Anda di halaman 1dari 10

REKAPITULASI

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR PEMERINTAH


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR
LOKASI : WILAYAH KECAMATAN INDRAMAYU
TAHUN ANGGARAN : APBD KABUPATEN INDRAMAYU TAHUN 2018

SUB TOTAL JUMLAH TOTAL


NO URAIAN PEKERJAAN HARGA HARGA
(RP.) (RP.)
PEKERJAAN BANGUNAN STANDARD
A PEKERJAAN PERSIAPAN 86,945,500.00 86,945,500.00
B PEKERJAAN GALIAN DAN URUGAN 108,710,162.00 108,710,162.00
C PEKERJAAN STRUKTUR BETON
I PONDASI BETON 283,625,639.40 283,625,639.40
II STRUKTUR BETON LANTAI - 1 1,235,500,295.00 1,235,500,295.00
III STRUKTUR BETON LANTAI - 2 21,707,756.00 21,707,756.00
D PEKERJAAN BETON PRAKTIS & BALOK LINTLE 85,941,359.00 85,941,359.00
E PEKERJAAN DINDING & RAILLING TANGGA 210,297,372.00 210,297,372.00
F PEKERJAAN KUSEN & DAUN PINTU/JENDELA + ACCESSORIES 194,440,100.00 194,440,100.00
G PEKERJAAN PLAFOND 151,255,012.00 151,255,012.00
H PEKERJAAN LANTAI 248,992,025.00 248,992,025.00
I PEKERJAAN PENGECATAN & LABURAN 113,292,593.00 113,292,593.00
J PEKERJAAN ELEKTRIKAL 54,836,900.00 54,836,900.00
K PEKERJAAN MEKANIKAL 121,446,000.00 121,446,000.00
L PEKERJAAN INTERIOR 184,321,547.00 184,321,547.00
M PEKERJAAN SARANA LUAR GEDUNG
I PEKERJAAAN SARANA PARKIR 87,707,280.00 87,707,280.00
II PEKERJAAN PEMBUATAN KANTIN 194,288,738.00 194,288,738.00

JUMLAH TOTAL 3,383,308,278.40

PPN (10%) 338,330,827.84

JUMLAH TOTAL 3,721,639,106.24

DIBULATKAN 3,721,639,000.00

TERBILANG : TUJUH RATUS EMPAT PULUH EMPAT JUTA ENAM PULUH TIGA RIBU DELAPAN RATUS RUPIAH.

Indramayu, 7 Juni 2018


-
Penawar
PT. SUMBER MEGA UTAMA
-
-
Drs. RUDY INDRA PRASETYO
Direktur Utama
-

1
DAFTAR KUANTITAS DAN HARGA
KEGIATAN PEMBANGUNAN GEDUNG KANTOR PEMERINTAH
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR
LOKASI WILAYAH KECAMATAN INDRAMAYU
SUMBER DANA APBD KABUPATEN INDRAMAYU TAHUN 2018
-
-

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR PEMERINTAH


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR
LOKASI : WILAYAH KECAMATAN INDRAMAYU
TAHUN ANGGARAN : APBD KABUPATEN INDRAMAYU TAHUN 2018

NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
PEKERJAAN BANGUNAN STANDARD
A PEKERJAAN PERSIAPAN
1 Pas. Bowplank dan Pengukuran Site 118.00 M' 01 65,100.00 7,681,800.00
2 Pek. Pembuatan Papan Nama Proyek 1.00 Unit 02 324,500.00 324,500.00
3 Pek. Pemasangan Pagar Sementara ( Seng Gelombang) 126.00 M' 03 289,200.00 36,439,200.00
4 Pek. Bongkaran Bangunan Exsisting 1.00 Ls - 25,000,000.00 25,000,000.00
5 Sewa Direksi Keet dan Gudang 1.00 Ls - 10,000,000.00 10,000,000.00
6 Biaya Administrasi dan Dokumentasi 1.00 Ls - 2,500,000.00 2,500,000.00
7 Biaya Listrik dan Air Kerja 1.00 Ls - 5,000,000.00 5,000,000.00
86,945,500.00
B PEKERJAAN GALIAN DAN URUGAN
1 Pek. Galian Pondasi Strausfile dia 30 217.50 M' - 140,000.00 30,450,000.00
2 Pek. Galian Tanah Poer P1,P2,P3 dan P4 54.34 M³ 05 79,200.00 4,303,728.00
3 Pek. Lantai Kerja Bwh Poer P1,P2,P2 dan P4 1.80 M³ 20 853,400.00 1,536,120.00
4 Pek. Lantai Kerja Bwh Sloof 2.73 M³ 20 853,400.00 2,329,782.00
5 Pek. Urugan Pasir Bwh Poer P1,P2,P3 dan P4 3.60 M³ 08 241,600.00 869,760.00
6 Pek. Urugan Pasir Bawah Sloof 5.57 M³ 08 241,600.00 1,345,712.00
7 Pek. Urugan Tanah Kembali 32.62 M³ 09 36,000.00 1,174,320.00
8 Pek. Urugan Tanah Peninggian bangunan di Padatkan 258.53 M³ 11 258,000.00 66,700,740.00
108,710,162.00
C PEKERJAAN STRUKTUR BETON
I PONDASI BETON
1 Pondasi Straus Pile Beton Dia 30 cm Beton K - 300
- Cor Beton K-300 9.22 M³ 25 1,090,400.00 10,053,488.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 2,316.84 Kg 27 15,400.00 35,679,336.00
2 Pas.Pondasi Poer Plat P1 70 x 120 x 40 cm Beton K - 300
- Cor Beton K-300 5.38 M³ 25 1,090,400.00 5,866,352.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 942.40 Kg 27 15,400.00 14,512,960.00
- Bekisting 24.32 M² 29 168,800.00 4,105,216.00
3 Pas.Pondasi Poer Plat P2 60/60 x 120 x 50 cm Beton K - 300
- Cor Beton K-300 3.69 M³ 25 1,090,400.00 4,023,576.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 568.58 Kg 27 15,400.00 8,756,132.00
- Bekisting 14.40 M² 29 168,800.00 2,430,720.00
4 Pas.Pondasi Poer Plat P3 70 x 70 x 40 cm Beton K - 300
- Cor Beton K-300 1.37 M³ 25 1,090,400.00 1,493,848.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 270.06 Kg 27 15,400.00 4,158,924.00
- Bekisting 7.84 M² 29 168,800.00 1,323,392.00
5 Pas.Pondasi Poer Plat P4 140 x 140 x 50 cm Beton K - 300
- Cor Beton K-300 5.88 M³ 25 1,090,400.00 6,411,552.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 736.25 Kg 27 15,400.00 11,338,250.00
- Bekisting 16.80 M² 29 168,800.00 2,835,840.00

2
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
5 Pekerjaan Pondasi Telapak Tangga 135 X 90 X 40 cm
- Cor Beton K-300 0.49 M³ 25 1,090,400.00 534,296.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 77.27 Kg 27 15,400.00 1,189,958.00
- Bekisting 1.80 M² 29 168,800.00 303,840.00
6 Pekerjaan Kolom Pedestal Tangga 20/135
- Cor Beton K-300 0.41 M³ 25 1,090,400.00 447,064.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 61.18 Kg 27 15,400.00 942,172.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 21.28 Kg 27 15,400.00 -
- Bekisting 4.65 M² 31 402,700.00 1,872,555.00
7 Pekerjaan Kolom Pedestal K1 30/30
- Cor Beton K-300 1.01 M³ 25 1,090,400.00 1,101,304.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 217.34 Kg 27 15,400.00 3,347,036.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 68.38 Kg 27 15,400.00 -
- Bekisting 13.44 M² 31 402,700.00 5,412,288.00
8 Pekerjaan Kolom Pedestal K2 30/30
- Cor Beton K-300 0.26 M³ 25 1,090,400.00 283,504.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 72.95 Kg 27 15,400.00 1,123,430.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 17.09 Kg 27 15,400.00 -
- Bekisting 3.36 M² 31 402,700.00 1,353,072.00
8 Pekerjaan Sloof (S1) 25/40
- Cor Beton K-300 3.68 M³ 25 1,090,400.00 4,012,672.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 489.54 Kg 27 15,400.00 7,538,916.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 244.95 Kg 15,400.00 -
- Bekisting 29.42 M² 30 181,500.00 5,339,730.00
9 Pekerjaan Sloof (S2) 25/40
- Cor Beton K-300 24.19 M³ 25 1,090,400.00 26,376,776.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 4,827.33 Kg 27 15,400.00 74,340,820.40
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 1,610.72 Kg 15,400.00 -
- Bekisting 193.48 M² 30 181,500.00 35,116,620.00
283,625,639.40

3
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
II STRUKTUR BETON LANTAI - 1

1 Pek . Penyemprotan Anti Rayap (Lentrex) 495.97 M² 83,600.00 -


1 Pek Urugan Pasir Bawah Lantai Kerja, t : 5 cm 24.80 M³ 08 241,600.00 5,991,680.00
2 Pek Lantai Kerja, t : 3 cm 14.88 M³ 20 853,400.00 12,698,592.00
3 Pek Cor Lantai Kerja dengan tulangan susut
- Cor Beton K-175 49.60 M³ 22 991,200.00 49,163,520.00
-Tulangan Pembesian Wiremest M6 495.97 M² - 36,300.00 18,003,711.00
4 Pekerjaan Kolom Beton K1 (30/30) cm
- Cor Beton K-300 9.20 M³ 25 1,090,400.00 10,031,680.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 2,169.39 Kg 27 15,400.00 33,408,606.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 623.93 Kg 15,400.00 -
- Bekisting 122.64 M² 31 402,700.00 49,387,128.00
5 Pekerjaan Kolom Beton K2 (30/30) cm
- Cor Beton K-300 2.21 M³ 25 1,090,400.00 2,409,784.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 729.54 Kg 27 15,400.00 11,234,916.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 170.94 Kg 15,400.00 -
- Bekisting 29.40 M² 31 402,700.00 11,839,380.00
6 Pekerjaan Balok Beton B1 (30/50) cm Elv 4.00
- Cor Beton K-250 29.26 M³ 24 1,056,900.00 30,924,894.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 5,840.51 Kg 27 15,400.00 89,943,854.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 1,624.12 Kg 15,400.00 -
- Bekisting 253.62 M² 32 410,300.00 104,060,286.00
7 Pekerjaan Balok Beton B1¹ (30/50) cm Elv 4.00
- Cor Beton K-250 2.48 M³ 24 1,056,900.00 2,621,112.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 563.74 Kg 27 15,400.00 8,681,596.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 145.74 Kg 15,400.00 -
- Bekisting 35.20 M² 32 410,300.00 14,442,560.00
7 Pekerjaan Balok Beton B2 (20/40) cm Elv 4.00
- Cor Beton K-250 5.49 M³ 24 1,056,900.00 5,802,381.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 1,333.99 Kg 27 15,400.00 20,543,446.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 419.69 Kg 15,400.00 -
- Bekisting 68.74 M² 32 410,300.00 28,204,022.00
8 Pekerjaan Balok Beton B1 (30/50) cm Elv 4.35
- Cor Beton K-250 14.10 M³ 24 1,056,900.00 14,902,290.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 2,814.13 Kg 27 15,400.00 43,337,602.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 782.55 Kg 15,400.00 -
- Bekisting 122.20 M² 32 410,300.00 50,138,660.00
9 Pekerjaan Balok Beton B2 (20/40) cm Elv 4.35
- Cor Beton K-250 4.90 M³ 24 1,056,900.00 5,178,810.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 1,191.41 Kg 27 15,400.00 18,347,714.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 374.83 Kg 15,400.00 -
- Bekisting 61.40 M² 32 410,300.00 25,192,420.00
10 Pekerjaan Balok Bordes Tangga (15/30) cm
- Cor Beton K-250 0.27 M³ 24 1,056,900.00 285,363.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 57.37 Kg 27 15,400.00 883,498.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 19.87 Kg 15,400.00 -
- Bekisting 4.50 M² 32 410,300.00 1,846,350.00

4
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
8 Pekerjaan Beton Plat Lantai, (Elv. +4.000)
- Cor Beton K-250 34.84 M³ 24 1,056,900.00 36,822,396.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 3,444.02 M² 27 15,400.00 53,037,908.00
- Bekisting 325.17 M² 33 650,700.00 211,588,119.00
9 Pekerjaan Beton Plat Lantai (S1), (Elv. +4.350)
- Cor Beton K-250 28.01 M³ 24 1,056,900.00 29,603,769.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 2,781.47 M² 27 15,400.00 42,834,638.00
- Bekisting 261.40 M² 33 650,700.00 170,092,980.00
10 Pekerjaan Beton Tangga
- Cor Beton K-250 3.02 M³ 24 1,056,900.00 3,191,838.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 773.28 Kg 27 15,400.00 11,908,512.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 295.76 M² 15,400.00 -
- Bekisting 18.35 M² 35 376,800.00 6,914,280.00

1,235,500,295.00
III STRUKTUR BETON LANTAI - 2

1 Pekerjaan Steek Kolom


- Cor Beton Tumbuk 2.52 M³ 20.2 862,300.00 2,172,996.00
-Tulangan Pembesian dengan Besi Ulir Atau BJTD 36 372.40 Kg 26.2 15,500.00 5,772,200.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 267.14 Kg 15,400.00
- Bekisting 33.60 M² 30.2 409,600.00 13,762,560.00
21,707,756.00
1,540,833,690.40
D PEKERJAAN BETON PRAKTIS & BALOK LINTLE
1 Pekerjaan kolom Praktis P 15/15
- Cor Beton K-175 (beton praktis) 4.68 M³ 22 991,200.00 4,638,816.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 788.51 Kg 27 15,400.00 12,143,054.00
- Bekisting 62.37 M² 31 402,700.00 25,116,399.00
2 Pekerjaan Balok lintel 15/20
- Cor Beton K-175 (beton praktis) 5.09 M³ 22 991,200.00 5,045,208.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 723.28 Kg 27 15,400.00 11,138,512.00
- Bekisting 67.90 M² 32 410,300.00 27,859,370.00
85,941,359.00
E PEKERJAAN DINDING & RAILLING TANGGA

1 Pek.Pasangang Dinding Bata Camp. 1 : 3 38.65 M² 36 121,600.00 4,699,840.00


2 Pek.Pasangang Dinding Bata Camp. 1 : 5 592.22 M² 37 116,300.00 68,875,186.00
3 Pek.Plesteran Dinding Bata Campuran 1 : 3 77.30 M² 39 56,800.00 4,390,640.00
4 Pek.Plesteran Dinding Bata Campuran 1 : 5 1,184.45 M² 40 51,800.00 61,354,510.00
5 Pekerjaan acian dinding 1,261.75 M² 42 27,000.00 34,067,250.00
6 Pek. Pasangan Dinding Partisi GRC t = 8 mm Rangka Metal Stud 26.55 M² 60 198,200.00 5,262,210.00
7 Pekerjaan Finishing & Profilan Kolom Belakang 4.00 Unit 2,500,000.00 10,000,000.00
8 Pekerjaan Perapihan Sudut Opening kusen aluminium 335.22 M¹ 42 25,200.00 8,447,544.00
9 Pekerjaan Finishing Kolom 121.28 M² 45 30,000.00 3,638,400.00
10 Pekerjaan dinding Batu Andesit Tinggi 80 Cm ( Pilar Ruang Tunggu 3.84 M² 83 294,100.00 1,129,344.00
11 Pekerjaan Railling tangga Steinless 8.88 M¹ 60 949,600.00 8,432,448.00
210,297,372.00
F PEKERJAAN KUSEN & DAUN PINTU/JENDELA + ACCESSORIES
1 Pasang Kusen dan Daun Pintu + Accessories Type PG1 3.00 Unit 49 7,201,300.00 21,603,900.00
2 Pasang Kusen dan Daun Pintu + Accessories Type PD1 3.00 Unit 50 6,068,400.00 18,205,200.00
3 Pasang Kusen dan Daun Pintu + Accessories Type P1 9.00 Unit 51 3,584,500.00 32,260,500.00
4 Pasang Kusen dan Daun Jendela+ Accessories Type J1 10.00 Unit 52 2,598,900.00 25,989,000.00
5 Pasang Kusen dan Daun Jendela+ Accessories Type J2 7.00 Unit 53 4,972,600.00 34,808,200.00
6 Pasang Kusen dan Daun Jendela+ BV1 12.00 Unit 56 2,224,300.00 26,691,600.00
7 Pasang Kusen dan Daun Jendela+ BV2 10.00 Unit 57 1,150,700.00 11,507,000.00
8 Pek. Pasang Kusen Allumunium + Daun Pintu Kaca ( Type PTS1 ) 3.00 Unit 54 5,705,400.00 17,116,200.00
9 Pek. Pasang Kusen Allumunium + Daun Pintu Kaca ( Type PTS2 ) 1.00 Unit 55 5,847,900.00 5,847,900.00
10 Pasang Glasblock 1.00 Unit 59 410,600.00 410,600.00

194,440,100.00

5
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
G PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond ( 60 x 60 ) Hollow 40x40 + 20x40 mm 563.66 M² 61 188,900.00 106,475,374.00
2 Pekerjaan Plafond Gypsum 9mm 563.66 M² 63 43,100.00 24,293,746.00
3 Pekerjaan Droop Cealing 64.41 M¹ 64 57,400.00 3,697,134.00
4 Pekerjaan List profil gipsum 521.39 M¹ 65 32,200.00 16,788,758.00

151,255,012.00
H PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=5 cm (Semua Ruangan) 37.82 M³ 08 241,600.00 9,137,312.00
2 Pekerjaan lantai Granit Tale 60X60 Marmo / polished Crema Marfill 756.43 M² 79 307,100.00 232,299,653.00
3 Pekerjaan Border lantai Granit Tale 30X60 Marmo/Polished Nero Marguina M² 316,100.00 -
3 Pekerjaan Keramik Tangga 30X60 19.40 M² 79 307,100.00 5,957,740.00
4 Pekerjaan Step Nozing tangga Uk. 10x60 32.40 M¹ 82 49,300.00 1,597,320.00
248,992,025.00
I PEKERJAAN PENGECATAN & LABURAN
1 Pekerjaan pengecatan dinding Interior 770.92 M² 72 36,700.00 28,292,764.00
2 Pekerjaan pengecatan dinding Exterior 413.53 M² 71 41,100.00 16,996,083.00
3 Pekerjaan pengecatan plafond 563.66 M² 73 36,700.00 20,686,322.00
4 Pekerjaan Waterproofing Emulsion 612.92 M² 75 50,200.00 30,768,584.00
5 Screed Lantai/Dak atap ad.1 : 3 : 5 (Penutup Waterproofing ) 612.92 M² 27,000.00 16,548,840.00
113,292,593.00
J PEKERJAAN ELEKTRIKAL
PEKERJAAN INSTALASI PENERANGAN DAN SETOPKONTAK
Pekerjaan Instalasi Penerangan dan Stopkontak didalam pipa
Conduit 20mm Lengkap dengan aksesoris
1 - Lampu TL 2 x 36 W RM 20.00 Bh 98 460,100.00 9,202,000.00
2 - Lampu Dowenlight Led 9 W 4" 43.00 Bh 99 222,100.00 9,550,300.00
3 - Lampu Dowenlight Led 4 W 2,5" Bh - -
3 - Saklar Seri 14.00 Bh - 22,000.00 308,000.00
4 - Stop kontak 40.00 Bh - 20,000.00 800,000.00
5 - Instalasi titik Lampu Penerangan 63.00 Ttk 100 259,600.00 16,354,800.00
6 - Instalasi stop kontak 1 fasa, 250 VA, 220 V 54.00 Ttk 101 244,100.00 13,181,400.00
PEKERJAAN SPARING PIPA AIR BEKAS
Referensi produk : Wavin , Rucika, Pralon
Sistem pemipaan PVC Class AW
1 PVC Pipe ø 100 mm (4") Kotor Dan Bekas 36.00 M¹ 90 115,500.00 4,158,000.00
2 Pasang Roof Drain 8.00 Bh 86 160,300.00 1,282,400.00
54,836,900.00
K PEKERJAAN MEKANIKAL
I PEKERJAAN INSTALASI TATA UDARA
1 AC Cassete
Pemasangan Ceiling AC kapasitas 24.000 btu/h (3 PK) 3.00 Unit 103 33,696,000.00 101,088,000.00
Type : Wall Mounted Series
Pekerjaan instalasi pipa Refrigern Lengkap dengan
2 Pemasangan Wall Mounted AC type Split kapasitas 18.000 btu/h ( 3.00 Unit 102 6,786,000.00 20,358,000.00
Pekerjaan instalasi pipa Refrigern Lengkap dengan
Isolasi Insoplex /Superloan
- Pipa Gas + Refrigerant
- Pipa Air buangan (PVC) "D" ¢ 20
- Kabel NYM 3 x 4 mm² + pvc 20mm
121,446,000.00
L PEKERJAAN INTERIOR

1 Treatment Dinding Multiplek Finishing Melamik Tinggi 85 Cm 64.04 M² 107 673,900.00 43,156,556.00
2 Backdrop Panel Multiplek Finishing Melamik Tinggi 330 Cm 126.39 M² 106 1,116,900.00 141,164,991.00
3 Meja Sidang (desain khusus) 400 X 85 X 100 Cm 2.00 Bh 7,922,000.00 -

6
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
4 Meja Sidang (desain khusus) 300 X 85 X 100 Cm 1.00 Bh 5,941,500.00 -

184,321,547.00
M PEKERJAAN SARANA LUAR GEDUNG
I PEKERJAAAN SARANA PARKIR

1 Pekerjaan Urugan Batu Kapur/Lime Stone 317.78 M3 13 240,000.00 76,267,200.00


2 Pekerjaan Pemadatan 317.78 M3 07 36,000.00 11,440,080.00
3 Sirtu Tebal 10 cm 63.79 M3 270,000.00 -
4 Pekerjaan Prima Cuat 637.90 M2 11,700.00 -
5 Pekerjaan Hotmix tebal 5 cm (Area Parkir) 637.90 M2 184,700.00 -
6 Pekerjaan Kansteen 92.13 M1 99,900.00 -
7 Pekerjaan Pengecatan Kansteen 41.46 M2 41,100.00 -
8 Pekerjaan Pemasangan Grevel U 20 cm 65.20 M1 370,700.00 -
87,707,280.00

7
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
II PEKERJAAN PEMBUATAN KANTIN
A PEKERJAAN PERSIAPAN
1 Pek. Pasang Papan Bouwplang 32.00 M¹ 01 65,100.00 2,083,200.00
2,083,200.00
B PEKERJAAN GALIAN, URUGAN TANAH DAN PONDASI BATU KALI
1 Galian tanah pondasi batu kali 30.24 M³ 04 64,700.00 1,956,528.00
2 Urugan pasir urug t=10 cm 1.44 M³ 08 241,600.00 347,904.00
3 Pekerjaan aanstamping batu kosong t=15 cm 4.32 M³ 17 492,000.00 2,125,440.00
4 Pek. Pondasi Batu kali camp. 1Pc:4Psr 13.01 M³ 16 841,600.00 10,949,216.00
5 Urugan tanah ex galian pondasi 11.48 M³ 09 36,000.00 413,280.00
15,792,368.00
C PEKERJAAN BETON
1 Pek. Sloof 15/20
- Cor Beton K-225 1.08 M³ 23 1,042,100.00 1,125,468.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 136.15 Kg 28 15,400.00 2,096,710.00
- Bekisting 14.40 M² 30 181,500.00 2,613,600.00
2 Beton Kolom 15/15
- Cor Beton K-225 0.90 M³ 23 1,042,100.00 937,890.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 151.71 Kg 28 15,400.00 2,336,334.00
- Bekisting 12.00 M² 31 402,700.00 4,832,400.00
3 Beton Ring Balok 15/20
- Cor Beton K-225 2.16 M³ 23 1,042,100.00 2,250,936.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 306.78 Kg 28 15,400.00 4,724,412.00
- Bekisting 28.80 M² 32 410,300.00 11,816,640.00
4 Plat Bton Meja Saji
- Cor Beton K-225 0.62 M³ 23 1,042,100.00 646,102.00
-Tulangan Pembesian dengan Besi polos Atau BJTD 24 72.87 Kg 28 15,400.00 1,122,198.00
- Bekisting 6.77 M² 33 650,700.00 4,405,239.00
38,907,929.00
D PEKERJAAN STRUKTUR ATAP

1 Pek. Rangka Atap Baja Ringan 69.13 M² 66 176,000.00 12,166,880.00


2 Pek. Pasang Penutup Atap Genteng setara Kenmuri 69.13 M² 67 185,400.00 12,816,702.00
3 Pek. Bubungan/Nok Genteng setara Kenmuri 11.15 M¹ 68 167,000.00 1,862,050.00
4 Lisplang Panel GRC plat 3/30 34.70 M¹ 69 94,500.00 3,279,150.00

30,124,782.00
E PEKERJAAN DINDING DAN PLESTERAN
1 Pekerjaan Pasangan Dinding Bata 1 : 5 71.43 M² 37 116,300.00 8,307,309.00
2 Pekerjaan plester dinding 1 : 5 142.86 M² 40 51,800.00 7,400,148.00
3 Pekerjaan Rolag 1 Bata Campuran 1 : 3 11.59 M² 38 251,600.00 2,916,044.00
4 Pekerjaan Acian 123.34 M² 42 27,000.00 3,330,180.00
5 Pekerjaan dinding Batu Andesit 19.52 M² 83 294,100.00 5,740,832.00
6 Pekerjaan Profilan 48.80 M¹ - 45,000.00 2,196,000.00
7 Pek.Finishing Sudut Ovening Sudut Pintu Dan Jendela 39.20 M¹ 43 25,200.00 987,840.00
30,878,353.00
F PEKERJAAN KUSEN ALLUMUNIUM
1 Pasang Kusen dan Daun Pintu + Accessories Type P1 4.00 Unit 51 3,584,500.00 14,338,000.00
2 Pasang Kusen BV 6.00 Unit 58 910,200.00 5,461,200.00
19,799,200.00
G PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm 5.58 M³ 21 853,400.00 4,761,972.00
2 Lantai kerja t = 5 cm 2.79 M³ 08 241,600.00 674,064.00
3 Pekerjaan lantai Granit Tale 60X60 Marmo / polished Crema Marfill 55.83 M² 79 307,100.00 17,145,393.00
4 Pekerjaan lantai keramik Meja Saji 20/20 6.16 M² 77 189,400.00 1,166,704.00
5 Pekerjaan Dinding 20/25 4.96 M² 78 238,900.00 1,184,944.00
24,933,077.00

8
NO URAIAN PEKERJAAN VOL SAT ANALISA HARGA SATUAN JUMLAH

(RP.) (RP.)
1 2 3 4 5 6=3x5
H PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond ( 60 x 60 ) Hollow 40x40 + 20x40 mm 55.89 M2 61 188,900.00 10,557,621.00
2 Pekerjaan Plafond Gypsum 9mm 55.89 M2 63 43,100.00 2,408,859.00
3 Pekerjaan List profil gipsum 105.40 M1 65 32,200.00 3,393,880.00
16,360,360.00
I PEKERJAAN PENGECATAN & LABURAN
1 Pekerjaan pengecatan dinding (Exterior) 48.87 M² 71 41,100.00 2,008,557.00
2 Pekerjaan pengecatan dinding (Interior) 74.47 M² 72 36,700.00 2,733,049.00
3 Pekerjaan pengecatan plafond 55.89 M² 73 36,700.00 2,051,163.00
6,792,769.00
J PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

1 Memasang Bak Cuci Piring Stainlees Stell 1 Lubang 2.00 Bh 84 603,300.00 1,206,600.00
2 Memasang Kran Leher Angsa 3/4″ 2.00 Bh 85 219,500.00 439,000.00
3 Pipa PVC 20 Type AW 25.00 M¹ 87 20,300.00 507,500.00
4 Pipa PVC 80 mm Type AW 15.00 M¹ 89 84,500.00 1,267,500.00
5 - Lampu Fitting 4.00 Bh - 75,000.00 300,000.00
6 - Lampu TL 2 x 36 W RM 2.00 Bh 98 460,100.00 920,200.00
6 - Saklar Seri 3.00 Bh - 22,000.00 66,000.00
7 - Stop kontak 6.00 Bh - 20,000.00 120,000.00
8 - Instalasi titik Lampu Penerangan 6.00 Ttk 100 259,600.00 1,557,600.00
9 - Instalasi stop kontak 1 fasa, 250 VA, 220 V 3.00 Ttk 101 244,100.00 732,300.00
10 Kabel Penyambungan Daya 1.00 Ls - 1,500,000.00 1,500,000.00
8,616,700.00
194,288,738.00

Indramayu, Mei 2018

PEJABAT PEMBUAT KOMITMEN

YUDI SUSWANTO K. ST
NIP. 19720526 200212 1 006

9
BAR CHART
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR
WAKTU PELAKSANAAN PEKERJAAN = 165 (SERATUS ENAM PULUH LIMA ) HARI KALENDER
No. URAIAN PEKERJAAN MINGGU KE- KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

8-14 Juli 15 - 21 22 - 28 29 - 4 Agut 5 - 11 12 - 18 19 - 25 26-1 Sept 2-8 9 - 15 16 - 22 23 - 29 30-6 Okt 7 - 13 14 - 20 21 - 27 28 - 3 4 - 10 Nov 11 - 17 18 - 24 25- 1 Des 2-8 9 - 15 16 - 22

A PEKERJAAN PERSIAPAN
B PEKERJAAN GALIAN DAN URUGAN
C PEKERJAAN STRUKTUR BETON
I PONDASI BETON
II STRUKTUR BETON LANTAI - 1
III STRUKTUR BETON LANTAI - 2
D PEKERJAAN BETON PRAKTIS & BALOK LINTLE
E PEKERJAAN DINDING & RAILLING TANGGA
F PEKERJAAN KUSEN & DAUN PINTU/JENDELA + ACCESSORIES
G PEKERJAAN PLAFOND
H PEKERJAAN LANTAI
I PEKERJAAN PENGECATAN & LABURAN
J PEKERJAAN ELEKTRIKAL
K PEKERJAAN MEKANIKAL
L PEKERJAAN INTERIOR
M PEKERJAAN SARANA LUAR GEDUNG
I PEKERJAAAN SARANA PARKIR
II PEKERJAAN PEMBUATAN KANTIN
KEMAJUAN BOBOT RENCANA S.D MINGGU KE 0.24 0.54 1.35 1.40 1.68 3.48 3.48 3.25 5.06 8.72 6.88 7.06 9.67 5.79 3.83 3.59 4.65 5.40 5.65 6.45 6.15 4.89 0.76 0.07
KEMAJUAN KOMULATIF RENCANA S.D MINGGU 0 0.24 0.78 2.13 3.52 5.20 8.68 12.17 15.41 20.47 29.19 36.07 43.12 52.80 58.58 62.41 66.00 70.64 76.04 81.69 88.14 94.29 99.17 99.93 100.00
KEMAJUAN BOBOT REALISASI S.D MINGGU KE 0.71 1.52 1.79 2.58 0.50 0.30 1.45 2.67
KEMAJUAN KOMULATIF REEALISASI S.D MINGG 0 0.71 2.23 4.03 6.61 7.11 7.41 8.86 11.53
DEVIASI (- +) 0.71 1.46 1.90 3.09
Dibuat :
PT. SUMBER MEGA UTAMA
5.742567
0.820367

Drs. RUDY INDRA PRASETYO


Direktur Utama