Barang :
GDB
SIKU50001
TANGGAL NO. BUKTI KETERANGAN MASUK KELUAR SISA HARGA SAT HARGA RATA @ NILAI
TANGGAL NO. BUKTI KETERANGAN MASUK KELUAR SISA HARGA SAT HARGA RATA @ NILAI
10-01-2024 OB24010024 160-QP/K/SK/XII/23 - RAB INTI - PEMBANGUNAN 0.00 9.00 72.00 171,820.82 204,328.54 14,711,654.53
KONTRUKSI LED JL.BOULEVARD RAYA (DEKAT
PATUNG KUDA GADING PANDAWA) UK 5X10
M/V NO SPK : 0225/W-JKT/SKP/A/VI/23 - SUB-
EMAN - FABRIKASI
11-01-2024 OB24010026 042-QP/K/SK/VI/22 - RAB INTI - PEMBANGUNAN 0.00 15.00 57.00 171,820.82 204,328.54 11,646,726.50
BB JL.BAWARAJA (TOL REFORMASI) MAKASSAR
1-12-0266 UK 4X8 NO SPK :
0002/W-JKT/SKP/AACMKS/XI/23
11-01-2024 OB24010029 042-QP/K/SK/VI/22 - RAB INTI - PEMBANGUNAN 0.00 20.00 37.00 171,820.82 204,328.54 7,560,155.80
LED JL.BAWARAJA (TOL REFORMASI) MAKASSAR
1-12-0266 UK 4X8 NO SPK :
0002/W-JKT/SKP/AACMKS/XI/23
Jumlah 137.00 101.00 37.00 204,328.54 7,560,155.80
Total 137.00 101.00 37.00