlah Satuan Tanggal Gudang


0001 0001030077 TRF 1 U 14.07.2023 2020
DIS;D3;20kV/400V;3P;250kVA;DYN5;O Gd UP3 Cikupa
D
0002 0003260226 LVSB;DIST;3P;400V;630A;4LINE;OD 1 SET 14.07.2023 2020
Gd UP3 Cikupa
0003 0003110015 CABLE 446 M 14.07.2023 2020
PWR;NA2XSEYBY;3X240mm2;20kV;UG Gd UP3 Cikupa
0004 0003050084 CONDUCTOR;AAAC-S;150mm2; 30 M 14.07.2023 2020
Gd UP3 Cikupa
0005 0003110517 CABLE 56 M 14.07.2023 2020
PWR;NYY;1X240mm2;0.6/1kV;Opstig Gd UP3 Cikupa
0006 0002090032 LA;20-24kV;K;10kA;POLYMER;; 3 BH 14.07.2023 2020
Gd UP3 Cikupa
0007 0003190019 CUT OUT;24KV;100A;;POLYMER 3 BH 14.07.2023 2020
Gd UP3 Cikupa
0008 0003070151 ISOLATOR;PINPOST;PORC;24KV;;12.5k 6 BH 14.07.2023 2020
N Gd UP3 Cikupa
0009 0003280129 CONN;20KV;LLC;AL;70-150mm2; BOLT 3 BH 14.07.2023 2020
Gd UP3 Cikupa
0010 0003280154 CONN;20kV;H;AL;70-150/120- 3 BH 14.07.2023 2020
240mm2;PRS; Gd UP3 Cikupa
0011 0003060167 COND ACC;PREFORMED TIE 150mm2 6 BH 14.07.2023 2020
Gd UP3 Cikupa
0012 0003120007 CABLE PWR ACC;CABLE SHOE AL 6 BH 14.07.2023 2020
150mm2 Gd UP3 Cikupa
0013 0003260238 LVSB;DIST;3P;400V;400A;4LINE;OD 1 SET 04.08.2023 2020
Gd UP3 Cikupa

Tanggal :
Peminta Pemeriksa

Tanda tangan:

Nama: ( R IQBAL. ) ( DIMAS WAHYU )

Hlm 1 dari 1

Anda mungkin juga menyukai