No : 22400/Q/TPM/ART/XII/22/R5

Rencana Anggaran Biaya


PROYEK SEKOLAH BUNDA MULIA
FINISHING AUDITORIUM
SBM CITRA GARDEN
DESKRIPSI
NO VOL SAT
ITEM

PEKERJAAN PERSIAPAN, PRASARANA DAN PENUNJANG


1 Pekerjaan persiapan,prasarana dan penunjang 1.00 ls 11.767%
2 Perancah bambu 540.00 m2 17.963%

PEKERJAAN PANGGUNG
1 Balok Beton 250 x 700
Pembesian 10D13 1,283.72 kg 2.893%
Pembesian Ø10-150 752.46 kg 1.696%
Bekisting 83.16 m2 3.056%
Cor Side Mix 10.40 m3 1.900%
Pemasangan stek D13 108.00 titik 0.259%
2 Plat beton tb 10 cm
Pembesian Ø10-150 1,248.20 kg 2.813%
Bekisting Floor Deck tb 0.75mm 140.58 m2 6.144%
Cor Side Mix 10 cm 14.06 m3 2.569%
Finishing Aci lantai 140.58 m2 0.953%
Tangga beton + perapihan 2.00 unit 0.667%
Tangga Besi untuk panggung + plat 3mm 2.00 unit 1.168%
3 Finishing Lantai depan panggung
Screeding lantai 5-7 cm 81.15 m2 0.801%
Finishing Aci lantai 81.15 m2 0.605%
Underlayer Carpet 81.15 m2
Finishing Carpet 81.15 m2
Plester dinding
4 Plester dinding As 15' 213.47 m² 2.106%
acian dinding 213.47 m²
5 Plester Dinding As 7 197.29 m² 1.947%
acian dinding 197.29 m² 1.470%
6 Plester dinding As A 256.65 m² 2.532%
acian dinding 256.65 m²
7 Plester dinding As D 259.42 m² 2.560%
acian dinding 259.42 m²
8 Dinding Panggung
Rangka Bahan CNP 75.35.15.1,6mm per jarak rangka 60 226.50 m²
Multiplek 6mm Finish HPL ex.Taco 226.50 m²
Dinding Gypsum 9mm (sisi koridor) 226.50 m²
Pengecatan dinding 226.50 m²
9 Dinding Bawah tribun dan samping ramp
Bongkar dinding Hebel eksisting 73.50 m² 0.380%
Pengarungan dan pembuangan puing bongkaran 8.82 m3 0.233%
Dinding Hebel 129.50 m² 3.607%
Plester dinding 259.00 m² 2.130%
Aci dinding 129.50 m² 0.742%
Jasa Pemasangan Marmer dinding (marmer SBO) 129.50 m²
Resin nat dan poles 129.50 m²
Plafond Gypsum 9mm di koridor bawah tribun 45.00 m²
Pengecatan dinding 5.40 m²
Pengecatan Plafond 45.00 m²
Pintu Kamuflase double (enginering + soundproof), include aksesoris ex.Dekson 3.00 unit
Pintu Kamuflase Single (enginering + soundproof), include aksesoris ex.Dekson 2.00 unit
Pintu lipat folding 1.00 unit
10 Dinding Akustik
Rangka Bahan Hollow Galvanize 0,7mm 40x40 per jarak rangka 60x60 421.02 m²
Material Akustik Perforated 421.02 m²
Jasa Pemasangan Akustik Dinding 421.02 m²
11 Plafond
Rangka Plafond Bahan Hollow Galvanize 0,7mm 40x40, include gantungan rod 680.32 m²
Gypsum 12 mm, include pemasangan 680.32 m²
Cat Plafond Gypsum 680.32 m²
12 Ruang Audio Control
Bobokan dinding 120 cm x 60 cm 1.20 m2 0.006%
Pengarungan dan pembuangan puing bongkaran 1.00 ls 0.026%
Balok Praktis keliling 3.60 m' 0.137%
Perapihan acian 3.60 m' 0.027%
Jendela Alumunium 1.00 ls
13 WalkWay
UNP 100.50.5 2,031.00 kg
CNP 100.50.20.2,3 2,214.00 kg
Baseplat 12 mm 130.00 kg
Dynabolt M12 180.00 pcs
Siku 40.40.4 516.00 kg
Railing Pipa 1" 2,6mm 2,069.00 kg
Gantungan Besi Beton 16 mm 574.00 kg
Cat Zincromate 7,534.00 kg
Cat Finish ex.Ftalit 7,534.00 kg
Expanded Metal GM30080 128.00 m2
14 Grouting Perbatasan Atap dan dinding
Grout Sudut keliling atap dan dinding 102.00 m' 2.557%
15 Ruang Kostum dan Ruang Pemanasan
Jasa Pemasangan Keramik HT 60x60 (Keramik SBO) 182.22 m2 3.603%
Gypsum polos 9mm Ex. Yoshino atau Jayaboard 182.22 m2 3.393%
Cat Plafond Gypsum 182.22 m2 0.954%
16 Toilet Ruang Kostum
Dinding Bata Ringan 66.50 m2 1.852%
Plester 133.00 m2 1.094%
Aci 133.00 m2 0.763%
Waterproofing toilet 10.00 m2 0.266%
Grouting 4" 2.00 m2 0.077%
Grouting 3" 5.00 m2 0.159%
Jasa Pemasangan Keramik dinding (Keramik SBO) 5.00 m2 0.099%
Tali air diatas keramik 6.00 m' 0.022%
17 Ruang Tunggu
Jasa Pemasangan Keramik HT 80x80 (Keramik SBO) 195.31 m2 4.383%
Gypsum polos 9mm Ex. Yoshino atau Jayaboard 195.31 m2
Cat Plafond Gypsum 195.31 m2
18 Ruang Operator
Partisi gypsum rangka metal stud 14.00 m2 0.422%
Insulasi dinding rockwool 14.00 m2 0.164%
Jasa Pemasangan Keramik HT 80x80 (Keramik SBO) 5.76 m2 0.129%
Pintu dan kusen 1.00 unit
19 Railing Ruang Rahasia
Railing Kawat Ram 3mm rangka siku 40x40 + plat strip tinggi 1,2m 32.04 m2 2.512%
Finish cat zincromate siku nya

Sub-Total

Jasa Kontraktor

Total Setelah Jasa Kontraktor

Total Pembulatan

* Penawaran berlaku 2 bulan sejak penawaran ini dibuat


* Harga merupakan harga satuan, rubah, tambah/kurang diluar BQ akan diperhitungkan sebagai adendum
Jakarta, 5 Februari 2023
Hormat Kami,

Teddy Gunawan
HARGA
TOTAL
SATUAN

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
By SBM By SBM
By SBM By SBM
-
-
HOLD HOLD
-
-
-
HOLD HOLD
-
HOLD HOLD

HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD

-
-
-
-
-
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
By SBM By SBM

HOLD HOLD
By SBM By SBM
By SBM By SBM
-
HOLD HOLD
HOLD HOLD
HOLD HOLD
-
-
-
-
-
By SBM By SBM
-
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
HOLD HOLD
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HOLD HOLD
HOLD HOLD
-
-
-
-
By SBM By SBM
-
-