Anda di halaman 1dari 12

TALIY SHHET PENGUKURAN THEODOLIT

LOKASI :

TITIK : X
AWAL (GPS) Y

BACAAN SUDUT BACAAN RAMBU


TITIK TARGET HORIZONTAL VERTIKAL BA BT
DERAJAT MENIT DETIK DERAJAT MENIT DETIK
ACAAN RAMBU
BB TINGGI ALAT (M)
TALIY SHHET PENGUKURAN THEODOLIT

LOKASI :

TITIK AWAL : X
Y
KOORDINAT GPS :

AZIMUT AWAL :

BACAAN SUDUT BACAAN RAMBU


TITIK TARGET HORIZONTAL VERTIKAL BA
DERAJAT MENIT DETIK DERAJAT MENIT DETIK
BACAAN RAMBU
TINGGI ALAT JARAK OPSI BEDA TINGGI TINGGI TITIK SUDUT DALAM
BT BB (M) (M) (M) (MDPL)
DERAJAT MENIT
SUDUT DALAM SUDUT AZIMUTH DELTA X DELTA Y

DETIK DESIMAL DERAJAT MENIT DETIK DESIMAL D.SINT T KOREKSI D.COST T KOREKSI
PERINTAH CAD
KOORDINAT LUAS AREAL
(X.N)-(X-Y) SHORCUT SHROCUT TINGGI SUMBU X
ROTASI OFFSITE
X Y TITIK TEXT TEXT DAN Y
TEXT
PL
INPUT
TALIY SHHET PENGUKURAN THEODOLIT
LOKASI :
TINGGI TITIK 3 MDPL

TITIK AWAL : X 6 50 170 7


Y 99 0 679 99
KOORDINAT GPS : 287 3 21 287

AZIMUT AWAL :

BACAAN SUDUT
TITIK TARGET HORIZONTAL VERTIKAL
DERAJAT MENIT DETIK DERAJAT MENIT DETIK
P1 P2-P7 94 35 42 90 0 0
P2 P3-P1 172 11 27 90 0 0
P3 P4-P2 107 27 56 90 0 0
P4 P5-P3 153 5 51 90 0 0
P5 P6-P4 100 42 2 90 0 0
P6 P7-P5 180 10 40 90 0 0
P7 P1-P6 92 3 36 90 0 0
BACAAN RAMBU
TINGGI ALAT JARAK OPSI BEDA TINGGI TINGGI TITIK SUDUT DALAM
BA BT BB (M) (M) (M) (MDPL)
DERAJAT
1.89 1.75 1.61 1.64 28 0.110 3 94
1.88 1.63 1.50 1.65 38 -0.020 2.98 172
1.86 1.70 1.53 1.63 33 0.070 3.05 107
1.69 1.60 1.51 1.62 18 -0.020 3.03 153
1.70 1.54 1.37 1.58 33 -0.040 2.99 100
1.42 1.24 1.05 1.57 37 -0.330 2.66 180
1.94 1.70 1.46 1.63 48 0.070 2.73 92
SUDUT DALAM SUDUT AZIMUTH DELTA X DELTA Y

MENIT DETIK DESIMAL DERAJAT MENIT DETIK DESIMAL D.SINT T KOREKSI D.COST T
35 42 94.595 287 3 21 287.0558 -26.76854 -26.76854 8.212497
11 27 172.1908 294 9 2574 294.865 -34.47744 -34.47744 15.9783
27 56 107.4656 367 12 718 367.3994 4.249937 4.249937 32.72519
5 51 153.0975 394 13 307 394.3019 10.14397 10.14397 14.86943
42 2 100.7006 473 15 1265 473.6014 30.23965 30.23965 -13.21225
10 40 180.1778 473 15 625 473.4236 33.95086 33.95086 -14.70846
3 36 92.06 561 18 229 561.3636 -17.4857 -17.4857 -44.70179
-0.021037 -0.119585
PERINTAH CAD
DELTA Y KOORDINAT LUAS AREAL
(X.N)-(X-Y) SHORCUT SHROCUT TINGGI
ROTASI OFFSITE
KOREKSI X Y TITIK TEXT TEXT
8.212497 7 99 3530 po -text m 5 0 6
15.9783 -28 115 -1393 po -text m
32.72519 -23 148 -1847 po -text m
14.86943 -13 163 -4747 po -text m
-13.21225 17 150 -5328 po -text m
-14.70846 51 135 79 po -text m
-44.70179 34 90 2703 po -text m
-3502.100
PERINTAH CAD
TEXT
SUMBU X DAN Y PL
INPUT
po6.8805555555555699.1886111111111 -text m12 6.8805555555555699.1886111111111
po-27.5968840094093115.166913932256 -text m-2 -27.5968840094093115.166913932256
po-23.3469466345423147.892103500992 -text m-2 -23.3469466345423147.892103500992
po-13.2029731247759162.761528554879 -text m-1 -13.2029731247759162.761528554879
po17.0366766856578149.549277446822 -text m17 17.0366766856578149.549277446822
po50.9875394839789134.840813378485 -text m50 50.9875394839789134.840813378485
po33.501840681106690.1390199315184 -text m33 33.501840681106690.1390199315184
close

Anda mungkin juga menyukai