PEKERJAAN :
PEMBANGUNAN GEDUNG BADAN PUSAT STATISTIK (BPS)
KAB. KONAWE UTARA
LOKASI :
OLEH :
CV. ASYIFA MEGA KONSTRUKSI
TAHUN ANGGARAN 2013
Nomor
Lampiran
SURAT PENAWARAN
: 022/AMK/KONUT/V/2013
: 1 (satu) berkas
Kepada Yth.
Panitia Pengadaan Barang Jasa
Badan Pusat Statistik (BPS)
Kab. Konawe Utara T.A. 2013
DiWanggudu
Perihal
JASMAUN
Direktur
REKAPITULASI
PEKERJAAN
TAHUN ANGG.
LOKASI
:
:
:
No.
JUMLAH HARGA
I.
PEKERJAAN PERSIAPAN
Rp.
12.025.000,00
II.
Rp.
15.775.118,27
III.
Rp.
225.779.451,99
IV.
Rp.
161.417.466,06
V.
Rp.
127.296.144,58
VI.
Rp.
60.183.634,55
VII.
Rp.
64.681.825,60
VIII.
Rp.
30.908.371,73
IX.
Rp.
36.184.000,00
X.
PEKERJAAN SANITASI
Rp.
30.563.024,92
XI.
Rp.
115.570.574,98
Real Cost
Rp.
880.384.612,672
Real Cost
Rp.
880.384.612,672
PPn10%-A
Rp.
88.038.461,27
Total Cost
Rp.
968.423.073,94
Dibulatkan
Rp.
968.423.000,00
TERBILANG : SEMBILAN RATUS ENAM PULUH DELAPAN JUTA EMPAT RATUS DUA PULUH TIGA RIBU RUPIAH
JASMAUN
Direktur
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
ILHAM, ST
Staf Teknik
NO.
1
:
:
:
URAIAN PEKERJAAN
VOLUME
SATUAN
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
I
1
2
3
4
5
6
PEKERJAAN PERSIAPAN
Pembuatan Direksi Keet
Pekerjaan Mobilisasi
Pemasangan Bouplank / Pengukuran Kembali
Administrasi / Foto Dokumentasi
Barak Kerja
Papan Nama Proyek
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)
1,00
1,00
1,00
1,00
1,00
1,00
Ls
Ls
Ls
Ls
Ls
Ls
2.500.000,00
5.000.000,00
500.000,00
1.500.000,00
2.500.000,00
25.000,00
2.500.000,00
5.000.000,00
500.000,00
1.500.000,00
2.500.000,00
25.000,00
12.025.000,00
II
1
2
3
4
5
6
7
M3
M3
M3
M3
M3
M3
M3
50.750,00
16.890,00
114.500,00
114.500,00
92.300,00
92.300,00
92.300,00
5.950.945,00
815.162,07
4.639.998,00
79.463,00
510.234,40
3.740.365,20
38.950,60
15.775.118,27
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
310.012,50
659.862,50
3.872.197,50
5.087.397,50
5.087.397,50
5.087.397,50
4.392.672,50
4.392.672,50
4.392.672,50
4.392.672,50
4.392.672,50
4.392.672,50
4.392.672,50
4.786.412,50
4.786.412,50
4.786.412,50
4.786.412,50
5.585.805,23
36.800.531,63
18.722.074,91
39.966.594,76
8.312.807,52
2.594.572,73
14.478.248,56
19.081.769,34
6.808.642,38
325.057,77
408.518,54
6.017.961,33
1.150.880,20
2.192.176,93
43.183.013,58
10.300.359,70
9.850.436,93
225.779.451,99
M2
M2
M2
M2
M2
M1
M1
M1
91.824,00
99.641,00
56.493,70
60.784,30
64.815,70
20.000,00
20.000,00
60.000,00
61.168.924,90
7.744.796,01
74.629.929,0
9.449.162,57
1.753.653,58
4.552.000,00
1.204.000,00
915.000,00
IV
1
2
3
4
5
6
7
8
666,154
77,727
1.321,031
155,454
27,056
227,600
60,200
15,250
161.417.466
V
1
2
27,0160
4,2180
M3
M3
813.487,50
813.487,50
21.977.178,30
3.431.290,28
3
4
5
6
7
8
9
M3
M2
M2
M1
M2
M2
M2
813.487,50
238.129,50
220.629,50
56.732,50
549.112,50
443.107,50
192.646,50
2.196.416,25
61.512.183,66
2.614.018,32
11.453.724,43
4.391.801,78
17.547.057,00
2.172.474,58
127.296.144,58
VI
73,40
M3
72.490,00
5.320.766,00
211,50
M3
72.490,00
15.331.635,00
11,70
M3
72.490,00
848.133,00
1,00
Unit
621.000,00
621.000,00
19,32
M2
437.500,00
8.452.500,00
3,00
M2
459.850,00
1.379.550,00
11,88
M2
459.850,00
5.463.018,00
1,44
M2
459.850,00
662.184,00
1,08
M2
459.850,00
496.638,00
10
26,84
M2
157.467,50
4.226.427,70
11
5,58
M2
107.967,50
602.458,65
12
0,84
M2
157.467,50
132.272,70
13
2,40
M2
107.967,50
259.122,00
14
8,00
Bh
219.825,00
1.758.600,00
15
8,00
Bh
294.825,00
2.358.600,00
16
1,00
Bh
15.951,50
15.951,50
17
27,00
Bh
58.451,50
1.578.190,50
18
66,00
Bh
63.451,50
4.187.799,00
19
24,00
Bh
63.451,50
1.522.836,00
20
33,00
Bh
63.451,50
2.093.899,50
21
12,00
Bh
63.451,50
761.418,00
22
66,00
Bh
23.451,50
1.547.799,00
23
24,00
Bh
23.451,50
562.836,00
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya)
VII
60.183.634,55
258,31
M2
234.935,00
258,31
M2
15.465,00
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya)
VIII
60.686.999,59
3.994.826,01
64.681.825,60
228,17
M2
120.000,00
228,17
M2
15.465,00
27.379.800,00
3.528.571,73
30.908.371,73
IX
121,00
Ttk
100.000,00
12.100.000,00
67,00
Bh
45.000,00
3.015.000,00
28,00
Bh
25.000,00
700.000,00
15,00
Bh
45.000,00
675.000,00
67,00
Bh
200.000,00
13.400.000,00
15,00
Bh
350.000,00
5.250.000,00
11,00
Bh
25.000,00
275.000,00
7,00
Bh
20.000,00
140.000,00
5,00
Bh
25.000,00
125.000,00
10
2,00
Bh
27.000,00
54.000,00
11
1,00
Bh
150.000,00
150.000,00
12
3,00
Bh
100.000,00
PEKERJAAN SANITAIR
300.000,00
36.184.000,00
66,21
M'
1,00
unit
178.566,61
11.822.894,92
3.500.000,00
20,00
3.500.000,00
M'
82.920,00
1.658.400,00
19,50
M'
63.082,50
1.230.108,75
93,50
M'
63.082,50
5.898.213,75
42,00
Bh
7.500,00
315.000,00
14,00
Bh
15.000,00
210.000,00
3,00
Bh
1.313.477,50
3.940.432,50
1,00
Bh
979.225,00
979.225,00
10
3,00
Bh
159.325,00
477.975,00
11
1,00
Bh
84.450,00
84.450,00
12
3,00
Bh
84.450,00
253.350,00
13
3,00
Ls
64.325,00
192.975,00
30.563.024,92
XI
1.476,485
M2
55.113,25
81.373.887
258,31
M2
20.522,50
5.301.249,07
104,30
M2
20.713,25
2.160.350,55
228,17
M2
55.113,25
12.574.914,69
35,77
M2
20.625,00
737.673,75
1,00
unit
3.000.000,00
3.000.000,00
1,00
unit
2.500.000,00
2.500.000,00
Relling Pence
6,15
M1
150.000,00
922.500,00
Meja Resepsionis
1,00
Unit
4.500.000,00
4.500.000,00
10
1,00
Ls
2.500.000,00
2.500.000,00
115.570.575
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
JASMAUN
Direktur
ILHAM, ST
Staf Teknik
NO.
1
2
3
4
Pekerja
Tukang
Kepala Tukang
Mandor
SATUAN
UPAH (Rp)
OH
OH
OH
OH
65.000,00
75.000,00
77.500,00
80.000,00
M3
Bh
M3
M3
M3
M3
M3
Kg
Kg
Kg
65.000,00
550,00
60.000,00
125.000,00
175.000,00
225.000,00
165.000,00
1.800,00
1.000,00
2.500,00
bh
bh
bh
bh
Bh
bh
bh
bh
50.000,00
45.000,00
17.000,00
15.000,00
15.000,00
15.000,00
7.000,00
12.000,00
Btg
M3
M3
M3
M3
M3
M3
M3
4.500,00
2.500.000,00
3.000.000,00
2.500.000,00
2.300.000,00
1.800.000,00
1.200.000,00
1.500.000,00
Lbr
M2
Lbr
Lbr
Lbr
M2
M1
M1
Biji
M1
M1
Lbr
125.000,00
120.000,00
55.000,00
65.000,00
55.000,00
55.000,00
15.000,00
20.000,00
5.000,00
50.000,00
15.000,00
55.000,00
M2
Lbr
M1
Kaki
M2
80.000,00
80.000,00
35.000,00
5.000,00
120.000,00
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Bh
Kg
M1
15.000,00
14.000,00
20.000,00
2.000,00
25.000,00
25.000,00
500,00
2.500,00
6.500,00
750.000,00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
45.000,00
30.000,00
25.000,00
11.000,00
8.000,00
5.000,00
20.000,00
7.000,00
5.500,00
Bahan Dasar
A
1
2
3
4
5
6
7
8
9
10
Tanah Urug
Batu Merah
Pasir Urug
Pasir Pasang
Pasir Beton
Koral Beton / Suplit 2,3 cm
Batu Belah Gunung
Semen Portland
Semen Warna
Semen Putih
Bahan Lantai
B
1
2
3
4
5
6
7
8
Bahan Kayu
C
1
2
3
4
5
6
7
8
D
1
2
3
4
5
6
7
8
9
10
11
12
Bahan Atap
E
1
2
3
4
5
Bahan Besi
F
1
2
3
4
5
6
7
8
9
10
Kawat Beton
Besi Beton Polos
Paku Biasa 5 - 12 cm (Campur)
Paku Sakura roof
Paku trileks
Paku Sekrup
Paku sekrup rangka stainless Stell
Mur Baut 12 mm
Besi Plat Baja T = 7 mm
Staintess Stell 1,5''
Bahan Cat
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
H
1
2
3
4
5
6
7
8
9
10
11
12
13
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
J
1
2
3
4
5
6
7
8
9
10
11
12
13
Minyak Cat
Lem Fox/Lem Kayu
Kuas Biasa 3 cm
ltr
Kg
bh
15.000,00
12.000,00
7.500,00
UB 888/400 Compound
Amplas Halus
Isolasi Gypsun
Minyak Bekisting
Residu
Zak
Lbr
Roll
ltr
Kg
15.000,00
3.500,00
5.000,00
15.000,00
10.000,00
bh
bh
Set
bh
bh
bh
Psg
Psg
Psg
Bh
Psg
Bh
Bh
175.000,00
225.000,00
225.000,00
3.500,00
2.500,00
7.500,00
250.000,00
50.000,00
45.000,00
50.000,00
25.000,00
15.000,00
10.000,00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
set
Bh
Bh
Bh
Bh
25.000,00
200.000,00
175.000,00
350.000,00
45.000,00
40.000,00
350.000,00
27.000,00
25.000,00
20.000,00
45.000,00
25.000,00
75.000,00
150.000,00
100.000,00
Set
Set
Bh
Bh
Bh
Bh
M1
M1
M1
M1
M1
bh
bh
1.000.000,00
750.000,00
55.000,00
75.000,00
35.000,00
5.000,00
150.000,00
50.000,00
35.000,00
30.000,00
65.000,00
7.500,00
15.000,00
Bahan Penggantung
Kunci Pintu Tanam 2 x slag
Kunci Tanam Putar Bulat KW 1 Untuk Kamar Mandi
Kunci Pintu Tanam 2 Daun
Kunci Pintu Selot
Grendel Pintu Biasa
Grendel Jendela Biasa
Pegangan Pintu stanless stell
Grendel Pintu Taman (Untuk Pintu 2 Daun)
Engsel Pintu (Kupu-kupu) ex stanless steel
Engsel Jendela (Kupu-kupu) ex stanless steel
Kait Angin Jungkit Lipat ex Stanlees Stell
Kait Angin Biasa
Tarikan Jendela Biasa
Bahan Saniter
Kloset Duduk Standar pakai tabung ex American standar
Wastafel keramik ex American standar atau setara
Floor Drain
Kran Air Dia 3/4' biasa ex Onda atau setara
Kran Air angsa Onda 1/2 (wastafel)
Seal Tape
Tempat Sabun Tanam ex American Standar
Pipa PVC 3/4 '' Aw
Pipa PVC 2 '' Aw
Pipa PVC 3 '' Aw
Pipa PVC 4 '' Aw
Elbow PVC 2 ''
Overshock PVC 2'' ke 2,5''
K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Bahan Penggantung
Baja Profil Stainless Steel
Pintu Alumunium 60 x 200 cm pabrikasi
Rangka daun pintu Alumunium
Bingkai Jendela alumunium archittrave
Kaca Tempered Clear 12 mm
Kaca Bening 5 mm
Kaca Reflektif 5 mm
Silicon sealent kaca /karet kaca
Sealant (Lem Kaca)
Kusen Alumunium 3''
Kusen Alumunium 4''
Door stoper Kent 021
Handle Pintu Alumunium ATT
Handle Pintu Kaca
Hinge pintu kaca
Pull Hanle HS DKS 801 32 x650 pss
Patch Fitting PT DKS 10,20, us 10+Cyt
Patch Fitting PT DKS 24
M1
Bh
M1
M1
M2
M2
M2
M1
btl
M1
M1
bh
psg
psg
bh
psg
set
bh
150.000,00
250.000,00
50.000,00
35.000,00
55.000,00
75.000,00
120.000,00
5.000,00
25.000,00
55.000,00
65.000,00
15.000,00
150.000,00
35.000,00
3.500,00
7.500,00
7.500,00
1.500,00
JASMAUN
Direktur
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
ILHAM, ST
Staf Teknik
TAHUN ANGG.
2013
LOKASI
@ Rp.
@ Rp.
65.000,00 =
80.000,00 =
Jumlah
Rp.
Rp.
Rp.
48.750,00
2.000,00
50.750,00
1 M3 Urugan Kembali
0,250 OH Pekerja
0,008 OH Mandor
@ Rp.
@ Rp.
65.000,00 =
80.000,00 =
Jumlah
Rp.
Rp.
Rp.
16.250,00
640,00
16.890,00
1 M3 Urugan Tanah
1,200 M3 Tanah / Sirtu
0,500 OH Pekerja
0,050 OH Mandor
@ Rp.
@ Rp.
@ Rp.
65.000,00 =
65.000,00 =
80.000,00 =
Jumlah
Rp.
Rp.
Rp.
Rp.
78.000,00
32.500,00
4.000,00
114.500,00
@ Rp.
@ Rp.
@ Rp.
60.000,00 =
65.000,00 =
80.000,00 =
Jumlah
Rp.
Rp.
Rp.
Rp.
72.000,00
19.500,00
800,00
92.300,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
165.000,00
1.800,00
125.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
181.500,00
244.800,00
68.000,00
97.500,00
56.250,00
5.812,50
6.000,00
659.862,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
165.000,00
60.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
198.000,00
25.920,00
50.700,00
29.250,00
3.022,50
3.120,00
310.012,50
1.800,00
175.000,00
225.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
392.400,00
91.000,00
195.750,00
107.250,00
18.750,00
1.937,50
6.400,00
813.487,50
1.800.000,00
20.000,00
15.000,00
14.000,00
15.000,00
1.800,00
175.000,00
225.000,00
65.000,00
75.000,00
75.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
486.000,00
40.000,00
9.000,00
2.100.000,00
33.750,00
604.800,00
91.000,00
182.250,00
35.100,00
20.625,00
117.000,00
105.000,00
25.032,50
22.640,00
3.872.197,50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
360.000,00
30.000,00
6.000,00
2.100.000,00
33.750,00
11.628,00
91.000,00
175.500,00
253.500,00
26.250,00
78.000,00
78.750,00
32.550,00
13.200,00
3.290.128,00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
720.000,00
3.000,00
192.500,00
90.000,00
80.000,00
30.000,00
2.240.000,00
30.750,00
604.800,00
94.500,00
182.250,00
458.250,00
20.625,00
123.750,00
157.500,00
31.232,50
28.240,00
5.087.397,50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
576.000,00
64.000,00
24.000,00
2.100.000,00
33.750,00
604.800,00
94.500,00
182.250,00
412.750,00
20.625,00
123.750,00
105.000,00
25.807,50
25.440,00
4.392.672,50
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
@
@
@
@
@
@
@
@
@
@
@
@
@
@
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.800.000,00
20.000,00
15.000,00
14.000,00
15.000,00
1.800,00
175.000,00
225.000,00
65.000,00
75.000,00
75.000,00
75.000,00
77.500,00
80.000,00
Jumlah
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
1.800.000,00
1.800.000,00
55.000,00
4.500,00
20.000,00
15.000,00
14.000,00
15.000,00
1.800,00
175.000,00
225.000,00
65.000,00
75.000,00
75.000,00
75.000,00
77.500,00
80.000,00
Jumlah
1 M3 Membuat Kolom Beton Bertulang (300 Kg Besi + Bekisting)
0,4000 M3 Kayu Papan
@ Rp. 1.800.000,00
0,1500 M3 Paku Campur
@ Rp.
20.000,00
3,5000
lbr Tripleks
@ Rp.
55.000,00
20,0000 btg Dolken dia 8''
@ Rp.
4.500,00
4,0000
kg Paku campur
@ Rp.
20.000,00
2,0000
Ltr Minyak Bekisting
@ Rp.
15.000,00
300,0000 KG Besi Beton
@ Rp.
14.000,00
4,5000 KG Kawat Beton
@ Rp.
15.000,00
336,0000 KG Portland Semen
@ Rp.
1.800,00
0,5400 M3 Pasir Beton
@ Rp.
175.000,00
0,8100 M3 Suplit
@ Rp.
225.000,00
7,050 OH Pekerja
@ Rp.
65.000,00
0,275 OH Tukang Batu
@ Rp.
75.000,00
1,650 OH Tukang Kayu
@ Rp.
75.000,00
1,400 OH Tukang Besi
@ Rp.
75.000,00
0,403 OH Kepala Tukang
@ Rp.
77.500,00
0,353 OH Mandor
@ Rp.
80.000,00
Jumlah
1 M3 Membuat Balok Beton Bertulang (300 Kg Besi + Bekisting)
0,4000 M3 Kayu Papan
@ Rp. 1.800.000,00
0,1500 M3 Paku Campur
@ Rp.
20.000,00
3,5000
lbr Tripleks
@ Rp.
55.000,00
20,0000 btg Dolken dia 8''
@ Rp.
4.500,00
4,0000
kg Paku campur
@ Rp.
20.000,00
2,0000
Ltr Minyak Bekisting
@ Rp.
15.000,00
300,0000 KG Besi Beton
@ Rp.
14.000,00
4,5000 KG Kawat Beton
@ Rp.
15.000,00
336,0000 KG Portland Semen
@ Rp.
1.800,00
0,5400 M3 Pasir Beton
@ Rp.
175.000,00
0,8100 M3 Suplit
@ Rp.
225.000,00
7,050 OH Pekerja
@ Rp.
65.000,00
0,275 OH Tukang Batu
@ Rp.
75.000,00
1,650 OH Tukang Kayu
@ Rp.
75.000,00
1,400 OH Tukang Besi
@ Rp.
75.000,00
0,403 OH Kepala Tukang
@ Rp.
77.500,00
0,353 OH Mandor
@ Rp.
80.000,00
Jumlah
1 M3 Membuat Plat Beton Bertulang (150 Kg Besi + Bekisting)
0,4000 M3 Kayu Papan
@ Rp. 1.800.000,00
0,1500 M3 Paku Campur
@ Rp.
20.000,00
3,5000
lbr Tripleks
@ Rp.
55.000,00
20,0000 btg Dolken dia 8''
@ Rp.
4.500,00
4,0000
kg Paku campur
@ Rp.
20.000,00
2,0000
Ltr Minyak Bekisting
@ Rp.
15.000,00
150,0000 KG Besi Beton
@ Rp.
14.000,00
2,2500 KG Kawat Beton
@ Rp.
15.000,00
336,0000 KG Portland Semen
@ Rp.
1.800,00
0,5400 M3 Pasir Beton
@ Rp.
175.000,00
0,8100 M3 Suplit
@ Rp.
225.000,00
7,050 OH Pekerja
@ Rp.
65.000,00
0,275 OH Tukang Batu
@ Rp.
75.000,00
1,650 OH Tukang Kayu
@ Rp.
75.000,00
1,400 OH Tukang Besi
@ Rp.
75.000,00
0,403 OH Kepala Tukang
@ Rp.
77.500,00
0,353 OH Mandor
@ Rp.
80.000,00
Jumlah
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
576.000,00
576.000,00
154.000,00
144.000,00
64.000,00
24.000,00
1.750.000,00
33.750,00
604.800,00
94.500,00
182.250,00
344.500,00
20.625,00
97.500,00
78.750,00
20.537,50
21.200,00
4.786.412,50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
720.000,00
3.000,00
192.500,00
90.000,00
80.000,00
30.000,00
4.200.000,00
67.500,00
604.800,00
94.500,00
182.250,00
458.250,00
20.625,00
123.750,00
105.000,00
31.232,50
28.240,00
7.031.647,50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
720.000,00
3.000,00
192.500,00
90.000,00
80.000,00
30.000,00
4.200.000,00
67.500,00
604.800,00
94.500,00
182.250,00
458.250,00
20.625,00
123.750,00
105.000,00
31.232,50
28.240,00
7.031.647,50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
720.000,00
3.000,00
192.500,00
90.000,00
80.000,00
30.000,00
2.100.000,00
33.750,00
604.800,00
94.500,00
182.250,00
458.250,00
20.625,00
123.750,00
105.000,00
31.232,50
28.240,00
4.897.897,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
550,00
1.800,00
125.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
38.500,00
25.866,00
5.000,00
20.800,00
7.500,00
775,00
1.200,00
99.641,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
550,00
1.800,00
125.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
38.500,00
17.424,00
5.625,00
20.800,00
7.500,00
775,00
1.200,00
91.824,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
19.500,00
11.250,00
1.162,50
12.000,00
43.912,50
@ Rp.
@ Rp.
@ Rp.
1.800,00 =
125.000,00 =
43.912,50 =
Jumlah
Rp.
Rp.
Rp.
Rp.
18.403,20
2.500,00
43.912,50
64.815,70
@ Rp.
@ Rp.
@ Rp.
1.800,00 =
125.000,00 =
43.912,50 =
Jumlah
Rp.
Rp.
Rp.
Rp.
13.996,80
2.875,00
43.912,50
60.784,30
@ Rp.
@ Rp.
@ Rp.
1.800,00 =
125.000,00 =
43.912,50 =
Jumlah
Rp.
Rp.
Rp.
Rp.
9.331,20
3.250,00
43.912,50
56.493,70
@ Rp.
@ Rp.
@ Rp.
1.800,00 =
125.000,00 =
43.912,50 =
Jumlah
Rp.
Rp.
Rp.
Rp.
9.331,20
3.250,00
43.912,50
56.493,70
50.000,00
1.800,00
125.000,00
1.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
139.000,00
14.742,00
5.625,00
1.500,00
45.500,00
26.250,00
2.712,50
2.800,00
238.129,50
45.000,00
1.800,00
125.000,00
1.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
1 M2 Pas. Tegel Plint Keramik Ukuran 10 x 60 (Type warna Gelap)
1,7000 bh Tegel Keramik
@ Rp.
15.000,00
1,1400
kg Semen portland
@ Rp.
15.000,00
0,0030 M3 Pasir pasang
@ Rp.
125.000,00
0,1000
kg Semen Warna
@ Rp.
1.000,00
0,090 OH Pekerja
@ Rp.
65.000,00
0,090 OH Tukang Batu
@ Rp.
75.000,00
0,009 OH Kepala Tukang
@ Rp.
77.500,00
0,005 OH Mandor
@ Rp.
80.000,00
Jumlah
1 M2 Pas. Lantai Keramik Ukuran 20 x 20 Anti Slip
25,0000 bh Tegel Keramik anti slip
@ Rp.
12.000,00
11,3800
kg Semen portland
@ Rp.
15.000,00
0,0420 M3 Pasir pasang
@ Rp.
125.000,00
1,5000
kg Semen Warna
@ Rp.
1.000,00
0,620 OH Pekerja
@ Rp.
65.000,00
0,350 OH Tukang Batu
@ Rp.
75.000,00
0,035 OH Kepala Tukang
@ Rp.
77.500,00
0,030 OH Mandor
@ Rp.
80.000,00
Jumlah
1 M2 Pas. Dinding Ornamen Entrance Keramik Ukuran 40 x 40 (Type warna)
6,2500 M2 Tegel 40 x40 cm
@ Rp.
15.000,00
11,3800
kg Semen portland
@ Rp.
1.800,00
0,0420 M3 Pasir pasang
@ Rp.
125.000,00
1,5000
kg Semen Warna
@ Rp.
1.000,00
0,620 OH Pekerja
@ Rp.
65.000,00
0,350 OH Tukang Batu
@ Rp.
75.000,00
0,035 OH Kepala Tukang
@ Rp.
77.500,00
0,030 OH Mandor
@ Rp.
80.000,00
Jumlah
1 M2 Pas. Dinding Keramik Ukuran 20 x 25 Cm (Warna)
20,0000 M2 Tegel 40 x40 cm
@ Rp.
17.000,00
10,4000
kg Semen portland
@ Rp.
1.800,00
0,0450 M3 Pasir pasang
@ Rp.
125.000,00
1,5000
kg Semen Warna
@ Rp.
1.000,00
0,700 OH Pekerja
@ Rp.
65.000,00
0,350 OH Tukang Batu
@ Rp.
75.000,00
0,035 OH Kepala Tukang
@ Rp.
77.500,00
0,035 OH Mandor
@ Rp.
80.000,00
Jumlah
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
121.500,00
14.742,00
5.625,00
1.500,00
45.500,00
26.250,00
2.712,50
2.800,00
220.629,50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25.500,00
17.100,00
375,00
100,00
5.850,00
6.750,00
697,50
360,00
56.732,50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
300.000,00
170.700,00
5.250,00
1.500,00
40.300,00
26.250,00
2.712,50
2.400,00
549.112,50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
93.750,00
20.484,00
5.250,00
1.500,00
40.300,00
26.250,00
2.712,50
2.400,00
192.646,50
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
340.000,00
18.720,00
5.625,00
1.500,00
45.500,00
26.250,00
2.712,50
2.800,00
443.107,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60.500,00
5.000,00
500,00
2.795,00
3.225,00
310,00
160,00
72.490,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
350.000,00
178.750,00
42.000,00
45.000,00
3.750,00
1.500,00
621.000,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
46.000,00
6.000,00
3.600,00
175.000,00
39.000,00
150.000,00
15.500,00
2.400,00
437.500,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
208.000,00
75.000,00
30.000,00
30.000,00
32.500,00
75.000,00
7.750,00
1.600,00
459.850,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
176.000,00
120.000,00
30.000,00
30.000,00
32.500,00
75.000,00
7.750,00
1.600,00
472.850,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
82.500,00
12.000,00
975,00
11.250,00
1.162,50
80,00
107.967,50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
132.000,00
12.000,00
975,00
11.250,00
1.162,50
80,00
157.467,50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
175.000,00
3.250,00
37.500,00
3.875,00
200,00
219.825,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250.000,00
3.250,00
37.500,00
3.875,00
200,00
294.825,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2.500,00
975,00
11.250,00
1.162,50
64,00
15.951,50
bh
Engsel Pintu
0,015
0,150
0,015
0,0008
OH
OH
OH
OH
Pekerja
Tukang
Kepala Tukang
Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
45.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45.000,00
975,00
11.250,00
1.162,50
64,00
58.451,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
50.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50.000,00
975,00
11.250,00
1.162,50
64,00
63.451,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
7.500,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7.500,00
975,00
11.250,00
1.162,50
64,00
20.951,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
10.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10.000,00
975,00
11.250,00
1.162,50
64,00
23.451,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
15.000,00
20.000,00
15.000,00
50.000,00
2.500,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10.500,00
66.000,00
15.000,00
50.000,00
30.000,00
4.550,00
52.500,00
5.425,00
960,00
234.935,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
55.000,00
2.500,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
20.020,00
30.000,00
6.500,00
3.750,00
387,50
400,00
61.057,50
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
5.000,00
20.000,00
65.000,00
75.000,00
77.500,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.820,00
400,00
7.800,00
4.500,00
465,00
480,00
15.465,00
bh
Engsel jendela
0,015
0,150
0,015
0,0008
OH
OH
OH
OH
Pekerja
Tukang
Kepala Tukang
Mandor
bh
Grendel jendela
0,015
0,150
0,015
0,0008
OH
OH
OH
OH
Pekerja
Tukang
Kepala Tukang
Mandor
bh
0,015
0,150
0,015
0,0008
OH
OH
OH
OH
Pekerja
Tukang
Kepala Tukang
Mandor
3,300
1,000
1,000
12,000
0,070
0,700
0,070
0,0120
m1
m1
m1
m1
OH
OH
OH
OH
OH
Besi Hollow 4 x 4 cm
Besi Hollow 2 x 4 cm MB
Hollow Angel
Kawat Penggantung
Sekrup
Pekerja
Tukang
Kepala Tukang
Mandor
12,000
0,100
0,050
0,005
0,0050
Ltr
bh
OH
OH
OH
OH
Gypsum Board 9 mm
Sekrup
Pekerja
Tukang
Kepala Tukang
Mandor
0,020
0,120
0,060
0,006
0,0060
Ltr
kg
OH
OH
OH
OH
0,202
0,036
0,600
1,200
1,200
1,200
Rp.
Rp.
Rp.
Rp.
Rp.
5.481,00
133.292,23
3.322,80
36.470,58
178.566,61
M1
%
oh
oh
oh
oh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
50.000,00
17.500,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60.000,00
6.125,00
10.125,00
1.085,00
5.265,00
320,00
82.920,00
M1
%
oh
oh
oh
oh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
35.000,00
12.250,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42.000,00
4.287,50
10.125,00
1.085,00
5.265,00
320,00
63.082,50
M1
%
oh
oh
oh
oh
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
35.000,00
12.250,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42.000,00
4.287,50
10.125,00
1.085,00
5.265,00
320,00
63.082,50
1.000.000,00
60.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.000.000,00
3.600,00
82.500,00
77,50
214.500,00
12.800,00
1.313.477,50
bh
bh
oh
oh
oh
oh
Seal tape
Tukang batu
Kepala Tukuang Batu
Pekerja
Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
75.000,00
5.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
75.000,00
125,00
7.500,00
775,00
650,00
400,00
84.450,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
750.000,00
90.000,00
1.800,00
125.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
750.000,00
10.800,00
10.800,00
1.250,00
108.750,00
11.625,00
78.000,00
8.000,00
979.225,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
150.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
150.000,00
7.500,00
775,00
650,00
400,00
159.325,00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
55.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
55.000,00
7.500,00
775,00
650,00
400,00
64.325,00
0,120
6,000
0,010
1,450
0,150
1,200
0,100
bh
%
kg
m3
oh
oh
oh
oh
Wastafel
0,100
0,010
0,010
0,005
=
=
=
=
50.750,00
659.862,50
92.300,00
60.784,30
Jumlah
0,025
0,100
0,010
0,010
0,005
2
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Galian Tanah
bh
M3
bh
oh
oh
oh
oh
Tempat sabun
Tukang batu
Kepala Tukuang Batu
Pekerja
Mandor
0,100
0,010
0,010
0,005
bh
oh
oh
oh
oh
Floor Drain
Tukang batu
Kepala Tukuang Batu
Pekerja
Mandor
0,063
0,00630
0,020
0,0025
kg
kg
kg
oh
oh
oh
oh
Acian tembok
Cat Dasar
Cat penutup ex mowilex
Tukang Cat
Kepala Tukuang Batu
Pekerja
Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
45.000,00
8.000,00
20.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45.000,00
800,00
2.600,00
4.725,00
488,25
1.300,00
200,00
55.113,25
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
8.000,00
8.000,00
20.000,00
75.000,00
77.500,00
65.000,00
80.000,00
Jumlah
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8.000,00
800,00
5.200,00
4.725,00
488,25
1.300,00
200,00
20.713,25
0,063
0,00630
0,020
0,0025
kg
kg
kg
oh
oh
oh
oh
Acian tembok
Cat Dasar
Cat penutup ex mowilex
Tukang Cat
Kepala Tukuang Batu
Pekerja
Mandor
800,00
5.200,00
750,00
1.260,00
1.500,00
300,00
1.200,00
562,50
3.875,00
4.875,00
200,00
20.522,50
1.100,00
800,00
75,00
15.000,00
1.550,00
1.300,00
800,00
20.625,00
METODE PELAKSANAAN
PEKERJAAN
TAHUN ANGG.
LOKASI
:
:
:
PEKERJAAN PENDAHULUAN
Yang termasuk kegiatan ini adalah :
Seluruh pekerjaan pekerjaan persiapan termasuk pembersihan dan pengukuran awal kegiatan yag terdiri dari :
a Pembersihan Lokasi
- Pekerjaan pembersihan lokasi dilaksanakan dengan tenaga manusia (manual) meliputi penebangan
pohon, pembersihan semak belukar segala sesuatu yang dianggap dapat mengganggu kestabilan
permukaan tanah dasar.
-
Semua sisa - sisa pembersihan akan dibuang diluar lokasi termasuk lapisan tanah humus akan dibuang
keluar lokasi pekerjaan.
b Pembuatan Bangsal Kerja
Pembuatan bangsal kerja sebagai tempat penyimpanan Bahan, alat, pekerja dilengkapi dengan ruang tamu
didalam ruang tersebut dipanjang gambar - gambar pelaksanaan, jangka waktu pelaksanaan (time scedulle)
dan buku tamu.
c Pekerjaan Bouwplank
Pasangan bouwplank akan diperkuat dengan balok 5x7 cm yang ditancapkan di luar area galian dipasang
kokoh dan kuat untuk menghindari geseran apabila terjadi longsoran galian, mandor akan selalu memantau
pemasangan bouplank dengan memperhatikan gambar kerja demi untuk menjaga supya tidak terjadi
kesalahan pada pelaksanaan setip jenis pekerjaan.
d Pengadaan Air minum, air kerja dan P3K
Yang termasuk kegiatan ini adalah :
- Penyediaan air kerja
Air kerja yang disiapkan adalah air bersih bebas dari lumpur/tidak berwarna, air yang mengandung sat
garam termasuk air payau tidak digunakan pada pekerjaan ini.
-
II
Menyiapkan lokasi kerja, menyiapkan gambar kerja dan mengajukan ijin kerja.
Menyiapkan tenaga kerja dan alat bantu yang dibutuhkan
Membersihkan lokasi pekerjaan
Melakukan pengukuran kembali dan pemasangan bouwplank sesuai gambar.
Melaksanakan pekerjaan galian sesuai bouwplank yang telah terpasang
Melaporkan kepada direksi bahwa pekerjaan telah selesai agar dapat dilanjutkan dengan
pekerjaan selanjutnya
IV
PEKERJAAN BETON
Yang termasuk pekerjaan ini adalah
Pek. Cor pada lantai tebal 10 cm dengan perbandingan = 1 Portland cement(PC) : 2 Pasir (Ps) : 3
Kerikil (Kr)
atau ditempat lain sesuai dengan gambar kerja atau petunjuk direksi.
dengan ketentuan bahwa :
Pasir yang digunakan adalah pasir beton yang disetujui oleh direksi
Kerikil yang digunakan adalah kerikil suplit yang disetujui oleh direksi
Setelah pekerjaan pengecoran lantai selesai maka dilanjutkan dengan pengacian air semen
Untuk menjaga kualitas acian maka alat digunakan adalah cetok dari baja datar.
seluruh pelaksanaan pekerjaan tersebut dibawah pengawasan mandor dan selalu mendapat persetujuan
dari direksi lapangan.
PEMBUATAN GUDANG
Yang dimaksud pekerjaan ini adalah Pembangunan Gudang sederhana dengan menggunakan rangka kayu.
pelaksanaan tersistematis sebagai berikut :
1 Pekerjaan Galian Tanah
Galian tanah dilaksanakan dengan menggunakan tenaga manusia
Yaitu melakukan penggalian tanah dan pembersihan
dari segala sisa galian yang dapat merintangi pelaksanaan pekerjaan
2 Pekerjaan Pas. Gunung 1 : 5 (Pondasi)
yang dimaksud dengan pekerjaan ini adalah pasangan pondasi batu gunung dengan
komposisi campuran 1 Portland cement (PC) : 5 pasir (PS) dilaksanakan dengan tenaga manusia
(manual)
yang tediri dari kepala tukang batu, tukang batu dan pekerja serta mandor yang
mendampingi pelaksanaan pekerjaan tersebut untuk memberikan arahan dan menjaga pasangan terhadap
kesesuaian dengan
gambar kerjagambar
yang ada
kerja
dan
yang
selalu
ada
berkordinasi
dan selalu berkordinasi
dengan direksi
dengan
lapangan.
direksi lapangan.
3 Plesteran 1 :Plesteran
3
1 : 3
Setelah pondasi selesai termasuk dengan pemerikasaan kembali oleh direksi lapangan
akan dilanjutkan dengan pekerjaan plesteran permukaan pondasi dengan komposisi campuran 1 PC :
3 PS dengan diikuti acian air semen dengan ketentuan bahwa permukaan plesteran diaci setelah
plesteran kering 80 % . Untuk menjaga kualitas acian maka alat digunakan adalah cetok dari baja datar.
seluruh pelaksanaan pekerjaan tersebut dibawah pengawasan mandor dan selalu mendapat persetujuan
dari direksi lapangan.
4 Pekerjaan Urugan Kembali
Tanah yang dipakai untuk pekerjaan urugan kembali ini adalah tanah sisa galian yang dipilih dengan
ketentuan bahwa tanah bekas galian yang bebas dari akar pohon, batang kayu dan bahan lain
yang diluar dari ketentuan akan dipisahkan kemudian dibuang dari lokasi pekerjaan.
bila memungkinkan pengurukan ini akan menggunakan denga alat bantu tentunya akan menyesuaikan
kondisi pekerjaan yang ada.
Segala sesuatu yang berkaitan dengan pekerjaan urugan pada seksi ini telah dijelaskan dalam metode
ini pada poin II.a dan II.b
8
9
10
11
Demikian metode pelaksanaan ini kami buat sebagai salah satu syarat penawaran pada pekerjaan tersebut di atas.
JASMAUN
Direktur
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
ILHAM, ST
Staf Teknik
URAIAN PEKERJAAN
Nomor
BOBOT
TIAP
JENIS
PEKERJA
AN3(%)
PEKERJAAN PERSIAPAN
1,47
1,93
27,68
19,79
15,61
7,38
3,79
4,44
PEKERJAAN SANITASI
3,75
10
BULAN KE - 1
BULAN KE - 2
BULAN KE - 3
BULAN KE -4
BULAN KE -5
KETERANGAN
1
0,37
0,37
0,37
0,37
0,28
0,28
0,28
100%
0,28
0,28
0,28
0,28
90%
5,54
5,54
5,54
5,54
5,54
3,30
3,30
3,30
3,30
3,30
3,30
2,23
2,23
2,23
2,23
2,23
2,23
2,23
1,84
1,84
1,84
1,84
0,95
0,95
0,95
0,95
1,11
1,11
80%
70%
JUMLAH / RENCANA
JASMAUN
Direktur
50%
1,11
1,11
40%
1,87
1,87
20%
14,17
100,00
0,37
0,37
0,64
1,01
0,64
1,66
0,64
2,30
5,81
5,81
5,81
11,62
9,11
20,73
9,11
29,84
11,06
40,91
5,53
46,44
5,53
51,96
60%
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
ILHAM, ST
Staf Teknik
7,37
59,34
5,02
64,36
5,02
69,38
6,13
75,51
2,06
77,56
2,98
80,55
4,72
4,72
4,72
7,71
88,25
4,72
92,97
4,72
100,00
10%
Nama
Jabatan
Bertindak untuk
Dan atas nama
Alamat
Email
: JASMAUN
: Direktur
: CV. ASYIFA MEGA KONSTRUKSI
: Desa Wanggudu Raya Kec. Asera
: asyifakonstruksijus@yahoo.co.id
A.
a.
Saya secara hukum mempunyai kapasitas menandatangani kontrak berdasarkan Surat Akte
Pendirian Perusahaan No. 20 Tanggal, 07 Januari 2012 Pada Notaris HIDAYAT, Sarjana
Hukum
b.
c.
d.
saya tidak sedang dan tidak akan terlibat pertentangan kepentingan dengan para
pihak yang terkait, langsung maupun tidak langsung dalam proses pengadaan ini;
e.
badan usaha yang saya wakili tidak masuk dalam Daftar Hitam, tidak dalam
pengawasan pengadilan, tidak pailit, dan kegiatan usahanya tidak sedang dihentikan;
f.
salah satu dan/atau semua pengurus badan usaha yang saya wakili tidak masuk
dalam Daftar Hitam;
g.
Data Administrasi
1.
2.
3.
4.
B.
Nama (PT/CV/Firma/
Koperasi/Perorangan)
Status
:
:
:
:
asyifakonstruksijus@yahoo.co.id
:
:
:
:
:
:
:
:
Pusat
Cabang
Izin Usaha
No. SITU
Masa berlaku ijin usaha
Instansi pemberi ijin usaha
D.
1.
2.
a. Nomor Akta
b. Tanggal
c. Nama Notaris
:
:
:
:
:
:
E. Pengurus
Nama
No. KTP
Nama
JASMAUN
ASYIFA RAHMADANI
No. KTP
20.1101.170484.0001
-
Direktur
Komanditer
F. Data Keuangan
NO.
1.
2.
JASMAUN
ASYIFA RAHMADANI
No. KTP
Alamat
Persentase (%)
20.1101.170484.0001
-
50
50
2. Pajak
a.
b.
c.
: 03.210.756.7.811.000
: 811-01-0000-04673, Tgl 01 Maret 2013
:
Januari 2013
1. PPh Pasal 21
2. SSP Pasal 25
3. PPN
Februari 2013
1. PPh Pasal 21
2. SSP Pasal 25
3. PPN
d. Surat Pengukuhan Pengusaha Kena Pajak : PEM-00486/WPJ.15/KP.0503/2013
Maret 2013
1. PPh Pasal 21
2. SSP Pasal 25
3. PPN
e. Surat Pengukuhan Pengusaha Kena Pajak : PEM-00486/WPJ.15/KP.0503/2013
3.
AKTIVA
I
II
PASSIVA
AKTIVA LANCAR
Kas
Bank
Piutang *)
Persediaan Barang
Pekerjaan dalam proses
Total Aktiva Lancar
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5.500.000,00
72.621.937,00
78.121.937,00
AKTIVA TETAP
-Tanah
- Bangunan
- Kendaraan
- Mesin dan Peralatan
- Inventaris
- Akumulasi Penyusutan
Total Aktifa Tetap
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
85.000.000,00
108.500.000,00
6.000.000,00
23.562.500,00
175.937.500,00
III. HUTANG
Hutang Dagang
Hutang Bank
Hutang Lainnya
Rp.
Rp.
Rp.
TOTAL HUTANG
Rp.
Rp.
Rp.
Rp.
Rp.
TOTAL MODAL
Rp.
254.059.437,00
Rp.
254.059.437,00
Rp.
254.059.437,00
JUMLAH AKTIVA
Rp.
254.059.437,00
Jumlah Passiva
JASMAUN
Direktur
G. Data Personalia
Tgl/bln/thn
No.
Nama
Lahir
Jabatan
Pendidikan
Pengalaman
dlm Proyek
Profesi
Sertifikat
(Tahun)
Keahlian
Ijazah
Kerja
Jasmaun
17 April 1984
SMA
Direktur
Management
Terlampir
Muh. Rajab, ST
26 Juli 1985
S1
Kepala Proyek
Teknik Arsitektur
Terlampir
05 September 1983
S1
Pelaksana I
Teknik Sipil
Terlampir
Andy Clemens, ST
11 November 1971
S1
Pelaksana
Teknik Sipil
Terlampir
Sahora, S.Pt
02 November 1980
S1
Koordinator
Peternakan
Terlampir
Muh. Amir
01 Maret 1970
STM
Pelaksana Lapangan
10
Surveyor
Terlampir
Mirwan
10 Februari 1979
SMK
Keuangan
Akuntansi
Terlampir
Kusmiyanti
26 Juni 1989
SMA
Administrasi
Pembukuan
Terlampir
JASMAUN
Direktur
H. Data Peralatan/Perlengkapan
No.
Jenis Peralatan
Jumlah
Kapasitas
Merk dan
atau output
Type
Kondisi
Tahun
Baik.Rusak Pembuatan
Lokasi
Bukti
Sekarang
Kepemi-
likan
Dump Truck
1 Unit
4000 CC
Baik
2011
Konawe Utara
Milk
Mobil Pick Up
1 Unit
1998 CC
Hylux
Baik
2009
Konawe Utara
Milik
Sepeda Motor
1 Unit
125 CC
Suzuki EN 125
Baik
2006
Konawe Utara
Milik
Sepeda Motor
2 Unit
150 CC
Yamaha Vixion
Baik
2007
Konawe Utara
Milik
Pompa Air
1 Unit
3"
Honda
Baik
2010
Konawe Utara
Milik
`
6
Peralatan Tukang
2 Set
Standart
Standart
Baik
2011
Konawe Utara
Milik
Beton Molen
1 Unit
50 Kg
M-QUIP MQ-350
Baik
2010
Konawe Utara
Milik
Gerobak Dorong
2 Unit
0,2 M3
Arco
Baik
2011
Konawe Utara
Milik
Komputer PC
Core 2 Duo
Intel Pentium
Baik
2009
Konawe Utara
Milik
10
Scanner
Baik
2010
Konawe Utara
Milik
JASMAUN
Direktur
I.
Bidang/Sub Bidang
Lokasi
3
Sipil/Jalan
Alamat/Telpon
No.Tanggal
Nilai
Kontrak
BA. Serah
Terima
10
Kab.
Kel. Wanggudu
99.520/SPK/IV/2012
Konut
Arsitektur/bangunan2
Kab.
Konut
Kab.
Konut
Sipil/Drainase
Nama
Desa Kokapi
2 Pemb. Lantai Jemur Desa
Kontrak
Sipil/Jalan
26-Sep-12
26-Sep-12
26-Sep-12
Kel. Wanggudu
101.520/SPK/IV/2012
Tgl, 19 April 2013
Kel. Wanggudu
101.520/SPK/IV/2012
Tgl, 19 April 2013
Kab.
Konut
31 Okt. 2012
26-Des-12
JASMAUN
Direktur
J.
No.
Bidang
Pekerjaan
2
Pemberi Tugas /
Pengguna Jasa
Sub Bidang
Pekerjaan
Lokasi
Kontrak *)
Progres Terakhir
Nama
Alamat
Telepon
No /
Tanggal
Nilai
Tanggal
10
JASMAUN
Direktur
K. MODAL KERJA
: 118/135.110/V/13/krd
Tanggal
: 17 Mei 2013
Nama Bank
Nilai
:
Demikian pernyataan ini kami buat dengan sebenarnya dan rasa penuh tanggung jawab.
apabila dikemudian hari, ditemukan data /dokumen yang kami sampaikan tidak benar dan ada
pemalsuan, maka kami bersedia dikenakan sanksi administrasi yaitu dimasukan dalam daftar
hitam perusahan dalam jangka waktu selama 2 (dua) tahun dan sanksi perdata dan pidana sesuai
ketentuan peraturan perundang-undangan.
JASMAUN
Direktur
DN
LN
TKDN
Total
Ribu Rp
% KDN
Barang
/Jasa
1
BARANG
I. Material Langsung (Bahan baku)
II. Peralatan (Barang jadi)
1.041.554.570,26
182.662.946,70
0
0
1.041.554.570,26
182.662.946,70
100
100
1.224.217.516,96
1.224.217.516,96
100
12.025.000,00
12.025.000,00
0
0
12.025.000,00
12.025.000,00
100
100
1.236.242.516,96
1.236.242.516,96
100
1,00
JASA
III. Jasa Umum
B. Sub Total Jasa
C. TOTAL Biaya (A + B)
Gabu-ngan
7
Formulasi perhitungan :
% TKDN (Gabungan Barang dan Jasa)
JASMAUN
Direktur
Dibuat Oleh :
CV. ASYIFA MEGA KONSTRUKSI
ILHAM, ST
Staf Teknik