Rab Pelatihan PP Berbasis Masyarakat
Rab Pelatihan PP Berbasis Masyarakat
Jumlah 9,525,000
URAIAN
VOLUME HRG SATUAN JUMLAH BIAYA
A RAPAT PERSIAPAN
Konsumsi Rapat Persiapan
1 Makan 8 orang 1 Hari 20,000 160,000
2 Snack 8 orang 1 Hari 10,000 80,000
B BELANJA BAHAN
1 Seminar Kit* 40 orang 1 Paket 35,000 1,400,000
2 Materi Pelatihan 40 orang 1 Paket 50,000 2,000,000
3 Dokumentasi LS 300,000
4 Pelaporan 2 Bundel 250,000
5 Spanduk 1 150,000
6 Kertas Plano 1 Rim 400,000
7 Spidol Kecil 5 Lusin 1 15,000 75,000
8 Spidol Besar 45 Bh 1 8,000 360,000
9 Kertas Meta Plan 40 Lmbr 1 3,000 120,000
10 Lakban Kertas 5 bh 1 15,000 75,000
11 Lem Sprey (Semprot) 1 bh 1 150,000 150,000
12 Sertifikat 40 lmbr 1 25,000 1,000,000
13 Kaos 50 bh 1 50,000 2,500,000
D BELANJA SEWA
1 Sewa Infocus 1 Unit 2 Hari 100,000 200,000
2 Sewa Audio/Spiker 1 Unit 2 Hari 150,000 300,000
3 Sewa Gedung 1 2 Hari 500,000 1,000,000
(……………………………)
__________________________
_____________________
SYARAKAT
KETERANGAN
SEMINAR KIT:
35 ID Peserta 5,000 175,000
35 pulpen 2,000 70,000
35 patlot 1,500 52,500
35 penggaris 3,000 105,000
35 penghapus 1,000 35,000
35 block note 7,500 262,500
35 bag map 15,000 525,000
35,000 1,050,000
TIM 11
KADES 1
SEKDES 1
LPM 1
ANGGOTA : KADUS 2
KPMD 2
TOMAS 1
LPM 2
PERANGKAT DESA 1
11
MATERI 1. Peran lembaga Desa dalam Perencanaan Pembangunan
2. Pemberdayaan Masyarakat
3. Keuangan Desa
4. Praktek Proses Penyusunan
RPJMdesa/RKPDESA
__________________________
Narsum
Pemdes Dinas PMD
PM Dinas PMD
DPPKAD
PD