Anda di halaman 1dari 37

AS PLAN DRAWING

PEMBANGUNAN BTS
PT. GANDA ALAM MAKMUR

GREENFIELD SST 82 METER MEDIUM LIGHT

PT. GANDA ALAM MAKMUR


TAHUN 2022
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

DRAWING LIST
NO DRAWING TITLE NO DRAWING SKALA REMARK
MENGETAHUI
1 DRAWING LIST CME-82-00 NTS
PT. GANDA ALAM MAKMUR
2 SITE MAP CME-82-01 NTS
3 PROPOSED ANTENNA PLACEMENT CME-82-02 1:300
4 LAYOUT KONTUR CME-82-03 1:100
5 SITE LAYOUT CME-82-04 1:100
PROYEK
6 TAMPAK DEPAN & TAMPAK SAMPING CME-82-05 1:100
7 POTONGAN LAYOUT LOCATION CME-82-06 1:75 PEMBANGUNAN BTS
8 DETAIL PONDASI TOWER CME-82-07 1:50
KONTRAKTOR
9 BAR BENDING PONDASI TOWER CME-82-08 1:50
PT. PICOTEL
10 TEMPLATE CME-82-09 1:50
11 LAYOUT GROUNDING CME-82-10 1:50
12 DETAIL AKSES ROAD CME-82-11 1:50
DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

SITE MAP

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 0 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

Site Name : MESS KM 5


Site ID :-
TEBING Koordinat
Alamat : Kec. Sangkulirang, Kab. Kutai Timur, Kalimantan Timur
Tinggi Tower : 82 METER MENGETAHUI

Tipe Tower : MEDIUM LIGHT PT. GANDA ALAM MAKMUR

PROYEK

TEBING PEMBANGUNAN BTS


PARIT PARIT PARIT PARIT

KONTRAKTOR

PT. PICOTEL
LOKASI

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

JALAN

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

SITE MAP

SITE MAP SCALE REVISI


SKALA 1 : 100 NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 1 A3
ANTENNA RF - m
ELV = - m AGL
TEBING TEBING
PT. GANDA ALAM MAKMUR
PARIT PARIT PARIT PARIT

PAGAR TYPE E CATATAN/KETERANGAN

ELV = - m AGL
GRAVEL
ELEV +0.20

TELKOMSEL
PAGAR TYPE E

PAGAR TYPE E
BTS

Pole ACPDB
GRAVEL
ELEV +0.20 BAK KONTROL

LAMPU
HALAMAN
KWH
METER

PINTU MASUK (PINTU GESER)

PAGAR TYPE E

RABAT

RABAT
MENGETAHUI

PT. GANDA ALAM MAKMUR

KEY PLAN
SKALA : NTS

PROYEK

ANTENNA RF PEMBANGUNAN BTS

Elv = - m AGL KONTRAKTOR


Upper Busbar
Busbar Atas ANTENNA RF
D A PT. PICOTEL
Dipasang 10m dibawah puncak tower
Elv = - m AGL
C B
ANTENNA RF

Elv = - m AGL DIDESAIN DIPERIKSA DISETUJUI


VERTICAL TRAY
ANTENNA RF PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

Middle Busbar
Busbar Tengah D A Elv = - m AGL IMAM MUBAROK

Busbar Tengah dipasang untuk tower


JUDUL GAMBAR
dengan ketinggian diatas 52 m.
Lower Busbar C B
Busbar bawah
GREEN FIELD SST 82 METER MEDIUM LIGHT
HORIZONTAL TRAY MESS KM 5
ANTENNA MICROWAVE

NAMA GAMBAR

PROPOSED ANTENNA PLACEMENT


DATA ANTENNA TOWER SST 82 M
Elevasi KAKI SCALE REVISI
NO ANTENNA DIMENSI AZYMUTH
(Meter) TOWER NO. TANGGAL PARAF
1 3 Sectoral -m -m - - 1
2 1 MW -m -m - - 2
ANTENNA PLACEMENT 3
SKALA 1:300 NO REGISTER

CME - 82 - 2 A3
Elv +2.00

Elv +1.00

RENCANA
PT. GANDA ALAM MAKMUR

Elv -1.00 CATATAN/KETERANGAN


0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
Elv -2.00

SECTION 1 - 1

Elv +2.00
6 5 4
Elv +1.00

15000 RENCANA
3 3
Elv -1.00 MENGETAHUI

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
Elv -2.00 PT. GANDA ALAM MAKMUR
SECTION 2 - 2

Elv +2.00

Elv +1.00

RENCANA
PROYEK
2 2

12000
Elv -1.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 PEMBANGUNAN BTS
Elv -2.00

SECTION 3 - 3
KONTRAKTOR

Elv +2.00
PT. PICOTEL
Elv +1.00

RENCANA

1 1
Elv -1.00

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
Elv -2.00 DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA
SECTION 4 - 4 PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

6 5 4
5000

Elv +2.00

Elv +1.00 IMAM MUBAROK

RENCANA JUDUL GAMBAR

Elv -1.00
GREEN FIELD SST 82 METER MEDIUM LIGHT
LAYOUT CONTOUR Elv -2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
MESS KM 5
Skala 1:100
SECTION 5 - 5

NAMA GAMBAR
Elv +2.00

Elv +1.00

RENCANA LAYOUT CONTOUR

Elv -1.00
SCALE REVISI
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
Elv -2.00 NO. TANGGAL PARAF

SECTION 6 - 6 1
2
3
SECTION CONTOUR NO REGISTER
Skala 1:100

CME - 82 - 3A A3
N

W E PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

S
TEBING TEBING

PARIT PARIT PARIT PARIT


15000
KOLOM PRAKTIS 15/15 KOLOM PRAKTIS 15/15
75 1425 2400 2400 2400 2400 2400 1425 75
PAGAR TYPE E

75

75
MENGETAHUI

PT. GANDA ALAM MAKMUR


2182
2250

2250
3925
GRAVEL 2100 500
2400

2400
ELEV +0.20 PROYEK

PEMBANGUNAN BTS

TELKOMSEL
PAGAR TYPE E

PAGAR TYPE E

3500
BTS
KONTRAKTOR
2400

2400
12000

12000
7636

PT. PICOTEL

Pole ACPDB
GRAVEL
2400

2400
ELEV +0.20 BAK KONTROL
DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

4575
LAMPU
HALAMAN
KWH
2400

2400
METER
2182

IMAM MUBAROK

1200 PINTU MASUK (PINTU GESER) JUDUL GAMBAR


75

75
PAGAR TYPE E
75 2400 2400 2400 2400 2025 GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5
10200 1500

RABAT

RABAT
KOLOM PRAKTIS 15/15 KOLOM PRAKTIS 15/20
15000

5000
NAMA GAMBAR

SITE LAYOUT

SCALE REVISI
3000
SITE LAYOUT NO. TANGGAL PARAF
SKALA 1:100
1
2
3
NO REGISTER

CME - 82 - 4 A3
PT. GANDA ALAM MAKMUR

TOWER - 82 M ML CATATAN/KETERANGAN

Lampu Tower

Kawat Berduri Pole KWH Meter


Pagar Type E BTS Outdoor
MENGETAHUI

PT. GANDA ALAM MAKMUR

Pintu Masuk
Busbar

PROYEK
15000

TAMPAK DEPAN
SKALA : NTS
PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

TOWER - 82 M ML

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

Lampu Tower

BTS Outdoor IMAM MUBAROK

Kawat Berduri
JUDUL GAMBAR
Pole KWH Meter Pagar Type E

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

Parit Existing
TAMPAK DEPAN & SAMPING
12000

SCALE REVISI
TAMPAK SAMPING
SKALA : NTS NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 5 A3
TOWER - 82 M ML

PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

Kawat Berduri
Pagar Type E BTS Outdoor

MENGETAHUI

PT. GANDA ALAM MAKMUR


Busbar

PROYEK

2000 11000 2000 PEMBANGUNAN BTS


15000

POTONGAN A-A KONTRAKTOR


SKALA : NTS

PT. PICOTEL
TOWER - 82 M ML

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

Kawat Berduri
Pagar Type E
IMAM MUBAROK

JUDUL GAMBAR

4000
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5

NAMA GAMBAR
Parit Existing

POTONGAN A-A & B-B

SCALE REVISI
500 11000 500 1200 600 500 NO. TANGGAL PARAF
12000 1

POTONGAN B-B 2
SKALA : NTS 3
NO REGISTER

CME - 82 - 6 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN
CATATAN UMUM :
1. Kuat tekan beton K-225.
2. Tulangan baja < 13mm, fy=240 MPa

3. Semua ukuran ditentukan dalam milimeter kecuali


dalam keadaan lain.

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL PONDASI

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 7A A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN
CATATAN UMUM :
1. Kuat tekan beton K-225.
2. Tulangan baja < 13mm, fy=240 MPa

3. Semua ukuran ditentukan dalam milimeter kecuali


dalam keadaan lain.

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DENAH PONDASI

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 7B A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN
CATATAN UMUM :
1. Kuat tekan beton K-225.
2. Tulangan baja < 13mm, fy=240 MPa

3. Semua ukuran ditentukan dalam milimeter kecuali


dalam keadaan lain.

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

BAR BENDING PONDASI

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 8 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

TM-2 TM-1

-3
TM DETAIL "2"

TM
-3
MENGETAHUI

PT. GANDA ALAM MAKMUR

TM-2
TM-1

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR
"2" DETAIL "1"
PT. PICOTEL
TM-2

TM-1
DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

-3
TM

TM
-3

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

TM-1 TM-2

NAMA GAMBAR
"1"

TEMPLATE
DETAIL ANCHOR
SCALE REVISI
NO. TANGGAL PARAF

TEMPLATE TOWER 82 MEDIUM LIGHT 1


2
3
NO REGISTER

CME - 82 - 8 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

COPPER BONDED ROD 3 5/8",-3M COPPER BONDED ROD 3 5/8",-3M

PROYEK

RECT. EMERSON ACA


PEMBANGUNAN BTS

KONTRAKTOR

Pole ACPDB
PT. PICOTEL
Copper plate t=3mm

BAK
KONTROL
BIMETALIC CLAMP
KWH
METER
COPPER PLATE t = 3mm
COPPER BONDED ROD 3 5/8",-3M DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

COPPER BONDED ROD 3 5/8",-3M

IMAM MUBAROK

RABAT

RABAT
JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

GROUNDING LAYOUT
GROUNDING

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 9 A3
Lightning Arrester

ANTENNA GSM
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN
GSM & MW
Grounding Kit
Upper Busbar
Busbar Atas

Covered with PVC 1" pipe Feeders


Dibungkus dengan pipa PVC 1 "

VERTICAL TRAY
The thread of all fixing bolts on the
busbar must be destroyed after installation.
GSM & MW
Ulir pada semua baut yang terpasang pada Grounding Kit GSM & MW
busbar harus dihancurkan setelah instalasi. Grounding Kit

Middle Busbar
Busbar Tengah
Busbar Tengah dipasang untuk tower BCC 50mm (dikoneksi ke BTS Outdoor)
dengan ketinggian diatas 42 m.
MENGETAHUI
Lower Busbar
Covered with PVC 1" pipe Busbar bawah
BCC 50mm2
Dibungkus dengan pipa PVC 1 " PT. GANDA ALAM MAKMUR
HORIZONTAL TRAY BCC 50mm (dikoneksi ke panel ACPDB)

BCC 50mm (dikoneksi ke baseframe/ kerangkeng


The thread of all fixing bolts on the
busbar must be destroyed after installation.
EGB
AAC 70mm2 Ulir pada semua baut yang terpasang pada
busbar harus dihancurkan setelah instalasi.

Kabel Seling/
PROYEK
Alumunium 50 mm2
Disambung dengan
Bimetallic Clamp
BCC 50mm2
Bimetalic Clamp PEMBANGUNAN BTS
BC 50mm2 BC 50mm2

KONTRAKTOR
BC 50mm2

BCC 50mm2
to fence PT. PICOTEL
Copper plate t=3mm
Plat tembaga t=3mm
BCC 50mm2
BCC 50mm2

Copper Bonded Rod 5/8"- 3m


Copper Bonded Rod 5/8"- 3m

DIDESAIN DIPERIKSA DISETUJUI


Fence PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR
Pagar

KWH METER BOX


IMAM MUBAROK
1. Grounding & Lightning Protection System Resistance < 1.00 ohm Principles of Integrated Grounding & Lightning Protection System
2. All connections above the earth level shall be made using JUDUL GAMBAR
Prinsip dari System Integrasi Perlindungan dan Pentanahan
mechanical bolted connectors.
3. All connections below the earth level shall be made using
CADWELD welding method. GREEN FIELD SST 82 METER MEDIUM LIGHT
4. Sharp turns are prohibited and conductors shall maintain a horizontal Copper Bonded Rod 5/8"- 3m MESS KM 5
or vertical course, and conductor orientation bends towards the position
Fence
of earth. Foundation
5. Copper Bonded Rod 5/8" Length 3m, 0.5m under ground level (Product : Furse, Tokai, CS, BMC)
Cable BC 50mm, Ring grounding required NAMA GAMBAR
6. Cable BC 50mm, ring grounding required to be placed under fence foundation, to be placed under fence foundation,
below the sand layer. below the sand layer.
7. Center ring ground cable need to protect with brick on top before backfilling. Kabel BC 50mm grounding melingkar (ring)
perlu ditempatkan di bawah pondasi pagar,

1. Kekuatan System Pentanahan dan Proteksi Penangkal Petir < 1.00 ohm
di bawah lapisan pasir
SCEMATIC GROUNDING
2. Semua koneksi di atas tanah menggunakan koneksi baut mekanik
3. Semua koneksi di bawah permukaan tanah menggunakan metode
pengelasan CADWELD. SCALE REVISI
4. Tekukan yang tajam atau gulungan pada kabel ground dilarang dan NO. TANGGAL PARAF
kabel grounding selalu mengarah horizontal atau ke tanah. 1
5. Copper Bonded Rod 5/8" Panjang 3m, 0.5m dari permukaan tanah (Product : Furse, Tokai, CS, BMC)
2
6. Kabel BC 50mm, grounding melingkar (ring) perlu ditempatkan di bawah pondasi
pagar, di bawah lapisan pasir. 3
7. Kabel ground tengah perlu dilindungi dengan pasangan bata di atasnya NO REGISTER
sebelum backfilling.
CME - 82 -9B A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

COR RABAT URUGAN PASIR / SIRTU


PT. GANDA ALAM MAKMUR
t=10cm DIPADATKAN , t = 5cm

1000 1000 1000


PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


DETAIL ACCESS ROAD PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR
SKALA 1 : 25

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL ACCES ROAD

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 11 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN
Pole ACPDB Pole ACPDB

LUBANG MENGETAHUI

PT. GANDA ALAM MAKMUR


+ 1.100 Tray Horizontal 300mm
WELDED

+ 0.60 Busbar
+ 0.40
PROYEK
Tanah urug dipadatkan + 0.20
+ 0.00 PEMBANGUNAN BTS
Pondasi Batu Kali 1:5 Tanah urug
Pasir Urug KONTRAKTOR

PT. PICOTEL

A
B B DIDESAIN DIPERIKSA DISETUJUI
Pole ACPDB
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

+ 0.60 + 0.40 + 0.20


IMAM MUBAROK
+ 0.75
JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

B
NAMA GAMBAR

DETAIL BTS

SCALE REVISI
NO. TANGGAL PARAF
A 1
2
3
NO REGISTER

CME - 82 - 12 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

+ 1.100

+ 0.75 + 0.75
+ 0.60

+ 0.40
MENGETAHUI
Tanah urug dipadatkan + 0.20
PT. GANDA ALAM MAKMUR
+ 0.00

Pondasi Batu Kali 1:5 Tanah urug


Pasir Urug

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

A
DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR
B B
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5

NAMA GAMBAR

DETAIL BTS

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 13 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

+ 1.100

+ 0.75
+ 0.60

+ 0.40
MENGETAHUI
Tanah urug dipadatkan + 0.20
PT. GANDA ALAM MAKMUR
+ 0.00

Pondasi Batu Kali 1:5 Tanah urug


Pasir Urug

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

I
DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR
II II
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5

NAMA GAMBAR

DETAIL BTS

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 14 A3
Tray Horizontal
300mm PT. GANDA ALAM MAKMUR

Profil L40x40x4 CATATAN/KETERANGAN


Busbar
Dynabolt M10
Hot Spun galvanized
atau Stainless Steel

MENGETAHUI

PT. GANDA ALAM MAKMUR


DETAIL A
SKALA 1 : 25

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

Pole ACPDB

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

Horizontal Cable Tray


JUDUL GAMBAR
Tray Horizontal
300mm

Busbar
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5
KABEL TRAY SUPORT

NAMA GAMBAR

Tanah urug
Leen Concrete (1:3:5)
DETAIL TRAY HORIZONTAL

SCALE REVISI
NO. TANGGAL PARAF
DETAIL PEMASANGAN TRAY HORIZONTAL 1
SKALA 1 : 100 2
3
NO REGISTER

CME - 82 - 15 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

For Grounding

1782

STIFF. 6mm PROYEK


DILAS

PEMBANGUNAN BTS
PLATE T=10mm
KONTRAKTOR

Profil L40x40x4
PT. PICOTEL

Kabel Tray Suport

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

For Grounding JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

DYNABOLT M12 NAMA GAMBAR


HOT SPUN GALVANIZED
ATAU STAINLESS STEEL Beton K225

DETAIL TRAY HORIZONTAL

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 16 A3
50
+3.00

0
17
2400 2400
Barbed wire Kawat Harmonika
PT. GANDA ALAM MAKMUR
5 lines + 50 x 50
Double Cross Line

7
22
CATATAN/KETERANGAN
2
800
+2.20

800
200
2000

KAWAT HARMONIKA

200
MENGETAHUI

PT. GANDA ALAM MAKMUR

75
+2.20
Siku 40.40.4 + plat
A B
strip t=3 mm diripet tiap 30 cm

TYPICAL SIDE VIEW


SKALA 1 : 100 3 Kawat harmonika
50 x 50
PROYEK

DETAIL 2
SKALA : 20
1 PEMBANGUNAN BTS
Sand Layer
4 4 D12 Gravel Layer
KONTRAKTOR
INSIDE CONCRETE PIPA 1"
Pasir +0,20
FOUNDATION WITH WELDED

300
Kerikil
HOLD FASTINGS & D16 L=40mm
4 D12 +0.10 PT. PICOTEL
50

0.00

100
PIPA 1"

300

100
PIPA 1"

450
100
A A

200
100
PLAT STRIP 30x3

SIKU 40.40.4

200
DIDESAIN DIPERIKSA DISETUJUI
ROOLAG BATA 500
DI BAUT / DI RIPET TIAP 30 cm PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR
550

KAWAT HARMONIKA 50x50 200


4 D12
POTONGAN A
DETAIL 3 POTONGAN B SKALA 1 : 50 IMAM MUBAROK

NTS SKALA 1 : 50
JUDUL GAMBAR

500 500
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5
200

KAWAT HARMONIKA 50x50

500

500
DI BAUT / DI RIPET TIAP 30 cm
KOLOM
NAMA GAMBAR
SIKU 40.40.4
PLAT STRIP 30x3

KOLOM
500
50

TAMPAK & POT. PAGAR TYPE E

DETAIL 4 POTONGAN A-A POTONGAN A-A AT CORNER


NTS
SKALA 1 : 50 SKALA 1 : 50
SCALE REVISI
NO. TANGGAL PARAF
1
2

DETAIL 1 3
SKALA : 20 NO REGISTER

CME - 82 - 17A A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

SCALE = 15:A4

MENGETAHUI

200
750 PT. GANDA ALAM MAKMUR

PROYEK
100
100

PEMBANGUNAN BTS
300
600
KONTRAKTOR

SCALE = 25:A4
PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

PONDASI
BATU KALI
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5
PASANGAN ROLAK PASANGAN ROLAK

2600 2400
NAMA GAMBAR

2600 2400

PAGAR TYPE E & DETAIL


(PONDASI BATU KALI)

SCALE REVISI
NO. TANGGAL PARAF
1
2
PASANGAN ROLAK PASANGAN ROLAK 3
NO REGISTER

CME - 82 - 17B A3
2400 2400

+3.00
VI VIII PT. GANDA ALAM MAKMUR

800
III V rail top L 40x40x4mm
CATATAN/KETERANGAN
+2.20
Plat bar 4x30x2000mm
Hot Dip Galvanized
VII
II
2000 Detail a

I IV
MENGETAHUI
1
200 350 200

Pas. DINDING 1/2 Bt Pas. DINDING 1/2 Bt


PT. GANDA ALAM MAKMUR
PAS ROLAG BATA PAS ROLAG BATA

-0.550

TYPICAL SIDE VIEW


SKALA 1 : 50
PROYEK
DETAIL VII DETAIL V
SKALA 1 : 5 SKALA 1 : 5

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

DETAIL II DETAIL III


SKALA 1 : 5 SKALA 1 : 5

IMAM MUBAROK

JUDUL GAMBAR
50
0

GREEN FIELD SST 82 METER MEDIUM LIGHT


17

MESS KM 5
7
DETAIL I 22 DETAIL IV
SKALA 1 : 5 SKALA 1 : 5
NAMA GAMBAR
800
200
75 200

PAGAR TYPE E & DETAIL


+2.20

SCALE REVISI
NO. TANGGAL PARAF
1
2
DETAIL VI DETAIL VIII 3
SKALA 1 : 5 SKALA 1 : 5
NO REGISTER

CME - 82 - 18 A3
200 2900 200

PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

1500 1500
L.40.40.4

Barbed wire
5 lines +
Double Cross Line TAMPAK ATAS
SKALA 1 : 25

MENGETAHUI
WELD
PT. GANDA ALAM MAKMUR

+ 3.00

L.40.40.4
WELD
ANCHORE TO FENCE COLUMN
PROYEK
800

KAWAT HARMONIKA

PEMBANGUNAN BTS
+ 2.20
DETAIL 1 KONTRAKTOR
NTS
3000 PT. PICOTEL
Barbed wire
1500 1500 5 lines +
Double Cross Line
KAWAT HARMONIKA

800
DIDESAIN DIPERIKSA DISETUJUI
2000

PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR
DETAIL 1

KAWAT HARMONIKA IMAM MUBAROK

KOLOM BETON
150/150 JUDUL GAMBAR
2000

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

50
L50x50x5, anchore each 1.00m NAMA GAMBAR
Concrete 1:3:5 Concrete 1:3:5 2900

L50x50x5, anchore each 1.00m


A DETAIL PINTU

POTONGAN A PINTU GESER SCALE REVISI


SKALA 1 : 25 SKALA 1 : 50 NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 19 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

Barbed wireb 5 lines +


Double Cross Line MENGETAHUI

PT. GANDA ALAM MAKMUR


BESI SIKU L 50X50X5

BESI SIKU L 50X50X5 BESI SIKU L 50X50X5

PROYEK

4 D12 4 D12 4 D12


PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

150 150 150


DIDESAIN DIPERIKSA DISETUJUI
DETAIL PAGAR KELILING DETAIL PAGAR KELILING PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

SKALA 1 : 50 SKALA 1 : 50

IMAM MUBAROK

JUDUL GAMBAR
2 D12

GREEN FIELD SST 82 METER MEDIUM LIGHT


150 2 D12
MESS KM 5

POTONGAN A-A
SKALA 1 : 50 NAMA GAMBAR

DETAIL PAGAR KELILING

SCALE REVISI
NO. TANGGAL PARAF
1
2
3
NO REGISTER

CME - 82 - 19 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR


NP0

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL POLE KWH METER

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 20 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL BOX KWH

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 21 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

WIRING DIAGRAM KWH METER

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 22 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

PANEL ACPDB

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 23 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

WIRING DIAGRAM ACPDB

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 24 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

Isolator

MENGETAHUI

PT. GANDA ALAM MAKMUR

Plat Baja Galvanis


Plat Baja Galvanis
400x200x4 mm
400x200x4 mm

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR
Ke BTS Outdoor
PT. PICOTEL
Ke antena GSM
Ke antena MICROWAVE

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR
Plat Baja Galvanis
400x200x4 mm
GREEN FIELD SST 82 METER MEDIUM LIGHT
MESS KM 5

Ke grounding terdekat
NAMA GAMBAR

Ke copper bonded rod 5/8"


ditanam di beton pedestal
DETAIL BAUT

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 25 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI
SS Tower
PT. GANDA ALAM MAKMUR

Lightning Arrester

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

* Integrated to KWH Meter and door fence


IMAM MUBAROK
* Integrasi ke KWH Meter dan pintu pagar
* Integrated to fence
* Integrasi ke pagar JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

LAYOUT GROUNDING SYSTEM

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 26 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

FRONT VIEW SIDE VIEW


DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

FRONT VIEW

SCALE REVISI
NO. TANGGAL PARAF

FRONT VIEW (OPEN COVER) 1

NO REGISTER

CME - 82 - 27 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

PILOT LAMP

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 28 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

LAMPU MOUNTING

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 29 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DETAIL PENTANAHAN TYPE-B


DIDESAIN DIPERIKSA DISETUJUI
PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

DETAIL PENTANAHAN TYPE-A GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL PENTANAHAN

DETAIL 2.
SCALE REVISI
NO. TANGGAL PARAF
1

DETAIL 1.
NO REGISTER

CME - 82 - 30 A3
PT. GANDA ALAM MAKMUR

CATATAN/KETERANGAN

MENGETAHUI

PT. GANDA ALAM MAKMUR

PROYEK

PEMBANGUNAN BTS

KONTRAKTOR

PT. PICOTEL

DIDESAIN DIPERIKSA DISETUJUI


PT TUNAS SATRIA MULTIKARYA PT. GANDA ALAM MAKMUR PT. GANDA ALAM MAKMUR

IMAM MUBAROK

JUDUL GAMBAR

GREEN FIELD SST 82 METER MEDIUM LIGHT


MESS KM 5

NAMA GAMBAR

DETAIL BOX CONTROL

SCALE REVISI
NO. TANGGAL PARAF
1

NO REGISTER

CME - 82 - 31 A3