Permit Grounding Kabel Yisu OK Tinggal Pasang Logo
Permit Grounding Kabel Yisu OK Tinggal Pasang Logo
□ KERJA MALAM
JENIS PEKERJAAN
□ PENGANGKATAN
LOKASI PEKERJAAN
MASA BERLAKU MULAI :
□ DRILLING MACHINE
□ FORK LIFT
PERALATAN YANG DIGUNAKAN
□ TOWER CRANE
□ MOBILE CRANE
JUMLAH PEKERJA
□ TEKANAN GAS/CAIRAN
□ LEDAKAN
IDENTIFIKASI BAHAYA □ KEBAKARAN
□ CUACA
□ SLIP,TRIP DAN FALL
□ JOB SAFETY ANALYSIS
□ INSPECTION TEST BY THIRD PARTY (PJTI)
□ TRAFFIC MANAGEMENT PLAN(TMP)
□ PEMADAM API
□ HOUSEKEEPING
PERSYARATAAN
□ GROUNDING
□ EAR FLUG/EAR MUFF
□ SARUNG TANGAN(HAND GLOVES)
□ FULL BODY HARNESS+LANYARD
□ OIL TRAP/ OIL SPILL COMBAT
CATATAN
Pemohon ijin,
PEMOHON IJIN
Pelaksana
Dietujui oleh,
IJIN DISETUJUI
IJIN DIBATALKAN
HSE- WORK PERMIT
SELESAI :
HSE Subcontractor/Contractor
Mengetahui,