Anda di halaman 1dari 15

Provinsi : Jawa Barat

Kabupaten : Garut
Kecamatan : Bayongbong
Desa : Pamalayan 784
Kegiatan : Jalan Usaha Tani
Volume : 425 meter 63 2 1
Nama Pekerjaan : Jalan Usaha Tani
Lokasi : Kp. Sindangsari
1.275

35.5
124.25
8697.5 3,739,925
6750000
BERITA ACARA
PENETAPAN HARGA SATUAN BAHAN, UPAH DAN ALAT
UNTUK PELAKSANAAN KEGIATAN LINGKUNGAN
Kelurahan Pamalayan
Kecamatan Bayongbong
Kabupaten Garut

HARGA SATUAN HASIL SURVEY*)


Kelp. Masy. 1 Kelp. Masy. 2 Kelp. Masy. 3 REKOMENDASI HARGA
TERENDAH YANG DIPILIH UNTUK
BULAN INI
NO Uraian Satuan
Alamat : Alamat : Alamat :
Harga Satuan*) Keterangan
Telp. : Telp. : Telp. :
I TENAGA KERJA
2 Pekerja HOK 65,000.00 60,000.00 60,000.00 65,000.00
3 Tukang Batu HOK 80,000.00 85,000.00 80,000.00 85,000.00
6 Mandor HOK 85,000.00 85,000.00 85,000.00 90,000.00

HARGA SATUAN HASIL SURVEY*)


Toko Pemasok Toko Pemasok Toko Pemasok REKOMENDASI HARGA
TERENDAH YANG DIPILIH UNTUK
BULAN INI
NO Uraian Satuan

Harga Satuan*) Keterangan

II BAHAN MATERIAL
1 Pasir Pasang m3 160,000 155,000 150,000 245,000.00
2 Pasir urug m3 110,000 1,150,000 100,000 125,000.00
3 Batu Belah m3 157,350 153,000 150,000 245,000.00
4 Semen PC (50Kg) Zak 71,680 71,400 70,000 56,000.00
5 Paku Kg 18,510 18,360 18,000 17,000.00
6 Kayu Kaso m3 1,530,000 1,530,000 1,500,000 1,000,000.00
7 Pipa 1" lt 46,680 45,900 45,000 56,000.00
8 Split 360,000
9 Bsei beton dia 10 55,000
10 Kawat 17,000
11
12
13 7,500
III ALAT
*) Harga Satuan sampai lokasi kegiatan (sudah termasuk biaya Transport)
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

DAFTAR UPAH PEKERJA BANGUNAN


TAHUN ANGGARAN 2022

Halaman 01
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5

1 Pekerja Hr 80,000.00
2 Pekerja Setengah Terampil Hr 65,000.00
3 Pekerja Terampil Hr 70,000.00
4 Tukang Gali Hr 57,000.00
5 Mandor Hr 110,000.00
6 Tukang Batu Setengah Terampil Hr 65,000.00
7 Tukang Batu Terampil Hr 100,000.00
8 Kepala Tukang Batu Hr 75,000.00
9 Tukang Kayu Setengah Terampil Hr 65,000.00
10 Tukang Kayu Terampil Hr 70,000.00
11 Kepala Tukang Kayu Hr 75,000.00
12 Tukang Cat Setengah Terampil Hr 65,000.00
13 Tukang Cat Terampil Hr 70,000.00
14 Kepala Tukang Cat Hr 75,000.00
15 Tukang Besi Beton Setengah Terampil Hr 65,000.00
16 Tukang Besi Beton Terampil Hr 70,000.00
17 Kepala Tukang Besi Beton Hr 75,000.00
18 Tukang Besi Profil Setengah Terampil Hr 65,000.00
19 Tukang Besi Profil Terampil Hr 70,000.00
20 Kepala Tukang Besi Profil Hr 75,000.00
21 Tukang Las Setengah Terampil Hr 65,000.00
22 Tukang Las Terampil Hr 70,000.00
23 Kepala Tukang Las Hr 75,000.00
24 Operator Alat Berat Hr 150,000.00
25 Pembantu Operator/ Mekanik Hr 57,000.00
26 Supir Truk Hr 75,000.00
27 Kenek Truk Hr 62,500.00
28 Penjaga Malam Hr 62,500.00

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

DAFTAR HARGA SATUAN BAHAN


TAHUN ANGGARAN 2022
KABUPATEN GARUT

Halaman 02
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5

1 Pasir Urug M3 150,000.00


2 Tanah Urug M3 88,000.00
3 Sirtu M3 200,000.00
4 Pasir Pasang Kali M3 220,000.00
5 Pasir Beton M3 250,000.00
6 Abu Batu M3 250,000.00
7 Kerikil M3 207,500.00
8 Bata Merah Kelas I Buah 750.00
9 Batu pecah 0,5 - 1 cm M3 250,000.00
10 Batu Pecah 1 - 2 cm M3 250,000.00
11 Batu Pecah 2 - 3 cm M3 250,000.00
12 Batu Pecah 3 - 5 cm M3 250,000.00
13 Batu Pecah 5 - 7 cm M3 250,000.00
14 Agregat Kelas B M3 164,000.00
15 Batu Tempel M2 121,000.00
16 Batu Candi M2 165,000.00
17 Batu Sikat Natural M2 110,000.00
18 Batu Sikat Warna M2 165,000.00
19 Batu Belah Pondasi M3 275,000.00
20 Buis Beton Dia 20 cm M' 45,000.00
21 Buis Beton Dia 30 cm M' 82,000.00
22 Buis Beton Dia 40 cm M' 72,500.00
23 Buis Beton Dia 50 cm M' 97,500.00
24 Buis Beton Dia 60 cm M' 110,000.00
25 Buis Beton Dia 80 cm M' 127,500.00
26 Buis Beton Dia 100 cm M' 150,000.00
27 Paving Blok Natural 8 cm (K.300) M2 71,000.00 Diproduksi dengan mesin
28 Paving Blok Natural 6 cm (K.300) M2 108,000.00 Diproduksi dengan mesin K.300
29 Paving Blok Warna 8 cm (K.300) M2 128,000.00 Diproduksi dengan mesin K.300
30 Paving Blok Warna 6 cm (K.300) M2 118,000.00 Diproduksi dengan mesin K.300
31 Paving Blok Natural 8 cm (manual) M2 60,000.00
32 Paving Blok Natural 6 cm (manual) M2 56,700.00
33 Paving Blok Warna 8 cm (manual) M2 62,400.00
34 Paving Blok Warna 6 cm (manual) M2 59,600.00
35 Tegel Badak PC M2 40,050.00
36 Kanstin 50x15x30 (K-300) Bh 44,000.00 Diproduksi dengan mesin
37 Kanstin 60x10x20 Bh 10,500.00
38 Keramik 20/25 cm Warna/Polos KW 1 sek. "Mulia" M2 61,000.00
39 Keramik 20/25 cm Warna/Corak KW 1 sek. "Mulia" M2 65,000.00
40 Keramik KW 1 Warna/Polos (20/20) sek. "Mulia" M2 59,000.00
41 Keramik KW 1 Warna/Corak (20/20) sek. "Mulia" M2 63,000.00
42 Keramik KW 1 Warna/Corak (30/30) sek. "Mulia" M2 55,000.00
43 Keramik KW 1 Warna/Corak (40/40) sek. "Mulia" M2 66,000.00
44 Keramik KW 1 Warna/Corak (33/33) Roman Gress M2 77,000.00
45 Semen PC (50 Kg) Zak 60,000.00
46 Semen Putih (40 Kg) Zak 132,000.00
47 Semen Warna (40 Kg) Kg 3,000.00
48 Gravel U 20 cm M' 44,000.00
49 Gravel U 30 cm M' 48,000.00
50 Gravel U 40 cm M' 52,000.00
Besi 6 btng 40,000.00
Besi 8 btng 55,000.00
Besi 10 btng 70,000.00
Besi 12 btng 95,000.00

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

51 Besi Beton Uk. Rata-rata Kg 12,500.00

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

Halaman 03
1 2 3 4 5
52 Flat Besi 2 s/d 5 mm Kg 16,000.00
53 Kawat Beton Kg 20,000.00
Wiremesh 6 (210 x 540) lbr 530,000.00
Wiremesh 8 lbr 717,000.00
Wiremesh 10 lbr 1,049,000.00
54 Wire Mesh/Kawat Baja dilas Kg 14,000.00
55 Besi Profil DN SII Kg 14,000.00
56 Besi IWF Ex. DN SII Kg 14,000.00
57 Besi Kabel/Sling 1 1/4" M' 197,000.00
58 Besi Kabel/Sling 1" M' 167,000.00
59 Besi Kabel/Sling 7/8" M' 118,000.00
60 Besi Kabel/Sling 5/8" M' 78,000.00
61 Besi Kabel/Sling 3/4" M' 39,000.00
62 Besi Kabel/Sling 1/2" M' 25,000.00
63 Besi Kabel/Sling 3/8" M' 21,000.00
64 Klem Besi 3 mm bh 306,000.00
65 Waltermur 1 1/2" bh 4,495,000.00
66 Waltermur 1 1/4" bh 2,278,000.00
67 Waltermur 1" bh 1,883,000.00
68 Waltermur 7/8" bh 1,002,000.00
69 Waltermur 5/8" bh 546,000.00
70 Waltermur 3/4" bh 78,000.00
71 Waltermur 1/2" bh 63,000.00
72 Waltermur 3/8" bh 54,000.00
73 Causen 1 1/4" bh 476,000.00
74 Causen 1" bh 320,000.00
75 Causen 7/8" bh 224,000.00
76 Causen 5/8" bh 133,000.00
77 Causen 3/4" bh 42,000.00
78 Causen 1/2" bh 27,000.00
79 Causen 3/8" bh 18,000.00
80 Klem Kabel 1 1/4" bh 306,000.00
81 Klem Kabel 1" bh 238,000.00
82 Klem Kabel 7/8" bh 127,000.00
83 Klem Kabel 5/8" bh 97,000.00
84 Klem Kabel 3/4" bh 67,000.00
85 Klem Kabel 1/2" bh 21,000.00
86 Klem Kabel 3/8" bh 18,000.00
87 Besi Siku L Kg 12,000.00
88 Besi Plat 0,5 mm Kg 11,000.00
89 Kawat Las Listrik Kg 41,000.00
Bronjong (0,5 x 1) bh 176,000.00
90 Bronjong Kawat 4 mm Kg 42,000.00
91 Kayu Albasia M3 1,500,000.00
92 Kayu Stoot 5 s/d 7 Btg 15,000.00
93 Kayu Stoot 7 s/d 10 Btg 23,000.00
94 Kayu Papan Terentang (Kls.III) M3 1,500,000.00
95 Kayu Awet Kls. I M3 4,639,000.00
96 Kayu Awet Kls. II M3 4,374,000.00
97 Kayu Kaso 5/7 kayu Awet Kls. I M3 3,810,000.00
98 Kayu Kaso 5/7 kayu Awet Kls. II M3 3,446,000.00
99 Kayu 5/10 kayu Kls. I M3 3,589,000.00
100 Kayu 5/10 kayu Kls. II M3 2,816,000.00
101 Multiplek tebal 9 mm Lbr 165,000.00
102 Dolken kayu galam, ø(8-10)cm, panjang 4 m Batang 64,000.00
103 Bambu Ø 6 - 8 / 600 cm Batang 30,000.00
104 Ijuk Kg 8,000.00
105 Paku 1 - 3 cm Kg 27,000.00
106 Paku 4 - 7 cm Kg 20,000.00
107 Paku 8 - 12 cm Kg 16,000.00
108 Cat Untuk Kanstin/Keb Beton , Cat sekualitas ICI Eksterior Kg 57,500.00
109 Cat Tembok sekualitas SANLEX Kg 22,000.00
110 Cat Tembok sekualitas Vinilex Kg 27,000.00
111 Cat Kayu Avian Kg 55,000.00

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

112 Minyak Cat Terpentin Ltr 7,000.00


113 Minyak tanah Ltr 22,000.00
114 Solar Ltr 6,000.00
115 Pelumas Mesin Ltr 28,000.00
116 Pelumas Bekisting Ltr 3,000.00
117 Kwas 3 " Bh 12,000.00
118 Plamir Tembok Kg 17,000.00
119 Rol Cat Tembok Buah 29,000.00
120 Ampelas Lembar 5,000.00
121 Meni Kayu/ Besi Kg 20,000.00
Pipa PVC 1/2 " lt
Pipa PVC 3/4 " lt
Pipa PVC 1,5 " lt
Pipa PVC 2 " lt
Pipa PVC 3 " lt
122 Pipa PVC 4 " lt 18,000.00
Pipa PVC 6 " lt
Pipa PVC 8 " lt
GRC lbr 66,000.00
Baja Ringan + Penutup m2 220,000.00

123 Asphalt (ESO) 1 Drum 150 kg Kg 17,000.00


124 Hotmix (HRS-WC) Ton 1,279,976.32
125 Hotmix (AC-BC) Ton 1,157,608.53
126 Hotmix (AC-WC) Ton 1,211,232.92

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

Halaman 04
1 2 3 4 5
127 Lempengan besi baja profil desain galvanis (Beam) Btg 1,029,000.00
128 Tiang penyangga besi st.32 galvanis (post) 1800x320x6 Btg 634,000.00
129 Besi pengikat baja profil desain (blocking) Bh 99,000.00
130 Mur baut beam 12 x 25 mm Bh 7,000.00
131 Mur baut blocking 16 x 30 mm Bh 9,000.00
132 Mur baut post 16 x 48 mm Bh 9,000.00
133 Besi angkur 30 x 30 x 3 mm m 36,000.00
134 Terminal end (sleeve Beam) Bh 407,000.00

0 -
0 -
0

0 -
0 -

file:///conversion/tmp/activity_task_scratch/597276509.xls
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan

DAFTAR HARGA SEWA ALAT


TAHUN ANGGARAN 2022
KABUPATEN GARUT

Halaman 04
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5

1 Asphalt Sprayer Jam 55,000.00


2 Air Compresor Jam 63,000.00
3 Dump Truck Jam 118,000.00
4 Concrete Mixer 0,125 m3 Jam 32,000.00
5 Concrete Vibrator Jam 23,000.00
6 Three Wheel Roller / stoom wall Jam 83,000.00
7 Aspal Finisher Jam 149,000.00
8 Pneumatic tyre Roller Jam 116,000.00
9 Tandem Roller Jam 118,000.00
10 Water Tank Truck Jam 192,000.00
11 Stemper 4 hp / alat pemadat Jam 22,000.00
12 Takel Jam 33,000.00
13 Welding set Jam 19,000.00
14 Genset Jam 32,000.00
15 Bor Tangan Jam 17,000.00
16 Bor Duduk Jam 31,000.00
17 Grinder Jam 21,000.00

0 -
0 -
0

0 -
0 -

file:///conversion/tmp/activity_task_scratch/597276509.xls
PERHITUNGAN KEBUTUHAN DAN BIAYA
TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
(per Item Pekerjaan)

Propinsi : Jawa Barat


Kabupaten : Garut Lokasi Kegiatan : Kp. Sindangsari
Kecamatan : Bayongbong Jenis Kegiatan : Jalan Usaha Tani
Desa : Pamalayan Volume : 425 meter

No Koefisien Uraian Volume Satuan Harga Satuan Jumlah Harga

I Konstruksi
1 PEKERJAAN PERSIAPAN
PEKERJAAN PEMBERSIHAN DAN PERATAAN 285.600 m2 ###
0.100 Pekerja 28.560 80,000 2,284,800
Jumlah 1 2,284,800
2 PEKERJAAN RABAT JALAN
Pekerjaan Beton K 225 42.500 m3
7.420 Semen PC (50 Kg) 315.350 m3 60,000 18,921,000
0.499 Pasir Beton 21.208 m3 250,000 5,301,875
0.776 Split 2/3 32.980 m3 250,000 8,245,000
8.833 Plastik Cor 375.417 m2 4,000 1,501,667
1.650 Pekerja 70.125 hok 80,000 5,610,000
0.275 Tukang 11.688 hok 100,000 1,168,750
40,748,292
Pekerjaan Bekisting 7.083 m2
0.040 Papan Albasiyah 0.283 m3 1,500,000 425,000
0.200 Paku 1.417 kg 20,000 28,333
0.107 Pekerja 0.756 hok 80,000 60,444
0.240 Tukang 1.700 hok 100,000 170,000
683,778
Jumlah 2 41,432,069
Upah Langsir 96.000 hok 50,000 4,800,000
Jumlah Total I 48,516,869
II Alat
1.000 Peralatan Konstruksi 1.000 ls 284,000 284,000
JUMLAH TOTAL II 284,000
III Administrasi 1.000
1.000 Papan Proyek 1.000 ls 250,000 250,000
1.000 Prasasti 1.000 ls 450,000 450,000
1.000 Pelaporan 1.000 ls 500,000 500,000
Jumlah Total III 1,200,000
Jumlah Biaya Kontruksi 48,516,869
Jumlah Biaya Alat 284,000
Jumlah Biaya Administrasi 1,200,000
Jumlah Total 50,000,869
Dibulatkan 50,000,000

Garut, ………………….. 2021


Tim Pelaksana Kegiatan
Ketua
###
###

( …………………….. )
PERHITUNGAN VOLUME PEKERJAAN
DESA MEKARSARI KECAMATAN BAYONGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2022

Desa : Pamalayan Lokasi Kegiatan : Kp. Sindangsari


Kecamatan : Bayongbong
Kabupaten : Garut Jenis Kegiatan : Jalan Usaha Tani
Provinsi : Jawa Barat Volume : 425 meter

NO SKETSA URAIAN VOLUME TOTAL

1 2 3 4
1 PEKERJAAN PERSIAPAN
PEKERJAAN PEMBERSIHAN DAN PERATAAN JALAN PEKERJAAN LEVELLING BADAN JALAN
1. PERATAAN BADAN JALAN
Dimensi
P = 425 m
L = 1.20 m
T = 0.56 m
TOTAL VOLUME = 285.6 m3 285.6 m2
0
2 PEKERJAAN RABAT JALAN

PEKERJAAN RABAT BETON PEKERJAAN BETON K 225


PANJANG = 425.00 m' Dimensi
LEBAR = 1.00 m' P = 425.00 m
TINGGI = 0.1 m' L = 1.00 m
SENGKANG = m' T = 0.10 m
= 42.50

TOTAL VOLUME = 42.50 m3 42.50 m3

PEKERJAAN BEKISTING
Dimensi = 21.25 m2

TOTAL VOLUME = 21.25 m2 7.08 m2

Garut, ………………….. 2021


Tim Pelaksana Kegiatan
Ketua

( …………………….. )
REKAPITULASI KEBUTUHAN VOLUME TENAGA KERJA/BAHAN/ALAT/ADMINISTRASI

Kabupaten : Garut Jenis Kegiatan : Jalan Usaha Tani


Kecamatan : Bayongbong Volume (PxLxT) : 425 meter
Desa : Pamalayan Lokasi : Kp. Sindangsari

JUMLAH/VOLUME
NO URAIAN Satuan
KEBUTUHAN

(1) (2) (3) (4)

A TENAGA KERJA :

1 Pekerja hok 99.441

2 Tukang hok 13.388

3 Upah Langsir hok 96.000

B BAHAN/MATERIAL : -

1 Semen PC (50 Kg) sak 315.350

2 Pasir Beton m3 21.208

3 Split 2/3 m3 32.980

4 Plastik Cor m2 375.417

5 Papan Albasiyah m3 0.283

6 Paku kg 1.417

C ALAT -

1 Peralatan Konstruksi ls 1.000

D ADMINISTRASI -

1 Papan Proyek ls 1.000

2 Prasasti ls 1.000

3 Pelaporan ls 1.000

Garut, ………………….. 2021


Tim Pelaksana Kegiatan
Ketua

( …………………….. )
RENCANA ANGGARAN BIAYA

Propinsi : Jawa Barat


Kabupaten : Garut Jenis Kegiatan : Jalan Usaha Tani
Kecamatan : Bayongbong Volume : 425 meter
Desa : Pamalayan Lokasi : Kp. Sindangsari

Jumlah Harga
NO Komponen Satuan Volume Harga Satuan

A. TENAGA KERJA
1 Pekerja hok 99.44 80,000 7,955,244
2 Tukang hok 13.39 100,000 1,338,750
3 Upah Langsir hok 96.00 50,000 4,800,000
JUMLAH 14,093,994
B. BAHAN BANGUNAN
1 Semen PC (50 Kg) sak 315.35 60,000 18,921,000
2 Pasir Beton m3 21.21 250,000 5,301,875
3 Split 2/3 m3 32.98 250,000 8,245,000
4 Plastik Cor m2 375.42 4,000 1,501,667
5 Papan Albasiyah m3 0.28 1,500,000 425,000
6 Paku kg 1.42 20,000 28,333
JUMLAH 34,422,875
C ALAT
1 Peralatan Konstruksi ls 1.00 284,000 284,000
JUMLAH 284,000
D ADMINISTRASI
1 Papan Proyek ls 1.00 250,000 250,000
2 Prasasti ls 1.00 450,000 450,000
3 Pelaporan ls 1.00 500,000 500,000
JUMLAH 1,200,000
JUMLAH (A s/d D) 50,000,869
DIBULATKAN 50,000,000

Garut, ………………….. 2021


Disetujui/Mengesahkan Tim Pelaksana Kegiatan
Kepala Desa Pamalayan Ketua

( …………………….. ) ( …………………….. )
REALISASI ANGGARAN BIAYA

Propinsi : Jawa Barat


Kabupaten : Garut Jenis Kegiat : Jalan Usaha Tani
Kecamatan : Bayongbong Volume : 425 meter
Desa : Pamalayan Lokasi : Kp. Sindangsari

NO Komponen Satuan Volume Harga Satuan Jumlah Harga

A. TENAGA KERJA

1 Pekerja hok #REF! 80,000 #REF!

2 Upah Langsir hok #REF! 50,000 #REF!

3 ### #REF! #REF! #REF! #REF!

4 ### #REF! #REF! #REF! #REF!

JUMLAH #REF!

B. BAHAN BANGUNAN

1 0 m3 #REF! #REF! #REF!

2 ### #REF! #REF! #REF! #REF!

3 Semen PC (50 Kg) sak #REF! 60,000 #REF!

4 ### #REF! #REF! #REF! #REF!

5 ### #REF! #REF! #REF! #REF!

6 ### #REF! #REF! #REF! #REF!

7 ### #REF! #REF! #REF! #REF!

JUMLAH #REF!

C ALAT

1 Peralatan Konstruksi ls #REF! 284,000 #REF!

2 ### #REF! #REF! #REF! #REF!

3 ### #REF! #REF! #REF! #REF!

4 ### #REF! #REF! #REF! #REF!

5 ### #REF! #REF! #REF! #REF!

JUMLAH #REF!

D ADMINISTRASI

1 Papan Proyek ls #REF! 250,000 #REF!

2 Prasasti ls #REF! 450,000 #REF!

3 Pelaporan ls #REF! 500,000 #REF!

4 ### ls #REF! #REF! #REF!

JUMLAH #REF!

E JUMLAH (A s/d D) #REF!

DIBULATKAN #REF!