HPS Ded 140JT
HPS Ded 140JT
DOKUMEN PENAWARAN
PENGADAAN LANGSUNG
PEKERJAAN :
JUMLAH BIAYA
NO. URAIAN PEKERJAAN
(Rp.)
I 0 -
II 0 -
A JUMLAH BIAYA -
C TOTAL BIAYA ( A + B ) -
D JUMLAH DIBULATKAN -
Terbilang : 0.00
Penawar,
PT. ANDRAXI MANDIRI INDONESIA
ENDRA MAULANA, ST
Direktur
PEMERINTAH KABUPATEN INDRAMAYU
HARGA SATUAN
No URAIAN PEKERJAAN Unit/Satuan Volume BIAYA (Rp)
(Rp)
a. Tenaga Ahli :
1 Team Leader / Ahli Teknik Sipil (6 Thn ) 1.00 Org 3 Bln 4,510,000 13,530,000.00
2 Ahli Arsitektur ( 4 Thn ) 1.00 Org 3 Bln 3,690,000 11,070,000.00
3 Ahli Teknik Sipil ( 4 Thn ) 1.00 Org 3 Bln 3,690,000 11,070,000.00
4 Ahli Mekanikal ( 4 Thn ) 1.00 Org 3 Bln 3,690,000 11,070,000.00
5 Ahli Lingkungan ( 4 Thn ) 1.00 Org 3 Bln 3,690,000 11,070,000.00
Jumlah Tenaga Ahli (a) = 57,810,000.00
b. Tenaga Pendukung :
1 Surveyor 3.00 Org 1 Bln 1,760,000 5,280,000.00
2 Drafter 3.00 Org 2 Bln 1,960,000 11,760,000.00
3 Administrasi 2.00 Org 3 Bln 1,760,000 10,560,000.00
Jumlah Tenaga Pendukung (b) = 27,600,000.00
Jumlah I ( a + b ) = 85,410,000.00
II. BIAYA LANGSUNG NON PERSONIL
a. Biaya Sewa Susut Kendaraan
1 Sewa Kendaraan Roda 4 1.00 Unit 20 Hari 450,000 9,000,000.00
2 Sewa Kendaraan Roda 2 3.00 Unit 60 Hari 85,000 15,300,000.00
3 Biaya Akomodasi dan Dokumentasi 1.00 Paket 2,500,000 2,500,000.00
Jumlah Biaya Sewa Susut Kendaraan (a) = 26,800,000.00
b. Biaya Alat Tulis Kantor
1 Tinta Printer Black 10.00 Tube 99,000 990,000.00
2 Tinta Printer Warna 10.00 Tube 105,000 1,050,000.00
3 HVS df 70 gram 8.00 Rim 62,000 496,000.00
4 HVS ef 70 gram 8.00 Rim 59,000 472,000.00
5 HVS ef 80 gram 8.00 Rim 58,000 464,000.00
Jumlah Biaya Alat Tulis Kantor (b) = 3,472,000.00
c. Biaya Pelaporan dan Penggandaan
1 Laporan Pendahuluan 5.00 Buku 290,000 1,450,000.00
2 Laporan Antara 5.00 Buku 290,000 1,450,000.00
3 Laporan Akhir 5.00 Buku 290,000 1,450,000.00
4 Laporan Gambar,RAB dan RKS 5.00 Buku 299,000 1,495,000.00
5 Hardisk 1.00 Bh 600,000 600,000.00
Jumlah Biaya Pelaporan dan Penggandaan (c) = 6,445,000.00
d. Biaya Diskusi dan Presentasi
1 Biaya Rapat dan Expose 1.00 Paket 4,000,000 4,000,000.00
Jumlah Biaya Diskusi dan Presentasi (d) = 4,000,000.00
Jumlah II ( a + b +c + d ) = 40,717,000.00
A. Jumlah I + II. = 126,127,000.00
B. PPn 11 % x ( A ) = 13,873,970.00
C. Total Biaya ( A + B ) = 140,000,970.00
D. Dibulatkan = 140,000,000.00
Terbilang : SERATUS EMPAT PULUH JUTA RUPIAH
Indramayu, 2023
Mengetahui :
Kepala Dinas PUPR
Kabupaten Indramayu
Program : Pemeliharaan, Rehabilitasi Pembangunan Infrastruktur Sumber Daya Air dan Energi Terbarukan
Kegiatan : Pengembangan dan Pengelolaan Sistem Irigasi Primer dan Sekunder pada Daerah Irigasi yang luasnya dibawah 1000 Ha dalam 1 (s
Pekerjaan : Perencanaan Teknis Rehabilitasi Jaringan Irigasi (DED untuk Kegiatan APBD II TA.2022)
HARGA SATUAN
No URAIAN PEKERJAAN Unit/Satuan Org/Bulan BIAYA (Rp)
(Rp)
a. Tenaga Ahli :
1 Team Leader/Ahli Sumber Daya Air (Sarjana Tek.Sipil 8 Thn) 1.00 Org 2 Bln 9,200,000 18,400,000.00
Jumlah Tenaga Ahli (a) = 18,400,000.00
b. Tenaga Pendukung :
2 Asisten Ahli Sumber Daya Air (S1 - 6 Thn) 1.00 Org 2 Bln 7,800,000 15,600,000.00
3 Tenaga Operator Komputer 2.00 Org 2 Bln 2,600,000 10,400,000.00
5 Tenaga Operator CAD 2.00 Org 2 Bln 4,700,000 18,800,000.00
6 Tenaga Surveyor 2.00 Org 1 Bln 4,300,000 8,600,000.00
7 Tenaga Office Boy 1.00 Org 2 Bln 1,200,000 2,400,000.00
Jumlah Tenaga Pendukung (b) = 55,800,000.00
Jumlah I ( a + b ) = 74,200,000.00
II. BIAYA LANGSUNG NON PERSONIL
a. Belanja Operasional Kantor :
1 Belanja Alat Tulis Kantor 1.00 Ls 2,328,000 2,328,000.00
2 Biaya Fotocopy Bahan 1.00 Ls 500,000 500,000.00
3 Biaya Sewa Laptop 2.00 Unit 450,000 900,000.00
4 Biaya Sewa Kendaraan (Roda 2) 2.00 Unit/Bln 500,000 1,000,000.00
5 Biaya Sewa Hand GPS 1.00 Unit/Bln 4 Hr 250,000 1,000,000.00
6 Biaya Sewa Alat Ukur ETS 1.00 Unit/Hr 4 Hr 250,000 1,000,000.00
7 Biaya Dokumentasi 1.00 Ls 650,000 650,000.00
8 Biaya Komunikasi 1.00 Ls 800,000 800,000.00
Jumlah Biaya Operasional Kantor (a) = 8,178,000.00
b. Biaya Pelaporan :
1. Belanja Cetak dan Penggandaan
a. Album Gambar Desain Final (A3) 5.00 Buku 85,000 425,000.00
b. Album Gambar Desain Final (F4) 5.00 Buku 60,000 300,000.00
c. RAB dan Spek Teknis 5.00 Buku 60,000 300,000.00
d. Album Foto lokasi 5.00 Buku 85,000 425,000.00
2. Pembuatan Laporan
* Laporan Awal 5.00 Buku 85,000 425,000.00
* Laporan antara/pertengahan 5.00 Buku 85,000 425,000.00
* Laporan Akhir 5.00 Buku 125,000 625,000.00
Jumlah Biaya Pelaporan (b) = 2,925,000.00
Jumlah II ( a + b ) = 11,103,000.00
A. Jumlah I + II. = 85,303,000.00
B. PPn 10 % x ( A ) = 8,530,300.00
C. Total Biaya ( A + B ) = 93,833,300.00
D. Dibulatkan = 93,833,300.00
Terbilang : 0
I Tahap Persiapan
Indramayu, 2019
ENDRA MAULANA, ST
Direktur
DATA PERSONIL INTI YANG DI TEMPATKAN PADA KEGIATAN/PEKERJAAN INI
Program : Pemeliharaan, Rehabilitasi Pembangunan Infrastruktur Sumber Daya Air dan Energi Terbarukan
Kegiatan : Pengembangan dan Pengelolaan Sistem Irigasi Primer dan Sekunder pada Daerah Irigasi yang luasnya dibawah 1000 Ha dalam 1 (satu) Daerah Kabupaten/Kota
Pekerjaan : Perencanaan Teknis Rehabilitasi Jaringan Irigasi (DED untuk Kegiatan APBD II TA.2022)
Lokasi : Kabupaten Indramayu
Penawar : PT. ANDRAXI MANDIRI INDONESIA
Pengalaman
Pendidikan Kerja Sertifikat /
No Nama Tgl./ Bln/Thn Lahir Jabatan Dalam Kegiatan ini Profesi / Keahlian
Terakhir Ijasah
(tahun)
ENDRA MAULANA, ST
Direktur
OPNAME FISIK
Program Pengembangan dan Pengelolaan Jaringan Irigasi, Rawa dan Jaringan Pengairan Lainnya
Kegiatan : Pemberdayaan Petani Pemakai Air dan Komisi Irigasi
Pekerjaan : Belanja Cetak dan Penggandaan Buku Kegiatan Komisi Irigasi, Pelatihan TOT Hemat Air , Evaluasi Kegiatan P3A/GP3A dan OTI
Lokasi : Dinas PSDATAMBEN Kab. Indramayu
Terbilang : 0