PEKERJAAN : PEKERJAAN PERENCANAAN PEMBANGUNAN UPT LABORATORIUM DAN PELAYANAN KESEHATAN DAERAH
A B C
I PEKERJAAN PERSIAPAN Rp. 206,676,251.58
II PEKERJAAN STRUKTUR Rp. 1,082,760,555.64
III PEKERJAAN ARSITEKTUR Rp. 1,196,835,910.58
IV PEKERJAAN PLUMBING Rp. 38,101,135.19
V PEKERJAAN ELEKTRIKAL Rp. 178,329,023.20
A. REAL COST Rp. 2,702,702,876.20
B. PAJAK PERTAMBAHAN NILAI (PPn) 11% x A Rp. 297,297,316.38
C. JUMLAH (A + B) Rp. 3,000,000,192.58
D. DIBULATKAN Rp. 3,000,000,000.00
I. PEKERJAAN PERSIAPAN
1 Sewa Pagar sementara dari seng gelombang tinggi 2 meter m' 199.6 198,482.08 39,617,022.2
2 Papan Nama Proyek ls 1.0 500,000.00 500,000.0
3 Penyediaan Air Kerja ls 1.0 8,000,000.00 8,000,000.0
4 Penyediaan Listrik Kerja ls 1.0 15,000,000.00 15,000,000.0
5 Pekerjaan sewa direksikeet m² 9.0 673,247.71 6,059,229.4
6 Perijinan, Dokumentasi dan Administrasi ls 1.0 12,000,000.00 12,000,000.0
7 Pekerjaan Keamanan Kesehatan dan Keselamatan Kerja (K3) ls 1.0
- Penyiapan RK3K ls 1.0 650,000.00 650,000.0
- Sosialisasi dan Promosi K3 ls 1.0 4,950,000.00 4,950,000.0
- Alat Pelindung Kerja ls 1.0 59,280,000.00 59,280,000.0
- Alat Pelindung Diri ls 1.0 24,050,000.00 24,050,000.0
- Asuransi ls 1.0 4,800,000.00 4,800,000.0
- Personil ls 1.0 17,000,000.00 17,000,000.0
- Fasilitas Sarana Kesehatan ls 1.0 1,750,000.00 1,750,000.0
- Rambu-rambu ls 1.0 3,400,000.00 3,400,000.0
- Konsultasi Tenaga Ahli ls 1.0 5,000,000.00 5,000,000.0
- Lain-lain Terkait Pengendalian Resiko K3 ls 1.0 4,620,000.00 4,620,000.0
JUMLAH I.PEKERJAAN PERSIAPAN 206,676,251.6
II. PEKERJAAN STRUKTUR
2.3. PEKERJAAN STRUKTUR ATAS
2.3.1. LANTAI 2
1 KOLOM TYPE K1
- Besi BJTD 40 = fy : 400 Mpa kg 9,091.9 18,938.3 172,185,470.9
- Bekisting kolom Multipleks m² 200.0 289,094.0 57,818,805.0
- Beton K-300 : fc' = 24.9 Mpa m³ 25.0 2,032,470.0 50,811,750.0
2 KOLOM TYPE KT
- Besi BJTD 40 = fy : 400 Mpa kg 48.1 18,938.3 911,706.3
- Bekisting kolom Multipleks m² 2.4 289,094.0 693,825.7
- Beton K-300 : fc' = 24.9 Mpa m³ 0.2 2,032,470.0 365,844.6
3 PEKERJAAN TANGGA
1 Pek. Anak Tangga
- Beton K-300 : fc' = 24.9 Mpa m³ 0.7 2,032,470.0 1,426,793.9
- Besi BJTD 40 = fy : 400 Mpa kg 154.7 18,938.3 2,929,700.0
- Bekisting Multiplek m² 5.8 392,679.7 2,261,834.8
2 Pek. Plat Lantai + Bordes T = 120 mm
- Beton K-300 : fc' = 24.9 Mpa m³ 1.5 2,032,470.0 2,956,512.2
- Besi BJTD 40 = fy : 400 Mpa kg 627.7 18,938.3 11,887,365.5
- Bekisting Lantai Multipleks m² 15.3 351,794.0 5,386,529.4
3 Pek. Balok bordes type BT
- Beton K-300 : fc' = 24.9 Mpa m³ 0.7 2,032,470.0 1,353,625.0
- Besi BJTD 40 = fy : 400 Mpa kg 129.3 18,938.3 2,449,328.2
- Bekisting Balok Multiplek m² 3.3 294,815.4 966,994.5
d. TOP FLOOR
1 Waterproofing Membran Sheet m² 591.3 171,000.0 101,115,720.0
7,468,250
V. PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
a. LANTAI 2
1 Panel
* SDP-LT.01 unit 1 9,171,777 9,171,777
* LP-PLT.01 unit 1 5,040,393 5,040,393
* PP-AC.LT.01 unit 1 4,175,133 4,175,133
* PP-EF unit 1 1,816,983 1,816,983
2 Kabel Feeder
* Dari MDP Ke :
SDP LT.01 Kabel NYY 4 X 50 mm2 m' 5 207,820 1,039,100
* Dari SDP-LT.01 Ke :
* LP. Penerangan Lt.1 Kabel NYY 4 x 6 mm2 m' 285 78,177 22,280,516
* PP. Stop Kontak Lt.1 Kabel NYY 4 x 6 mm3 m' 228 78,177 17,824,412
* Kabel ke indoor unit ac Kabel NYM 3x6 mm2 m' 228 61,587 14,041,797
280
280
370
370
730
730
2080
2080
700
700
370
370
1
SKALA: 1 : 150
3100
460 730 720 730 460
280
280
370
370
730
730
2080
2080
700
700
1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150