REKAPITULASI ANGGARAN BIAYA

ESTIMASI ENGINEER (EE)

PEKERJAAN : PEKERJAAN PERENCANAAN PEMBANGUNAN UPT LABORATORIUM DAN PELAYANAN KESEHATAN DAERAH

LOKASI : JLN. WIJAYA KUSUMA RAYA NO. 2 MAKASSAR


TAHUN ANGGARAN : 2023

NO ITEM PEKERJAAN JUMLAH

A B C
I PEKERJAAN PERSIAPAN Rp. 206,676,251.58
II PEKERJAAN STRUKTUR Rp. 1,082,760,555.64
III PEKERJAAN ARSITEKTUR Rp. 1,196,835,910.58
IV PEKERJAAN PLUMBING Rp. 38,101,135.19
V PEKERJAAN ELEKTRIKAL Rp. 178,329,023.20
A. REAL COST Rp. 2,702,702,876.20
B. PAJAK PERTAMBAHAN NILAI (PPn) 11% x A Rp. 297,297,316.38
C. JUMLAH (A + B) Rp. 3,000,000,192.58
D. DIBULATKAN Rp. 3,000,000,000.00

TERBILANG : Tiga Milyar Rupiah.


RINCIAN RENCANA ANGGARAN BIAYA
PEKERJAAN PERENCANAAN PEMBANGUNAN UPT LABORATORIUM DAN PELAYANAN KESEHATAN DAERAH SULAWESI SELATAN
PEKERJAAN STANDAR
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Sewa Pagar sementara dari seng gelombang tinggi 2 meter m' 199.6 198,482.08 39,617,022.2
2 Papan Nama Proyek ls 1.0 500,000.00 500,000.0
3 Penyediaan Air Kerja ls 1.0 8,000,000.00 8,000,000.0
4 Penyediaan Listrik Kerja ls 1.0 15,000,000.00 15,000,000.0
5 Pekerjaan sewa direksikeet m² 9.0 673,247.71 6,059,229.4
6 Perijinan, Dokumentasi dan Administrasi ls 1.0 12,000,000.00 12,000,000.0
7 Pekerjaan Keamanan Kesehatan dan Keselamatan Kerja (K3) ls 1.0
- Penyiapan RK3K ls 1.0 650,000.00 650,000.0
- Sosialisasi dan Promosi K3 ls 1.0 4,950,000.00 4,950,000.0
- Alat Pelindung Kerja ls 1.0 59,280,000.00 59,280,000.0
- Alat Pelindung Diri ls 1.0 24,050,000.00 24,050,000.0
- Asuransi ls 1.0 4,800,000.00 4,800,000.0
- Personil ls 1.0 17,000,000.00 17,000,000.0
- Fasilitas Sarana Kesehatan ls 1.0 1,750,000.00 1,750,000.0
- Rambu-rambu ls 1.0 3,400,000.00 3,400,000.0
- Konsultasi Tenaga Ahli ls 1.0 5,000,000.00 5,000,000.0
- Lain-lain Terkait Pengendalian Resiko K3 ls 1.0 4,620,000.00 4,620,000.0
JUMLAH I.PEKERJAAN PERSIAPAN 206,676,251.6
II. PEKERJAAN STRUKTUR
2.3. PEKERJAAN STRUKTUR ATAS
2.3.1. LANTAI 2
1 KOLOM TYPE K1
- Besi BJTD 40 = fy : 400 Mpa kg 9,091.9 18,938.3 172,185,470.9
- Bekisting kolom Multipleks m² 200.0 289,094.0 57,818,805.0
- Beton K-300 : fc' = 24.9 Mpa m³ 25.0 2,032,470.0 50,811,750.0
2 KOLOM TYPE KT
- Besi BJTD 40 = fy : 400 Mpa kg 48.1 18,938.3 911,706.3
- Bekisting kolom Multipleks m² 2.4 289,094.0 693,825.7
- Beton K-300 : fc' = 24.9 Mpa m³ 0.2 2,032,470.0 365,844.6
3 PEKERJAAN TANGGA
1 Pek. Anak Tangga
- Beton K-300 : fc' = 24.9 Mpa m³ 0.7 2,032,470.0 1,426,793.9
- Besi BJTD 40 = fy : 400 Mpa kg 154.7 18,938.3 2,929,700.0
- Bekisting Multiplek m² 5.8 392,679.7 2,261,834.8
2 Pek. Plat Lantai + Bordes T = 120 mm
- Beton K-300 : fc' = 24.9 Mpa m³ 1.5 2,032,470.0 2,956,512.2
- Besi BJTD 40 = fy : 400 Mpa kg 627.7 18,938.3 11,887,365.5
- Bekisting Lantai Multipleks m² 15.3 351,794.0 5,386,529.4
3 Pek. Balok bordes type BT
- Beton K-300 : fc' = 24.9 Mpa m³ 0.7 2,032,470.0 1,353,625.0
- Besi BJTD 40 = fy : 400 Mpa kg 129.3 18,938.3 2,449,328.2
- Bekisting Balok Multiplek m² 3.3 294,815.4 966,994.5

2.3.2. TOP FLOOR


1 BALOK TYPE B1
- Besi BJTD 40 = fy : 400 Mpa kg 14,624.5 18,938.3 276,962,228.0
- Bekisting Balok Multipleks m² 227.0 294,815.4 66,932,677.3
- Beton K-300 : fc' = 24.9 Mpa m³ 46.1 2,032,470.0 93,615,568.2
2 BALOK TYPE B2
- Besi BJTD 40 = fy : 400 Mpa kg 3,791.1 18,938.3 71,796,099.3
- Bekisting Balok Multipleks m² 109.6 294,815.4 32,320,612.3
- Beton K-300 : fc' = 24.9 Mpa m³ 13.1 2,032,470.0 26,625,357.0
3 PLAT LANTAI BONDEK T=12 cm
- Beton K-300 : fc' = 24.9 Mpa m³ 40.0 2,032,470.0 81,254,695.4
- Besi Wiremesh M10-150 m² 591.0 130,600.8 77,185,072.8
- Plat Bondek t-0.75 mm CTC m² 129.0 322,962.5 41,662,159.3
1,082,760,555.6
III. PEKERJAAN ARSITEK
3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
a. LANTAI 2
1 Memasang dinding bata ringan 200 x 600 x 100 m² 591.0 156,851.6 92,699,303.0
2 Membuat plesteran semen instan m² 1,853.7 68,210.3 126,443,216.1
3 Membuat acian semen instan m² 1,853.7 51,105.7 94,736,001.0
4 Opening pintu & jendela m' 351.3 19,687.1 6,915,503.8
5 Kolom praktis 10/10 cm m³ 3.8 7,085,226.0 26,940,863.4
6 Balok praktis 10/15 cm m³ 1.4 5,643,167.0 7,707,155.4

JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 355,442,042.7


3.2. PEKERJAAN PASANGAN LANTAI
a. LANTAI 2
1 Memasang lantai homogeneous tile uk. 60 x 60 cm m² 535.3 299,933.4 160,560,361.1
2 Memasang lantai Unpolished tile uk. 30 x 30 cm m² 56.0 261,397.9 14,638,282.1

d. TOP FLOOR
1 Waterproofing Membran Sheet m² 591.3 171,000.0 101,115,720.0

JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI 276,314,363.2


3.3. PEKERJAAN PASANGAN PLAFOND
a. LANTAI 2
1 Pemasangan Plafond GRC board tebal 6 mm + Rangka m² 591.3 118,900.4 70,308,183.7
2 Pemasangan List Plafond m' 309.0 31,354.1 9,688,424.6
3 Pengecatan plafond interior (emultion) m² 591.3 32,148.6 19,010,110.2
4 Pengecatan List plafond interior (emultion) m² 309.0 32,148.6 9,933,917.4
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)

JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND 108,940,635.9


3.4. PEKERJAAN PASANGAN PINTU DAN JENDELA
a. LANTAI 2
PINTU
1 Kusen dan Pintu Type P1 unit 16.0 6,293,820.4 100,701,125.8
2 Kusen dan Pintu Type P2 Uk. 2x800x2100 mm unit 10.0 8,679,827.6 86,798,275.6
3 Kusen dan Pintu Type PS Pabrikasi Uk. 600x600 mm unit 10.0 1,981,633.5 19,816,335.0

JENDELA DAN VENTILASI


1 Type J1 unit 2.0 8,549,510.3 17,099,020.7
2 Type J2 unit 4.0 6,672,516.4 26,690,065.6
3 Type J3 unit 4.0 1,526,373.7 6,105,494.6
4 Type V1 unit 2.0 1,080,879.5 2,161,759.0

JUMLAH 3.4. 259,372,076.3

3.5. PEKERJAAN PASANGAN SANITAIR


a. LANTAI 2
1 Kloset duduk lengkap dengan aksesoris bh 6.0 3,878,306.3 23,269,837.8
2 Wastafel Pedestal + kran lengkap dengan aksesoris bh 5.0 1,606,286.0 8,031,430.0
3 Wastafel Top Mount + kran lengkap dengan aksesoris bh 2.0 2,559,888.1 5,119,776.2
4 Scrub Station 1 Person + kran lengkap dengan aksesoris bh 2.0 29,700,000.0 59,400,000.0
5 Spoelhoek bh 2.0 7,809,340.0 15,618,680.0
5 Kaca cermin 5 mm bevel m² 0.9 279,798.8 251,818.9
6 Jet washer set 6.0 464,685.4 2,788,112.3
7 Tisue holder bh 6.0 114,223.7 685,342.4
8 Floor drain bh 7.0 211,852.9 1,482,970.0
11 Kran air unit 6.0 44,658.1 267,948.5
12 Towel bar stainless steel bh 6.0 339,928.1 2,039,568.3

JUMLAH 3.5.PEKERJAAN PASANGAN SANITAIR 118,955,484.2

3.6. PEKERJAAN PENGECATAN


a. LANTAI 2
1 Pengecatan dinding interior (emultion) m² 591.3 32,148.6 19,010,110.2
2 Pengecatan dinding eksterior (wheathershield) m² 591.3 40,924.4 24,199,419.5

JUMLAH 3.6.PEKERJAAN PENGECATAN 43,209,529.6

3.7. PEKERJAAN RAILLING DAN HAND RAILLING


a. LANTAI 2
1 Railing tangga m' 18.6 1,042,387.5 19,336,288.1
- ∅ 2" Timber Handrail W/. Clear Stained Finished
- ∅ 20 mm Stainless Steel Railing W/. Black Matt Paint Finished
- 2 X (10x80) mm Thick Stainless Steel Plate Railing W/. Black Matt Paint Finished
2 Railing tangga Darurat m' 18.6 822,937.5 15,265,490.6
- ∅ 2" Timber Handrail W/. Clear Stained Finished
- BSP ∅ 2" W/. Synthetic Enamel Paint Finished
- BSP ∅ 1" W/. Synthetic Enamel Paint Finished

JUMLAH 3.7.PEKERJAAN RAILLING DAN HAND RAILLING 34,601,778.8

IV. PEKERJAAN PLUMBING


4.1. INSTALASI AIR BERSIH
a. LANTAI 2
1 Pemipaan:
* Pipa PPr PN10 Dia. 50 mm Setara Dia. 1.1/2" m' 14.0 93,634.2 1,310,878.8
* Pipa PPr PN10 Dia. 32 mm Setara Dia. 1" m' 81.5 45,525.2 3,710,299.7
* Pipa PPr PN10 Dia. 20 mm Setara Dia. 1/2" m' 90.6 22,186.5 2,010,098.6
3 Gate Valve
* Gate Valve 5K Dia. 32 mm Setara Dia. 1" bh 1.0 281,853.0 281,853.0
4 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1.0 155,119.6 155,119.6

7,468,250

4.3. INSTALASI AIR KOTOR


a. LANTAI 2
1 Pemipaan:
* Pipa PVC AW Dia. 4" m' 190 139,887 26,536,564
* Pipa PVC AW Dia. 3" m' 14 105,705 1,479,874
* Pipa PVC AW Dia. 2" m' 20 74,684 1,523,546
2 Floor Clean Out
* Clean Out Dia. 4" bh 4 225,473 901,890
3 Fitting & Material Bantu 35% Dari Harga Pipa (SNI) lot 1 191,012 191,012

JUMLAH 4.3.INSTALASI AIR KOTOR 30,632,885

V. PEKERJAAN ELEKTRIKAL
5.1. PEKERJAAN PANEL DAN KABEL FEEDER
a. LANTAI 2
1 Panel
* SDP-LT.01 unit 1 9,171,777 9,171,777
* LP-PLT.01 unit 1 5,040,393 5,040,393
* PP-AC.LT.01 unit 1 4,175,133 4,175,133
* PP-EF unit 1 1,816,983 1,816,983
2 Kabel Feeder
* Dari MDP Ke :
SDP LT.01 Kabel NYY 4 X 50 mm2 m' 5 207,820 1,039,100
* Dari SDP-LT.01 Ke :
* LP. Penerangan Lt.1 Kabel NYY 4 x 6 mm2 m' 285 78,177 22,280,516
* PP. Stop Kontak Lt.1 Kabel NYY 4 x 6 mm3 m' 228 78,177 17,824,412
* Kabel ke indoor unit ac Kabel NYM 3x6 mm2 m' 228 61,587 14,041,797

JUMLAH 5.1.PEKERJAAN PANEL DAN KABEL FEEDER 75,390,110


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
5.1. PEKERJAAN INSTALASI PENERANGAN DAN DAYA STOP KONTAK
a. LANTAI 2
* Lampu RMO TL LED G13 2x18 Watt set 34 495,391 16,843,284
* Lampu Ceiling Light Santos G10 LED 20 WATT set 14 293,266 4,105,720
* Lampu SOROT AMAR SON-T E40150 WATT 3 WATT set 7 4,430,476 31,013,330
* Saklar Ganda bh 20 61,097 1,221,937
* Saklar Tunggal bh 17 58,902 1,001,340
* Stop Kontak bh 44 58,244 2,562,736
* Instalasi Penerangan ttk 48 430,923 20,684,284
* Instalasi Stop Kontak ttk 44 430,923 18,960,594
* Pipa Konduit Penerangan di dinding m' 72 34,307 2,470,071
* Pipa Konduit Stop Kontak di dinding m' 119 34,307 4,075,617

JUMLAH 5.1.PEKERJAAN INSTALASI PENERANGAN DAN DAYA STOP KONTAK 102,938,914


3100
460 730 720 730 460

280
280

370
370

730
730

2080
2080

700
700

370
370

460 730 720 730 460


3100

1
SKALA: 1 : 150
3100
460 730 720 730 460

280
280

370
370

730
730

2080
2080

700
700

460 730 720 730 460


3100

1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150
1
SKALA: 1 : 150