### REKAPITULASI AKHIR ENGENEERING ESTIMATE

PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B


UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : PLEMINERY
LOKASI : PROPINSI SULAWESI BARAT

No JE JUMLAH HARGA
NI JENIS PEKERJAAN
Rp.
S
PE
A KE PEKERJAAN PLEMENERY ( PENDAHULUAN ) 6,638,500,000.00
RJ
AA
B N PEKERJAAN SITE DEVELOPMENT 9,605,000,000.00

C PEKERJAAN PAGAR KELILING KOMPLEKS


STRUKTUR 6,375,000,000.00
ARSITEKTUR 2,422,500,000.00

D PEKERJAAN LANSEKAP 2,346,000,000.00

E PEKERJAAN BANGUNAN
STRUKTUR 40,800,000,000.00
ARSITEKTUR 38,675,000,000.00
INTERIOR FORNITUR 24,225,000,000.00

F ELEKTRIKAL DAN MEKANIKAL


ELEKTRIKAL
- LISTRIK 13,464,000,000.00
- NURSE CALL 1,708,500,000.00
- TELEPON 1,326,000,000.00
- MATV 527,850,000.00
- SOUND SYSTEM 667,250,000.00
- SIRS 3,421,250,000.00
MEKANIKAL
- PLUMBING 6,587,500,000.00
- LIFT 4,101,250,000.00
- PNEUMATIC SYSTEM 4,823,750,000.00
- TATA UDARA 11,900,000,000.00
- FIRE ALARM 1,585,250,000.00
- FIRE FIGHTING 4,220,250,000.00
- GAS MEDIK 4,900,250,000.00
- POMPA DAN TANDON AIR 201,450,000.00
- SUMP PIT 127,500,000.00

Jumlah 190,649,050,000.00
Pajak Pertambahan Nilai (PPN 10 %) 19,064,905,000.00
J u m la h Total 209,713,955,000.00
Dibulatkan 209,713,955,000.00

Terbilang ; Dua Ratus Sembilan Milliar Tujuh Ratus Tiga Belas Juta Sembilan Ratus Lima Puluh
Lima Ribu Rupiah,-

Mamuju, ……., Agustus, 2009


Konsultan Perencana,
PT. Bintang Intirekatama

Drs. Yusuf. T
Direktur
### REKAPITULASI AKHIR ENGENEERING ESTIMATE 1.
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : PLEMINERY
LOKASI : PROPINSI SULAWESI BARAT

No JE JUMLAH HARGA
NI JENIS PEKERJAAN
Rp.
S
PE
A KE PEKERJAAN PLEMENERY ( PENDAHULUAN ) Err:520
RJ
B AA PEKERJAAN SITE DEVELOPMENT #REF!
C N PEKERJAAN BANGUNAN - E Err:520
D PEKERJAAN BANGUNAN - F Err:520
E PEKERJAAN BANGUNAN - D #REF!
F PEKERJAAN SELASAR PENGUBUNG
G PEKERJAAN BANGUNAN ASRAMA PUTRA Err:520
H PEKERJAAN BANGUNAN ASRAMA PUTRI Err:520
I PEKERJAAN BANGUNAN FARMASI Err:520
J PEKERJAAN BANGUNAN ISOLASI Err:520
K PEKERJAAN BANGUNAN IPSARS Err:520
L PEKERJAAN BANGUNAN AUTOPSI Err:520
M PEKERJAAN BANGUNAN LOUNDRY Err:520
N PEKERJAAN BANGUNAN DAPUR Err:520

Jumlah Err:520

Pajak Pertambahan Nilai (PPN 10 %) Err:520

J u m la h Total Err:520
Dibulatkan Err:520

Terbilang ;

Mamuju, ……., Agustus, 2009

Konsultan Perencana,
PT. Bintang Intirekatama

Drs. Yusuf. T
Direktur
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
A. KE STRUKTUR
RJA
I AN PEKERJAAN GALIAN/TIMBUNAN
1 Pek. Galian pondasi poor ( tanah keras ) 972.00 m3 #REF! #REF!
2 Pek. Galian pondasi garis dan sloof 727.50 m3 #REF! #REF!
3 Pek. Timbun kembali 890.00 m3 #REF! #REF!
#REF!

II PEKERJAAN PONDASI DAN STRUKTUR BAWAH


A. LANTAI _ 1
1 Pek. Pasir alas pondasi dan sloof 97.00 m3 #REF! #REF!
2 Pek. Batu kosong 51.00 m3 #REF! #REF!
3 Pek. Pondasi batu belah 1 : 4 102.00 m3 #REF! #REF!
4 Pek. Lantai kerja sloof dan Pondasi poor 1 : 3 : 5 tebal 10 cm 71.88 m3 #REF! #REF!
5 Pek. Pondasi Poor + stek 125.50 m3 #REF! #REF!
6 Pas. Bekesting 384.00 m2 #REF! #REF!
7 Pek. Pondasi dinding lift 13.50 m3 #REF! #REF!
8 Pas. Bekesting 10.50 m2 #REF! #REF!
9 Pek. Dinding lift beton 20.90 m3 #REF! #REF!
10 Pas. Bekesting 220.00 m2 #REF! #REF!
11 Pek. Sloof beton 30/60 90.70 m3 #REF! #REF!
12 Pas. Bekesting sloof 604.80 m2 #REF! #REF!
13 Pek. Sloof beton 30/50 72.00 m3 #REF! #REF!
14 Pas. Bekesting sloof 486.00 m2 #REF! #REF!
15 Pek. Sloof beton praktis 20/30 15.50 m3 #REF! #REF!
16 Pas. Bekesting sloof 102.16 m2 #REF! #REF!
17 Pek. Kolom beton 40 x 69.00 m3 #REF! #REF!
18 Pas. Bekesting Kolom 690.00 m2 #REF! #REF!
19 Pas. Beton late diatas kosen 4.50 m3 #REF! #REF!
20 Pas. Bekesting balok 65.00 m2 #REF! #REF!
21 Pek. Kolom beton praktis 8.60 m3 #REF! #REF!
22 Pas. Bekesting Kolom 65.00 m2 #REF! #REF!
#REF!
III PEKERJAAN STRUKTUR ATAS
B. LANTAI - II
1 Pek. Balok beton BT 35 x 80 cm K 250 0.00 m3 #REF! #REF!
2 Pas. Bekesting balok 0.00 m2 #REF! #REF!
3 Pek. Balok beton B1 35 x 65 cm K 250 105.00 m3 #REF! #REF!
4 Pas. Bekesting balok 851.00 m2 #REF! #REF!
5 Pek. Balok beton B2 35x 50 cm K 250 85.00 m3 #REF! #REF!
6 Pas. Bekesting balok 546.00 m2 #REF! #REF!
7 Pek. Balok beton B3 30 x 40 cm K 250 60.00 m3 #REF! #REF!
8 Pas. Bekesting balok 377.00 m2 #REF! #REF!
9 Pek. Balok beton BA 20 x 30 cm K 250 11.75 m3 #REF! #REF!
10 Pas. Bekesting balok 148.00 m2 #REF! #REF!
11 Pek. Dinding lift beton 14.20 m3 #REF! #REF!
12 Pas. Bekesting 152.00 m2 #REF! #REF!
13 Pek. Plat lantai beton 244.00 m3 #REF! #REF!
14 Pek. Bondek + Wiremash 2,040.00 m2 #REF! #REF!
15 Pek. Listplank beton 7.50 m3 #REF! #REF!
16 Pas. Bekesting listplank 40.00 m2 #REF! #REF!
17 Pas. Beton late diatas kosen 3.50 m3 #REF! #REF!
18 Pas. Bekesting balok 34.00 m2 #REF! #REF!
19 Pas. Tangga beton lantai - I ke II 9.50 m3 #REF! #REF!
20 Pas. Bekesting 21.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
21
PE Pek. Kolom beton 40 x 40 cm K 250 57.70 m3 #REF! #REF!
KE
22 Pas. Bekesting kolom 576.00 m2 #REF! #REF!
RJA
23
AN Pek. Kolom beton praktis 12.50 m3 #REF! #REF!
24 Pas. Bekesting kolom 180.00 m2 #REF! #REF!
#REF!

D. LANTAI - III ( ATAP )


1 Pek. Balok beton B1 35 x 65 cm K 250 87.69 m3 #REF! #REF!
2 Pas. Bekesting balok 545.00 m2 #REF! #REF!
3 Pek. Balok beton B2 35 x 50 cm K 250 85.50 m3 #REF! #REF!
4 Pas. Bekesting balok 558.00 m2 #REF! #REF!
5 Pek. Balok beton B3 30 x 40 cm K 250 19.00 m3 #REF! #REF!
6 Pas. Bekesting balok 216.00 m2 #REF! #REF!
7 Pek. Balok beton BA 20 x 30 cm K 250 4.50 m3 #REF! #REF!
8 Pek. Dinding lift beton 12.20 m3 #REF! #REF!
9 Pas. Bekesting 122.00 m2 #REF! #REF!
10 Pas. Bekesting balok 40.00 m2 #REF! #REF!
11 Pek. Plat lantai beton 142.00 m3 #REF! #REF!
12 Pek. Bondek + Wiremash 1,190.00 m2 #REF! #REF!
13 Pek. Listplank beton dan tanggulan beton 8.80 m3 #REF! #REF!
14 Pas. Bekesting listplank 40.00 m2 #REF! #REF!
15 Pas. Beton late diatas kosen 3.50 m3 #REF! #REF!
16 Pas. Bekesting balok 34.00 m2 #REF! #REF!
17 Pas. Tangga beton lantai - II ke III 9.50 m3 #REF! #REF!
18 Pas. Bekesting 21.00 m2 #REF! #REF!
19 Pek. Kolom beton 40 x 40 cm K 250 10.20 m3 #REF! #REF!
20 Pas. Bekesting kolom 102.00 m2 #REF! #REF!
21 Pas. Ring Balk beton 30/40 ( untuk Atap spandek + Genteng ) 23.60 m3 #REF! #REF!
22 Pas. Bekesting balok 236.00 #REF! #REF!
23 Pek. Kolom beton praktis 5.50 m3 #REF! #REF!
24 Pas. Bekesting kolom 80.00 m2 #REF! #REF!
#REF!
E. LANTAI - ATAP DAN PARAPET
1 Pek. Kolom beton 30 x 30 cm K 250 ( kuda kuda atap dan parapet ) 7.97 m3 #REF! #REF!
2 Pas. Bekesting kolom 120.00 m2 #REF! #REF!
3 Pek. Kolom beton praktis 1.10 m3 #REF! #REF!
4 Pas. Bekesting kolom 22.50 m2 #REF! #REF!
5 Pas. Ring balk parapet 10/20 x 60 ( beton praktis ) 9.50 m3 #REF! #REF!
6 Pas. Bekesting ringbalk 180.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

B. ARSITEKTUR
IV. PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
A. LANTAI - I
1 Pek. Tembok 1 batu diatas sloof 1 : 3 ( bata ringan ) 31.00 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 62.00 m2 #REF! #REF!
3 Pek. Tembok 1/2 batu 1 : 3 ( bata ringan ) 120.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
4
PE Pek. Plesteran beton 1 : 3 240.00 m2 #REF! #REF!
KE
5 Pek. Tembok 1 : 5 ( bata ringan ) 2,100.00 m2 #REF! #REF!
RJA
AN6 Pek. Plesteran beton 1 : 3 435.00 m2 #REF! #REF!
7 Pek. Plesteran Tembok 1 : 5 4,200.00 m2 #REF! #REF!
8 Pek. Acian tembok 4,755.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Tembok 1 : 3 ( bata ringan ) 76.00 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 152.00 m2 #REF! #REF!
3 Pek. Tembok 1 : 5 ( bata ringan ) 2,497.00 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 326.00 m2 #REF! #REF!
5 Pek. Plesteran Tembok 1 : 5 4,994.00 m2 #REF! #REF!
6 Pek. Acian tembok 5,396.00 m2 #REF! #REF!
#REF!
D LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 ( bata ringan ) 0.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( bata ringan, termasuk tembok parapet ) 611.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 104.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 1,222.00 m2 #REF! #REF!
5 Pek. Acian tembok 1,326.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

V. PEKERJAAN LANTAI DAN DINDING


Catatan
Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A. LANTAI - I
1 Pek. Timbunan tanah dalam bangunan 995.00 m3 #REF! #REF!
2 Pek. Timbunan pasir dalam bangunan 745.00 m3 #REF! #REF!
3 Pek. Lantai kerja alas lantai 2,479.00 m3 #REF! #REF!
4 Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 66.00 m2 #REF! #REF!
5 Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 1,660.00 m2 #REF! #REF!
6 Pek. Lantai keramik 40x40 cm selasar ( warna putih )stara Roman 545.00 m2 #REF! #REF!
7 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 2,520.00 m' #REF! #REF!
8 Pek. Lantai keramik 20x20 cm stara Roman - Toliet 48.00 m2 #REF! #REF!
9 Pek. Dinding keramik 20x25 cm stara Roman - Toilet 188.00 m2 #REF! #REF!
10 Pek. Lantai Granit dekoratif ( Hall ) 25.00 m2 #REF! #REF!
11 Pek. Granit pelapis dinding lift 25.00 m2 550,000.00 13,750,000.00
12 Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
13 Pek. Lantai Vinyl termasuk Plint dan border 160.00 m2 #REF! #REF!
14 Pek. Wall Guard /bumper (dado) 80.00 m' 645,000.00 51,600,000.00
15 Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 40.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
### Pek. Timbunan pasir alas lantai 74.00 m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 0.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 736.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm selasar ( warna putih )stara Roman 545.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 730.00 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM 70.00 m2 85,000.00 5,950,000.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 70.00 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 165.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
###
PE Pek. Lantai Granit dekoratif ( Hall ) 25.00 m2 #REF! #REF!
KE Pek.
### Granit pelapis dinding lift 25.00 m2 550,000.00 13,750,000.00
RJA
###
AN Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border 898.00 m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 40.00 m2 #REF! #REF!
#REF!
C LANTAI - IV ( ATAP )
1 Pek. Timbunan pasir alas lantai 6.48 m3 #REF! #REF!
2 Pek. Lantai keramik 40x40 cm stara Roman 216.00 m2 #REF! #REF!
3 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 85.00 m' #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

VI. PEKERJAAN KOSEN DAN KACA


Catatan
Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A. LANTAI - I
Pintu Utama
1 Pek. Frame Gate Pintu stanless steel lengkap 2.00 unt 15,500,000.00 31,000,000.00
2 Pek. Pintu utama kaca template 12 lengkap handle, engsel atas 2.00 set 25,000,000.00 50,000,000.00
dan bawah serta kunci
3 Pek. Kaca polos 12 mm 32.00 m2 15,000.00 480,000.00
Pintu Ruangan + WC/KM ( Aluminium ) + Fiber
1 Pas. Kosen pintu fiber bertulang 9.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 3.10 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 341.00 m' 125,000.00 42,625,000.00
4 Pek. Daun Pintu + rangka panil fiber 118.00 m2 450,000.00 53,100,000.00
5 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
6 Pas. Handle + kunci 57.00 bh #REF! #REF!
7 Pas. Kunci bundar ( Wc/Km ) 11.00 bh 250,000.00 2,750,000.00
8 Pas. Handle 2.00 bh 125,000.00 250,000.00
9 Pas. Engsel pintu 204.00 bh #REF! #REF!
10 Pas. Grendel tanam pintu 44.00 bh 55,000.00 2,420,000.00
11 Pas. Door closer 68.00 bh #REF! #REF!
Jendela Utama
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Jendela Aluminium podwer coating 530.00 m' #REF! #REF!
2 Ras. Jendela bingkai aluminium windowwall + Kaca 6 mm 116.00 m' #REF! #REF!
3 Pas. Engsel jendela 204.00 bh 50,000.00 10,200,000.00
4 Pas. Hak angin 204.00 bh 10,000.00 2,040,000.00
5 Pas. Grendel jendela 102.00 bh 50,000.00 5,100,000.00
#REF!
B. LANTAI - II
Pintu Ruangan ( Aluminium + Fiber )
1 Pek. Kosen Pintu Aluminium podwer coating 27.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 9.50 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 398.00 m' 125,000.00 49,750,000.00
4 Pek. Daun Pintu + rangka panil fiber 147.00 m2 450,000.00 66,150,000.00
5 Pek. Kaca polos 8 mm m2 #REF! #REF!
6 Pek. Kaca polos 6 mm 6.50 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
7
PE Pas. Handle + kunci 68.00 bh #REF! #REF!
KE
8 Pas. Kunci bundar ( Wc/Km ) 8.00 bh 250,000.00 2,000,000.00
RJA
AN9 Pas. Handle 6.00 bh 125,000.00 750,000.00
10 Pas. Engsel pintu 276.00 bh #REF! #REF!
11 Pas. Grendel tanam pintu 97.00 bh Err:520 Err:520
12 Pas. Door closer 76.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Jendela Aluminium podwer coating 396.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 92.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent 9.00 m2 #REF! #REF!
4 Pas. Engsel jendela 210.00 bh 50,000.00 10,500,000.00
5 Pas. Hak angin 210.00 bh 10,000.00 2,100,000.00
6 Pas. Grendel tanam 105.00 bh 50,000.00 5,250,000.00
#REF!
C LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 16.80 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 6.00 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 25.00 m' 125,000.00 3,125,000.00
4 Pek. Daun Pintu + rangka panil fiber 3.50 450,000.00 1,575,000.00
5 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
6 Pek. Kaca polos 8 mm m2 #REF! #REF!
7 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
8 Pas. Handle + kunci 2.00 bh #REF! #REF!
9 Pas. Handle 8.00 bh 125,000.00 1,000,000.00
10 Pas. Engsel pintu 12.00 bh #REF! #REF!
11 Pas. Grendel tanam pintu 8.00 bh Err:520 Err:520
12 Pas. Door closer 2.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 55.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 14.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 32.00 bh 50,000.00 1,600,000.00
5 Pas. Hak angin 32.00 bh 10,000.00 320,000.00
6 Pas. Grendel tanam 16.00 bh 50,000.00 800,000.00
#REF!

Sub Total A+B+C+D+E #REF!

VII. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 2,371.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,371.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 2,480.00 m' 35,000.00 86,800,000.00
6 Pas. List plapon type kecil 89.00 m' 25,000.00 2,225,000.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
B.
PE LANTAI - II
KE
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
RJA
AN2 Pas. Rangka metal gypsum lengkap 2,335.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,335.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. 0.00 m2 #REF! #REF!
5 Pas. List plapon type besar 1,461.00 m' 35,000.00 51,135,000.00
6 Pas. List plapon type kecil 98.00 m' 25,000.00 2,450,000.00
#REF!
C LANTAI - III ( ATAP )
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 286.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 286.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 235.00 m' 35,000.00 8,225,000.00
6 Pas. Les plapon type kecil m' 25,000.00 0.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


VIII. PEKERJAAN ATAP
1 Pek. Kuda kuda baja IWF 6,750.00 kg #REF! #REF!
2 Pek. Gording baja INP 2,150.00 kg #REF! #REF!
3 Pek. Dudukan kuda kuda + anker 8.00 bh 350,000.00 2,800,000.00
4 Pek. Kuda kuda baja ringan 655.00 m2 #REF! #REF!
5 Pek. Kuda kuda stainless steel ( atap ) transparan bh
6 Pek. Rangka atap 285.00 m2 #REF! #REF!
7 Pek. Seng pelapis atap 285.00 m2 35,000.00 9,975,000.00
8 Pek. Atap genteng keramik 285.00 m2 #REF! #REF!
9 Pek. Nok genteng keramik 55.00 m' #REF! #REF!
10 Pek. Bubungan dekoratif 2.00 bh 2,500,000.00 5,000,000.00
11 Pek. Atap Spandec SWG 655.00 m2 #REF! #REF!
12 Pek. Kuda kuda stanlis stel termasuk rangka untuk kaca 11.00 bh 5,000,000.00 55,000,000.00
13 Pek. Atap Transparant ( kaca templet 12 mm ) 152.00 m2 950,000.00 144,400,000.00
14 Pas. Roof insulation + ram kasa 940.00 m2 55,000.00 51,700,000.00
15 Pek. Nok spandek 58.00 m' #REF! #REF!
16 Pek. Listplank papan 15.00 m2 #REF! #REF!
17 Pek. Waterproofing type ………( plat latai II dan atap dak ) 1,685.00 m2 95,000.00 160,075,000.00
18 Pek. Plesteran floorhardener 1,685.00 m2 32,500.00 54,762,500.00
#REF!

IX. PEKERJAAN CAT DAN FINISHING


A. LANTAI - I
1 Pek. Pengecetan dasar ( undercoating ) 4,755.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 2,853.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 1,902.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 2,371.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Pengecetan dasar ( undercoating ) 5,396.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 3,237.60 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 2,158.40 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
4 Pek. Pengecetan Partisi gypsum
PE m2 #REF! #REF!
KE
5 Pek. Pengecetan Plapon 2,335.00 m2 #REF! #REF!
RJA
AN6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
C LANTAI - IV
1 Pek. Pengecetan dasar ( undercoating ) 1,326.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 530.40 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 795.60 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 286.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 25.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

X PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama stainlessstell 55.00 m' 950,000.00 52,250,000.00
2 Pek. Railing tangga service stainlessstell 55.00 m' 850,000.00 46,750,000.00
99,000,000.00

XI. PEKERJAAN SANITAIR


A. LANTAI - I
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 6.00 set 2,144,000.00 12,864,000.00
3 Kaca diatas wastafel Type TX 705 AE 6.00 set 718,000.00 4,308,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 6.00 m2 200,000.00 1,200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 11.00 set 3,150,000.00 34,650,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 26.00 bh 262,000.00 6,812,000.00
10 Urinal Moslem U 370 M 3.00 set 3,200,000.00 9,600,000.00
11 Pembatas Urinal Type A 100 (warna) 2.00 bh 894,000.00 1,788,000.00
12 Floordrain Type 1 BV 1 11.00 bh 270,000.00 2,970,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 6.00 set 3,500,000.00 21,000,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
B. LANTAI - II
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 13.00 set 2,144,000.00 27,872,000.00
3 Kaca diatas wastafel Type TX 705 AE 13.00 set 718,000.00 9,334,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 13.00 m2 200,000.00 2,600,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 10.00 set 3,150,000.00 31,500,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 10.00 bh 262,000.00 2,620,000.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 10.00 bh 270,000.00 2,700,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
15 Meja washtfel ( marmer )
PE 3.00 3,500,000.00 10,500,000.00
KE
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
RJA
17 Hand Bar KM/WC Type TX 701 AL
AN 0.00 bh 943,000.00 0.00
#REF!
C LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 2.00 set 2,144,000.00 4,288,000.00
3 Kaca diatas wastafel Type TX 705 AE 2.00 set 718,000.00 1,436,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 2.00 m2 200,000.00 400,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) set 3,150,000.00 0.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
9 Kran air dinding type T 23 BQ 13 N ex Toto bh 262,000.00 0.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 bh 270,000.00 0.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
#REF!

F. PEKERJAAN SEPTIKTANK
1 Pek. Septiktan, konstruksi beton bertulang kapasitas ……… m3 5.00 unt 25,000,000.00 125,000,000.00
lengkap lubang kontrol dan pipa hawa
2 Pek, Peresapan air buangan dari septiktank 10.00 unt 15,000,000.00 150,000,000.00
275,000,000.00

Sub Total A+B+C+D+E+F #REF!

XII 1 PEKERJAAN PEMBERSIHAN


2 Pek. Rabat beton keliling bangunan 180.00 m2 #REF! #REF!
3 Pek. Buis beton keling bangunan 160.00 m' 65,000.00 10,400,000.00
4 Pek. Pondasi penahan rabat dan buis 43.20 m3 #REF! #REF!
5 Pek. Pembersihan sisa pekerjaan 1.00 ls 10,000,000.00 10,000,000.00
6 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 15,000,000.00 15,000,000.00
25,000,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
A. KE ARSITEKTUR
RJA
I AN PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
LANTAI - II
1 Pek. Tembok 1 : 3 25.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) 55.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 50.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 110.00 m2 #REF! #REF!
5 Pek. Acian tembok 135.00 m2 #REF! #REF!
#REF!
LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 0.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) 78.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 0.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 156.00 m2 #REF! #REF!
5 Pek. Acian tembok 156.00 m2 #REF! #REF!
#REF!

Sub Total A+B #REF!

II. PEKERJAAN LANTAI DAN DINDING


Catatan
Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A LANTAI - II
### Pek. Timbunan pasir alas lantai 54.14 m3 #REF! #REF!
### Pek. Lantai keramik 50x50 cm ( warna gelap stara Roman ) 57.50 m2 #REF! #REF!
### Pek. Lantai keramik 50x50 cm ( warna putih )stara Roman 755.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 0.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 992.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 50 m' #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 650.00 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM 99.00 m2 85,000.00 8,415,000.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 99.00 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 210.50 m2 #REF! #REF!
### Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
### Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
B LANTAI - IV ( ATAP )
### Pek. Timbunan pasir alas lantai 10.40 m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 334.80 m2 #REF! #REF!
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 11.80 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 15.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 56.00 m' #REF! #REF!
#REF!

Sub Total A+B #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
KE
RJA
III. AN PEKERJAAN KOSEN DAN KACA
Catatan
Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A LANTAI - II
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu Aluminium podwer coating 22.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm lengkap selant m2 #REF! #REF!
5 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
6 Pas. Handle + kunci 4.00 bh #REF! #REF!
7 Pas. Handle bh 125,000.00 0.00
8 Pas. Engsel pintu 24.00 bh #REF! #REF!
9 Pas. Grendel tanam pintu 8.00 bh Err:520 Err:520
10 Pas. Door closer 4.00 bh #REF! #REF!
Pintu Ruangan ( Kayu ) 0.00
1 Pas. Kosen pintu kayu kls I 1.85 m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 12.45 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 31.86 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
5 Pas. Engsel pintu 165.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 41.00 bh #REF! #REF!
7 Pas. Handel bh 125,000.00 0.00
8 Pas. Grendel tanam pintu 28.00 bh Err:520 Err:520
9 Pas. Door closer dan door stop 41.00 bh #REF! #REF!
Partisi doble
1 Pas. Partisi full gypsum rangka metal 72.00 m' 225,000.00 16,200,000.00
2 Pas. Partisi gypsum + kaca 5 mm rangka aluminium 74.00 m2 250,000.00 18,500,000.00
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 47.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 9.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 42.00 bh 50,000.00 2,100,000.00
5 Pas. Hak angin 42.00 bh 10,000.00 420,000.00
6 Pas. Grendel tanam 21.00 bh 50,000.00 1,050,000.00
#REF!
B LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm lengkap selant m2 #REF! #REF!
5 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
6 Pas. Handle + kunci bh #REF! #REF!
7 Pas. Handle bh 125,000.00 0.00
8 Pas. Engsel pintu bh #REF! #REF!
9 Pas. Grendel tanam pintu bh Err:520 Err:520
10 Pas. Door closer bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
Pintu
PE Ruangan ( Kayu ) 0.00
KE
1 Pas. Kosen pintu kayu kls I 0.75 m3 #REF! #REF!
RJA
AN2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 13.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 3.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
5 Pas. Engsel pintu 30.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 8.00 bh #REF! #REF!
7 Pas. Handle bh #REF! #REF!
8 Pas. Grendel tanam pintu 6.00 bh Err:520 Err:520
9 Pas. Door closer dan door stop 8.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 30.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 8.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 12.00 bh 50,000.00 600,000.00
5 Pas. Hak angin 12.00 bh 10,000.00 120,000.00
6 Pas. Grendel tanam 6.00 bh 50,000.00 300,000.00
#REF!

Sub Total A+B #REF!

IV. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar m' 35,000.00 0.00
6 Pas. List plapon type kecil m' 25,000.00 0.00
#REF!
B. LANTAI - II
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 1,576.80 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 1,576.80 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 560.00 m' 35,000.00 19,600,000.00
6 Pas. List plapon type kecil 78.00 m' 25,000.00 1,950,000.00
#REF!
C LANTAI - III ( ATAP )
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 86.76 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 86.76 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 87.00 m' 35,000.00 3,045,000.00
6 Pas. Les plapon type kecil 5.60 m' 25,000.00 140,000.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
V. KE PEKERJAAN CAT DAN FINISHING
RJA
B. LANTAI - II
AN
1 Pek. Pengecetan dasar ( undercoating ) 3,282.50 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 3,282.50 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 1,576.80 m2 #REF! #REF!
6 Pek. Pengecetan kayu 610.00 m2 #REF! #REF!
#REF!
C LANTAI - III ( ATAP )
1 Pek. Pengecetan dasar ( undercoating ) 1,591.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 1,591.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 86.76 m2 #REF! #REF!
6 Pek. Pengecetan kayu 350.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

VI. PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama dan darurat stainlessstell m' 950,000.00 0.00
2 Pek. Railing Void pada hall utama 35.00 m' 850,000.00 29,750,000.00
29,750,000.00

VII. PEKERJAAN SANITAIR


A. LANTAI - II
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 10.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 5.00 set 2,144,000.00 10,720,000.00
3 Kaca diatas wastafel Type TX 705 AE 10.00 set 718,000.00 7,180,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 15.00 m2 200,000.00 3,000,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 10.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 7.00 set 3,150,000.00 22,050,000.00
7 Pas. Baik air KM lapis kermik 17.00 set 500,000.00 8,500,000.00
8 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 17.00 bh 164,000.00 2,788,000.00
9 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
10 Kran air dinding type T 23 BQ 13 N ex Toto 17.00 bh 262,000.00 4,454,000.00
11 Urinal Moslem U 370 M set 3,200,000.00 0.00
12 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
13 Floordrain Type 1 BV 1 17.00 bh 270,000.00 4,590,000.00
14 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
15 Meja pantry + sink set 1,500,000.00 0.00
16 Meja washtfel ( marmer ) 2.00 3,500,000.00 7,000,000.00
17 Tempat handuk Type TX 726 AE 9.00 bh 1,369,000.00 12,321,000.00
18 Hand Bar KM/WC Type TX 701 AL 10.00 bh 943,000.00 9,430,000.00
#REF!
B. LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 1.00 set 2,144,000.00 2,144,000.00
3 Kaca diatas wastafel Type TX 705 AE 1.00 set 718,000.00 718,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 1.00 m2 200,000.00 200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 2.00 set 3,150,000.00 6,300,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 2.00 bh 164,000.00 328,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
8
PE Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 2.00 bh 164,000.00 328,000.00
KE
9 Kran air dinding type T 23 BQ 13 N ex Toto 2.00 bh 262,000.00 524,000.00
RJA
10
AN Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 3.00 bh 270,000.00 810,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
#REF!

Sub Total A+B #REF!

VIII. PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan 1.00 ls 15,000,000.00 15,000,000.00
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 10,000,000.00 10,000,000.00
25,000,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : SELASAR PENGHUBUNG
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
ERJA
A. AN STRUKTUR
I PEKERJAAN GALIAN/TIMBUNAN
1 Pek. Galian pondasi garis m3 #REF!
2 Pek. Timbun kembali m3 #REF!

II PEKERJAAN PONDASI DAN STRUKTUR


A. LANTAI _ 1
1 Pek. Pasir alas pondasi m3 #REF!
2 Pek. Batu kosong m3 #REF!
3 Pek. Pondasi batu belah 1 : 4 m3 #REF!
4 Pek. Sloof beton praktis 20/30 m3 #REF!
5 Pas. Bekesting sloof m2 #REF!
6 Pek. Kolom beton 30 x 30 cm K 250 m3 #REF!
7 Pas. Bekesting Kolom m2 #REF!
8 Pek. Balok beton 30 x 40 cm K 250 m3 #REF!
9 Pas. Bekesting balok m2 #REF!
10 Pek. Plat lantai beton m3 #REF!
11 Pek. Bekesting plat Lantai #REF!
12 Pek. Listplank beton m3 #REF!
13 Pas. Bekesting listplank m2 #REF!
14 Pek. Waterproofing m3 85,000.00
15 Pek. Plesteran 1 : 2 penutup waterproofing m2 #REF!
16 Pek. Acian penutup plesetran m2 #REF!

B. ARSITEKTUR
III PEKERJAAN TEMBOK, PLESTERAN DAN LANTAI
A. LANTAI - I
1 Pek. Tembok 1 : 3, ( 1 batu diatas sloof ) m2 #REF!
2 Pek. Tembok 1 : 5 m2 #REF!
3 Pek. Plesteran beton 1 : 3 m2 #REF!
4 Pek. Plesteran Tembok 1 : 5 m2 #REF!
5 Pek. Acian tembok m2 #REF!
6 Pasangan dinding bata kerawang untuk Raamp m2 125,000.00
7 Pasangan dinding Glass block untuk Raamp m2 350,000.00
8 Pek. Timbunan tanah dalam bangunan m3 #REF!
9 Pek. Timbunan pasir dalam bangunan m3 #REF!
10 Pek. Lantai kerja alas lantai m3 #REF!
11 Pek. Lantai keramik 40x40 cm stara Roman m2 #REF!
12 Pek. Plint keramik lantai stara Roman - Terras Luar m' #REF!

IV. PEKERJAAN CAT DAN FINISHING


1 Pek. Pengecetan dasar ( undercoating ) m2 #REF!
2 Pek. Pengecetan tembok dan beton m2 #REF!
3 Pek. Pengecetan Plapon m2 #REF!
4 Pek. Pengecetan kayu m2 #REF!

V PEKERJAAN PEMBERSIHAN
1 Pek. Rabat beton keliling bangunan 0.00 m2 #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : SELASAR PENGHUBUNG
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
2 Pek. Buis beton keling bangunan 0.00 65,000.00
m'
ERJA
3
AN Pek. Pondasi penahan rabat dan buis 0.00 m3 #REF!
4 Pek. Pembersihan sisa pekerjaan 1.00 ls 5,000,000.00
5 Pek. Pembuangan sisa pekerjaan ke tempat penampungan ls
REKAPITULASI
PEKERJAAN : PEMBANGUNAN PUSKESMAS PEMBANTU DILOA
LOKASI : TIMIKA

NO JENIS PEKERJAAN JUMLAH ( Rp )

I PEKERJAAN PERSIAPAN 8,000,000.00


II PEKERJAAN TANAH DAN PONDASI 198,450,000.00
III PEKERJAAN BETON 77,683,339.06
IV PEKERJAAN DINDING & PLESTERAN -
V PEKERJAAN PENUTUP LANTAI & DINDING 26,380,061.50
VI PEKERJAAN KAYU 296,260,438.52
VII PEKERJAAN RANGKA & PENUTUP ATAP 103,474,302.32
VIII PEKERJAAN LANGIT-LANGIT 56,805,935.28
IX PEKERJAAN SANITASI 22,994,634.50
X PEKERJAAN INSTALASI LISTRIK 17,070,000.00
XI PEKERJAAN KUNCI DAN PENGGANTUNG 10,669,904.00
XII PEKERJAAN PENGECATAN 21,774,312.50
XIII PEKERJAAN AKHIR 7,045,780.00

(A) REAL COST ( JUMLAH I - XIII ) 846,608,707.67


(B) PPN 10% ( A X 10% ) 84,660,870.77
(C) JUMLAH ( A + B ) 931,269,578.44
DIBULATKAN 931,269,000.00

TERBILANG : Sembilan Ratus Tiga Puluh Satu Juta Dua Ratus Enam Puluh
Sembilan Ribu Rupiah,-

Timika, 20 Juni 2019


Kontraktor Pelaksana
PT. BELGIA PUTRA PAPUA

TASYA MAGAI
Direktris
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNAN PUSKESMAS PEMBANTU DILOA


LOKASI : TIMIKA
HARGA SAT JUMLAH HARGA
NO JENIS PEKERJAAN SAT VOLUME
( Rp. ) ( Rp. )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN 8,000,000.00
1 Pembersihan Lapangan dan Perataan Ls 1.00 5,000,000.00 5,000,000.00
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 3,000,000.00 3,000,000.00
II PEKERJAAN TANAH DAN PONDASI 198,450,000.00
1 Pek. Pasangan Pondasi Umpak Buah 63.00 3,150,000.00 198,450,000.00

III PEKERJAAN BETON 77,683,339.06


1 Pek. Put Pland K.225 M³ 28.67 2,533,003.00 72,608,531.00
Cor Lantai Kamarmandi M3 0.41 12,302,565.00 5,074,808.06
IV PEKERJAAN DINDING & PLESTERAN -
1 Pas. Dinding Batu Batako 1/2, 1 : 4 M² -
2 Pek. Plesteran Dinding 1 : 4 M² -
3 Pek. Acian M² - -
V PEKERJAAN PENUTUP LANTAI & DINDING 26,380,061.50
1 Pas. Lantai Keramik KM/WC 25/25 M² 11.75 596,810.00 7,012,517.50
2 Pas. Dinding Keramik KM/WC 25/40 M² 34.40 563,010.00 19,367,544.00
VI PEKERJAAN KAYU 296,260,438.52
1 Pek. Pintu M² 6.15 1,126,300.00 6,926,745.00
2 Pas. Jendela M² 10.66 980,040.00 10,447,226.40
3 Pas. Ventilasi M² 6.64 895,560.00 5,946,518.40
4 Pas. Dinding Kayu M² 313.29 575,568.00 180,319,698.72
5 Pas. Lantai Kayu M² 92.50 1,001,300.00 92,620,250.00
VII PEKERJAAN RANGKA & PENUTUP ATAP 103,474,302.32
1 Pas. Kuda-kuda kayu klas I M³ 4.60 12,274,200.00 56,461,320.00
2 Pas. Gording M³ 2.80 11,332,800.00 31,731,840.00
3 Pas. Atap Seng Gelombang BJLS 30 M² 110.47 96,256.00 10,633,323.32
4 Pas. Listplank M' 27.94 166,350.00 4,647,819.00
VIII PEKERJAAN LANGIT-LANGIT 56,805,935.28
1 Pas. Plafon Tripleks 6mm M² 147.00 291,101.00 42,791,847.00
2 Pas. List Plafon Profil M' 626.58 22,366.00 14,014,088.28

IX PEKERJAAN SANITASI 22,994,634.50


1 Pas. Kloset Jongkok Bh 3.00 1,196,460.00 3,589,380.00
2 Pek. Septik Tank & Peresapan Unit 1.00 10,325,376.50 10,325,376.50
3 Pas. Kran Air Bh 7.00 43,430.00 304,010.00
4 Pas. Bak Mandi Bh 3.00 2,000,000.00 6,000,000.00
5 Pas. Pipa Air Kotor 3" + Sambungan M' 20.00 107,281.60 2,145,632.00
6 Pas. Pipa Air Bersih 1/2" - 3/4" + Sambungan M' 20.00 31,511.80 630,236.00

X PEKERJAAN INSTALASI LISTRIK 17,070,000.00


1 Pas. Lampu SL 20 Watt Bh 16.00 505,000.00 8,080,000.00
2 Pas. Stop Kontak Ttk 9.00 435,000.00 3,915,000.00
3 Pas. Saklar Tunggal Ttk 9.00 380,000.00 3,420,000.00
4 Pas. Saklar Double Ttk 3.00 385,000.00 1,155,000.00
5 Pas. Sekring + Box Sekring Ls 1.00 500,000.00 500,000.00
XI PEKERJAAN KUNCI DAN PENGGANTUNG 10,669,904.00
1 Pas. Engsel Pintu Bh 36.00 53,244.50 1,916,802.00
2 Pas. Engsel Jendela Bh 32.00 52,163.00 1,669,216.00
3 Pas. Kunci Tanam 2 Slag Bh 10.00 432,978.00 4,329,780.00
4 Pas. Grendel Jendela Bh 14.00 52,163.00 730,282.00
5 Pas. Kait Angin Bh 32.00 63,244.50 2,023,824.00
XII PEKERJAAN PENGECATAN 21,774,312.50
1 Pek. Cat Kilat Kayu M² 92.50 35,915.00 3,322,137.50
3 Pek. Cat Plafond M² 147.00 125,525.00 18,452,175.00
XIII PEKERJAAN AKHIR 7,045,780.00
1 Pembersihan Akhir Ls 1.00 4,000,000.00 4,000,000.00
2 Foto Dokumentasi Ls 1.00 3,000,000.00 3,045,780.00

i JUMLAH TOTAL Rp 846,608,707.67


ii HPS - DIBULATKAN Rp 846,608,000.00
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN PUSKESMAS PEMBANTU DILOA
LOKASI : DISTRIK JILA
MASA PELAKSANAAN
BOBOT
NO JENIS PEKERJAAN SAT VOLUME I II III IV KET
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4
I PEKERJAAN PERSIAPAN
100
1 Pembersihan Lapangan dan Perataan Ls 1.00 0.59 0.59
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 0.35 0.35
II PEKERJAAN TANAH DAN PONDASI -
1 Pek. Pasangan Pondasi Umpak Buah 63.00 23.44 5.86 5.86 5.86 5.86
90
III PEKERJAAN BETON -
Pek. Put Pland K225 M³ 28.67 8.58 2.14 2.14 2.14 2.14
1 Pek. Lantai DAK Beton K.250 M³ 0.41 0.60 0.15 0.15 0.15 0.15
V PEKERJAAN PENUTUP LANTAI & DINDING -
1 Pas. Lantai Keramik KM/WC 40/40 M² 11.75 0.83 0.83
80
2 Pas. Dinding Keramik KM/WC 40/40 M² 34.40 2.29 2.29
VI PEKERJAAN KAYU -
1 Pek. Pintu M² 6.15 0.82 0.41 0.41
2 Pas. Jendela M² 10.66 1.23 0.62 0.62
3 Pas. Ventilasi M² 6.64 0.70 0.35 0.35
5 Pas. Dinding Kayu M² 131.29 21.30 1.00 2.00 3.00 1.00 3.00 11.30
70
6 Pas. Lantai Kayu M² 92.50 10.94 1.00 2.00 4.00 1.00 6.00 (3.06)
VII PEKERJAAN RANGKA & PENUTUP ATAP -
1 Pas. Kuda-kuda kayu klas I M³ 4.60 6.67 1.67 1.67 1.67 1.67
2 Pas. Gording M³ 2.80 3.75 0.94 0.94 0.94 0.94
60
3 Pas. Atap Seng Gelombang BJLS 30 M² 110.47 1.26 0.31 0.31 0.31 0.31
4 Pas. Listplank M' 27.94 0.55 0.55
VIII PEKERJAAN LANGIT-LANGIT -
1 Pas. Plafon Tripleks 4mm M² 147.00 5.05 2.53 2.53
2 Pas. List Plafon Profil M' 626.68 1.66 0.83 0.83
IX PEKERJAAN SANITASI - 50
1 Pas. Kloset Jongkok Bh 2.00 0.42 0.42
3 2 Pek. Septik Tank & Peresapan Unit 1.00 1.22 0.30 0.30 0.30 0.30
3 Pas. Kran Air Bh 7.00 0.04 0.04
4 Pas. Bak Mandi Bh 3.00 0.71 0.71
40
5 Pas. Pipa Air Kotor 3" + Sambungan M' 20.00 0.25 0.25
6 Pas. Pipa Air Bersih 1/2" - 3/4" + Sambungan M' 20.00 0.07 0.07
X PEKERJAAN INSTALASI LISTRIK -
1 Pas. Lampu SL 20 Watt Bh 16.00 0.95 0.48 0.48
2 Pas. Stop Kontak Ttk 9.00 0.46 0.23 0.23
30
3 Pas. Saklar Tunggal Ttk 9.00 0.40 0.20 0.20
4 Pas. Saklar Double Ttk 3.00 0.14 0.07 0.07
5 Pas. Sekring + Box Sekring Ls 1.00 0.06 0.03 0.03
XI PEKERJAAN KUNCI DAN PENGGANTUNG -
1 Pas. Engsel Pintu Bh 36.00 0.23 0.11 0.11
20
2 Pas. Engsel Jendela Bh 32.00 0.20 0.10 0.10
3 Pas. Kunci Tanam 2 Slag Bh 10.00 0.51 0.26 0.26
4 Pas. Grendel Jendela Bh 14.00 0.09 0.04 0.04
5 Pas. Kait Angin Bh 32.00 0.24 0.12 0.12
XII PEKERJAAN PENGECATAN -
10
1 Pek. Cat Kilat Kayu M² 92.50 0.39 0.20 0.20
3 Pek. Cat Plafond M² 147.00 2.18 2.18
XIII PEKERJAAN AKHIR -
1 Pembersihan Akhir Ls 1.00 0.47 0.47
2 Foto Dokumentasi Ls 1.00 0.35 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0

JUMLAH 100.00
RENCANA PERMINGGU - 0.97 2.17 8.03 8.03 8.03 8.34 4.48 7.48 10.01 11.94 11.18 7.47 5.38 2.60 3.41 0.49
KUMULATIF RENCANA PERMINGGU - 0.97 3.13 11.16 19.19 27.21 35.55 40.03 47.51 57.51 69.45 80.64 88.11 93.50 96.10 99.51 100
REEALISASI PERMINGGU -
KUMULATIF REALISASI PERMINGGU -
DEVIASI

Kontraktor
PT. BELGIA PUTRA PAPUA

TASYA MAGAI, SH
Direktris
DAFTAR ANALISA HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
1 1 M2 PEMBERSIHAN LOKASI
0.1000 H.o Pekerja Rp. 155,000.00 Rp. 15,500.00
0.0100 H.o Mandor Rp. 226,000.00 Rp. 2,260.00
0.0010 Ls Alat Bantu Rp. 200,000.00 Rp. 200.00
Rp. 17,960.00
2 1 M' PASANGAN BOUWPLANK
0.0120 M3 Papan Kayu Kelas II Rp. 7,500,000.00 Rp. 90,000.00
0.1000 Gloss Benang Rp. 15,000.00 Rp. 1,500.00
0.0100 Kg Paku Rp. 40,000.00 Rp. 400.00
0.0400 H.o Pekerja Rp. 155,000.00 Rp. 6,200.00
0.0600 H.o Tukang Rp. 185,000.00 Rp. 11,100.00
0.0060 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,200.00
0.0030 H.o Mandor Rp. 226,000.00 Rp. 678.00
Rp. 111,078.00
7 1 M3 URUGAN KEMBALI
0.1920 H.o Pekerja Rp. 155,000.00 Rp. 29,760.00
0.0190 H.o Mandor Rp. 226,000.00 Rp. 4,294.00
Rp. 34,054.00
8 1 M3 PEMADATAN TANAH
0.5000 H.o Pekerja Rp. 155,000.00 Rp. 77,500.00
0.0500 H.o Mandor Rp. 226,000.00 Rp. 11,300.00
Rp. 88,800.00
9 1 M3 URUGAN PASIR
1.2000 M3 Pasir Urug Rp. 220,000.00 Rp. 264,000.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.0100 H.o Mandor Rp. 226,000.00 Rp. 2,260.00
Rp. 312,760.00
10 1 M3 URUGAN SIRTU
1.2000 M3 Sirtu Rp. 220,000.00 Rp. 264,000.00
0.2500 H.o Pekerja Rp. 155,000.00 Rp. 38,750.00
0.0250 H.o Mandor Rp. 226,000.00 Rp. 5,650.00
Rp. 308,400.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M
0.7500 H.o Pekerja Rp. 155,000.00 Rp. 116,250.00
0.0250 H.o Mandor Rp. 226,000.00 Rp. 5,650.00
Rp. 121,900.00
2 1 M3 PASANGAN BATU KOSONG
0.4320 M3 Pasir Pasangan Rp. 500,000.00 Rp. 216,000.00
1.2000 M3 Batu Kali Rp. 700,000.00 Rp. 840,000.00
0.7800 H.o Pekerja Rp. 155,000.00 Rp. 120,900.00
0.3900 H.o Tukang Batu Rp. 185,000.00 Rp. 72,150.00
0.0390 H.o Kepala Tukang Rp. 200,000.00 Rp. 7,800.00
0.0390 H.o Mandor Rp. 226,000.00 Rp. 8,814.00
Rp. 1,265,664.00
6 1 M3 PASANGAN PONDASI BATU KALI 1 : 4
0.4850 M3 Pasir Pasangan Rp. 500,000.00 Rp. 242,500.00
1.2000 M3 Batu Kali Rp. 700,000.00 Rp. 840,000.00
3.1960 Zak Semen Rp. 190,000.00 Rp. 607,240.00
1.5000 H.o Pekerja Rp. 155,000.00 Rp. 232,500.00
0.6000 H.o Tukang Batu Rp. 185,000.00 Rp. 111,000.00
0.0600 H.o Kepala Tukang Rp. 200,000.00 Rp. 12,000.00
0.0750 H.o Mandor Rp. 226,000.00 Rp. 16,950.00
Rp. 2,062,190.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
4 1 M2 PASANGAN DINDING BATAKO TEBAL 1/2 BATAKO, 1 : 2
0.0380 M3 Pasir Pasangan Rp. 500,000.00 Rp. 19,000.00
18.0000 Bh Batu Batako Rp. 6,000.00 Rp. 108,000.00
0.3790 Zak Semen Rp. 190,000.00 Rp. 72,010.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.1000 H.o Tukang Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0150 H.o Mandor Rp. 226,000.00 Rp. 3,390.00
Rp. 269,400.00
5 1 M2 PASANGAN DINDING BATAKO TEBAL 1/2 BATAKO, 1 : 4
0.0430 M3 Pasir Pasangan Rp. 500,000.00 Rp. 21,500.00
18.0000 Bh Batu Batako Rp. 6,000.00 Rp. 108,000.00
0.2300 Zak Semen Rp. 190,000.00 Rp. 43,700.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.1000 H.o Tukang Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0150 H.o Mandor Rp. 226,000.00 Rp. 3,390.00
Rp. 243,590.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
2 1 M2 PLESTERAN 1 : 2 TEBAL 15 mm
0.0200 M3 Pasir Pasangan Rp. 500,000.00 Rp. 10,000.00
0.2045 Zak Semen Rp. 190,000.00 Rp. 38,851.20
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.1500 H.o Tukang Rp. 185,000.00 Rp. 27,750.00
0.0150 H.o Kepala Tukang Rp. 200,000.00 Rp. 3,000.00
0.0150 H.o Mandor Rp. 226,000.00 Rp. 3,390.00
Rp. 129,491.20
4 1 M2 PLESTERAN 1 : 4 TEBAL 15 mm
0.0240 M3 Pasir Pasangan Rp. 500,000.00 Rp. 12,000.00
0.1248 Zak Semen Rp. 190,000.00 Rp. 23,712.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.1500 H.o Tukang Rp. 185,000.00 Rp. 27,750.00
0.0150 H.o Kepala Tukang Rp. 200,000.00 Rp. 3,000.00
0.0150 H.o Mandor Rp. 226,000.00 Rp. 3,390.00
Rp. 116,352.00
17 1 M2 ACIAN
0.0650 Zak Semen Rp. 190,000.00 Rp. 12,350.00
0.2000 H.o Pekerja Rp. 155,000.00 Rp. 31,000.00
0.1000 H.o Tukang Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0100 H.o Mandor Rp. 226,000.00 Rp. 2,260.00
Rp. 66,110.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
1 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS I
1.1000 M3 Balok Kayu Kelas I Rp. 7,500,000.00 Rp. 8,250,000.00
1.2300 Kg Paku 10 cm Rp. 40,000.00 Rp. 49,200.00
1.0000 kg Lem Kayu Rp. 50,000.00 Rp. 50,000.00
7.0000 H.o Pekerja Rp. 155,000.00 Rp. 1,085,000.00
21.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 3,885,000.00
2.1000 H.o Kepala Tukang Rp. 200,000.00 Rp. 420,000.00
0.3500 H.o Mandor Rp. 226,000.00 Rp. 79,100.00
Rp. 13,818,300.00
2 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS II
1.2000 M3 Balok Kayu Kelas II Rp. 5,000,000.00 Rp. 6,000,000.00
1.2500 Kg Paku 10 cm Rp. 40,000.00 Rp. 50,000.00
1.0000 Kg Lem Kayu Rp. 50,000.00 Rp. 50,000.00
6.0000 H.o Pekerja Rp. 155,000.00 Rp. 930,000.00
18.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 3,330,000.00
1.8000 H.o Kepala Tukang Rp. 200,000.00 Rp. 360,000.00
0.3000 H.o Mandor Rp. 226,000.00 Rp. 67,800.00
Rp. 10,787,800.00
3 1 M2 PASANG DINDING KAYU KLAS ll
0.0400 M3 Papan Kayu Kelas II Rp. 7,500,000.00 Rp. 300,000.00
0.0500 Kg Paku Campur Rp. 40,000.00 Rp. 2,000.00
0.3500 H.o Pekerja Rp. 155,000.00 Rp. 54,250.00
1.0500 H.o Tukang Kayu Rp. 185,000.00 Rp. 194,250.00
0.1050 H.o Kepala Tukang Rp. 200,000.00 Rp. 21,000.00
0.0180 H.o Mandor Rp. 226,000.00 Rp. 4,068.00
Rp. 575,568.00
3 1 M2 PASANG PINTU KLAMP KAYU KLAS ll
0.0400 M3 Papan Kayu Kelas II Rp. 7,500,000.00 Rp. 300,000.00
0.0500 Kg Paku Campur Rp. 40,000.00 Rp. 2,000.00
0.3500 H.o Pekerja Rp. 155,000.00 Rp. 54,250.00
1.0500 H.o Tukang Kayu Rp. 185,000.00 Rp. 194,250.00
0.1050 H.o Kepala Tukang Rp. 200,000.00 Rp. 21,000.00
0.0180 H.o Mandor Rp. 226,000.00 Rp. 4,068.00
Rp. 575,568.00
4 1 M2 PASANG PINTU KLAMP KAYU KLAS ll
0.0400 M3 Papan Kayu Kelas II Rp. 15,000.00 Rp. 600.00
0.0500 Kg Paku Campur Rp. 3,000.00 Rp. 150.00
0.3500 H.o Pekerja Rp. 155,000.00 Rp. 54,250.00
1.0500 H.o Tukang Kayu Rp. 185,000.00 Rp. 194,250.00
0.1050 H.o Kepala Tukang Rp. 200,000.00 Rp. 21,000.00
0.0180 H.o Mandor Rp. 226,000.00 Rp. 4,068.00
Rp. 274,318.00
5 1 M2 PASANG PINTU PANEL KAYU KELAS I
0.0400 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 200,000.00
0.5000 Kg Lem Kayu Rp. 40,000.00 Rp. 20,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
3.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 555,000.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.3000 H.o Kepala Tukang Rp. 200,000.00 Rp. 60,000.00
0.0500 H.o Mandor Rp. 226,000.00 Rp. 11,300.00
Rp. 1,001,300.00
5 1 M2 PASANG LANTAI KAYU KELAS I
0.0400 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 200,000.00
0.5000 Kg Lem Kayu Rp. 40,000.00 Rp. 20,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
3.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 555,000.00
0.3000 H.o Kepala Tukang Rp. 200,000.00 Rp. 60,000.00
0.0500 H.o Mandor Rp. 226,000.00 Rp. 11,300.00
Rp. 1,001,300.00
6 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KELAS I
0.0240 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 120,000.00
0.3000 Kg Lem Kayu Rp. 50,000.00 Rp. 15,000.00
1.1000 M2 Kaca Bening 5 mm Rp. 200,000.00 Rp. 220,000.00
0.8000 H.o Pekerja Rp. 155,000.00 Rp. 124,000.00
2.4000 H.o Tukang Kayu Rp. 185,000.00 Rp. 444,000.00
0.2400 H.o Kepala Tukang Rp. 200,000.00 Rp. 48,000.00
0.0400 H.o Mandor Rp. 226,000.00 Rp. 9,040.00
Rp. 980,040.00
7 1 M2 PASANG PINTU DAN JENDELA JALUSI KAYU KELAS I
0.0640 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 320,000.00
0.5000 Kg Lem Kayu Rp. 50,000.00 Rp. 25,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
3.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 555,000.00
0.3000 H.o Kepala Tukang Rp. 200,000.00 Rp. 60,000.00
0.0500 H.o Mandor Rp. 226,000.00 Rp. 11,300.00
Rp. 1,126,300.00
8 1 M2 PASANG PINTU DOUBLE TEACKWOOD, RANGKA EXPOSE KAYU KELAS l
0.0250 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 125,000.00
0.0300 Kg Paku Campur Rp. 40,000.00 Rp. 1,200.00
0.3000 Ltr Lem Kayu Rp. 50,000.00 Rp. 15,000.00
1.0000 Lbr Teackwood Rp. 165,000.00 Rp. 165,000.00
0.8000 H.o Pekerja Rp. 155,000.00 Rp. 124,000.00
2.4000 H.o Tukang Kayu Rp. 185,000.00 Rp. 444,000.00
0.2400 H.o Kepala Tukang Rp. 200,000.00 Rp. 48,000.00
0.0400 H.o Mandor Rp. 226,000.00 Rp. 9,040.00
Rp. 931,240.00
9 1 M2 PASANG JALUSI MATI KUSEN KAYU KELAS I
0.0600 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 300,000.00
0.1500 Kg Paku Campur Rp. 40,000.00 Rp. 6,000.00
0.6700 H.o Pekerja Rp. 155,000.00 Rp. 103,850.00
2.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 370,000.00
0.2000 H.o Kepala Tukang Rp. 200,000.00 Rp. 40,000.00
0.3350 H.o Mandor Rp. 226,000.00 Rp. 75,710.00
Rp. 895,560.00
10 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KELAS l
1.1000 M3 Balok Kayu Kelas I Rp. 7,500,000.00 Rp. 8,250,000.00
5.6000 Kg Paku Campur Rp. 40,000.00 Rp. 224,000.00
15.0000 Kg Besi Strip Rp. 45,000.00 Rp. 675,000.00
4.0000 H.o Pekerja Rp. 155,000.00 Rp. 620,000.00
12.0000 H.o Tukang Kayu Rp. 185,000.00 Rp. 2,220,000.00
1.2000 H.o Kepala Tukang Rp. 200,000.00 Rp. 240,000.00
0.2000 H.o Mandor Rp. 226,000.00 Rp. 45,200.00
Rp. 12,274,200.00
11 1 M3 GORDING KAYU KELAS I
1.1000 M3 Balok Kayu Kelas I Rp. 7,500,000.00 Rp. 8,250,000.00
3.0000 Kg Paku Kayu Rp. 40,000.00 Rp. 120,000.00
6.0000 H.o Pekerja Rp. 155,000.00 Rp. 930,000.00
9.0000 H.o Tukang Rp. 185,000.00 Rp. 1,665,000.00
1.5000 H.o Kep. Tukang Rp. 200,000.00 Rp. 300,000.00
0.3000 H.o Mandor Rp. 226,000.00 Rp. 67,800.00
Rp. 11,332,800.00
14 1 M2 PASANG RANGKA ATAP SIRAP KAYU KELAS ll
0.1650 M3 Kayu Kelas ll Rp. 5,000,000.00 Rp. 825,000.00
0.2000 Kg Paku Campur Rp. 40,000.00 Rp. 8,000.00
0.1200 H.o Pekerja Rp. 155,000.00 Rp. 18,600.00
0.1200 H.o Tukang Kayu Rp. 185,000.00 Rp. 22,200.00
0.0120 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,400.00
0.0060 H.o Mandor Rp. 226,000.00 Rp. 1,356.00
Rp. 877,556.00
15 1 M2 PASANG RANGKA LANGIT-LANGIT/PLAFOND 0.5 x 1 M, KAYU KELAS ll atau KELAS lll
0.0154 M3 Balok Kelas II atau III Rp. 5,000,000.00 Rp. 77,000.00
0.2000 Kg Paku Campur Rp. 40,000.00 Rp. 8,000.00
0.1500 H.o Pekerja Rp. 155,000.00 Rp. 23,250.00
0.3000 H.o Tukang Kayu Rp. 185,000.00 Rp. 55,500.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.0300 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,000.00
0.0750 H.o Mandor Rp. 226,000.00 Rp. 16,950.00
Rp. 186,700.00
16 1 M2 PASANG RANGKA LANGIT-LANGIT/PLAFOND 60 x 60 CM, KAYU KELAS ll atau KELAS lll
0.0163 M3 Balok Kayu Kelas II atau III Rp. 5,000,000.00 Rp. 81,500.00
0.2500 Kg Paku Campur Rp. 40,000.00 Rp. 10,000.00
0.2000 H.o Pekerja Rp. 155,000.00 Rp. 31,000.00
0.3000 H.o Tukang Kayu Rp. 185,000.00 Rp. 55,500.00
0.0300 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,000.00
0.0100 H.o Mandor Rp. 226,000.00 Rp. 2,260.00
Rp. 186,260.00
17 1 M1 PASANG LISTPLANK 3/20 CM, KAYU KELAS ll
0.0108 M3 Papan Kayu Kelas II Rp. 7,500,000.00 Rp. 81,000.00
0.1000 Kg Paku Campur Rp. 40,000.00 Rp. 4,000.00
0.1000 H.o Pekerja Rp. 155,000.00 Rp. 15,500.00
0.2000 H.o Tukang Kayu Rp. 185,000.00 Rp. 37,000.00
0.0200 H.o Kepala Tukang Rp. 200,000.00 Rp. 4,000.00
0.0050 H.o Mandor Rp. 226,000.00 Rp. 1,130.00
Rp. 142,630.00
18 1 M1 PASANG LISTPLANK 2x 3/20 CM, KAYU KELAS I
0.0145 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 72,500.00
0.0600 Kg Paku Campur Rp. 40,000.00 Rp. 2,400.00
0.1500 H.o Pekerja Rp. 155,000.00 Rp. 23,250.00
0.2500 H.o Tukang Kayu Rp. 185,000.00 Rp. 46,250.00
0.0250 H.o Kepala Tukang Rp. 200,000.00 Rp. 5,000.00
0.0750 H.o Mandor Rp. 226,000.00 Rp. 16,950.00
Rp. 166,350.00
22 1 M1 PASANG LIST PLAFOND ( KAYU PROFIL )
1.0500 M1 Kayu Profil Rp. 12,000.00 Rp. 12,600.00
0.0500 Kg Paku 2" Rp. 40,000.00 Rp. 2,000.00
0.0210 H.o Pekerja Rp. 155,000.00 Rp. 3,255.00
0.0210 H.o Tukang Kayu Rp. 185,000.00 Rp. 3,885.00
0.0020 H.o Kepala Tukang Rp. 200,000.00 Rp. 400.00
0.0010 H.o Mandor Rp. 226,000.00 Rp. 226.00
Rp. 22,366.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
1 1 M3 MEMBUAT BETON TUMBUK 1 Pc : 3 Ps : 5 Kr
4.3600 Zak Semen Portland Rp. 190,000.00 Rp. 828,400.00
0.5200 M3 Pasir Beton Rp. 500,000.00 Rp. 260,000.00
0.8700 M3 Kerikil Beton Rp. 700,000.00 Rp. 609,000.00
1.6500 H.o Pekerja Rp. 155,000.00 Rp. 255,750.00
0.2500 H.o Tukang Batu Rp. 185,000.00 Rp. 46,250.00
0.0250 H.o Kepala Tukang Rp. 200,000.00 Rp. 5,000.00
0.0800 H.o Mandor Rp. 226,000.00 Rp. 18,080.00
Rp. 2,022,480.00
5 1 M3 BETON MUTU K225 (19,3 Mpa), SLUMP (12 ±2)CM, W/C = 0,58
7.4200 Zak Semen Portland Rp. 190,000.00 Rp. 1,409,800.00
0.4986 M3 Pasir Beton Rp. 500,000.00 Rp. 249,300.00
0.7756 M3 Kerikil Beton Rp. 700,000.00 Rp. 542,920.00
215.0000 Ltr Air
1.6500 H.o Pekerja Rp. 155,000.00 Rp. 255,750.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
0.0280 H.o Kepala Tukang Rp. 200,000.00 Rp. 5,600.00
0.0830 H.o Mandor Rp. 226,000.00 Rp. 18,758.00
Rp. 2,533,003.00
11 PEMBESIAN 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
1.0500 Kg Besi Beton (Polos/Ulir) Rp. 15,800.00 Rp. 16,590.00
0.0150 Kg Kawat Beton Rp. 25,000.00 Rp. 375.00
0.0070 H.o Pekerja Rp. 155,000.00 Rp. 1,085.00
0.0070 H.o Tukang Batu Rp. 185,000.00 Rp. 1,295.00
0.0007 H.o Kepala Tukang Rp. 200,000.00 Rp. 140.00
0.0004 H.o Mandor Rp. 226,000.00 Rp. 90.40
Rp. 19,575.40
UNTUK 1M3 BETON BERTULANG = 110 X 19.609,50 Rp. 2,153,294.00
13 1 M2 PASANG BEKISTING UNTUK PONDASI
0.0400 M3 Kayu Bekisting ( Kayu Klas III ) Rp. 2,500,000.00 Rp. 100,000.00
0.3000 Kg Paku Campur Rp. 40,000.00 Rp. 12,000.00
0.1000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 2,000.00
0.5200 H.o Pekerja Rp. 155,000.00 Rp. 80,600.00
0.2600 H.o Tukang Kayu Rp. 185,000.00 Rp. 48,100.00
0.0260 H.o Kepala Tukang Rp. 200,000.00 Rp. 5,200.00
0.0260 H.o Mandor Rp. 226,000.00 Rp. 5,876.00
Rp. 253,776.00
14 1 M2 PASANG BEKISTING UNTUK SLOOF
0.0450 M3 Kayu Bekisting ( Kayu Klas III ) Rp. 2,500,000.00 Rp. 112,500.00
0.3000 Kg Paku Campur Rp. 40,000.00 Rp. 12,000.00
0.1000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 2,000.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.5200 H.o Pekerja Rp. 155,000.00 Rp. 80,600.00
0.2600 H.o Tukang Kayu Rp. 185,000.00 Rp. 48,100.00
0.0260 H.o Kepala Tukang Rp. 200,000.00 Rp. 5,200.00
0.0260 H.o Mandor Rp. 226,000.00 Rp. 5,876.00
Rp. 266,276.00
BEKISTING UNTUK 1 M3 SlOOF = 197.460 x 10 Rp. 2,662,760.00
15 1 M2 PASANG BEKISTING UNTUK KOLOM
0.0400 M3 Kayu Bekisting ( Kayu Klas III ) Rp. 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Campur Rp. 40,000.00 Rp. 16,000.00
0.2000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 4,000.00
0.0150 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 75,000.00
0.3500 Lbr Playwood 9 mm Rp. 180,000.00 Rp. 63,000.00
2.0000 Btg Balok 5/10 Rp. 80,000.00 Rp. 160,000.00
0.6600 H.o Pekerja Rp. 155,000.00 Rp. 102,300.00
0.3300 H.o Tukang Kayu Rp. 185,000.00 Rp. 61,050.00
0.0330 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,600.00
0.0330 H.o Mandor Rp. 226,000.00 Rp. 7,458.00
Rp. 595,408.00
BEKESTING UNTUK 1 M3 KOLOM = 382.305,00 x 10 Rp. 5,954,080.00
16 1 M2 PASANG BEKISTING UNTUK BALOK
0.0400 M3 Kayu Bekisting ( Kayu Klas III ) Rp. 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Campur Rp. 40,000.00 Rp. 16,000.00
0.2000 Ltr Minyak Bekisting Rp. - Rp. -
0.0180 M3 Balok Kayu Matoa Rp. 2,500,000.00 Rp. 45,000.00
0.3500 Lbr Playwood 9 mm Rp. 180,000.00 Rp. 63,000.00
2.0000 Btg Balok 5/10 Rp. 80,000.00 Rp. 160,000.00
0.6600 H.o Pekerja Rp. 155,000.00 Rp. 102,300.00
0.3300 H.o Tukang Kayu Rp. 185,000.00 Rp. 61,050.00
0.0330 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,600.00
0.0330 H.o Mandor Rp. 226,000.00 Rp. 7,458.00
Rp. 561,408.00
BEKESTING UNTUK 1 M3 BALOK = 388.305,00 x 10 Rp. 5,614,080.00
1 M3 Balok Sloof Rp. 7,349,057.00
1 M3 Kolom Rp. 10,640,377.00
1 M3 Ring Balok Rp. 10,300,377.00

17 1 M2 PASANG BEKISTING UNTUK PLAT LANTAI


0.0400 M3 Kayu Bekisting ( Kayu Klas II ) Rp. 5,000,000.00 Rp. 200,000.00
0.4000 Kg Paku Campur Rp. 40,000.00 Rp. 16,000.00
0.2000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 4,000.00
0.0150 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 75,000.00
0.3500 Lbr Playwood 9 mm Rp. 180,000.00 Rp. 63,000.00
6.0000 Btg Balok 5/10 Rp. 80,000.00 Rp. 480,000.00
0.6600 H.o Pekerja Rp. 155,000.00 Rp. 102,300.00
0.3300 H.o Tukang Batu Rp. 185,000.00 Rp. 61,050.00
0.0330 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,600.00
0.0330 H.o Mandor Rp. 226,000.00 Rp. 7,458.00
Rp. 1,015,408.00
18 1 M2 PASANG BEKISTING UNTUK DINDING
0.0300 M3 Kayu Bekisting ( Kayu Klas II ) Rp. 5,000,000.00 Rp. 150,000.00
0.4000 Kg Paku Campur Rp. 40,000.00 Rp. 16,000.00
0.2000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 4,000.00
0.0200 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 100,000.00
0.3500 Lbr Playwood 9 mm Rp. 180,000.00 Rp. 63,000.00
3.0000 Btg Balok 5/10 Rp. 80,000.00 Rp. 240,000.00
4.0000 Bh Formitie/Penjaga Jarak Rp. 25,000.00 Rp. 100,000.00
0.6600 H.o Pekerja Rp. 155,000.00 Rp. 102,300.00
0.3300 H.o Tukang Batu Rp. 185,000.00 Rp. 61,050.00
0.0330 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,600.00
0.0330 H.o Mandor Rp. 226,000.00 Rp. 7,458.00
Rp. 850,408.00
19 1 M2 PASANG BEKISTING UNTUK TANGGA
0.0300 M3 Kayu Bekisting ( Kayu Klas II ) Rp. 5,000,000.00 Rp. 150,000.00
0.4000 Kg Paku Campur Rp. 40,000.00 Rp. 16,000.00
0.1500 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 3,000.00
0.0150 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 75,000.00
0.3500 Lbr Playwood 9 mm Rp. 180,000.00 Rp. 63,000.00
2.0000 Btg Balok 5/10 Rp. 80,000.00 Rp. 160,000.00
0.6600 H.o Pekerja Rp. 155,000.00 Rp. 102,300.00
0.3300 H.o Tukang Batu Rp. 185,000.00 Rp. 61,050.00
0.0330 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,600.00
0.0330 H.o Mandor Rp. 226,000.00 Rp. 7,458.00
Rp. 644,408.00
20 1 M2 PASANG JEMBATAN UNTUK COR BETON
0.0264 M3 Papan Kayu Klas II Rp. 7,500,000.00 Rp. 198,000.00
0.6000 Kg Paku Campur Rp. 40,000.00 Rp. 24,000.00
0.5000 Btg Balok 5/10 Rp. 80,000.00 Rp. 40,000.00
0.1500 H.o Pekerja Rp. 155,000.00 Rp. 23,250.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.0500 H.o Tukang Batu Rp. 185,000.00 Rp. 9,250.00
0.0050 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,000.00
0.0080 H.o Mandor Rp. 226,000.00 Rp. 1,808.00
Rp. 297,308.00
21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 Kg Besi + Bekisting)
0.2000 M3 Kayu Matoa Rp. 5,000,000.00 Rp. 1,000,000.00
1.5000 Kg Paku Campur Rp. 40,000.00 Rp. 60,000.00
0.4000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 8,000.00
157.5000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 2,488,500.00
2.2500 Kg Kawat Beton Rp. 25,000.00 Rp. 56,250.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
5.3000 H.o Pekerja Rp. 155,000.00 Rp. 821,500.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.3000 H.o Tukang Kayu Rp. 185,000.00 Rp. 240,500.00
1.0500 H.o Tukang Besi Rp. 185,000.00 Rp. 194,250.00
0.2620 H.o Kepala Tukang Rp. 200,000.00 Rp. 52,400.00
0.2650 H.o Mandor Rp. 226,000.00 Rp. 59,890.00
Rp. 7,145,965.00
22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekisting)
0.2700 M3 Kayu Matoa Rp. 5,000,000.00 Rp. 1,350,000.00
2.0000 Kg Paku Campur Rp. 40,000.00 Rp. 80,000.00
0.6000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 12,000.00
210.0000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 3,318,000.00
3.0000 Kg Kawat Beton Rp. 25,000.00 Rp. 75,000.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
5.6500 H.o Pekerja Rp. 155,000.00 Rp. 875,750.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.5600 H.o Tukang Kayu Rp. 185,000.00 Rp. 288,600.00
1.4000 H.o Tukang Besi Rp. 185,000.00 Rp. 259,000.00
0.3230 H.o Kepala Tukang Rp. 200,000.00 Rp. 64,600.00
0.2830 H.o Mandor Rp. 226,000.00 Rp. 63,958.00
Rp. 8,551,583.00
23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 Kg Besi + Bekisting)
0.4000 M3 Papan Kayu Matoa Rp. 5,000,000.00 Rp. 2,000,000.00
4.0000 Kg Paku Campur Rp. 40,000.00 Rp. 160,000.00
2.0000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 40,000.00
315.0000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 4,977,000.00
4.5000 Kg Kawat Beton Rp. 25,000.00 Rp. 112,500.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
0.1500 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 750,000.00
3.5000 Lbr Plywood 9 mm Rp. 180,000.00 Rp. 630,000.00
20.0000 Btng Balok 5/10 Rp. 80,000.00 Rp. 1,600,000.00
7.0500 H.o Pekerja Rp. 155,000.00 Rp. 1,092,750.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.6500 H.o Tukang Kayu Rp. 185,000.00 Rp. 305,250.00
2.1000 H.o Tukang Besi Rp. 185,000.00 Rp. 388,500.00
0.4030 H.o Kepala Tukang Rp. 200,000.00 Rp. 80,600.00
0.3530 H.o Mandor Rp. 226,000.00 Rp. 79,778.00
Rp. 14,381,053.00
24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 Kg Besi + Bekisting)
0.3200 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 2,400,000.00
3.2000 Kg Paku Campur Rp. 40,000.00 Rp. 128,000.00
1.6000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 32,000.00
210.0000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 3,318,000.00
3.0000 Kg Kawat Beton Rp. 25,000.00 Rp. 75,000.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
0.1400 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 700,000.00
2.8000 Lbr Plywood 9 mm Rp. 180,000.00 Rp. 504,000.00
16.0000 Btng Balok 5/10 Rp. 80,000.00 Rp. 1,280,000.00
6.3500 H.o Pekerja Rp. 155,000.00 Rp. 984,250.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.6500 H.o Tukang Kayu Rp. 185,000.00 Rp. 305,250.00
1.4000 H.o Tukang Besi Rp. 185,000.00 Rp. 259,000.00
0.3330 H.o Kepala Tukang Rp. 200,000.00 Rp. 66,600.00
0.3180 H.o Mandor Rp. 226,000.00 Rp. 71,868.00
Rp. 12,288,643.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 Kg Besi + Bekisting)
0.3200 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 2,400,000.00
3.2000 Kg Paku Campur Rp. 40,000.00 Rp. 128,000.00
1.6000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 32,000.00
157.5000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 2,488,500.00
2.2500 Kg Kawat Beton Rp. 25,000.00 Rp. 56,250.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
0.1200 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 600,000.00
2.8000 Lbr Plywood 9 mm Rp. 180,000.00 Rp. 504,000.00
32.0000 Btng Balok 5/10 Rp. 80,000.00 Rp. 2,560,000.00
5.3000 H.o Pekerja Rp. 155,000.00 Rp. 821,500.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.3000 H.o Tukang Kayu Rp. 185,000.00 Rp. 240,500.00
1.0500 H.o Tukang Besi Rp. 185,000.00 Rp. 194,250.00
0.2650 H.o Kepala Tukang Rp. 200,000.00 Rp. 53,000.00
0.2650 H.o Mandor Rp. 226,000.00 Rp. 59,890.00
Rp. 12,302,565.00
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 Kg Besi + Bekisting)
0.2400 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 1,800,000.00
3.2000 Kg Paku Campur Rp. 40,000.00 Rp. 128,000.00
1.6000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 32,000.00
157.5000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 2,488,500.00
2.2500 Kg Kawat Beton Rp. 25,000.00 Rp. 56,250.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
0.1600 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 800,000.00
2.8000 Lbr Plywood 9 mm Rp. 180,000.00 Rp. 504,000.00
24.0000 Btng Balok 5/10 Rp. 80,000.00 Rp. 1,920,000.00
5.3000 H.o Pekerja Rp. 155,000.00 Rp. 821,500.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.3000 H.o Tukang Kayu Rp. 185,000.00 Rp. 240,500.00
1.0500 H.o Tukang Besi Rp. 185,000.00 Rp. 194,250.00
0.2620 H.o Kepala Tukang Rp. 200,000.00 Rp. 52,400.00
0.2650 H.o Mandor Rp. 226,000.00 Rp. 59,890.00
Rp. 11,261,965.00
27 1 M3 MEMBUAT TANGGA BETON BERTULANG (200 Kg Besi + Bekisting)
0.2500 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 1,875,000.00
3.0000 Kg Paku Campur Rp. 40,000.00 Rp. 120,000.00
1.2000 Ltr Minyak Bekisting Rp. 20,000.00 Rp. 24,000.00
210.0000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 3,318,000.00
3.0000 Kg Kawat Beton Rp. 25,000.00 Rp. 75,000.00
6.7200 Zak Semen Portland Rp. 190,000.00 Rp. 1,276,800.00
0.5400 M3 Pasir Beton Rp. 500,000.00 Rp. 270,000.00
0.8100 M3 Kerikil Beton Rp. 700,000.00 Rp. 567,000.00
0.1050 M3 Balok Kayu Matoa Rp. 5,000,000.00 Rp. 525,000.00
2.5000 Lbr Plywood 9 mm Rp. 180,000.00 Rp. 450,000.00
14.0000 Btng Balok 5/10 Rp. 80,000.00 Rp. 1,120,000.00
5.6500 H.o Pekerja Rp. 155,000.00 Rp. 875,750.00
0.2750 H.o Tukang Batu Rp. 185,000.00 Rp. 50,875.00
1.5600 H.o Tukang Kayu Rp. 185,000.00 Rp. 288,600.00
1.4000 H.o Tukang Besi Rp. 185,000.00 Rp. 259,000.00
0.3230 H.o Kepala Tukang Rp. 200,000.00 Rp. 64,600.00
0.2830 H.o Mandor Rp. 226,000.00 Rp. 63,958.00
Rp. 11,223,583.00
28 1 M1 MEMBUAT KOLOM PRAKTIS BETON BERTULANG ( 11 X 11 ) CM
0.0020 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 15,000.00
0.0100 Kg Paku Campur Rp. 40,000.00 Rp. 400.00
3.0000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 47,400.00
0.0450 Kg Kawat Beton Rp. 25,000.00 Rp. 1,125.00
0.0800 Zak Semen Portland Rp. 190,000.00 Rp. 15,200.00
0.0060 M3 Pasir Beton Rp. 500,000.00 Rp. 3,000.00
0.0090 M3 Kerikil Beton Rp. 700,000.00 Rp. 6,300.00
0.1800 H.o Pekerja Rp. 155,000.00 Rp. 27,900.00
0.0200 H.o Tukang Batu Rp. 185,000.00 Rp. 3,700.00
0.0200 H.o Tukang Kayu Rp. 185,000.00 Rp. 3,700.00
0.0200 H.o Tukang Besi Rp. 185,000.00 Rp. 3,700.00
0.0060 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,200.00
0.0090 H.o Mandor Rp. 226,000.00 Rp. 2,034.00
Rp. 130,659.00
29 1 M1 MEMBUAT RING BALK BETON BERTULANG ( 10 X 15 ) CM
0.0030 M3 Papan Kayu Matoa Rp. 7,500,000.00 Rp. 22,500.00
0.0200 Kg Paku Campur Rp. 40,000.00 Rp. 800.00
3.6000 Kg Besi Beton Polos Rp. 15,800.00 Rp. 56,880.00
0.0500 Kg Kawat Beton Rp. 25,000.00 Rp. 1,250.00
0.1100 Zak Semen Portland Rp. 190,000.00 Rp. 20,900.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.0090 M3 Pasir Beton Rp. 500,000.00 Rp. 4,500.00
0.0150 M3 Kerikil Beton Rp. 700,000.00 Rp. 10,500.00
0.2970 H.o Pekerja Rp. 155,000.00 Rp. 46,035.00
0.0330 H.o Tukang Batu Rp. 185,000.00 Rp. 6,105.00
0.0330 H.o Tukang Kayu Rp. 185,000.00 Rp. 6,105.00
0.0330 H.o Tukang Besi Rp. 185,000.00 Rp. 6,105.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0150 H.o Mandor Rp. 226,000.00 Rp. 3,390.00
Rp. 187,070.00
ANALISA PEKERJAAN KONSTRUKSI PENUTUP ATAP
16 1 M2 PASANG ATAP SENG GELOMBANG
0.7000 Lbr Seng Gelombang BJLS 30 Rp. 90,000.00 Rp. 63,000.00
0.0200 Kg Paku Biasa 1/2'' - 1'' Rp. 50,000.00 Rp. 1,000.00
0.1200 H.o Pekerja Rp. 155,000.00 Rp. 18,600.00
0.0600 H.o Tukang Kayu Rp. 185,000.00 Rp. 11,100.00
0.0060 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,200.00
0.0060 H.o Mandor Rp. 226,000.00 Rp. 1,356.00
Rp. 96,256.00
17 1 M2 PASANG ATAP NOK SENG
0.3000 Lbr Seng Plat BJLS 30 Rp. 85,000.00 Rp. 25,500.00
0.0400 Kg Paku Biasa 1/2'' - 1'' Rp. 50,000.00 Rp. 2,000.00
0.1500 H.o Pekerja Rp. 155,000.00 Rp. 23,250.00
0.0700 H.o Tukang Kayu Rp. 185,000.00 Rp. 12,950.00
0.0080 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,600.00
0.0060 H.o Mandor Rp. 226,000.00 Rp. 1,356.00
Rp. 66,656.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT (PLAFOND)
11 1 M' PEKERJAAN LIST PLAFOND KAYU PROFIL
1.1000 M' List Kayu Profil Rp. 12,000.00 Rp. 13,200.00
0.0100 Kg Paku Rp. 40,000.00 Rp. 400.00
0.0500 H.o Pekerja Rp. 155,000.00 Rp. 7,750.00
0.0500 H.o Tukang Kayu Rp. 185,000.00 Rp. 9,250.00
0.0050 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,000.00
0.0030 H.o Mandor Rp. 226,000.00 Rp. 678.00
Rp. 32,278.00
14 1 M2 PEKERJAAN PLAFOND PLYWOOD 6 MM + RANGKA KAYU MATOA
0.0230 Lbr Balok Kayu Matoa Rp. 5,000,000.00 Rp. 115,000.00
0.0600 Kg Paku Campur Rp. 40,000.00 Rp. 2,400.00
0.3900 Lbr Plywood 6 mm Rp. 120,000.00 Rp. 46,800.00
0.2700 H.o Pekerja Rp. 155,000.00 Rp. 41,850.00
0.4000 H.o Tukang Kayu Rp. 185,000.00 Rp. 74,000.00
0.0400 H.o Kepala Tukang Rp. 200,000.00 Rp. 8,000.00
0.0135 H.o Mandor Rp. 226,000.00 Rp. 3,051.00
Rp. 291,101.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
1.0000 Bh Closet Jongkok Perselin Rp. 400,000.00 Rp. 400,000.00
0.1200 Zak Semen Portland Rp. 190,000.00 Rp. 22,800.00
0.0100 M3 Pasir Pasangan Rp. 500,000.00 Rp. 5,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
1.5000 H.o Tukang Batu Rp. 185,000.00 Rp. 277,500.00
1.5000 H.o Kepala Tukang Rp. 200,000.00 Rp. 300,000.00
0.1600 H.o Mandor Rp. 226,000.00 Rp. 36,160.00
Rp. 1,196,460.00
5 MEMASANG 1 BUAH WASHTAFEL
1.0000 Bh Washtafel Rp. 2,000,000.00 Rp. 2,000,000.00
0.1200 Set Perlengkapan Rp. 2,000,000.00 Rp. 240,000.00
0.1200 Zak Semen Portland Rp. 190,000.00 Rp. 22,800.00
0.0100 M3 Pasir Pasangan Rp. 500,000.00 Rp. 5,000.00
1.2000 H.o Pekerja Rp. 155,000.00 Rp. 186,000.00
1.4500 H.o Tukang Batu Rp. 185,000.00 Rp. 268,250.00
0.1500 H.o Kepala Tukang Rp. 200,000.00 Rp. 30,000.00
0.1000 H.o Mandor Rp. 226,000.00 Rp. 22,600.00
Rp. 2,774,650.00
8 MEMASANG 1 BUAH BAK AIR FIBREGLASS
1.0000 Bh Bak Fibreglass Rp. 500,000.00 Rp. 500,000.00
0.1200 Set Perlengkapan Rp. 175,000.00 Rp. 21,000.00
3.0000 H.o Pekerja Rp. 155,000.00 Rp. 465,000.00
4.5000 H.o Tukang Batu Rp. 185,000.00 Rp. 832,500.00
0.9000 H.o Kepala Tukang Rp. 200,000.00 Rp. 180,000.00
0.9000 H.o Mandor Rp. 226,000.00 Rp. 203,400.00
Rp. 2,201,900.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


12 MEMASANG 1 BUAH SEPTICTANK + PERESAPAN
12.A SEPTICTANK
3.3350 Zak Sement Portland Rp. 190,000.00 Rp. 633,650.00
0.8500 M3 Pasir Pasangan Rp. 500,000.00 Rp. 425,000.00
300.0000 Bh Batu Tela Rp. 6,000.00 Rp. 1,800,000.00
1.5000 M' Pipa PVC 2 " Rp. 28,750.00 Rp. 43,125.00
2.0000 M' Pipa PVC 4 " Rp. 81,250.00 Rp. 162,500.00
12.B PERESAPAN
4.0750 M3 Galian Tanah Rp. 121,900.00 Rp. 496,742.50
2.9050 M3 Kerikil Beton Rp. 700,000.00 Rp. 2,033,500.00
0.6150 M3 Urugan Pasir Rp. 312,760.00 Rp. 192,347.40
7.0000 M' Pipa PVC 4 " Rp. 81,250.00 Rp. 568,750.00
2.0000 M2 Ijuk Rp. 25,000.00 Rp. 50,000.00
0.1600 M3 Pasangan Beton Cetak T = 8 Cm Rp. 11,261,965.00 Rp. 1,801,914.40
6.0000 M2 Plesteran 1 : 2 Rp. 129,491.20 Rp. 776,947.20
2.0000 O.h Pekerja Rp. 155,000.00 Rp. 310,000.00
3.5000 O.h Tukang Batu Rp. 185,000.00 Rp. 647,500.00
0.9000 O.h Kepala Tukang Rp. 200,000.00 Rp. 180,000.00
0.9000 O.h Mandor Rp. 226,000.00 Rp. 203,400.00
Rp. 10,325,376.50
19 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 3/4''
1.2000 M' Pipa PVC 3/4'' Rp. 10,000.00 Rp. 12,000.00
0.3500 Ls Perlengkapan Rp. 3,500.00 Rp. 1,225.00
0.0360 H.o Pekerja Rp. 155,000.00 Rp. 5,580.00
0.0600 H.o Tukang Batu Rp. 185,000.00 Rp. 11,100.00
0.0060 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,200.00
0.0018 H.o Mandor Rp. 226,000.00 Rp. 406.80
Rp. 31,511.80
23 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 3''
1.2000 M' Pipa PVC 3'' Rp. 50,000.00 Rp. 60,000.00
0.3500 Ls Perlengkapan Rp. 17,500.00 Rp. 6,125.00
0.0810 H.o Pekerja Rp. 155,000.00 Rp. 12,555.00
0.1350 H.o Tukang Batu Rp. 185,000.00 Rp. 24,975.00
0.0135 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,700.00
0.0041 H.o Mandor Rp. 226,000.00 Rp. 926.60
Rp. 107,281.60
25 MEMASANG 1 BUAH BAK CUCI PIRING STAINLES STEEL
1.0000 Bh Bak Cuci Piring Stainles Rp. 300,000.00 Rp. 300,000.00
1.0000 Set Water Drain + Accesories Rp. 25,000.00 Rp. 25,000.00
0.0300 H.o Pekerja Rp. 155,000.00 Rp. 4,650.00
0.3000 H.o Tukang Batu Rp. 185,000.00 Rp. 55,500.00
0.0300 H.o Kepala Tukang Rp. 200,000.00 Rp. 6,000.00
0.0015 H.o Mandor Rp. 226,000.00 Rp. 339.00
Rp. 391,489.00
26 MEMASANG 1 BUAH KRAN DIA 3/4'' ATAU 1/2''
1.0000 Bh Krain Air Rp. 20,000.00 Rp. 20,000.00
0.0250 Bh Seal Tape Rp. 10,000.00 Rp. 250.00
0.0100 H.o Pekerja Rp. 155,000.00 Rp. 1,550.00
0.1000 H.o Tukang Batu Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0050 H.o Mandor Rp. 226,000.00 Rp. 1,130.00
Rp. 43,430.00
27 MEMASANG 1 BUAH FLOOR DRAIN
1.0000 Bh Floor Drain Aluminium Rp. 50,000.00 Rp. 50,000.00
0.0100 H.o Pekerja Rp. 155,000.00 Rp. 1,550.00
0.1000 H.o Tukang Batu Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0050 H.o Mandor Rp. 226,000.00 Rp. 1,130.00
Rp. 73,180.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA


1 MEMASANG 1 BUAH KUNCI TANAM ANTIK
1.0000 Bh Kunci Tanam Antik Rp. 300,000.00 Rp. 300,000.00
0.0600 H.o Pekerja Rp. 155,000.00 Rp. 9,300.00
0.6000 H.o Tukang Kayu Rp. 185,000.00 Rp. 111,000.00
0.0600 H.o Kepala Tukang Rp. 200,000.00 Rp. 12,000.00
0.0030 H.o Mandor Rp. 226,000.00 Rp. 678.00
Rp. 432,978.00
2 MEMASANG 1 BUAH KUNCI TANAM BIASA
1.0000 Bh Kunci Tanam Biasa Rp. 150,000.00 Rp. 150,000.00
0.0100 H.o Pekerja Rp. 155,000.00 Rp. 1,550.00
0.5000 H.o Tukang Kayu Rp. 185,000.00 Rp. 92,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0050 H.o Mandor Rp. 226,000.00 Rp. 1,130.00
Rp. 247,180.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


4 MEMASANG 1 BUAH KUNCI SILINDER
1.0000 Bh Kunci Silinder Rp. 80,000.00 Rp. 80,000.00
0.0050 H.o Pekerja Rp. 155,000.00 Rp. 775.00
0.5000 H.o Tukang Kayu Rp. 185,000.00 Rp. 92,500.00
0.0050 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,000.00
0.0025 H.o Mandor Rp. 226,000.00 Rp. 565.00
Rp. 174,840.00
5 MEMASANG 1 BUAH ENGSEL PINTU
1.0000 Bh Engsel Pintu Rp. 20,000.00 Rp. 20,000.00
0.0150 H.o Pekerja Rp. 155,000.00 Rp. 2,325.00
0.1500 H.o Tukang Kayu Rp. 185,000.00 Rp. 27,750.00
0.0150 H.o Kepala Tukang Rp. 200,000.00 Rp. 3,000.00
0.0008 H.o Mandor Rp. 226,000.00 Rp. 169.50
Rp. 53,244.50
6 MEMASANG 1 BUAH ENGSEL JENDELA KUPU-KUPU
1.0000 Bh Engsel Jendela Kupu-Kupu Rp. 30,000.00 Rp. 30,000.00
0.0100 H.o Pekerja Rp. 155,000.00 Rp. 1,550.00
0.1000 H.o Tukang Kayu Rp. 185,000.00 Rp. 18,500.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0005 H.o Mandor Rp. 226,000.00 Rp. 113.00
Rp. 52,163.00
7 MEMASANG 1 BUAH ENGSEL ANGIN
1.0000 Bh Engsel Angin Rp. 25,000.00 Rp. 25,000.00
0.0200 H.o Pekerja Rp. 155,000.00 Rp. 3,100.00
0.2000 H.o Tukang Kayu Rp. 185,000.00 Rp. 37,000.00
0.0200 H.o Kepala Tukang Rp. 200,000.00 Rp. 4,000.00
0.0100 H.o Mandor Rp. 226,000.00 Rp. 2,260.00
Rp. 71,360.00
8 MEMASANG 1 BUAH PASANG KAIT ANGIN
1.0000 Bh Kait Angin Rp. 30,000.00 Rp. 30,000.00
0.0150 H.o Pekerja Rp. 155,000.00 Rp. 2,325.00
0.1500 H.o Tukang Kayu Rp. 185,000.00 Rp. 27,750.00
0.0150 H.o Kepala Tukang Rp. 200,000.00 Rp. 3,000.00
0.0008 H.o Mandor Rp. 226,000.00 Rp. 169.50
Rp. 63,244.50
16 MEMASANG 1 M2 PASANG KACA, TEBAL 5 MM
1.1000 M2 Kaca 5 mm Rp. 200,000.00 Rp. 220,000.00
0.0150 H.o Pekerja Rp. 155,000.00 Rp. 2,325.00
0.1500 H.o Tukang Kayu Rp. 185,000.00 Rp. 27,750.00
0.0150 H.o Kepala Tukang Rp. 200,000.00 Rp. 3,000.00
0.0008 H.o Mandor Rp. 226,000.00 Rp. 169.50
Rp. 253,244.50
ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI
0.7000 H.o Pekerja Rp. 155,000.00 Rp. 108,500.00
0.3500 H.o Tukang Rp. 200,000.00 Rp. 70,000.00
0.0350 H.o Kepala Tukang Rp. 200,000.00 Rp. 7,000.00
0.0350 H.o Mandor Rp. 226,000.00 Rp. 7,910.00
Rp. 499,830.00
2 MEMASANG 1 M2 DINDING KERAMIK 20 X 20 CM
26.5000 Bh Keramik 25 x 25 cm Rp. 10,000.00 Rp. 265,000.00
0.1860 Zak Semen portland Rp. 190,000.00 Rp. 35,340.00
0.0180 M3 Pasir pasang Rp. 500,000.00 Rp. 9,000.00
1.9400 Kg Semen warna Rp. 20,000.00 Rp. 38,800.00
0.9000 H.o Pekerja Rp. 155,000.00 Rp. 139,500.00
0.4500 H.o Tukang Rp. 200,000.00 Rp. 90,000.00
0.0450 H.o Kepala Tukang Rp. 200,000.00 Rp. 9,000.00
0.0450 H.o Mandor Rp. 226,000.00 Rp. 10,170.00
Rp. 596,810.00
3 MEMASANG 1 M2 DINDING KERAMIK 25 X 40 CM
21.2000 Bh Keramik 20 x 25 cm Rp. 10,000.00 Rp. 212,000.00
0.1860 Zak Semen portland Rp. 190,000.00 Rp. 35,340.00
0.0180 M3 Pasir pasang Rp. 500,000.00 Rp. 9,000.00
2.9000 Kg Semen warna Rp. 20,000.00 Rp. 58,000.00
0.9000 H.o Pekerja Rp. 155,000.00 Rp. 139,500.00
0.4500 H.o Tukang Rp. 200,000.00 Rp. 90,000.00
0.0450 H.o Kepala Tukang Rp. 200,000.00 Rp. 9,000.00
0.0450 H.o Mandor Rp. 226,000.00 Rp. 10,170.00
1,501,000.00 Rp. 563,010.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


5 MEMASANG 1 M2 LANTAI KERAMIK 40 X 40 CM
6.6300 Bh Keramik 40 x 40 cm Rp. 14,400.00 Rp. 95,472.00
0.1960 Zak Semen portland Rp. 190,000.00 Rp. 37,240.00
0.0450 M3 Pasir pasang Rp. 500,000.00 Rp. 22,500.00
1.3000 Kg Semen warna Rp. 20,000.00 Rp. 26,000.00
0.7000 H.o Pekerja Rp. 155,000.00 Rp. 108,500.00
0.3500 H.o Tukang Rp. 200,000.00 Rp. 70,000.00
0.0350 H.o Kepala Tukang Rp. 200,000.00 Rp. 7,000.00
0.0350 H.o Mandor Rp. 226,000.00 Rp. 7,910.00
Rp. 374,622.00
7 MEMASANG 1 M' PLINT KERAMIK 10 X 40 CM
2.6500 Bh Plint keramik 10 x 40 Cm Rp. 3,000.00 Rp. 7,950.00
0.0228 Zak Semen portland Rp. 190,000.00 Rp. 4,332.00
0.0030 M3 Pasir pasang Rp. 500,000.00 Rp. 1,500.00
0.1000 Kg Semen warna Rp. 20,000.00 Rp. 2,000.00
0.0900 H.o Pekerja Rp. 155,000.00 Rp. 13,950.00
0.0900 H.o Tukang Rp. 200,000.00 Rp. 18,000.00
0.0090 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,800.00
0.0050 H.o Mandor Rp. 226,000.00 Rp. 1,130.00
Rp. 50,662.00
8 MEMASANG 1 M2 DINDING BATU ALAM LIMESTONE
1.0500 M2 Batu Alam Limestone Rp. 400,000.00 Rp. 420,000.00
0.2350 Zak Semen Portland Rp. 190,000.00 Rp. 44,650.00
0.0350 M3 Pasir Pasangan Rp. 500,000.00 Rp. 17,500.00
1.5000 Kg Semen Warna Rp. 20,000.00 Rp. 30,000.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.2000 H.o Tukang Batu Rp. 200,000.00 Rp. 40,000.00
0.0200 H.o Kepala Tukang Rp. 200,000.00 Rp. 4,000.00
0.0020 H.o Mandor Rp. 226,000.00 Rp. 452.00
Rp. 603,102.00
9 MEMASANG 1 M2 DINDING BATU ALAM CANDI
1.0500 M2 Batu Alam Candi Rp. 450,000.00 Rp. 472,500.00
0.3080 Zak Semen Portland Rp. 190,000.00 Rp. 58,520.00
0.0350 M3 Pasir Pasangan Rp. 500,000.00 Rp. 17,500.00
1.5000 Kg Semen Warna Rp. 20,000.00 Rp. 30,000.00
0.3000 H.o Pekerja Rp. 155,000.00 Rp. 46,500.00
0.2000 H.o Tukang Batu Rp. 200,000.00 Rp. 40,000.00
0.0200 H.o Kepala Tukang Rp. 200,000.00 Rp. 4,000.00
0.0020 H.o Mandor Rp. 226,000.00 Rp. 452.00
Rp. 669,472.00
10 MEMASANG 1 M2 PAVING BLOK
50.0000 Bh Paving Blok Rp. 5,000.00 Rp. 250,000.00
0.1200 M3 Pasir Pasangan Rp. 500,000.00 Rp. 60,000.00
0.1000 H.o Pekerja Rp. 155,000.00 Rp. 15,500.00
0.0500 H.o Tukang Batu Rp. 200,000.00 Rp. 10,000.00
0.0100 H.o Kepala Tukang Rp. 200,000.00 Rp. 2,000.00
0.0010 H.o Mandor Rp. 226,000.00 Rp. 226.00
Rp. 337,726.00
ANALISA BIAYA KONSTRUKSI BIAYA PENGECETAN
5 1 M2 MENGEROK KARAT ATAU CAT LAMA PERMUKAAN BAJA DENGAN PANCAR PASIR ( SANBLASTING )
DENGAN TINGKAT KEBERSIHAN Sa 2 1/2
0.0500 Kg Pasir Silika Rp. 11,500.00 Rp. 575.00
10.0000 Ltr BBM Rp. 10,000.00 Rp. 100,000.00
1.0000 Hr Kompresor, Blasting Pot Rp. 230,000.00 Rp. 230,000.00
1.0000 Hr Selang dan Nozzle Rp. 115,000.00 Rp. 115,000.00
1.6000 H.o Pekerja Rp. 155,000.00 Rp. 248,000.00
1.6000 H.o Tukang Cat Rp. 200,000.00 Rp. 320,000.00
0.8000 H.o Kepala Tukang Rp. 200,000.00 Rp. 160,000.00
0.5000 H.o Mandor Rp. 226,000.00 Rp. 113,000.00
Rp. 1,286,575.00
6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU
0.0800 Kg Dempul Kayu Rp. 25,000.00 Rp. 2,000.00
0.0200 Kg Minyak Cat Rp. 40,000.00 Rp. 800.00
2.0000 Lbr Kertas Gosok Rp. 10,000.00 Rp. 20,000.00
0.0400 H.o Pekerja Rp. 155,000.00 Rp. 6,200.00
0.0400 H.o Tukang Cat Rp. 200,000.00 Rp. 8,000.00
0.0040 H.o Kepala Tukang Rp. 200,000.00 Rp. 800.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


0.0025 H.o Mandor Rp. 226,000.00
Rp. 565.00
Rp. 38,365.00
7 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
0.2000 Kg Cat Meni Rp. - Rp. -
0.1500 Kg Plamir Rp. - Rp. -
0.1700 Kg Cat Dasar Rp. 50,000.00 Rp. 8,500.00
0.2600 Kg Cat Penutup 2 Kali Rp. 50,000.00 Rp. 13,000.00
0.0700 H.o Pekerja Rp. 155,000.00 Rp. 10,850.00
0.0090 H.o Tukang Cat Rp. 200,000.00 Rp. 1,800.00
0.0060 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,200.00
0.0025 H.o Mandor Rp. 226,000.00 Rp. 565.00
Rp. 35,915.00
13 1 M2 PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
0.1000 Kg Plamir Rp. 25,000.00 Rp. 2,500.00
0.1000 Kg Cat Dasar Rp. 300,000.00 Rp. 30,000.00
0.2600 Kg Cat Penutup 2 Kali Rp. 300,000.00 Rp. 78,000.00
0.0200 H.o Pekerja Rp. 155,000.00 Rp. 3,100.00
0.0630 H.o Tukang Cat Rp. 200,000.00 Rp. 12,600.00
0.0063 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,260.00
0.0025 H.o Mandor Rp. 226,000.00 Rp. 565.00
Rp. 128,025.00
15 1 M2 PENGECATAN PLAFOND ( 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP )
0.1000 Ltr Cat Dasar Rp. 300,000.00 Rp. 30,000.00
0.2600 Kg Cat Penutup 2 Kali Rp. 300,000.00 Rp. 78,000.00
0.0200 H.o Pekerja Rp. 155,000.00 Rp. 3,100.00
0.0630 H.o Tukang Cat Rp. 200,000.00 Rp. 12,600.00
0.0063 H.o Kepala Tukang Rp. 200,000.00 Rp. 1,260.00
0.0025 H.o Mandor Rp. 226,000.00 Rp. 565.00
Rp. 125,525.00
ANALISA BIAYA KONSTRUKSI BIAYA LISTRIK
5 1 TITIK PASANG LAMPU SL 20 WATT
1.0000 Bh Lampu SL 20 Watt Rp. 100,000.00 Rp. 100,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa listrik PVC AW 5/8" Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
0.5000 H.o Tukang Listrik Rp. 200,000.00 Rp. 100,000.00
Rp. 505,000.00
7 1 BUAH PASANG STOP KONTAK
1.0000 Bh Stop Kontak Rp. 30,000.00 Rp. 30,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa listrik PVC AW 5/8" Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Pekerja Rp. 155,000.00 Rp. 155,000.00
0.5000 H.o Tukang Listrik Rp. 200,000.00 Rp. 100,000.00
Rp. 435,000.00
9 1 BUAH PASANG SAKLAR DOUBLE
1.0000 Bh Saklar Double Rp. 35,000.00 Rp. 35,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa listrik PVC AW 5/8" Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Tukang Listrik Rp. 200,000.00 Rp. 200,000.00
Rp. 385,000.00
10 1 BUAH PASANG SAKLAR TUNGGAL
1.0000 Bh Saklar Tunggal Rp. 30,000.00 Rp. 30,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa listrik PVC AW 5/8" Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Tukang Listrik Rp. 200,000.00 Rp. 200,000.00
Rp. 380,000.00
11 1 BUAH PASANG SEKRING OTOMATIS
1.000 Bh Sekring otomatis Rp. 75,000.00 Rp. 75,000.00
10.000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
1.0000 H.o Tukang Listrik Rp. 200,000.00 Rp. 200,000.00
Rp. 375,000.00
12 1 BUAH PASANG BOX SEKRING
1.000 Bh Box Sekring Rp. 50,000.00 Rp. 50,000.00
1.0000 H.o Tukang Listrik Rp. 200,000.00 Rp. 200,000.00
Rp. 250,000.00
13 1 BUAH PASANG PANEL INSTALASI
1.000 Bh Panel Instalasi Rp. 2,500,000.00 Rp. 2,500,000.00
10.000 M' Kabel NYM 3 x 2.5 mm Rp. 18,000.00 Rp. 180,000.00
2.000 M' Kabel NYF GbY 4 x 25 Rp. 20,000.00 Rp. 40,000.00
1.0000 H.o Tukang Listrik Rp. 200,000.00 Rp. 200,000.00
Rp. 2,920,000.00

Analisa Biaya Konstruksi Dinas Pekerjaan Umum Kab. Mimika`


DAFTAR SATUAN BAHAN DAN UPAH

NO URAIAN SATUAN HARGA (Rp)

A. NAMA BAHAN :
1 Semen Portland Zak 190,000.00
2 Pasir Beton M3 500,000.00
3 Pasir Pasangan M3 500,000.00
4 Pasir Urug/Timbunan M3 220,000.00
5 Kerikil Cor/Kerikil Kali Pilihan M3 700,000.00
6 Semen Warna Kg 20,000.00
7 Karangan Urug M3 75,000.00
8 Tanah Timbunan M3 200,000.00
9 Batu Kali / Batu Gunung M3 700,000.00
10 Batu Tela / Batako ( HB ) Bh 6,000.00
11 Batu Terawang / Roster Bh 6,000.00
12 Besi Beton U-24 Kg 15,800.00
13 Besi Beton Ulir U-24 Kg 22,500.00
14 Hollow Galvalum 4/4 cm Btg 240,000.00
15 Hollow Galvalum 2/4 cm Btg 160,000.00
16 Stifenner Bh 20,000.00
17 Sekrup Kg 200,000.00
18 Kawat Penggantung + Ramset Bh 7,000.00
19 Kawat Ikat ( Bendrat ) Kg 25,000.00
20 Balok Kayu Kelas I (5/10 dan 6/12) M3 7,500,000.00
21 Balok Kayu Kelas II (5/5,5/7,5/10 dan 6/12) M3 5,000,000.00
22 Balok Kayu Kelas III (5/5,5/7,5/10 dan 6/12) M3 2,500,000.00
23 Papan Kelas I (2/20 dan 2/25) M3 5,000,000.00
24 Papan Kelas II (2/20 dan 2/25) M3 7,500,000.00
25 Papan Kelas III (Bekesting dan Bouwplank) M3 2,500,000.00
26 List Profil M' 12,000.00
27 Tripleks 3 mm Lbr 80,000.00
28 Tripleks 4 mm Lbr 120,000.00
29 Tripleks 6 mm Lbr 140,000.00
30 Tripleks 9 mm Lbr 180,000.00
31 Tripleks 12 mm Lbr 220,000.00
32 Plafon Akustik 30x30 Lbr 15,000.00
33 Plafon Akustik 60x60 Lbr 45,000.00
34 Teackwood Lbr 165,000.00
35 Formika Lbr 325,000.00
36 Pipa PVC 1/2" AW - 4 m M' 7,500.00
37 Pipa PVC 3/4" AW - 4 m M' 10,000.00
38 Pipa PVC 1" AW - 4 m M' 12,000.00
39 Pipa PVC 1.5" AW - 4 m M' 20,125.00
40 Pipa PVC 2" AW - 4 m M' 28,750.00
41 Pipa PVC 3" AW - 4 m M' 50,000.00
42 Pipa PVC 4" AW - 4 m M' 81,250.00
43 Seal Tape Bh 10,000.00
44 Bak Air Fibreglass 55x55x60 Unit 500,000.00
45 Urinoir Ex. Toto Unit 2,500,000.00
46 Pipa Instalasi M' 5,000.00
47 Pipa Galvanis 1/2" - 6 m M' 32,500.00
48 Pipa Galvanis 3/4" - 6 m M' 37,500.00
49 Pipa Galvanis 1" - 6 m M' 54,100.00
50 Pipa Galvanis 1.5" - 6 m M' 80,000.00
51 Pipa Galvanis 2" - 6 m M' 100,000.00
52 Pipa Galvanis 3" - 6 m M' 250,000.00
53 Lem Pipa Kg 40,000.00

Harga Bahan dan Upah Dinas Pekerjaan Umum Kab. Mimika


NO URAIAN SATUAN HARGA (Rp)

54 Lem Kayu Kg 50,000.00


55 Floor Drain Aluminium Bh 50,000.00
56 Stop Kran 1/2" Bh 20,000.00
57 Stop Kran 3/4" Bh 30,000.00
58 Kloset Jongkok Ex Toto Bh 400,000.00
59 Kloset Duduk Ex Toto Bh 2,500,000.00
60 Washtafel Ex Toto Bh 2,000,000.00
61 Paku Campur Kg 40,000.00
62 Paku Seng Kg 50,000.00
63 Paku Hak Panjang Kg 40,000.00
64 Alat Baut, Baut Ls 20,000.00
65 Genteng Metal Sakura Roof Lbr 55,000.00
66 Bubungan Genteng Metal Sakura Roof Bh 50,000.00
67 Paku Genteng Metal Kg 30,000.00
68 Paku Tripleks Kg 30,000.00
69 Paku Sekrup 3.5" Bh 3,000.00
70 Seng Plat BJLS 30 Lbr 85,000.00
71 Seng Gelombang BJLS 30 Lbr 90,000.00
72 Seng Plat Bubungan BJLS 30 M' 35,000.00
73 Spandek Zincalume M2 125,000.00
74 Nok Spandek Zincalume M' 35,000.00
75 Besi Plat M2 350,000.00
76 Besi Profil Kg 25,000.00
79 Besi Siku 20.20 6 m Kg 20,000.00
80 Besi Siku 30.30 6 m Kg 20,000.00
81 Besi Siku 40.40 6 m Kg 20,000.00
82 Besi Siku 60.60 6 m Kg 20,000.00
83 Besi Siku 70.70 6 m Kg 20,000.00
84 Besi Siku 100.100 6 m Kg 20,000.00
85 Besi Siku 150.150 6 m Kg 20,000.00
86 Besi Plat 4 mm Kg 20,000.00
87 Besi Plat 8 mm Kg 20,000.00
88 Besi Plat 20 mm Kg 20,000.00
89 Profil Aluminium (Kusen) M' 300,000.00
90 Skrup Fixer Bh 1,250.00
91 Sealant Tube 60,000.00
92 Pintu Aluminium (Rangka Daun) M' 400,000.00
93 Jendela Aluminium (Rangka Daun) M' 350,000.00
94 Composite Panel Aluminium 4 mm Lbr 650,000.00
95 Profil Kaca 5 mm M' 200,000.00
96 Profil Kaca 8 mm M' 400,000.00
97 Kawat Las Kg 40,000.00
98 Besi Strip 2x3 M' 45,000.00
99 Kawat Harmonika M2 15,000.00
100 Kusen Aluminium M' 300,000.00
101 Kaca Bening 5 mm M2 200,000.00
102 Kaca Nako Lbr 30,000.00
103 Paving Block Bh 5,000.00
104 Batu Alam Limestone M2 400,000.00
105 Batu Alam Candi M2 450,000.00
106 Keramik 10x30 cm Bh 3,000.00
107 Keramik 20x20 cm Bh 8,000.00
108 Keramik 25x25 cm Bh 10,000.00
109 Keramik 25x40 cm Bh 13,000.00
110 Keramik 30x30 cm Bh 15,000.00
111 Keramik 40x40 cm Bh 14,400.00
112 Kunci Tanam 2 Slaag Bh 150,000.00

Harga Bahan dan Upah Dinas Pekerjaan Umum Kab. Mimika


NO URAIAN SATUAN HARGA (Rp)

113 Engsel Pintu Kuningan Bh 20,000.00


114 Engse Jendela Kuningan Bh 30,000.00
115 Engsel Angin Bh 25,000.00
116 Grendel Pintu Bh 20,000.00
117 Grendel Jendela Bh 15,000.00
118 Hak Angin Jendela Bh 30,000.00
119 Kertas Gosok (Amplas) Lbr 10,000.00
120 Plamur Kg 25,000.00
121 Dempul Kg 25,000.00
122 Residu Ltr 25,000.00
123 Meni Kayu Ltr 25,000.00
124 Meni Besi Ltr 25,000.00
125 Cat Tembok Ex Jotun/Setara Ltr 300,000.00
126 Cat Tembok Ex Avitex/Setara Ltr 30,000.00
127 Cat Kilat Kayu Kg 50,000.00
128 Cat Besi Kg 50,000.00
129 Cat Sinchromat Kg 60,000.00
130 Tinner Ltr 40,000.00
131 Plitur Teack Oil Ltr 45,000.00
132 Kuas Biasa Bh 25,000.00
133 Kuas Roll Bh 30,000.00
134 Lampu TL ( 1 X 40 Watt ) Bh 125,000.00
135 Lampu TL ( 2 X 40 Watt ) Bh 200,000.00
136 Lampu TL ( 1 X 20 Watt ) Bh 75,000.00
137 Lampu TL ( 2 X 20 Watt ) Bh 150,000.00
138 Lampu SL 18 Watt + Fitting Bh 100,000.00
139 Lampu Down Light 20 Watt + Fitting Bh 100,000.00
140 Saklar Tunggal Bh 30,000.00
141 Saklar Ganda Bh 35,000.00
142 Stop Kontak Bh 30,000.00
143 Stop Kontak AC Bh 50,000.00
144 Sekring Otomatis Bh 75,000.00
145 Box Sekring Bh 50,000.00
146 Kabel NYM 2 X 2.5 mm M' 10,000.00
147 Kabel NYM 3 X 2.5 mm M' 18,000.00
148 Kabel NYF GbY 4 x 25 mm M' 20,000.00
149 Panel Instalasi Bh 2,500,000.00
150 Klem Kabel Bh 5,000.00
151 Polycarbonate M2 450,000.00
152 Mangkok Saklar Bh 7,000.00
153 Minyak Bekesting Ltr 20,000.00
154 Batu Belah M3 1,000,000.00
155 Kawat Ram M2 50,000.00
156 Gypsum Board 9 mm Lbr 100,000.00
157 List Profil Gypsum M' 30,000.00
158 Tepung Gypsum Kg 10,000.00
159 Bak Cuci Stainles Steel Bh 300,000.00
160 Fitting Bh 30,000.00
161 Kayu Dolken Ø 8-10 4 m Btg 15,000.00
162 Benang Gloss 15,000.00
163 Rapidrant Glng 115,000.00
164 Strorox - 100 Ltr 25,000.00
165 Jaring Kawat Baja / Wire Mesh Kg 20,000.00
166 Balok 5/10 ( Kayu Klas II ) Btg 80,000.00
167 Formitie / Penjaga Jarak Bh 25,000.00
168 Genteng Palentong Bh 12,500.00
169 Genteng Kodok Bh 17,500.00

Harga Bahan dan Upah Dinas Pekerjaan Umum Kab. Mimika


NO URAIAN SATUAN HARGA (Rp)

170 Asbes Gelombang Lbr 40,000.00


171 Nok Stel Gelombang 0.92 M Lbr 40,500.00
172 Nok Stel Gelombang 1.05 M Lbr 43,500.00
173 Nok Stel Gelombang 1.08 M Lbr 44,000.00
174 Nok Paten 0.92 M Lbr 48,500.00
175 Nok Paten 1.05 M Lbr 52,000.00
176 Nok Paten 1.08 M Lbr 53,000.00
177 Nok Stel Rata 0.92 M Lbr 29,000.00
178 Nok Stel Rata 1.05 M Lbr 29,000.00
179 Genteng Beton Lbr 30,000.00
180 Aluminium Foil M2 325,000.00
181 Asbes 1 x 1 m Lbr 40,500.00
182 Perlengkapan Urinoir Set 385,000.00
183 Porselen 10 x 20 cm Bh 1,500.00
184 Ubin Porselen M2 75,000.00
185 Baja WF Kg 21,000.00
186 Kawat Nyamuk M2 45,000.00
187 Kawat Kassa M2 30,000.00
188 Kunci Tanam Antik Bh 300,000.00
189 Kunci Tanam Kamar Mandi Bh 200,000.00
190 Kunci Silinder Bh 80,000.00
191 Door Closer Bh 250,000.00
192 Kunci Selot Bh 80,000.00
193 Door Holder Bh 65,000.00
194 Door Stop Bh 250,000.00
195 Rel Pintu Dorong Bh 550,000.00
196 Kunci Lemari Bh 65,000.00
197 Kaca Bening 3 mm M2 150,000.00
198 Pasir Silika Kg 11,500.00
199 Soda Api Kg 6,500.00
200 Sabun Kg 20,000.00
201 BBM Ltr 10,000.00
202 Vernis Ltr 80,000.00
203 Water Drain + Asesories Set 25,000.00
204 Kompressor, Blasting Pot Hr 230,000.00
205 Selang dan Nozzle Hr 115,000.00
206 Alang-Alang Ikat 6,000.00
207 Kapur Sirih Kg 11,500.00
208 Ijuk M2 25,000.00
209 Alat Bantu Unit 200,000.00
B. TENAGA KERJA
1 Mandor O/H 226,000.00
2 Kepala Tukang O/H 200,000.00
3 Tukang Kayu / Batu / Besi O/H 185,000.00
4 Pekerja O/H 155,000.00

Harga Bahan dan Upah Dinas Pekerjaan Umum Kab. Mimika


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : JALAN, PARKIR DAN LANSEKAP
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
ERJA
I AN PEKERJAAN PERSIAPAN DAN CUT AND FILL
1 Pek. Pengukuran site m2 0.00
2 Pek. Galian tanah dengan alat ( Cut ) dan membuang keluar dari 65,000.00 m3 29,750.00 1,933,750,000.00
lokasi minimal 4,5 km
3 Pekerjaan Timbunan dengan alat maxsimal jarak angkut 500 m m3 17,500.00 0.00
1,933,750,000.00

II PEKERJAAN JALAN DAN PARKIR


1 Pek. Galian badan dan bahu jalan 1,588.30 M3 #REF! #REF!
2 Pek. Lapisan Pondasi Agregate tebal 30 cm 4,538.00 m2 #REF! #REF!
3 Pek. Prim coat 4,538.00 m2 21,500.00 97,567,000.00
4 ATB, tebal 5 cm 4,538.00 m2 85,000.00 385,730,000.00
5 Tack Coat 4,538.00 m2 19,500.00 88,491,000.00
6 Lataston (HRS), tebal = 5 cm 4,538.00 m2 117,500.00 533,215,000.00
7 Pek. Kansteen beton 799.00 m' #REF! #REF!
#REF!

III. PEKERJAAN SALURAN


A. SALURAN KOMLEKS ( INDUK )
### Pek. Saluran induk beton bertulang K 250 tebal 20 cm ( termasuk, 890.00 m' #REF! #REF!
galian, lantai kerja, beton bertulang dan pelesteran 1 : 3 )
2 Pek. Grill besi ( besi profil dan streep ) dicat anti karat dan finishing m' 275,000.00 0.00
3 Pek. Gorong gorong beton bertulang dia 80 cm 30.00 m' 350,000.00 10,500,000.00
4 Pek. Bak kontrol pertemuan antar saluran 15.00 bh 2,000,000.00 30,000,000.00
#REF!
B. SALURAN PEMBANGI
### Pek. Saluran induk beton bertulang K 250 tebal 15 cm ( termasuk, m' #REF! #REF!
galian, lantai kerja, beton bertulang dan pelesteran 1 : 3 ) #REF! #REF!
2 Pek. Bak kontrol pertemuan antar saluran bh 1,500,000.00 0.00
3 Pek. Gorong gorong beton bertulang dia 60 cm m' 350,000.00 0.00
4 Pek. Grill besi ( besi profil dan streep ) dicat anti karat dan finishing m' 225,000.00 0.00
#REF!

Sub Total A+B #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : JALAN, PARKIR DAN LANSEKAP
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
IV. PEK PEKERJAAN LANSEKAP
ERJA
A. TAMAN
AN
1 Penanaman. Rumput penutup permukaan tanah termasuk melapis m2 #REF!
humus tanah dan pupuk
2 Penanaman. pohon perdu phn 75,000.00
3 Pemasangan kansteen beton 100,000.00

B. POHON
1 Penanaman. pohon pengarah
2 Penanaman. pohon peneduh
3 Penanaman. pohon penyerap air dn penahan erosi

C. SARANA OLAH RAGA RINGAN

Sub Total A+B

V. PEKERJAAN LIMBAH
1 Pek. Pembuatan bak penampungan limbah
2 Pek. Treatmen limbah
3 Pek. Kolam buatan untuk uji coba

VI. PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan ls
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan ls
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
B. KE ARSITEKTUR
RJA
IV. AN PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
A. LANTAI - I
1 Pek. Tembok 1 batu diatas sloof 1 : 3 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
3 Pek. Tembok 1/2 batu 1 : 3 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
5 Pek. Tembok 1 : 5 m2 #REF! #REF!
6 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
7 Pek. Plesteran Tembok 1 : 5
PE m2 #REF! #REF!
KE
8 Pek. Acian tembok m2 #REF! #REF!
RJA
AN #REF!
B. LANTAI - II
1 Pek. Tembok 1 : 3 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
3 Pek. Tembok 1 : 5 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
5 Pek. Plesteran Tembok 1 : 5 m2 #REF! #REF!
6 Pek. Acian tembok m2 #REF! #REF!
#REF!
D LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 m2 #REF! #REF!
5 Pek. Acian tembok m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
V. PE PEKERJAAN LANTAI DAN DINDING
KE Catatan
RJA
AN Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A. LANTAI - I
1 Pek. Timbunan tanah dalam bangunan m3 #REF! #REF!
2 Pek. Timbunan pasir dalam bangunan m3 #REF! #REF!
3 Pek. Lantai kerja alas lantai m3 #REF! #REF!
4 Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) m2 #REF! #REF!
5 Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman m2 #REF! #REF!
6 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
7 Pek. Lantai keramik 20x20 cm stara Roman - Toliet m2 #REF! #REF!
8 Pek. Dinding keramik 20x25 cm stara Roman - Toilet m2 #REF! #REF!
9 Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
10 Pek. Granit pelapis dinding lift m2 550,000.00 0.00
11 Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman m2 #REF! #REF!
12 Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
13 Pek. Wall Guard /bumper (dado) m' 645,000.00 0.00
14 Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
B. LANTAI - II
### Pek. Timbunan pasir alas lantai m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM m2 85,000.00 0.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet m2 #REF! #REF!
### Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
### Pek. Granit pelapis dinding lift m2 550,000.00 0.00
### Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
C LANTAI - IV ( ATAP )
1 Pek. Timbunan pasir alas lantai m3 #REF! #REF!
2 Pek. Lantai keramik 40x40 cm stara Roman m2 #REF! #REF!
3 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
VI. PE PEKERJAAN KOSEN DAN KACA
KE Catatan
RJA
AN Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A. LANTAI - I
Pintu Utama
1 Pek. Frame Gate Pintu stanless steel lengkap 2.00 unt 15,500,000.00 31,000,000.00
2 Pek. Pintu utama kaca template 12 lengkap handle, engsel atas 2.00 set 25,000,000.00 50,000,000.00
dan bawah serta kunci
3 Pek. Kaca polos 12 mm 32.00 m2 15,000.00 480,000.00
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 10.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 3.50 m2 #REF! #REF!
3 Pek. Kaca polos 6 mm 1.00 m2 #REF! #REF!
4 Pas. Handle + kunci 1.00 bh #REF! #REF!
5 Pas. Handle 2.00 bh 125,000.00 250,000.00
6 Pas. Engsel pintu 6.00 bh #REF! #REF!
7 Pas. Grendel tanam pintu 4.00 bh 55,000.00 220,000.00
8 Pas. Door closer 1.00 bh #REF! #REF!
Pintu Ruangan ( Kayu )
1 Pas. Kosen pintu kayu kls I 2.25 m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 0.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 105.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm 1.00 m2 #REF! #REF!
5 Pas. Engsel pintu 198.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 56.00 bh #REF! #REF!
7 Pas. Handel 20.00 bh 125,000.00 2,500,000.00
8 Pas. Grendel tanam pintu 84.00 bh 55,000.00 4,620,000.00
9 Pas. Door closer dan door stop 56.00 bh #REF! #REF!
Jendela Utama
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 499.00 m' #REF! #REF!
2 Ras. Jendela bingkai aluminium windowwall + Kaca 6 mm 117.00 m' #REF! #REF!
3 Pas. Engsel jendela 228.00 bh 50,000.00 11,400,000.00
4 Pas. Hak angin 228.00 bh 10,000.00 2,280,000.00
5 Pas. Grendel jendela 114.00 bh 50,000.00 5,700,000.00
#REF!
B. LANTAI - II
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 37.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 9.50 m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm m2 #REF! #REF!
5 Pek. Kaca polos 6 mm 2.80 m2 #REF! #REF!
6 Pas. Handle + kunci 3.00 bh #REF! #REF!
7 Pas. Handle 6.00 bh 125,000.00 750,000.00
8 Pas. Engsel pintu 18.00 bh #REF! #REF!
9 Pas. Grendel tanam pintu 12.00 bh 55,000.00 660,000.00
10 Pas. Door closer 3.00 bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
Pintu
PE Ruangan ( Kayu ) 0.00
KE
1 Pas. Kosen pintu kayu kls I 3.50 m3 #REF! #REF!
RJA
AN2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 0.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 134.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm 4.00 m2 #REF! #REF!
5 Pas. Engsel pintu 258.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 61.00 bh #REF! #REF!
7 Pas. Handel 42.00 bh 125,000.00 5,250,000.00
8 Pas. Grendel tanam pintu 84.00 bh 55,000.00 4,620,000.00
9 Pas. Door closer dan door stop 65.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 363.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 92.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent 9.00 m2 #REF! #REF!
4 Pas. Engsel jendela 48.00 bh 50,000.00 2,400,000.00
5 Pas. Hak angin 48.00 bh 10,000.00 480,000.00
6 Pas. Grendel tanam 24.00 bh 50,000.00 1,200,000.00
#REF!
C LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 16.80 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 6.00 m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm m2 #REF! #REF!
5 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
6 Pas. Handle + kunci 2.00 bh #REF! #REF!
7 Pas. Handle 8.00 bh 125,000.00 1,000,000.00
8 Pas. Engsel pintu 12.00 bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
9 Pas. Grendel tanam pintu
PE 8.00 bh 55,000.00 440,000.00
KE
10 Pas. Door closer 2.00 bh #REF! #REF!
RJA
Pintu
AN Ruangan ( Kayu ) 0.00
1 Pas. Kosen pintu kayu kls I m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy m2 #REF! #REF!
4 Pek. Kaca polos 6 mm m2 #REF! #REF!
5 Pas. Engsel pintu bh #REF! #REF!
6 Pas. Kunci + Handel type besar bh #REF! #REF!
7 Pas. Handle 8.00 bh #REF! #REF!
8 Pas. Grendel tanam pintu bh 55,000.00 0.00
9 Pas. Door closer dan door stop bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 55.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 14.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 32.00 bh 50,000.00 1,600,000.00
5 Pas. Hak angin 32.00 bh 10,000.00 320,000.00
6 Pas. Grendel tanam 16.00 bh 50,000.00 800,000.00
#REF!

Sub Total A+B+C+D+E #REF!

VII. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 2,233.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,233.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 2,480.00 m' 35,000.00 86,800,000.00
6 Pas. List plapon type kecil 89.00 m' 25,000.00 2,225,000.00
#REF!
B. LANTAI - II
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 1,576.80 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 1,576.80 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. 0.00 m2 #REF! #REF!
5 Pas. List plapon type besar 1,461.00 m' 35,000.00 51,135,000.00
6 Pas. List plapon type kecil 98.00 m' 25,000.00 2,450,000.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
C
PE LANTAI - III ( ATAP )
KE
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
RJA
AN2 Pas. Rangka metal gypsum lengkap 286.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 286.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 235.00 m' 35,000.00 8,225,000.00
6 Pas. Les plapon type kecil m' 25,000.00 0.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


VIII. PEKERJAAN ATAP
1 Pek. Kuda kuda baja IWF 6,750.00 kg #REF! #REF!
2 Pek. Gording baja INP 2,150.00 kg #REF! #REF!
3 Pek. Dudukan kuda kuda + anker 8.00 bh 350,000.00 2,800,000.00
4 Pek. Kuda kuda baja ringan 655.00 m2 210,000.00 137,550,000.00
5 Pek. Kuda kuda stainless steel ( atap ) transparan bh
6 Pek. Rangka atap 285.00 m2 #REF! #REF!
7 Pek. Seng pelapis atap 285.00 m2 35,000.00 9,975,000.00
8 Pek. Atap genteng keramik 285.00 m2 #REF! #REF!
9 Pek. Nok genteng keramik 55.00 m' #REF! #REF!
10 Pek. Bubungan dekoratif 2.00 bh 2,500,000.00 5,000,000.00
11 Pek. Atap Spandec SWG 655.00 m2 #REF! #REF!
12 Pek. Atap Transparant ( kaca templet 12 mm ) m2
13 Pas. Roof insulation + ram kasa 940.00 m2 55,000.00 51,700,000.00
14 Pek. Nok spandek 58.00 m' #REF! #REF!
15 Pek. Listplank papan 15.00 m2 #REF! #REF!
16 Pek. Waterproofing type ………( plat latai II dan atap dak ) 1,121.00 m2 95,000.00 106,495,000.00
17 Pek. Plesteran floorhardener 1,121.00 m2 32,500.00 36,432,500.00
#REF!

IX. PEKERJAAN CAT DAN FINISHING


A. LANTAI - I
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 2,233.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 1,576.80 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
C
PE LANTAI - IV
KE
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
RJA
AN2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 286.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 25.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

X PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama stainlessstell 55.00 m' 950,000.00 52,250,000.00
2 Pek. Railing tangga service stainlessstell 55.00 m' 850,000.00 46,750,000.00
99,000,000.00

XI. PEKERJAAN SANITAIR


A. LANTAI - I
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 6.00 set 2,144,000.00 12,864,000.00
3 Kaca diatas wastafel Type TX 705 AE 6.00 set 718,000.00 4,308,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 6.00 m2 200,000.00 1,200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 11.00 set 3,150,000.00 34,650,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 26.00 bh 262,000.00 6,812,000.00
10 Urinal Moslem U 370 M 3.00 set 3,200,000.00 9,600,000.00
11 Pembatas Urinal Type A 100 (warna) 2.00 bh 894,000.00 1,788,000.00
12 Floordrain Type 1 BV 1 11.00 bh 270,000.00 2,970,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 6.00 set 3,500,000.00 21,000,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
B.
PE LANTAI - II
KE
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
RJA
AN2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 5.00 set 2,144,000.00 10,720,000.00
3 Kaca diatas wastafel Type TX 705 AE 13.00 set 718,000.00 9,334,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 13.00 m2 200,000.00 2,600,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 10.00 set 3,150,000.00 31,500,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 10.00 bh 262,000.00 2,620,000.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 10.00 bh 270,000.00 2,700,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 3.00 3,500,000.00 10,500,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
C LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 2.00 set 2,144,000.00 4,288,000.00
3 Kaca diatas wastafel Type TX 705 AE 2.00 set 718,000.00 1,436,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 2.00 m2 200,000.00 400,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) set 3,150,000.00 0.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
9 Kran air dinding type T 23 BQ 13 N ex Toto bh 262,000.00 0.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 bh 270,000.00 0.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE #REF!
KE
RJA
AN
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
F.
PE PEKERJAAN SEPTIKTANK
KE
1 Pek. Septiktan, konstruksi beton bertulang kapasitas ……… m3 5.00 unt 25,000,000.00 125,000,000.00
RJA
AN lengkap lubang kontrol dan pipa hawa
2 Pek, Peresapan air buangan dari septiktank 10.00 unt 15,000,000.00 150,000,000.00
275,000,000.00

Sub Total A+B+C+D+E+F #REF!

XII PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan 1.00 ls 25,000,000.00 25,000,000.00
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 15,000,000.00 15,000,000.00
40,000,000.00
RENCANA ANGGARAN BIAYA
(RAB)

KEGIATAN :

PEKERJAAN :
PEMBANGUNAN PUSKESMAS PEMBANTU DILOA

LOKASI
KABUPATEN MIMIKA

KONSULTAN PERENCANA

CV. LAMBDA KREASINDO


KONSULTAN MANAJEMEN DAN TEKNIK
Jl. Karunrung Asri Blok E No. 14 Makassar
Jl. Nuri Sektoral No. 11 Timika - Papua
ANALISA HARGA SATUAN DASAR BAHAN

BAHAN/MATERIAL : MINYAK SOLAR (M.184)

Jarak tempuh = 5.00 Km.


Kecepatan rata - rata = 40.00 Km / jam
Kapasitas angkut = 1,000.00 Ltr.
Waktu tempuh = 2.00 x 5.00 / 40.00 = 0.25 / jam
Waktu Muat dengan tenaga manusia = 2.00 Orang/hari
Waktu bongkar = 2.00 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya Bongkar = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya angkut = Rp. 200,000.00 / 1,000.00 x 0.25 = Rp. 50.00 / Ltr.
Sub total biaya angkut = Rp. 110.00 + 110.00 + 50.00 = Rp. 270.00 / Ltr.
Penyusutan 1,00 % = Rp. 10,000.00 x 0.01 = Rp. 100.00 / Ltr.
Total biaya angkut = Rp. 270.00 + 100.00 = Rp. 370.00 / Ltr.

Harga Solar di Timika (Untuk Industri) = Rp. 10,000.00


Harga Solar di lokasi Proyek = Rp. 10,000.00 + 370.00 + 39,176.92 Rp. 49,546.92 / Ltr.

BAHAN/MATERIAL : MINYAK PELUMAS (M.185)

Jarak tempuh = 5.00 Km.


Kecepatan rata - rata = 40.00 Km / jam
Kapasitas angkut = 1,000.00 Ltr.
Waktu tempuh = 2.00 x 5.00 / 40.00 = 0.25 / jam
Waktu Muat dengan tenaga manusia = 2.00 Orang/hari
Waktu bongkar = 2.00 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya Bongkar = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya angkut = Rp. 200,000.00 / 1,000.00 x 0.25 = Rp. 50.00 / Ltr.
Sub total biaya angkut = Rp. 110.00 + 110.00 + 50.00 = Rp. 270.00 / Ltr.
Penyusutan 1,00 % = Rp. 30,000.00 x 0.01 = Rp. 300.00 / Ltr.
Total biaya angkut = Rp. 270.00 + 300.00 = Rp. 570.00 / Ltr.

Harga Pelumas di Timika = Rp. 30,000.00


Harga Pelumas di lokasi Proyek = Rp. 30,000.00 + 570.00 + 39,176.92 Rp. 69,746.92 / Ltr.

BAHAN / MATERIAL : MINYAK PREMIUM / BENSIN (M.186)

Jarak tempuh = 10.00 Km.


Kecepatan rata - rata = 40.00 Km / jam
Kapasitas angkut = 1,000.00 Ltr.
Waktu tempuh = 2.00 x 10.00 / 40.00 = 0.50 / jam
Waktu Muat dengan tenaga manusia = 2.00 Orang/hari
Waktu bongkar = 2.00 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya Bongkar = Rp. 55,000.00 / 1,000.00 x 2.00 = Rp. 110.00 / Ltr.
Biaya angkut = Rp. 200,000.00 / 1,000.00 x 0.50 = Rp. 100.00 / Ltr.
Sub total biaya angkut = Rp. 110.00 + 110.00 + 100.00 = Rp. 320.00 / Ltr.
Penyusutan 1,00 % = Rp. 10,000.00 x 0.01 = Rp. 100.00 / Ltr.
Total biaya angkut = Rp. 320.00 + 100.00 = Rp. 420.00 / Ltr.

Harga Bensin di Timika = Rp. 10,000.00


Harga Bensin di lokasi Proyek = Rp. 10,000.00 + 420.00 + 39,176.92 Rp. 49,596.92 / Ltr.
ANALISA HARGA SATUAN DASAR BAHAN

BAHAN / MATERIAL : TULANGAN BAJA (M.167)

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut udara (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga Besi tulangan di Timika = Rp. 14,750.00 / kg


Harga besi tulangan di lokasi Proyek = Rp. 14,750.00 + 39,176.9 = Rp. 53,926.92 / kg.

BAHAN / MATERIAL : KAWAT BAJA (M.168)

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga kawat bendrat di Timika = Rp. 20,000.00 / kg


Harga kawat bendrat di lokasi Proyek = Rp. 20,000.00 + 39,176.9 Rp. 59,176.92 / kg.

BAHAN / MATERIAL : BAJA PROFIL

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut udara (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga Baja Profil di Timika = Rp. / kg


Harga Baja Profil di lokasi Proyek = Rp. - + 39,176.9 = Rp. 39,176.92 / kg.

BAHAN / MATERIAL : MATERIAL JEMBATAN GANTUNG/SELING

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga kawat/kabel jembatan di Timika = Rp. / kg


Harga kawat/kabel jemb. di lokasi Proyek = Rp. - + 39,176.9 Rp. 39,176.92 / kg.
ANALISA HARGA SATUAN DASAR BAHAN
BAHAN / MATERIAL : PAKU CAMPUR (M.166)

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga paku di Timika = Rp. 17,000.00 / kg


Harga paku di lokasi Proyek = Rp. 17,000.00 + 39,176.9 Rp. 56,176.92 / kg.

BAHAN / MATERIAL : CAT BESI

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga Cat Besi di Timika = Rp. 40,000.00 / kg


Harga Cat Besi di lokasi Proyek = Rp. 40,000.00 + 39,176.9 Rp. 79,176.92 / kg.

BAHAN / MATERIAL : KAWAT LAS

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga Kawat Las di Timika = Rp. 37,500.00 / kg


Harga Kawat Las di lokasi Proyek = Rp. 37,500.00 + 39,176.9 Rp. 76,676.92 / kg.

BAHAN / MATERIAL : PAKU JEMBATAN (M.166)

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga paku jembatan di Timika = Rp. 25,000.00 / kg


Harga paku jembatan di lokasi Proyek = Rp. 25,000.00 + 39,176.9 Rp. 64,176.92 / kg.
ANALISA HARGA SATUAN DASAR BAHAN

BAHAN / MATERIAL : PORTLAND CEMENT (M.080)

Kapasitas angkut = 1,300.00 kg


Waktu tempuh = 0.50 jam
Waktu bongkar - muat = 0.50 jam
Total waktu = 0.50 + 0.50 = 1.00 jam
Biaya angkut (carter angkutan udara) = Rp. 50,000,000 / 1,300.00 x 1.00 = Rp. 38,461.54 / kg
Biaya bongkar-muat (Tenaga 2 org) = Rp. 100,000.00 / 1,300.00 x 2.00 = Rp. 153.85 / kg
Biaya angkut darat (ke bandara & proyek) = Rp. 365,000.00 / 1,300.00 x 2.00 = Rp. 561.54 / kg
Total biaya angkut = Rp. 38,461.54 + 153.85 + 561.54 = Rp. 39,176.92 / kg.

Harga Semen di Timika = Rp. 1,660.00 / kg


Harga Semen di lokasi Proyek = Rp. 1,660.00 + 39,176.9 = Rp. 40,836.92 / kg.
Harga 1 Zak Semen (50 Kg) di lokasi Proyek = Rp. 40,836.92 x 50.00 = Rp. 2,041,846 / Zak

BAHAN/MATERIAL : KAYU 5/20 (M.067)

Jarak tempuh = 5.00 Km.


Kecepatan rata - rata = 5.00 Km / jam
Kapasitas angkut (non truck) = 1.00 m3
Waktu tempuh = 1.00 x 5.00 / 5.00 = 1.00 / jam
Waktu Muat dengan tenaga manusia = 0.43 Orang/hari
Waktu bongkar = 0.43 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 100,000.00 / 1.00 x 0.43 = Rp. 42,857.14 / M3
Biaya Bongkar = Rp. 100,000.00 / 1.00 x 0.43 = Rp. 42,857.14 / M3
Biaya angkut (tenaga manusia ke lokasi) = Rp. 365,000.00 / 1.00 x 1.00 = Rp. 365,000.00 / M3
Sub total biaya angkut = Rp. 42,857.14 + 42,857 + 365,000 = Rp. 450,714.29 / M3
Penyusutan 1,00 % = Rp. 3,000,000 x 0.01 = Rp. 30,000.00 / M3
Total biaya angkut = Rp. 450,714.29 + 30,000 = Rp. 480,714.29 / M3

Harga Kayu besi Lokal = Rp. 3,000,000


Harga Kayu besi di lokasi Proyek = Rp. 3,000,000 + 480,714 Rp. 3,480,714 / M3

BAHAN/MATERIAL : KAYU 20/25 (M.070)

Jarak tempuh = 5.00 Km.


Kecepatan rata - rata = 5.00 Km / jam
Kapasitas angkut (non truck) = 1.00 m3
Waktu tempuh = 1.00 x 5.00 / 5.00 = 1.00 / jam
Waktu Muat dengan tenaga manusia = 0.57 Orang/hari
Waktu bongkar = 0.57 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 100,000.00 / 1.00 x 0.57 = Rp. 57,142.86 / M3
Biaya Bongkar = Rp. 100,000.00 / 1.00 x 0.57 = Rp. 57,142.86 / M3
Biaya angkut (tenaga manusia ke lokasi) = Rp. 365,000.00 / 1.00 x 1.00 = Rp. 365,000.00 / M3
Sub total biaya angkut = Rp. 57,142.86 + 57,143 + 365,000 = Rp. 479,285.71 / M3
Penyusutan 1,00 % = Rp. 4,500,000 x 0.01 = Rp. 45,000.00 / M3
Total biaya angkut = Rp. 479,285.71 + 45,000 = Rp. 524,285.71 / M3

Harga Kayu besi Lokal = Rp. 4,500,000 (50% > dari harga standar)
Harga Kayu besi di lokasi Proyek = Rp. 4,500,000 + 524,286 Rp. 5,024,286 / M3
BAHAN / MATERIAL : KAYU BEKISTING/PERANCAH

Jarak tempuh = 5.00 Km.


Kecepatan rata - rata = 5.00 Km / jam
Kapasitas angkut (non truck) = 1.00 m3
Waktu tempuh = 1.00 x 5.00 / 5.00 = 1.00 / jam
Waktu Muat dengan tenaga manusia = 0.57 Orang/hari
Waktu bongkar = 0.57 Orang/hari
Biaya muat dengan tenaga manusia = Rp. 100,000.00 / 1.00 x 0.57 = Rp. 57,142.86 / M3
Biaya Bongkar = Rp. 100,000.00 / 1.00 x 0.57 = Rp. 57,142.86 / M3
Biaya angkut (tenaga manusia ke lokasi) = Rp. 365,000.00 / 1.00 x 1.00 = Rp. 365,000.00 / M3
Sub total biaya angkut = Rp. 57,142.86 + 57,143 + 365,000 = Rp. 479,285.71 / M3
Penyusutan 1,00 % = Rp. 2,000,000 x 0.01 = Rp. 20,000.00 / M3
Total biaya angkut = Rp. 479,285.71 + 20,000 = Rp. 499,285.71 / M3

Harga Kayu Bekisting Lokal = Rp. 2,000,000


Harga Kayu Bekisting di lokasi Proyek = Rp. 2,000,000 + 499,286 Rp. 2,499,286 / M3
1.00 Galian Tanah Biasa

3.50 Panjang Dindinf 92.50 3.00 Panjang Dinding


3.50 Luas Bangunan 147.00 3.00 Luas Bangunan

P1 P2 P.RATA2
NO URAIAN OAKERJAAN
M1 M1 M2

1.00 Galian Tanah Biasa 92.50

2.00 Pondasi Batu Kali 92.50

3.00 Timbunan Pilihan-pondasi 147.00

4.00 Pek.Slof 92.50

5.00 Kolom Titik 27.00 0.15

6.00 Pek.Ring Balok 92.50

7.00 Cor Lantai dasar 147.00

8.00 PUT Ponadai titik 63.00

9.00 Cor Lantai K.Mandi 1 3.00


Cor Lantai K.Mandi 2 2.00

7.00 Pembesian Jumlah Panjang


Pembesian Sloef
Besi 12 4.00 92.50
Besi 6 1,628.00 0.55

Pembesian Kolom 27.00


Besi 12 4.00 3.60
besi 6 1,710.72 0.60

Pembesian Rin Balok


Besi 12 4.00 92.50
Besi 6 1,628.00 0.70

Balok Teras

Berat Besi

P1 P2 P.RATA2
NO URAIAN OAKERJAAN
M1 M1 M2
Pasang Bakesting Sloft 92.50
Pasang Bakesting Ring Balok 92.50
Pasang Bakesting Kolom 25

A Pek. DINDINF & PLESTERAN P.Dinding Dinding Kos


1.00 Pas. Dinding Batu Batako 92.50 -
Jendela 1 2.00 daun 1.70
Jendela 2 4.00 daun 0.70
Jendela 3 1.00 daun 0.70
Jendela 4 3.00 daun 0.70
Jendela 5 3.00 daun -
Pintu 1 A 1.00 daun 1.50
Pintu 1 B 1.00 daun 1.50
Pintu 2 8.00 0.90
L. Angin1 8.00 daun 1.70
L. Angin2 2.00 1.50
Luas
L, Dindin - Pintu Jend & lainnya

2.00 Pek. Plesteran Dinding 1 : 4


3.00 Pek. Acian

P1 P2 P.RATA2
NO URAIAN OAKERJAAN
M1 M1 M2

Pas. Lantai Keramik KM/WC 25/25 5.00


Pas. Dinding Keramik KM/WC 25/40 16.50

Lantai wc umum 2.00


dinding wc umum 5.00

Pas. Lantai Keramik 60/60 141.75


Pek. Kayu
Pek. Pintu
Pas. Jendela
Pas. Ventilasi

Pas. Kuda-kuda kayu klas I


Pas. Gording 232.82
Pas. Atap Seng Gelombang BJLS 30
Atap depan 15.62 7.06 19.15
At1 1.75

Atap Teras A 15.72 5.90


Atap Teras B 15.72 5.90
Atap Teras c 2 sisi 12.22 3.00
Atap Belakang 13.87 7.06 17.40
Atap Samping K 10.12
Atap Samping Kr a 6.64
b 1.75
c 1.75
VOLUME Atap

Pas. Listplank

VIII PEKERJAAN LANGIT-LANGIT

1.00 Pas. Plafon Tripleks 6mm


2.00 Pas. List Plafon Profil 92.50 x 2.00

Pek. Pengecetan Dinding


Pek. Cat Kilat Kayu 0.09 8.00
Pintu 1 A 1.00 daun 2.00
Pintu 1 B 1.00 daun 9.00
Jendela 3 1.00
Jendela 2 4.00
Jendela 1 2.00
Jendela 5 3.00

Pek. Cat Plafond

1.00 Pas. Engsel Pintu 30.00


2.00 Pas. Engsel Jendela 28.00
3.00 Pas. Kunci Tanam 2 Slag 10.00
4.00 Pas. Grendel Jendela 14.00
5.00 Pas. Kait Angin 28.00

120.00
anjang Dinding 58.00 3.50 Panjang Dindinf 74.50 18.00
as Bangunan 110.80 3.50 Luas Bangunan 147.00

L1 L2 L.RATA2 TINGGI VOLUME


M1 M1 M2 M1 M3

0.20 0.20 18.50

0.50 0.30 0.65 0.80 48.10

1.00 98.90

0.15 0.20 2.78

0.15 3.80 2.31


Teras
0.15 0.20 2.78 0.30 0.83

0.05 7.35

0.50 0.30 0.65 0.70 28.67

1.75 0.05 0.26


1.50 0.05 0.15
0.41
Total.P Berat Jenis

0.88 325.60
0.22 196.99
- 522.59

0.88 342.14
0.22 225.82
567.96

0.88 325.60
0.22 250.71
576.31
626.58

2,757.41

L1 L2 L.RATA2 TINGGI VOLUME


M1 M1 M2 M1 M3
0.40 37.00
0.55 50.88
0.60 3.80 27.28

TL.P.Dinding
92.50 3.80 351.50 269.80
1.55 5.27
1.30 3.64
1.30 0.91
0.40 0.84
0.40 -
2.05 3.08
2.05 3.08
2.05 14.76
0.40 5.44
0.40 1.20
38.21
313.29

626.58
626.58

L1 L2 L.RATA2 TINGGI VOLUME


M1 M1 M2 M1 M3

1.75 - 8.75
1.60 26.40

1.50 3.00
1.60 8.00

130.00 130.00

20.91
10.66
6.64

2.00 26.00
0.05 0.10 1.16 0.86 1.50 m3

5.81 111.26
5.14 9.00
102.27

18.67 2.54 47.42


18.67 2.54 47.42
1.52 5.14 15.63
110.47

5.81 101.09
5.81 29.40
1.30 8.63
3.30 2.89
3.30 2.89
310.21

27.94

147.00
185.00

626.58

2.05 4.10
2.05 18.45
6.80 6.80
4.90 19.60
5.90 11.80
5.10 15.30
76.05

147.00