12 operasi, Hari
5252.BHB Operasi Bidang Keamanan [Base Line] 212,317,000 212,317,000 KD
Operasi
Lokasi : KOTA JAKARTA TIMUR
Operasi Penanganan Gangguan Keamanan Dan Ketertiban Di
5252.BHB.001 12.0 operasi 212,317,000 212,317,000
Wilayah
JUMLAH KOMPONEN UTAMA 212,317,000 212,317,000
PLN 0
Kepala Kantor Wilayah
RMP 0
PNP 0
BLU 0
HIBAH 0