### REKAPITULASI AKHIR ENGENEERING ESTIMATE

PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B


UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : PLEMINERY
LOKASI : PROPINSI SULAWESI BARAT

No JE JUMLAH HARGA
NI JENIS PEKERJAAN
Rp.
S
PE
A KE PEKERJAAN PLEMENERY ( PENDAHULUAN ) 6,638,500,000.00
RJ
AA
B N PEKERJAAN SITE DEVELOPMENT 9,605,000,000.00

C PEKERJAAN PAGAR KELILING KOMPLEKS


STRUKTUR 6,375,000,000.00
ARSITEKTUR 2,422,500,000.00

D PEKERJAAN LANSEKAP 2,346,000,000.00

E PEKERJAAN BANGUNAN
STRUKTUR 40,800,000,000.00
ARSITEKTUR 38,675,000,000.00
INTERIOR FORNITUR 24,225,000,000.00

F ELEKTRIKAL DAN MEKANIKAL


ELEKTRIKAL
- LISTRIK 13,464,000,000.00
- NURSE CALL 1,708,500,000.00
- TELEPON 1,326,000,000.00
- MATV 527,850,000.00
- SOUND SYSTEM 667,250,000.00
- SIRS 3,421,250,000.00
MEKANIKAL
- PLUMBING 6,587,500,000.00
- LIFT 4,101,250,000.00
- PNEUMATIC SYSTEM 4,823,750,000.00
- TATA UDARA 11,900,000,000.00
- FIRE ALARM 1,585,250,000.00
- FIRE FIGHTING 4,220,250,000.00
- GAS MEDIK 4,900,250,000.00
- POMPA DAN TANDON AIR 201,450,000.00
- SUMP PIT 127,500,000.00

Jumlah 190,649,050,000.00
Pajak Pertambahan Nilai (PPN 10 %) 19,064,905,000.00
J u m la h Total 209,713,955,000.00
Dibulatkan 209,713,955,000.00

Terbilang ; Dua Ratus Sembilan Milliar Tujuh Ratus Tiga Belas Juta Sembilan Ratus Lima Puluh
Lima Ribu Rupiah,-

Mamuju, ……., Agustus, 2009


Konsultan Perencana,
PT. Bintang Intirekatama

Drs. Yusuf. T
Direktur
### REKAPITULASI AKHIR ENGENEERING ESTIMATE 1.
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : PLEMINERY
LOKASI : PROPINSI SULAWESI BARAT

No JE JUMLAH HARGA
NI JENIS PEKERJAAN
Rp.
S
PE
A KE PEKERJAAN PLEMENERY ( PENDAHULUAN ) #REF!
RJ
B AA PEKERJAAN SITE DEVELOPMENT #REF!
C N PEKERJAAN BANGUNAN - E #REF!
D PEKERJAAN BANGUNAN - F #REF!
E PEKERJAAN BANGUNAN - D #REF!
F PEKERJAAN SELASAR PENGUBUNG
G PEKERJAAN BANGUNAN ASRAMA PUTRA #REF!
H PEKERJAAN BANGUNAN ASRAMA PUTRI #REF!
I PEKERJAAN BANGUNAN FARMASI #REF!
J PEKERJAAN BANGUNAN ISOLASI #REF!
K PEKERJAAN BANGUNAN IPSARS #REF!
L PEKERJAAN BANGUNAN AUTOPSI #REF!
M PEKERJAAN BANGUNAN LOUNDRY #REF!
N PEKERJAAN BANGUNAN DAPUR #REF!

Jumlah #REF!

Pajak Pertambahan Nilai (PPN 10 %) #REF!

J u m la h Total #REF!
Dibulatkan #REF!

Terbilang ;

Mamuju, ……., Agustus, 2009

Konsultan Perencana,
PT. Bintang Intirekatama

Drs. Yusuf. T
Direktur
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
A. KE STRUKTUR
RJA
I AN PEKERJAAN GALIAN/TIMBUNAN
1 Pek. Galian pondasi poor ( tanah keras ) 972.00 m3 #REF! #REF!
2 Pek. Galian pondasi garis dan sloof 727.50 m3 #REF! #REF!
3 Pek. Timbun kembali 890.00 m3 #REF! #REF!
#REF!

II PEKERJAAN PONDASI DAN STRUKTUR BAWAH


A. LANTAI _ 1
1 Pek. Pasir alas pondasi dan sloof 97.00 m3 #REF! #REF!
2 Pek. Batu kosong 51.00 m3 #REF! #REF!
3 Pek. Pondasi batu belah 1 : 4 102.00 m3 #REF! #REF!
4 Pek. Lantai kerja sloof dan Pondasi poor 1 : 3 : 5 tebal 10 cm 71.88 m3 #REF! #REF!
5 Pek. Pondasi Poor + stek 125.50 m3 #REF! #REF!
6 Pas. Bekesting 384.00 m2 #REF! #REF!
7 Pek. Pondasi dinding lift 13.50 m3 #REF! #REF!
8 Pas. Bekesting 10.50 m2 #REF! #REF!
9 Pek. Dinding lift beton 20.90 m3 #REF! #REF!
10 Pas. Bekesting 220.00 m2 #REF! #REF!
11 Pek. Sloof beton 30/60 90.70 m3 #REF! #REF!
12 Pas. Bekesting sloof 604.80 m2 #REF! #REF!
13 Pek. Sloof beton 30/50 72.00 m3 #REF! #REF!
14 Pas. Bekesting sloof 486.00 m2 #REF! #REF!
15 Pek. Sloof beton praktis 20/30 15.50 m3 #REF! #REF!
16 Pas. Bekesting sloof 102.16 m2 #REF! #REF!
17 Pek. Kolom beton 40 x 69.00 m3 #REF! #REF!
18 Pas. Bekesting Kolom 690.00 m2 #REF! #REF!
19 Pas. Beton late diatas kosen 4.50 m3 #REF! #REF!
20 Pas. Bekesting balok 65.00 m2 #REF! #REF!
21 Pek. Kolom beton praktis 8.60 m3 #REF! #REF!
22 Pas. Bekesting Kolom 65.00 m2 #REF! #REF!
#REF!
III PEKERJAAN STRUKTUR ATAS
B. LANTAI - II
1 Pek. Balok beton BT 35 x 80 cm K 250 0.00 m3 #REF! #REF!
2 Pas. Bekesting balok 0.00 m2 #REF! #REF!
3 Pek. Balok beton B1 35 x 65 cm K 250 105.00 m3 #REF! #REF!
4 Pas. Bekesting balok 851.00 m2 #REF! #REF!
5 Pek. Balok beton B2 35x 50 cm K 250 85.00 m3 #REF! #REF!
6 Pas. Bekesting balok 546.00 m2 #REF! #REF!
7 Pek. Balok beton B3 30 x 40 cm K 250 60.00 m3 #REF! #REF!
8 Pas. Bekesting balok 377.00 m2 #REF! #REF!
9 Pek. Balok beton BA 20 x 30 cm K 250 11.75 m3 #REF! #REF!
10 Pas. Bekesting balok 148.00 m2 #REF! #REF!
11 Pek. Dinding lift beton 14.20 m3 #REF! #REF!
12 Pas. Bekesting 152.00 m2 #REF! #REF!
13 Pek. Plat lantai beton 244.00 m3 #REF! #REF!
14 Pek. Bondek + Wiremash 2,040.00 m2 #REF! #REF!
15 Pek. Listplank beton 7.50 m3 #REF! #REF!
16 Pas. Bekesting listplank 40.00 m2 #REF! #REF!
17 Pas. Beton late diatas kosen 3.50 m3 #REF! #REF!
18 Pas. Bekesting balok 34.00 m2 #REF! #REF!
19 Pas. Tangga beton lantai - I ke II 9.50 m3 #REF! #REF!
20 Pas. Bekesting 21.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
21
PE Pek. Kolom beton 40 x 40 cm K 250 57.70 m3 #REF! #REF!
KE
22 Pas. Bekesting kolom 576.00 m2 #REF! #REF!
RJA
23
AN Pek. Kolom beton praktis 12.50 m3 #REF! #REF!
24 Pas. Bekesting kolom 180.00 m2 #REF! #REF!
#REF!

D. LANTAI - III ( ATAP )


1 Pek. Balok beton B1 35 x 65 cm K 250 87.69 m3 #REF! #REF!
2 Pas. Bekesting balok 545.00 m2 #REF! #REF!
3 Pek. Balok beton B2 35 x 50 cm K 250 85.50 m3 #REF! #REF!
4 Pas. Bekesting balok 558.00 m2 #REF! #REF!
5 Pek. Balok beton B3 30 x 40 cm K 250 19.00 m3 #REF! #REF!
6 Pas. Bekesting balok 216.00 m2 #REF! #REF!
7 Pek. Balok beton BA 20 x 30 cm K 250 4.50 m3 #REF! #REF!
8 Pek. Dinding lift beton 12.20 m3 #REF! #REF!
9 Pas. Bekesting 122.00 m2 #REF! #REF!
10 Pas. Bekesting balok 40.00 m2 #REF! #REF!
11 Pek. Plat lantai beton 142.00 m3 #REF! #REF!
12 Pek. Bondek + Wiremash 1,190.00 m2 #REF! #REF!
13 Pek. Listplank beton dan tanggulan beton 8.80 m3 #REF! #REF!
14 Pas. Bekesting listplank 40.00 m2 #REF! #REF!
15 Pas. Beton late diatas kosen 3.50 m3 #REF! #REF!
16 Pas. Bekesting balok 34.00 m2 #REF! #REF!
17 Pas. Tangga beton lantai - II ke III 9.50 m3 #REF! #REF!
18 Pas. Bekesting 21.00 m2 #REF! #REF!
19 Pek. Kolom beton 40 x 40 cm K 250 10.20 m3 #REF! #REF!
20 Pas. Bekesting kolom 102.00 m2 #REF! #REF!
21 Pas. Ring Balk beton 30/40 ( untuk Atap spandek + Genteng ) 23.60 m3 #REF! #REF!
22 Pas. Bekesting balok 236.00 #REF! #REF!
23 Pek. Kolom beton praktis 5.50 m3 #REF! #REF!
24 Pas. Bekesting kolom 80.00 m2 #REF! #REF!
#REF!
E. LANTAI - ATAP DAN PARAPET
1 Pek. Kolom beton 30 x 30 cm K 250 ( kuda kuda atap dan parapet ) 7.97 m3 #REF! #REF!
2 Pas. Bekesting kolom 120.00 m2 #REF! #REF!
3 Pek. Kolom beton praktis 1.10 m3 #REF! #REF!
4 Pas. Bekesting kolom 22.50 m2 #REF! #REF!
5 Pas. Ring balk parapet 10/20 x 60 ( beton praktis ) 9.50 m3 #REF! #REF!
6 Pas. Bekesting ringbalk 180.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

B. ARSITEKTUR
IV. PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
A. LANTAI - I
1 Pek. Tembok 1 batu diatas sloof 1 : 3 ( bata ringan ) 31.00 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 62.00 m2 #REF! #REF!
3 Pek. Tembok 1/2 batu 1 : 3 ( bata ringan ) 120.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
4
PE Pek. Plesteran beton 1 : 3 240.00 m2 #REF! #REF!
KE
5 Pek. Tembok 1 : 5 ( bata ringan ) 2,100.00 m2 #REF! #REF!
RJA
AN6 Pek. Plesteran beton 1 : 3 435.00 m2 #REF! #REF!
7 Pek. Plesteran Tembok 1 : 5 4,200.00 m2 #REF! #REF!
8 Pek. Acian tembok 4,755.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Tembok 1 : 3 ( bata ringan ) 76.00 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 152.00 m2 #REF! #REF!
3 Pek. Tembok 1 : 5 ( bata ringan ) 2,497.00 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 326.00 m2 #REF! #REF!
5 Pek. Plesteran Tembok 1 : 5 4,994.00 m2 #REF! #REF!
6 Pek. Acian tembok 5,396.00 m2 #REF! #REF!
#REF!
D LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 ( bata ringan ) 0.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( bata ringan, termasuk tembok parapet ) 611.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 104.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 1,222.00 m2 #REF! #REF!
5 Pek. Acian tembok 1,326.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

V. PEKERJAAN LANTAI DAN DINDING


Catatan
Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A. LANTAI - I
1 Pek. Timbunan tanah dalam bangunan 995.00 m3 #REF! #REF!
2 Pek. Timbunan pasir dalam bangunan 745.00 m3 #REF! #REF!
3 Pek. Lantai kerja alas lantai 2,479.00 m3 #REF! #REF!
4 Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 66.00 m2 #REF! #REF!
5 Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 1,660.00 m2 #REF! #REF!
6 Pek. Lantai keramik 40x40 cm selasar ( warna putih )stara Roman 545.00 m2 #REF! #REF!
7 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 2,520.00 m' #REF! #REF!
8 Pek. Lantai keramik 20x20 cm stara Roman - Toliet 48.00 m2 #REF! #REF!
9 Pek. Dinding keramik 20x25 cm stara Roman - Toilet 188.00 m2 #REF! #REF!
10 Pek. Lantai Granit dekoratif ( Hall ) 25.00 m2 #REF! #REF!
11 Pek. Granit pelapis dinding lift 25.00 m2 550,000.00 13,750,000.00
12 Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
13 Pek. Lantai Vinyl termasuk Plint dan border 160.00 m2 #REF! #REF!
14 Pek. Wall Guard /bumper (dado) 80.00 m' 645,000.00 51,600,000.00
15 Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 40.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
### Pek. Timbunan pasir alas lantai 74.00 m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 0.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 736.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm selasar ( warna putih )stara Roman 545.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 730.00 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM 70.00 m2 85,000.00 5,950,000.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 70.00 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 165.00 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
###
PE Pek. Lantai Granit dekoratif ( Hall ) 25.00 m2 #REF! #REF!
KE Pek.
### Granit pelapis dinding lift 25.00 m2 550,000.00 13,750,000.00
RJA
###
AN Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border 898.00 m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 40.00 m2 #REF! #REF!
#REF!
C LANTAI - IV ( ATAP )
1 Pek. Timbunan pasir alas lantai 6.48 m3 #REF! #REF!
2 Pek. Lantai keramik 40x40 cm stara Roman 216.00 m2 #REF! #REF!
3 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 85.00 m' #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

VI. PEKERJAAN KOSEN DAN KACA


Catatan
Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A. LANTAI - I
Pintu Utama
1 Pek. Frame Gate Pintu stanless steel lengkap 2.00 unt 15,500,000.00 31,000,000.00
2 Pek. Pintu utama kaca template 12 lengkap handle, engsel atas 2.00 set 25,000,000.00 50,000,000.00
dan bawah serta kunci
3 Pek. Kaca polos 12 mm 32.00 m2 15,000.00 480,000.00
Pintu Ruangan + WC/KM ( Aluminium ) + Fiber
1 Pas. Kosen pintu fiber bertulang 9.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 3.10 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 341.00 m' 125,000.00 42,625,000.00
4 Pek. Daun Pintu + rangka panil fiber 118.00 m2 450,000.00 53,100,000.00
5 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
6 Pas. Handle + kunci 57.00 bh #REF! #REF!
7 Pas. Kunci bundar ( Wc/Km ) 11.00 bh 250,000.00 2,750,000.00
8 Pas. Handle 2.00 bh 125,000.00 250,000.00
9 Pas. Engsel pintu 204.00 bh #REF! #REF!
10 Pas. Grendel tanam pintu 44.00 bh 55,000.00 2,420,000.00
11 Pas. Door closer 68.00 bh #REF! #REF!
Jendela Utama
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Jendela Aluminium podwer coating 530.00 m' #REF! #REF!
2 Ras. Jendela bingkai aluminium windowwall + Kaca 6 mm 116.00 m' #REF! #REF!
3 Pas. Engsel jendela 204.00 bh 50,000.00 10,200,000.00
4 Pas. Hak angin 204.00 bh 10,000.00 2,040,000.00
5 Pas. Grendel jendela 102.00 bh 50,000.00 5,100,000.00
#REF!
B. LANTAI - II
Pintu Ruangan ( Aluminium + Fiber )
1 Pek. Kosen Pintu Aluminium podwer coating 27.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 9.50 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 398.00 m' 125,000.00 49,750,000.00
4 Pek. Daun Pintu + rangka panil fiber 147.00 m2 450,000.00 66,150,000.00
5 Pek. Kaca polos 8 mm m2 #REF! #REF!
6 Pek. Kaca polos 6 mm 6.50 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
7
PE Pas. Handle + kunci 68.00 bh #REF! #REF!
KE
8 Pas. Kunci bundar ( Wc/Km ) 8.00 bh 250,000.00 2,000,000.00
RJA
AN9 Pas. Handle 6.00 bh 125,000.00 750,000.00
10 Pas. Engsel pintu 276.00 bh #REF! #REF!
11 Pas. Grendel tanam pintu 97.00 bh #REF! #REF!
12 Pas. Door closer 76.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Jendela Aluminium podwer coating 396.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 92.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent 9.00 m2 #REF! #REF!
4 Pas. Engsel jendela 210.00 bh 50,000.00 10,500,000.00
5 Pas. Hak angin 210.00 bh 10,000.00 2,100,000.00
6 Pas. Grendel tanam 105.00 bh 50,000.00 5,250,000.00
#REF!
C LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 16.80 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 6.00 m2 #REF! #REF!
3 Pek. Kosen pintu fiberglass 25.00 m' 125,000.00 3,125,000.00
4 Pek. Daun Pintu + rangka panil fiber 3.50 450,000.00 1,575,000.00
5 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
6 Pek. Kaca polos 8 mm m2 #REF! #REF!
7 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
8 Pas. Handle + kunci 2.00 bh #REF! #REF!
9 Pas. Handle 8.00 bh 125,000.00 1,000,000.00
10 Pas. Engsel pintu 12.00 bh #REF! #REF!
11 Pas. Grendel tanam pintu 8.00 bh #REF! #REF!
12 Pas. Door closer 2.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 55.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 14.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 32.00 bh 50,000.00 1,600,000.00
5 Pas. Hak angin 32.00 bh 10,000.00 320,000.00
6 Pas. Grendel tanam 16.00 bh 50,000.00 800,000.00
#REF!

Sub Total A+B+C+D+E #REF!

VII. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 2,371.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,371.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 2,480.00 m' 35,000.00 86,800,000.00
6 Pas. List plapon type kecil 89.00 m' 25,000.00 2,225,000.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
B.
PE LANTAI - II
KE
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
RJA
AN2 Pas. Rangka metal gypsum lengkap 2,335.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,335.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. 0.00 m2 #REF! #REF!
5 Pas. List plapon type besar 1,461.00 m' 35,000.00 51,135,000.00
6 Pas. List plapon type kecil 98.00 m' 25,000.00 2,450,000.00
#REF!
C LANTAI - III ( ATAP )
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 286.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 286.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 235.00 m' 35,000.00 8,225,000.00
6 Pas. Les plapon type kecil m' 25,000.00 0.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


VIII. PEKERJAAN ATAP
1 Pek. Kuda kuda baja IWF 6,750.00 kg #REF! #REF!
2 Pek. Gording baja INP 2,150.00 kg #REF! #REF!
3 Pek. Dudukan kuda kuda + anker 8.00 bh 350,000.00 2,800,000.00
4 Pek. Kuda kuda baja ringan 655.00 m2 #REF! #REF!
5 Pek. Kuda kuda stainless steel ( atap ) transparan bh
6 Pek. Rangka atap 285.00 m2 #REF! #REF!
7 Pek. Seng pelapis atap 285.00 m2 35,000.00 9,975,000.00
8 Pek. Atap genteng keramik 285.00 m2 #REF! #REF!
9 Pek. Nok genteng keramik 55.00 m' #REF! #REF!
10 Pek. Bubungan dekoratif 2.00 bh 2,500,000.00 5,000,000.00
11 Pek. Atap Spandec SWG 655.00 m2 #REF! #REF!
12 Pek. Kuda kuda stanlis stel termasuk rangka untuk kaca 11.00 bh 5,000,000.00 55,000,000.00
13 Pek. Atap Transparant ( kaca templet 12 mm ) 152.00 m2 950,000.00 144,400,000.00
14 Pas. Roof insulation + ram kasa 940.00 m2 55,000.00 51,700,000.00
15 Pek. Nok spandek 58.00 m' #REF! #REF!
16 Pek. Listplank papan 15.00 m2 #REF! #REF!
17 Pek. Waterproofing type ………( plat latai II dan atap dak ) 1,685.00 m2 95,000.00 160,075,000.00
18 Pek. Plesteran floorhardener 1,685.00 m2 32,500.00 54,762,500.00
#REF!

IX. PEKERJAAN CAT DAN FINISHING


A. LANTAI - I
1 Pek. Pengecetan dasar ( undercoating ) 4,755.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 2,853.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 1,902.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 2,371.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Pengecetan dasar ( undercoating ) 5,396.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 3,237.60 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 2,158.40 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
4 Pek. Pengecetan Partisi gypsum
PE m2 #REF! #REF!
KE
5 Pek. Pengecetan Plapon 2,335.00 m2 #REF! #REF!
RJA
AN6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
C LANTAI - IV
1 Pek. Pengecetan dasar ( undercoating ) 1,326.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 530.40 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 795.60 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 286.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 25.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

X PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama stainlessstell 55.00 m' 950,000.00 52,250,000.00
2 Pek. Railing tangga service stainlessstell 55.00 m' 850,000.00 46,750,000.00
99,000,000.00

XI. PEKERJAAN SANITAIR


A. LANTAI - I
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 6.00 set 2,144,000.00 12,864,000.00
3 Kaca diatas wastafel Type TX 705 AE 6.00 set 718,000.00 4,308,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 6.00 m2 200,000.00 1,200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 11.00 set 3,150,000.00 34,650,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 26.00 bh 262,000.00 6,812,000.00
10 Urinal Moslem U 370 M 3.00 set 3,200,000.00 9,600,000.00
11 Pembatas Urinal Type A 100 (warna) 2.00 bh 894,000.00 1,788,000.00
12 Floordrain Type 1 BV 1 11.00 bh 270,000.00 2,970,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 6.00 set 3,500,000.00 21,000,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
B. LANTAI - II
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 13.00 set 2,144,000.00 27,872,000.00
3 Kaca diatas wastafel Type TX 705 AE 13.00 set 718,000.00 9,334,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 13.00 m2 200,000.00 2,600,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 10.00 set 3,150,000.00 31,500,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 10.00 bh 262,000.00 2,620,000.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 10.00 bh 270,000.00 2,700,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : GEDUNG - F
RUANG PERAWATAN KELAS 2 DAN 3
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
15 Meja washtfel ( marmer )
PE 3.00 3,500,000.00 10,500,000.00
KE
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
RJA
17 Hand Bar KM/WC Type TX 701 AL
AN 0.00 bh 943,000.00 0.00
#REF!
C LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 2.00 set 2,144,000.00 4,288,000.00
3 Kaca diatas wastafel Type TX 705 AE 2.00 set 718,000.00 1,436,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 2.00 m2 200,000.00 400,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) set 3,150,000.00 0.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
9 Kran air dinding type T 23 BQ 13 N ex Toto bh 262,000.00 0.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 bh 270,000.00 0.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
#REF!

F. PEKERJAAN SEPTIKTANK
1 Pek. Septiktan, konstruksi beton bertulang kapasitas ……… m3 5.00 unt 25,000,000.00 125,000,000.00
lengkap lubang kontrol dan pipa hawa
2 Pek, Peresapan air buangan dari septiktank 10.00 unt 15,000,000.00 150,000,000.00
275,000,000.00

Sub Total A+B+C+D+E+F #REF!

XII 1 PEKERJAAN PEMBERSIHAN


2 Pek. Rabat beton keliling bangunan 180.00 m2 #REF! #REF!
3 Pek. Buis beton keling bangunan 160.00 m' 65,000.00 10,400,000.00
4 Pek. Pondasi penahan rabat dan buis 43.20 m3 #REF! #REF!
5 Pek. Pembersihan sisa pekerjaan 1.00 ls 10,000,000.00 10,000,000.00
6 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 15,000,000.00 15,000,000.00
25,000,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
A. KE ARSITEKTUR
RJA
I AN PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
LANTAI - II
1 Pek. Tembok 1 : 3 25.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) 55.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 50.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 110.00 m2 #REF! #REF!
5 Pek. Acian tembok 135.00 m2 #REF! #REF!
#REF!
LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 0.00 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) 78.00 m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 0.00 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 156.00 m2 #REF! #REF!
5 Pek. Acian tembok 156.00 m2 #REF! #REF!
#REF!

Sub Total A+B #REF!

II. PEKERJAAN LANTAI DAN DINDING


Catatan
Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A LANTAI - II
### Pek. Timbunan pasir alas lantai 54.14 m3 #REF! #REF!
### Pek. Lantai keramik 50x50 cm ( warna gelap stara Roman ) 57.50 m2 #REF! #REF!
### Pek. Lantai keramik 50x50 cm ( warna putih )stara Roman 755.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) 0.00 m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 992.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 50 m' #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 650.00 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM 99.00 m2 85,000.00 8,415,000.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 99.00 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 210.50 m2 #REF! #REF!
### Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
### Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman 50.00 m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
B LANTAI - IV ( ATAP )
### Pek. Timbunan pasir alas lantai 10.40 m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman 334.80 m2 #REF! #REF!
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet 11.80 m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet 15.00 m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 56.00 m' #REF! #REF!
#REF!

Sub Total A+B #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
KE
RJA
III. AN PEKERJAAN KOSEN DAN KACA
Catatan
Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A LANTAI - II
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu Aluminium podwer coating 22.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm lengkap selant m2 #REF! #REF!
5 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
6 Pas. Handle + kunci 4.00 bh #REF! #REF!
7 Pas. Handle bh 125,000.00 0.00
8 Pas. Engsel pintu 24.00 bh #REF! #REF!
9 Pas. Grendel tanam pintu 8.00 bh #REF! #REF!
10 Pas. Door closer 4.00 bh #REF! #REF!
Pintu Ruangan ( Kayu ) 0.00
1 Pas. Kosen pintu kayu kls I 1.85 m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 12.45 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 31.86 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
5 Pas. Engsel pintu 165.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 41.00 bh #REF! #REF!
7 Pas. Handel bh 125,000.00 0.00
8 Pas. Grendel tanam pintu 28.00 bh #REF! #REF!
9 Pas. Door closer dan door stop 41.00 bh #REF! #REF!
Partisi doble
1 Pas. Partisi full gypsum rangka metal 72.00 m' 225,000.00 16,200,000.00
2 Pas. Partisi gypsum + kaca 5 mm rangka aluminium 74.00 m2 250,000.00 18,500,000.00
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 47.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 9.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 42.00 bh 50,000.00 2,100,000.00
5 Pas. Hak angin 42.00 bh 10,000.00 420,000.00
6 Pas. Grendel tanam 21.00 bh 50,000.00 1,050,000.00
#REF!
B LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm lengkap selant m2 #REF! #REF!
5 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
6 Pas. Handle + kunci bh #REF! #REF!
7 Pas. Handle bh 125,000.00 0.00
8 Pas. Engsel pintu bh #REF! #REF!
9 Pas. Grendel tanam pintu bh #REF! #REF!
10 Pas. Door closer bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
Pintu
PE Ruangan ( Kayu ) 0.00
KE
1 Pas. Kosen pintu kayu kls I 0.75 m3 #REF! #REF!
RJA
AN2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 13.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 3.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm lengkap selant m2 #REF! #REF!
5 Pas. Engsel pintu 30.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 8.00 bh #REF! #REF!
7 Pas. Handle bh #REF! #REF!
8 Pas. Grendel tanam pintu 6.00 bh #REF! #REF!
9 Pas. Door closer dan door stop 8.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 30.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 8.50 m' #REF! #REF!
3 Pas. Kaca 6 mm lengkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 12.00 bh 50,000.00 600,000.00
5 Pas. Hak angin 12.00 bh 10,000.00 120,000.00
6 Pas. Grendel tanam 6.00 bh 50,000.00 300,000.00
#REF!

Sub Total A+B #REF!

IV. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar m' 35,000.00 0.00
6 Pas. List plapon type kecil m' 25,000.00 0.00
#REF!
B. LANTAI - II
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 1,576.80 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 1,576.80 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 560.00 m' 35,000.00 19,600,000.00
6 Pas. List plapon type kecil 78.00 m' 25,000.00 1,950,000.00
#REF!
C LANTAI - III ( ATAP )
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 86.76 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 86.76 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 87.00 m' 35,000.00 3,045,000.00
6 Pas. Les plapon type kecil 5.60 m' 25,000.00 140,000.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
V. KE PEKERJAAN CAT DAN FINISHING
RJA
B. LANTAI - II
AN
1 Pek. Pengecetan dasar ( undercoating ) 3,282.50 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 3,282.50 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 1,576.80 m2 #REF! #REF!
6 Pek. Pengecetan kayu 610.00 m2 #REF! #REF!
#REF!
C LANTAI - III ( ATAP )
1 Pek. Pengecetan dasar ( undercoating ) 1,591.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 1,591.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 86.76 m2 #REF! #REF!
6 Pek. Pengecetan kayu 350.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

VI. PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama dan darurat stainlessstell m' 950,000.00 0.00
2 Pek. Railing Void pada hall utama 35.00 m' 850,000.00 29,750,000.00
29,750,000.00

VII. PEKERJAAN SANITAIR


A. LANTAI - II
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 10.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 5.00 set 2,144,000.00 10,720,000.00
3 Kaca diatas wastafel Type TX 705 AE 10.00 set 718,000.00 7,180,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 15.00 m2 200,000.00 3,000,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 10.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 7.00 set 3,150,000.00 22,050,000.00
7 Pas. Baik air KM lapis kermik 17.00 set 500,000.00 8,500,000.00
8 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 17.00 bh 164,000.00 2,788,000.00
9 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
10 Kran air dinding type T 23 BQ 13 N ex Toto 17.00 bh 262,000.00 4,454,000.00
11 Urinal Moslem U 370 M set 3,200,000.00 0.00
12 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
13 Floordrain Type 1 BV 1 17.00 bh 270,000.00 4,590,000.00
14 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
15 Meja pantry + sink set 1,500,000.00 0.00
16 Meja washtfel ( marmer ) 2.00 3,500,000.00 7,000,000.00
17 Tempat handuk Type TX 726 AE 9.00 bh 1,369,000.00 12,321,000.00
18 Hand Bar KM/WC Type TX 701 AL 10.00 bh 943,000.00 9,430,000.00
#REF!
B. LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 1.00 set 2,144,000.00 2,144,000.00
3 Kaca diatas wastafel Type TX 705 AE 1.00 set 718,000.00 718,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 1.00 m2 200,000.00 200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 2.00 set 3,150,000.00 6,300,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 2.00 bh 164,000.00 328,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
8
PE Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 2.00 bh 164,000.00 328,000.00
KE
9 Kran air dinding type T 23 BQ 13 N ex Toto 2.00 bh 262,000.00 524,000.00
RJA
10
AN Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 3.00 bh 270,000.00 810,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
#REF!

Sub Total A+B #REF!

VIII. PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan 1.00 ls 15,000,000.00 15,000,000.00
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 10,000,000.00 10,000,000.00
25,000,000.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : SELASAR PENGHUBUNG
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
ERJA
A. AN STRUKTUR
I PEKERJAAN GALIAN/TIMBUNAN
1 Pek. Galian pondasi garis m3 #REF!
2 Pek. Timbun kembali m3 #REF!

II PEKERJAAN PONDASI DAN STRUKTUR


A. LANTAI _ 1
1 Pek. Pasir alas pondasi m3 #REF!
2 Pek. Batu kosong m3 #REF!
3 Pek. Pondasi batu belah 1 : 4 m3 #REF!
4 Pek. Sloof beton praktis 20/30 m3 #REF!
5 Pas. Bekesting sloof m2 #REF!
6 Pek. Kolom beton 30 x 30 cm K 250 m3 #REF!
7 Pas. Bekesting Kolom m2 #REF!
8 Pek. Balok beton 30 x 40 cm K 250 m3 #REF!
9 Pas. Bekesting balok m2 #REF!
10 Pek. Plat lantai beton m3 #REF!
11 Pek. Bekesting plat Lantai #REF!
12 Pek. Listplank beton m3 #REF!
13 Pas. Bekesting listplank m2 #REF!
14 Pek. Waterproofing m3 85,000.00
15 Pek. Plesteran 1 : 2 penutup waterproofing m2 #REF!
16 Pek. Acian penutup plesetran m2 #REF!

B. ARSITEKTUR
III PEKERJAAN TEMBOK, PLESTERAN DAN LANTAI
A. LANTAI - I
1 Pek. Tembok 1 : 3, ( 1 batu diatas sloof ) m2 #REF!
2 Pek. Tembok 1 : 5 m2 #REF!
3 Pek. Plesteran beton 1 : 3 m2 #REF!
4 Pek. Plesteran Tembok 1 : 5 m2 #REF!
5 Pek. Acian tembok m2 #REF!
6 Pasangan dinding bata kerawang untuk Raamp m2 125,000.00
7 Pasangan dinding Glass block untuk Raamp m2 350,000.00
8 Pek. Timbunan tanah dalam bangunan m3 #REF!
9 Pek. Timbunan pasir dalam bangunan m3 #REF!
10 Pek. Lantai kerja alas lantai m3 #REF!
11 Pek. Lantai keramik 40x40 cm stara Roman m2 #REF!
12 Pek. Plint keramik lantai stara Roman - Terras Luar m' #REF!

IV. PEKERJAAN CAT DAN FINISHING


1 Pek. Pengecetan dasar ( undercoating ) m2 #REF!
2 Pek. Pengecetan tembok dan beton m2 #REF!
3 Pek. Pengecetan Plapon m2 #REF!
4 Pek. Pengecetan kayu m2 #REF!

V PEKERJAAN PEMBERSIHAN
1 Pek. Rabat beton keliling bangunan 0.00 m2 #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : SELASAR PENGHUBUNG
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
2 Pek. Buis beton keling bangunan 0.00 65,000.00
m'
ERJA
3
AN Pek. Pondasi penahan rabat dan buis 0.00 m3 #REF!
4 Pek. Pembersihan sisa pekerjaan 1.00 ls 5,000,000.00
5 Pek. Pembuangan sisa pekerjaan ke tempat penampungan ls
DAFTAR SATUAN BAHAN DAN UPAH

NO URAIAN SATUAN HARGA (Rp)

A. NAMA BAHAN :
1 Semen Portland Zak 90,000.00
2 Pasir Beton M3 470,000.00
3 Pasir Pasangan M3 400,000.00
4 Pasir Urug/Timbunan M3 230,000.00
5 Kerikil Cor/Kerikil Kali Pilihan M3 1,000,000.00
6 Batu Kali / Batu Gunung M3 600,000.00
7 Batu Tela / Batako ( HB ) Bh 2,600.00
8 Balok Kayu Kelas I (5/10 dan 6/12) M3 5,000,000.00
9 Balok Kayu Kelas II (5/5,5/7,5/10 dan 6/12) M3 2,500,000.00
10 Pipa Instalasi M' 5,000.00
11 Pipa Galvanis 1/2" - 6 m M' 32,500.00
12 Pipa Galvanis 3/4" - 6 m M' 37,500.00
13 Pipa Galvanis 1" - 6 m M' 54,100.00
14 Pipa Galvanis 1.5" - 6 m M' 80,000.00
15 Pipa Galvanis 2" - 6 m M' 100,000.00
16 Pipa Galvanis 3" - 6 m M' 250,000.00
17 Lem Pipa Kg 45,000.00
18 Lem Kayu Kg 45,000.00
19 Stop Kran 1/2" Bh 15,000.00
20 Stop Kran 3/4" Bh 20,000.00
21 Paku Campur Kg 20,000.00
22 Paku Seng Kg 30,000.00
23 Paku Hak Panjang Kg 30,000.00
34 Seng Plat BJLS 30 Lbr 85,000.00
25 Seng Gelombang BJLS 30 Lbr 95,000.00
26 Spandek Zincalume M2 250,000.00
27 Besi Strip 2x3 M' 45,000.00
28 Kawat Harmonika M2 145,000.00
29 Kunci Slot Gembok Bh 250,000.00
30 Gembok Bh 150,000.00
31 Engsel Pintu Kuningan Bh 54,082.50
32 Lampu SL 18 Watt + Fitting Bh 75,000.00
33 Saklar Tunggal Bh 30,000.00
34 Stop Kontak Bh 30,000.00
35 Sekring Otomatis Bh 75,000.00
36 Kabel NYM 2 X 2.5 mm M' 10,000.00
B. TENAGA KERJA
1 Mandor O/H 190,000.00
2 Kepala Tukang O/H 160,000.00
3 Tukang Kayu / Batu / Besi O/H 150,000.00
4 Pekerja O/H 125,000.00
DAFTAR ANALISA HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
1. 1 M3 URUGAN SIRTU
1.2000 M3 Sirtu Rp. 230,000.00 Rp. 276,000.00
0.2500 H.o Pekerja Rp. 125,000.00 Rp. 31,250.00
0.0250 H.o Mandor Rp. 190,000.00 Rp. 4,750.00
Rp. 312,000.00
2. 1 M3 GALIAN TANAH BIASA SEDALAM 1 M
0.7500 H.o Pekerja Rp. 125,000.00 Rp. 93,750.00
0.0250 H.o Mandor Rp. 190,000.00 Rp. 4,750.00
Rp. 98,500.00
3. 1 M3 PASANGAN BATU KOSONG
0.4320 M3 Pasir Pasangan Rp. 400,000.00 Rp. 172,800.00
1.7000 M3 Batu Kali Rp. 600,000.00 Rp. 1,020,000.00
0.7800 H.o Pekerja Rp. 125,000.00 Rp. 97,500.00
0.3900 H.o Tukang Batu Rp. 150,000.00 Rp. 58,500.00
0.0390 H.o Kepala Tukang Rp. 160,000.00 Rp. 6,240.00
0.0390 H.o Mandor Rp. 190,000.00 Rp. 7,410.00
Rp. 1,362,450.00
4. 1 M3 PASANGAN PONDASI BATU KALI 1 : 2.5
0.4560 M3 Pasir Pasangan Rp. 400,000.00 Rp. 182,400.00
1.5000 M3 Batu Kali Rp. 600,000.00 Rp. 900,000.00
6.7100 Zak Semen Rp. 90,000.00 Rp. 603,900.00
1.5000 H.o Pekerja Rp. 125,000.00 Rp. 187,500.00
0.6000 H.o Tukang Batu Rp. 150,000.00 Rp. 90,000.00
0.0600 H.o Kepala Tukang Rp. 160,000.00 Rp. 9,600.00
0.0750 H.o Mandor Rp. 190,000.00 Rp. 14,250.00
Rp. 1,987,650.00
5. 1 M2 PASANGAN DINDING BATAKO TEBAL 1/2 BATAKO, 1 : 4
0.0430 M3 Pasir Pasangan Rp. 400,000.00 Rp. 17,200.00
18.0000 Bh Batu Batako Rp. 2,600.00 Rp. 46,800.00
0.2300 Zak Semen Rp. 90,000.00 Rp. 20,700.00
0.3000 H.o Pekerja Rp. 125,000.00 Rp. 37,500.00
0.1000 H.o Tukang Rp. 150,000.00 Rp. 15,000.00
0.0100 H.o Kepala Tukang Rp. 160,000.00 Rp. 1,600.00
0.0150 H.o Mandor Rp. 190,000.00 Rp. 2,850.00
Rp. 141,650.00
6. 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KELAS l
1.2000 M3 Balok Kayu Kelas I Rp. 5,000,000.00 Rp. 6,000,000.00
5.6000 Kg Paku Campur Rp. 20,000.00 Rp. 112,000.00
15.0000 Kg Besi Strip Rp. 45,000.00 Rp. 675,000.00
4.0000 H.o Pekerja Rp. 125,000.00 Rp. 500,000.00
12.0000 H.o Tukang Kayu Rp. 150,000.00 Rp. 1,800,000.00
1.2000 H.o Kepala Tukang Rp. 160,000.00 Rp. 192,000.00
0.2000 H.o Mandor Rp. 190,000.00 Rp. 38,000.00
Rp. 9,317,000.00
7. 1 M3 GORDING KAYU KELAS II
1.1000 M3 Balok Kayu Kelas I Rp. 5,000,000.00 Rp. 5,500,000.00
3.0000 Kg Paku Kayu Rp. 20,000.00 Rp. 60,000.00
6.0000 H.o Pekerja Rp. 125,000.00 Rp. 750,000.00
9.0000 H.o Tukang Rp. 150,000.00 Rp. 1,350,000.00
1.5000 H.o Kep. Tukang Rp. 160,000.00 Rp. 240,000.00
0.3000 H.o Mandor Rp. 190,000.00 Rp. 57,000.00
Rp. 7,957,000.00
8. 1 M1 PASANG LISTPLANK 2x 3/20 CM, KAYUE KELAS I
0.0145 M3 Papan Kayu Kelas I Rp. 5,000,000.00 Rp. 72,500.00
0.0600 Kg Paku Campur Rp. 20,000.00 Rp. 1,200.00
0.1500 H.o Pekerja Rp. 125,000.00 Rp. 18,750.00
0.2500 H.o Tukang Kayu Rp. 150,000.00 Rp. 37,500.00
0.0250 H.o Kepala Tukang Rp. 160,000.00 Rp. 4,000.00
0.0750 H.o Mandor Rp. 190,000.00 Rp. 14,250.00
Rp. 148,200.00
9. 1 M2 PASANG KAWAT HARMONIKA
1.0000 M2 Kawat Harmonika Rp. 145,000.00 Rp. 145,000.00
0.0200 Kg Paku Biasa Rp. 20,000.00 Rp. 400.00
0.0018 M3 Balok 5/5 Ky Kls I Rp. 5,000,000.00 Rp. 9,000.00
0.1000 H.o Pekerja Rp. 125,000.00 Rp. 12,500.00
0.1000 H.o Tukang Batu Rp. 150,000.00 Rp. 15,000.00
0.0100 H.o Kepala Tukang Rp. 160,000.00 Rp. 1,600.00
0.0005 H.o Mandor Rp. 190,000.00 Rp. 95.00
Rp. 183,595.00
10. 1 M3 BETON MUTU K250 (21,7 Mpa), SLUMP (12 ±2)CM, W/C = 0,56
7.6800 Zak Semen Portland Rp. 90,000.00 Rp. 691,200.00
0.5943 M3 Pasir Beton Rp. 470,000.00 Rp. 279,321.00
0.9696 M3 Kerikil Beton Rp. 1,000,000.00 Rp. 969,600.00
215.0000 Ltr Air
1.6500 H.o Pekerja Rp. 125,000.00 Rp. 206,250.00
0.2750 H.o Tukang Batu Rp. 150,000.00 Rp. 41,250.00
0.0280 H.o Kepala Tukang Rp. 160,000.00 Rp. 4,480.00
0.0830 H.o Mandor Rp. 190,000.00 Rp. 15,770.00
Rp. 2,207,871.00
11. 1M' PASANG SALURAN KELILING BANGUNAN
0.5000 m3 Galian tanah Rp. 98,500 Rp. 49,250
0.0800 m3 Urugan pasir Rp. 315,400 Rp. 25,232
0.0800 m3 Beton Tumbuk 1 : 3 : 5 Rp. 1,769,750 Rp. 141,580
0.1100 m3 Pasang Batu Tela 1 : 2 Rp. - Rp. -
0.9000 m2 Plesteran 1 : 2 Rp. 81,462 Rp. 73,316
Rp. 289,378
12. 1 M2 PASANG ATAP NOK SENG
0.3000 Lbr Seng Plat BJLS 30 Rp. 85,000.00 Rp. 25,500.00
0.0400 Kg Paku Biasa 1/2'' - 1'' Rp. 30,000.00 Rp. 1,200.00
0.1500 H.o Pekerja Rp. 125,000.00 Rp. 18,750.00
0.0700 H.o Tukang Kayu Rp. 150,000.00 Rp. 10,500.00
0.0080 H.o Kepala Tukang Rp. 160,000.00 Rp. 1,280.00
0.0060 H.o Mandor Rp. 190,000.00 Rp. 1,140.00
Rp. 58,370.00
13. 1 M2 PASANG ATAP SPANDEK ZINCALUME
1.42900 M2 Atap Spandek Zincalume Rp. 250,000.00 Rp. 357,250.00
0.0200 Kg Paku Hak Panjang Rp. 30,000.00 Rp. 600.00
0.2000 H.o Pekerja Rp. 125,000.00 Rp. 25,000.00
0.1000 H.o Tukang Kayu Rp. 150,000.00 Rp. 15,000.00
0.0100 H.o Kepala Tukang Rp. 160,000.00 Rp. 1,600.00
0.0010 H.o Mandor Rp. 190,000.00 Rp. 190.00
Rp. 399,640.00
14. MEMASANG 1 BUAH KUNCI SLOT GEMBOK
1.0000 Bh Kunci Slot Gembok Rp. 250,000.00 Rp. 250,000.00
1.0000 Bh Gembok Rp. 150,000.00 150,000.00
0.0100 H.o Pekerja Rp. 125,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 150,000.00 Rp. 75,000.00
0.0100 H.o Kepala Tukang Rp. 160,000.00 Rp. 1,600.00
0.0050 H.o Mandor Rp. 190,000.00 Rp. 950.00
Rp. 478,800.00
15. MEMASANG 1 BUAH ENGSEL PINTU
1.0000 Bh Engsel Pintu Rp. 54,082.50 Rp. 54,082.50
0.0150 H.o Pekerja Rp. 125,000.00 Rp. 1,875.00
0.1500 H.o Tukang Kayu Rp. 150,000.00 Rp. 22,500.00
0.0150 H.o Kepala Tukang Rp. 160,000.00 Rp. 2,400.00
0.0008 H.o Mandor Rp. 190,000.00 Rp. 142.50
Rp. 81,000.00
16. 1 TITIK PASANG LAMPU SL 18 WATT
1.0000 Bh Lampu SL 18 Watt Rp. 75,000.00 Rp. 75,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa Instalasi Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Pekerja Rp. 125,000.00 Rp. 125,000.00
0.5000 H.o Tukang Listrik Rp. 150,000.00 Rp. 75,000.00
Rp. 425,000.00
17. 1 BUAH PASANG STOP KONTAK
1.0000 Bh Stop Kontak Rp. 30,000.00 Rp. 30,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa Instalasi Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Pekerja Rp. 125,000.00 Rp. 125,000.00
0.5000 H.o Tukang Listrik Rp. 150,000.00 Rp. 75,000.00
Rp. 380,000.00
18. 1 BUAH PASANG SAKLAR TUNGGAL
1.0000 Bh Saklar Tunggal Rp. 30,000.00 Rp. 30,000.00
10.0000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
10.0000 M' Pipa Instalasi Rp. 5,000.00 Rp. 50,000.00
1.0000 H.o Tukang Listrik Rp. 150,000.00 Rp. 150,000.00
Rp. 330,000.00
19. 1 BUAH PASANG SEKRING OTOMATIS
1.000 Bh Sekring otomatis Rp. 75,000.00 Rp. 75,000.00
10.000 M' Kabel NYM 2 x 2.5 mm Rp. 10,000.00 Rp. 100,000.00
1.0000 H.o Tukang Listrik Rp. 150,000.00 Rp. 150,000.00
Rp. 325,000.00
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 1
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 28 Mei 2019 - 03 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI -
1 Pek. Galian Pondasi M³ 6.84 0.17 2.05 30.00 0.05 2.05 30.00 0.05
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 - - - - - -
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 - - - - - -
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 - - - - - -
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 - - - - - -
III PEKERJAAN BETON -
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - -
IV PEKERJAAN KAYU -
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - - - -
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - - - -
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - - - -
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - - - -
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - - - -
V PEKERJAAN PENUTUP ATAP -
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG -
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - -
VII PEKERJAAN SUMUR BOR -
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - -
VIII PEKERJAAN LAIN-LAIN -
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - -
0.00 - - - - - -
B INSTALASI LISTRIK -
I PEKERJAAN INSTALASI LISTRIK -
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - -
6 Genset Ls 1.00 3.68 - - - - - -
TOTAL 100 0 2.45 2.45
RENCANA : 2.40 %
REAL : 2.45 %
DEVIASI (±) : 0.05 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAN :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
T.A : 2019

NO JENIS PEKERJAAN JUMLAH ( Rp )

A. PEMBANGUNAN KANDANG AYAM


IA PEKERJAAN PERSIAPAN 9,800,000.00
IIA PEKERJAAN TANAH DAN PONDASI 61,545,745.98
IIIA PEKERJAAN BETON 44,561,847.09
IVA PEKERJAAN KAYU 58,854,620.25
VA PEKERJAAN PENUTUP ATAP 73,514,687.72
VIA PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 49,940,000.00
VIIA PEKERJAAN SUMUR BOR 61,900,000.00
VIIIA PEKERJAAN LAIN-LAIN 19,635,149.04
B. INSTALASI LISTRIK
IB PEKERJAAN INSTALASI LISTRIK 28,000,000.00

A. REAL COST ((IIA+IIIA+IVA+VA+VIA+IB) X 2 )+ IA + VIIA+VIIIA 407,752,050.09


B. PPN 10% ( A X 10% ) 40,775,205.01
C. JUMLAH ( A + B ) 448,527,255.10
D. DIBULATKAN 448,520,000.00

TERBILANG :
Empat Ratus Empat Puluh Delapan Juta Lima Ratus Dua Puluh Ribu Rupiah

Timika, 22 Mei 2019


CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktris
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : JALAN, PARKIR DAN LANSEKAP
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
PEK
ERJA
I AN PEKERJAAN PERSIAPAN DAN CUT AND FILL
1 Pek. Pengukuran site m2 0.00
2 Pek. Galian tanah dengan alat ( Cut ) dan membuang keluar dari 65,000.00 m3 29,750.00 1,933,750,000.00
lokasi minimal 4,5 km
3 Pekerjaan Timbunan dengan alat maxsimal jarak angkut 500 m m3 17,500.00 0.00
1,933,750,000.00

II PEKERJAAN JALAN DAN PARKIR


1 Pek. Galian badan dan bahu jalan 1,588.30 M3 #REF! #REF!
2 Pek. Lapisan Pondasi Agregate tebal 30 cm 4,538.00 m2 #REF! #REF!
3 Pek. Prim coat 4,538.00 m2 21,500.00 97,567,000.00
4 ATB, tebal 5 cm 4,538.00 m2 85,000.00 385,730,000.00
5 Tack Coat 4,538.00 m2 19,500.00 88,491,000.00
6 Lataston (HRS), tebal = 5 cm 4,538.00 m2 117,500.00 533,215,000.00
7 Pek. Kansteen beton 799.00 m' #REF! #REF!
#REF!

III. PEKERJAAN SALURAN


A. SALURAN KOMLEKS ( INDUK )
### Pek. Saluran induk beton bertulang K 250 tebal 20 cm ( termasuk, 890.00 m' #REF! #REF!
galian, lantai kerja, beton bertulang dan pelesteran 1 : 3 )
2 Pek. Grill besi ( besi profil dan streep ) dicat anti karat dan finishing m' 275,000.00 0.00
3 Pek. Gorong gorong beton bertulang dia 80 cm 30.00 m' 350,000.00 10,500,000.00
4 Pek. Bak kontrol pertemuan antar saluran 15.00 bh 2,000,000.00 30,000,000.00
#REF!
B. SALURAN PEMBANGI
### Pek. Saluran induk beton bertulang K 250 tebal 15 cm ( termasuk, m' #REF! #REF!
galian, lantai kerja, beton bertulang dan pelesteran 1 : 3 ) #REF! #REF!
2 Pek. Bak kontrol pertemuan antar saluran bh 1,500,000.00 0.00
3 Pek. Gorong gorong beton bertulang dia 60 cm m' 350,000.00 0.00
4 Pek. Grill besi ( besi profil dan streep ) dicat anti karat dan finishing m' 225,000.00 0.00
#REF!

Sub Total A+B #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT KEGIATAN : JALAN, PARKIR DAN LANSEKAP
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JENI JENIS PEKERJAAN VOLUME SAT
S Rp. Rp.
IV. PEK PEKERJAAN LANSEKAP
ERJA
A. TAMAN
AN
1 Penanaman. Rumput penutup permukaan tanah termasuk melapis m2 #REF!
humus tanah dan pupuk
2 Penanaman. pohon perdu phn 75,000.00
3 Pemasangan kansteen beton 100,000.00

B. POHON
1 Penanaman. pohon pengarah
2 Penanaman. pohon peneduh
3 Penanaman. pohon penyerap air dn penahan erosi

C. SARANA OLAH RAGA RINGAN

Sub Total A+B

V. PEKERJAAN LIMBAH
1 Pek. Pembuatan bak penampungan limbah
2 Pek. Treatmen limbah
3 Pek. Kolam buatan untuk uji coba

VI. PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan ls
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan ls
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE
B. KE ARSITEKTUR
RJA
IV. AN PEKERJAAN TEMBOK DAN PLESTERAN
Catatan
Plesteran memakai MU 301, Tebal pelesteran 1,5
Acian memakai MU 200
Tembok memakai bata ringan Primacon uk, 10 x 20 x 60 cm
A. LANTAI - I
1 Pek. Tembok 1 batu diatas sloof 1 : 3 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
3 Pek. Tembok 1/2 batu 1 : 3 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
5 Pek. Tembok 1 : 5 m2 #REF! #REF!
6 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
7 Pek. Plesteran Tembok 1 : 5
PE m2 #REF! #REF!
KE
8 Pek. Acian tembok m2 #REF! #REF!
RJA
AN #REF!
B. LANTAI - II
1 Pek. Tembok 1 : 3 m2 #REF! #REF!
2 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
3 Pek. Tembok 1 : 5 m2 #REF! #REF!
4 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
5 Pek. Plesteran Tembok 1 : 5 m2 #REF! #REF!
6 Pek. Acian tembok m2 #REF! #REF!
#REF!
D LANTAI - III ( ATAP )
1 Pek. Tembok 1 : 3 m2 #REF! #REF!
2 Pek. Tembok 1 : 5 ( termasuk tembok parapet ) m2 #REF! #REF!
3 Pek. Plesteran beton 1 : 3 m2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 m2 #REF! #REF!
5 Pek. Acian tembok m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
V. PE PEKERJAAN LANTAI DAN DINDING
KE Catatan
RJA
AN Lapisan mortal lantai memakai MU 400
Nut lantai dan dinding memakai MU type ………
A. LANTAI - I
1 Pek. Timbunan tanah dalam bangunan m3 #REF! #REF!
2 Pek. Timbunan pasir dalam bangunan m3 #REF! #REF!
3 Pek. Lantai kerja alas lantai m3 #REF! #REF!
4 Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) m2 #REF! #REF!
5 Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman m2 #REF! #REF!
6 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
7 Pek. Lantai keramik 20x20 cm stara Roman - Toliet m2 #REF! #REF!
8 Pek. Dinding keramik 20x25 cm stara Roman - Toilet m2 #REF! #REF!
9 Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
10 Pek. Granit pelapis dinding lift m2 550,000.00 0.00
11 Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman m2 #REF! #REF!
12 Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
13 Pek. Wall Guard /bumper (dado) m' 645,000.00 0.00
14 Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
B. LANTAI - II
### Pek. Timbunan pasir alas lantai m3 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna gelap stara Roman ) m2 #REF! #REF!
### Pek. Lantai keramik 40x40 cm ( warna putih )stara Roman m2 #REF! #REF!
### Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
### Pek. Waterproofing alas lantai WC/KM m2 85,000.00 0.00
### Pek. Lantai keramik 20x20 cm stara Roman - Toliet m2 #REF! #REF!
### Pek. Dinding keramik 20x25 cm stara Roman - Toilet m2 #REF! #REF!
### Pek. Lantai Granit dekoratif ( Hall ) m2 #REF! #REF!
### Pek. Granit pelapis dinding lift m2 550,000.00 0.00
### Pek. Lantai keramik Untuk Tangga 40 x 40 Stara Roman m2 #REF! #REF!
### Pek. Lantai Vinyl termasuk Plint dan border m2 #REF! #REF!
### Dinding KM/WC Cubical PVC uk. 1,8 X 0,9 m2 #REF! #REF!
#REF!
C LANTAI - IV ( ATAP )
1 Pek. Timbunan pasir alas lantai m3 #REF! #REF!
2 Pek. Lantai keramik 40x40 cm stara Roman m2 #REF! #REF!
3 Pek. Plint spesial (hospital plint) Lantai keramik tile10 X 40 m' #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!


RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
VI. PE PEKERJAAN KOSEN DAN KACA
KE Catatan
RJA
AN Kosen aluminium memakai Alcan podwer coating
Kosen dan daun pintu kayu memakai kayu kls I
A. LANTAI - I
Pintu Utama
1 Pek. Frame Gate Pintu stanless steel lengkap 2.00 unt 15,500,000.00 31,000,000.00
2 Pek. Pintu utama kaca template 12 lengkap handle, engsel atas 2.00 set 25,000,000.00 50,000,000.00
dan bawah serta kunci
3 Pek. Kaca polos 12 mm 32.00 m2 15,000.00 480,000.00
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 10.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 3.50 m2 #REF! #REF!
3 Pek. Kaca polos 6 mm 1.00 m2 #REF! #REF!
4 Pas. Handle + kunci 1.00 bh #REF! #REF!
5 Pas. Handle 2.00 bh 125,000.00 250,000.00
6 Pas. Engsel pintu 6.00 bh #REF! #REF!
7 Pas. Grendel tanam pintu 4.00 bh 55,000.00 220,000.00
8 Pas. Door closer 1.00 bh #REF! #REF!
Pintu Ruangan ( Kayu )
1 Pas. Kosen pintu kayu kls I 2.25 m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 0.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 105.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm 1.00 m2 #REF! #REF!
5 Pas. Engsel pintu 198.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 56.00 bh #REF! #REF!
7 Pas. Handel 20.00 bh 125,000.00 2,500,000.00
8 Pas. Grendel tanam pintu 84.00 bh 55,000.00 4,620,000.00
9 Pas. Door closer dan door stop 56.00 bh #REF! #REF!
Jendela Utama
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 499.00 m' #REF! #REF!
2 Ras. Jendela bingkai aluminium windowwall + Kaca 6 mm 117.00 m' #REF! #REF!
3 Pas. Engsel jendela 228.00 bh 50,000.00 11,400,000.00
4 Pas. Hak angin 228.00 bh 10,000.00 2,280,000.00
5 Pas. Grendel jendela 114.00 bh 50,000.00 5,700,000.00
#REF!
B. LANTAI - II
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 37.00 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 9.50 m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm m2 #REF! #REF!
5 Pek. Kaca polos 6 mm 2.80 m2 #REF! #REF!
6 Pas. Handle + kunci 3.00 bh #REF! #REF!
7 Pas. Handle 6.00 bh 125,000.00 750,000.00
8 Pas. Engsel pintu 18.00 bh #REF! #REF!
9 Pas. Grendel tanam pintu 12.00 bh 55,000.00 660,000.00
10 Pas. Door closer 3.00 bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
Pintu
PE Ruangan ( Kayu ) 0.00
KE
1 Pas. Kosen pintu kayu kls I 3.50 m3 #REF! #REF!
RJA
AN2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy 0.00 m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy 134.00 m2 #REF! #REF!
4 Pek. Kaca polos 6 mm 4.00 m2 #REF! #REF!
5 Pas. Engsel pintu 258.00 bh #REF! #REF!
6 Pas. Kunci + Handel type besar 61.00 bh #REF! #REF!
7 Pas. Handel 42.00 bh 125,000.00 5,250,000.00
8 Pas. Grendel tanam pintu 84.00 bh 55,000.00 4,620,000.00
9 Pas. Door closer dan door stop 65.00 bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 363.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 92.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent 9.00 m2 #REF! #REF!
4 Pas. Engsel jendela 48.00 bh 50,000.00 2,400,000.00
5 Pas. Hak angin 48.00 bh 10,000.00 480,000.00
6 Pas. Grendel tanam 24.00 bh 50,000.00 1,200,000.00
#REF!
C LANTAI - III ( ATAP )
Pintu Ruangan ( Aluminium )
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 16.80 m' #REF! #REF!
2 Pek. Pintu bingkai Aluminium + Kaca 8 mm, podwer coating 6.00 m2 #REF! #REF!
3 Pek. Jendela bingkai Aluminium + Kaca 5 mm, podwer coating m2 #REF! #REF!
4 Pek. Kaca polos 8 mm m2 #REF! #REF!
5 Pek. Kaca polos 6 mm 2.00 m2 #REF! #REF!
6 Pas. Handle + kunci 2.00 bh #REF! #REF!
7 Pas. Handle 8.00 bh 125,000.00 1,000,000.00
8 Pas. Engsel pintu 12.00 bh #REF! #REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
9 Pas. Grendel tanam pintu
PE 8.00 bh 55,000.00 440,000.00
KE
10 Pas. Door closer 2.00 bh #REF! #REF!
RJA
Pintu
AN Ruangan ( Kayu ) 0.00
1 Pas. Kosen pintu kayu kls I m3 #REF! #REF!
2 Pas. Pintu Rangka kayu kls I finish sunkai cat epoxy m2 #REF! #REF!
3 Pas. Pintu Panil Papan kayu kls I finish cat epoxy m2 #REF! #REF!
4 Pek. Kaca polos 6 mm m2 #REF! #REF!
5 Pas. Engsel pintu bh #REF! #REF!
6 Pas. Kunci + Handel type besar bh #REF! #REF!
7 Pas. Handle 8.00 bh #REF! #REF!
8 Pas. Grendel tanam pintu bh 55,000.00 0.00
9 Pas. Door closer dan door stop bh #REF! #REF!
Jendela Utama 0.00
1 Pas. Rangka curtinwall lengkap braket m' #REF! #REF!
2 Pas. Kaca 8 mm lengkap sealent m2 #REF! #REF!
Jendela Ruangan/luar 0.00
1 Pek. Kosen Pintu/Jendela Aluminium podwer coating 55.00 m' #REF! #REF!
2 Pas. Jendela bingkai aluminium windowwall + Kaca 6 mm 14.00 m' #REF! #REF!
3 Pas. Kaca 6 mm lenkap sealent m2 #REF! #REF!
4 Pas. Engsel jendela 32.00 bh 50,000.00 1,600,000.00
5 Pas. Hak angin 32.00 bh 10,000.00 320,000.00
6 Pas. Grendel tanam 16.00 bh 50,000.00 800,000.00
#REF!

Sub Total A+B+C+D+E #REF!

VII. PEKERJAAN RANGKA DAN PLAPON


A. LANTAI - I
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 2,233.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 2,233.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. List plapon type besar 2,480.00 m' 35,000.00 86,800,000.00
6 Pas. List plapon type kecil 89.00 m' 25,000.00 2,225,000.00
#REF!
B. LANTAI - II
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
2 Pas. Rangka metal gypsum lengkap 1,576.80 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 1,576.80 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. 0.00 m2 #REF! #REF!
5 Pas. List plapon type besar 1,461.00 m' 35,000.00 51,135,000.00
6 Pas. List plapon type kecil 98.00 m' 25,000.00 2,450,000.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
C
PE LANTAI - III ( ATAP )
KE
1 Pas. Rangka Maincrostee dan crosstee + plapon akustik m2 #REF! #REF!
RJA
AN2 Pas. Rangka metal gypsum lengkap 286.00 m2 #REF! #REF!
3 Pas. Plapon gypsum board type ……….. 286.00 m2 #REF! #REF!
4 Pas. Plapon calcy board type ……….. m2 #REF! #REF!
5 Pas. Les plapon type besar 235.00 m' 35,000.00 8,225,000.00
6 Pas. Les plapon type kecil m' 25,000.00 0.00
#REF!
F. CLADING ALUMINIUM PANEL
Pek. Rangka holo metal 1 mm + clading, lengkap breaket, sealen m2 750,000.00 0.00
0.00

Sub Total A+B+C+D+E+F #REF!


VIII. PEKERJAAN ATAP
1 Pek. Kuda kuda baja IWF 6,750.00 kg #REF! #REF!
2 Pek. Gording baja INP 2,150.00 kg #REF! #REF!
3 Pek. Dudukan kuda kuda + anker 8.00 bh 350,000.00 2,800,000.00
4 Pek. Kuda kuda baja ringan 655.00 m2 210,000.00 137,550,000.00
5 Pek. Kuda kuda stainless steel ( atap ) transparan bh
6 Pek. Rangka atap 285.00 m2 #REF! #REF!
7 Pek. Seng pelapis atap 285.00 m2 35,000.00 9,975,000.00
8 Pek. Atap genteng keramik 285.00 m2 #REF! #REF!
9 Pek. Nok genteng keramik 55.00 m' #REF! #REF!
10 Pek. Bubungan dekoratif 2.00 bh 2,500,000.00 5,000,000.00
11 Pek. Atap Spandec SWG 655.00 m2 #REF! #REF!
12 Pek. Atap Transparant ( kaca templet 12 mm ) m2
13 Pas. Roof insulation + ram kasa 940.00 m2 55,000.00 51,700,000.00
14 Pek. Nok spandek 58.00 m' #REF! #REF!
15 Pek. Listplank papan 15.00 m2 #REF! #REF!
16 Pek. Waterproofing type ………( plat latai II dan atap dak ) 1,121.00 m2 95,000.00 106,495,000.00
17 Pek. Plesteran floorhardener 1,121.00 m2 32,500.00 36,432,500.00
#REF!

IX. PEKERJAAN CAT DAN FINISHING


A. LANTAI - I
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 2,233.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
B. LANTAI - II
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 1,576.80 m2 #REF! #REF!
6 Pek. Pengecetan kayu 110.00 m2 #REF! #REF!
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
C
PE LANTAI - IV
KE
1 Pek. Pengecetan dasar ( undercoating ) 0.00 m2 #REF! #REF!
RJA
AN2 Pek. Pengecetan tembok dalam 0.00 m2 #REF! #REF!
3 Pek. Pengecetan tembok luar 0.00 m2 #REF! #REF!
4 Pek. Pengecetan Partisi gypsum m2 #REF! #REF!
5 Pek. Pengecetan Plapon 286.00 m2 #REF! #REF!
6 Pek. Pengecetan kayu 25.00 m2 #REF! #REF!
#REF!

Sub Total A+B+C+D+E #REF!

X PEKERJAAN RAILING TANGGA


1 Pek. Railing tangga utama stainlessstell 55.00 m' 950,000.00 52,250,000.00
2 Pek. Railing tangga service stainlessstell 55.00 m' 850,000.00 46,750,000.00
99,000,000.00

XI. PEKERJAAN SANITAIR


A. LANTAI - I
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 6.00 set 2,144,000.00 12,864,000.00
3 Kaca diatas wastafel Type TX 705 AE 6.00 set 718,000.00 4,308,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 6.00 m2 200,000.00 1,200,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 11.00 set 3,150,000.00 34,650,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 11.00 bh 164,000.00 1,804,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 26.00 bh 262,000.00 6,812,000.00
10 Urinal Moslem U 370 M 3.00 set 3,200,000.00 9,600,000.00
11 Pembatas Urinal Type A 100 (warna) 2.00 bh 894,000.00 1,788,000.00
12 Floordrain Type 1 BV 1 11.00 bh 270,000.00 2,970,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 6.00 set 3,500,000.00 21,000,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
B.
PE LANTAI - II
KE
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
RJA
AN2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 5.00 set 2,144,000.00 10,720,000.00
3 Kaca diatas wastafel Type TX 705 AE 13.00 set 718,000.00 9,334,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 13.00 m2 200,000.00 2,600,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) 0.00 set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) 10.00 set 3,150,000.00 31,500,000.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto 10.00 bh 164,000.00 1,640,000.00
9 Kran air dinding type T 23 BQ 13 N ex Toto 10.00 bh 262,000.00 2,620,000.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 10.00 bh 270,000.00 2,700,000.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 3.00 3,500,000.00 10,500,000.00
16 Tempat handuk Type TX 726 AE 0.00 bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL 0.00 bh 943,000.00 0.00
#REF!
C LANTAI - III ( ATAP )
1 Wastafel type L 522 V3 warna+ kran TX 101 LB ex. Toto (utk.Pasien) 0.00 set #REF! #REF!
2 Wastafel type L 237 V3/L 237 F + kran TX 101 LB ex. Toto (utk. Umum) 2.00 set 2,144,000.00 4,288,000.00
3 Kaca diatas wastafel Type TX 705 AE 2.00 set 718,000.00 1,436,000.00
4 Cermin wastafel kaca 5 mm dibevel + rangka 2.00 m2 200,000.00 400,000.00
5 Kloset duduk type CW 704 J/SW 784JP warna ex. Toto (R.Perawatan) set #REF! #REF!
6 Kloset duduk type CW 705 L/TV150NS ex. Toto (Toilet umum) set 3,150,000.00 0.00
7 Shower spray ( bilas ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
8 Shower head ( mandi ) typeTHX 20 NBPIV ex. Toto bh 164,000.00 0.00
9 Kran air dinding type T 23 BQ 13 N ex Toto bh 262,000.00 0.00
10 Urinal Moslem U 370 M set 3,200,000.00 0.00
11 Pembatas Urinal Type A 100 (warna) bh 894,000.00 0.00
12 Floordrain Type 1 BV 1 bh 270,000.00 0.00
13 Kran Kitchen type TX 607 KES ex Toto bh 1,460,000.00 0.00
14 Meja pantry + sink set 1,500,000.00 0.00
15 Meja washtfel ( marmer ) 0.00
16 Tempat handuk Type TX 726 AE bh 1,369,000.00 0.00
17 Hand Bar KM/WC Type TX 701 AL bh 943,000.00 0.00
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
PE #REF!
KE
RJA
AN
RENCANA ENGENEERING ESTIMATE
PROYEK : PENINGKATAN PELAYANAN KESEHATAN RUMAH SAKIT UMUM REGIONAL TYPE - B
UNIT PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM REGIONAL TYPE B MAMUJU SULAWESI BARAT
UNIT BANGUNAN : POLIKLINIK
LANJUTAN ( PENYEMPURNAAN LANTAI - I, II
LOKASI : PROPINSI SULAWESI BARAT

HARGA SAT JUMLAH HARGA


No JEN JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
IS
F.
PE PEKERJAAN SEPTIKTANK
KE
1 Pek. Septiktan, konstruksi beton bertulang kapasitas ……… m3 5.00 unt 25,000,000.00 125,000,000.00
RJA
AN lengkap lubang kontrol dan pipa hawa
2 Pek, Peresapan air buangan dari septiktank 10.00 unt 15,000,000.00 150,000,000.00
275,000,000.00

Sub Total A+B+C+D+E+F #REF!

XII PEKERJAAN PEMBERSIHAN


1 Pek. Pembersihan sisa pekerjaan 1.00 ls 25,000,000.00 25,000,000.00
2 Pek. Pembuangan sisa pekerjaan ke tempat penampungan 1.00 ls 15,000,000.00 15,000,000.00
40,000,000.00
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 2
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 04 Juni 2019 - 10 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI -
1 Pek. Galian Pondasi M³ 6.84 0.17 2.05 30.00 0.05 4.79 70.00 0.12 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 - - - 6.84 100.00 2.29 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 - - - 3.89 30.00 1.89 3.89 30.00 1.89
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 - - - - - - - - -
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 - - - - - - - - -
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - - - - - - -
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - - - - - - -
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - - - - - - -
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - - - - - - -
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - - - - - - -
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 2.45 4.30 6.75
RENCANA : 6.18 %
REAL : 6.75 %
DEVIASI (±) : 0.57 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 3
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 11 Juni 2019 - 17 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI -
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 3.89 30.00 1.89 7.77 60.00 3.79 11.66 90.00 5.68
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 - - - - - - - - -
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 - - - - - - - - -
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - - - - - - -
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - - - - - - -
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - - - - - - -
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - - - - - - -
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - - - - - - -
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 6.75 3.79 10.54
RENCANA : 9.95 %
REAL : 10.54 %
DEVIASI (±) : 0.59 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 4
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 18 Juni 2019 - 24 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 11.66 90.00 5.68 1.30 10.00 0.63 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 - - - 7.70 100.00 0.27 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 - - - 39.59 50.00 3.03 39.59 50.00 3.03
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - - - - - - -
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - - - - - - -
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - - - - - - -
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - - - - - - -
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - - - - - - -
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 10.54 3.93 14.47
RENCANA : 13.72 %
REAL : 14.47 %
DEVIASI (±) : 0.74 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 1
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 28 Mei 2019 - 24 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI - - -
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 39.59 50.00 3.03 39.59 50.00 3.03
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - - - -
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - - - -
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - - - -
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - - - -
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - - - -
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - -
0.00 - - - - - -
B INSTALASI LISTRIK - - -
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - -
6 Genset Ls 1.00 3.68 - - - - - -
TOTAL 100 0.00 14.47 14.47
RENCANA : 13.72 %
REAL : 14.47 %
DEVIASI (±) : 0.74 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.01
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 28 Mei 2019 - 24 Juni 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
BOBOT RENC. 28 Mei1 2019 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
No URAIAN PEKERJAAN (%) 04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019 16 Juli 2019 23 Juli 2019 30 Juli 2019
06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
- - - - - - - - -
REAL. - - - - - - - - - -
26 02
29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real.
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real.
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real.
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real.
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real.
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93
KUM.
0.00
2.45 6.75 10.54 14.47
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.01
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06

30
2.41 2.41
20

10
3.43
0

8.49 7.47 2.41

90.12 97.59 100.00

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 5
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 18 Juni 2019 - 24 Juni 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 39.59 50.00 3.03 39.59 50.00 3.03 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - 0.40 100.00 0.91 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - 0.12 100.00 0.27 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - 0.68 100.00 1.55 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - 1.21 100.00 2.36 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - 25.20 50.00 0.92 25.20 50.00 0.92
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - - - - - - -
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 14.47 9.04 23.51
RENCANA : 22.96 %
REAL : 23.51 %
DEVIASI (±) : 0.55 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 6
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 02 Juli 2019 - 08 Juli 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 25.20 50.00 0.92 25.20 50.00 0.92 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - 74.51 41.00 7.30 74.51 41.00 7.30
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 23.51 8.22 31.73
RENCANA : 31.31 %
REAL : 31.73 %
DEVIASI (±) : 0.41 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 7
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 09 Juli 2019 - 15 Juli 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 74.51 41.00 7.30 27.26 15.00 2.67 101.77 56.00 9.97
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 31.73 2.67 34.40
RENCANA : 34.20 %
REAL : 34.40 %
DEVIASI (±) : 0.20 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 8
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 16 Juli 2019 - 22 Juli 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 101.77 56.00 9.97 36.35 20.00 3.56 138.12 76.00 13.54
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 34.40 3.56 37.96
RENCANA : 37.09 %
REAL : 37.96 %
DEVIASI (±) : 0.88 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 2
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 18 Juni 2019 - 22 Juli 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI - - - - - - - - -
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 39.59 50.00 3.03 39.59 50.00 3.03 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 - - - 0.40 100.00 0.91 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 - - - 0.12 100.00 0.27 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 - - - 0.68 100.00 1.55 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 - - - 1.21 100.00 2.36 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 - - - 50.40 100.00 1.83 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 - - - 138.12 76.00 13.54 138.12 76.00 13.54
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 14.47 23.49 37.96
RENCANA : 37.09 %
REAL : 37.96 %
DEVIASI (±) : 0.88 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.02
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 18 Juni 2019 - 22 Juli 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
RENC.
No URAIAN PEKERJAAN BOBOT 28 Mei1 2019 2 3 4 5 6 7
04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019
8
16 Juli 2019
9
23 Juli 2019
10
30 Juli 2019
11 12 13 14 15 16 17 18 19

(%) - - - - - - - - -06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
REAL. -
- - - - - - - - -
26 02
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93 3.03
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real.
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real. 6.01 0.92
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real. 7.30 2.67 3.56
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real.
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real.
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93 9.04 8.22 2.67 3.56
KUM.
0.00
2.45 6.75 10.54 14.47 23.51 31.73 34.40 37.96
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74 0.55 0.41 0.20 0.88
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.02
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06

30
2.41 2.41
20

10
3.43
0

8.49 7.47 2.41

90.12 97.59 100.00

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 9
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 23 Juli 2019 - 29 Juli 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - - - - - - -
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - - - - - - -
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 138.12 76.00 13.54 27.26 15.00 2.67 165.38 91.00 16.21
2 Pas. Nok Seng M' 15.17 0.22 - - - - - - - - -
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 37.96 2.67 40.63
RENCANA : 39.97 %
REAL : 40.63 %
DEVIASI (±) : 0.66 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 10
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 30 Juli 2019 - 05 Ags 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - 2.19 25.00 1.19 2.19 25.00 1.19
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - 5.43 100.00 2.94 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 165.38 91.00 16.21 16.36 9.00 1.60 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 - - - 15.17 100.00 0.22 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - - - - - - -
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 40.63 5.95 46.58
RENCANA : 46.47 %
REAL : 46.58 %
DEVIASI (±) : 0.11 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 11
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 06 Ags 2019 - 12 Ags 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 2.19 25.00 1.19 5.26 60.00 2.85 7.45 85.00 4.04
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - - - - - - -
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
7 Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
9 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - 4.00 100.00 0.98 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 46.58 3.83 50.41
RENCANA : 50.07 %
REAL : 50.41 %
DEVIASI (±) : 0.34 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 12
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 13 Ags 2019 - 19 Ags 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 7.45 85.00 4.04 1.32 15.00 0.71 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - 45.68 100.00 3.24 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
7 Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
9 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 50.41 3.95 54.36
RENCANA : 53.68 %
REAL : 54.36 %
DEVIASI (±) : 0.69 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 3
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 23 Juli 2019 - 19 Ags 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 - - - 8.77 100.00 4.75 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 - - - 5.43 100.00 2.94 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 - - - 45.68 100.00 3.24 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - - - - - - -
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 138.12 76.00 13.54 43.62 24.00 4.27 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 - - - 15.17 100.00 0.22 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 - - - 4.00 100.00 0.98 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 37.96 16.40 54.36
RENCANA : 53.68 %
REAL : 54.36 %
DEVIASI (±) : 0.69 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.03
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 23 Juli 2019 - 19 Ags 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
RENC.
No URAIAN PEKERJAAN BOBOT 28 Mei1 2019 2 3 4 5 6 7
04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019
8
16 Juli 2019
9
23 Juli 2019
10
30 Juli 2019
11 12 13 14 15 16 17 18 19

(%) - - - - - - - - -06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
REAL. -
- - - - - - - - -
26 02
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93 3.03
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real. 4.13 2.85 3.95
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real. 6.01 0.92
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real. 7.30 2.67 3.56 2.67 1.82 0.98
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real.
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real.
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93 9.04 8.22 2.67 3.56 2.67 5.95 3.83 3.95
KUM.
0.00
2.45 6.75 10.54 14.47 23.51 31.73 34.40 37.96 40.63 46.58 50.41 54.36
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74 0.55 0.41 0.20 0.88 0.66 0.11 0.34 0.69
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.03
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06

30
2.41 2.41
20

10
3.43
0

8.49 7.47 2.41

90.12 97.59 100.00

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 13
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 20 Ags 2019 - 26 Ags 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - 76.00 80.00 3.42 76.00 80.00 3.42
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - - - - - - -
7 Pas. Engsel Pintu Bh 6.00 0.12 - - - - - - - - -
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - - - - - - -
9 Dudukan Kandang Batrei M³ 1.22 2.78 - - - - - - - - -
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 54.36 3.42 57.79
RENCANA : 57.28 %
REAL : 57.79 %
DEVIASI (±) : 0.50 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 14
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 27 Ags 2019 - 02 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 76.00 80.00 3.42 19.00 20.00 0.86 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - 2.20 100.00 0.10 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 - - - 6.00 100.00 0.12 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - 2.00 100.00 0.23 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 - - - 1.22 100.00 2.78 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - - - - - - -
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 57.79 4.08 61.87
RENCANA : 60.89 %
REAL : 61.87 %
DEVIASI (±) : 0.98 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 15
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 03 Sep 2019 - 09 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - 0.50 50.00 2.08 0.50 50.00 2.08
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 61.87 2.08 63.95
RENCANA : 63.34 %
REAL : 63.95 %
DEVIASI (±) : 0.62 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 16
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 10 Sep 2019 - 16 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 0.50 50.00 2.08 0.50 50.00 2.08 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 63.95 2.08 66.04
RENCANA : 65.79 %
REAL : 66.04 %
DEVIASI (±) : 0.25 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 4
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 20 Ags 2019 - 16 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI - - -
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 - - - 95.00 100.00 4.28 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 - - - 2.20 100.00 0.10 2.20 100.00 0.10
Pas. Engsel Pintu Bh 6.00 0.12 - - - 6.00 100.00 0.12 6.00 100.00 0.12
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 - - - 2.00 100.00 0.23 2.00 100.00 0.23
8 Dudukan Kandang Batrei M³ 1.22 2.78 - - - 1.22 100.00 2.78 1.22 100.00 2.78
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 - - - 1.00 100.00 4.17 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - - - - - - -
4 kandang Batrey Set 63.00 5.87 - - - - - - - - -
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 54.36 11.68 66.04
RENCANA : 65.79 %
REAL : 66.04 %
DEVIASI (±) : 0.25 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.04
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 23 Juli 2019 - 19 Ags 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
RENC.
No URAIAN PEKERJAAN BOBOT 28 Mei1 2019 2 3 4 5 6 7
04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019
8
16 Juli 2019
9
23 Juli 2019
10
30 Juli 2019
11 12 13 14 15 16 17 18 19

(%) - - - - - - - - -06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
REAL. -
- - - - - - - - -
26 02
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93 3.03
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real. 4.13 2.85 3.95
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real. 6.01 0.92 3.42 4.08
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real. 7.30 2.67 3.56 2.67 1.82 0.98
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real. 2.08 2.08
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real.
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93 9.04 8.22 2.67 3.56 2.67 5.95 3.83 3.95 3.42 4.08 2.08 2.08
KUM.
0.00
2.45 6.75 10.54 14.47 23.51 31.73 34.40 37.96 40.63 46.58 50.41 54.36 57.79 61.87 63.95 66.04
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74 0.55 0.41 0.20 0.88 0.66 0.11 0.34 0.69 0.50 0.98 0.62 0.25
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.04
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06

30
2.41 2.41
20

10
3.43
0

8.49 7.47 2.41

90.12 97.59 100.00

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 17
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 17 Sep 2019 - 23 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG - - -
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - 1.00 100.00 1.23 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 - - - 12.60 20.00 1.17 12.60 20.00 1.17
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 66.04 2.40 68.44
RENCANA : 68.24 %
REAL : 68.44 %
DEVIASI (±) : 0.20 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 18
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 24 Sep 2019 - 30 Sep 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG - - -
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 12.60 20.00 1.17 25.20 40.00 2.35 37.80 60.00 3.52
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - - - - - - -
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 68.44 2.35 70.79
RENCANA : 70.69 %
REAL : 70.79 %
DEVIASI (±) : 0.10 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 19
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 01 Okt 2019 - 07 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 37.80 60.00 3.52 25.20 40.00 2.35 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - 1.00 100.00 8.83 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 - - - - - - - - -
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - - - - - - -
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - - - - - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - - - - - - -
2 Lampu Sorot Bh 2.00 1.39 - - - - - - - - -
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - - - - - - -
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - - - - - - -
5 Pas. MCB Bh 1.00 0.08 - - - - - - - - -
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 70.79 11.18 81.97
RENCANA : 81.63 %
REAL : 81.97 %
DEVIASI (±) : 0.34 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 20
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 08 Okt 2019 - 14 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 63.00 100.00 5.87 - - - 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 1.00 100.00 8.83 - - - 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 - - - 1.00 100.00 1.57 1.00 100.00 1.57
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - 1.00 100.00 3.92 1.00 100.00 3.92
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - 1.00 100.00 0.86 1.00 100.00 0.86
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - 8.40 60.00 0.88 8.40 60.00 0.88
2 Lampu Sorot Bh 2.00 1.39 - - - 1.20 60.00 0.84 1.20 60.00 0.84
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - 1.20 60.00 0.10 1.20 60.00 0.10
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - 0.60 60.00 0.06 0.60 60.00 0.06
5 Pas. MCB Bh 1.00 0.08 - - - 0.60 60.00 0.05 0.60 60.00 0.05
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 81.97 8.26 90.23
RENCANA : 90.12 %
REAL : 90.23 %
DEVIASI (±) : 0.11 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 5
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 17 Sep 2019 - 14 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
8 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 - - - 1.00 100.00 1.23 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 - - - 63.00 100.00 5.87 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 - - - 1.00 100.00 8.83 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 - - - 1.00 100.00 1.57 1.00 100.00 1.57
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 - - - 1.00 100.00 3.92 1.00 100.00 3.92
4 Tanggki Air 1100 L Unit 1.00 0.86 - - - 1.00 100.00 0.86 1.00 100.00 0.86
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - - - - - - -
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - - - - - - -
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 - - - 8.40 60.00 0.88 8.40 60.00 0.88
2 Lampu Sorot Bh 2.00 1.39 - - - 1.20 60.00 0.84 1.20 60.00 0.84
3 Pas. Saklar Ganda Ttk 2.00 0.16 - - - 1.20 60.00 0.10 1.20 60.00 0.10
4 Pas. Stop Kontak Ttk 1.00 0.09 - - - 0.60 60.00 0.06 0.60 60.00 0.06
5 Pas. MCB Bh 1.00 0.08 - - - 0.60 60.00 0.05 0.60 60.00 0.05
6 Genset Ls 1.00 3.68 - - - - - - - - -
TOTAL 100 66.04 24.19 90.23
RENCANA : 90.12 %
REAL : 90.23 %
DEVIASI (±) : 0.11 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.05
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 17 Sep 2019 - 14 Okt 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
RENC.
No URAIAN PEKERJAAN BOBOT 28 Mei1 2019 2 3 4 5 6 7
04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019
8
16 Juli 2019
9
23 Juli 2019
10
30 Juli 2019
11 12 13 14 15 16 17 18 19

(%) - - - - - - - - -06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
REAL. -
- - - - - - - - -
26 02
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93 3.03
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real. 4.13 2.85 3.95
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real. 6.01 0.92 3.42 4.08
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real. 7.30 2.67 3.56 2.67 1.82 0.98
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real. 2.08 2.08 2.40 2.35 2.35
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real. 8.83
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93 9.04 8.22 2.67 3.56 2.67 5.95 3.83 3.95 3.42 4.08 2.08 2.08 2.40 2.35 11.18
KUM.
0.00
2.45 6.75 10.54 14.47 23.51 31.73 34.40 37.96 40.63 46.58 50.41 54.36 57.79 61.87 63.95 66.04 68.44 70.79 81.97
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74 0.55 0.41 0.20 0.88 0.66 0.11 0.34 0.69 0.50 0.98 0.62 0.25 0.20 0.10 0.34
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.05
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06
6.35
30
2.41 2.41
20

10
3.43
1.91 0

8.49 7.47 2.41

90.12 97.59 100.00

8.26

90.23

0.11

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 21
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 15 Okt 2019 - 21 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG - - -
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 63.00 100.00 5.87 - - - 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 1.00 100.00 8.83 - - - 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 1.00 100.00 1.57 - - - 1.00 100.00 1.57
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 1.00 100.00 3.92 - - - 1.00 100.00 3.92
4 Tanggki Air 1100 L Unit 1.00 0.86 1.00 100.00 0.86 - - - 1.00 100.00 0.86
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - 0.50 50.00 0.61 0.50 50.00 0.61
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - 4.36 100.00 2.36 4.36 100.00 2.36
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - - - - - - -
0.00 - - - - - - - - -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 8.40 60.00 0.88 5.60 40.00 0.58 14.00 100.00 1.46
2 Lampu Sorot Bh 2.00 1.39 1.20 60.00 0.84 0.80 40.00 0.56 2.00 100.00 1.39
3 Pas. Saklar Ganda Ttk 2.00 0.16 1.20 60.00 0.10 0.80 40.00 0.06 2.00 100.00 0.16
4 Pas. Stop Kontak Ttk 1.00 0.09 0.60 60.00 0.06 0.40 40.00 0.04 1.00 100.00 0.09
5 Pas. MCB Bh 1.00 0.08 0.60 60.00 0.05 0.40 40.00 0.03 1.00 100.00 0.08
6 Genset Ls 1.00 3.68 - - - 1.00 100.00 3.68 1.00 100.00 3.68
TOTAL 100 90.23 7.93 98.16
RENCANA : 97.59 %
REAL : 98.16 %
DEVIASI (±) : 0.57 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN MINGGU KE - 22
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 22 Okt 2019 - 24 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Minggu Lalu Minggu Ini S/D Minggu Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
7 Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
8 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
9 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
10 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 63.00 100.00 5.87 - - - 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 1.00 100.00 8.83 - - - 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 1.00 100.00 1.57 - - - 1.00 100.00 1.57
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 1.00 100.00 3.92 - - - 1.00 100.00 3.92
4 Tanggki Air 1100 L Unit 1.00 0.86 1.00 100.00 0.86 - - - 1.00 100.00 0.86
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 0.50 50.00 0.61 0.50 50.00 0.61 1.00 100.00 1.23
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 4.36 100.00 2.36 - - - 4.36 100.00 2.36
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - 1.00 100.00 1.23 1.00 100.00 1.23
0.00 - - - - 100.00 - - 100.00 -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 14.00 100.00 1.46 - - - 14.00 100.00 1.46
2 Lampu Sorot Bh 2.00 1.39 2.00 100.00 1.39 - - - 2.00 100.00 1.39
3 Pas. Saklar Ganda Ttk 2.00 0.16 2.00 100.00 0.16 - - - 2.00 100.00 0.16
4 Pas. Stop Kontak Ttk 1.00 0.09 1.00 100.00 0.09 - - - 1.00 100.00 0.09
5 Pas. MCB Bh 1.00 0.08 1.00 100.00 0.08 - - - 1.00 100.00 0.08
6 Genset Ls 1.00 3.68 1.00 100.00 3.68 - - - 1.00 100.00 3.68
TOTAL 100 98.16 1.84 100.00
RENCANA : 100.00 %
REAL : 100.00 %
DEVIASI (±) : 0.00 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
LAPORAN REALISASI FISIK LAPANGAN BULAN KE - 5
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATASPEMASARAN
PENINGKATAN HASIL PRODUKSI
HASIL PETERNAKAN UNGGULAN DAERAH
PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 15 Okt 2019 - 24 Okt 2019

PROGRES PEKERJAAN
BOBOT S/D Bulan Lalu Bulan Ini S/D Bulan Ini
NO JENIS PEKERJAAN SAT VOLUME (%) Prestasi Bobot Prestasi Bobot Prestasi Bobot
Volume % % Volume % % Volume % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A PEMBANGUNAN KANDANG AYAM
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Ls 1.00 1.35 1.00 100.00 1.35 - - - 1.00 100.00 1.35
2 Pengukuran dan Pemasangan Bouwplank Ls 1.00 1.05 1.00 100.00 1.05 - - - 1.00 100.00 1.05
II PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Pondasi M³ 6.84 0.17 6.84 100.00 0.17 - - - 6.84 100.00 0.17
2 Pek.Pondasi Batu Kosong M³ 6.84 2.29 6.84 100.00 2.29 - - - 6.84 100.00 2.29
3 Pek.Pondasi Batu Kali M³ 12.96 6.32 12.96 100.00 6.32 - - - 12.96 100.00 6.32
4 Pek.Pondasi Rolak Batah M² 7.704 0.27 7.70 100.00 0.27 - - - 7.70 100.00 0.27
5 Pek. Timbunan Sirtu di Bawah Lantai Bangunan M³ 79.18 6.06 79.18 100.00 6.06 - - - 79.18 100.00 6.06
III PEKERJAAN BETON
1 Pek. Rabat Beton Keliling 1 PC: 3PS :3KR (Tebal 10 Cm) M³ 8.77 4.75 8.77 100.00 4.75 - - - 8.77 100.00 4.75
2 Pek. Lantai Beton 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 5.43 2.94 5.43 100.00 2.94 - - - 5.43 100.00 2.94
3 Pek.Saluran Keliling Beton M' 45.68 3.24 45.68 100.00 3.24 - - - 45.68 100.00 3.24
IV PEKERJAAN KAYU
1 Pasangan Kolom Kayu Kelas I 2x5/10 M³ 0.40 0.91 0.40 100.00 0.91 - - - 0.40 100.00 0.91
2 Pas.Ring Balok Kayu Kelas I 5/10 M³ 0.12 0.27 0.12 100.00 0.27 - - - 0.12 100.00 0.27
3 Pas. Konstruksi Kuda-Kuda Kayu Kelas I 5/10 M³ 0.68 1.55 0.68 100.00 1.55 - - - 0.68 100.00 1.55
4 Pas. Konstruksi Gording Kayu Kelas I 5/10 M³ 1.21 2.36 1.21 100.00 2.36 - - - 1.21 100.00 2.36
5 Pas.Dinding Kawat Harmonika + Rangka Ky Kls I M² 95.00 4.28 95.00 100.00 4.28 - - - 95.00 100.00 4.28
6 Pas.Pintu Harmodika Raka Kayu Besi M² 2.20 0.10 2.20 100.00 0.10 - - - 2.20 100.00 0.10
Pas. Engsel Pintu Bh 6.00 0.12 6.00 100.00 0.12 - - - 6.00 100.00 0.12
7 Pas.Kunci Slot Pintu Lengkap Gembok Bh 2.00 0.23 2.00 100.00 0.23 - - - 2.00 100.00 0.23
8 Dudukan Kandang Batrei M³ 1.22 2.78 1.22 100.00 2.78 - - - 1.22 100.00 2.78
9 Pas. Listplank 2/20 Kayu Kelas I M' 50.40 1.83 50.40 100.00 1.83 - - - 50.40 100.00 1.83
V PEKERJAAN PENUTUP ATAP
1 Pas. Atap Spandek 0.3 M² 181.74 17.81 181.74 100.00 17.81 - - - 181.74 100.00 17.81
2 Pas. Nok Seng M' 15.17 0.22 15.17 100.00 0.22 - - - 15.17 100.00 0.22
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG
1 Tanggki Air Obat 20 L Unit 4.00 0.98 4.00 100.00 0.98 - - - 4.00 100.00 0.98
2 Pipa Intalasi PVC 1/2'' + Nipel + Aksesories Lainnya Ls 1.00 4.17 1.00 100.00 4.17 - - - 1.00 100.00 4.17
3 Pipa Tempat Pakan Ls 1.00 1.23 1.00 100.00 1.23 - - - 1.00 100.00 1.23
4 kandang Batrey Set 63.00 5.87 63.00 100.00 5.87 - - - 63.00 100.00 5.87
VII PEKERJAAN SUMUR BOR
1 Sumur Bor + Pipa GIP 2" Anti Karat + Pipa Penyedot PVC 3/4", Dalam = 20 m Ls 1.00 8.83 1.00 100.00 8.83 - - - 1.00 100.00 8.83
2 Pompa Air Otomatis Unit 1.00 1.57 1.00 100.00 1.57 - - - 1.00 100.00 1.57
3 Tower Air T = 3.5 m Rangka Besi Siku + Cor Beton Tumbuk 2m x 2m Unit 1.00 3.92 1.00 100.00 3.92 - - - 1.00 100.00 3.92
4 Tanggki Air 1100 L Unit 1.00 0.86 1.00 100.00 0.86 - - - 1.00 100.00 0.86
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir Ls 1.00 1.23 - - - 1.00 100.00 1.23 1.00 100.00 1.23
2 Pek.Cor Beton Jalan Masuk 1 PC: 2PS :3KR (Tebal 10 Cm) M³ 4.36 2.36 - - - 4.36 100.00 2.36 4.36 100.00 2.36
3 Foto Dokumentasi Dan Pelaporan Ls 1.00 1.23 - - - 1.00 100.00 1.23 1.00 100.00 1.23
0.00 - - - - 100.00 - - 100.00 -
B INSTALASI LISTRIK
I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Bh 14.00 1.46 8.40 60.00 0.88 5.60 40.00 0.58 14.00 100.00 1.46
2 Lampu Sorot Bh 2.00 1.39 1.20 60.00 0.84 0.80 40.00 0.56 2.00 100.00 1.39
3 Pas. Saklar Ganda Ttk 2.00 0.16 1.20 60.00 0.10 0.80 40.00 0.06 2.00 100.00 0.16
4 Pas. Stop Kontak Ttk 1.00 0.09 0.60 60.00 0.06 0.40 40.00 0.04 1.00 100.00 0.09
5 Pas. MCB Bh 1.00 0.08 0.60 60.00 0.05 0.40 40.00 0.03 1.00 100.00 0.08
6 Genset Ls 1.00 3.68 - - - 1.00 100.00 3.68 1.00 100.00 3.68
TOTAL 100 90.23 9.77 100.00
RENCANA : 100.00 %
REAL : 100.00 %
DEVIASI (±) : 0.00 % `

Disetujui Diperiksa Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana
(PPTK) CV.HARVEY MANDIRI CV. CAHAYA PUTRA PAPUA

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA KARLINDA WESAREYAK


Nip. 19721217 200605 2 003 Site Supervisi Direktur
TIME SCHEDULE BULAN KE.06
CV. CAHAYA PUTRA PAPUA
INSTANSI : DINAS PETERNAKAN DAN KESEHATAN HEWAN
KEGIATAN : PROMOSI ATAS HASIL PRODUKSI PETERNAKAN UNGGULAN DAERAH
PENINGKATAN PEMASARAN HASIL PRODUKSI PETERNAKAN
PROGRAM :
PEKERJAAN : PEMBANGUANAN KANDANG AYAM 500 EKOR 2 UNIT DAN PENGADAAN INSTALASI LISTRIK KANDANG
LOKASI : KAMPUNG TIMIKA JAYA ,JALUR 5,DISTRIK MIMIKA BARU,SP2
THN ANGGARAN : 2019
PERIODE : 15 Okt 2019 - 24 Okt 2019

150 (Seratus Lima Puluh) Hari Kalender


I II III IV V
RENC.
No URAIAN PEKERJAAN BOBOT 28 Mei1 2019 2 3 4 5 6 7
04 Juni 2019 11 Juni 2019 18 Juni 2019 25 Juni 2019 02 Juli 2019 09 Juli 2019
8
16 Juli 2019
9
23 Juli 2019
10
30 Juli 2019
11 12 13 14 15 16 17 18 19

(%) - - - - - - - - -06 Ags 2019 13 Ags 2019 20 Ags 2019 27 Ags 2019 03 Sep 2019 10 Sep 2019 17 Sep 2019 24 Sep 2019 01 Okt 2019
REAL. -
- - - - - - - - -
26 02
03 Juni 10 Juni 2019 17 Juni 2019 24 Juni 2019 01 Juli 2019 08 Juli 2019 15 Juli 2019 22 Juli 2019 29 Juli 2019 05 Ags 2019 12 Ags 2019 19 Ags 2019 Ags 2019 Sep 2019 09 Sep 2019 16 Sep 2019 23 Sep 2019 30 Sep 2019 07 Okt 2019
2019

A PEMBANGUNAN KANDANG AYAM

I PEKERJAAN PERSIAPAN 2.40 Renc. 2.40


Real. 2.40
II PEKERJAAN TANAH DAN PONDASI 15.09 Renc. 3.77 3.77 3.77 3.77
Real. 0.05 4.30 3.79 3.93 3.03
III PEKERJAAN BETON 10.93 Renc. 5.46 5.46
Real. 4.13 2.85 3.95
IV PEKERJAAN KAYU 14.43 Renc. 2.89 2.89 2.89 2.89 2.89
Real. 6.01 0.92 3.42 4.08
V PEKERJAAN PENUTUP ATAP 18.03 Renc. 3.61 3.61 3.61 3.61 3.61
Real. 7.30 2.67 3.56 2.67 1.82 0.98
VI PEKERJAAN INSTALASI DAN PERLENGKAPAN KANDANG 12.25 Renc. 2.45 2.45 2.45 2.45 2.45
Real. 2.08 2.08 2.40 2.35 2.35
VII PEKERJAAN SUMUR BOR 15.18 Renc. 5.06
Real. 8.83
VIII PEKERJAAN LAIN-LAIN 4.82 Renc.
Real.
B INSTALASI LISTRIK

I PEKERJAAN INSTALASI LISTRIK 6.87 Renc. 3.43


Real.

JUMLAH 100.00
RENC.
2.40 3.77 3.77 3.77 9.24 8.35 2.89 2.89 2.89 6.49 3.61 3.61 3.61 3.61 2.45 2.45 2.45 2.45 10.94
KUM.
Rencana : 0.00
2.40 6.18 9.95 13.72 22.96 31.31 34.20 37.09 39.97 46.47 50.07 53.68 57.28 60.89 63.34 65.79 68.24 70.69 81.63
REAL.
2.45 4.30 3.79 3.93 9.04 8.22 2.67 3.56 2.67 5.95 3.83 3.95 3.42 4.08 2.08 2.08 2.40 2.35 11.18
KUM.
0.00
2.45 6.75 10.54 14.47 23.51 31.73 34.40 37.96 40.63 46.58 50.41 54.36 57.79 61.87 63.95 66.04 68.44 70.79 81.97
DEVIASI
Realisasi : ( +/- ) 0.05 0.57 0.59 0.74 0.55 0.41 0.20 0.88 0.66 0.11 0.34 0.69 0.50 0.98 0.62 0.25 0.20 0.10 0.34
`

Disetujui Diperiksa

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas

(PPTK) CV.HARVEY MANDIRI

MERRY CHRISTINE WAKUM,S.PE.M.Si. DOMINGGUS RANDA


Nip. 19721217 200605 2 003 Site Supervisi
HEDULE BULAN KE.06
HAYA PUTRA PAPUA

150 (Seratus Lima Puluh) Hari Kalender


V VI
20 21 22
08 Okt 2019 15 Okt 2019 22 Okt 2019 KET
- - -
21
14 Okt 2019 Okt 2019 24 Okt 2019

100

90

80

70

60

50

40
5.06 5.06
6.35
30
2.41 2.41
2.98 1.84
20

10
3.43
1.91 4.95 0

8.49 7.47 2.41

90.12 97.59 100.00

8.26 7.93 1.84

90.23 98.16 100.00

0.11 0.57 -

Dibuat

Kontraktor Pelaksana

CV. CAHAYA PUTRA PAPUA

KARLINDA WESAREYAK
Direktur