PEKERJAAN :
GUDANG LPG KENDALPAYAK
LOKASI :
GG. APOKAT, KENDALPAYAK
KECAMATAN PAKISAJI, KABUPATEN MALANG
TAHUN 2023
GAMBAR ARSITEKTUR
U ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
PEMILIK
PRABOWO EDHISARWONO
PERENCANA DIGAMBAR
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
YO
KABUPATEN MALANG
I MUL
JL. AD
PEMILIK
LOKASI
PRABOWO EDHISARWONO
PERENCANA DIGAMBAR
YO
I MUL
JL. AD
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
GG. AP
OKAT
GG. AP
OKAT
YO
GG. AP
OKAT
I MUL
LAYOUT NTS
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
TABUNG LPG PEMILIK
GUDANG +1.10
6.00
-0.10
GUDANG
5.00
-0.10 PRABOWO EDHISARWONO
3.50
TEMPAT
B GUDANG
PENURUNAN B
-0.10 PERENCANA DIGAMBAR
TABUNG LPG
-0.10
22.50
22.50
3.50
GUDANG
-0.10 GUDANG
5.00
-0.10
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
-0.10 PENURUNAN ±0.00
TABUNG LPG
-0.10
TERAS
-0.05
KM/WC
1.50
-0.05
4.40
Parkir Parkir
1.00 1.00
16.00
A
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
PEMILIK
PRABOWO EDHISARWONO
PERENCANA DIGAMBAR
[ARS-01] TAMPAK SAMPING
SKALA 1 : 100
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
REVISI
KODE HALAMAN
ARS-KOS 04
ASBUILT DRAWING
Bubungan
7.65 7.65
LOKASI PEKERJAAN
1.10 Tempat Penurunan Tabung LPG Tempat Penurunan Tabung LPG Parkir
-0.10 -0.10 -0.15
±0.00 ±0.00
PRABOWO EDHISARWONO
1.55 1.55
Sloof 20 x 30 cm 0.90 3.23 0.90 16.73 0.90 Sloof 20 x 30 cm
4.50 18.00
PERENCANA DIGAMBAR
Pondasi Batu Kali Pondasi Batu Kali
22.50
Talang Seng
7.65
6.55
5.15 5.00
Ring Balok 15 x 20 cm 4.25
3.55
JUDUL GAMBAR SKALA
Balok 15 x 30 cm
Ring Balok 15 x 20 cm
POTONGAN A - A 1 : 100
Gudang Tempat Penurunan Tabung LPG Gudang
-0.10 -0.10 -0.10 POTONGAN B - B 1 : 100
±0.00 ±0.00
1.55 1.55
0.90 5.72 0.90 4.10 0.90 2.73 0.90 REVISI
Sloof 20 x 30 cm
7.00 5.00 4.00
Pondasi Batu Kali
16.00
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
TABUNG LPG PEMILIK
GUDANG +1.10
6.00
-0.10
GUDANG
5.00
-0.10 PRABOWO EDHISARWONO
3.50
TEMPAT
GUDANG
PENURUNAN
-0.10 PERENCANA DIGAMBAR
TABUNG LPG
-0.10
22.50
22.50
3.50
GUDANG
-0.10 GUDANG
5.00
-0.10
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
GUDANG TEMPAT
3.60
-0.10 PENURUNAN
TABUNG LPG
-0.10
KM/WC
1.50
-0.05
4.40
Parkir Parkir
1.00 1.00
16.00
REVISI
KETERANGAN :
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
A4
PEMILIK
6.00
A4
5.00
PRABOWO EDHISARWONO
3.50
A4
A5
PERENCANA DIGAMBAR
22.50
22.50
3.50
A4
5.00
A4
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
A5 DISAHKAN DISETUJUI
6.00
A4
3.60
A1
A1
1.50
A2
4.40
A5
1.00 1.00
A2
JUDUL GAMBAR SKALA
DENAH
1 : 100
1.50 4.95 6.10 3.45 LANTAI
16.00
KETERANGAN :
3.90
PEMILIK
PRABOWO EDHISARWONO
11.35
21.75
21.75
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
4.50
2.60
2.00
JUDUL GAMBAR SKALA
16.15
REVISI
KETERANGAN :
SPESIFIKASI MATERAIAL KODE HALAMAN
NO. SIMBOL / NOTASI
NAMA KOMPONEN TYPE / JENIS
LOKASI PEKERJAAN
GEWEL PAS. DINDING 3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
KUDA - KUDA GALVALUM C 75 GEWEL PAS. DINDING
5.00
GORDING KAYU
PRABOWO EDHISARWONO
3.50
USUK KAYU
PERENCANA DIGAMBAR
22.50
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
1.00 1.00
DENAH
1 : 100
1.50 4.95 6.10 3.45 ATAP
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
KUDA - KUDA GALVALUM C 75
6.00
RENG GALVALUM R 45
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
KUDA - KUDA GALVALUM C 75
RENG GALVALUM R 45
4.40
RENG GALVALUM R 45
1.00 1.00
DENAH
1 : 100
1.50 4.95 6.10 3.45 ATAP
16.00
REVISI
KODE HALAMAN
PEKERJAAN :
PABRIK PLASTIK JATISARI PAKISAJI
LOKASI :
JATISARI KECAMATAN PAKISAJI
KABUPATEN MALANG, JAWA TIMUR
TAHUN 2022
GAMBAR
MECHANICAL
ELECTRICAL DAN
PLUMBING
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
1.00 1.00
DENAH
1 : 100
1.50 4.95 6.10 3.45 LISTRIK
16.00
REVISI
KETERANGAN :
SPESIFIKASI MATERAIAL
NO. SIMBOL / NOTASI
NAMA KOMPONEN TITIK / UNIT
Saklar Tunggal
KODE HALAMAN
2 6 Titik
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
1.00 1.00
16.00
REVISI
KETERANGAN :
SPESIFIKASI MATERAIAL
NO. SIMBOL / NOTASI KODE HALAMAN
NAMA KOMPONEN TITIK / UNIT
LOKASI PEKERJAAN
PEMILIK
L FT PRABOWO EDHISARWONO
20 Watt
P
PERENCANA DIGAMBAR
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
REVISI
KODE HALAMAN
MEP-KOS 03
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
1.00 1.00
P
JUDUL GAMBAR SKALA
S
DENAH
1 : 100
1.50 4.95 6.10 3.45 AIR BERSIH
16.00
REVISI
KETERANGAN :
SPESIFIKASI MATERAIAL
NO. SIMBOL / NOTASI
NAMA KOMPONEN TYPE / JENIS
[MEP-01] DENAH AIR BERSIH 2 S Sumur Bor Sumber Jaringan Air Bersih
LOKASI PEKERJAAN
PIPA PVC 1/2"
CLOSED DUDUK GG. APOKAT, KENDALPAYAK
KECAMATAN PAKISAJI,
KABUPATEN MALANG
PEMILIK
PRABOWO EDHISARWONO
PERENCANA DIGAMBAR
FLOOR DRAIN
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
PIPA PVC 4"
KE ARAH RESAPAN
REVISI
KODE HALAMAN
[MEP-01]
DIAGRAM AIR BERSIH, AIR KOTOR, DAN AIR BEKAS
SKALA NTS MEP-KOS 05
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
RESAPAN
SEPTICTANK
4.40
1.00 1.00
REVISI
KODE HALAMAN
KETERANGAN :
SPESIFIKASI MATERAIAL
[MEP-01] DENAH AIR BEKAS DAN AIR KOTOR NO. SIMBOL / NOTASI
NAMA KOMPONEN TYPE / JENIS
SKALA 1 : 100 MEP-KOS 06
Pipa 3" untuk Afoer
1 Pipa Air Kotor
Pipa 4" untuk Closed
ASBUILT DRAWING
NAMA PEKERJAAN
Urugan pasir
Ijuk
Plat beton
7 LOKASI PEKERJAAN
Pas. Batu bata
10 10 30 120 30 10 10 70
Urugan tanah
220
GG. APOKAT, KENDALPAYAK
Pas. bata kosongan
KECAMATAN PAKISAJI,
KABUPATEN MALANG
[MEP-01] POTONGAN 1
297
SKALA NTS
PEMILIK
30
180
OUT LET IN LET
Pasir 10
Ijuk 15
60
1
10 10 30 120 30 10 10
220
210
PRABOWO EDHISARWONO
KRIKIL KASAR
POTONGAN 2
60
[MEP-01]
SKALA NTS PERENCANA DIGAMBAR
10 10 30 120 30 10 10
220
30
LAPISAN IJUK
DETAIL RESAPAN
30
PASIR
[MEP-01]
SKALA NTS
80 BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
ventilasi pvc 2" desinfectan tube
pvc 2"
taman
POTONGAN A
DISAHKAN DISETUJUI
inlet pvc 4"
CINCIN DIA 80CM dari kloset outlet pvc 4"
ke resapan
135
KESALURAN
BUANGAN 300
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
RESAPAN
1.00 1.00
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
PEMILIK
30
OUT LET IN LET
60
BATU BELAH
210
PRABOWO EDHISARWONO
KRIKIL KASAR
60
PERENCANA DIGAMBAR
30
LAPISAN IJUK
30
PASIR
BRIAN
80 WAHYU ANDYKA
EKI WIRAWAN, ST
IN LET
DETAIL SUMUR
NTS
RESAPAN AIR HUJAN
REVISI
KODE HALAMAN
MEP-KOS 09
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
PEMILIK
7.65 7.65
PRABOWO EDHISARWONO
2.50
Tempat Penyimpanan Tabung LPG 2.10
+1.10
Rangka Kayu
1.10
22.50
POTONGAN SALURAN
1 : 100
AIR HUJAN
REVISI
KODE HALAMAN
MEP-KOS 10
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
TURUN KE BAK KONTROL
PENTAHANAN
1.00 1.00
DENAH
1 : 100
1.50 4.95 6.10 3.45 PENANGKAL PETIR
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
PEMILIK
7.65 7.65
PRABOWO EDHISARWONO
2.50
Tempat Penyimpanan Tabung LPG 2.10
+1.10
1.10
Box Grounding
1.55 1.55 DISAHKAN DISETUJUI
22.50
POTONGAN
1 : 100
PENANGKAL PETIR
REVISI
KODE HALAMAN
MEP-KOS 12
ASBUILT DRAWING
100
L 50.50.5 NAMA PEKERJAAN
DILGAVANIZE
400
HANDLE Ø 12
PEMILIK
1.50
PRABOWO EDHISARWONO
BC 50 mm
BC - 50 mm
[MEP-01] DETAIL A
CONDUIT 25 mm SKALA NTS BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
DET-B
JUDUL GAMBAR SKALA
KODE HALAMAN
MEP-KOS 13
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
6.00
3.60
1.50
4.40
1.00 1.00
DENAH RENCANA
1 : 100
1.50 4.95 6.10 3.45 PANEL LISTRIK
16.00
REVISI
KODE HALAMAN
KETERANGAN :
SPESIFIKASI MATERAIAL
[MEP-01] DENAH APAR NO. SIMBOL / NOTASI
NAMA KOMPONEN TYPE / JENIS
SKALA 1 : 100 MEP-KOS 14
1 Apar Powder 3 Kg
AS BUILT DRAWING
PEKERJAAN :
PABRIK PLASTIK JATISARI PAKISAJI
LOKASI :
JATISARI KECAMATAN PAKISAJI
KABUPATEN MALANG, JAWA TIMUR
TAHUN 2022
GAMBAR
STRUKTUR
ASBUILT DRAWING
NAMA PEKERJAAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
0.20
6.00
3.60
0.30
0.80
1.50
4.40
1.00 1.00
DENAH
1 : 100
1.50 4.95 6.10 3.45 PONDASI BATU KALI
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
P-1
P-1 P-1
5.00
P-1 P-1 P-1 PRABOWO EDHISARWONO
18.95
19.00
5.00
1.40
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
P-1 P-1 P-1
1.40
DISAHKAN DISETUJUI
P-1 P-1
6.00
4.45
P-1 P-1 P-1
DENAH
1 : 100
3.50 3.55 6.10 3.95 PONDASI FOOTPLAT - P1
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
SL-1 PEMILIK
6.00
SL-1 SL-1
SL-1
SL-1
SL-1
5.00
SL-1 SL-1 PRABOWO EDHISARWONO
3.50
SL-1 SL-1
PERENCANA DIGAMBAR
SL-1
SL-1
22.50
22.50
3.50
SL-1 SL-1
5.00
SL-1 SL-1
BRIAN
SL-1 EKI WIRAWAN, ST WAHYU ANDYKA
SL-1
DISAHKAN DISETUJUI
6.00
SL-1 SL-1
3.60
SL-1 SL-1
SL-1 SL-1
0.20
1.50
SL-1
4.40
SL-1
1.00 1.00
SL-1
JUDUL GAMBAR SKALA
SL-1 SL-1 SL-1
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
KP KP
KL KL KL
KL KL KL
5.00
PRABOWO EDHISARWONO
KL KL KL KL KL
22.50
22.50
3.50
5.00
BRIAN
KL KL KL EKI WIRAWAN, ST WAHYU ANDYKA
KL KL DISAHKAN DISETUJUI
6.00
3.60
KP KP
0.15
0.25
KP KP KP
KL KL
0.25
KL 0.15
1.50
4.40
KP KP
1.00 1.00
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
BL-1 PEMILIK
6.00
BL-1 BL-1
BL-1 BL-1
BL-1 BL-1
5.00
BL-1 BL-1 PRABOWO EDHISARWONO
3.50
BL-1 BL-1
PERENCANA DIGAMBAR
BL-1
BL-1 BL-1
22.50
22.50
3.50
BL-1 BL-1
5.00
0.15 BL-1 BL-1
BRIAN
BL-1 BL-1 EKI WIRAWAN, ST WAHYU ANDYKA
BL-1
DISAHKAN DISETUJUI
6.00
BL-1 BL-1
3.60
BL-1 BL-1
1.50
4.40
1.00 1.00
16.00
REVISI
KODE HALAMAN
LOKASI PEKERJAAN
3.50 3.50 5.00 4.00
4.50
PEMILIK
6.00
5.00
PRABOWO EDHISARWONO
22.50
3.50
5.00
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
RB
DISAHKAN DISETUJUI
6.00
3.60
RB RB
RB
1.50
RB 0.15
4.40
RB
1.00 1.00
RB
JUDUL GAMBAR SKALA
RB RB RB
16.00
REVISI
KODE HALAMAN
0.58
0.58
2 / Ø12 GG. APOKAT, KENDALPAYAK
Ø12 - 200
Ø10 - 200
KECAMATAN PAKISAJI,
1.60
GAMBAR
0.58 0.25
0.58 0.25
1.40
1.40
Ø12 - 200 Ø10 - 200 SKALA KABUPATEN MALANG
1 : 50
Ø12 - 200 Ø10 - 200 Ø10 - 200
Ø12 - 200 PEMILIK
1.20
0.30
1.50 1.40
1.60
0.05
LANTAI KERJA T= 5 CM
DIMENSI 1.40 x 1.40 x 0.30
PASIR URUG T = 5 CM
TULANGAN LENTUR Ø12 -200
PONDASI FOOTPLAT
UK. 140x140x30 CM TULANGAN SUDUT Ø10 -200 PRABOWO EDHISARWONO
PERENCANA DIGAMBAR
BRIAN
EKI WIRAWAN, ST WAHYU ANDYKA
DISAHKAN DISETUJUI
±0.00 LANTAI
0.35
0.35
1.40
SLOOF 20x30 CM
1.60
1.00
Ø12 - 200
Ø10 - 200
0.58
0.25
1.40
1.40
0.20
1 : 25
PONDASI P1
1.60 DETAIL PENULANGAN
1 : 50
PONDASI P1
0.05
Ø10 - 200
DETAIL PONDASI
0.58
0.58
KODE HALAMAN
0.30
0.30
0.30
0.30
Ø8 - 100 Ø8 - 150
KABUPATEN MALANG
2 / Ø12
2 / Ø10
0.25
0.15
0.15
0.15
GAMBAR GAMBAR
0.25
0.25
Ø8 - 150 Ø8 - 150
SKALA SKALA
1 : 20 1 : 20
0.15
0.25 BRIAN
2 / Ø10 EKI WIRAWAN, ST WAHYU ANDYKA
2 / Ø12
DISAHKAN DISETUJUI
DIMENSI 0.25 x 0.25 DIMENSI 0.15 x 0.15
TULANGAN UTAMA 4 / Ø12 TULANGAN UTAMA 4 / Ø10
SENGKANG Ø8 -150 SENGKANG Ø8 -150
TIPE BALOK - BL1 BALOK - BL1 TIPE RING BALOK - RB RING BALOK - RB
3 / Ø12 2 / Ø12
3 / Ø12 2 / Ø12
0.15 0.15 JUDUL GAMBAR SKALA
0.15 0.15
GAMBAR GAMBAR
SKALA SKALA
0.20
0.20
0.20
0.20
0.30
0.30
0.30
0.30
1 : 20 1 : 20 Ø8 - 100 Ø8 - 150
Ø8 - 100 Ø8 - 150 DETAIL PENULANGAN 1 : 20
0.15 0.15
0.15 0.15
2 / Ø12 2 / Ø12
2 / Ø12 2 / Ø12
DIMENSI 0.15 x 0.30 0.15 x 0.30 DIMENSI 0.15 x 0.20 0.15 x 0.20
3 / Ø12 2 / Ø12 3 / Ø12 2 / Ø12
REVISI
TULANGAN ATAS TULANGAN ATAS
TULANGAN TENGAH - - TULANGAN TENGAH - -
TULANGAN BAWAH 2 / Ø12 2 / Ø12 TULANGAN BAWAH 2 / Ø12 2 / Ø12
SENGKANG Ø8 -100 Ø8 -150 SENGKANG Ø8 -100 Ø8 -150
KODE HALAMAN
STR-KOS 08