DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M³ 71.740,00 52,20 3.744.828,00 0,23 - - - - - - - - -
2.2.(1) Pasangan Batu dengan Mortar M³ 1.821.910,00 29,70 54.110.727,00 3,31 - - - - - - - - -
DIVISI 7. STRUKTUR
7.1 (7) a Beton strukur, fc’20 MPa M³ 4.250.530,00 5,63 23.930.483,90 1,47 - - - - - - - - -
7.1 (8) Beton , fc’15 Mpa (Bahu Jalan) M³ 2.811.220,00 39,00 109.637.580,00 6,71 - - - - - - - - -
7.3.(1) Baja Tulangan Polos BjTP 280 Kg 25.060,00 952,79 23.876.917,40 1,46 - - - - - - - - -
7.9.(1) Pasangan Batu M³ 1.785.600,00 25,68 45.854.208,00 2,81 - - - - - - - - -
Halaman 9a