CK Boyolali
RENCANA ANGGARAN BIAYA
( EE)
KEGIATAN :
TAHUN ANGGARAN
2019
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : PEMELIHARAAN PASAR WONOSEGORO
LOKASI : Desa Sudimoro
ANGGARAN : 2019
JUMLAH #NAME?
DIBULATKAN #NAME?
Dibulatkan #NAME?
Terbilang : Seratus Empat Puluh Delapan Juta Dua Ratus Lima Puluh Sembilan Ribu Rupiah
Boyolali, 2018
Menyetujui, Menyetujui, Dibuat Oleh
KABID PENGELOLAAN KASI PENDAPATAN DAN PENAGIHAN Boyolali, ……………………2019
DAN PENDAPATAN PERDAGANGAN
Mengetahui, Disusun Oleh,
KEPALA DINAS PERDAGANGAN DAN PERINDUSTRIAN PT. Krida Karya Advisory
KABUPATEN BOYOLALI
114,283,744.00
143,110,000.00
134,285,000.00
BACK UP VOLUME REHAP PASAR WONOSEGORO Luas 48
C PEKERJAAN SALURAN + GRILL BESI Volume Sat Ket Panjang Tinggi 1 Tinggi 2 Lebar 14.010
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 9.444 m2 2.00 4.85 0.400 0.700 0.600 1.601
3.00 24.90 0.400 0.650 0.600 7.844
E PEKERJAAN PASANGAN BATA DIATAS TALUD +PEMIPAAN Volume Sat Ket Panjang Tinggi Volume
1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 2.757 m2 18.38 0.150 2.757
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 814,022.33
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank m' Err:509
3 A.2.2.1.5 Pembuatan Kantor Sementara dg Lantai Plesteran m2 Err:509
4 A.2.2.1.7 Pembuatan Gudang Semen dan Peralatan m2 Err:509
5 A.2.2.1.9 Membersihkan Lapangan dan Perataan m2 11,797.50
6 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu m2 Err:509
7 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm bh Err:509
8 A.2.2.1.13 Bongkaran Beton Bertulang m3 1,028,487.90
9 A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah m3 487,018.95
HITUNG PS1 Bongkaran Lantai Lama m2 20,418.75
1 HITUNG PS1 Bongkaran batu Kali m3 115,706.25
2 HITUNG PS2 Bongkaran Dinding 1/2 batu m2 15,427.50
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
7 A.4.6.1.7 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati) m2 Err:509
8 A.4.6.1.8 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) m2 Err:509
9 A.4.6.1.9 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II m2 Err:509
10 A.4.6.1.10 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II m2 Err:509
11 A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I m2 Err:509
12 A.4.6.1.12 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II m2 Err:509
13 A.4.6.1.13 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter m3 Err:509
14 A.4.6.1.14 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I m3 Err:509
15 A.4.6.1.15 Pemasangan konstruksi Gording, Kayu Klas II m3 Err:509
16 A.4.6.1.16 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II m2 Err:509
HITUNG KY1 Pemasangan Rangka Atap Genteng Keramik Reng Baru, Kayu Jati m2 Err:509
17 A.4.6.1.17 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II m2 Err:509
18 A.4.6.1.18 Pemasangan Rangka Atap Sirap, Kayu Klas II m2 Err:509
19 A.4.6.1.19 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III m2 Err:509
20 A.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III m2 Err:509
21 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II m' Err:509
22 A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' Err:509
23 A.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III m2 Err:509
24 A.4.6.1.24 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II m2 Err:509
25 A.4.6.1.25 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II m2 Err:509
26 A.4.6.1.26 Pemasangan Dinding Lambriziring dari Papan klas I m2 Err:509
27 A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 Err:509
28 A.4.6.1.28 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV m2 Err:509
HITUNG Pembuatan & Pemasangan Jalusi Kayu Klas I atau II m2 Err:509
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
A.4.1.1.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) m3 Err:509
A.4.1.1.32 Membuat Lantai Beton Bertulang (150 kg Besi + Bekisting) m3 Err:509
29 A.4.1.1.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) m3 Err:509
30 A.4.1.1.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) m3 Err:509
31 A.4.1.1.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm m' 82,945.83
32 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 113,221.79
HITUNG BT10 Memasang Waterproofing Plat Beton Membrane Bakar m2 120,084.25
HITUNG BT10a Memasang Waterproofing Plat Beton Membrane Bakar Bituline m2 219,991.75
HITUNG BT11 Membuat Grill Beton Bertulang K-225 Uk. 60x120x10 cm Unit 223,520.95
HITUNG BT12 Membuat Grill Beton Bertulang K-225 Uk. 60x130x10 cm Unit 232,965.08
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
4 A.5.1.1.5 Memasang Wastafel Seri CE-7 White Ex. Toto Unit 545,080.25
5 A.5.1.1.6 Pemasangan Bathcuip porselen Unit 1,071,039.75
6 A.5.1.1.7 Pemasangan Bak Fibreglass vol.1 m3 Unit 1,051,490.00
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit Err:509
8 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 372,468.25
HITUNG SN2 Memasang Shower Mandi Ex. SAN-EI Seri SK30P Unit 1,638,289.13
HITUNG SN3 Memasang Jet Washer Kloset Ex. Onda Unit 173,815.13
9 A.5.1.1.14 Pemasangan Floor Drain buah 99,222.75
10 A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh Err:509
HITUNG SN4 Pemasangan Soap Holder Unit 57,422.75
HITUNG SN5 Pemasangan Kran Air Leher Angsa Unit 154,972.13
12 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 809,949.80
HITUNG SN7 Pemasangan Bak Kontrol + Gril Besi Pas.Batu Bata 60x60 tinggi 100 cm bh 1,113,950.60
HITUNG SN Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 100 cm bh 932,737.30
13 A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½" m' 39,279.35
14 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" bh 107,141.38
15 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾" m' 45,417.35
16 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1" m' 51,896.35
17 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " m' 77,521.95
18 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" m' 126,856.40
19 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4" m' 391,131.40
20 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" m' 15,282.85
21 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" m' 21,608.40
22 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" m' 24,864.95
23 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½" m' 40,051.00
24 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" m' 62,710.45
25 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3" m' 81,965.40
26 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4" m' 128,000.40
27 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' 87,494.00
28 A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' 38,677.10
29 A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm m' 141,729.94
30 A.5.1.1.36 Pemasangan Pipa Beton Ø 100 cm m' 622,938.25
HITUNG SN6 Pemasangan Bak Kontrol Pas.Batu Bata 30 x 60 tinggi 60 cm Bh 404,974.90
HITUNG SN8 Pemasangan Saluran Beton U 30 cm tinggi 50cm m' 296,135.07
HITUNG SN9 Pemasangan Saluran Beton U 30 cm tinggi 30 cm m' 202,608.40
HITUNG SN10 Pemasangan Pipa Beton Ø 30 cm m' 152,383.44
HITUNG SN11 Pemasangan Saluran Batu Bata U 20 cm m' 258,797.24
HITUNG SN12 Pemasangan Saluran Batu Bata U 15 cm m' 114,744.79
1 HITUNG SN13 Pemasangan Septictank dan Peresapan Unit 5,018,594.56
HITUNG SN14 Memasang Watertank Kapasitas 2.000 liter ex. Penguin TP 200 Unit 10,346,105.00
HITUNG SN15 Memasang Pompa Air ex. Shimizu PS 130 BIT Unit 860,612.50
HITUNG SN16 Pek. Roof Tank 1050 Ltr ( Ex. Penguin ) + Pompa Air (ex. Shimizu 125 ) Unit 2,524,520.90
HITUNG SN17 Pemasangan Pipa PVC tipe AW Ø 3/4" m' 18,308.40
HITUNG SN18 Pemasangan Pipa PVC tipe AW Ø 2" m' 36,524.40
2 HITUNG SN19 Pemasangan Pipa PVC tipe AW Ø 3" m' 63,089.40
HITUNG SN20 Pemasangan Pipa PVC tipe AW Ø 4" m' 97,244.40
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
13 A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds m2 166,694.0
14 A.4.2.1.15 Pemasangan Terali Besi Strip (2x3) cm m2 Err:509
15 A.4.2.1.16 Pemasangan Kawat Nyamuk m2 Err:509
16 A.4.2.1.17 Pemasangan Jendela Nako & Tralis m2 Err:509
17 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' Err:509
18 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' Err:509
1 HITUNG AL1 Pemasangan Grill Besi Siku 45.45.5 m1 467,795.2
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
HITUNG LT6 Pemasangan Dinding Keramik 30 x 30 cm m2 #REF!
HITUNG LT7 Pemasangan Lantai Keramik 25 x 25 cm Unpolish m2 182,818.90
HITUNG LT8 Pemasangan Lantai Keramik 40 x 40 cm Unpolish m2 177,550.45
HITUNG LT9 Pemasangan Dinding/Lantai Batu Candi 10x20 cm m2 272,957.03
HITUNG LT10 Pemasangan Keramik Dinding 20x20 cm m2 195,225.53
HITUNG LT11 Pemasangan Lantai Batu Candi 40x40 cm m2 Err:509
HITUNG LT12 Pemasangan Dinding Batu Lempeng Acak Finish Coating Clear m2 258,402.38
HITUNG LT13 Pemasangan Dinding Batu Andesit Susun Sirih finish Coating m2 367,670.88
HITUNG LT14 Pemasangan Lantai Batu Sikat m2 111,689.88
HITUNG LT15 Pemasangan Dinding Koral Sumbawa m2 Err:509
CK Boyolali
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
HITUNG BV1 Pemasangan Bouvenlicht Kaca Rangka Alumunium ( BV1 ) Unit 817,028.17
HITUNG BV2 Pemasangan Bouvenlicht Kaca Rangka Alumunium ( BV2 ) Unit 381,495.20
CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2019
HARGA
NO. JENIS BAHAN SATUAN KET.
(Rp)
1 Pekerja Hr 66,000
2 Mandor Hr 82,500
3 Tukang listrik Hr 82,500
4 Tukang kayu Hr 82,500
5 Kep. tk. kayu Hr 88,000
6 Tukang batu Hr 82,500
7 Kep. tk. batu Hr 88,000
8 Tukang besi Hr 82,500
9 Kep. tk. besi Hr 88,000
10 T u k a n g c a t Hr 82,500
11 K e p . t k . c a t Hr 88,000
12 T u k a n g p l i t u r Hr 82,500
13 T u k a n g j a l a n Hr 82,500
14 T u k a n g g a l i Hr 82,500
15 Tukang masak aspal Hr 82,500
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2019
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
I BAHAN DASAR
1 BATU BELAH
Batu Gunung Belah m3 314,200.00
2 KERIKIL
Pecah 5 - 7 cm m3 308,700.00 Pecah mesin
Pecah 3 - 5 cm m3 308,700.00 Pecah mesin
Beton 0.5 - 1 cm m3 358,300.00
Beton 1 - 2 cm m3 330,800.00
Beton 2 - 3 cm m3 330,800.00 Pecah Mesin
-
3 BATU BATA ex lokal bh 930.00
Bata Ekspose bh 2,400.00 dim 4.5 x 11 x 22
Concrete Block ( CB 15 ) / Batako (lubang 2 bh 2,500.00
-
4 PASIR Urug m3 210,000.00
Pasang m3 304,500.00
Beton m3 306,600.00
Artifisial Putih m3 -
-
5 TANAH Sirtu m3 168,000.00
5 TANAH Tanah Padas m3 72,500.00
Tanah Biasa m3 72,500.00
Sirtu (Quarry) m3 72,500.00
Tanah Padas (Quarry) m3 47,300.00
Tanah Biasa (Quarry) m3 42,000.00
Tanah Subur m3 75,600.00
-
6 KAPUR Pasang m3 286,000.00
-
6 PORTLAND CEMENT -
Portland Cement 40 kg zak 53,800.00
Portland Cement kg 1,345.00
Semen Putih 40 kg zak 132,000.00
Semen warna kg 19,500.00
Semen Putih kg 3,300.00
Pengisi Nat AM 50 kg 23,000.00
-
8 Plastik Plastik tebal 0,8 gulung 136,500.00 uk 1,5x25 m
Plastik tebal 0,8 m2 1,820.00
-
II BAHAN PENUTUP ATAP -
1 GENTENG TANAH LIAT -
Genteng Lokal Tipe Plenthong bh 1,980.00
Genteng Kebumen Tipe Plentong Kecil bh 3,860.00
Genteng Kebumen Tipe Morando bh 4,630.00
Genteng Keramik Kanmuri bh -
Genteng Keramik KIA Kw I bh -
Genteng Keramik Glazur Super Jatiwangi Bh -
Genteng Kerpus Lokal bh 5,070.00
Genteng Kerpus Kebumen bh 7,610.00
Genteng Kerpus Keramik bh -
-
4 ASBES Asbes Gelombang Besar -
200 x 102 x 0.5 cm bh 114,100.00
240 x 102 x 0.5 cm bh 115,400.00
Asbes Gelombang Kecil -
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
10 ATAP METAL Genteng Ex. Sakura Roof Elang lbr 66,080.00 Type Classic
Nok Atap Metal bh 52,400.00 Type Ratu
Penutup Nok bh 19,000.00 Type Ratu
Skrup pcs 900.00
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
4 HOMOGENOUS TILE
Homogenous Tile 60/60 Indogress TPZ bh 60,400.00
Homogenous Tile 60/60 Top Gress bh -
Step Nosing 10/30 m1 24,200.00
5 BATU ALAM
Batu Andesit 20x40 m2 169,100.00
Batu Andesit 20x20 m2 169,100.00
Batu Lempeng Acak m2 78,500.00
Batu Sikat m2 -
Polos Susun Sirih 3 x 40 cm m2 144,000.00
Bintik Susun Sirih 3 x 40 cm m2 192,000.00
Andesit 20 x 40 cm m2 104,200.00
6 GEOMEMBRANE
Geomembrane 1 mm m2 57,500.00
Geomembrane 1.5 mm m2 79,500.00
Geomembrane 2 mm m2 108,500.00
-
V BAHAN CETAK -
1 BUIS BETON
Ø 20 cm Panjang 100 cm bh 60,400.00
Ø 30 cm Panjang 100 cm bh 72,500.00
Ø 40 cm Panjang 100 cm bh 84,500.00
Ø 50 cm Panjang 100 cm bh 120,800.00
Ø 60 cm Panjang 100 cm bh 84,500.00
Ø 80 cm Panjang 100 cm bh 96,600.00
Ø 100 cm Panjang 100 cm bh 120,800.00
U 10 cm - 100 cm bh -
U 15 cm - 100 cm bh -
U 20 cm - 100 cm bh 53,100.00
U 30 cm - 100 cm bh 65,200.00
-
2 LUBANG ANGIN (ROSTER) PC + PASIR -
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
20 X 20 cm bh 9,700.00
3 PAVING -
Holland 20 x 10 x 6 cm K.250 - K.300 m2 79,200.00 Natural Ex.Master Beton
m2 98,800.00 Warna Ex.Master Beton
Holland 21 x 10,5 x 8 cm K.300 m2 108,000.00 Ex.Master Beton
m2 130,000.00 Warna Ex.Master Beton
Square 20 x 20 x 6 cm K.250 - K.300 m2 74,400.00 Natural
m2 86,400.00 Warna
Square 20 x 20 x 8 cm K.250 - K.300 m2 108,000.00
Hexagon 20 x 20 x 6 cm K.250 - K.300 m2 74,400.00 Natural
86,400.00 Warna
Grass Block Kotak 30 x 30 x 8 cm m2 96,000.00 Natural
96,000.00 Warna
Topi Uskup 30 x 21 x 6 cm K.250 - K.300 m' 16,800.00 Natural
19,200.00 Warna
Kanstein Besar/Kerb 60 x 30 x 20 cm bh 66,000.00 K.300
Kanstein Kecil Non Lock 40 x 20 x 10 cm bh 24,000.00 K.300
Kanstein Lock 50 x 20 x 10 cm bh 32,500.00
Kanstein L Profil 60 x 10 ; 20 x 40 bh 78,000.00
Kerb Standart 10/12x35x50 K-300 bh 48,000.00 Ex.Master Beton
Holland 10,5 x 21 x 8 cm K-300 m2 129,000.00 Ex. ALDAS
Kerb Standart 10/12,5x30x50 K-300 bh 33,750.00 Ex. ALDAS
4 U-DITCH
U-Ditch 400x400x1200 Type HD Bh 560,000.00 Master / KH Beton
U-Ditch 400x400x1200 Type LD Bh 425,000.00 Master / KH Beton
Cover U-Ditch 400x1200 10 cm Type HD Bh 441,200.00 Master / KH Beton
Cover U-Ditch 400x1200 10 cm Type LD Bh 300,800.00 Master / KH Beton
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
5 LISTPLANG GRC
9 x 300 x 2440 mm ( Tekstur ) m' 93,000.00
9 x 200 x 2440 mm ( Tekstur ) m' 60,400.00
-
6 PVC Polos m2 100,750.00 Ex. Wifon
-
6 Alumunium Composit Panel m2 - Ex. Seven
Rangka Besi Hollow + Bracing m2 -
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
-
7 Exhaust Fan Ceiling Panasonic 10" FV25TGU Unit -
Panasonic 8" FV20TGU Unit -
Maspion 10" MV-250NEX Unit -
Maspion 8" CEF-20MP Unit -
VI B A H A N F I N I S H I N G -
1 KAYU -
Menie Kayu kg 44,700.00
Dempul plamur kg 44,700.00
Ambril/amplas lbr 5,500.00
Batu Apung kg 24,200.00
Cat Kayu Decolux kg 70,000.00
Siralax ons 12,100.00
Spiritus ltr 31,400.00
Melamik kg 62,800.00
Lem Kayu Fox Kuning kg 86,600.00
HPL Motif Serat Kayu (2,4 x 1.2 m) lbr 199,300.00
Foam Sheet 3 mm m2 7,900.00
-
2 TEMBOK -
Plamur Plamur kg 35,100.00
Cat Dasar
Ex. Catylac kg 25,900.00
Ex. Jotun Jotashield Primer Kg 49,000.00
Cat Tembok
Ex. Catylac kg 25,900.00
Ex. Jotun Jotashield Antifade kg 101,800.00
Ex. Nippon Weatherbond Kg 80,640.00
Ex. Mowilex kg 80,000.00
-
Coating liter 94,200.00 Ex. Propan Stone Care
-
1 BESI -
Menie kg 47,100.00
Cat Ex. Decolux kg 60,400.00
Ex. Danagloos kg 90,000.00
Cat Poxy Ex. Penta kg 55,000.00
Thinner A ltr 30,200.00
Minyak cat ltr 30,200.00
Lem Aica Aibon kg 43,500.00
-
X BAHAN KACA -
1 BENING
5 mm m2 126,800.00
8 mm m2 163,100.00
12 mm m2 301,900.00
2 ES KABUR
3 mm m2 86,000.00
5 mm m2 138,600.00
3 RAY BAND -
5 mm m2 129,300.00
8 mm m2 241,500.00
12 mm m2 273,000.00
4 TEMPERED
10 mm m2 797,000.00
12 mm m2 905,600.00
-
5 STOPSOL Dark Blue 8 mm m2 487,500.00
Dark Green 8 mm m2 507,000.00
-
-
XI BAHAN INSTALASI LISTRIK -
1 KABEL NYY 3 x 2.5 mm m' 14,080.00
NYM 3 x 2.5 mm m' 11,550.00
NYFGBY 3 x 2,5 mm m' 23,650.00
NYM 2 x 2.5 mm m' 6,720.00
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
28 Lampu
Baret / Plafond Kecil Unit 216,000.00 Ex. Panasonic Kecil
Baret / Plafond Besar Unit 291,600.00 Ex. Panasonic Besar
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
-
XII ALAT - ALAT PENGUNCI & PENGGANTUNG -
1 KUNCI TANAM -
Bellucci 2 X slag bh 192,000.00 Seri HP.858.43BZ
-
Muller ( Putih ) 2 X slag bh 192,000.00 Seri 952184 SN/CP
Muller ( Kuning ) 2 X slag bh 192,000.00 Seri 952184 SN/GP
-
2 ENGSEL DAN GERENDEL -
Engsel Pintu Panel Kuning dimensi 3" Tebal bh 26,000.00 Ex. Axell
Kuning dimensi 4" Tebal bh 32,500.00 Ex. Axell
Kuning dimensi 5" Tebal bh 39,000.00 Ex. Axell
-
Engsel Ram Jendela Kuningan 2" bh 9,100.00 Ex. Axell
Kuningan 2.5" bh 11,700.00 Ex. Axell
Kuningan 3" bh 14,300.00 Ex. Axell
-
Nylon kupu-kupu 3" bh 7,800.00 Ex. RCH
4" bh 11,700.00 Ex. RCH
-
Espagnoled - dalam negeri bh 17,000.00
Grendel Tanam luar negeri bh -
Grendel biasa bh -
Hak Angin Kuningan bh 46,150.00
Door Stop bh -
-
36 Petanahan/arde BCC 50 mm2 m 75,000.00
37 BCC 16 mm2 m 23,000.00
38 BCC 10 mm2 m 13,000.00
39 Penangkal Petir electro static non radioaktif unit 8,000,000.00
-
XIII BAHAN SANITAIR -
1 KLOSET DUDUK bh 2,160,000.00 ex ina
Seri CW863NPJ unit 5,100,000.00 Ex. Toto
Seri CW702J/SW784JP unit 3,125,000.00 Ex. Toto
Amstad Winplus White Unit 1,668,000.00 Ex. Amstad
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp) KETERANGAN
CK Boyolali
DAFTAR SEWA PERALATAN
HARGA
NO. PERALATAN SATUAN KET.
(Rp)
CK Boyolali
HARGA JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
5 HITUNG TA2 1.000 m3 Mengurug Tanah Padat ( Bekas Galian Tanah ) 20,418.75
A TENAGA 18,562.50
L.01 0.250 OH Pekerja 66,000.00 16,500.00
L.04 0.025 OH Mandor 82,500.00 2,062.50
B BAHAN -
C PERALATAN
D Jumlah A + B + C 18,562.50
E Overhead & Profit 10% 1,856.25
F Harga Satuan Pekerjaan (D+E) 20,418.75
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.4 1.000 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PP 966,781.20
A TENAGA 173,662.50
L.01 1.500 OH Pekerja 66,000.00 99,000.00
L.02 0.750 OH Tukang Batu 82,500.00 61,875.00
L.03 0.075 OH Kepala Tukang 88,000.00 6,600.00
L.04 0.075 OH Mandor 82,500.00 6,187.50
B BAHAN 705,229.50
1.200 m3 Batu Belah 15/20 314,200.00 377,040.00
117.000 Kg Portland Cement 1,345.00 157,365.00
0.561 m3 Pasir Pasang 304,500.00 170,824.50
C PERALATAN
D Jumlah A + B + C 878,892.00
E Overhead & Profit 10% 87,889.20
F Harga Satuan Pekerjaan (D+E) 966,781.20
CK Boyolali
HARGA
BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.11 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6P 133,516.24
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan 91,210.90
70.000 Buah Bata Merah 5 x 11 x 22 930.00 65,100.00
8.320 Kg Portland Semen 1,345.00 11,190.40
0.049 m3 Pasir Pasang 304,500.00 14,920.50
C PERALATAN
D Jumlah A + B + C 121,378.40
E Overhead & Profit 10% 12,137.84
F Harga Satuan Pekerjaan (D+E) 133,516.24
12 A.4.4.1.12 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8P 131,158.50
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan 89,067.50
70.000 Buah Bata Merah 5 x 11 x 22 930.00 65,100.00
6.500 Kg Portland Semen 1,345.00 8,742.50
0.050 m3 Pasir Pasang 304,500.00 15,225.00
C PERALATAN
D Jumlah A + B + C 119,235.00
E Overhead & Profit 10% 11,923.50
F Harga Satuan Pekerjaan (D+E) 131,158.50
13 A.4.4.1.13 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3K 132,918.50
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan 90,667.50
70.000 Buah Bata Merah 5 x 11 x 22 930.00 65,100.00
4.500 Kg Portland Semen 1,345.00 6,052.50
0.050 m3 Pasir Pasang 304,500.00 15,225.00
0.015 m3 Kapur Padam 286,000.00 4,290.00
C PERALATAN
D Jumlah A + B + C 120,835.00
E Overhead & Profit 10% 12,083.50
F Harga Satuan Pekerjaan (D+E) 132,918.50
14 A.4.4.1.14 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 1S Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
70.000 Buah Bata Merah 5 x 11 x 22 930.00 65,100.00
0.018 m3 Semen Merah Err:509 Err:509
0.018 m3 Pasir Pasang 304,500.00 5,481.00
0.018 m3 Kapur Padam 286,000.00 5,148.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
15 A.4.4.1.15 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1S Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
CK Boyolali
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
70.000 Buah Bata Merah 5 x 11 x 22 930.00 65,100.00
0.014 m3 Semen Merah Err:509 Err:509
0.028 m3 Pasir Pasang 304,500.00 8,526.00
0.014 m3 Kapur Padam 286,000.00 4,004.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
16 A.4.4.1.20 1.000 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
12.500 buah Batako Err:509 Err:509
15.160 kg PC 1,345.00 20,390.20
0.364 m3 Pasir Pasang 304,500.00 110,838.00
0.280 kg Besi Angkur Ø 8 mm 13,900.00 3,892.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
17 A.4.4.1.21 1.000 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
12.500 buah Batako Err:509 Err:509
12.130 kg PC 1,345.00 16,314.85
0.388 m3 Pasir Pasang 304,500.00 118,146.00
0.280 kg Besi Angkur Ø 8 mm 13,900.00 3,892.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
18 A.4.4.1.22 1.000 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 2PP Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
30.000 Buah Terawang / Roster Err:509 Err:509
14.000 kg Portland Semen 1,345.00 18,830.00
0.032 m3 Pasir Pasang 304,500.00 9,744.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
19 A.4.4.1.23 1.000 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP Err:509
A Tenaga 30,167.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan Err:509
30.000 Buah Terawang / Roster Err:509 Err:509
11.000 kg Portland Semen 1,345.00 14,795.00
0.035 m3 Pasir Pasang 304,500.00 10,657.50
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
HITUNG 1.000 m2 Pemasangan Dinding Bata Ekspose Ukuran (4.5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 252,151.24
A Tenaga 35,117.50
L.01 0.350 OH Pekerja 66,000.00 23,100.00
L.02 0.120 OH Tukang Batu 82,500.00 9,900.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
B Bahan 194,110.90
70.000 Buah Bata Ekspose 4.5 x 11 x 22 2,400.00 168,000.00
8.320 Kg Portland Semen 1,345.00 11,190.40
0.049 m3 Pasir Pasang 304,500.00 14,920.50
C PERALATAN
D Jumlah A + B + C 229,228.40
E Overhead & Profit 10% 22,922.84
F Harga Satuan Pekerjaan (D+E) 252,151.24
HITUNG DD1 1.000 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x20x20)cm Camp. 1SP : 2PP 384,715.65
m2 Tenaga 30,167.50
0 0.300 OH Pekerja 66,000.00 19,800.00
L.01 0.100 OH Tukang Batu 82,500.00 8,250.00
L.02 0.010 OH Kepala Tukang 88,000.00 880.00
L.03 0.015 OH Mandor 82,500.00 1,237.50
OH Bahan 319,574.00
30.000 Buah Terawang / Roster Beton 9,700.00 291,000.00
14.000 kg Portland Semen 1,345.00 18,830.00
0.032 m3 Pasir Pasang 304,500.00 9,744.00
C PERALATAN
D Jumlah A + B + C 349,741.50
E Overhead & Profit 10% 34,974.15
F Harga Satuan Pekerjaan (D+E) 384,715.65
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
V A.4.5.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.5.2.6 1.000 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm 53,782.87
TENAGA 34,732.50
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.02 0.150 OH Tukang batu 82,500.00 12,375.00
L.03 0.015 OH Kepala Tukang 88,000.00 1,320.00
L.04 0.015 OH Mandor 82,500.00 1,237.50
BAHAN 14,161.02
4.416 Kg Portland Cement 1,345.00 5,939.52
0.027 m3 Pasir Pasang 304,500.00 8,221.50
C PERALATAN
D Jumlah A + B + C 48,893.52
E Overhead & Profit 10% 4,889.35
F Harga Satuan Pekerjaan (D+E) 53,782.87
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
VI A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N
1 A.4.1.1.2 1.000 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 1,042,666.33
A Tenaga 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B Bahan 806,979.48
276.000 Kg Portland Semen 1,345.00 371,220.00
828.000 kg Pasir Beton 219.00 181,332.00
1,012.000 kg Kerikil (maksimum 30 mm) 245.04 247,977.48
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 947,878.48
E Overhead & Profit 10% 94,787.85
F Harga Satuan Pekerjaan (D+E) 1,042,666.33
2 A.4.1.1.5 1.000 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,104,842.32
A TENAGA 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B BAHAN 863,503.11
326.000 Kg Portland Semen 1,345.00 438,470.00
760.000 Kg Pasir Beton 219.00 166,440.00
1,029.000 Kg Kerikil (maksimum 30 mm) 245.04 252,143.11
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,004,402.11
E Overhead & Profit 10% 100,440.21
F Harga Satuan Pekerjaan (D+E) 1,104,842.32
6 A.4.1.1.6 1.000 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 1,136,862.30
A Tenaga 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B Bahan 892,612.19
352.000 Kg Portland Semen 1,345.00 473,440.00
731.000 Kg Pasir Beton 219.00 160,089.00
1,031.000 Kg Kerikil (maksimum 30 mm) 245.04 252,633.19
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,033,511.19
E Overhead & Profit 10% 103,351.12
F Harga Satuan Pekerjaan (D+E) 1,136,862.30
7 A.4.1.1.7 1.000 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,161,335.76
A TENAGA 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B BAHAN 914,860.78
371.000 Kg Portland Semen 1,345.00 498,995.00
698.000 Kg Pasir Beton 219.00 152,862.00
1,047.000 Kg Kerikil (maksimum 30 mm) 245.04 256,553.78
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,055,759.78
E Overhead & Profit 10% 105,575.98
F Harga Satuan Pekerjaan (D+E) 1,161,335.76
8 A.4.1.1.8 1.000 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1,176,967.53
A Tenaga 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
CK Boyolali
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B Bahan 929,071.48
384.000 Kg Portland Semen 1,345.00 516,480.00
692.000 Kg Pasir Beton 219.00 151,548.00
1,039.000 Kg Kerikil (maksimum 30 mm) 245.04 254,593.48
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,069,970.48
E Overhead & Profit 10% 106,997.05
F Harga Satuan Pekerjaan (D+E) 1,176,967.53
9 A.4.1.1.9 1.000 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 1,204,085.30
A Tenaga 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B Bahan 953,724.00
406.000 Kg Portland Semen 1,345.00 546,070.00
684.000 kg Pasir Beton 219.00 149,796.00
1,026.000 kg Kerikil (maksimum 30 mm) 245.04 251,408.00
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,094,623.00
E Overhead & Profit 10% 109,462.30
F Harga Satuan Pekerjaan (D+E) 1,204,085.30
10 A.4.1.1.10 1.000 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 1,212,371.40
A Tenaga 140,899.00
L.01 1.650 OH Pekerja 66,000.00 108,900.00
L.02 0.275 OH Tukang Batu 82,500.00 22,687.50
L.03 0.028 OH Kepala Tukang 88,000.00 2,464.00
L.04 0.083 OH Mandor 82,500.00 6,847.50
B Bahan 961,256.81
413.000 Kg Portland Semen 1,345.00 555,485.00
681.000 Kg Pasir Beton 219.00 149,139.00
1,021.000 Kg Kerikil (maksimum 30 mm) 245.04 250,182.81
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,102,155.81
E Overhead & Profit 10% 110,215.58
F Harga Satuan Pekerjaan (D+E) 1,212,371.40
11 A.4.1.1.11 1.000 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,286,295.74
A Tenaga 179,217.50
L.01 2.100 OH Pekerja 66,000.00 138,600.00
L.02 0.350 OH Tukang Batu 82,500.00 28,875.00
L.03 0.035 OH Kepala Tukang 88,000.00 3,080.00
L.04 0.105 OH Mandor 82,500.00 8,662.50
B Bahan 990,142.26
439.000 Kg Portland Semen 1,345.00 590,455.00
670.000 Kg Pasir Beton 219.00 146,730.00
1,006.000 Kg Kerikil (maksimum 30 mm) 245.04 246,507.26
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,169,359.76
E Overhead & Profit 10% 116,935.98
F Harga Satuan Pekerjaan (D+E) 1,286,295.74
12 A.4.1.1.12 1.000 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,297,271.29
A Tenaga 179,217.50
L.01 2.100 OH Pekerja 66,000.00 138,600.00
L.02 0.350 OH Tukang Batu 82,500.00 28,875.00
L.03 0.035 OH Kepala Tukang 88,000.00 3,080.00
L.04 0.105 OH Mandor 82,500.00 8,662.50
B Bahan 1,000,120.04
448.000 Kg Portland Semen 1,345.00 602,560.00
667.000 Kg Pasir Beton 219.00 146,073.00
1,000.000 Kg Kerikil (maksimum 30 mm) 245.04 245,037.04
CK Boyolali
215.000 ltr Air 30.00 6,450.00
C PERALATAN
D Jumlah A + B + C 1,179,337.54
E Overhead & Profit 10% 117,933.75
F Harga Satuan Pekerjaan (D+E) 1,297,271.29
3 HITUNG BT1 1.000 Kg Pembesian dg Besi Polos atau Besi Ulir 17,602.31
A TENAGA 1,134.10
L.01 0.007 OH Pekerja 66,000.00 462.00
L.02 0.007 OH Tukang Besi 82,500.00 577.50
L.03 0.001 OH Kepala Tukang 88,000.00 61.60
L.04 0.000 OH Mandor 82,500.00 33.00
B BAHAN 14,868.00
1.050 Kg Besi Beton (polos/ulir) 13,900.00 14,595.00
0.015 Kg Kawat Beton 18,200.00 273.00
C PERALATAN
D Jumlah A + B + C 16,002.10
E Overhead & Profit 10% 1,600.21
F Harga Satuan Pekerjaan (D+E) 17,602.31
CK Boyolali
0.045 m3 Kayu Klas III (Terentang) 2,205,000.00 99,225.00
0.300 Kg Paku Biasa 2" - 5" Err:509 Err:509
0.100 Ltr Minyak Bekisting 6,700.00 670.00
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 3,500.00 7,000.00
C PERALATAN
D Jumlah A + B + C 372,384.90
E Overhead & Profit 10% 37,238.49
F Harga Satuan Pekerjaan (D+E) 409,623.39
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HITUNG AT2 1.000 m' Pemasangan Genteng Bubung Glasur Sejenis 71,861.90
A Tenaga 44,825.00
L.01 0.400 OH Pekerja 66,000.00 26,400.00
L.02 0.200 OH Tukang Kayu 82,500.00 16,500.00
L.03 0.020 OH Kepala Tukang 88,000.00 1,760.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 20,504.00
5.000 Buah Genteng Bubung Glasur sejenis - -
8.000 Kg Portland Semen 1,345.00 10,760.00
0.032 m3 Pasir Pasang 304,500.00 9,744.00
C PERALATAN
D Jumlah A + B + C 65,329.00
E Overhead & Profit 10% 6,532.90
F Harga Satuan Pekerjaan (D+E) 71,861.90
HITUNG AT4 1.000 m2 Pasang Usuk dan Reng Baja Ringan C.75.075 109,778.63
A TENAGA 20,198.75
L.01 0.125 OH Pekerja 66,000.00 8,250.00
L.02 0.125 OH Tukang Atap 82,500.00 10,312.50
L.03 0.0125 OH Kepala Tukang 88,000.00 1,100.00
L.04 0.0065 OH Mandor 82,500.00 536.25
B BAHAN 63,680.00
1.440 m' Usuk Baja Ringan C.75 20,200.00 29,088.00
3.680 m' Reng Baja Ringan 9,400.00 34,592.00
C PERALATAN 15,920.00
CK Boyolali
0.250 Aksesories 25% dari Bahan 63,680.00 15,920.00
D Jumlah A + B + C 99,798.75
E Overhead & Profit 10% 9,979.88
F Harga Satuan Pekerjaan (D+E) 109,778.63
HITUNG AT8 1.000 m2 Pasang Atap Genteng Metal Ex. Sakura Roof 144,388.31
A TENAGA 12,512.50
L.01 0.050 OH Pekerja 66,000.00 3,300.00
L.02 0.100 OH Tukang Atap 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.001 OH Mandor 82,500.00 82.50
B BAHAN 118,749.60
1.62 lbr Genteng Metal 66,080.00 107,049.60
13.00 pcs Skrup 900.00 11,700.00
C PERALATAN
D Jumlah A + B + C 131,262.10
E Overhead & Profit 10% 13,126.21
F Harga Satuan Pekerjaan (D+E) 144,388.31
HITUNG AT9 1.000 m' Pasang Nok Genteng Metal Ex. Sakura Roof 86,226.25
A TENAGA 8,387.50
L.01 0.050 OH Pekerja 66,000.00 3,300.00
L.02 0.050 OH Tukang Atap 82,500.00 4,125.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.001 OH Mandor 82,500.00 82.50
B BAHAN 70,000.00
1.25 bh Nok Genteng Metal 52,400.00 65,500.00
5.00 pcs Skrup 900.00 4,500.00
C PERALATAN
CK Boyolali
D Jumlah A + B + C 78,387.50
E Overhead & Profit 10% 7,838.75
F Harga Satuan Pekerjaan (D+E) 86,226.25
CK Boyolali
HARGA JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HITUNG PF2 1.000 m2 Memasang Langit-langit GRC Board tebal 4 mm + Rangka Hollow Galvanis 121,727.32
A Tenaga 40,397.50
L.01 0.250 OH Pekerja 66,000.00 16,500.00
L.02 0.250 OH Tukang Besi 82,500.00 20,625.00
L.03 0.025 OH Kepala Tukang 88,000.00 2,200.00
L.04 0.013 OH Mandor 82,500.00 1,072.50
B Bahan 70,263.70
0.364 Lbr GRC Board 120 x240 x 0.4 cm 72,500.00 26,390.00
1.580 m' Besi Hollow 40 x 40 x 3.5 mm 8,900.00 14,062.00
0.700 m' Besi Hollow 20 x 40 x 3.5 mm 7,200.00 5,040.00
0.310 zak Compoun 2,900.00 899.00
3.500 bh Dinabolt 1,800.00 6,300.00
1.38 m' Cotton Plaster 340.00 469.20
39.750 Buah Sekrup 190.00 7,552.50
0.500 Perkuatan dan Penggantung (50% x rangka) 19,102.00 9,551.00
C PERALATAN
D Jumlah A + B + C 110,661.20
E Overhead & Profit 10% 11,066.12
F Harga Satuan Pekerjaan (D+E) 121,727.32
HITUNG PF4 1.000 m2 Memasang Ceiling PVC + Rangka Hollow Galvanis 226,593.13
A Tenaga 40,397.50
L.01 0.250 OH Pekerja 66,000.00 16,500.00
L.02 0.250 OH Tukang Besi 82,500.00 20,625.00
L.03 0.025 OH Kepala Tukang 88,000.00 2,200.00
L.04 0.013 OH Mandor 82,500.00 1,072.50
B Bahan 165,596.25
1.050 m2 PVC 100,750.00 105,787.50
4.050 m' Besi Hollow 40 x 40 x 4 mm 8,900.00 36,045.00
4.000 bh Dinabolt 1,800.00 7,200.00
39.750 Buah Sekrup 190.00 7,552.50
0.250 Perkuatan dan Penggantung (25% x rangka) 36,045.00 9,011.25
C PERALATAN
D Jumlah A + B + C 205,993.75
E Overhead & Profit 10% 20,599.38
CK Boyolali
F Harga Satuan Pekerjaan (D+E) 226,593.13
HITUNG PF5 1.000 m2 Memasang ACP ( Alumunium Composite Panel ) merk Seven 204,792.50
A Tenaga 186,175.00
L.01 1.250 OH Pekerja 66,000.00 82,500.00
L.02 1.100 OH Tukang 82,500.00 90,750.00
L.03 0.100 OH Kepala Tukang 88,000.00 8,800.00
L.04 0.050 OH Mandor 82,500.00 4,125.00
B Bahan -
1.100 m2 ACP merk Seven - -
1.100 m2 Rangka besi hollow + bracing - -
0.350 Perlengkapan 25 % - -
C PERALATAN
D Jumlah A + B + C 186,175.00
E Overhead & Profit 10% 18,617.50
F Harga Satuan Pekerjaan (D+E) 204,792.50
CK Boyolali
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HITUNG HARGA SATUAN PEKERJAAN PARTISI DAN FURNITURE
HITUNG PT 1.000 M2 Pemasangan Dinding Partisi Rangkap Gypsumboard 9mm Rangka Metal Stud Err:509
A TENAGA 38,912.50
L.01 0.150 OH Pekerja 66,000.00 9,900.00
L.02 0.250 OH Tukang Kayu 82,500.00 20,625.00
L.03 0.025 OH Kepala Tukang 88,000.00 2,200.00
L.04 0.075 OH Mandor 82,500.00 6,187.50
B BAHAN Err:509
0.718 Lbr Gypsumboard 9mm 102,700.00 73,738.60
2.000 m Metal Stud MS.76 24,000.00 48,000.00
2.000 Bh Angel Clip Err:509 Err:509
2.000 Bh Gording Clip Err:509 Err:509
0.700 Btg Hanger Rod Err:509 Err:509
3.000 Bh Furring Joint Err:509 Err:509
3.000 Bh Ramset Err:509 Err:509
18.000 Pcs Sekrup Gypsum Err:509 Err:509
0.400 Kg Cornice Adhesive Err:509 Err:509
1.300 m' Textile Tape Err:509 Err:509
2.000 m2 Cat 18,307.74 36,615.48
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
HITUNG BD 1.000 Unit Pembuatan Back Drop Uk. 440 x 360 cm Err:509
A TENAGA 6,820,000.00
L.01 40.000 OH Pekerja 66,000.00 2,640,000.00
L.02 35.000 OH Tukang Kayu 82,500.00 2,887,500.00
L.03 10.000 OH Kepala Tukang 88,000.00 880,000.00
L.04 5.000 OH Mandor 82,500.00 412,500.00
B BAHAN Err:509
18.928 m2 Triplek / Blockboard 18 mm Err:509 Err:509
24.990 m2 Triplek / Blockboard 9 mm Err:509 Err:509
13.671 m2 Triplek / Blockboard 6 mm Err:509 Err:509
2.160 m2 MDF 6 mm Err:509 Err:509
6.000 Pasang Engsel sendok Err:509 Err:509
6.000 Unit Handle P. 12 cm Err:509 Err:509
4.800 m' Strip plat stainless Err:509 Err:509
1.000 Buah Saklar Tunggal 29,400.00 29,400.00
2.000 Buah Stop Kontak 31,800.00 63,600.00
8.490 m2 HPL Ardenas Maple Err:509 Err:509
17.862 m2 HPL Red Sapelle (TH-275B) Err:509 Err:509
7.980 m2 HPL Cloud Saw cut (TH-927J) Err:509 Err:509
8.904 m2 HPL white Glossy (dalam almari) Err:509 Err:509
2.000 Kg Paku Err:509 Err:509
3.000 Kg Lem Kayu Err:509 Err:509
25.000 Kg Lem Fox Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
5.040 m2 HPL Cloud Saw cut (TH-927J) Err:509 Err:509
3.300 m2 HPL white Glossy Err:509 Err:509
1.250 Kg Paku Err:509 Err:509
1.000 Kg Lem Kayu Err:509 Err:509
12.500 Kg Lem Fox Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U
1 A.4.6.1.1 1.000 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I Err:509
A Tenaga 2,408,175.00
L.01 7.000 OH Pekerja 66,000.00 462,000.00
L.02 21.000 OH Tukang Kayu 82,500.00 1,732,500.00
L.03 2.100 OH Kepala Tukang 88,000.00 184,800.00
L.04 0.350 OH Mandor 82,500.00 28,875.00
B Bahan Err:509
1.100 m3 Kayu Klas I (Jati) , Balok 37,485,000.00 41,233,500.00
1.250 kg Paku Biasa 2" - 5 " Err:509 Err:509
1.000 kg Lem Kayu Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
2 A.4.6.1.2 1.000 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III Err:509
Tenaga 2,064,150.00
L.01 6.000 OH Pekerja 66,000.00 396,000.00
L.02 18.000 OH Tukang Kayu 82,500.00 1,485,000.00
L.03 1.800 OH Kepala Tukang 88,000.00 158,400.00
L.04 0.300 OH Mandor 82,500.00 24,750.00
Bahan Err:509
1.200 m3 Kayu Klas II (Bangkirai) , Balok 14,883,800.00 17,860,560.00
1.250 kg Paku Biasa 2" - 5 " Err:509 Err:509
1.000 kg Lem Kayu Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
3 A.4.6.1.3 1.000 m2 Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer) Err:509
A Tenaga 120,450.00
L.01 0.350 OH Pekerja 66,000.00 23,100.00
L.02 1.050 OH Tukang Kayu 82,500.00 86,625.00
L.03 0.105 OH Kepala Tukang 88,000.00 9,240.00
L.04 0.018 OH Mandor 82,500.00 1,485.00
B Bahan Err:509
0.040 m3 Kayu Klas II (Kamfer), papan 8,820,000.00 352,800.00
0.050 Kg Paku Biasa 2" - 5 " Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
4 A.4.6.1.4 1.000 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III Err:509
Tenaga 120,450.00
L.01 0.350 OH Pekerja 66,000.00 23,100.00
L.02 1.050 OH Tukang Kayu 82,500.00 86,625.00
L.03 0.105 OH Kepala Tukang 88,000.00 9,240.00
L.04 0.018 OH Mandor 82,500.00 1,485.00
Bahan Err:509
0.040 m3 Kayu Klas II (Kamfer), papan 8,820,000.00 352,800.00
0.050 Kg Paku Biasa 2" - 5 " Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
5 A.4.6.1.5 1.000 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II Err:509
A Tenaga 344,025.00
L.01 1.000 OH Pekerja 66,000.00 66,000.00
L.02 3.000 OH Tukang Kayu 82,500.00 247,500.00
L.03 0.300 OH Kepala Tukang 88,000.00 26,400.00
L.04 0.050 OH Mandor 82,500.00 4,125.00
B Bahan Err:509
0.040 m3 Kayu Klas I (Jati), papan 44,100,000.00 1,764,000.00
0.050 kg Lem Kayu Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
6 A.4.6.1.6 1.000 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II Err:509
CK Boyolali
A Tenaga 275,220.00
L.01 0.800 OH Pekerja 66,000.00 52,800.00
L.02 2.400 OH Tukang Kayu 82,500.00 198,000.00
L.03 0.240 OH Kepala Tukang 88,000.00 21,120.00
L.04 0.040 OH Mandor 82,500.00 3,300.00
B Bahan Err:509
0.024 m3 Kayu Klas I (Jati), papan 44,100,000.00 1,058,400.00
0.300 kg Lem Kayu Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
7 A.4.6.1.7 1.000 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati) Err:509
A Tenaga 344,025.00
L.01 1.000 OH Pekerja 66,000.00 66,000.00
L.02 3.000 OH Tukang Kayu 82,500.00 247,500.00
L.03 0.300 OH Kepala Tukang 88,000.00 26,400.00
L.04 0.050 OH Mandor 82,500.00 4,125.00
B Bahan Err:509
0.064 m3 Kayu Klas I (Jati), papan 44,100,000.00 2,822,400.00
0.500 kg Lem Kayu Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
8 A.4.6.1.8 1.000 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 9 Err:509
A Tenaga 240,817.50
L.01 0.700 OH Pekerja 66,000.00 46,200.00
L.02 2.100 OH Tukang Kayu 82,500.00 173,250.00
L.03 0.210 OH Kepala Tukang 88,000.00 18,480.00
L.04 0.035 OH Mandor 82,500.00 2,887.50
B Bahan Err:509
0.025 m3 Kayu Klas II (Kamfer), papan 8,820,000.00 220,500.00
0.030 Kg Paku Biasa 1/2" - 1" Err:509 Err:509
0.500 Ltr Lem Kayu Err:509 Err:509
1.000 Lbr Plywood tebal 4 mm uk.90x220cm Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
9 A.4.6.1.9 1.000 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II Err:509
A Tenaga 275,220.00
L.01 0.800 OH Pekerja 66,000.00 52,800.00
L.02 2.400 OH Tukang Kayu 82,500.00 198,000.00
L.03 0.240 OH Kepala Tukang 88,000.00 21,120.00
L.04 0.040 OH Mandor 82,500.00 3,300.00
B Bahan Err:509
0.026 m3 Kayu Klas II (Kamfer), papan 8,820,000.00 225,792.00
0.030 Kg Paku Biasa 1/2" - 1" Err:509 Err:509
0.500 Ltr Lem Kayu Err:509 Err:509
1.000 Lbr Plywood tebal 4 mm uk.90x220cm Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
10 A.4.6.1.10 1.000 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II Err:509
A Tenaga 254,457.50
L.01 0.670 OH Pekerja 66,000.00 44,220.00
L.02 2.000 OH Tukang Kayu 82,500.00 165,000.00
L.03 0.200 OH Kepala Tukang 88,000.00 17,600.00
L.04 0.335 OH Mandor 82,500.00 27,637.50
B Bahan Err:509
0.060 m3 Kayu Klas I (Jati), papan 44,100,000.00 2,646,000.00
0.150 Kg Paku Biasa 1/2" - 1" Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
11 A.4.6.1.11 1.000 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I Err:509
A Tenaga 275,220.00
L.01 0.800 OH Pekerja 66,000.00 52,800.00
L.02 2.400 OH Tukang Kayu 82,500.00 198,000.00
CK Boyolali
L.03 0.240 OH Kepala Tukang 88,000.00 21,120.00
L.04 0.040 OH Mandor 82,500.00 3,300.00
B Bahan Err:509
0.025 m3 Kayu Klas I (Jati), papan 44,100,000.00 1,102,500.00
0.030 Kg Paku Biasa 1/2" - 1" Err:509 Err:509
0.300 kg Lem Kayu Err:509 Err:509
1.000 Lbr Teakwood (90 x 220) cm x 4 mm Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
12 A.4.6.1.12 1.000 m2 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas Err:509
A Tenaga 292,462.50
L.01 0.850 OH Pekerja 66,000.00 56,100.00
L.02 2.550 OH Tukang Kayu 82,500.00 210,375.00
L.03 0.255 OH Kepala Tukang 88,000.00 22,440.00
L.04 0.043 OH Mandor 82,500.00 3,547.50
B Bahan Err:509
0.025 m3 Kayu Klas II (Kamfer), papan 8,820,000.00 220,500.00
0.030 Kg Paku Biasa 1/2" - 1" Err:509 Err:509
0.080 kg Lem Kayu Err:509 Err:509
1.000 Lbr Teakwood (90 x 220) cm x 4 mm Err:509 Err:509
0.500 Lbr Formika Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
13 A.4.6.1.13 1.000 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter Err:509
A Tenaga 1,376,100.00
L.01 4.000 OH Pekerja 66,000.00 264,000.00
L.02 12.000 OH Tukang Kayu 82,500.00 990,000.00
L.03 1.200 OH Kepala Tukang 88,000.00 105,600.00
L.04 0.200 OH Mandor 82,500.00 16,500.00
B Bahan Err:509
1.100 m3 Kayu Kamfer, balok 8,158,500.00 8,974,350.00
15.000 Kg Besi Strip 17,300.00 259,500.00
5.600 Kg Paku Biasa 2" - 5" Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
16 A.4.6.1.16 1.000 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II Err:509
A Tenaga 16,142.50
L.01 0.100 OH Pekerja 66,000.00 6,600.00
L.02 0.100 OH Tukang Kayu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan Err:509
0.014 m3 Kayu Klas II (Kruing), Kaso-kaso (5x7) cm 7,166,300.00 100,328.20
0.004 m3 Reng (2x3) cm Jati 12,127,500.00 43,659.00
0.250 Kg Paku Biasa 2" - 5" Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
HITUNG KY1 1.000 m2 Pemasangan Rangka Atap Genteng Keramik Reng Baru, Kayu Jati Err:509
A Tenaga 16,142.50
L.01 0.100 OH Pekerja 66,000.00 6,600.00
CK Boyolali
L.02 0.100 OH Tukang Kayu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan Err:509
0.004 m3 Reng (2x3) cm Kayu Jati 12,127,500.00 43,659.00
0.250 Kg Paku Biasa 2" - 5" Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 0.10 Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
HARGA JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA
1 A.4.6.2.2 1.000 Buah Pemasangan Kunci Tanam Biasa 47,522.75
A Tenaga 43,202.50
L.01 0.010 OH Pekerja 66,000.00 660.00
L.02 0.500 OH Tukang Kayu 82,500.00 41,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan -
1.000 Buah Kunci Tanam Biasa - -
C PERALATAN
D Jumlah A + B + C 43,202.50
E Overhead & Profit 10% 4,320.25
F Harga Satuan Pekerjaan (D+E) 47,522.75
Overhead & Profit
HITUNG KK1 1.000 Buah Pemasangan Kunci Tanam Besar 258,722.75
A Tenaga 43,202.50
L.01 0.010 OH Pekerja 66,000.00 660.00
L.02 0.500 OH Tukang Kayu 82,500.00 41,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 192,000.00
1.000 Buah Kunci Tanam Tebal Ex. Bellucci 192,000.00 192,000.00
C PERALATAN
D Jumlah A + B + C 235,202.50
E Overhead & Profit 10% 23,520.25
F Harga Satuan Pekerjaan (D+E) 258,722.75
CK Boyolali
L.01 0.010 OH Pekerja 66,000.00 660.00
L.02 0.100 OH Tukang Kayu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 14,300.00
1.000 Buah Engsel Jendela 3" 14,300.00 14,300.00
C PERALATAN
D Jumlah A + B + C 24,502.50
E Overhead & Profit 10% 2,450.25
F Harga Satuan Pekerjaan (D+E) 26,952.75
CK Boyolali
D Jumlah A + B + C 19,662.50
E Overhead & Profit 10% 1,966.25
F Harga Satuan Pekerjaan (D+E) 21,628.75
CK Boyolali
L.02 0.150 OH Tukang Kayu 82,500.00 12,375.00
L.03 0.015 OH Kepala Tukang 88,000.00 1,320.00
L.04 0.001 OH Mandor 82,500.00 61.88
B Bahan Err:509
1.100 m2 Kaca Cermin Err:509 Err:509
C PERALATAN
D Jumlah A + B + C Err:509
E Overhead & Profit 10% Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN AKSESORIES
HITUNG AS1 1.000 m' Pemasangan Handrail Tangga Bahan Stainless Steel 832,654.04
A Tenaga 54,958.22
L.01 0.500 OH Pekerja 66,000.00 33,000.00
L.02 0.250 OH Tukang Besi 82,500.00 20,625.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.005 OH Mandor 82,500.00 453.22
B Bahan 520,000.00
2.000 m' Pipa Stainless Steel 2 inch (Arah Memanjang) 80,000.00 160,000.00
1.500 m' Pipa Stainless Steel 2 inch (Tiang) 80,000.00 120,000.00
6.000 m' Pipa Stainless Steel 3/4 inch (Ornamen) 40,000.00 240,000.00
C PERALATAN 182,000.00
0.350 Peralatan 35% dari bahan 520,000.00 182,000.00
D Jumlah A + B + C 756,958.22
E Overhead & Profit 10% 75,695.82
F Harga Satuan Pekerjaan (D+E) 832,654.04
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
VI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 HITUNG AL1 1.000 m1 Pemasangan Grill Besi Siku 45.45.5 467,795.21
A Tenaga 165,110.00
L.01 0.700 OH Pekerja 66,000.00 46,200.00
L.02 1.400 OH Tukang Besi 82,500.00 115,500.00
L.03 0.020 OH Kepala Tukang 88,000.00 1,760.00
L.04 0.020 OH Mandor 82,500.00 1,650.00
B Bahan 260,158.38
7.271 Kg Besi siku 14,200.00 103,243.47
13.344 Kg Besi beton polos / Ulir / Tulangan 10,700.00 142,784.91
0.300 Kg Meni Besi 47,100.00 14,130.00
C PERALATAN
D Jumlah A + B + C 425,268.38
E Overhead & Profit 10% 42,526.84
F Harga Satuan Pekerjaan (D+E) 467,795.21
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
2 HITUNG SN19 1.000 m' Pemasangan Pipa PVC tipe AW Ø 3" 63,089.40
A Tenaga 8,019.00
L.01 0.036 OH Pekerja 66,000.00 2,376.00
L.02 0.060 OH Tukang Batu 82,500.00 4,950.00
L.03 0.006 OH Kepala Tukang 88,000.00 528.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 49,335.00
1.050 m' Pipa PVC Ø 3" 42,900.00 45,045.00
0.100 Ls Perlengkapan 10% x pipa 42,900.00 4,290.00
C PERALATAN
D PERALATAN 57,354.00
E Jumlah A + B + C 10% 5,735.40
F Harga Satuan Pekerjaan (D+E) 63,089.40
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
HITUNG LT8 1.000 m2 Pemasangan Lantai Keramik 40 x 40 cm Unpolish 177,550.45
A Tenaga 46,310.00
L.01 0.400 OH Pekerja 66,000.00 26,400.00
L.02 0.200 OH Tukang Batu 82,500.00 16,500.00
L.03 0.020 OH Kepala Tukang 88,000.00 1,760.00
L.04 0.020 OH Mandor 82,500.00 1,650.00
B Bahan 115,099.50
6.560 Buah Keramik Lantai 40 x 40 cm Unpolish 12,700.00 83,312.00
9.000 Kg Portland Semen 1,345.00 12,105.00
0.045 m3 Pasir Pasang 304,500.00 13,702.50
0.260 Kg Pengisi Nat AM 50 23,000.00 5,980.00
C PERALATAN
D Jumlah A + B + C 161,409.50
E Overhead & Profit 10% 16,140.95
F Harga Satuan Pekerjaan (D+E) 177,550.45
CK Boyolali
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
10 A.4.7.1.10 1.000 m2 Pengecat Tembok Baru ( 1lap Cat Dasar 2 lap. Cat penutup ) Ex. Catylac 18,307.74
A Tenaga 7,319.40
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.02 0.063 OH Tukang Cat 82,500.00 5,197.50
L.03 0.006 OH Kepala Tukang 88,000.00 554.40
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 9,324.00
0.100 Kg Cat Dasar 25,900.00 2,590.00
0.260 Kg Cat Penutup 2 kali 25,900.00 6,734.00
C PERALATAN
D Jumlah A + B + C 16,643.40
E Overhead & Profit 10% 1,664.34
F Harga Satuan Pekerjaan (D+E) 18,307.74
HITUNG CT1 1.000 m2 Pengecat Tembok Baru ( 1lap Cat Dasar 2 lap. Cat penutup ) Exterior 36,321.34
A Tenaga 7,319.40
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.02 0.063 OH Tukang Cat 82,500.00 5,197.50
L.03 0.006 OH Kepala Tukang 88,000.00 554.40
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 25,700.00
0.100 Kg Cat Dasar 49,000.00 4,900.00
0.260 Kg Cat Penutup 2 kali 80,000.00 20,800.00
C PERALATAN
D Jumlah A + B + C 33,019.40
E Overhead & Profit 10% 3,301.94
F Harga Satuan Pekerjaan (D+E) 36,321.34
HITUNG CT4 1.000 m2 Pengecat Plafond Baru ( 2 lap. Cat penutup ) Ex. Catylac 12,527.57
A Tenaga 10,041.90
L.01 0.040 OH Pekerja 66,000.00 2,640.00
L.02 0.080 OH Tukang Cat 82,500.00 6,600.00
L.03 0.006 OH Kepala Tukang 88,000.00 554.40
L.04 0.003 OH Mandor 82,500.00 247.50
B Bahan 1,346.80
0.260 Kg Cat Penutup 2 kali 5,180.00 1,346.80
C PERALATAN
D Jumlah A + B + C 11,388.70
E Overhead & Profit 10% 1,138.87
F Harga Satuan Pekerjaan (D+E) 12,527.57
CK Boyolali
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp
HARGA SATUAN PEKERJAAN PINTU DAN JENDELA ALUMUNIUM
HITUNG PJ1 1.000 Unit Pemasangan Pintu & Jendela Kaca Tempered 12 mm ( PU ) 20,258,016.68
A TENAGA 677,600.00
L.01 4.000 OH Pekerja 66,000.00 264,000.00
L.02 4.000 OH Tukang Besi 82,500.00 330,000.00
L.03 0.800 OH Kepala Tukang 88,000.00 70,400.00
L.04 0.160 OH Mandor 82,500.00 13,200.00
B BAHAN 17,738,778.80
3.780 m2 Pintu Kaca Tempered 12 mm 905,600.00 3,423,168.00
25.100 m2 Jendela Kaca Tempered 12 mm 301,900.00 7,577,690.00
2.000 set Floor Hinge Dekson FH 84 SSS 1,231,200.00 2,462,400.00
2.000 Bh Patch Fitting Dekson PT 20 PSS 435,600.00 871,200.00
2.000 set Pull Handle 586,800.00 1,173,600.00
5.052 Tube Sealant 35,000.00 176,820.00
0.600 Ls Finishing Kaca Tempered 60% ( Total Harga Kaca ) 3,423,168.00 2,053,900.80
C PERALATAN
D Jumlah A + B + C 18,416,378.80
E Overhead & Profit 10% 1,841,637.88
F Harga Satuan Pekerjaan (D+E) 20,258,016.68
HITUNG PJ2 1.000 Unit Pemasangan Pintu & Jendela Kaca Rangka Alumunium ( PJ1 ) 3,858,499.01
A TENAGA 246,309.38
L.01 0.961 OH Pekerja 66,000.00 63,394.98
L.02 1.961 OH Tukang Besi 82,500.00 161,743.72
L.03 0.196 OH Kepala Tukang 88,000.00 17,252.66
L.04 0.047 OH Mandor 82,500.00 3,918.01
B BAHAN 3,261,417.00
10.710 m' Kusen Alumunium Coklat 1 mm Ex. Alexindo 102,000.00 1,092,420.00
6.510 m' Daun Pintu Frame Alumunium 102,000.00 664,020.00
3.360 m' Daun Jendela Frame Alumunium 102,000.00 342,720.00
1.995 m2 Kaca Bening 5 mm 126,800.00 252,966.00
1.000 set Handle Pintu 602,400.00 602,400.00
3.000 Bh Engsel Pintu 4" 28,000.00 84,000.00
1.000 Set Cesement 12" 120,000.00 120,000.00
1.000 Bh Rambuncis 67,800.00 67,800.00
21.000 buah Skrup Fixer 600.00 12,600.00
0.643 Tube Sealant Kusen 35,000.00 22,491.00
C PERALATAN
D Jumlah A + B + C 3,507,726.38
E Overhead & Profit 10% 350,772.64
F Harga Satuan Pekerjaan (D+E) 3,858,499.01
HITUNG PJ3 1.000 Unit Pemasangan Pintu Kaca Rangka Alumunium ( P1 ) 2,740,889.64
A TENAGA 220,815.35
L.01 0.803 OH Pekerja 66,000.00 52,965.33
L.02 1.803 OH Tukang Besi 82,500.00 148,706.66
L.03 0.180 OH Kepala Tukang 88,000.00 15,862.04
L.04 0.040 OH Mandor 82,500.00 3,281.31
B BAHAN 2,270,902.50
7.035 m' Kusen Alumunium Coklat 1 mm Ex. Alexindo 102,000.00 717,570.00
6.510 m' Daun Pintu Frame Alumunium 102,000.00 664,020.00
1.418 m2 Kaca Bening 5 mm 126,800.00 179,739.00
1.000 set Handle Pintu 602,400.00 602,400.00
3.000 Bh Engsel Pintu 4" 28,000.00 84,000.00
14.000 buah Skrup Fixer 600.00 8,400.00
0.422 Tube Sealant Kusen 35,000.00 14,773.50
C PERALATAN
D Jumlah A + B + C 2,491,717.85
E Overhead & Profit 10% 249,171.79
F Harga Satuan Pekerjaan (D+E) 2,740,889.64
HITUNG PJ4 1.000 Unit Pemasangan Pintu Kaca Double Rangka Alumunium ( P2 ) 3,875,260.03
A TENAGA 236,840.17
CK Boyolali
L.01 0.902 OH Pekerja 66,000.00 59,521.11
L.02 1.902 OH Tukang Besi 82,500.00 156,901.39
L.03 0.190 OH Kepala Tukang 88,000.00 16,736.15
L.04 0.045 OH Mandor 82,500.00 3,681.52
B BAHAN 3,286,123.50
9.345 m' Kusen Alumunium Coklat 1 mm Ex. Alexindo 102,000.00 953,190.00
12.600 m' Daun Pintu Frame Alumunium 102,000.00 1,285,200.00
1.943 m2 Kaca Bening 5 mm 126,800.00 246,309.00
1.000 set Handle Pintu 602,400.00 602,400.00
6.000 Bh Engsel Pintu 4" 28,000.00 168,000.00
19.000 buah Skrup Fixer 600.00 11,400.00
0.561 Tube Sealant Kusen 35,000.00 19,624.50
C PERALATAN
D Jumlah A + B + C 3,522,963.67
E Overhead & Profit 10% 352,296.37
F Harga Satuan Pekerjaan (D+E) 3,875,260.03
HITUNG PKM 1.000 Unit Pemasangan Pintu Spandek PVC Rangka Alumunium ( PKM ) 2,096,866.16
A TENAGA 207,391.97
L.01 0.719 OH Pekerja 66,000.00 47,473.80
L.02 1.719 OH Tukang Besi 82,500.00 141,842.25
L.03 0.172 OH Kepala Tukang 88,000.00 15,129.84
L.04 0.036 OH Mandor 82,500.00 2,946.08
B BAHAN 1,698,850.00
5.100 m' Kusen Alumunium Dark Brown 1 mm Ex. Alexindo 102,000.00 520,200.00
4.000 m' Frame Pintu Alumunium 102,000.00 408,000.00
0.850 m2 Spandek PVC 55,000.00 46,750.00
0.150 m2 Kaca Buram 5 mm 138,600.00 20,790.00
1.000 set Handle Pintu 602,400.00 602,400.00
3.000 Bh Engsel Pintu 4" 28,000.00 84,000.00
10.000 buah Skrup Fixer 600.00 6,000.00
0.306 Tube Sealant Kusen 35,000.00 10,710.00
C PERALATAN
D Jumlah A + B + C 1,906,241.97
E Overhead & Profit 10% 190,624.20
F Harga Satuan Pekerjaan (D+E) 2,096,866.16
HITUNG PJ5 1.000 Unit Pemasangan Jendela Kaca Rangka Alumunium ( J1 ) 2,837,057.92
A TENAGA 237,568.57
L.01 0.906 OH Pekerja 66,000.00 59,819.10
L.02 1.906 OH Tukang Besi 82,500.00 157,273.88
L.03 0.191 OH Kepala Tukang 88,000.00 16,775.88
L.04 0.045 OH Mandor 82,500.00 3,699.71
B BAHAN 2,341,575.00
9.450 m' Kusen Alumunium Dark Brown 1 mm Ex. Alexindo 102,000.00 963,900.00
7.560 m' Daun Jendela Frame Alumunium 102,000.00 771,120.00
1.575 m2 Kaca Bening 5 mm 126,800.00 199,710.00
2.000 Set Cesement 12" 120,000.00 240,000.00
2.000 Bh Rambuncis 67,800.00 135,600.00
19.000 buah Skrup Fixer 600.00 11,400.00
0.567 Tube Sealant Kusen 35,000.00 19,845.00
C PERALATAN
D Jumlah A + B + C 2,579,143.57
E Overhead & Profit 10% 257,914.36
F Harga Satuan Pekerjaan (D+E) 2,837,057.92
HITUNG BV1 1.000 Unit Pemasangan Bouvenlicht Kaca Rangka Alumunium ( BV1 ) 817,028.17
A TENAGA 40,499.08
L.01 0.251 OH Pekerja 66,000.00 16,568.24
L.02 0.251 OH Tukang Besi 82,500.00 20,710.31
CK Boyolali
L.03 0.025 OH Kepala Tukang 88,000.00 2,209.10
L.04 0.012 OH Mandor 82,500.00 1,011.43
B BAHAN 702,253.80
5.838 m' Kusen Alumunium Dark Brown 1 mm Ex. Alexindo 102,000.00 595,476.00
0.630 m2 Kaca Buram 5 mm 138,600.00 87,318.00
12.000 buah Skrup Fixer 600.00 7,200.00
0.350 Tube Sealant Kusen 35,000.00 12,259.80
C PERALATAN
D Jumlah A + B + C 742,752.88
E Overhead & Profit 10% 74,275.29
F Harga Satuan Pekerjaan (D+E) 817,028.17
HITUNG BV2 1.000 Unit Pemasangan Bouvenlicht Kaca Rangka Alumunium ( BV2 ) 381,495.20
A TENAGA 16,024.82
L.01 0.099 OH Pekerja 66,000.00 6,555.78
L.02 0.099 OH Tukang Besi 82,500.00 8,194.73
L.03 0.010 OH Kepala Tukang 88,000.00 874.10
L.04 0.005 OH Mandor 82,500.00 400.21
B BAHAN 330,789.00
2.310 m' Kusen Alumunium Dark Brown 1 mm Ex. Alexindo 102,000.00 235,620.00
0.630 m2 Kaca Buram 5 mm 138,600.00 87,318.00
5.000 buah Skrup Fixer 600.00 3,000.00
0.139 Tube Sealant Kusen 35,000.00 4,851.00
C PERALATAN
D Jumlah A + B + C 346,813.82
E Overhead & Profit 10% 34,681.38
F Harga Satuan Pekerjaan (D+E) 381,495.20
CK Boyolali
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
HITUNG EL2 1.000 Unit Pek. Lampu LED 10,5 watt + Armateur Downlight Silver Crome 4" Ex. Panasonic 143,591.25
A Tenaga 4,537.50
L.02 0.050 OH Tukang 82,500.00 4,125.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 126,000.00
1.000 Bh Armateur Downlight Silver Chrome 4 " Ex. Panasonic 60,000.00 60,000.00
1.000 Bh Lampu 10,5 Watt LED 66,000.00 66,000.00
C PERALATAN
D Jumlah A + B + C 130,537.50
E Overhead + Profit 10% 13,053.75
F Harga Satuan Pekerjaan (D+E) 143,591.25
HITUNG EL7 1.000 Bh Pek. Pemasangan Stop Kontak Dinding Ex. Clipsal 39,971.25
A Tenaga 4,537.50
L.02 0.050 OH Tukang 82,500.00 4,125.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 31,800.00
1.000 Bh Stop Kontak 31,800.00 31,800.00
C PERALATAN
D Jumlah A + B + C 36,337.50
E Overhead + Profit 10% 3,633.75
F Harga Satuan Pekerjaan (D+E) 39,971.25
HITUNG EL8 1.000 Bh Pek. Pemasangan Stop Kontak AC Ex. Panasonic + Instalasi 155,515.25
A Tenaga 4,537.50
L.02 0.050 OH Tukang 82,500.00 4,125.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 136,840.00
3.000 m' Kabel NYM ukr 3 x 2,5 mm2 14,080.00 42,240.00
3.000 m' Pipa Clipsal 3,500.00 10,500.00
1.500 unit Tee Doos 7,000.00 10,500.00
1.000 unit Sock (1 Sock per 3 m) 400.00 400.00
3.000 unit Klem 400.00 1,200.00
1.000 Bh Stop Kontak AC 72,000.00 72,000.00
C PERALATAN
D Jumlah A + B + C 141,377.50
E Overhead + Profit 10% 14,137.75
F Harga Satuan Pekerjaan (D+E) 155,515.25
HITUNG EL9 1.000 Bh Pek. Pemasangan Saklar Double Ex. Clipsal 43,931.25
A Tenaga 4,537.50
L.02 0.050 OH Tukang 82,500.00 4,125.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 35,400.00
1.000 Bh Saklar Double 35,400.00 35,400.00
C PERALATAN
D Jumlah A + B + C 39,937.50
E Overhead + Profit 10% 3,993.75
F Harga Satuan Pekerjaan (D+E) 43,931.25
CK Boyolali
HITUNG EL10 1.000 Bh Pek. Pemasangan Saklar Single Ex. Clipsal 37,331.25
A Tenaga 4,537.50
L.02 0.050 OH Tukang 82,500.00 4,125.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 29,400.00
1.000 Bh Saklar Single 29,400.00 29,400.00
C PERALATAN
D Jumlah A + B + C 33,937.50
E Overhead + Profit 10% 3,393.75
F Harga Satuan Pekerjaan (D+E) 37,331.25
HITUNG EL13 1.000 Unit Pekerjaan Pasang Penangkal Petir Electro Static Non Radioaktif 12,140,768.75
A Tenaga 112,062.50
L.01 1.000 OH Pekerja 66,000.00 66,000.00
L.02 0.500 OH Tukang 82,500.00 41,250.00
L.03 0.050 OH Kepala Tukang 88,000.00 4,400.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 10,925,000.00
15.000 m Petanahan/arde BCC 50 mm2 75,000.00 1,125,000.00
50.000 m BCC 16 mm2 23,000.00 1,150,000.00
50.000 m BCC 10 mm2 13,000.00 650,000.00
1.000 unit Penangkal Petir electro static non radioaktif 8,000,000.00 8,000,000.00
( head kurn R 150m 1 unit, connecting sleeve 1 unit, tiang galvaniz 2"
2 meter 1 batang, pipa pralon 1/2" 1 batang, pengeboran max 15 m
( 2 ohm), kabel BC 50 mm 15 m, arde/copper road 1 meter 1 batang,
sock 1 pcs, connector cincin 1 pcs )
C PERALATAN
D Jumlah A + B + C 11,037,062.50
E Overhead + Profit 10% 1,103,706.25
F Harga Satuan Pekerjaan (D+E) 12,140,768.75
CK Boyolali
HARGA
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH JUMLAH
Rp Rp
HITUNG ASP2 1.0000 Liter Pek. Lapis Resap Pengikat - Aspal Cair 256.48
A Tenaga 41.01
L.01 0.0036 jam Pekerja 9,428.57 33.94
L.04 0.0006 jam Mandor 11,785.71 7.07
B Bahan -
0.8528 Kg Aspal - -
0.3220 liter Kerosene - -
C PERALATAN 192.15
0.0003 Jam Asp. Distributor 431,107.60 129.33
0.0003 Jam Air Compresor 209,397.10 62.82
D Jumlah A + B + C 233.17
E Overhead + Profit 10% 23.32
F Harga Satuan Pekerjaan (D+E) 256.48
HITUNG ASP3 1.0000 Liter Pek. Lapis Perekat - Aspal Cair 256.48
A Tenaga 41.01
L.01 0.0036 jam Pekerja 9,428.57 33.94
L.04 0.0006 jam Mandor 11,785.71 7.07
B Bahan -
0.9064 Kg Aspal - -
0.2200 liter Kerosene - -
C PERALATAN 192.15
0.0003 Jam Asp. Distributor 431,107.60 129.33
0.0003 Jam Air Compresor 209,397.10 62.82
D Jumlah A + B + C 233.17
E Overhead + Profit 10% 23.32
F Harga Satuan Pekerjaan (D+E) 256.48
HITUNG ASP4 1.0000 Ton Pek. Laston Lapis Antara ( AC-BC ) 664,982.62
A Tenaga 2,356.67
L.01 0.2222 jam Pekerja 9,428.57 2,095.03
L.04 0.0222 jam Mandor 11,785.71 261.64
B Bahan 12,710.25
0.3385 m3 Lolos screen2 ukuran ( 9.5 - 19,0) - -
0.3385 m3 Lolos screen2 ukuran ( 0 - 5) - -
9.4500 Kg Semen 1,345.00 12,710.25
57.6800 Kg Aspal - -
C PERALATAN 589,462.73
0.0818 jam Wheel Loader 678,846.30 55,529.63
0.0222 jam AMP 1406900 7,881,392.20 174,966.91
0.0222 jam Genset 482,138.80 10,703.48
1.0029 jam Dump Truck 319,739.20 320,666.44
0.0101 jam Asphalt Finisher 1,310,636.80 13,237.43
0.0100 jam Tandem Roller 541,187.90 5,411.88
0.0146 jam P. Tyre Roller 612,805.60 8,946.96
D Jumlah A + B + C 604,529.65
E Overhead + Profit 10% 60,452.97
F Harga Satuan Pekerjaan (D+E) 664,982.62
CK Boyolali
HITUNG ASP5 1.0000 Ton Pek. Laston Lapis Aus ( AC-WC ) 657,297.13
A Tenaga 1,938.04
L.01 0.1778 jam Pekerja 9,428.57 1,676.40
L.04 0.0222 jam Mandor 11,785.71 261.64
B Bahan 28,245.00
0.2917 m3 Lolos screen2 ukuran ( 9.5 - 19,0) - -
0.3815 m3 Lolos screen2 ukuran ( 0 - 5) - -
21.0000 Kg Semen 1,345.00 28,245.00
60.7700 Kg Aspal - -
C PERALATAN 567,359.80
0.0688 jam Wheel Loader 678,846.30 46,704.63
0.0222 jam AMP 1406900 7,881,392.20 174,966.91
0.0222 jam Genset 482,138.80 10,703.48
0.9504 jam Dump Truck 319,739.20 303,880.14
0.0122 jam Asphalt Finisher 1,310,636.80 15,989.77
0.0080 jam Tandem Roller 541,187.90 4,329.50
0.0176 jam P. Tyre Roller 612,805.60 10,785.38
D Jumlah A + B + C 597,542.84
E Overhead + Profit 10% 59,754.28
F Harga Satuan Pekerjaan (D+E) 657,297.13
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PAVING
HITUNG PV1 1.000 m2 Pemasangan Paving Holland Natural Uk. 20 x 10,5 x 8 cm K-250 Ex. MASTER BETON 150,505.67
A Tenaga 20,955.00
L.01 0.167 OH Pekerja 66,000.00 11,000.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan 114,156.00
1.050 m2 Paving holland 20 x 10,5 x 8 cm 108,000.00 113,400.00
0.004 m3 Pasir Urug Pengisi Nat 210,000.00 756.00
C PERALATAN 1,712.34
0.015 m2 Sewa Peralatan 1.5% dari bahan 114,156.00 1,712.34
D Jumlah A + B + C 136,823.34
E Overhead & Profit 10% 13,682.33
F Harga Satuan Pekerjaan (D+E) 150,505.67
HITUNG PV2 1.000 m2 Pemasangan Paving Holland Natural Uk. 20 x 10 x 6 cm K-250 Ex. MASTER BETON 116,742.71
A Tenaga 20,955.00
L.01 0.167 OH Pekerja 66,000.00 11,000.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan 83,916.00
1.050 m2 Paving holland 20 x 10,5 x 6 cm 79,200.00 83,160.00
0.004 m3 Pasir Urug 210,000.00 756.00
C PERALATAN 1,258.74
0.015 m2 Sewa Peralatan 1.5% dari bahan 83,916.00 1,258.74
D Jumlah A + B + C 106,129.74
E Overhead & Profit 10% 10,612.97
F Harga Satuan Pekerjaan (D+E) 116,742.71
HITUNG PV2 1.000 m1 Pemasangan Kerb Standard K-250 Uk. 10/12 x 35 x 50 cm Ex. MASTER BETON 115,050.46
A Tenaga 7,718.33
L.01 0.067 OH Pekerja 66,000.00 4,400.00
L.02 0.033 OH Tukang Batu 82,500.00 2,750.00
L.03 0.003 OH Kepala Tukang 88,000.00 293.33
L.04 0.003 OH Mandor 82,500.00 275.00
B Bahan 96,872.99
2.000 Buah Kerb Standard Uk. 10/12 x 35 x 50 48,000.00 96,000.00
0.302 Kg Portland Cement 1,345.00 406.73
0.002 m3 Pasir Pasang 304,500.00 466.27
C PERALATAN
D Jumlah A + B + C 104,591.33
E Overhead & Profit 10% 10,459.13
F Harga Satuan Pekerjaan (D+E) 115,050.46
HITUNG PV3 1.000 m1 Pemasangan Kanstein Besar K-300 Uk. 60 x 30 x 20 cm K-300 216,906.02
A Tenaga 10,351.00
L.01 0.099 OH Pekerja 66,000.00 6,534.00
L.02 0.037 OH Tukang Batu 82,500.00 3,052.50
L.03 0.004 OH Kepala Tukang 88,000.00 352.00
L.04 0.005 OH Mandor 82,500.00 412.50
B Bahan 186,836.29
2.625 Buah Kanstein besar K-300 Uk. 60 x 30 x 20 cm 66,000.00 173,250.00
0.302 Kg Portland Cement 1,345.00 406.73
0.002 m3 Pasir Pasang 304,500.00 466.27
0.029 m3 Pasir Urug 210,000.00 6,090.00
13.035 kg Pasir Beton 219.00 2,854.67
14.985 kg Kerikil (maksimum 30 mm) 245.04 3,671.88
3.225 ltr Air 30.00 96.75
C PERALATAN
D Jumlah A + B + C 197,187.29
E Overhead & Profit 10% 19,718.73
F Harga Satuan Pekerjaan (D+E) 216,906.02
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN SULING-SULING
HITUNG SL1 1.000 m' Pemasangan Sulingan Pipa PVC tipe AW Ø 2" Ex. Wavin 35,759.90
A Tenaga 8,019.00
L.01 0.036 OH Pekerja 66,000.00 2,376.00
L.02 0.060 OH Tukang Batu 82,500.00 4,950.00
L.03 0.006 OH Kepala Tukang 88,000.00 528.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 24,490.00
1.100 m' Pipa PVC Ø 2" 21,900.00 24,090.00
0.200 Kg Ijuk 2,000.00 400.00
C PERALATAN -
D Jumlah A + B + C 32,509.00
E Overhead & Profit 10% 3,250.90
F Harga Satuan Pekerjaan (D+E) 35,759.90
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN SALURAN U-DITCH
HITUNG DR1 1.000 m' Pekerjaan Saluran U-Ditch 400x400x1200 Type HD 595,241.35
A 48,328.50
L.01 0.435 OH Pekerja 66,000.00 28,710.00
L.02 0.195 OH Tukang Batu 82,500.00 16,087.50
L.03 0.020 OH Kepala Tukang 88,000.00 1,716.00
L.04 0.022 OH Mandor 82,500.00 1,815.00
B Bahan 492,800.00
0.88 Buah U-Ditch 400x400x1200 Type HD 560,000.00 492,800.00
C PERALATAN -
D Jumlah A + B + C 541,128.50
E Overhead & Profit 10% 54,112.85
F Harga Satuan Pekerjaan (D+E) 595,241.35
HITUNG DR2 1.000 m' Pekerjaan Saluran U-Ditch 400x400x1200 Type LD 464,561.35
A 48,328.50
L.01 0.435 OH Pekerja 66,000.00 28,710.00
L.02 0.195 OH Tukang Batu 82,500.00 16,087.50
L.03 0.020 OH Kepala Tukang 88,000.00 1,716.00
L.04 0.022 OH Mandor 82,500.00 1,815.00
B Bahan 374,000.00
0.88 Buah U-Ditch 400x400x1200 Type LD 425,000.00 374,000.00
C PERALATAN -
D Jumlah A + B + C 422,328.50
E Overhead & Profit 10% 42,232.85
F Harga Satuan Pekerjaan (D+E) 464,561.35
HITUNG DR3 1.000 m' Pekerjaan Cover/Tutup U-Ditch Type HD 400x1200 Tebal 10 cm 452,552.10
A 23,155.00
L.01 0.200 OH Pekerja 66,000.00 13,200.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan 388,256.00
0.88 Buah Cover U-Ditch 400x1200 Type HD 441,200.00 388,256.00
C PERALATAN -
D Jumlah A + B + C 411,411.00
E Overhead & Profit 10% 41,141.10
F Harga Satuan Pekerjaan (D+E) 452,552.10
HITUNG DR4 1.000 m' Pekerjaan Cover/Tutup U-Ditch Type LD 400x1200 Tebal 10 cm 316,644.90
A 23,155.00
L.01 0.200 OH Pekerja 66,000.00 13,200.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan 264,704.00
0.88 Buah Cover U-Ditch 400x1200 Type LD 300,800.00 264,704.00
C PERALATAN -
D Jumlah A + B + C 287,859.00
E Overhead & Profit 10% 28,785.90
F Harga Satuan Pekerjaan (D+E) 316,644.90
CK Boyolali
L.04 0.044 OH Mandor 82,500.00 3,630.00
B Bahan -
0.88 Buah U-Ditch 400x400x1200 Type HD - -
C PERALATAN -
D Jumlah A + B + C 96,657.00
E Overhead & Profit 10% 9,665.70
F Harga Satuan Pekerjaan (D+E) 106,322.70
HITUNG DR6 1.000 m' Pekerjaan Cover/Tutup U-Ditch Type LD 400x600 25,470.50
A 23,155.00
L.01 0.200 OH Pekerja 66,000.00 13,200.00
L.02 0.100 OH Tukang Batu 82,500.00 8,250.00
L.03 0.010 OH Kepala Tukang 88,000.00 880.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan -
1.75 Buah Cover U-Ditch 400x600 - -
C PERALATAN -
D Jumlah A + B + C 23,155.00
E Overhead & Profit 10% 2,315.50
F Harga Satuan Pekerjaan (D+E) 25,470.50
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN BRONJONG & TRUCUK
Pasangan Batu Bronjong kawat uk. L=2,0m x B=1,0 m x T= 0,5 m berisi batu Kali 15-20 cm
HITUNG BJG 1.000 Bh kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat pengikat 2,0 mm, 936,389.52
ukuran lubang heksagonal 100 x 120 mm (adopsi Bidang PSDA Kode P.06a.4.b)
A 159,775.00
L.01 1.140 OH Pekerja 66,000.00 75,240.00
L.02 0.380 OH Tukang Batu 82,500.00 31,350.00
L.03 0.325 OH Kepala Tukang 88,000.00 28,600.00
L.04 0.298 OH Mandor 82,500.00 24,585.00
B Bahan 691,488.20
1.30 m3 Batu / batu belah Uk. 15/20 314,200.00 408,460.00
15.55 Kg Kawat Bronjong Galvanis dia 3 mm 18,200.00 283,028.20
C PERALATAN -
D Jumlah A + B + C 851,263.20
E Overhead & Profit 10% 85,126.32
F Harga Satuan Pekerjaan (D+E) 936,389.52
HITUNG TCK 1.000 m' 1 m panjang cerucuk bambu ø 8 – 10 cm (adopsi Bidang PSDA Kode Analisa P.07.b) 30,242.30
A Tenaga 12,430.00
L.01 0.120 OH Pekerja 66,000.00 7,920.00
L.02 - OH Tukang Kayu 82,500.00 -
L.03 0.040 OH Kepala Tukang 88,000.00 3,520.00
L.04 0.012 OH Mandor 82,500.00 990.00
B Bahan 9,975.00
1.050 m' Bambu Petung diameter 8 – 10 cm 9,500.00 9,975.00
C PERALATAN 5,088.00
0.040 Sewa-hari Tripod tinggi 5 m 54,500.00 2,180.00
0.040 Sewa-hari Alat pancang Hammer 0.5 ton 72,700.00 2,908.00
D Jumlah A + B + C 27,493.00
E Overhead & Profit 10% 2,749.30
F Harga Satuan Pekerjaan (D+E) 30,242.30
CK Boyolali
HARGA
JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN TAMAN
HITUNG TM1 1.000 m3 Pek. Media Tanam ( Tanah Merah Dan Pupuk ) 143,687.50
A Tenaga 20,625.00
L.01 0.300 OH Pekerja 66,000.00 19,800.00
L.04 0.010 OH Mandor 82,500.00 825.00
B Bahan 110,000.00
1.000 m3 Tanah Subur 110,000.00 110,000.00
C PERALATAN -
D Jumlah A + B + C 130,625.00
E Overhead & Profit 10% 13,062.50
F Harga Satuan Pekerjaan (D+E) 143,687.50
HITUNG TM2 1.000 m2 Pek. Tanaman Kacang Hias /m2 isi 15 polybag 48,108.50
A Tenaga 1,485.00
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 42,250.00
15.000 polybag Tanaman Kacang hias 2,750.00 41,250.00
0.040 Kg Pupuk kandang 25,000.00 1,000.00
C PERALATAN
D Jumlah A + B + C 43,735.00
E Overhead & Profit 10% 4,373.50
F Harga Satuan Pekerjaan (D+E) 48,108.50
HITUNG TM3 1.000 m1 Pek. Tanaman Pangkas ( Hijau & Merah ) 42,058.50
A Tenaga 1,485.00
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 36,750.00
6.000 polybag Tanaman Pangkas ( Hijau ) 2,750.00 16,500.00
6.000 polybag Tanaman Pangkas ( Merah ) 2,750.00 16,500.00
0.040 Kg Pupuk kandang 25,000.00 1,000.00
C PERALATAN
D Jumlah A + B + C 38,235.00
E Overhead & Profit 10% 3,823.50
F Harga Satuan Pekerjaan (D+E) 42,058.50
HITUNG TM4 1.000 m2 Pek. Tanam Pohon Ketapang Kencana Tinggi 1.00 m 140,233.50
A Tenaga 1,485.00
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 126,000.00
1.000 bh Pohon Ketapang Kencana 125,000.00 125,000.00
0.040 Kg Pupuk kandang 25,000.00 1,000.00
C PERALATAN
D Jumlah A + B + C 127,485.00
E Overhead & Profit 10% 12,748.50
F Harga Satuan Pekerjaan (D+E) 140,233.50
HITUNG TM5 1.000 bh Pek. Tanam Pohon Pucuk Merah Tinggi min 60 cm 102,558.50
A Tenaga 1,485.00
L.01 0.020 OH Pekerja 66,000.00 1,320.00
L.04 0.002 OH Mandor 82,500.00 165.00
B Bahan 91,750.00
1.000 bh Tanaman Pucuk Merah Tinggi Min 60 cm 90,750.00 90,750.00
0.040 Kg Pupuk kandang 25,000.00 1,000.00
C PERALATAN
D Jumlah A + B + C 93,235.00
E Overhead & Profit 10% 9,323.50
F Harga Satuan Pekerjaan (D+E) 102,558.50
CK Boyolali