Anda di halaman 1dari 2

Periode : 13-10-2023 s/d 11-01-2024

Kartu Stok Gudang :

Barang :
GDB

STALL0005
TANGGAL NO. BUKTI KETERANGAN MASUK KELUAR SISA HARGA SAT HARGA RATA @ NILAI

STALL0005 [STALL 40 X 40MM 2,3MMX6MTR]


HARGA RATA-RATA : 0.00
13-10-2023 Saldo Awal Saldo Awal 0.00 0.00 18.00 219,819.82 219,819.82 3,956,756.76
13-10-2023 OB23100035 057-QP/K/SK/IV23-ADD-01-PEMBANGUNAN 0.00 18.00 0.00 166,160.59 219,819.82 0.00
KONTRUKSI LED FAMILY MART - MG-JP-052 - UK
23X10 - NO SPK : 0155/W-JKT/SKP/A/V/23
14-10-2023 TB23100054 122-QP/K/SK/VIII/23 - RAB INTI - 35.00 0.00 35.00 219,819.82 219,819.82 7,693,693.70
PEMBANGUNAN KONTRUKSI LED & BB LOKASI
BLORA 38 - UK 22X10 & 12X10 - NO SPK :
0154/W-JKT/SKP/A/V/23
19-10-2023 TB23100060 122-QP/K/SK/VIII/23, RAB TAMBAHAN 1, 17.00 0.00 52.00 207,207.21 215,696.47 11,216,216.27
PEMBANGUNAN KONSTRUKSI LED DAN BB
LOKASI BLORA 38
19-10-2023 OB23100065 122-QP/K/SK/VIII/23 - RAB INTI - 0.00 35.00 17.00 166,160.59 215,696.47 3,666,839.93
PEMBANGUNAN KONTRUKSI LED & BB LOKASI
BLORA 38 - UK 22X10 & 12X10 - NO SPK :
0154/W-JKT/SKP/A/V/23
25-10-2023 OB23100081 137-QP/K/SK/X/23 - RAB INTI- PEMBANGUNAN 0.00 2.00 15.00 166,160.59 215,696.47 3,235,447.00
KONTRUKSI LED POS POLISI BLORA UK 5X4 M/H
NO SPK : 0322/W-JKT/SKP/A/X/23 - TEAM LAS
27-10-2023 TB23100071 122-QP/K/SK/VIII/23 - RAB INTI - 45.00 0.00 60.00 207,207.21 209,329.52 12,559,771.45
PEMBANGUNAN KONTRUKSI LED & BB LOKASI
BLORA 38 - UK 22X10 & 12X10 - NO SPK :
0154/W-JKT/SKP/A/V/23
29-10-2023 OB23100083 122-QP/K/SK/VIII/23 - RAB TAMBAHAN II - 0.00 40.00 20.00 166,160.59 209,329.52 4,186,590.48
PEMBANGUNAN KONTRUKSI LED & BB LOKASI
BLORA 38 - UK 22X10 & 12X10 - NO SPK :
0154/W-JKT/SKP/A/V/23 -SUBKON HADI
03-11-2023 TB23110007 QP/K/SK/X23 - RAB TAMBAHAN VIII- 45.00 0.00 65.00 207,207.21 207,860.23 13,510,914.93
PEMBANGUNAN KONTRUKSI ABDUL MUIS - PM-
JKT017 NO SPK:0005/AMN-JKT/SKP/A/IV/19
03-11-2023 TB23110006 137-QP/K/SK/X/23 - RAB INTI- PEMBANGUNAN 2.00 0.00 67.00 207,207.21 207,840.74 13,925,329.35
KONTRUKSI LED POS POLISI BLORA UK 5X4 M/H
NO SPK : 0322/W-JKT/SKP/A/X/23
11-11-2023 OB23110027 QP/K/SK/X23 - RAB TAMBAHAN VIII- 0.00 45.00 22.00 166,160.59 207,840.74 4,572,496.21
PEMBANGUNAN KONTRUKSI ABDUL MUIS - PM-
JKT017 NO SPK:0005/AMN-JKT/SKP/A/IV/19
20-11-2023 OB23110050 TEAM LAS - RESIZE KONSTRUKSI LOKASI ABDUL 0.00 1.00 21.00 166,160.59 207,840.74 4,364,655.47
MUIS ABDUL MUIS
21-11-2023 OB23110054 TEAM LAS - FABRIKASI RANGKA STAGE U/ EVENT 0.00 1.00 20.00 166,160.59 207,840.74 4,156,814.73
CFD LOKASI BLORA 10
27-11-2023 OB23110062 TEAM GABUNGAN - EVENT LED LOKASI POLRES 0.00 1.00 19.00 166,160.59 207,840.74 3,948,974.00
TANGERANG KOTA UK 3X5 M/H
05-12-2023 TB23120009 138-QP/K/SK/X/23 - RAB TAMBAHAN I - 2.00 0.00 21.00 198,198.20 206,922.40 4,345,370.40
PEMBANGUNAN KONTRUKSI LED ASIA AFRIKA
(KAV 3-5)- KODE LOKASI : MG-JP-034/09 A- NO
SPK : 0326/W-JKT/SKP/A/X/23
07-12-2023 OB23120012 158-QP/K/SK/XII/23 - RAB INTI - RESIZE LED 0.00 15.00 6.00 166,160.59 206,922.40 1,241,534.40
PLUIT ELANG BONDOL UK 6X12 M/H NO SPK :
0366/W-JKT/SKP/A/XI/23 - SUBKON HARNO
15-12-2023 TB23120043 158-QP/K/SK/XII/23 - RAB INTI - RESIZE LED 15.00 0.00 21.00 198,198.20 200,690.83 4,214,507.40
PLUIT ELANG BONDOL UK 6X12 M/H NO SPK :
0366/W-JKT/SKP/A/XI/23
15-12-2023 TB23120042 122-QP/K/SK/VIII/23 - RAB TAMBAHAN 4 - 8.00 0.00 29.00 198,198.20 200,003.21 5,800,093.00
PEMBANGUNAN KONTRUKSI LED DAN BB BLORA
38 22X10 DAN 12X10 NO SPK :
0154/W-JKT/SKP/A/V/23
15-12-2023 TB23120041 156-QP/K/SK/XII/23 - RESIZE LED KAMALA 15.00 0.00 44.00 198,198.20 199,387.86 8,773,066.00
DADAP UK 6X12 /H NO SPK :
0380/W-JKT/SKP/A/XII/23
11 January 2024 16:46 Page 1 of 2

TANGGAL NO. BUKTI KETERANGAN MASUK KELUAR SISA HARGA SAT HARGA RATA @ NILAI
15-12-2023 TB23120058 160-QP/K/SK/XII/23 - RAB INTI - PEMBANGUNAN 24.00 0.00 68.00 198,198.20 198,967.98 13,529,822.80
KONTRUKSI LED JL.BOULEVARD RAYA (DEKAT
PATUNG KUDA GADING PANDAWA) UK 5X10
M/V NO SPK : 0225/W-JKT/SKP/A/VI/23
16-12-2023 OB23120037 156-QP/K/SK/XII/23 - RESIZE LED KAMALA 0.00 15.00 53.00 166,160.59 198,967.98 10,545,303.06
DADAP UK 6X12 /H NO SPK :
0380/W-JKT/SKP/A/XII/23
18-12-2023 OB23120040 TEAM LAS - REVISI RANGKA MODUL LOKASI 0.00 1.00 52.00 166,160.59 198,967.98 10,346,335.08
RUKO SAMUI
19-12-2023 OB23120041 138-QP/K/SK/X/23 - RAB TAMBAHAN I - 0.00 2.00 50.00 166,160.59 198,967.98 9,948,399.12
PEMBANGUNAN KONTRUKSI LED ASIA AFRIKA
(KAV 3-5)- KODE LOKASI : MG-JP-034/09 A- NO
SPK : 0326/W-JKT/SKP/A/X/23 - SUBKON HADI
20-12-2023 TB23120070 042-QP/K/SK/VI/22 - RAB INTI - PEMBANGUNAN 22.00 0.00 72.00 260,000.00 217,616.65 15,668,399.12
LED JL.BAWARAJA (TOL REFORMASI) MAKASSAR
1-12-0266 UK 4X8 NO SPK :
0002/W-JKT/SKP/AACMKS/XI/23
20-12-2023 TB23120051 159-QP/K/SK/VIII/23 - RAB INTI - 32.00 0.00 104.00 198,198.20 211,641.75 22,010,741.52
PEMBANGUNAN KONTRUKSI LED & BB WULING
A - MG-JP-061 - 10X10 M/H - NO SPK : 0374/W-
JKT/SKP/A/XI/23
09-01-2024 OB24010019 122-QP/K/SK/VIII/23 - RAB TAMBAHAN 4 - 0.00 8.00 96.00 166,160.59 211,641.75 20,317,607.55
PEMBANGUNAN KONTRUKSI LED DAN BB BLORA
38 22X10 DAN 12X10 NO SPK :
0154/W-JKT/SKP/A/V/23
09-01-2024 OB24010021 160-QP/K/SK/XII/23 - RAB INTI - PEMBANGUNAN 0.00 11.00 85.00 166,160.59 211,641.75 17,989,548.35
KONTRUKSI LED JL.BOULEVARD RAYA (DEKAT
PATUNG KUDA GADING PANDAWA) UK 5X10
M/V NO SPK : 0225/W-JKT/SKP/A/VI/23
10-01-2024 TB24010017 122-QP/K/SK/VIII/23 - RAB TAMBAHAN 5 - 85.00 0.00 170.00 198,198.20 204,919.97 34,836,395.36
PEMBANGUNAN KONTRUKSI LED DAN BB BLORA
38 22X10 DAN 12X10 NO SPK :
0154/W-JKT/SKP/A/V/23
10-01-2024 TB24010019 161-QP/K/SK/XII/23 - RAB INTI - PEMBANGUNAN 11.00 0.00 181.00 198,198.20 204,511.47 37,016,575.56
KONTRUKSI LED GEDUNG HIJAU 77 (GIBRAN
CENTER) UK 6X3
10-01-2024 OB24010024 160-QP/K/SK/XII/23 - RAB INTI - PEMBANGUNAN 0.00 13.00 168.00 166,160.59 204,511.47 34,357,926.48
KONTRUKSI LED JL.BOULEVARD RAYA (DEKAT
PATUNG KUDA GADING PANDAWA) UK 5X10
M/V NO SPK : 0225/W-JKT/SKP/A/VI/23 - SUB-
EMAN - FABRIKASI
11-01-2024 OB24010029 042-QP/K/SK/VI/22 - RAB INTI - PEMBANGUNAN 0.00 22.00 146.00 166,160.59 204,511.47 29,858,674.21
LED JL.BAWARAJA (TOL REFORMASI) MAKASSAR
1-12-0266 UK 4X8 NO SPK :
0002/W-JKT/SKP/AACMKS/XI/23
Jumlah 358.00 230.00 146.00 204,511.47 29,858,674.21
Total 358.00 230.00 146.00

11 January 2024 16:46 Page 2 of 2

Anda mungkin juga menyukai