Anda di halaman 1dari 6

TABEL

NAMA WARGA YANG TERLAYANI JARINGAN PIPA IPAL


LEGENDA.
NO. NAMA WARGA STATUS : Pipa SR Ø 3 KEMENTRIAN PEKERJAAN UMUM
1 SUPIYAH TERLAYANI : Pipa Ø 6 DAN PERUMAHN RAKYAT
REPUBLIK INDONESIA
2 AEP TERLAYANI : Pipa Ø 4
3 SANTI TERLAYANI : Pipa Ø 3 KETERANGAN

4 SAHRIL TERLAYANI : Sungai


5 OLIB TERLAYANI ASBUILD DRAWING
: Jl. Gang
6 AJENG TERLAYANI
7 NANA TERLAYANI : Jembatan
8 ANGGA TERLAYANI
PEKERJAAN
9 SARINO TERLAYANI : Rumah PENINGKATAN KUALITAS
10 JAENI TERLAYANI PERMUKIMAN KUMUH
: Masjid KABUPATEN PURWAKARTA

A
KAWASAN RK 1
30
31 : IPAL
LOKASI

in m
L=

a4 0
: Manhole
in m

pip 12,8
1
pip 8,30
0

KELURAHAN CIPAISAN, NAGRIKALER,


,4

a6 m
pip = 14

L=
in
4
a
L

: Bak Kontrol PURWAMEKAR KECAMATAN


32 28 PURWAKARTA KABUPATEN
L = 1,90 m L = 1,10 m
pipa 3 in L = 0,20 m
L = 6,00 m L= pipa 3 in pipa 3 in
pipa 3 in L = 0,35 m
pipa 3 in pip 7,20
a4 m
33
L = 0,25m
33 32 32
in

29
31 31
: Grease Trap PURWAKARTA
m
in m

L = 1,10 m
pipa 3 in
0

pip 6,20

pipa 3 in
,6

in
pip 16

L = 0,20 m
1

DIKETAHUI OLEH :
a6
4

pipa 3 in
=

L=
a
L

30 30
L = 0,35m

L = 1,30 m
pipa 3 in L = 3,50 m
pipa 3 in
PPK PKP 1
pipa 3 in
33 26 26
25 SATUAN KERJA PELAKSANAAN PRASARANA
L = 9,40 m

34 34 pipa 3 in

L = 0,20 m
25 25 16 PERMUKIMAN WILAYAH I
m

L = 0,25m L = 0,20 m
29
pipa 3 in
27 pipa 3 in pipa 3 in
PROVINSI JAWA BARAT
in m

7,35
6 in

L = 0,25 m L = 0,45 m L = 0,25m


L = 5,20 m
5

L = 0,15m
pipa 3 in pipa 3 in pipa 3 in 16
,3

L = 9,30 m pipa 3 in pipa 3 in


pipa
pip 11

L=

pipa 3 in 35 35 29 28
4
=

L = 12,50 m 24
a
L

pipa 3 in
36 36
L = 15

28
24
pipa

L = 0,20 m
24
27 pipa 3 in
L = 0,20 m
L = 0,25 m
6 in
,50 m

pipa 3 in pipa 3 in
34 L = 9,40 m
27 23
23
m

L = 12,00 m

C
L = 0,50 m
pipa 3 in L = 7,20 m pipa 3 in
pip 6,00

pipa 3 in
pipa 3 in
in

L = 0,25 m L = 0,20 m

RUDI EKO SETIADI, ST., MT.


1
a6

pipa 3 in pipa 3 in
L=

L = 0,20 m
L = 7,15m
38 38 pipa 3 in

NIP. 19860525 200812 1 001


pipa 3 in

37 37
26 L=
8, L = 25,20 m
13
pipa 40 m pipa 3 in 15 15
6 in
L = 0,25m
pipa 3 in L=
23 L = 0,35 m
13 13
DIKETAHUI OLEH :

0m
2
pip ,3 m pipa 3 in L = 0,35m

in
a6

L = 7,2
pipa 3 in
in

pipa 4
L=
L=
6
pip ,3 m
2
pip 0,25
L = 15,75 m
pipa 3 in
16 DIREKSI LAPANGAN
35 a6

10 a6 m
L = 0,20 m
in in L = 0,20 m
pipa 3 in L = 0,55 m
PENGEMBANGAN KAWASAN PERMUKIMAN I
pipa 3 in

44 44 L= 36 22 12
pipa 3 in
L = 0,35 m
pipa 3 in

09 4 22 L = 4, 14 14
L = 3,70 m
pipa 3 in
pip ,25 m 22 80 m 10 10
a6 pipa L = 0,20 m
L = 7,60 m in L = 0,30 m 6 in
18 pipa 3 in
m

pipa 3 in L=

01
pipa ,10 m
pipa 3 in L = 7,10 m 9,50 04 04
pip 3,25

39 pipa 3 in m
L = 5,55 m
in

L = 0,20 m pipa pipa 3 in


L=
37 6 in

4 in
1
a6

L = 0,85 m

m
pipa 3 in

16
1
40
L=

L= pip 0,0 m pipa 3 in

8,05
17
pipa 85 m

4 in
a6

L=
pip ,75 m 43
in
4 in

a6 43 L=
5,

pipa
L=
in 13
pipa ,80 m 06
L=

L = 6,60 m L = 1,40 m L = 0,20 m


6 in
L = 0,20 m 42
pipa 3 in
L = 0,20 m
39
18
18
pipa 3 in
09 09
pipa 3 in
R. ERIE HARIANSYAH, ST.
08
pipa 3 in pipa 3 in

02
L = 0,20 m
53 53
L = 11,85m
pipa 3 in
pipa 3 in
42 39
L = 0,55 m 19 L = 1,40 m
pipa 3 in
15 L= NIP. 19670405 200604 1 004
38
pipa 3 in 9
L = 3,10 m
pipa ,50 m 11 L = 0,20 m

07

0m
L = 0,55 m pipa 3 in
pipa 3 in
pipa ,55 m

in
pipa 3 in 6 in

L = 5,0
52 52
14 DIPERIKSA/ DISETUJUI
06

pipa 4
pip 7,5 m

m
17
4 in

L = 0,20 m 17
13

L = 14,10 m

pip 2,55
51 L=
in

pipa 3 in 51 L = 17,50 m

in
pipa 3 in L = 6,50 m 8
L=

pip ,85 m
1

pipa 3 in
a6

L = 10,85 m

a4
05
pipa 3 in
L=

L = 0,20 m L = 0,45 m

L=
pipa 3 in
pipa 3 in 50
49 19 19 pipa 3 in
a6
in
50
04 TECHNICAL MANAGEMENT CONSULTANT 2
L = 1,40 m
12
20
L = 7,15 m L = 0,20 m L = 1,00 m
40 pipa 3 in

05
pip ,7 m

pipa 3 in pipa 3 in
pipa 3 in L = 0,20 m
10
in

L = 0,20 m C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

pipa 3 in L = 0,45 m L = 0,15 m


PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI
kotaku.png

03 12
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

C:\Users\ASUS

kotaku.png ROG
ZEPHYRUS\Downloads\lambang
4

kotaku.png

pipa 3 in
a6

pipa 3 in pipa 3 in
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png
L=

L = 3,60 m 40
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png
kotaku.png

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

21 21 L = 0,20 m
5m
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

L = 1,40 m
kotaku.png
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

pipa 3 in
pipa 70 m

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

03
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

03
kotaku.png

pipa 3 in pipa 3 in
L=
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

48 in
C:\Users\ASUS
4 in

ROG
ZEPHYRUS\Downloads\lambang
L = 2,4
kotaku.png

8,00
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

L = 0,20 m 11
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang
3,

kotaku.png

pipa 4
11

m
pipa m C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

41 41 pipa 3 in L = 33

in
L = 0,20 m
L=

6 in 20 20 ,25 m
DIPERIKSA OLEH DISETUJUI OLEH

L = 4,7
L = 0,20 m
41 pipa 3 in L = 0,20 m

pipa 4
L= pipa 3 in pipa
L = 0,20 m
L = 0,20 m
L = 2,45 m
pipa 3 in 6 in
1 pipa 3 in
pip ,00 m L = 7,20 m
pipa 3 in L = 0,20 m pipa 3 in 05 05
a6
in
pipa 3 in
21 pipa 3 in
07
pipa ,20 m

L = 9,00 m
pipa 3 in 45 46 46
02
4 in

L = 0,20 m
45
16

42
L = 0,25 m
pipa 3 in L = 0,30 m L = 3,05 m
L = 8,0 pipa 3 in
47 47
L=

pipa 3 in
pipa 4
0m
L = 6,90 m
46 04 L = 24,
80m
pipa 3 in
in
43 pipa 3 in 48 48 pipa 6
m

L = 1,25 m in 02
L=
03
L = 23,90

pipa 3 in L = 1,0
L = 0,50 m 8,
pipa 50 m
pipa 4 in
pipa 75 m

pipa 3 in L = 0,50 m 5m
m

L = 0,20 m
47 4 in pipa 3 in
49 pipa 6
4 in

in
TOPIK HAMDANI, ST.
pip 22,8

44 49 Ir. WISMONO
5,

pipa 3 in
in

L=
L=
a6
L=

54 5,
54 L = 2,00 m
pipa 3 in
pipa 60 m
4 in L = 0,45 m
pipa 3 in
02 CIVIL ENGINEER TEAM LEADER
45

m
55 55
DIBUAT OLEH :

3 in
L = 0,85
56 56

pipa
L = 0,20 m L = 0,50 m L = 37,
a6 m

pipa 3 in pipa 3 in
08 01 3m
pip 3,7

pipa 6
in

L = 0,20 m
50 L = 0,30 m
pipa 3 in
in
L=

pipa 3 in L = 0,15m
pipa 3 in
06 06
51

pipa ,9 m
3 in
01

18
L=
L = 3,00 m
pipa 3 in

L = 0,15 m
pipa 3 in
07 07 01

PT. TIGALAPAN ADAM INTERNASIONAL


m
L = 17,85
m

pipa 4 in
pip 30,0
in

DIGAMBAR OLEH DISETUJUI OLEH


a6
L=

B 09 L = 0,50 m

08
pipa 3 in

08
L = 0,15 m
pipa 3 in

D E AL FAUZI AFENDI, ST.


DRAFTER
Ir. HOTMA SITOHANG, MT.

NAMA GAMBAR

DENAH IPAL DAN


PROJECT MANAGER

JARINGAN AIR LIMBAH

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

1 : 75 I.B-017 029
LEGENDA.
: Pipa Ø 6
KEMENTRIAN PEKERJAAN UMUM
: Pipa Ø 4 DAN PERUMAHN RAKYAT
: Pipa Ø 3 REPUBLIK INDONESIA

: Sungai KETERANGAN

: Jl. Gang
ASBUILD DRAWING
: Jembatan
30
: Rumah PEKERJAAN
31 PENINGKATAN KUALITAS
PERMUKIMAN KUMUH

in m
L=
: Masjid

0
in m

pip 12,8
1
pip 8,30 KABUPATEN PURWAKARTA

4 40
a6

a4
m

pi = 14
KAWASAN RK 1

L=
in : IPAL

pa
L
: Bak Kontrol
LOKASI

L = 6,00 m
32 L = 1,90 m
pipa 3 in
28 L=
L = 1,10 m
pipa 3 in
L = 0,20 m
: Grease Trap KELURAHAN CIPAISAN, NAGRIKALER,
pipa 3 in
pip 7,20 PURWAMEKAR KECAMATAN
pipa 3 in L = 0,35 m
pipa 3 in a4 m
33 33
in 31 31 PURWAKARTA KABUPATEN
32 32
PURWAKARTA
L = 0,25m 29

m
in m

L = 1,10 m
pipa 3 in
0

pip 6,20
pipa 3 in
,6

DIKETAHUI OLEH :

in
pip 16

L = 0,20 m

1
a6
4

pipa 3 in
=

L=
PPK PKP 1
a
L

30 30 SATUAN KERJA PELAKSANAAN PRASARANA


L = 0,35m PERMUKIMAN WILAYAH I
pipa 3 in L = 3,50 m PROVINSI JAWA BARAT
L = 1,30 m pipa 3 in
pipa 3 in
33 26 26
25
L = 9,40 m
34 pipa 3 in
34 25 25 16
L = 0,20 m

m
L = 0,25m L = 0,20 m
29 RUDI EKO SETIADI, ST., MT.
pipa 3 in
27 pipa 3 in pipa 3 in

7,35
in m

6 in
L = 0,25 m L = 0,45 m L = 0,25m
L = 5,20 m
5

pipa 3 in L = 0,15m pipa 3 in pipa 3 in 16 NIP. 19860525 200812 1 001


,3

L = 9,30 m pipa 3 in pipa 3 in


pip 11

pipa
L=
pipa 3 in 35 35 29 28
4

DIKETAHUI OLEH :
=

L = 12,50 m 24
a
L

pipa 3 in
36 36
L=1

28
24 DIREKSI LAPANGAN
pipa

L = 0,20 m
24
27 pipa 3 in PENGEMBANGAN KAWASAN PERMUKIMAN I
5,50

L = 0,25 m L = 0,20 m
6 in

pipa 3 in
34
pipa 3 in
23
m

27
L = 9,40 m 23

m
L = 12,00 m L = 0,50 m
pipa 3 in L = 7,20 m pipa 3 in

pip 6,00
pipa 3 in
pipa 3 in

in
L = 0,25 m L = 0,20 m

1
a6
pipa 3 in pipa 3 in

L = 7,15m
L= R. ERIE HARIANSYAH, ST.
38 38
pipa 3 in NIP. 19670405 200604 1 004
37 37
26 L=
8,4 L = 25,20 m
DIPERIKSA/ DISETUJUI
pip 0m pipa 3 in
a6
in
L = 0,25m TECHNICAL MANAGEMENT CONSULTANT 2
pipa 3 in L=
2
pip ,3 m
23 PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI
a6
in
L= L= DIPERIKSA OLEH DISETUJUI OLEH
2
6
pip ,3 m pip 0,25
35 a6

10 a6 m
in in
L = 0,20 m
pipa 3 in

44 44 L= 36 22 22
09 4 L=4 TOPIK HAMDANI, ST. Ir. WISMONO
L = 3,70 m
pip ,25 m 22 ,80 m
pipa 3 in a6 pipa CIVIL ENGINEER TEAM LEADER
L = 7,60 m in L = 0,30 m 6 in
18
m

pipa 3 in L= DIBUAT OLEH :

01
pipa 3 in L = 7,10 m 9,5
pip 3,25

39 pipa 3 in pipa 0 m
in

L = 0,20 m
L=
37 6 in
1
a6

1 pipa 3 in

40 pip 0,0 m
L=

L=
1
pip ,75 m
a6
a6
in
43
43
pipa ,85 m
4 in
17
in
5
L=

L = 6,60 m L = 1,40 m
pipa 3 in 39 pipa 3 in
L = 0,20 m 42 L = 0,20 m 18
18 PT. TIGALAPAN ADAM INTERNASIONAL
08
pipa 3 in pipa 3 in

02 19
L = 0,20 m 42 39
L = 11,85m pipa 3 in L = 0,55 m
53 53 pipa 3 in
pipa 3 in DIGAMBAR OLEH DISETUJUI OLEH
L = 3,10 m
pipa 3 in 38
52 52

AL FAUZI AFENDI, ST. Ir. HOTMA SITOHANG, MT.


DRAFTER PROJECT MANAGER
NAMA GAMBAR

DENAH JARINGAN AIR LIMBAH


SEGMEN A
IPAL CIPAISAN 80 KK

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

I.B-018 029
LEGENDA.
: Pipa Ø 6
KEMENTRIAN PEKERJAAN UMUM
: Pipa Ø 4 DAN PERUMAHN RAKYAT
: Pipa Ø 3 REPUBLIK INDONESIA

: Sungai KETERANGAN

: Jl. Gang
L=
4
36 ASBUILD DRAWING
pip ,25 m
a6 : Jembatan
L = 7,60 m in
18

m
L=

01
pipa 3 in
9,5

pip 3,25
39 pipa 0 m

in
L = 0,20 m
L= : Rumah PEKERJAAN
37 6 in

1
a6
1 pipa 3 in

40 pip 0,0 m

L=
L=

pipa ,85 m
1
pip ,75 m
a6
in
43 17 PENINGKATAN KUALITAS

4 in
a6 43
in

5
PERMUKIMAN KUMUH

L=
L = 6,60 m
pipa 3 in 39
L = 1,40 m
pipa 3 in
: Masjid KABUPATEN PURWAKARTA
L = 0,20 m 42 L = 0,20 m 18
18 KAWASAN RK 1
08 : IPAL
pipa 3 in pipa 3 in

02 39
19
L = 0,20 m 42 L = 1,40 m
L = 11,85m pipa 3 in L = 0,55 m
53 53 pipa 3 in pipa 3 in

38
pipa 3 in
: Bak Kontrol
07
L = 3,10 m
L = 0,55 m
pipa 3 in LOKASI

pipa 3,55 m
pipa 3 in
52 52

06 : Grease Trap

pip 7,5 m
17 KELURAHAN CIPAISAN, NAGRIKALER,

4 in
L = 0,20 m L = 14,10 m 17

1
51

in
pipa 3 in 51 L = 17,50 m
pipa 3 in L = 6,50 m PURWAMEKAR KECAMATAN

L=
1
pipa 3 in

a6
L = 10,85 m

05
pipa 3 in

L=
L = 0,20 m
pipa 3 in
pipa 3 in 50
49 19 19 PURWAKARTA KABUPATEN
04
50 L = 1,40 m
L = 7,15 m
pipa 3 in
pip ,7 m
40 L = 0,20 m
pipa 3 in
pipa 3 in
20 L = 0,20 m
PURWAKARTA
in
L = 0,20 m C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

pipa 3 in

03
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang
4
kotaku.png

pipa 3 in a6 C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

DIKETAHUI OLEH :
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png
L=

L = 3,60 m
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

40
21 21
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

L = 1,40 m
kotaku.png

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

pipa ,70 m
pipa 3 in C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

PPK PKP 1
kotaku.png

pipa 3 in
L=
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

48
C:\Users\ASUS

4 in
ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

8,0
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

L = 0,20 m SATUAN KERJA PELAKSANAAN PRASARANA


pipa 0 m
C:\Users\ASUS

ROG
ZEPHYRUS\Downloads\lambang

kotaku.png

3
C:\Users\ASUS

ROG

41
ZEPHYRUS\Downloads\lambang

41
kotaku.png

pipa 3 in
6 in PERMUKIMAN WILAYAH I

L=
L = 0,20 m 20 20
L=
1
41 pipa 3 in
L = 0,20 m
L = 0,20 m
pipa 3 in
PROVINSI JAWA BARAT
pip ,00 m L = 7,20 m
pipa 3 in L = 0,20 m
a6
in
pipa 3 in
21 pipa 3 in
pipa ,20 m

L = 9,00 m
pipa 3 in 45 46 46
4 in

L = 0,20 m
45
16

42 L = 8,0 47 47
pipa 3 in L = 0,30 m
RUDI EKO SETIADI, ST., MT.
L=

pipa 3 in
0m
pipa 4 NIP. 19860525 200812 1 001
in
43
L = 6,90 m
pipa 3 in 48 48 46 L = 1,25 m
L = 0,50 m
L=
8,50 pipa 3 in DIKETAHUI OLEH :

pipa ,75 m
pipa L = 0,50 m
pipa 3 in m
m

L = 0,20 m
47 4 in pipa 3 in
49 DIREKSI LAPANGAN

4 in
pip 22,8

pipa 3 in
44 49 PENGEMBANGAN KAWASAN PERMUKIMAN I
in

5
L=

L=
a6
L=

54 5
54 L = 2,00 m pipa ,60 m L = 0,45 m
pipa 3 in 4 in
pipa 3 in

55 55
56
45
56
L = 0,20 m L = 0,50 m
R. ERIE HARIANSYAH, ST.
a6 m

pipa 3 in pipa 3 in
pip 3,7
in

NIP. 19670405 200604 1 004


L = 0,20 m
50
L=

pipa 3 in
DIPERIKSA/ DISETUJUI

51 TECHNICAL MANAGEMENT CONSULTANT 2


PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI

DIPERIKSA OLEH DISETUJUI OLEH

TOPIK HAMDANI, ST. Ir. WISMONO


CIVIL ENGINEER TEAM LEADER
a6 0m

DIBUAT OLEH :
pip 30,
in
L=

PT. TIGALAPAN ADAM INTERNASIONAL


DIGAMBAR OLEH DISETUJUI OLEH

AL FAUZI AFENDI, ST. Ir. HOTMA SITOHANG, MT.


DRAFTER PROJECT MANAGER
NAMA GAMBAR

DENAH JARINGAN AIR LIMBAH


SEGMEN B
IPAL CIPAISAN 80 KK

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

I.B-019 029
LEGENDA.
: Pipa Ø 6
KEMENTRIAN PEKERJAAN UMUM
: Pipa Ø 4 DAN PERUMAHN RAKYAT
: Pipa Ø 3 REPUBLIK INDONESIA

: Sungai KETERANGAN

: Jl. Gang
ASBUILD DRAWING
: Jembatan

: Rumah PEKERJAAN
PENINGKATAN KUALITAS
PERMUKIMAN KUMUH
: Masjid KABUPATEN PURWAKARTA
: IPAL KAWASAN RK 1
: Bak Kontrol
LOKASI
: Grease Trap KELURAHAN CIPAISAN, NAGRIKALER,
PURWAMEKAR KECAMATAN
PURWAKARTA KABUPATEN
PURWAKARTA

DIKETAHUI OLEH :
PPK PKP 1
SATUAN KERJA PELAKSANAAN PRASARANA
PERMUKIMAN WILAYAH I
PROVINSI JAWA BARAT

RUDI EKO SETIADI, ST., MT.


NIP. 19860525 200812 1 001
DIKETAHUI OLEH :
DIREKSI LAPANGAN
L = 0,20 m PENGEMBANGAN KAWASAN PERMUKIMAN I
pipa 3 in

15 15 13
13 13
L = 0,35 m

pipa 4 m
pipa 3 in L = 0,35m
R. ERIE HARIANSYAH, ST.

0
in
L = 7,2
pipa 3 in

L = 15,75 m
NIP. 19670405 200604 1 004
pipa 3 in
16 DIPERIKSA/ DISETUJUI
L = 0,20 m
pipa 3 in L = 0,55 m TECHNICAL MANAGEMENT CONSULTANT 2
pipa 3 in
PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI
14 14 12 10
L = 0,35 m
pipa 3 in
10 DIPERIKSA OLEH DISETUJUI OLEH
pipa 6,10 m

L = 5,55 m
pipa 3 in
4 in

m
1

8,05

17
4 in
L=

TOPIK HAMDANI, ST. Ir. WISMONO


L=
pipa
L=

13 CIVIL ENGINEER TEAM LEADER


pipa ,80 m L = 0,20 m
6 in pipa 3 in DIBUAT OLEH :
09 09

15 L=
9
pip ,50 m
a6
in
11 L = 0,20 m
pipa 3 in

14
m
pip 2,55

L=
PT. TIGALAPAN ADAM INTERNASIONAL
in

8
pip ,85 m
a4
L=

a6
in DIGAMBAR OLEH DISETUJUI OLEH

10
AL FAUZI AFENDI, ST. Ir. HOTMA SITOHANG, MT.
DRAFTER PROJECT MANAGER
NAMA GAMBAR

DENAH JARINGAN AIR LIMBAH


SEGMEN C
IPAL CIPAISAN 80 KK

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

I.B-020 029
LEGENDA.
: Pipa Ø 6
KEMENTRIAN PEKERJAAN UMUM
: Pipa Ø 4 DAN PERUMAHN RAKYAT
: Pipa Ø 3 REPUBLIK INDONESIA

: Sungai KETERANGAN

: Jl. Gang
L = 0,20 m ASBUILD DRAWING
pipa 3 in
: Jembatan
16 12 04 04
L = 0,85 m
pipa 3 in
: Rumah PEKERJAAN
17

m
pipa 6,10 m

8,05
4 in
L= PENINGKATAN KUALITAS

4 in
13
pipa ,80 m 06

pipa
L=
1
L = 0,20 m
PERMUKIMAN KUMUH

L=
6 in pipa 3 in
09 09
: Masjid KABUPATEN PURWAKARTA
15 L= : IPAL KAWASAN RK 1
9,5
11 L = 0,20 m

00 m
pip 0m pipa 3 in
a6 : Bak Kontrol

in
in LOKASI
14

pipa 4
L = 5,
m
: Grease Trap

pip 2,55
L= KELURAHAN CIPAISAN, NAGRIKALER,

in
8
pip ,85 m

a4
L = 0,45 m
PURWAMEKAR KECAMATAN

L=
a6
pipa 3 in in
12 L = 1,00 m PURWAKARTA KABUPATEN
L = 0,45 m
pipa 3 in 12
10 05 pipa 3 in
L = 0,15 m
pipa 3 in
PURWAKARTA
L = 0,20 m

45 m
pipa 3 in 03 03 DIKETAHUI OLEH :

in
11 PPK PKP 1

L = 2,
pipa 4
11

7m
L=3

in
L = 0,20 m
3,25 SATUAN KERJA PELAKSANAAN PRASARANA
L = 0,20 m m

pipa 4
pipa 3 in

L = 4,
pipa PERMUKIMAN WILAYAH I
L = 2,45 m
pipa 3 in 6 in
pipa 3 in 05 05 PROVINSI JAWA BARAT
07

04 L = 24
pipa 6
,80m RUDI EKO SETIADI, ST., MT.
m in NIP. 19860525 200812 1 001
03
L = 23,90
pipa 4 in
DIKETAHUI OLEH :
DIREKSI LAPANGAN
PENGEMBANGAN KAWASAN PERMUKIMAN I

08 L = 0,30 m
pipa 3 in
R. ERIE HARIANSYAH, ST.
L = 0,15m
pipa 3 in
NIP. 19670405 200604 1 004
06 06 DIPERIKSA/ DISETUJUI
TECHNICAL MANAGEMENT CONSULTANT 2
L = 3,00 m
pipa 3 in PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI

DIPERIKSA OLEH DISETUJUI OLEH

L = 0,15 m
pipa 3 in

07 07
m

TOPIK HAMDANI, ST. Ir. WISMONO


L = 17,85

CIVIL ENGINEER TEAM LEADER


pipa 4 in

DIBUAT OLEH :

09 L = 0,50 m
PT. TIGALAPAN ADAM INTERNASIONAL
pipa 3 in DIGAMBAR OLEH DISETUJUI OLEH
L = 0,15 m
pipa 3 in
08 08

AL FAUZI AFENDI, ST. Ir. HOTMA SITOHANG, MT.


DRAFTER PROJECT MANAGER
NAMA GAMBAR

DENAH JARINGAN AIR LIMBAH


SEGMEN D
IPAL CIPAISAN 80 KK

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

I.B-021 029
LEGENDA.
: Pipa Ø 6
KEMENTRIAN PEKERJAAN UMUM
: Pipa Ø 4 DAN PERUMAHN RAKYAT
: Pipa Ø 3 REPUBLIK INDONESIA

: Sungai KETERANGAN

: Jl. Gang
ASBUILD DRAWING
: Jembatan

: Rumah PEKERJAAN
PENINGKATAN KUALITAS
PERMUKIMAN KUMUH
: Masjid KABUPATEN PURWAKARTA
: IPAL KAWASAN RK 1
: Bak Kontrol
LOKASI
: Grease Trap KELURAHAN CIPAISAN, NAGRIKALER,
PURWAMEKAR KECAMATAN
PURWAKARTA KABUPATEN
PURWAKARTA

DIKETAHUI OLEH :
PPK PKP 1
SATUAN KERJA PELAKSANAAN PRASARANA
PERMUKIMAN WILAYAH I
PROVINSI JAWA BARAT
02 L = 0,25 m
L = 3,05 m pipa 3 in
pipa 3 in

02
03 L = 1,05
m
RUDI EKO SETIADI, ST., MT.
pipa 6
in
NIP. 19860525 200812 1 001
DIKETAHUI OLEH :
02 DIREKSI LAPANGAN
PENGEMBANGAN KAWASAN PERMUKIMAN I
85 m
3 in
L = 0,
pipa

L = 37
01 ,3 m
pipa 6
in

R. ERIE HARIANSYAH, ST.


pipa 8,9 m

NIP. 19670405 200604 1 004


3 in

01
1
L=

DIPERIKSA/ DISETUJUI
TECHNICAL MANAGEMENT CONSULTANT 2
PT. CIRIAJASA JV PT. INACON LUHUR PERTIWI

DIPERIKSA OLEH DISETUJUI OLEH


01

TOPIK HAMDANI, ST. Ir. WISMONO


CIVIL ENGINEER TEAM LEADER
DIBUAT OLEH :

PT. TIGALAPAN ADAM INTERNASIONAL


DIGAMBAR OLEH DISETUJUI OLEH

AL FAUZI AFENDI, ST. Ir. HOTMA SITOHANG, MT.


DRAFTER PROJECT MANAGER
NAMA GAMBAR

DENAH JARINGAN AIR LIMBAH


SEGMEN E
IPAL CIPAISAN 80 KK

SKALA GAMBAR NO. LEMBAR JML. LEMBAR

I.B-022 029

Anda mungkin juga menyukai